Sunteți pe pagina 1din 10

NOSS RUJUKAN BAGI PROGRAM PRA DIPLOMA KOLEJ VOKASIONAL TAHUN 2014

KURSUS : TEKNOLOGI PEMBINAAN


KOD
MODUL

NAMA MODUL
TEKNOLOGI
PEMBINAAN KV

KOMPETENSI
TEKNOLOGI
PEMBINAAN

KOD NOSS
RUJUKAN

DUTY YANG
DIRUJUK

TASK
NO

TASK YANG DIRUJUK

1. Identify the fundamentals

The
fundamental of
building trade
in construction
industry

of building trade in
construction industry.

SEMESTER 1

WTP
101

2. recognize the category of


building trade in
INTRODUCTION TO
construction industry.

The category
of building
trade in
construction
industry

CONSTRUCTION
TECHNOLOGY

3. Comply with building


regulation and by laws.

Building
Regulation ByLaw

4. establish building
construction teams in
construction industry.

Building
Construction
Team in Con
Industry
Comply with
OSH Practices

1. Comply with OSH


Practices
2. Use Safe Attires and
Gears for Various Jobs

WTP
102

WTP
103

SAFETY
PRACTICES IN
CONSTRUCTION
INDUSTRY

CONSTRUCTION
TOOLS AND
EQUIPMENTS

ELEMEN
VOKASIONAL
YANG DITAMBAH

3. Comply with tools and


equipment safety rules
4. adhere to site safety
equipment
5. Demonstrate the use of fire
fighting equipment
6. Apply Emergency first aid
techniques
1. carry out hand and
machine tools
application and
maintenance
2. carry out power tools
application and
maintenance
3.carry out equipment/plants
application and
maintenance

B-0101/2/3

PRACTICE
SAFETY
PRECAUTION

01.01

Use safety attires &


gears while performing
various job

01.02

Comply with tools &


equipment safety rules

01.03
01.04
01.05

02.01

B-0101/2/3

USE TOOLS AND


EQUIPMENT

02.02

02.03

Adhere to site safety


equipment
Demonstrate the use of
fire fighting equipment
Apply emergency first
aid techniques
Identify & use hand
tools & machine tools
Identify & use power
tools
Identify & use
equipment/ plant

DUTY/TAS
K YANG
DIGUGUR
KAN

JUSTIFIKASI /
CATATAN

Asas
pengenalan
kepada
kursus
Teknologi
Pembinaan
Asas
pengenalan
kepada
kursus
Teknologi
Pembinaan

Tambah nilai

4. comply with construction


safety in handling tools
and equipment/plant

comply with
construction
safety in
handling tools
and
equipment/
plant

1. carry out basic technical


drawing
2. identify types of drawings
in
building construction

WTP
104

TECHNICAL AND
BUILDING
DRAWING

WTP
105

FOUNDATION
WORK

3. produce various symbols


in
technical drawings and
building plan
4. produce building plan for
single stor building

REINFORCEMENT
AND CONCRETE
WORKS I

B-0101/2/3

READ AND
UNDERSTAND
TECHNICAL AND
DRAWING

03.02

Interpret building plans

06.01

Perform piling works

2. setting out and


excavating trenches for
shallow trench
3. carry out pest
control services
4. construct timbering
andshoring

06.02

Excavate trenches

06.03

Provide pest control


services
Construct timbering &
shoring

1 prepare material for


required reinforcement
2. place reinforcement in
position for up to two
storey buildings
3. install necessary
outlet traps

B-0101/2/3

PREPARE
FOUNDATION

06.04

06.06

Pour & screed lean


concrete on the
trenches bed
Perform pile cap works

07.02

Erect formwork for set


up STUMP

06.05

PREPARE
FORMWORK

08.01
FABRICATE
REINFORCEMENT
ACCORDING TO
SPECIFICATIONS
PERFORM
CONCRETE
WORKS
ACCORDING TO

08.02

09.07

identify types
of drawings in
building
construction

Tambah nilai

produce
building plan
for single stor
building

Tambah nilai

Identify various
symbols in technical
drawing & building plan

03.03

7.construct stump

WTP 106

Draw basic technical


drawing

5. interpret single
storey building plan
1.carry out piling work

5. pour and screed lean


concrete on the trench
beds
6.perform pile cap work

Tambah nilai

Identify types of
materials & prepare for
required reinforcement
Fabricate & place
reinforcement up to
two storey building
Install outlet traps

SPECIFICATIONS
4. make spacer blocks
FABRICATE
REINFORCEMENT
ACCORDING TO
SPECIFICATIONS

5.install spacers

08.03

Make spacer blocks

08.04

Install necessary
spacers

6. identify materials for


concrete mixtures

Identify materials for


concrete mixtures

7. batch concrete by
proportions

PERFORM
CONCRETE
WORKS
ACCORDING TO
SPECIFICATIONS

8. place and compact


concrete
9. perform curing
concrete

B-0101/2/3

Mix concrete according


to proportions
09.03

Place & compact


concrete

09.04

Perform curing
concrete

NAMA MODUL
TEKNOLOGI
PEMBINAAN KV

\SEMESTER 2

KOD
MODUL

KOMPETENSI TEKNOLOGI
PEMBINAAN KV

KOD
NOSS
RUJUKAN

DUTY YANG
DIRUJUK
LAY BRICKS
ACCORDING TO
SPECIFICATIONS
REQUIRED

1. select frames and fix


fasteners on frames

TASK
NO

12.11

Install necessary
fasteners needed

11.01

Select frames & fix


fasteners on frames

INSTALL FRAMES
WTP201

WTP202

DOOR AND
WINDOW FRAMES
INSTALLATION

BRICKWORKS

2. fix frames on the wall

11.02
B-0101/2/3

4. erect formwork for lintel

LAY BRICKS
ACCORDING TO
SPECIFICATIONS
REQUIRED
PREPARE
FORMWORK

5. place lintel over frames

INSTALL FRAMES

3. construct door and window


opening on brick wall

1. select materials

Construct door &


window opening on
brick wall

07.03

Erect & dismantle


formwork for lintel

11.03

Erect lintel over frames

B-0101/2/3

DUTY/TA
SK
YANG
DIGUGU
RKAN

JUSTIFIKASI /
CATATAN

Prepare & fix frames

12.04

Identify & select materials

2. prepare mortar
12.02
3. construct stretcher,
english and flemish
bond wall in
various forms with
pointing and jointing
4. construct rough
and axe
arches

TASK YANG DIRUJUK

ELEMEN
VOKASIONAL
YANG
DITAMBAH

12.03
LAY BRICKS
ACCORDING TO
SPECIFICATIONS
REQUIRED

12.05

Prepare mortar according


to proportions
Construct stretcher,
English & Flemish bond
wall in various forms with
pointing & jointing
Construct rough arches

Construct axe arches


Dismantle formwork
accordingly

6. dismantle formwork

Erect formwork for arches


PREPARE
FORMWORK
9. construct isolated piers
10. construct attached piers

07.09
12.07

Erect formwork for arches


Construct isolated piers
construct
attached

Tambah nilai

piers
11. erect coping and capping
on brickwork

12.14

12. construct pavior

LAY BRICKS
ACCORDING TO
SPECIFICATIONS
REQUIRED

13. construct block and slab


pavior

12.12

Construct block & slab


pavior

14. construct hollow block


walls

12.17

Construct hollow block


walls

15. lay off damp proof


course in brickwork

12.19

Lay off damp proof course


in brickwork
Identify & select materials

2. prepare mortar by propotion

WTP 203

perform plain vertical


surface for finishing
works.
perform plastering
work on plain vertical
surfaces with finishers

PLASTERING
WORKS

B-0101/2/3

PERFORM
PLASTERING
AND RENDERING
WORKS

5. prepare curve
vertical surfaces for
plastering
7.

Construct pavior.

12.13

1. select materials for finishing


works.

3.

Erect coping & capping on


brickwork

16.02

Prepare mortar according


to required proportion

16.03

Prepare plain vertical


surface

16.04

Perform plastering on plain


vertical surfaces with
finishers

16.05

6. perform plastering
work on curve vertical
surfaces with finishers.
7. perform rough- cast
finish on plastered
works.

16.06
16.07

select proper materials for


wall finishing

Perform plastering on
curve vertical surfaces
withfinishers
Perform rough cost finish
on plastered works
Identify & select materials

prepare vertical backing


surface
3. prepare adhesives
for tiling and mosaic fixing
perform tiles laying on walls.

Prepare curve vertical


surfaces for plastering

B-0101/2/3

WALL AND
FLOOR

17.02

Prepare vertical backing


surface

17.03

Prepare adhesive for tiling


& mosaic fixing
Set out & lay tiles on walls

WTP 204

perform rendering for backing


surface
6. perform tiles laying on floor.

FINISHING
WORKS I

17.05
17.06

perform mosaic laying on


floor.

17.07

Perform rendering & apply


for backing surface
Set out & lay tile on floor
Set out & lay mosaic floor

17.18

Identify, select &


prepare materials for
painting works

9. prepare background surfaces


suitable for painting works
10. perform water-based
painting works

17.19

perform oil-based painting


works

17.21

Prepare background
surfaces for painting works
Perform water based
painting works
Perform oil based painting

8. identify, select and prepare


materials for painting work

FINISHING

17.20

1. Determine materials
for internal
sanitation
WTP 205

SANITATION,
DRAINAGE AND
SEWERAGE
MATERIAL

2. Determine
materials for
drainage system

B-0101/2/3

INSTALL
DRAINAGE AND
SEWERAGE
SYSTEM

Ketiga-tiga
kompetensi
ini dirangka
dengan
merujuk task
18.01
18.01

Identify & select materials

19.01

Identify & select materials

SEMESTER 3

3. Determine
materials for
sewerage system
1. Select Materials for Fencing
Work
.2. Construct chain fences with
mild steel pipe for gate post
WTP 301

FENCING WORK

Set out & construct chain


fences with valid steel
pipe gate post

INSTALL FENCES
B-0101/2/3

3. Construct brickwork and


masonry for gate post

19.03

1. Apply Computer Aided


Drawing (CAD) in building
drawing

Set out & construct brick


work & masonry gate post

computer
aided
drawing
(cad) in
building
drawing
B-010-

READ AND

Tambah nilai

WTP 302

BUILDING
DRAWING

2. Produce basic drawing for


given tasks

1/2/3

UNDERSTAND
TECHNICAL AND
DRAWING

basic
drawing for
given tasks

3. Draw Detail Drawing for


given Task by Using CAD

Draw detail drawing for


given jobs

4. interpret Blue
Print/Plan for
Single Storey
Building

WTP 303

interpretion
of blue
print/plan for
single storey
building

5. Submit amendment
drawings for approval / asbuiltdrawing
1. Fabricate Formwork Parts to
Required Shape &and
Sizes

03.05

2. Erect formwork for ground


beam

07.04

Erect formwork for ground


beam

3. Erect formwork for columns

07.05

Erect formwork for column

4. Erect Formwork
for Upper Floor beams/
roof beams
5. Erect Formwork for floor
slabs

07.06

Erect formwork for upper


floor beam/ roof

Draw & submit amendment


drawings for approval
Identify materials &
fabricate formwork
members to required
shapes & sizes

B-0101/2/3

PREPARE
FORMWORK

FORMWORK AND 6. Erect formwork for staircase


CONCRETE WORK
II
7. Lay damp proof
course membrane

Tambah nilai

B-0101/2/3

8. Place Reinforcement in
Position up to Four Storey
Building

FABRICATE
REINFORCEMENT
ACCORDING TO
SPECIFICATIONS

9. perform concrete test

B-0101/2/3

PERFORM
CONCRETE
WORKS
ACCORDING TO
SPECIFICATIONS

10. dismantle formwork

B-0101/2/3

PREPARE
FORMWORK

Erect formwork for floor


slab
07.10

Erect formwork for


staircase (L3)

08.05

Lay damp proof course


membrane

08.06

Fabricate & place


reinforcement in position
up to 4- storey building
Perform concrete test

07.08

Dismantle formwork
accordingly.

Tambah nilai

WTP 304

BRICKWORKS AND
MASONRY 1

1. Select Masonry Materials

B-0101/2/3

2. Construct Curve Wall

B-0101/2/3

3. Construct Brick Step


4. Construct Hollow Block
Reinforcement Wall and
Columns
5. Construct Random Rubble
Walls

PERFORM
SUPERVISORY
FUNCTION
12.15
LAY BRICKS
ACCORDING TO
SPECIFICATIONS
REQUIRED

B-0101/2/3

PERFORM
SUPERVISORY
FUNCTION

SCAFFOLDING
SYSTEM

SEMESTER 4

WTP 305

Construct brick step

13.02
14.01

B-0101/2/3

ERECT
SCAFFOLDING
14.04

4. suspended scaffolding

14.03

1. Prepare Overhead Surfaces

for Plastering

WTP 401

PLASTERING
WORKS II

4. Carry out Plastering Works


on Non-Masonry
Structures and for Special
Purpose
FINISHING WORK II 1. Lay mosaic on wall
2. Lay pre-cast terrazzo

B-0101/2/3

PERFORM
PLASTERING AND
RENDERING
WORKS

16.09

Identify & select scaffolding

Prepare, erect & dismantle


dependent scaffolding
Prepare, erect & dismantle
suspended scaffolding
Prepare overhead
surfaces for
plastering
Prepare plastering for
overhead works with
finishers
Perform shanghai
finish on plastered
works

16.11

Perform plastering works


on non masonry structures
& special purpose

17.08

Set out & lay mosaic on


wall

17.09

Set out & lay pre cast


terrazzo

3. Carry out cast in-situ terrazzo

4. Carry out polishing and


grinding work on terrazzo.

Construct hollow block


reinforcement wall &
columns
Construct random rubble
walls

Prepare, erect &


dismantle independent
scaffolding

3. dependent scaffolding

2. Carry out plastering for


Overhead Works with
Finishers
3. Carry out Shanghai Finish on
Plastered Works

Construct curve wall

12.16
12.18

1. scaffolding identification
2. independent scaffolding

Identify & select masonry


materials

Set out & perform


cast in-site terrazzo
17.11

Perform grinding &


polishing work on

B-0101/2/3

WTP 402

WALL AND FLOOR


FINISHING

terrazzo

5. Lay Square marble

17.12

Set out & lay square


marble

6. Set out and Lay broken


marble
7. Carry out grinding and
polishing works on
marbles floor

17.13

Set out & lay broken


marble
Perform grinding &
polishing work on
marble floor

8. lay parquet/ Floor Board on


floor

Set out & lay parquet


on floor

9. Carry out grinding and


polishing work on
parquet /floor Board on
Floor

Perform grinding &


polishing work on
parquet floor

10. lay polyvinyl chloride tiles

17.17

Set out & lay polyvinyl


chloride tiles

1. Carry out installation of


sanitation system
WTP 403

SANITATION,
DRAINAGE AND
SEWERAGE
SYSTEM

Installation
of sanitation
system

2. excavate trenches for


sewerage system

Set the gradient &


excavate trenches
for sewerage
system
Prepare bed for
laying sewerage
drain pipe

3. prepare for lying sewerage


drain pipe
4. lay and joint pipes

18.04

5. construct manholes
6. construct domestic septic
tank and disposal system
7. Dig trenches for drainage

Lay & joint pipes


Set out &construct
manholes

B-0101/2/3

INSTALL
DRAINAGE AND
SEWERAGE
SYSTEM

18.06

Set out &construct septic


tank & disposal system

18.07

Set out the gradient & dig


trenches for drainage

8. lay and join drains

Lay & joint drains

9. lay and join culverts

Lay & joint culverts

10. Construct sump trap

18.10

Construct sump trap

Tambah nilai

1. Identify types of building


services
WTP 404

B-0101/2/3

BUILDING
MAINTENANCE 2. Repair minor defects
3. Repair major defects

B-0101/2/3

PERFORM
CONCRETE
WORKS
ACCORDING TO
SPECIFICATIONS

09.06

Identify types of building


services required

PERFORM
REPAIRING AND
EXTENSION
WORKS

20.01

Detect & repair minor


defects
Detect & repair major
structural defects

20.02

S-ar putea să vă placă și