MACHERLA MUNICIPALITY 2014-15

LEAD STATEMENT
Sl.No

Materials

Quarry

Unit

Lead in
K.M

Intial Cost

20mm HBG SS5 M.C

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

1300.00

12.5 mm HBG SS5 M.C (13.2/12.5MM)

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

1045.00

10mm HBG SS5 M.C

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

890.00

6mm HBG SS5 M.C

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

700.00

40mm HBG SS5 M.C

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

805.00

Coarse aggregate 9.5 - 4.75mm

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

545.00

Fine aggreagate (Sand) for plastering


work

DHARANI KOTA

1 Cum

125.60

505.00

Fine aggreagate (Sand) for Concrete


work

DHARANI KOTA

1 Cum

125.60

385.00

Sand for filling for concrete work

DHARANI KOTA

1 Cum

125.60

285.00

10

Cost of crushed stone dust

K.M. 2.5 of GNT - HYD Road

1 Cum

38.30

340.00

11

Gravel / Quarry Spall

At K.M 131.30 GNT - HYD

1 Cum

8.00

98.00

12

Cement

1.00 M.T

Local

4000.00

13

Reinforcement Steel HYSD (including


loading charges)

1.00 M.T

Local

46000.00

Certified that the leads are taken and corect to the best of my knowledge.

014-15

Deduct
Stacking

Basic Rate

Conveyance
Charges

Deduct
Contractor
Profit @ 14%

Total Cost

0.00

1300.00

470.00

57.72

1712.28

0.00

1045.00

470.00

57.72

1457.28

0.00

890.00

470.00

57.72

1302.28

0.00

700.00

470.00

57.72

1112.28

0.00

805.00

470.00

57.72

1217.28

0.00

545.00

470.00

57.72

957.28

0.00

505.00

1340

0.00

385.00

1340

0.00

285.00

1340

164.56

1460.44

0.00

340.00

470.00

57.72

752.28

0.00

98.00

116.00

14.25

199.75

4000.00

4000.00

46000.00

46000.00

to the best of my knowledge.

164.56
164.56

1680.44
1560.44

80

80

300

300

90

960
1340

412.28070175

1175.4385965

470

1340

412.28

1175.44

57.72

164.56

MACHERLA MUNICIPALITY
WATER SUPPLY IMPROVEMENT SCHEME UNDER JnNURM -II
construction of Coffer dam for intake well in Bugga Vagu Reservoir
DETAILED CUM ABSTRACT OF ESTIMATE
Sl. Descriptio
No. n of item
1

No.

No.

Formation of bund/approach ramp with Gravel/Quarry spall


from approved
quarry including
cost
and conveyance
of
all
Ring bund
1
128.74
6.50
3.50
For Approach
Ramp
1
150.00
8.00
3.50
(4.50+26.5)/2+
(4.5+10.5)/2=11.50
Disposal of surplus earth with a lead of 1km over
initial lead including ,transport,unloading etc
Approch
completeramp
Qty same as approch ramp
removal
for Copper dam
Qty same as ring bund
removal
100% Machinical means
Total

Quantity

Rate

unit

2928.84
4200.00
7128.84

#REF!

cum

4200.00
2928.84
7128.84

#REF!

cum
Rs

rvoir

Total

#REF!

#REF!
#REF!
#REF!
Lakhs

Macherla Municipality
#REF!
Name of Sub Project :- Construction 10.00 m dia clear water sump at Existing 7.00 MLD WTP Head
water Works
Detailed cum Abstract of Estimate
S. No.

Description

Nos.

Quantity

Rate

unit

#REF!

cum

#REF!

cum

#REF!

cum

Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304
MORTH for foundations upto 3.00m depth
Note : Classifications of Earth Work
Specification are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H--ordinary soil-- upto 3m depth
By manual
+151.20m

means

+155.00m-

1 0.786 12.00 12.00

3.80

430.10
440.00

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH for foundations
RBR-FNDN-2(1)
(+)151.20m-(+)151.50m

1 0.786 12.00 12.00

0.30

33.96
34.00

Plain cement concrete (1:4:8) using 40mm m/c SS5 HBG including
machine mixing, laying, compacting, finishing, curing etc for
foundations
(+)151.50m-(+)151.80m

1 0.786 12.00 12.00

0.30

33.96
34.00

Supply and placing of the design mix concrete corresponding to IS


-456 using WEIGH BATCHER/MIXER using 20 mm size graded
machine crushed hard granite metal (coarse agggregate) from
approved quarry including cost and conveyance of all materials
like cement,fine aggregate(sand),coarse aggregate ,water etc to
site and including seigniorage charges ,sales and other taxes on all
materials including all operational ,incidental and labour charges
such as weigh batching ,machine mixing ,laying concrete ,curing
etc complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS NO 402) with minimum
cement content as per IS Code from standard suppliers approved
by the deparment including pumping , centering,shuttering,laying
concrete ,vibrating,curing etc M30 design mix concrete with
concrete mixer

Raft (+)151.80m-(+)152.60m

1 0.786 11.60 11.60

0.80

84.61
85.00

For side walls circular 0.30m thick


initial height 3.00 m (+)152.60m- 1 3.14
(+)155.60m
For side walls circular 0.30m thick
additional height 1.00 over initial
height 3.00m

10.30

0.30

3.00

10.30

0.30

0.20

(+)155.60m-(+)155.80m
d

Columns0.30 x 0.30 ,3.20-0.30

0.30

0.30

2.90

Roof beams

1 3.14

4.00

0.30

0.30

Roof slab 0.15m thick


0.786x(10.60^2-3.70^2)

Roof dome slab 0.15m thick

1 0.786

3.70

0.15

3.70

0.786 10.60 10.60

Add extra for dome portion

#REF!

cum

#REF!

sqm

#REF!

cum

#REF!

10sqm

#REF!

10sqm

#REF!

kg

88.31
11.69

or say

100.00

Colour washing two coats Using snowcem including cost and


conveyance of all labour charges etc.,complete as per (in and out
side)
out side

1 3.142 10.60

1.00

33.31
100.00
133.31
140.00

Top of dome

cum

Providing impervious coat to exposed RCC roof slab surface with


CM(1:3), 20mm thick with 1kg of water proof compound per bag
of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of
materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work
Top of slab

#REF!

1.61
2.00

sqm

77.55
78.00

#REF!

1.13
1.20

sqm

2.09
2.10

#REF!

1.94

2.00
1

cum

29.11
30.00

1 3.14

#REF!

Supply and delivery and fixing in position M S gril of any design


including all fabrication and all fixing charges etc compalete as
per ss and as directed by the dept authorities
Man hole cover

20.00

40.00

Ladder

100.00

200.00
240.00

Providing High Yield Strength Deformed (HYSD)/ Thermo


Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
500 grade as per IS 1786-1979) of different diameters for RCC
works , including labour charges for straightening, cutting, bending
to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for reinforcement work as
per approved designs and drawings, including cost and conveyance
of steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of
work in all floors.( APSS No.126)

Raft

85.00

80

6800.00

Side walls

32.00

100

3200.00

Columns

2.10

120

252.00

Beams

1.20

120

144.00

Roof slab

11.70

80

936.00

Dome slab

2.00

80

160.00
11492.00
11500.00

#REF!

kgs
Rs

g 7.00 MLD WTP Head

Total

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
Lakhs

JANGAREDDY GUDEM NAGARA PANCHAYAT

Basic Rate

conveyance charges
upto 5 km

conveyance charges
beyond 5 km upto 30 km
@ Rs 12.40/km

10

11

1.00 MT

Local

0.00

5840.00

0.00

0.00

0.00

0.00

0.00

M-005

1 cum

Prakkilanka

52.00

610.00

82.70

310.00

226.60

619.30

74.21

M -006

1 cum

Prakkilanka

52.00

677.00

82.70

310.00

226.60

619.30

74.21

4 Sand for Filling

M-004

1 cum

52.00

460.00

82.70

310.00

226.60

619.30

74.21

5 HBG Metal - 6mm SS5 m/c

M- 050

1 cum

45.00

735.00

82.70

310.00

154.50

547.20

65.57

6 HBG Metal - 10mm SS5 m/c

M- 051

1 cum

45.00

935.00

82.70

310.00

154.50

547.20

65.57

M- 052

1 cum

45.00

1097.00

82.70

310.00

154.50

547.20

65.57

8 HBG Metal - 20mm SS5 m/c

M- 053

1 cum

45.00

1365.00

82.70

310.00

154.50

547.20

65.57

9 HBG Metal - 40mm


25mm SS5 m/c

M- 054
M- 055

1 cum

Prakkilanka
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road

45.00

1313.00

82.70

310.00

154.50

547.20

65.57

45.00

845.00

82.70

310.00

154.50

547.20

65.57

45.00

635.00

82.70

310.00

154.50

547.20

65.57

45.00

662.00

82.70

310.00

154.50

547.20

65.57

45.00

798.00

82.70

310.00

154.50

547.20

65.57

1
2 Sand for Concreate
292.00/50 kg bag
3 Sand for Mortor

Rs

HBG Metal - 13.20 / 12.50mm


SS5 m/c

10
11
12
13

1 cum
Aggregates 90 to 45mm graded
HBG
HBG IRC
IRC m/c
m/c metal
metal
graded HBG IRC m/c metal

M-039

1 cum

M- 038

1 cum

M- 042

1 cum

Deduct
13.615%
over
conveyance
charges
heads

SSR Code

SNo

Cement (Oct 2015 ) for WGDt


2

on coveyance
charges

Lead

conveyance charges
beyond 30 km @
10.30/km

Source

Description of materials

Unit

LEAD STATEMENT FOR THE YEAR 2015-16

Source

Lead

Basic Rate

conveyance charges
upto 5 km

conveyance charges
beyond 5 km upto 30 km
@ Rs 12.40/km

1 cum

KM 72/4 of
E.G.K.Road

45.00

704.00

82.70

310.00

154.50

547.20

65.57

Stone Crusher Dust finer than


15 3mm with not more than 10%
passing 0.075 sieve
Aggregates 53 to 22.40mm
16
graded HBG IRC m/c metal
Close graded granular sub base
17
material 9.50 to 4.75mm

M-021

1 cum

KM 72/4 of
E.G.K.Road

45.00

357.00

82.70

310.00

154.50

547.20

65.57

M-036

1 cum

45.00

872.00

82.70

310.00

154.50

547.20

65.57

M-016

1 cum

45.00

592.00

82.70

310.00

154.50

547.20

65.57

18

Close graded granular sub base


material 2.36mm & below

M-022

1 cum

45.00

438.00

82.70

310.00

154.50

547.20

65.57

19

(M 045)

1 cum

45.00

1210.00

82.70

310.00

154.50

547.20

65.57

45.00

875.00

82.70

310.00

154.50

547.20

65.57

45.00

557.00

82.70

310.00

154.50

547.20

65.57

45.00

1029.00

82.70

310.00

154.50

547.20

65.57

45.00

1145.00

82.70

310.00

154.50

547.20

65.57

21.00

103.00

82.70

198.40

0.00

281.10

33.69

(M 040)

20
21
22

(M 030)
(M 044)
Aggregate 40mm - 20mm

25

M -008

Cost of Steel HYSD Bars 8 40mm dia FE 415

26 MS Angle, Channels etc.


27 2 nd class bricks

BMT-A-01

Deduct
13.615%
over
conveyance
charges
heads

1 cum
1 MT

Local

0.00

32000.00

0.00

0.00

0.00

0.00

0.00

1 MT

Local

0.00

40000.00

0.00

0.00

0.00

0.00

0.00

1000

Local

2.00

5200.00

69.80

0.00

0.00

0.00

0.00

1 cum
1 cum

1 cum

24 Gravel for sub base

KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road
E.G.K Road

1 cum

23

KM 72/4 of
E.G.K.Road
KM 72/4 of
E.G.K.Road

on coveyance
charges

Unit

14

conveyance charges
beyond 30 km @
10.30/km

SSR Code

Description of materials

SNo

M- 041

graded HBG IRC m/c metal

Cost 20mm metal 0.60 Cum

1813.35

1.00 cum

1088.01

Mazdoor

320.00

Cost 13.20 / 12.50mm metal 0.15 Cum

1545.35

1.00 cum

231.80

Water

103.00

Cost 10mm metal 0.15 Cum

1383.35

1.00 cum

207.50

Concerete mixer 300 /


200

338.60

Cost 6mm metal 0.10 Cum

1183.35

1.00 cum

118.34

Mason 1st Class

420.00

1645.65

Bar Bender

490.00

Mason 2nd Class

Concerete mixer 600 /


400

Certified that leads mentioned above are correct to best of my knowledge

Assistant Engineer
Jangareddygudem Nagar
Panchayat

Deputy Executive Engineer

Executive Engineer

Superintending Engineer

on coveyance
charges

Deduct
13.615%
over
conveyance
charges
heads

conveyance charges
beyond 30 km @
10.30/km

conveyance charges
beyond 5 km upto 30 km
@ Rs 12.40/km

conveyance charges
upto 5 km

Basic Rate

Lead

Source

Unit

SSR Code

Description of materials

SNo

28 Aggregates 20mm graded HBG SS5 m/c metal including seignoiorage, blasting charges, machine crushing charges Unit 1.00 cum

Y GUDEM NAGARA PANCHAYAT

Total cost

EMENT FOR THE YEAR 2015-16

12
5840.00
1155.09
1222.09
1005.09
1216.63
1416.63
1578.63
1846.63
1794.63
1326.63
1116.63
1143.63
1279.63

Total cost
1185.63
838.63
1353.63
1073.63
919.63
1691.63
1356.63
1038.63
1510.63
1626.63
350.41
32000.00
40000.00
5200.00

Total cost

, blasting charges, machine crushing charges Unit 1.00 cum


375.00

456.20

Superintending Engineer

Jangareddygudem Nagar Panchayat


DATA FOR BUILDINGS 2015 - 16 (Oct 2015)
Sl No

Description of item
MORTARS

Unit

Quantity Rate in Rs Amount in Rs

BLD-CSTN-1

CEMENT MORTAR (1:3)--unit 1.00 cum

BLD-CSTN-1-4

A-MATERIALS
Cement

kg

480.00

5.84

2803.20

Sand including 5% wastage

cum

1.05

1222.09

1283.19

Seigniorage charges for sand (seignoirage included in


sand cost)

cum

1.05

0.00

0.00

0.00

0.00

0.00

0.20

320.00

64.00

B- MACHINARY
Nil
C-LABOUR
Man mazdoor for mixing mortar

day

20% on labour

12.80

Grand total
2

CEMENT MORTAR (1:4)--unit 1.00 cum

4163.19
BLD-CSTN-1-5

A-MATERIALS
Cement

kg

360.00

5.84

2102.40

Sand including 5% wastage

cum

1.05

1222.09

1283.19

Seigniorage charges for sand (seignoirage included in


sand cost)

cum

1.05

0.00

0.00

0.00

0.00

0.00

0.20

320.00

64.00

B- MACHINARY
Nil
C-LABOUR
Man mazdoor for mixing mortar

day

20% on labour

12.80

Grand total
3

CEMENT MORTAR (1:5)--unit 1.00 cum

3462.39
BLD-CSTN-1-6

A-MATERIALS
Cement

kg

288.00

5.84

1681.92

Sand including 5% wastage

cum

1.05

1222.09

1283.19

Seigniorage charges for sand (seignoirage included in


sand cost)

cum

1.05

0.00

0.00

0.00

0.00

0.00

0.20

320.00

64.00

B- MACHINARY
Nil
C-LABOUR
Man mazdoor for mixing mortar
20% on labour

day

12.80

Grand total
4

CEMENT MORTAR (1:6)--unit 1.00 cum

3041.91
BLD-CSTN-1-7

A-MATERIALS
Cement

kg

240.00

5.84

1401.60

Sand including 5% wastage

cum

1.05

1222.09

1283.19

Seigniorage charges for sand (seignoirage included in


sand cost)

cum

1.05

0.00

0.00

0.00

0.00

0.00

0.20

320.00

64.00

B- MACHINARY
Nil
C-LABOUR
Man mazdoor for mixing mortar

day

20% on labour

12.80

Grand total
5

2761.59

Plain cement concrete (1:4:8) using 40mm with concrete mixer mixing upto plinth level unit 1.00 cum
BLD-CSTN-2-5
A. MATERIALS
Cement

kg

162.00

5.84

946.08

Coarse aggregate 40mm

cum

0.90

1326.63

1193.96

Fine aggregate (sand)

cum

0.45

1155.09

519.79

Seigniorage charges for C.A(included in metal cost

cum

0.90

0.00

0.00

Seigniorage charges for F.A (included in sand cost)

cum

0.45

0.00

0.00

kl

1.20

103.00

123.60

hour

1.00

338.60

338.60

Mason 1st class -labour rates -skilled

day

0.10

420.00

42.00

Mazdoor unskilled

day

1.39

320.00

444.80

Water (including for curing)


B .MACHINARY
Concrete mixer 300/200 Diesel item -16
C.LABOUR

20% on labour

97.36

Grand total

3706.19

13.615% over heads and contractors profit -

504.60
4210.79

RCC Design mix weigh batcher/mixer

BLD-CSTN-2-14

Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH BATCHER/MIXER
using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry
including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water
etc to site and including seigniorage charges ,sales and other taxes on all materials including all
operational ,incidental and labour charges such as weigh batching ,machine mixing ,laying concrete
,curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS
NO 402) with minimum cement content as per IS Code from standard suppliers approved by the
deparment including pumping , centering,shuttering,laying concrete ,vibrating,curing etc M25 design mix
unit 1.00cum
A

foundations,plinth,pedestals (below plinth) excluding cement cost any grade mix


BLD-CSTN-2-14-A
A. MATERIALS
20 mm graded HBG metal

0.80

cum

1645.65

1316.52

sand

0.40

cum

1155.09

462.03

Mason 1st class -labour rates -

0.133

day

420.00

55.86

Mason 2nd class -

0.267

day

375.00

100.13

Mazdoor unskilled

4.60

day

320.00

1472.00

B. LABOUR

20% on labour

325.60

C MACHINERY
Concrete mixer 600/400 Diesel

1.333

Hr

456.20

608.11

Water including curing

1.20

kl

103.00

123.60

Rate/cum
A.1

column footings

4463.85

cement content 380 kgs/cum M25 design mix

unit 1.00 cum

Rate of VRCC M25 design mix


cement M25

4463.85
380.00

kg

5.84

2219.20

1.00

cum

750.00

750.00

centering charges
material charges+labour charges 277+473=750
20% on labour

94.60
7527.65

13.615% over heads and contractors profit -

1024.89
8552.54

A-2

Plinth beams cement content 350 kgs/cum M25 design mix

unit 1.00 cum

Rate of VRCC M25 design mix


cement M25

4463.85
380.00

kg

5.84

2219.20

1.00

cum

2476.00

2476.00

centering charges
material charges+labour charges 1335+1141=2476
20% on labour 1141.00

228.20
9387.25

13.615% over heads and contractors profit -

1278.07
10665.33

A-3

Pedestals cement content 380 kgs/cum M25 design mix

unit 1.00 cum

Rate of VRCC M25 design mix

4463.85

cement M25

380.00

kg

5.84

2219.20

1.00

cum

1068.00

1068.00

centering charges
material charges+labour charges 315+753=1068
20% on labour

150.60
7901.65

13.615% over heads and contractors profit -

1075.81
8977.46

columns,lintels,water tanks,RCC walls in buildings excluding cement cost any grade mix
BLD-CSTN-2-14-B
A. MATERIALS
20 mm graded HBG metal

0.80

cum

1645.65

1316.52

sand

0.40

cum

1155.09

462.03

Mason 1st class -labour rates -skilled

0.167

day

420.00

70.14

Mason 2nd class - semi skilled category

0.167

day

375.00

62.63

Mazdoor unskilled

5.60

day

320.00

1792.00

B. LABOUR

20% on labour

384.95

C MACHINERY
Concrete mixer 600/400 Diesel

1.333

Hr

456.20

608.11

Water including curing

1.20

KL

103.00

123.60

Rate/cum
B-1

4819.99

Columns GF upto 3.66m height cement content 380 kgs/cum M25 design Mix unit 1.00 cum
Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2041.00

2041.00

centering charges
material charges+labour charges 341+1700=2041
20% on labour

340.00
9420.19

13.615% over heads and contractors profit -

1282.56
10702.75

B-1-1 COLUMNS FF upto 3.66m height cement content 380 kgs/cum M25 design Mix unit 1.00 cum
Rate of VRCC M25 design mix
cement M25
centering charges
material charges+labour charges 341+1700=2041
20% on labour

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2041.00

2041.00
340.00

lift chage 10% on labour 1924.77

192.48
9612.66

13.615% over heads and contractors profit -

1308.76

Total/cum

10921.43

COLUMNS 2nd floor upto 3.66m height cement content 380 kgs/cum M25 design Mix
B-1-2

unit 1.00 cum


Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2211.00

2211.00

centering charges
material charges+labour charges 341+1870=2211
20% on labour

374.00

lift chage 20% on labour 1924.77

384.95
10009.14

B-1-3

13.615% over heads and contractors profit -

1362.74

Total/cum
COLUMNS 3rd floor upto 3.66m height cement content 380 kgs/cum M25 design Mix

11371.89

unit 1.00 cum


Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2381.00

2381.00

centering charges
material charges+labour charges 341+2040=2381
20% on labour

408.00

lift chage 30% on labour 1924.77

577.43
10405.62

B-2

13.615% over heads and contractors profit -

1416.72

Total/cum

11822.34

Lintels GF upto 3.66m height cement content 380 kgs/cum M25 design mix
unit 1.00 cum
Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2344.00

2344.00

centering charges
material charges+labour charges 1133+1211=2344
20% on labour

242.20
9625.39

13.615% over heads and contractors profit -

1310.50
10935.88

B-2-1

LINTELS FF upto 3.66m height cement content 380 kgs/cum M25 design mix unit 1.00 cum
Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2344.00

2344.00

centering charges
material charges+labour charges 1133+1211=2344
20% on labour

242.20

lift chage 10% on labour 1924.77

192.48
9817.86

B-2-2

13.615% over heads and contractors profit -

1336.70

Total/cum

11154.57

LINTELS 2nd floor upto 3.66m height cement content 380 kgs/cum M25 design mix unit 1.00
cum
Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2465.00

2465.00

centering charges
material charges+labour charges1133+1332=2465
20% on labour

266.40

lift chage 20% on labour 1924.77

384.95
10155.54

B-2-3

13.615% over heads and contractors profit -

1382.68

Total/cum

11538.22

LINTELS 3rd floor upto 3.66m height cement content 380 kgs/cum M25 design mix unit 1.00
cum
Rate of VRCC M25 design mix
cement M25

4819.99
380.00

kg

5.84

2219.20

1.00

cum

2586.00

2586.00

centering charges
material charges+labour charges1133+1453=2586
20% on labour

290.60

lift chage 30% on labour 1924.77

577.43
10493.22

13.615% over heads and contractors profit -

1428.65

Total/cum

11921.87

RCC slabs, beams excluding cement cost any grade mix

BLD-CSTN-2-14-C

A. MATERIALS
20 mm graded HBG metal

0.80

cum

1645.65

1316.52

sand

0.40

cum

1155.09

462.03

Mason 1st class -labour rates -skilled

0.067

day

420.00

28.14

Mason 2nd class - semi skilled

0.133

day

375.00

49.88

Mazdoor unskilled

3.077

day

320.00

984.64

B. LABOUR

20% on labour

212.53

C MACHINERY
Concrete mixer 600/400 Diesel

0.308

hour

456.20

140.51

Water including curing

1.20

kl

103.00

123.60

Total/cum
C-1

3317.85

RCC Slabs GF upto 3.66m height 0.075m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.075=0.075 cum

0.075

cum

3317.85

248.84

cement M25 380 x0.075=

28.50

kg

5.84

166.44

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40
836.68

13.615% over heads and contractors profit -

113.91
950.59

C-1-1

RCC Slabs FF upto 3.66m height 0.075m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm1.00 x0.075=0.075 cum

0.075

cum

3317.85

248.84

cement M25 380 x0.075=

28.5

kg

5.84

166.44

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40

lift chage 10% on labour 1062.66*0.075

7.97
844.65

13.615% over heads and contractors profit -

115.00
959.65

RCC Slabs 2nd floor upto 3.66m height 0.075m thick cement content 380 kgs/cum M25 design
C-1-2 mix unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm

1.00 x0.075=0.075 cum

cement M25 380 x0.075=

0.075

cum

3317.85

248.84

28.5

kg

5.84

166.44

1.00

sqm

405.00

405.00

centering charges
material charges+labour charges
227+178=405.00/sqm.
20% on labour

35.60

lift chage 20% on labour 1062.66*0.075

15.94
871.82

13.615% over heads and contractors profit -

118.70
990.52

C-2

RCC Slabs GF upto 3.66m height 0.125m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm1.00 x0.125=0.125 cum

0.125

cum

3317.85

414.73

cement M25 380 x0.125=

47.50

kg

5.84

277.40

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40
1113.53

13.615% over heads and contractors profit -

151.61
1265.14

C-2-1

RCC Slabs

FF upto 3.66m height 0.125m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm

Rate of VRCC M25 design mix


quantity of concrete/sqm 1.00 x0.125=0.125 cum

0.125

cum

3317.85

414.73

cement M25 380 x0.125=

47.50

kg

5.84

277.40

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40

lift chage 10% on labour 1062.66*0.125

13.28
1126.81

13.615% over heads and contractors profit -

153.42
1280.23

C-2-2

RCC Slabs 2nd floor upto 3.66m height 0.125m thick cement content 380 kgs/cum M25 design
mix unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.125=0.125 cum

0.125

cum

3317.85

414.73

cement M25 380 x0.125=

47.50

kg

5.84

277.40

1.00

sqm

405.00

405.00

centering charges
material charges+labour charges
227+178=405.00/sqm.
20% on labour

35.60

lift chage 20% on labour 1062.66*0.125

26.57
1159.30

13.615% over heads and contractors profit -

157.84
1317.14

C-2-3

RCC Slabs 3rd floor upto 3.66m height 0.125m thick cement content 380 kgs/cum M25 design
mix unit 1.00 sqm
Rate of VRCC M25 design mix

quantity of concrete/sqm 1.00 x0.125=0.125 cum

0.125

cum

3317.85

414.73

cement M25 380 x0.125=

47.50

kg

5.84

277.40

1.00

sqm

421.00

421.00

centering charges
material charges+labour charges
227+194=421.00/sqm.
20% on labour

38.80

lift chage 30% on labour 1062.66*0.125

39.85
1191.78

13.615% over heads and contractors profit -

162.26
1354.04

C.3

RCC Slabs GF upto 3.66m height 0.14m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.14=0.14 cum

0.14

cum

3317.85

464.50

cement M25 380 x0.14=

53.20

kg

5.84

310.69

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40
1196.59

13.615% over heads and contractors profit -

162.92
1359.50

C.3.1

RCC Slabs
1.00 sqm

FF upto 3.66m height 0.14m thick cement content 380 kgs/cum M25 design mix unit

Rate of VRCC M25 design mix


quantity of concrete/sqm 1.00 x0.14=0.14 cum

0.14

cum

3317.85

464.50

cement M25 380 x0.14=

53.20

kg

5.84

310.69

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40

lift chage 10% on labour 1062.66*0.15

15.94
1212.53

13.615% over heads and contractors profit -

165.09
1377.61

C.3.2

RCC Slabs 2nd floor upto 3.66m height 0.14m thick cement content 380 kgs/cum M25 Design
mix unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.14=0.14 cum

0.14

cum

3317.85

464.50

cement M25 380 x0.14=

53.20

kg

5.84

310.69

centering charges

material charges+labour charges


227+178=405.00/sqm.

1.00

sqm

405.00

405.00

20% on labour

35.60

lift chage 20% on labour 1062.66*0.15

31.88
1247.67

13.615% over heads and contractors profit -

169.87
1417.54

C.3.3

RCC Slabs GF upto 3.66m height 0.15m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.15=0.15 cum

0.15

cum

3317.85

497.68

cement M25 380 x0.15=

57.00

kg

5.84

332.88

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40
1251.96

13.615% over heads and contractors profit -

170.45
1422.41

C.3.4

RCC Slabs
1.00 sqm

FF upto 3.66m height 0.15m thick cement content 380 kgs/cum M25 design mix unit

Rate of VRCC M25 design mix


quantity of concrete/sqm 1.00 x0.15=0.15 cum

0.15

cum

3317.85

497.68

cement M25 380 x0.15=

57.00

kg

5.84

332.88

1.00

sqm

389.00

389.00

centering charges
material charges+labour charges
227+162=389.00/sqm.
20% on labour

32.40

lift chage 10% on labour 1062.66*0.15

15.94
1267.90

13.615% over heads and contractors profit -

172.62
1440.52

C.3.5

RCC Slabs 2nd floor upto 3.66m height 0.15m thick cement content 380 kgs/cum M25 Design
mix unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.15=0.15 cum

0.15

cum

3317.85

497.68

cement M25 380 x0.15=

57.00

kg

5.84

332.88

1.00

sqm

405.00

405.00

centering charges
material charges+labour charges
227+178=405.00/sqm.
20% on labour

35.60

lift chage 20% on labour 1062.66*0.15

31.88
1303.04

13.615% over heads and contractors profit -

C.4

177.41

1480.45
RCC Slabs GF upto 3.66m height 0.20m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.20=0.20 cum

0.20

cum

3317.85

663.57

cement M25 380 x0.20=

76.00

kg

5.84

443.84

1.00

sqm

399.00

399.00

centering charges
material charges+labour charges
233+166=399.00/sqm.
20% on labour

33.20
1539.61

13.615% over heads and contractors profit -

209.62

1749.23
RCC Slabs FF upto 3.66m height 0.20m thick cement content 380 kgs/cum M25 design mix
C-4-1
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.20=0.20 cum

0.20

cum

3317.85

663.57

cement M25 380 x0.20=

76.00

kg

5.84

443.84

1.00

sqm

399.00

399.00

centering charges
material charges+labour charges
233+166=399.00/sqm.
20% on labour

33.20

lift chage 10% on labour 1062.66*0.20

21.25
1560.86

13.615% over heads and contractors profit -

212.51
1773.37

C-4-2

RCC Slabs 2nd floor upto 3.66m height 0.20m thick cement content 380 kgs/cum M25 design mix
unit 1.00 sqm
Rate of VRCC M25 design mix
quantity of concrete/sqm 1.00 x0.20=0.20 cum

0.20

cum

3317.85

663.57

cement M25 350 x0.20=

76.00

kg

5.84

443.84

1.00

sqm

416.00

416.00

centering charges
material charges+labour charges
233+183=406.00/sqm.
20% on labour

36.60

lift chage 20% on labour 1062.66*0.20

42.51
1602.52

13.615% over heads and contractors profit -

218.18

1820.70
C-5

RCC Sun shades 0.60m wide ,0.10m thick at fixed end and 0.05m at free end
height cement content 380 kgs/cum M25 design mix unit 1.00 Rmt

GF upto 3.66m

Rate of VRCC M25 design mix


quantity of concrete/Rmt = 1.00 x0.60
x(0.10+0.05/2)=0.045 cum

0.045

cum

3317.85

149.30

cement M25
380224+186
x0.045= =410.00/sqm =
centering
charges

17.10

kg

5.84

99.86

0.60

sqm

410.00

246.00

1.00

sqm

22.32

22.32

20% on labour 186.00x0.60=111.60x20%=22.32

517.49
13.615% over heads and contractors profit -

70.46
587.94

C-5-1

RCC Sun shades 0.60m wide ,0.10m thick at fixed end and 0.05m at free end
height cement content 380 kgs/cum M25 design mix unit 1.00 Rmt
Rate of VRCC M25 design mix
quantity of concrete/Rmt = 1.00 x0.60
x(0.10+0.05/2)=0.045 cum
cement M25
380224+186
x0.045= =410.00/sqm =
centering
charges

20% on labour 186.00x0.60=111.60x20%=22.32

0.045

cum

3317.85

149.30

17.10

kg

5.84

99.86

0.60

sqm

410.00

246.00

1.00

sqm

22.32

22.32

Lift charges (1062.66x0.045)x0.10

4.78
522.27
71.11
593.38

13.615% over heads and contractors profit -

C-5-2

FF upto 3.66m

RCC Sun shades 0.60m wide ,0.10m thick at fixed end and 0.05m at free end
3.66m height cement content 380 kgs/cum M25 design mix unit 1.00 Rmt

2 nd floor upto

Rate of VRCC M25 design mix


quantity of concrete/Rmt = 1.00 x0.60
x(0.10+0.05/2)=0.045 cum

0.045

cum

3317.85

149.30

cement
380224+205
x0.045= =429.00/sqm =
centeringM25
charges

17.10

kg

5.84

99.86

0.60

sqm

429.00

257.40

1.00

sqm

24.60

24.60

20% on labour 205.00x0.60=123.00x20%=24.60


Lift charges (1062.66x0.045)x0.20

9.56
540.73

13.615% over heads and contractors profit -

73.62

RCC Sun shades 0.60m wide ,0.10m thick at fixed end and 0.05m at free end
C-5-3
3.66m height cement content 380 kgs/cum M25 design mix unit 1.00 Rmt

614.35
3 rd floor upto

Rate of VRCC M25 design mix


quantity of concrete/Rmt = 1.00 x0.60
x(0.10+0.05/2)=0.045 cum

0.045

cum

3317.85

149.30

cement
380224+223
x0.045= =447.00/sqm =
centeringM25
charges

17.10

kg

5.84

99.86

0.60

sqm

447.00

268.20

20% on labour 223.00x0.60=133.80x20%=26.76


Lift charges (1062.66x0.045)x0.30

1.00

sqm

26.76

26.76
14.35
558.47

13.615% over heads and contractors profit -

76.04
634.51

C-6

BEAMS GF upto3.66m height cement content 380 kgs /cum M25 desidn mix unit 1.00 cum
Rate of VRCC M25 nominal mix
cement M25

3317.85
380.00

kg

5.84

2219.20

1.00

cum

3428.00

3428.00

centering charges
material charges+labour charges
2002+1426=3428.00/cum
20% on labour

285.20
9250.25

13.615% over heads and contractors profit C-6-1

BEAMS FF upto3.66m height cement content 380 kgs /cum M25 desidn mix

1259.42
10509.67
unit 1.00 cum

Rate of VRCC M25 nominal mix


cement M25
centering charges

380.00

kg

5.84

3317.85
2219.20

material charges+labour charges


2002+1426=3428.00/cum

1.00

cum

3428.00

3428.00

20% on labour

285.20

Lift charges (1062.66)x0.10

106.27
9356.52
1273.89
10630.41

13.615% over heads and contractors profit -

C-6-2

BEAMS 2nd floor upto3.66m height cement content 380 kgs /cum M25 design mix unit 1.00 cum
Rate of VRCC M25 nominal mix
cement M25
centering charges

380.00

kg

5.84

3317.85
2219.20

material charges+labour charges


2002+1569=3571.00/cum

1.00

cum

3571.00

3571.00

20% on labour
Lift charges (1062.66)x0.20

313.80
212.53
9634.38
1311.72
10946.10

13.615% over heads and contractors profit -

C-6-3

BEAMS 3rd floor upto3.66m height cement content 380 kgs /cum M25 desidn mix unit 1.00 cum
Rate of VRCC M25 nominal mix
cement M25
centering charges

380.00

kg

5.84

3317.85
2219.20

material charges+labour charges


2002+1711=3713.00/cum

1.00

cum

3713.00

3713.00

20% on labour
Lift charges (1062.66)x0.30
13.615% over heads and contractors profit -

342.20
318.80
9911.05
1349.39
11260.44

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS)
steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges
such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc.,
complete for finished item of work in all floors.( APSS No.126) (BLD-CSTN-2-18)
unit 1.00 MT

GF
Material
HYSD bars including 5% for overlaps and wastage

1.05

MT

32000.00

33600.00

6.00

kgs

70.00

420.00

black smith/bar bender

10.00

day

420.00

4200.00

Mazdoor unskilled

10.00

day

320.00

3200.00

Binding wire item-3


Labour for cutting bending shifting to site tying
and placing in position

20% on labour

1480.00
42900.00

13.615% over heads and contractors profit -

5840.84
48740.84

Rate /kg
b

48.74

first floor
Material
HYSD bars including 5% for overlaps and wastage

1.05

MT

32000.00

33600.00

6.00

kgs

70.00

420.00

black smith/bar bender

10.00

day

420.00

4200.00

Mazdoor unskilled

10.00

day

320.00

3200.00

Binding wire item-3


Labour for cutting bending shifting to site tying and
placing in position

20% on labour

1480.00

lift charges 10% on labour (4900+3200)=8100*10%

0.00
42900.00

13.615% over heads and contractors profit -

5840.84
48740.84

Rate /kg
c

48.74

2nd floor
Material
HYSD bars including 5% for overlaps and wastage

1.05

MT

32000.00

33600.00

6.00

kgs

70.00

420.00

black smith/bar bender

10.00

day

420.00

4200.00

Mazdoor unskilled

10.00

day

320.00

3200.00

Binding wire item-3


Labour for cutting bending shifting to site tying and
placing in position

20% on labour

1480.00

lift charges 20% on labour(4900+3200)=8100*20%

0.00
42900.00

13.615% over heads and contractors profit -

5840.84
48740.84

Rate /kg
d

48.74

3rd floor
Material
HYSD bars including 5% for overlaps and wastage

1.05

MT

32000.00

33600.00

6.00

kgs

70.00

420.00

black smith/bar bender

10.00

day

420.00

4200.00

Mazdoor unskilled

10.00

day

320.00

3200.00

Binding wire item-3


Labour for cutting bending shifting to site tying and
placing in position

20% on labour

1480.00

lift charges 30% on labour (4900+3200)=8100*30%

0.00
42900.00

13.615% over heads and contractors profit -

5840.84
48740.84

Rate /kg

48.74

Brick masonary in CM (1:5) with traditional size 23x11x7cm unit 1.00 cum
BLD-CSTN-3-1 -a-iii

Ground floor
materials
cement

57.60

kgs

5.84

336.38

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

mason 1st class

0.24

day

420.00

100.80

mason 2nd class

0.56

day

375.00

210.00

Mazdoor unskilled

1.89

day

320.00

604.80

sand
labour

20% on labour

183.12
4341.92

13.615% over heads and contractors profit -

591.15
4933.07

First floor
materials
cement

57.60

kgs

5.84

336.38

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

0.24
0.56

day
day

420.00
375.00

100.80
210.00

sand
labour
mason 1st class
mason 2nd class

Mazdoor unskilled

1.89

day

320.00

20% on labour

604.80
183.12

lift charges
materials 10% on labour 915.60

91.56
4433.48

13.615% over heads and contractors profit -

603.62
5037.10

Brick masonary in CM (1:6) with traditional size 23x11x7cm unit 1.00 cum
BLD-CSTN-3-1 -a-iv

Ground floor
materials
cement

48.00

kgs

5.84

280.32

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

mason 1st class

0.24

day

420.00

100.80

mason 2nd class

0.56

day

375.00

210.00

Mazdoor unskilled

1.89

day

320.00

604.80

sand
labour

20% on labour

183.12
4285.86

13.615% over heads and contractors profit -

583.52
4869.38

First floor
materials
cement

48.00

kgs

5.84

280.32

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

mason 1st class

0.24

day

420.00

100.80

mason 2nd class

0.56

day

375.00

210.00

Mazdoor unskilled

1.89

day

320.00

604.80

sand
labour

20% on labour

183.12

lift charges
materials 10% on labour 915.60

91.56
4377.42

13.615% over heads and contractors profit -

595.99
4973.40

2 nd floor
materials

cement

48.00

kgs

5.84

280.32

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

mason 1st class

0.24

day

420.00

100.80

mason 2nd class

0.56

day

375.00

210.00

Mazdoor unskilled

1.89

day

320.00

604.80

sand
labour

20% on labour

183.12

lift charges
materials 20% on labour 915.60

183.12
4468.98

13.615% over heads and contractors profit -

608.45
5077.43

3rd floor
materials
cement

48.00

kgs

5.84

280.32

Bricks traditional size 23x11x7 cm 2nd class

512.00

1000 nos

5200.00

2662.40

0.20

cum

1222.09

244.42

mason 1st class

0.24

day

420.00

100.80

mason 2nd class

0.56

day

375.00

210.00

Mazdoor unskilled

1.89

day

320.00

604.80

sand
labour

20% on labour

183.12

lift charges
materials 30% on labour 915.60

274.68
4560.54

13.615% over heads and contractors profit -

620.92
5181.45

10

Plastering with CM (1:3) 12mm thick GF to ceiling unit 10.00 sqm BLD-CSTN-6-1

Ground floor
Materials
Cement mortar (1:3)

0.15

cum

4163.19

624.48

Mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour
scaffolding charges

111.84
0.00

1295.52

13.615% over heads and contractors profit -

176.38

Rate/10sqm

1471.90

Rate/sqm

147.19

first floor
Materials
Cement mortar (1:3)

0.15

cum

4163.19

624.48

Mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges on materials 10% on labour 559.20

55.92

scaffolding charges 2.37+12.55=14.92

10

sqm

14.92

149.20

20% on labour

10

0.20

12.55

25.10
1525.74

13.615% over heads and contractors profit -

207.73

Rate/10sqm

1733.47

Rate/sqm

173.35

2nd floor
Materials
Cement mortar (1:3)

0.15

cum

4163.19

624.48

Mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges on materials 20% on labour 559.20

111.84

scaffolding charges 2.37+17.64=20.01

10

sqm

20.01

200.10

20% on labour

10

0.20

17.64

35.28
1642.74

13.615% over heads and contractors profit -

223.66

Rate/10sqm

1866.40

Rate/sqm

186.64

3rd floor
Materials
Cement mortar (1:3)

0.15

cum

4163.19

624.48

0.60

day

420.00

252.00

Labour
Mason 1st class

Mazdoor unskilled

0.96

day

320.00

307.20

20% on labour

111.84

lift charges on materials 30% on labour 559.20

167.76

scaffolding charges 2.37+22.73=25.10

10

sqm

25.10

251.00

20% on labour

10

0.20

22.73

45.46
1759.74

13.615% over heads and contractors profit -

239.59

Rate/10sqm

1999.33

Rate/sqm

199.93

11

Plastering with CM (1:4) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-2

Ground floor
Materials
Cement mortar (1:5)

0.15

cum

3462.39

519.36

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84
1190.40
1190.40

13.615% over heads and contractors profit -

162.07

Rate/10sqm

1352.47

Rate/sqm

135.25

First floor
Materials
Cement mortar (1:5)

0.15

cum

3462.39

519.36

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
10% onlabour 559.20

55.92

scaffolding charges 0.99+6.18=7.17

10

sqm

7.17

71.70

20% on labour

10

0.20

6.18

12.36
1330.38

13.615% over heads and contractors profit -

181.13

Rate/10sqm

1511.51

Rate/sqm

151.15

2nd floor
Materials
Cement mortar (1:5)

0.15

cum

3462.39

519.36

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
20% onlabour 559.20

111.84

scaffolding charges 0.99+8.78=9.77

10

sqm

9.77

97.70

20% on labour

10

0.20

8.78

17.56
1417.50

13.615% over heads and contractors profit -

192.99

Rate/10sqm

1610.49

Rate/sqm

161.05

3rd floor
Materials
Cement mortar (1:5)

0.15

cum

3462.39

519.36

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
30% onlabour 559.20

167.76

scaffolding charges 0.99+11.37=12.36

10

sqm

12.36

123.60

20% on labour

10

0.20

11.37

22.74
1504.50

13.615% over heads and contractors profit -

204.84

Rate/10sqm

1709.34

Rate/sqm

170.93

12

Plastering with CM (1:5) 12mm thick GF unit 10.00 sqm

Ground floor

BLD-CSTN-6-3

Materials
Cement mortar (1:5)

0.15

cum

3041.91

456.29

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84
1127.33

13.615% over heads and contractors profit -

153.49

Rate/10sqm

1280.81

Rate/sqm

128.08

First floor
Materials
Cement mortar (1:5)

0.15

cum

3041.91

456.29

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
10% onlabour 559.20

55.92

scaffolding charges 0.99+6.18=7.17

10

sqm

7.17

71.70

20% on labour

10

0.20

6.18

12.36
1267.31

13.615% over heads and contractors profit -

172.54

Rate/10sqm

1439.85

Rate/sqm

143.99

2nd floor
Materials
Cement mortar (1:5)

0.15

cum

3041.91

456.29

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
20% onlabour 559.20

111.84

scaffolding charges 0.99+8.78=9.77

10

sqm

9.77

97.70

20% on labour

10

0.20

8.78

17.56
1354.43

13.615% over heads and contractors profit -

184.41

Rate/10sqm

1538.83

Rate/sqm

153.88

3rd floor
Materials
Cement mortar (1:5)

0.15

cum

3041.91

456.29

mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84

lift charges
30% onlabour 559.20

167.76

scaffolding charges 0.99+11.37=12.36

10

sqm

12.36

123.60

20% on labour

10

0.20

11.37

22.74
1441.43

13.615% over heads and contractors profit -

196.25

Rate/10sqm

1637.68

Rate/sqm

163.77

14

Plastering with CM (1:5) 20mm thick GF unit 10.00 sqm

Ground floor

BLD-CSTN-6-3

Materials
Cement mortar (1:5)

0.21

cum

3041.91

638.80

mason 1st class

0.94

day

420.00

394.80

Mazdoor unskilled

1.60

day

320.00

512.00

Labour

20% on labour

181.36
1726.96

13.615% over heads and contractors profit -

235.13

Rate/10sqm

1962.09

Rate/sqm

196.21

First floor
Materials
Cement mortar (1:5)

0.21

cum

3041.91

638.80

mason 1st class

0.94

day

420.00

394.80

Mazdoor unskilled

1.60

day

320.00

512.00

Labour

20% on labour

181.36

lift charges
10% onlabour 559.20

55.92

scaffolding charges 0.99+6.18=7.17

10

sqm

7.17

71.70

20% on labour

10

0.20

6.18

12.36
1866.94

13.615% over heads and contractors profit -

254.18

Rate/10sqm

2121.13

Rate/sqm

212.11

2nd floor
Materials
Cement mortar (1:5)

0.21

cum

3041.91

638.80

mason 1st class

0.94

day

420.00

394.80

Mazdoor unskilled

1.60

day

320.00

512.00

Labour

20% on labour

181.36

lift charges
20% onlabour 559.20

111.84

scaffolding charges 0.99+8.78=9.77

10

sqm

9.77

97.70

20% on labour

10

0.20

8.78

17.56
1954.06

13.615% over heads and contractors profit -

266.05

Rate/10sqm

2220.11

Rate/sqm

222.01

3rd floor
Materials
Cement mortar (1:5)

0.21

cum

3041.91

638.80

mason 1st class

0.94

day

420.00

394.80

Mazdoor unskilled

1.60

day

320.00

512.00

Labour

20% on labour

181.36

lift charges
30% onlabour 559.20

167.76

scaffolding charges 0.99+11.37=12.36

10

sqm

12.36

123.60

20% on labour

10

0.20

11.37

22.74
2041.06

14

13.615% over heads and contractors profit -

277.89

Rate/10sqm

2318.95

Rate/sqm

231.90

Plastering with CM (1:3) 20mm thick GF unit 10.00 sqm

BLD-CSTN-6-8

Materials
Cement mortar (1:3)

0.21

cum

4163.19

874.27

mason 2nd class

0.94

day

420.00

394.80

Mazdoor unskilled

1.60

day

320.00

512.00

Labour

20% on labour

181.36

1962.43
1962.43

15

13.615% over heads and contractors profit -

267.18

Rate/10sqm

2229.61

Rate/sqm

222.96

Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304
MORTH for foundations of cc drains unit 1.00 cum
RBR-FNDN-2(1)
Sand filling unit 1.00 cum
a) Labour
Mate
Mazdoor (Unskilled)

day
0.31

day

320.00

20% on labour

99.20
19.84

b) Material
Sand

1.00

cum

1,005.09

1005.09

water

0.10

KL

103.00

10.30
1134.43
1134.43

16

13.615% over heads and contractors profit -

154.45

Total / Cum

1288.88

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304 MORTH RBR-FNDN-1 1(A) & SOR
-2013-14 CL-2-II
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H--ordinary soil--manual means upto 3m depth for foundations of buildings in restricted places
unit 1.00 cum
Taking output = 10 cum
a) Labour
Mate
Mazdoor (Unskilled)

day
3.64

day

320.00

1164.80

20% on labour

232.96

75% extra for foundations in restricted places

873.60
2271.36

13.615% over heads and contractors profit -

309.25

Cost for 10 cum = a+b+c

2580.61

Rate per cum = (a+b+c)/10

258.06

17

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304 MORTH RBR-FNDN-1 1(A) & SOR
-2013-14 CL-2-II
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H--ordinary soil--manual means upto 3m depth for foundations unit 1.00 cum
Taking output = 10 cum
a) Labour
Mate

day

Mazdoor (Unskilled)

3.64

day

320.00

20% on labour

1164.80
232.96
1397.76

18
a

13.615% over heads and contractors profit -

190.31

Cost for 10 cum = a+b+c

1588.07

Rate per cum = (a+b+c)/10

158.81

Painting with Synthetic Enamel paints - Two Coats - For New Iron Work

unit 10.00 sqm


BLD-CSTN-10-12 -V

ground floor
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per British
Paints (I) Ltd. BMT-J-30

1.100

276.00

303.60

day

1.100

375.00

412.50

B. LABOUR
Painter
20% on labour

82.50

Sundries including brushes, soap, putty etc.,

0.00
798.60

13.615% over heads and contractors profit -

108.73

cost for 10 sqm

907.33

Rate/sqm

90.73

Painting, Priming Coat on New Iron Work

BLD-CSTN-10-6

Unit: 10 sqm
A. MATERIALS :
Red Oxide Primer BMT-J-03

0.70

142.00

99.40

day

0.70

375.00

262.50

B. LABOUR
Painter
20% on labour

52.50
414.40

Sundries including brushes, soap, putty etc.,1%

0.00

cost for 10 sqm

414.40

13.615% over heads and contractors profit -

56.42

Total cost for 10 sqm

470.82

Rate/sqm

47.08

Total 91.64+47.55=139.19/sqm

137.81

first floor
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per British
Paints (I) Ltd. BMT-J-30

1.100

276.00

303.60

day

1.100

375.00

412.50

B. LABOUR
Painter
20% on labour

82.50

lift charges 10% on labour

41.25

Sundries including brushes, soap, putty etc.,

0.00
839.85

13.615% over heads and contractors profit -

114.35

cost for 10 sqm

954.20

Rate/sqm

95.42

Painting, Priming Coat on New Iron Work

BLD-CSTN-10-6

Unit: 10 sqm
A. MATERIALS :
Red Oxide Primer BMT-J-03

0.70

142.00

99.40

day

0.70

375.00

262.50

B. LABOUR
Painter
20% on labour

52.50

lift charges 10% on labour

26.25
440.65

Sundries including brushes, soap, putty etc.,1%

0.00

cost for 10 sqm

440.65

13.615% over heads and contractors profit -

59.99

Total cost for 10 sqm

500.64

Rate/sqm

50.06

Total 97.21+50.06=147.27/sqm

145.48

2nd floor
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per British
Paints (I) Ltd. BMT-J-30

1.100

276.00

303.60

day

1.100

375.00

412.50

B. LABOUR
Painter

20% on labour

82.50

lift charges 20% on labour

82.50

Sundries including brushes, soap, putty etc.,

0.00
881.10

13.615% over heads and contractors profit -

119.96

cost for 10 sqm

1001.06

Rate/sqm
Painting, Priming Coat on New Iron Work

100.11
BLD-CSTN-10-6

Unit: 10 sqm
A. MATERIALS :
Red Oxide Primer BMT-J-03

0.70

142.00

99.40

day

0.70

375.00

262.50

B. LABOUR
Painter
20% on labour

52.50

lift charges 20% on labour

52.50
466.90

Sundries including brushes, soap, putty etc.,1%

0.00

cost for 10 sqm

466.90

13.615% over heads and contractors profit -

63.57

Total cost for 10 sqm

530.47

Rate/sqm

53.05

Total 101.89+53.05=153.15/sqm

153.15

3rd floor
A. MATERIALS :
Synthetic Enamel paint (at 20 sqm / litre as per British
Paints (I) Ltd. BMT-J-30

1.100

276.00

303.60

day

1.100

375.00

412.50

B. LABOUR
Painter
30% on labour

123.75

lift charges 20% on labour

82.50

Sundries including brushes, soap, putty etc.,

0.00
922.35

13.615% over heads and contractors profit -

125.58

cost for 10 sqm

1047.93

Rate/sqm

104.79

Painting, Priming Coat on New Iron Work


Unit: 10 sqm
A. MATERIALS :

BLD-CSTN-10-6

Red Oxide Primer BMT-J-03

0.70

142.00

99.40

day

0.70

375.00

262.50

B. LABOUR
Painter
20% on labour

52.50

lift charges 30% on labour

78.75
493.15

Sundries including brushes, soap, putty etc.,1%

0.00

cost for 10 sqm

493.15

13.615% over heads and contractors profit -

67.14

Total cost for 10 sqm

560.29

Rate/sqm

56.03

Total 106.63+56.59=163.21/sqm

160.82

19

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water
proof compound per bag of cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials and including all operational, incidental
and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off
junctions of wall and slab etc,, complete for finished item of work
BLD-CSTN-8-25

ground floor
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3

cum

0.210

Water proof compound (Quick setting, rapid


hardening and water proofing compound Conforming
to IS: I.S. 2645-2003)BMT-H.119

litre

2.000

Mason 1st class

day

0.660

nd

Mason 2 class

day

1.540

Mazdoor (unskiled)

day

3.70

4163.19

874.27

80.00

160.00

420.00

277.20

375.00

577.50

320.00

1184.00

B. LABOUR

20% on labour

407.74
3480.71
3480.71

13.615% over heads and contractors profit -

473.90

Total/10 sqm

3954.61

Rate/sqm

395.46

first floor
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3

cum

0.210

4163.19

874.27

Water proof compound (Quick setting, rapid


hardening and water proofing compound Conforming
to IS: I.S. 2645-2003)BMT-H.119

litre

2.000

80.00

160.00

Mason 1st class

day

0.660

420.00

277.20

nd

Mason 2 class

day

1.540

375.00

577.50

Mazdoor (unskiled)

day

3.70

320.00

1184.00

B. LABOUR

20% on labour

407.74

lift charges 10% on labour 2038.70

203.87
3684.58
3684.58

13.615% over heads and contractors profit -

501.66

Total/10 sqm

4186.24

Rate/sqm

418.62

2nd floor
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3

cum

0.210

4163.19

874.27

Water proof compound (Quick setting, rapid


hardening and water proofing compound Conforming
to IS: I.S. 2645-2003)BMT-H.119

litre

2.000

80.00

160.00

B. LABOUR

0.00

Mason 1st class

day

0.660

420.00

277.20

nd

Mason 2 class

day

1.540

375.00

577.50

Mazdoor (unskiled)

day

3.70

320.00

1184.00

20% on labour

407.74

lift charges 20% on labour 2038.70

407.74
3888.45
3888.45

13.615% over heads and contractors profit -

529.41

Total/10 sqm

4417.86

Rate/sqm

441.79

3rd floor
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3

cum

0.210

4163.19

874.27

Water proof compound (Quick setting, rapid


hardening and water proofing compound Conforming
to IS: I.S. 2645-2003)BMT-H.119

litre

2.000

80.00

160.00

Mason 1st class

day

0.660

420.00

277.20

Mason 2 class

day

1.540

375.00

577.50

B. LABOUR

nd

Mazdoor (unskiled)

day

3.70

320.00

1184.00

20% on labour

407.74

lift charges 30% on labour 2038.70

611.61
4092.32
4092.32

13.615% over heads and contractors profit -

557.17

Total/10 sqm

4649.49

Rate/sqm

464.95

20

Manufacture,supply,delivery of MS grill gates,window ornamental safety grill ,made with MS flats,MS


angles,MS squares etc including welding,finishing,applying red oxide paint as primary coat etc complete
unit 1.00 kgs - Building SSR - 2015-16 rates

ground floor
Material
MS flats,MS angles,etc

1.05

kg

40.00

42.00

1.00

kg

24.00

24.00

1.00

kg

4.00

Overheads & Contractors Profit 13.615%

4.00
5.60
75.60
10.29

Rate/kg

85.89

Labour for cutting bending shifting to site tying and


placing in position BMM.V.14
labour charges for fixing BMM.V.15
20% on labour

first floor
Material
MS flats,MS angles,etc

1.05

kg

40.00

42.00

Labour for cutting bending shifting to site tying


and placing in position BMM.V.14

1.00

kg

24.00

24.00

labour charges for fixing BMM.V.15

1.00

kg

4.00

4.00

20% on labour

5.60

Lift charges 10% on labour 28.00

2.80
78.40

Overheads & Contractors Profit 13.615%

10.67

Rate/kg

89.07

2nd floor
Material
MS flats,MS angles,etc

1.05

kg

40.00

42.00

Labour for cutting bending shifting to site tying


and placing in position BMM.V.14

1.00

kg

24.00

24.00

labour charges for fixing BMM.V.15

1.00

kg

4.00

4.00

20% on labour

5.60

Lift charges 20% on labour 28.00

5.60
81.20

Overheads & Contractors Profit 13.615%

11.06

Rate/kg

92.26

3rd floor
Material
MS flats,MS angles,etc

1.05

kg

40.00

42.00

Labour for cutting bending shifting to site tying


and placing in position BMM.V.14

1.00

kg

24.00

24.00

labour charges for fixing BMM.V.15

1.00

kg

4.00

4.00

20% on labour

5.60

Lift charges 30% on labour 28.00

8.40
84.00

21

Overheads & Contractors Profit 13.615%

11.44

Rate/kg

95.44

Supply, delivery and fixing of 110mm dia single socket PVC pipes 4 kg/sqcm prince/Sudhakar or any ISI
brand for rain water pipes with clamps - Building SSR - 2015-16 rates
Basic rate BMW-G-13

Rmt

3.00

484.00

161.33

labour charges for laying,fixing and commissioning the


PVC pipes including couplers/bends/tees etc any
diameter including fixing necessary fittings
benda,plugs,couplers,junctions,tees ftc with sovent
jointing as per standard practice BMW-G-152

Rmt

1.00

70.00

70.00

20% labour on fixing charges

14.00

provision for clamps LS

10.00
255.33

22

23

24

Overheads & Contractors Profit 13.615%

34.76

Rate/Rmt

290.10

supply of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings
Basic rate BMW-G-60

107.00

Overheads & Contractors Profit 13.615%

14.57

Rate/each

121.57

supply of 110 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings
Basic rate BMW-G-78

295.00

Overheads & Contractors Profit 13.615%

40.16

Rate/each

335.16

supply of 110 mm dia - Coupler - UPVC/SWR Pipe fittings


Basic rate BMW-G-93

57.00

Overheads & Contractors Profit 13.615%

7.76

Rate/each

64.76

25

Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with aluminium
anodised sections of Jindal sections and outer frame top horizontals & both verticals of 2408 of size 101.6
x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45 mm x 47.62 mm x 3.18
and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with tinted-bronze/green glass 5 mm
thick(middle to top),MDF Board-exterior both sides laminaed 12mm thick(middle to bottom) fixed including
supply and fixing aluminium handles of 150 mm for each shutter and all labour charges for fixing the
fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in
position, fixing shutter to frame etc. completed for finished item of work - BLD-CSTN-11-31 & Item 11 of
Revised data

ground floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x2.10m door
ALUMINIUM SECTION
vertical 2*2.10=4.20

no 2408

top horizantal 1*1.20=1.20


total 4.20+1.20=5.40 rmt*2.404 kg=12.98 kgs
shutter frame
vertical 2*2.10=4.20

no 4504

horizantals 2*1.20=2.40
total 4.20+2.40=6.60 rmt*1.505kg=9.933
midle no 4621 1*1.20=1.20*1.505=1.806
total 12.98+9.933+1.806=24.719 kgs BMS.W.01
tinted-bronze/green GLASS 5mm thick
1.20*1.05=1.26 BMT.I.08
SILICON SEALANT

kg

24.719

321.00

7934.80

sqm

1.26

644.00

811.44

LS

150.00

RUBBER BEADING 2(1.20+2.10) BMS.W.06

RMT

6.60

2.00

13.20

Alum.Anodised.PC HandlesBMT-G-34

each

140.00

280.00

tower bolts 200mm long BMT-G-09

each

141.00

141.00

DOOR STOPPER BMT-G-57

each

63.00

63.00

heavy duty mortice lock 6/7 levers BMT-G-66

each

935.00

935.00

MDF Board-exterior both sides laminaed 12mm thick


BMT-K-81 1.20* 1.05 sqm

sqm

1.26

863.00

1087.38

RATE FOR 2.52 sqm

11415.82

rate for 1.00 sqm

4530.09

B) LABOUR CHARGES
1st Class Carpenter

day

0.099

420.00

41.58

2nd Class Carpenter

day

0.020

375.00

7.43

Power Saw Cutter - Hand Operated - Operator

day

0.099

375.00

37.13

Power Drill - Hand Operated - Operator

day

0.099

375.00

37.13

Unskilled Mazdoor

day

0.297

320.00

95.04

20% on labour

43.66

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
BMC.X.02

Hrs

0.793

125.00

99.13

Power Drill - Hand Operated - Hire Charges


BMC.X.03

Hrs

0.793

116.00

91.99

Non Technical Work Inspecotr

Nos

0.099

400.00

39.60

20% on labour

7.92
5030.67

Power charges for Motors

1%

50.31
5080.98

Overheads & Contractors Profit 13.615%

691.78

BASIC COST per 1 sqm

5772.76

Rate/1.20 x2.10m size door

14547.35

Rate/1.00 x2.10m size door

12122.79

first floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x2.10m door
ALUMINIUM SECTION
vertical 2*2.10=4.20

no 2408

top horizantal 1*1.20=1.20


total 4.20+1.20=5.40 rmt*2.541kg=13.72 kgs
shutter frame
vertical 2*2.10=4.20

no 4504

horizantals 2*1.20=2.40
total 4.20+2.40=6.60 rmt*1.505kg=9.933
midle no 4621 1*1.20=1.20*1.505=1.806
total 12.98+9.933+1.806=24.719 kgs BMS.W.01
tinted-bronze/green GLASS 5mm thick
1.20*1.05=1.26 BMT.I.08
SILICON SEALANT

1.495
kg

24.719

321.00

7934.80

sqm

1.26

644.00

811.44

LS

150.00

RUBBER BEADING 2(1.20+2.10) BMS.W.06

RMT

6.60

2.00

13.20

Alum.Anodised.PC HandlesBMT-G-34

each

140.00

280.00

tower bolts 200mm long BMT-G-09

each

141.00

141.00

DOOR STOPPER BMT-G-57

each

63.00

63.00

heavy duty mortice lock 6/7 levers BMT-G-66

each

935.00

935.00

MDF Board-exterior both sides laminaed 12mm thick


BMT-K-81 1.20* 1.05 sqm

sqm

1.26

863.00

1087.38

RATE FOR 2.52 sqm

11415.82

rate for 1.00 sqm

4530.09

B) LABOUR CHARGES
1st Class Carpenter

day

0.099

420.00

41.58

2nd Class Carpenter

day

0.020

375.00

7.43

Power Saw Cutter - Hand Operated - Operator

day

0.099

375.00

37.13

Power Drill - Hand Operated - Operator

day

0.099

375.00

37.13

Unskilled Mazdoor

day

0.297

320.00

95.04

20% on labour

43.66

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
BMC.X.02

Hrs

0.793

125.00

99.13

Power Drill - Hand Operated - Hire Charges


BMC.X.03

Hrs

0.793

116.00

91.99

Non Technical Work Inspecotr

Nos

0.099

400.00

39.60

20% on labour

7.92

lift charges 10% on labour

25.79
5056.46

Power charges for Motors

1%

50.56
5107.03

Overheads & Contractors Profit 13.615%

695.32

BASIC COST per 1 sqm

5802.35

Rate/1.20 x2.10m size door

14621.92

Rate/1.00 x2.10m size door

12184.93

2nd floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x2.10m door
ALUMINIUM SECTION
vertical 2*2.10=4.20

no 2408

top horizantal 1*1.20=1.20


total 4.20+1.20=5.40 rmt*2.541kg=13.72 kgs
shutter frame
vertical 2*2.10=4.20

no 4504

horizantals 2*1.20=2.40
total 4.20+2.40=6.60 rmt*1.505kg=9.933
midle no 4621 1*1.20=1.20*1.505=1.806
total 13.72+9.933+1.806=25.459 kgs BMS.W.01
tinted-bronze/green GLASS 5mm thick
1.20*1.05=1.26 BMT.I.08
SILICON SEALANT

kg

24.719

321.00

7934.80

sqm

1.26

644.00

811.44

LS

150.00

RUBBER BEADING 2(1.20+2.10) BMS.W.06

RMT

6.60

2.00

13.20

Alum.Anodised.PC HandlesBMT-G-34

each

140.00

280.00

tower bolts 200mm long BMT-G-09

each

141.00

141.00

DOOR STOPPER BMT-G-57

each

63.00

63.00

heavy duty mortice lock 6/7 levers BMT-G-66

each

935.00

935.00

MDF Board-exterior both sides laminaed 12mm thick


BMT-K-81 1.20* 1.05 sqm

sqm

1.26

863.00

1087.38

RATE FOR 2.52 sqm

11415.82

rate for 1.00 sqm

4530.09

B) LABOUR CHARGES
1st Class Carpenter

day

0.099

420.00

41.58

2nd Class Carpenter

day

0.020

375.00

7.43

Power Saw Cutter - Hand Operated - Operator

day

0.099

375.00

37.13

Power Drill - Hand Operated - Operator

day

0.099

375.00

37.13

Unskilled Mazdoor

day

0.297

320.00

95.04

20% on labour

43.66

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
BMC.X.02

Hrs

0.793

125.00

99.13

Power Drill - Hand Operated - Hire Charges


BMC.X.03

Hrs

0.793

116.00

91.99

Non Technical Work Inspecotr

Nos

0.099

400.00

39.60

20% on labour

7.92

lift charges 20% on labour

51.58
5082.25

Power charges for Motors

1%

50.82
5133.08

Overheads & Contractors Profit 13.615%

698.87

BASIC COST per 1 sqm

5831.94

Rate/1.20 x2.10m size door

14696.50

Rate/1.00 x2.10m size door

12247.08

Rate/2.00 x2.10m size door

24494.16

3rd floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x2.10m door
ALUMINIUM SECTION
vertical 2*2.10=4.20

no 2408

top horizantal 1*1.20=1.20


total 4.20+1.20=5.40 rmt*2.404 kg=12.98 kgs
shutter frame
vertical 2*2.10=4.20

no 4504

horizantals 2*1.20=2.40
total 4.20+2.40=6.60 rmt*1.505kg=9.933
midle no 4621 1*1.20=1.20*1.495=1.794
total 12.98+9.933+1.794=24.707kgs BMS.W.01
tinted-bronze/green GLASS 5mm thick
1.20*1.05=1.26 BMT.I.08
SILICON SEALANT

kg

24.707

321.00

7930.95

sqm

1.26

644.00

811.44

LS

150.00

RUBBER BEADING 2(1.20+2.10) BMS.W.06

RMT

6.60

2.00

13.20

Alum.Anodised.PC HandlesBMT-G-34

each

140.00

280.00

tower bolts 200mm long BMT-G-09

each

141.00

141.00

DOOR STOPPER BMT-G-57

each

63.00

63.00

heavy duty mortice lock 6/7 levers BMT-G-66

each

935.00

935.00

MDF Board-exterior both sides laminaed 12mm thick


BMT-K-81 1.20* 1.05 sqm

sqm

1.26

863.00

1087.38

RATE FOR 2.52 sqm

11411.97

rate for 1.00 sqm

4528.56

B) LABOUR CHARGES
1st Class Carpenter

day

0.099

420.00

41.58

2nd Class Carpenter

day

0.020

375.00

7.43

Power Saw Cutter - Hand Operated - Operator

day

0.099

375.00

37.13

Power Drill - Hand Operated - Operator

day

0.099

375.00

37.13

Unskilled Mazdoor

day

0.297

320.00

95.04

20% on labour

43.66

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
BMC.X.02

Hrs

0.793

125.00

99.13

Power Drill - Hand Operated - Hire Charges


BMC.X.03

Hrs

0.793

116.00

91.99

Non Technical Work Inspecotr

Nos

0.099

400.00

39.60

20% on labour

7.92

lift charges 30% on labour

77.37
5106.51

Power charges for Motors

1%

51.07
5157.58

26

Overheads & Contractors Profit 13.615%

702.20

BASIC COST per 1 sqm

5859.78

Rate/1.20 x2.10m size door

14766.65

Rate/1.00 x2.10m size door

12305.55

Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with
aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals
of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x 29.5 mm,
Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather interlocking frame
of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply and fixing aluminium
handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures
with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position,
fixing shutter to frame etc. completed for finished item of work BLD-CSTN-11-30 - Item -10 of - Revised
data.
grond floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x1.35m
BMS.W.01

kgs

8.544

321.00

2742.62

Aluminiun sections frame


top horizantal 8774 1.20mx1=1.20
verticals

8774 1.35mx2=2.70

Total

3.90 Rmtx0.695 kgs= 2.71

Bottom Harizantal 8773


1.20mx1=1.20x0.695kgs=0.834 kgs
shutters
top,bottom, 8304 2x2x0.60=2.40
vertical

8304

Total

2x2x1.35= 5.40

7.80 x 0.642=5.00

5mm thick glass BMT.I.02


2x0.60x1.35= 1.62 sqm
Silicon sealent

sqm

1.62

558.00

LS

903.96
50.00

(0.60+1.35)*2*2 RUBBER BEADING

Rmt

7.80

2.00

15.60

Alum.Anodised.PC Handles BMT-G-31

Each

75.00

150.00

Material for 1.20x1.35m

3862.18

Material for 1.00 sqm


B) LABOUR CHARGES
1st Class Carpenter

2384.06
day

0.096

420.00

40.32

2nd Class Carpenter

day

0.289

375.00

108.38

Power Saw Cutter - Hand Operated - Operator

day

0.096

375.00

36.00

Power Drill - Hand Operated - Operator

day

0.096

375.00

36.00

Unskilled Mazdoor

day

0.289

320.00

92.48

20% labour

62.64

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges

Hrs

0.771

125.00

96.38

Power Drill - Hand Operated - Hire Charges

Hrs

0.771

116.00

89.44

Non Technical Work Inspecotr

Nos

0.096

400.00

38.40

20% labour

7.68
2991.77

Power charges for Motors

1%

29.92
3021.68

Overheads & Contractors Profit 13.615%

411.40

BASIC COST per 1 sqm

3433.08

Rate/1.50 x1.200m size window

6179.55

Rate/1.20 x1.200m size window

4943.64

Rate/1.80 x1.500m size window

9269.33

first floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x1.35m
BMS.W.01
Aluminiun sections frame
top horizantal 8774 1.20mx1=1.20

kgs

8.544

321.00

2742.62

verticals

8774 1.35mx2=2.70

Total

3.90 Rmtx0.695 kgs= 2.71

Bottom Harizantal 8773


1.20mx1=1.20x0.695kgs=0.834 kgs
shutters
top,bottom, 8304 2x2x0.60=2.40
vertical

8304

Total

2x2x1.35= 5.40

7.80 x 0.642=5.00

5mm thick glass BMT.I.02


2x0.60x1.35= 1.62 sqm
Silicon sealent

sqm

1.62

558.00

LS

903.96
50.00

(0.60+1.35)*2*2 RUBBER BEADING

Rmt

7.80

2.00

15.60

Alum.Anodised.PC Handles BMT-G-31

Each

75.00

150.00

Material for 1.20x1.35m

3862.18

Material for 1.00 sqm

2384.06

B) LABOUR CHARGES
1st Class Carpenter

day

0.096

420.00

40.32

2nd Class Carpenter

day

0.289

375.00

108.38

Power Saw Cutter - Hand Operated - Operator

day

0.0960

375.00

36.00

Power Drill - Hand Operated - Operator

day

0.0960

375.00

36.00

Unskilled Mazdoor

day

0.2890

320.00

92.48

20% labour

62.64

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges

Hrs

0.7710

125.00

96.38

Power Drill - Hand Operated - Hire Charges

Hrs

0.7710

116.00

89.44

Non Technical Work Inspecotr

Nos

0.096

400.00

38.40

20% labour

7.68

lift charges 10% on labour

35.16
3026.92

Power charges for Motors

1%

30.27
3057.19

Overheads & Contractors Profit 13.615%

416.24

BASIC COST per 1 sqm

3473.43

Rate/1.50 x1.200m size window

6252.17

Rate/1.80 x1.500m size window

9378.26

2nd floor
UNIT 1 sqm

A) MATERIAL REQUIREMENT for 1.20x1.35m


BMS.W.01

kgs

8.544

321.00

2742.62

sqm

1.62

558.00

903.96

Aluminiun sections frame


top horizantal 8774 1.20mx1=1.20
verticals

8774 1.35mx2=2.70

Total

3.90 Rmtx0.695 kgs= 2.71

Bottom Harizantal 8773


1.20mx1=1.20x0.695kgs=0.834 kgs
shutters
top,bottom, 8304 2x2x0.60=2.40
vertical

8304

Total

2x2x1.35= 5.40

7.80 x 0.642=5.00

5mm thick glass BMT.I.02


2x0.60x1.35= 1.62 sqm
Silicon sealent

LS

50.00

(0.60+1.35)*2*2 RUBBER BEADING

Rmt

7.80

2.00

15.60

Alum.Anodised.PC Handles BMT-G-31

Each

75.00

150.00

Material for 1.20x1.35m

3862.18

Material for 1.00 sqm

2384.06

B) LABOUR CHARGES
1st Class Carpenter

day

0.096

420.00

40.32

2nd Class Carpenter

day

0.289

375.00

108.38

Power Saw Cutter - Hand Operated - Operator

day

0.0960

375.00

36.00

Power Drill - Hand Operated - Operator

day

0.0960

375.00

36.00

Unskilled Mazdoor

day

0.2890

320.00

92.48

20% labour

62.64

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges

Hrs

0.7710

125.00

96.38

Power Drill - Hand Operated - Hire Charges

Hrs

0.7710

116.00

89.44

Non Technical Work Inspecotr

Nos

0.096

400.00

38.40

20% labour

7.68

lift charges 20% on labour

70.32
3062.08

Power charges for Motors

1%

30.62
3092.70

Overheads & Contractors Profit 13.615%

421.07

BASIC COST per 1 sqm

3513.77

Rate/1.50 x1.200m size window

6324.79

Rate/1.20 x1.200m size window

5059.83

Rate/1.80 x1.500m size window


d

9487.19

3rd floor
UNIT 1 sqm
A) MATERIAL REQUIREMENT for 1.20x1.35m
BMS.W.01

kgs

8.544

321.00

2742.62

sqm

1.62

558.00

903.96

Aluminiun sections frame


top horizantal 8774 1.20mx1=1.20
verticals

8774 1.35mx2=2.70

Total

3.90 Rmtx0.695 kgs= 2.71

Bottom Harizantal 8773


1.20mx1=1.20x0.695kgs=0.834 kgs
shutters
top,bottom, 8304 2x2x0.60=2.40
vertical

8304

Total

2x2x1.35= 5.40

7.80 x 0.642=5.00

5mm thick glass BMT.I.02


2x0.60x1.35= 1.62 sqm
Silicon sealent

LS

50.00

(0.60+1.35)*2*2 RUBBER BEADING

Rmt

7.80

2.00

15.60

Alum.Anodised.PC Handles BMT-G-31

Each

75.00

150.00

Material for 1.20x1.35m

3862.18

Material for 1.00 sqm

2384.06

B) LABOUR CHARGES
1st Class Carpenter

day

0.096

420.00

40.32

2nd Class Carpenter

day

0.289

375.00

108.38

Power Saw Cutter - Hand Operated - Operator

day

0.0960

375.00

36.00

Power Drill - Hand Operated - Operator

day

0.0960

375.00

36.00

Unskilled Mazdoor

day

0.2890

320.00

92.48

20% labour

62.64

C) Machinery
Power Saw Cutter - Hand Operated - Hire charges

Hrs

0.7710

125.00

96.38

Power Drill - Hand Operated - Hire Charges

Hrs

0.7710

116.00

89.44

Non Technical Work Inspecotr

Nos

0.096

400.00

38.40

20% labour

7.68

lift charges 30% on labour

105.47
3097.24

Power charges for Motors

1%

30.97
3128.21

27

28

29

Overheads & Contractors Profit 13.615%

425.91

BASIC COST per 1 sqm

3554.12

Rate/1.50 x1.200m size window

6397.41

Rate/1.20 x1.200m size window

5117.93

Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall
thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined
with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be
reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using
65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to
be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per
manufacturers specification and direction of Engineer-in-Charge for finished item of work unit 1.00 RmtBuilding SSR- 2015-16
Basic rate BMT-N.01

325.00

Overheads & Contractors Profit 13.615%

44.25

Rate/Rmt

369.25

Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes
of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S.
frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered
with 5mm thick heat moulded PVC C channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm
wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide
cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in
the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on
either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of
20mm width is to be stuck on the interior side of the C Channel using PVC solvent adhesive. Complete
as per direction of Engineer-in-charge, manufacturers specification & drawing for finished item of work
unit 1.00 sqm - Building SSR- 2015-16

Basic rate BMT-N.02

2362.00

Overheads & Contractors Profit 13.615%

321.59

Rate/sqm

2683.59

Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including
curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH. unit 1.00 cum
Nominal mix 1:3:6- For Flooring-BLDCSTN-2-2
Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per item 11.4. P.C.C grade
M 10
(a) Material
Cement

220

5.84

1284.80

Coarse sand

0.45

cum

1155.09

519.79

40 mm aggregate m/c SS5

0.90

cum

1794.63

1615.16

Water

1.20

kl

103.00

123.60

(b) Labour
Mate

day

Mason (1st Class)

0.10

day

420.00

42.00

Mazdoor (Unskilled)

1.39

day

320.00

444.80

20% on labour

97.36

(c) Machinery
Concrete mixer 300/200 Diesel

1.00

hour

338.60

338.60
4466.11

(d) Formwork @ 4% on cost of material, labour


4.00%
and machinery (a+b+c)

0.00
4466.11

30

e&f) Overheads & Contractors Profit13.615%

608.06

Total/cum

5074.17

Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size Graded
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including
curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH. unit 1.00 cum
Nominal mix M20 - RBR-SBST-5(II)
cement concrete M20nominal mix. Rate may be taken as per item 11.4. R.C.C grade M 20
(a) Material
Cement

0.33

5.84

1.93

Coarse sand

0.45

cum

1155.09

519.79

20 mm aggregate m/c SS5 graded

0.90

cum

1645.65

1481.09

day

Mason (1st Class)

0.10

day

420.00

42.00

Mazdoor (Unskilled)

1.39

day

320.00

444.80

(b) Labour
Mate

20% on labour

97.36

(c) Machinery
Concrete mixer 300/200 Diesel

0.40

hour

Generator 63 KVA

0.40

hour

Vibrator

338.60

135.44
0.00
0.00
2722.40

(d) Formwork @ 10% on cost of material, labour and


machinery (a+b+c)

10%

272.24
2994.64

e&f) Overheads & Contractors Profit13.615%

407.72

Total/cum

3402.36

31

Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable locking arrangement & making necessary holes
for inlet & outlets and over flow pipes but without fittings & base support for tanks unit 1.00 litre
Basic rate BMW-G.01

6.00

Overheads & Contractors Profit13.615%

0.82
6.82

32

Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-31981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 630 mm x 450 mm unit each
Basic rate BMW-D.05

1665.00

Overheads & Contractors Profit13.615%

226.69
1891.69

33

Supplying & Fixing low down porcelain flushing tank 10 Lit Capacity Hindustan Sanitary ware/ parry/
Neycer with internal components unit each
Basic rate BMW-D.11

2534.00

13.615% extra

345.00
2879.00

34

35

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent
complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar cock unit
each
Basic rate BMW-D.25

2169.00

Overheads & Contractors Profit13.615%

295.31
2464.31

Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal
flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995
unit each
Basic rate BMW-D.33

930.00

Overheads & Contractors Profit13.615%

126.62
1056.62

36

Supplying of 110 mm dia 3 M single Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand. unit each
Basic rate BMW-G.35

828.00

Overheads & Contractors Profit13.615%

112.73
940.73

Rate/Rmt
37

313.58

Supply of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any ISI Brand) unit each
Basic rate BMW-G.57

83.00

Overheads & Contractors Profit13.615%

11.30
94.30

38

Supply of 110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme
or any ISI Brand)unit each
Basic rate BMW-G.72

130.00

Overheads & Contractors Profit13.615%

17.70
147.70

39

Supply of 110 mm dia - double Tee with Door - UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme
or any ISI Brand)unit each
Basic rate BMW-G.75

260.00

Overheads & Contractors Profit13.615%

35.40
295.40

40

Supply of 110 mm dia - Coupler - UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI
Brand unit each
Basic rate BMW-G.93

57.00

Overheads & Contractors Profit13.615%

7.76
64.76

41

Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc
any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice unit 1.00 Rmt
Basic rate BMW-G.152

70.00

Overheads & Contractors Profit13.615%

9.53
79.53

42

Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to
914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20
Kg. unit each
Basic rate BMW-B.06

3825.00

Overheads & Contractors Profit13.615%

520.77

Rate/each

4345.77

43

S&F KITEC Polyethyene-Aluminium polyethene (PE-A-PE) composite pressure pipes confirming to IS


15450 -2004 with UV stabilized ,caron block for ,cold water supply capable to withstand pressure upto
80C including all special composite fittings, plastic,brass blend inserts for
elbows,tees,reducers,couplers,connectors etc complete for external works including laying pipes ,fixing in
position testing and commissioning ete

25mm dia OD BMW-I-205

44

45

Rmt

1.00

244.00

285.00

Overheads & Contractors Profit13.615%

38.80

Total

323.80

20mm dia OD BMW-I-204

Rmt

1.00

195.00

195.00

Overheads & Contractors Profit13.615%

26.55

Total

221.55

16mm dia OD BMW-I-203

Rmt

1.00

157.00

157.00

Overheads & Contractors Profit13.615%

21.38

Total

178.38

S & F Gunmetal (GM) horizantal non return valve as per IS - Class - I, Indian make heavy type - 25 mm
NB Size unit each
Basic rate BMW-F.47

870.00

Overheads & Contractors Profit13.615%

118.45

Rate/each

988.45

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 25 mm NB Size unit each

46

47

48

49

Basic rate BMW-F.59

912.00

Overheads & Contractors Profit13.615%

124.17

Rate/each

1036.17

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 20 mm NB Size unit each
Basic rate BMW-F.57

621.00

Overheads & Contractors Profit13.615%

84.55

Rate/each

705.55

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 15 mm NB Size unit each
Basic rate BMW-F.55

476.00

Overheads & Contractors Profit13.615%

64.81

Rate/each

540.81

S&F 12.7 mm N.P bib tap Indian make heavy dutys Seiko/ Senior/ Nice or equivalent unit each
Basic rate BMW-E.07

407.00

Overheads & Contractors Profit13.615%

55.41

Rate/each

462.41

Supply and Transportation of 1.0HP Single phase ISI Mono block CI body motor pumpset (25x25mm).
Makes: Kirloskar / Crompton / Texmo / CRI / KSB / Havells Hi-flow V1 ELEC-5.4.53
Basic rate

7455.00

Overheads & Contractors Profit13.615%

1015.00

Rate/each

8470.00

50

Supply and fixing of 20 mm dia 1.50 mm thick PVC pipe concealed in walls with all required accessories
including masonary work for light , fan and plug point with metal deep box including all labour chages
unit 1.00 Rmt BLD-ELEC-1-4

Ground floor
taking out put 100m
a.
Material
20mm
dia 1.50mm thick PVC pipe item100m

20.00

2000.00

100 nos

44.00

88.00

each

184.00

552.00

each

12

22.00

264.00

each

12

4.00

48.00

kg.

50

5.84

292.00

Skilled electrician ELEC 8-1-74

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

Mason 1st class

day

420.00

840.00

52 ELEC-1.2.1
1.00
m=20.00
U links
ELEC-8.1.7 100nos=44.00
10''x8'' Metal box ELEC-1.3.11
20mm dia 1,2,3,4 way deep junction box
ELEC-1.2.38
20mm PVC bends ELEC-1.2.43
cement
b.Labour charges

20% on labour

638.00
7072.00

sundries 1%

0.00
7072.00

Overheads & Contractors Profit13.615%

0.00

Total

7072.00

Rate/Rmt
b

70.72

1st floor
taking out put 100m
a.
Material
20mm
dia 1.50mm thick PVC pipe item100m

20.00

2000.00

100 nos

44.00

88.00

each

184.00

552.00

each

12

22.00

264.00

each

12

4.00

48.00

kg.

50

5.84

292.00

Skilled electrician ELEC 8-1-74

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

Mason 1st class

day

420.00

840.00

52 ELEC-1.2.1
1.00
m=20.00
U links
ELEC-8.1.7 100nos=44.00
10''x8'' Metal box ELEC-1.3.11
20mm dia 1,2,3,4 way deep junction box
ELEC-1.2.38
20mm PVC bends ELEC-1.2.43
cement
b.Labour charges

20% on labour

638.00

lift charges 10% on labour

0.00
7072.00

sundries 1%

0.00
7072.00

Overheads & Contractors Profit13.615%

0.00

Total

7072.00

Rate/Rmt
c

70.72

2nd floor
taking out put 100m
a.
Material
20mm
dia 1.50mm thick PVC pipe item100m

20.00

2000.00

100 nos

44.00

88.00

each

184.00

552.00

each

12

22.00

264.00

52 ELEC-1.2.1
1.00
m=20.00
U links
ELEC-8.1.7 100nos=44.00
10''x8'' Metal box ELEC-1.3.11
20mm dia 1,2,3,4 way deep junction box
ELEC-1.2.38

20mm PVC bends ELEC-1.2.43

each

12

4.00

48.00

kg.

50

5.84

292.00

Skilled electrician ELEC 8-1-74

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

Mason 1st class

day

420.00

840.00

cement
b.Labour charges

20% on labour

638.00

lift charges 20% on labour

0.00
7072.00

sundries 1%

0.00
7072.00

Overheads & Contractors Profit13.615%

0.00

Total

7072.00

Rate/Rmt
d

70.72

3rd floor
taking out put 100m
a.
Material
20mm
dia 1.50mm thick PVC pipe item100m

20.00

2000.00

100 nos

44.00

88.00

each

184.00

552.00

each

12

22.00

264.00

each

12

4.00

48.00

kg.

50

5.84

292.00

Skilled electrician ELEC 8-1-74

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

Mason 1st class

day

420.00

840.00

52 ELEC-1.2.1
1.00
m=20.00
U links
ELEC-8.1.7 100nos=44.00
10''x8'' Metal box ELEC-1.3.11
20mm dia 1,2,3,4 way deep junction box
ELEC-1.2.38
20mm PVC bends ELEC-1.2.43
cement
b.Labour charges

20% on labour
lift charges 30% on labour

638.00
0.00
7072.00

sundries 1%

0.00
7072.00

Overheads & Contractors Profit13.615%


Total
Rate/Rmt

0.00
7072.00
70.72

51

Supply and fixing of 25 mm dia 2.00 mm thick PVC pipe concealed in roof slab with all required
accessories including masonary work all labour chages unit 1.00 Rmt BLD-ELEC-1-4-2-

Ground floor
taking out put 100m
a. Material
25mm dia 2mm thick PVC pipe item-55 ELEC-1.2.4
25mm dia 1,2,3,4 way deep junction box item 90
ELEC-1.2.39

100m

32.00

3200.00

each

12

25.00

300.00

25mm pvc bends item 95 ELEC-1.2.44

each

12

6.00

72.00

Skilled electrician

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

b.Labour charges

20% on labour

470.00
6392.00

sundries 1%

0.00
6392.00

Overheads & Contractors Profit13.615%

0.00

Total

6392.00

Rate/Rmt
b

63.92

first floor
taking out put 100m
a. Material
25mm dia 2mm thick PVC pipe item-55 ELEC-1.2.4
25mm dia 1,2,3,4 way deep junction box item 90
ELEC-1.2.39

100m

32.00

3200.00

each

12

25.00

300.00

25mm pvc bends item 95 ELEC-1.2.44

each

12

6.00

72.00

Skilled electrician

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

b.Labour charges

20% on labour
lift charges 10% on labour

470.00
0.00
6392.00

sundries 1%

0.00
6392.00

Overheads & Contractors Profit13.615%


Total
Rate/Rmt
c

2nd floor

0.00
6392.00
63.92

taking out put 100m


a. Material
25mm dia 2mm thick PVC pipe item-55 ELEC-1.2.4
25mm dia 1,2,3,4 way deep junction box item 90
ELEC-1.2.39

100m

32.00

3200.00

each

12

25.00

300.00

25mm pvc bends item 95 ELEC-1.2.44

each

12

6.00

72.00

Skilled electrician

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

b.Labour charges

20% on labour

470.00

lift charges 20% on labour

0.00
6392.00

sundries 1%

0.00
6392.00

Overheads & Contractors Profit13.615%

0.00

Total

6392.00

Rate/Rmt
d

63.92

3rd floor
taking out put 100m
a. Material
25mm dia 2mm thick PVC pipe item-55 ELEC-1.2.4
25mm dia 1,2,3,4 way deep junction box item 90
ELEC-1.2.39

100m

32.00

3200.00

each

12

25.00

300.00

25mm pvc bends item 95 ELEC-1.2.44

each

12

6.00

72.00

Skilled electrician

day

480.00

960.00

Semi Skilled electrician

day

375.00

750.00

Helpers

day

320.00

640.00

b.Labour charges

20% on labour
lift charges 30% on labour

470.00
0.00
6392.00

sundries 1%

0.00
6392.00

Overheads & Contractors Profit13.615%


Total
Rate/Rmt

0.00
6392.00
63.92

52

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated Flexible copper cable in existing
pipe with 6A siwtch, ceiling rose and 3 mm thick hyla sheet covering to switch control box including all
labour charges etc,., complet for light, bell , fan and exhaust fan points in non - residential building- for 6
points unit eachBLD-ELEC-2-1

Ground floor

out put 6 points


a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

101.00

606.00

6A 2 way ceiling rose ELEC-1.7.40

each

16.00

96.00

Skilled electrician

day

0.60

480.00

288.00

Semi Skilled electrician

day

1.20

375.00

450.00

Helpers

day

0.60

320.00

192.00

b.Labour charges

20% on labour

186.00
2869.00

sundries

0.00
2869.00

Overheads & Contractors Profit13.615%

0.00

Total

2869.00

Rate/each

478.17

first floor
out put 6 points
a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

101.00

606.00

6A 2 way ceiling rose ELEC-1.7.40

each

16.00

96.00

Skilled electrician

day

0.60

480.00

288.00

Semi Skilled electrician

day

1.20

375.00

450.00

Helpers

day

0.60

320.00

192.00

b.Labour charges

20% on labour
lift charges 10% on labour

186.00
0.00
2869.00

sundries

0.00
2869.00

Overheads & Contractors Profit13.615%

0.00

Total

2869.00

Rate/each

478.17

2nd floor
out put 6 points

a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

101.00

606.00

6A 2 way ceiling rose ELEC-1.7.40

each

16.00

96.00

Skilled electrician

day

0.60

480.00

288.00

Semi Skilled electrician

day

1.20

375.00

450.00

Helpers

day

0.60

320.00

192.00

b.Labour charges

20% on labour

186.00

lift charges 20% on labour

0.00
2869.00

sundries

0.00
2869.00

Overheads & Contractors Profit13.615%

0.00

Total

2869.00

Rate/each

478.17

3rd floor
out put 6 points
a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

101.00

606.00

6A 2 way ceiling rose ELEC-1.7.40

each

16.00

96.00

Skilled electrician

day

0.60

480.00

288.00

Semi Skilled electrician

day

1.20

375.00

450.00

Helpers

day

0.60

320.00

192.00

b.Labour charges

20% on labour
lift charges 30% on labour

186.00
0.00
2869.00

sundries

0.00
2869.00

Overheads & Contractors Profit13.615%

53

0.00

Total

2869.00

Rate/each

478.17

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated Flexible copper cable in existing
pipe with 6A modular siwtch control and 3/2 pin sockets fixing on board including all labour charges unit
each BLD-ELEC-2-1-3

Ground floor
out put 15 points
a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

15

101.00

1515.00

6A 3 pin/2pin socket item ELEC-1.9.4

each

15

141.00

2115.00

Skilled electrician

day

1.50

480.00

720.00

Semi Skilled electrician

day

1.50

375.00

562.50

Helpers

day

1.50

320.00

480.00

b.Labour charges

20% on labour

352.50
6796.00

sundries

0.00
6796.00

Overheads & Contractors Profit13.615%

0.00

Total

6796.00

Rate/each

453.07

first floor
out put 15 points
a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

15

101.00

1515.00

6A 3 pin/2pin socket item ELEC-1.9.4

each

15

141.00

2115.00

Skilled electrician

day

1.50

480.00

720.00

Semi Skilled electrician

day

1.50

375.00

562.50

Helpers

day

1.50

320.00

480.00

b.Labour charges

20% on labour
lift charges 10% on labour

352.50
0.00
6796.00

sundries

0.00
6796.00

Overheads & Contractors Profit13.615%

0.00

Total

6796.00

Rate/each

453.07

2nd floor

out put 15 points


a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

15

101.00

1515.00

6A 3 pin/2pin socket item ELEC-1.9.4

each

15

141.00

2115.00

Skilled electrician

day

1.50

480.00

720.00

Semi Skilled electrician

day

1.50

375.00

562.50

Helpers

day

1.50

320.00

480.00

b.Labour charges

20% on labour

352.50

lift charges 20% on labour

0.00
6796.00

sundries

0.00
6796.00

Overheads & Contractors Profit13.615%

0.00

Total

6796.00

Rate/each

453.07

3rd floor
out put 15 points
a. Material
14/0.3 mm PVC FR flexible copper wire ELEC-1.5.1

100m

1051.00

1051.00

6A modular switch ELEC-1.9.2

each

15

101.00

1515.00

6A 3 pin/2pin socket item ELEC-1.9.4

each

15

141.00

2115.00

Skilled electrician

day

1.50

480.00

720.00

Semi Skilled electrician

day

1.50

375.00

562.50

Helpers

day

1.50

320.00

480.00

b.Labour charges

20% on labour
lift charges 30% on labour

352.50
0.00
6796.00

sundries

0.00
6796.00

Overheads & Contractors Profit13.615%

0.00

Total

6796.00

Rate/each

453.07

54

Supply and run of 2 of 36/0.3 mm. (1.5. sq.mm) Fire retardant PVC insulated Flexible copper cable in
existing pipe for mains including all labour charges etc.,unit 1.00 rmtBLD-ELEC-3-1-4

Ground floor
out put 100 Rmt
a. Material
36/0.3 mm 2.50 sqmm PVC FR flexible copper wire
100m
ELEC-1.5.10

2195.00

4390.00

b.Labour charges
Skilled electrician

day

0.67

480.00

321.60

Semi Skilled electrician

day

2.00

375.00

750.00

Helpers

day

0.67

320.00

214.40

20% on labour

257.20
5933.20

sundries

0.00
5933.20

Overheads & Contractors Profit13.615%

0.00

Total

5933.20

Rate/Rmt
b

59.33

first floor
out put 100 Rmt
a. Material
36/0.3 mm 2.50 sqmm PVC FR flexible copper wire
100m
ELEC-1.5.10

2195.00

4390.00

b.Labour charges
Skilled electrician

day

0.67

480.00

321.60

Semi Skilled electrician

day

2.00

375.00

750.00

Helpers

day

0.67

320.00

214.40

20% on labour
lift charges 10% on labour

257.20
0.00
5933.20

sundries

0.00
5933.20

Overheads & Contractors Profit13.615%


Total
Rate/Rmt
c

2nd floor
out put 100 Rmt
a. Material

0.00
5933.20
59.33

36/0.3 mm 2.50 sqmm PVC FR flexible copper wire


100m
ELEC-1.5.10

2195.00

4390.00

b.Labour charges
Skilled electrician

day

0.67

480.00

321.60

Semi Skilled electrician

day

2.00

375.00

750.00

Helpers

day

0.67

320.00

214.40

20% on labour

257.20

lift charges 20% on labour

0.00
5933.20

sundries

0.00
5933.20

Overheads & Contractors Profit13.615%

0.00

Total

5933.20

Rate/Rmt
d

59.33

3rd floor
out put 100 Rmt
a. Material
36/0.3 mm 2.50 sqmm PVC FR flexible copper wire
100m
ELEC-1.5.10

2195.00

4390.00

b.Labour charges
Skilled electrician

day

0.67

480.00

321.60

Semi Skilled electrician

day

2.00

375.00

750.00

Helpers

day

0.67

320.00

214.40

20% on labour

257.20

lift charges 30% on labour

0.00
5933.20

sundries

0.00
5933.20

Overheads & Contractors Profit13.615%

0.00

Total

5933.20

Rate/Rmt
55

59.33

supply and run of 1 of 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated Flexible copper cable in
existing pipe for earth continuity including all labour charges etc. unit 1.00 rmtBLD-ELEC-3-1-2
out put 100 rmt
a. Material
14/0.3 mm 1.00 sqmm PVC FR flexible copper wire
100m
ELEC-1.5.1

1051.00

1051.00

0.34

480.00

163.20

b.Labour charges
Skilled electrician

day

Semi Skilled electrician

day

1.00

375.00

375.00

Helpers

day

0.34

320.00

108.80

20% on labour

129.40
1827.40

sundries 1%

0.00
1827.40

Overheads & Contractors Profit13.615%

0.00

Total

1827.40

Rate/Rmt
18.27
supply and run of 4 of 6 sq.mm (7/18) WPSC alluminium cable along with No.10 SWG G.I barer wire
through PVC cleats with all accessories including all labour charges etc.,unit 1.00 rmt
56
BLD-ELEC-6-1-4
out put 100 rmt
a. Material
6 sqmm WPSC Aluminium cableELEC-1.6.2

100m

1497.00

5988.00

kg.

13.40

68.00

911.20

kg.

25.00

70.00

1750.00

100 nos

440.00

440.00

Skilled electrician

day

2.00

480.00

960.00

Semi Skilled electrician

day

2.00

375.00

750.00

Helpers

day

2.00

320.00

640.00

No 10 SWG GI wire 6.70x2

ELEC-8.1.41

Binding wire
PVC cleats ELEC-8.1.16
b.Labour charges

20% on labour

470.00
11909.20

sundries

0.00
11909.20

Overheads & Contractors Profit13.615%

0.00

Total

11909.20

Rate/rmt
57

S&F of 63 Amps 415 V TPN swich disconnector fuse unit cubical type without fuses of makes
Standard/Crystal/Havells/HPL unit each
Basic rate ELEC-2.1.2
Overheads & Contractors Profit13.615%
Each

58

119.09

each

2445.00

2445.00
0.00
2445.00

Providing independent earthing by excavating a trench toa depyh of 2.10m in all soils, as per size specied
in data ,using 40 mm dia B class GI pipe 2.50m long with necessary accessories with hume pipe ring duly
providing staggered holes including filling with equal proportion of salt and charcoal in layers and all
labour charges etc complete unit eachBLD-ELEC-5-1-1
a. Material

EW excavation 1 st step 1.50x0.60x0.90m=0.85 cum


2nd step 1.20x0.60x1.20 m=0.90 cum

cum

1.75

139.78

25% extra for narrow trench


40 mm dia B class GI pipe ELEC-8.1.58

244.61
61.15

rmt

2.50

381.00

952.50

25 x6mm (1''x1/4'') GI flat duly drilled 12mm dia holes


4 nos of 200mm length(LR)

each

80.00

80.00

Drilling of 16 nos through holes of 12mm dia(LR)

each

16

6.00

96.00

set

13.00

52.00

each

275.00

275.00

Hard coke ELEC-8.1.13

kg.

40

9.00

360.00

salt ELEC-8.1.14

kg.

20

4.00

80.00

Semi Skilled electrician

day

0.50

375.00

187.50

Helpers

day

0.50

320.00

160.00

Gi nuts ,bolts,washers ELEC-8.1.9


18'' dia RCC hume pipe ring ELEC-8.1.62

b .Labour

20% on labour

69.50
2618.26

Overheads & Contractors Profit13.615%

0.00

Total

59

2618.26

S&F of TPN distrubution board with IP 42 protection (metal door) suitable for 3 phase ELCB-RCCB-FP
isolator as incomer and 10 KA SP MCBS as out going including internal connection and labour charges
for surface-flush mounting etc -- 63 A FP isolator-1 no for incomer,6-32A SP MCBS -18 Nos for out
going unit each BLD-ELEC-4-4-4
output each
a. Material
6 way TPN D.B with IP-42 Protection IS 13032
suitable for 18 Nos SP outgoing 1 no 4 pole incomer
etc., ELEC - 2 -12-58

each

1900.00

1900.00

63A ,4 Pole Isolator/ELCB/RCCB ELEC-2.11.16

each

2947.00

2947.00

10 KA-6-32A range SP MCBS ELEC-2.9.1

each

12

201.00

2412.00

Skilled electrician

day

0.50

480.00

240.00

Semi Skilled electrician

day

1.00

375.00

375.00

Helpers

day

1.00

320.00

320.00

b.Labour charges

20% on labour

187.00
8381.00

sundries

0.00
8381.00

Overheads & Contractors Profit13.615%


Total
60

0.00
8381.00

Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes Crompton High Speed / Bajaj
Ultima / Havells Velocity / Usha Astra / Orient Summer Pride unit each

Basic rate ELEC-5.1.1

1600.00

Overheads & Contractors Profit13.615%

0.00

Total
61

1600.00

Supply of stepped type Electronic Regulator of makes GM G Home / Gold Medal Olive / Million Zoom /
Anchor Penta Cherry / Great white Omega unit each
Basic rate ELEC-1.7.12

198.00

Overheads & Contractors Profit13.615%

0.00

Total
62

198.00

Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with
Electronic Ballast Chokes and all standard accessoriesof makes Wipro / G.E. / Phillips / Crompton / Bajaj.
Unit each
Basic rate ELEC-3.6.7

1173.00

Supply of 36/40W fluorescent Lamp of makes Wipro /


G.E. / Phillips / Crompton / Bajaj ELEC-3.7.7

45.00
1218.00

Overheads & Contractors Profit13.615%

0.00

Total
63

1218.00

Supply of 32A TP Plug and Socket in SS enclosure. Makes: Gold Medal / Milltec / Sputnik / Bentec /
Sigma / Anchor Panasonic / V-Guard( for AC board) unit each
Basic rate ELEC-2.12.69

each

1300.00

Overheads & Contractors Profit13.615%

1300.00
0.00

Total

1300.00

64

RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials
to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges
etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished
item of work. (APSS No.403 & 903) BLDCTSN 6-11

Ground floor
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop)
BMT-F-28
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides

sqm

13.30

17.00

226.10

cum
kg
sqm

0.25
50.00
21.80

4163.19
5.84
134.81

1040.80
292.00
2938.81

kg

26.40

42.90

1132.56

1st Class Mason

day

8.00

420.00

3360.00

Miller Operator

day

1.00

0.00

0.00

Mazdoor (unskilled)

day

10.00

320.00

3200.00

6mm both ways @ 15 cm c/c


1.00/0.20=6x2=12.00mx0.22kg/m=2.64kg x10
sqm=26.40 kg
B) LABOUR CHARGES

20% on labour

1312.00

c) Machinery
Machine Mixing Mortar with Miller - Hire charges

Hrs

2.00

338.60

677.20

BASIC COST per 10 sqm

14179.47

13.615% over heads and contractors profit

1930.53

COST per 10 sqm

16110.00

Rate/sqm

1611.00

first floor
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop)
BMT-F-28

sqm

13.30

17.00

226.10

Cement Mortar 1:3 for 25 mm thick

cum

0.25

4163.19

1040.80

kg

50.00

sqm

21.80

134.81

2938.81

kg

5.00

42.90

214.50

1st Class Mason

day

8.00

420.00

3360.00

Miller Operator

day

1.00

0.00

0.00

Mazdoor (unskilled)

day

10.00

320.00

3200.00

Dry Cement for making Lumps


12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides
HYSD Steel/ Mild steel & Binding wire

0.00

B) LABOUR CHARGES

lift charges 10% of labour

656.00

20% on labour

1312.00

c) Machinery
Machine Mixing Mortar with Miller - Hire charges

Hrs

2.00

338.60

677.20

BASIC COST per 10 sqm

13625.41

13.615% over heads and contractors profit

1855.10

COST per 10 sqm

15480.51

Rate/sqm

1548.05

2nd floor
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop)
BMT-F-28
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides
HYSD Steel/ Mild steel & Binding wire
B) LABOUR CHARGES

sqm

13.30

17.00

226.10

cum

0.25

4163.19

1040.80

kg

50.00

sqm

21.80

134.81

2938.81

kg

5.00

42.90

214.50

0.00

1st Class Mason

day

8.00

420.00

3360.00

Miller Operator

day

1.00

0.00

0.00

Mazdoor (unskilled)

day

10.00

320.00

3200.00

lift charges 20% of labour

1312.00

20% on labour

1312.00

c) Machinery
Machine Mixing Mortar with Miller - Hire charges

65

Hrs

2.00

338.60

677.20

BASIC COST per 10 sqm

14281.41

13.615% over heads and contractors profit

1944.41

COST per 10 sqm

16225.82

Rate/sqm

1622.58

CEMENT MORTAR (1:2)--unit 1.00 cum

BLD-CSTN-1-4

A-MATERIALS
Cement

kg

720.00

5.84

4204.80

Sand including 5% wastage

cum

1.05

1222.09

1283.19

Seigniorage charges for sand (seignoirage included in


sand cost)

cum

1.05

0.00

0.00

0.00

0.00

0.00

0.20

320.00

64.00

B- MACHINARY
Nil
C-LABOUR
Man mazdoor for mixing mortar

day

20% on labour

12.80

Grand total
66

5564.79

Plastering with CM (1:4) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-1


Ground floor
Materials
Cement mortar (1:4)

0.15

cum

3462.39

519.36

Mason 1st class

0.60

day

420.00

252.00

Mazdoor unskilled

0.96

day

320.00

307.20

Labour

20% on labour

111.84
1190.40

67

Plastering with CM (1:2) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-1


Ground floor
Materials
Cement mortar (1:4)

0.15

cum

5564.79

834.72

0.60

day

420.00

252.00

Labour
Mason 1st class

Mazdoor unskilled

0.96

day

320.00

20% on labour

307.20
111.84
1505.76

68

69

70

Plastering with CM (1:2)&(1:4) 12mm thick GF unit 10.00 sqm BLD-CSTN-6-1


Plastering with CM (1:2) 12 mm thick

1505.76

Plastering with CM (1:4) 12 mm thick

1190.40

Rate/10 sqm

1348.08

Rate/ sqm

134.81

Providing and fixing of IS 3564 marked Aluminium extruded section body tubulor type univercel Hydralic
door closer with double speed adjustment Hardwyn make(GAZEL) with necessary accessiores and
screws BMT -G-74 Umit each
Basic rate

1198.00

13.615% over heads and contractors profit

163.11

Rate/each

1361.11

Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size Graded
hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including
curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
MORD and 1500, 1700 & 2100 MORTH. unit 1.00 cum Nominal mix 1:3:6 - RBR-FNDN-4
Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per item 11.4. P.C.C grade M 10
(a) Material
Cement

0.22

5840.00

1284.80

Coarse sand

0.45

cum

1155.09

519.79

20 mm aggregate graded m/c SS5

0.90

cum

1645.65

1481.09

Water including curing M-189

1.20

kl

103.00

123.60

day

Mason (1st Class) item I-11

0.10

day

420.00

42.00

Mazdoor (Unskilled) item III-4

1.39

day

320.00

444.80

(b) Labour
Mate

20% on labour

97.36

(c) Machinery
Concrete mixer 300/200 Diesel

item -16

Water tanker 6 kl capacity

0.40

hour

338.60

135.44

0.13

hour

630.00

81.90
4210.77

(d) Formwork @ 4% on cost of material, labour


4.00%
and machinery (a+b+c)

168.43
4379.20

13.615% over heads and contractors profit

596.23

Total/cum

4975.43

71

RCC M-20 Nominal mix (cement,fine aggregate,coarse aggregate) corresponding to Table -9 of IS -456
using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from approved quarry
including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate ,water
etc to site and including seigniorage charges ,sales and other taxes on all materials including all
operational ,incidental and labour charges such as machine mixing ,laying concrete ,curing etc complete
but excluding cost of steel and its fabrication charges for finished item of work,but including
centering,shuttering unit 1.00cum for culvert slabs RBR-SBST-5 A
A. MATERIALS
20 mm graded HBG metal

0.90

cum

1645.65

1481.09

sand

0.45

cum

1155.09

519.79

330.00

kgs

5.84

1927.20

Mason 1st class -labour rates -skilled category item


I-11

0.10

day

420.00

42.00

Mazdoor unskilled item III-4

1.39

day

320.00

444.80

Cement
B. LABOUR

20% on labour

97.36

C MACHINERY
Concrete mixer 300/200 Diesel

item -16

Generator 33 kva

hour

0.40

338.60

135.44

hour

1.40

0.00

0.00
4647.67

(d) Formwork @ 10% on cost of material, labour


and machinery (a+b+c)

464.77
5112.44

72

13.615% over heads and contractors profit -

696.06

Rate/cum

5808.50

Total/cum

5808.50

Providing concrete for plain/reinforced concrete in open foundations using 2/3 of 40 mm and 1/3 of 20mm
nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and technical specifications Clause 802,
803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Nominal mix 1:3:6 - RBR-FNDN-4
Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per item 11.4.P.C.C grade M 10
Unit = cum
(a) Material
Cement

0.22

5840.00

1284.80

Coarse sand

0.45

cum

1155.09

519.79

40 mm aggregate m/c SS5

0.60

cum

1326.63

795.98

20 mm aggregate m/c SS5

0.30

cum

1846.63

553.99

Water including curing M-189

1.20

kl

103.00

123.60

day

(b) Labour
Mate

Mason (1st Class) item I-11

0.10

day

420.00

42.00

Mazdoor (Unskilled) item III-4

1.39

day

320.00

444.80

20% on labour

97.36

(c) Machinery
Concrete mixer 300/200 Diesel

item -16

Water tanker 6 kl capacity item -65

0.40

hour

338.60

135.44

0.13

hour

630.00

81.90
4079.65

(d) Formwork @ 4% on cost of material, labour


and machinery (a+b+c)

4.00%

4.00%

163.19
4242.84

73

e&f) Overheads & Contractors Profit13.615%

577.66

Total/cum

4820.50

Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared
sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel
channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the
formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed
and plate vibrators and finished in continuous operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge /
culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing
compound (where specified) and water finishing to lines and grade as per drawing and Technical
Specification Clause 1501 MORD. item RBR-CCPV-5 of standard data

Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate

day

Mason (1st class) item I-11

day

5.00

420.00

2100.00

Mason (2nd class) item II-35

day

5.00

375.00

1875.00

Mazdoor (Unskilled) item III-4

day

150.00

320.00

48000.00

Mazdoor (Skilled) item III-4

day

6.00

320.00

1920.00

Surveyor

day

2.00

0.00

0.00

Mazdoor (Semi-Skilled)item III-4

day

6.00

320.00

1920.00

Blacksmith for cutting of dowel bars including removal


of burrs, fabrications & fixing of dowel bars.

day

1.00

0.00

0.00

20% on labour

11163.00

b) Machinery
Concrete mixer 600/400 Diesel item-18

hour

36.00

0.00

0.00

Needle vibrator

hour

9.00

175.40

1578.60

Screed vibrator

hour

9.00

0.00

0.00

Plate vibrator item -39

hour

9.00

0.00

0.00

Concrete joint cutting machine for initial & final cuts

hour

4.00

0.00

0.00

Water tanker 6 kl capacity item -65

hour

5.00

630.00

3150.00

Air Compressor (1 hour initial + 1 hour final)

hour

2.00

0.00

0.00

25 mm 2/3*67.5=45.00 cum

cum

45.00

1794.63

80758.19

12.50 mm 1/3*67.50=22.50

cum

22.50

1578.63

35519.10

Sand as per IS:383 and conforming to Clause


1500.2.4.2 @ 0.45 cum/cum of concrete

cum

33.75

1155.09

38984.17

Cement @ 400 kg/cum of concrete

30.00

5840.00

175200.00

Polythene sheet 125 micron (LR)

sqm

412.50

0.00

0.00

0.118

0.00

0.00

kg

5.00

0.00

0.00

litre

19.00

96.00

1824.00

90.00

0.00

0.00

90.00

0.00

0.00

No.

483.00

0.00

0.00

litre

122.00

0.00

0.00

litre
kl

131.25
18.00

0.00
0.00

0.00
0.00

sqm

3.00

902.00

2706.00

c) Material
Crushed stone coarse aggregates, grading will be as
per Clause 1501.2.4.1 (Table 1500.1) of specifications
@ 0.90 cum/cum of concrete (25 mm & 12.5 mm
blending) 67.50 cum

Mild steel dowel bar 25 mm dia of grade S 240. 500


mm long 20 Nos. at culvert/bridge slab and at
construction joint including 5 per cent wastage.
(4x20x0.500)+5 per cent wastage = 42 m @ 2.80 kg
per m = 117.60kg
Bitumen primer @ 200 ml per joint for 23 joints BMT
-H-94 of building SSR
Bituminous sealant 800 ml per joint for 23 joints BMTH.93 of building SSR
Jute rope 12 mm dia including 5 per cent wastage
Debonding strips 3.75 m (length) x 10 mm (width) x 5
mm (thick) cut-out of rubber filler board or similar
material including 5 per cent wastage
Polythene sheathing, covering 2/3rd dowel bars
(20x23) and tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement(sl BMT-H64 page 24 of building SSR material rates 2010-11)
Curing compound (if used) @ 0.33 litre per sqm
Water for curing M-189
Joint filler board 20 mm thick as per IS:1838
(4 x 3.75 x 0.200 = 3 sqm) BMT-U-02

406698.06
d) Formwork @ 3% of (a+b+c)

12200.94
418899.00

e&f) Overheads & Contractors Profit 13.615%

57033.10

Cost for 75 cum = a+b+c+d+e+f

475932.10

Rate per cum = (a+b+c+d+e+f)/75

6345.76

supply and fixing of pre cast RCC jollys of approved design 50mm thick
unit 1.00 sqm
Basic rate BMS.W.17

sqm

1.00

402.00

402.00

13.615% over heads and contractors profit

54.73

Rate/sqm

456.73

74

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and conveyance
of materials to work site & all operational, incidental, labour charges etc complete for finshined item of
work as per SS 911 for Internal walls unit 10.00 sqm

Ground floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.360

Nos.

480.00

172.80

Painter 2nd class

0.840

Nos.

375.00

315.00

20% MAA

0.200

772.35

154.47

Sundries including brushes , ladders etc., @ 1%

0.010

1470.22

0.00

Rate per 10 sqm

1470.22

Rate per 1 sqm

147.02

Overheads & Contractors Profit 13.615%

0.136

147.022

Rate per 1 sqm


b

167.04

First floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.360

Nos.

480.00

172.80

Painter 2nd class

0.840

Nos.

375.00

315.00

20% MAA

0.200

772.35

154.47

Sundries including brushes , ladders etc., @ 1%

0.010

1470.22

0.00

lit charges 10% on labour

77.24

Rate per 10 sqm

1547.46

Rate per 1 sqm

154.75

Overheads & Contractors Profit 13.615%

0.136

154.746

Rate per 1 sqm


c

20.02

21.07
175.82

2 nd floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.360

Nos.

480.00

172.80

Painter 2nd class

0.840

Nos.

375.00

315.00

20% MAA

0.200

772.35

154.47

Sundries including brushes , ladders etc., @ 1%

0.010

1470.22

0.00

lit charges 20% on labour

154.47

Rate per 10 sqm

1624.69

Rate per 1 sqm

162.47

Overheads & Contractors Profit 13.615%

0.136

162.469

Rate per 1 sqm


d

22.12
184.59

3rd floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.360

Nos.

480.00

172.80

Painter 2nd class

0.840

Nos.

375.00

315.00

20% MAA

0.200

772.35

154.47

Sundries including brushes , ladders etc., @ 1%

0.010

1470.22

0.00

lit charges 30% on labour

231.71

Rate per 10 sqm

1701.93

Rate per 1 sqm

170.19

Overheads & Contractors Profit 13.615%

0.136

170.193

Rate per 1 sqm

23.17
193.36

75

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and conveyance
of materials to work site & all operational, incidental, labour charges etc complete for finshined item of
work as per SS 911 for external l walls unit 10.00 sqm

Ground floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Mazdoor

1.500

Nos.

320.00

480.00

20% MAA

0.200

1049.10

209.82

Sundries including brushes , ladders etc., @ 1%

0.010

1802.32

Rate per 10 sqm

1802.32

Rate per 1 sqm

180.23

Overheads & Contractors Profit 13.615%

0.136

180.232

Rate per 1 sqm


b

First floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Mazdoor

1.500

Nos.

320.00

480.00

20% MAA

0.200

1049.10

209.82

Sundries including brushes , ladders etc., @ 1%

0.010

1802.32

0.00
56.91

Rate per 10 sqm

1859.23

Rate per 1 sqm

185.92

Overheads & Contractors Profit 13.615%

0.136

185.923

Rate per 1 sqm

25.31
211.23

2 nd floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Mazdoor

1.500

Nos.

320.00

480.00

20% MAA

0.200

1049.10

209.82

Sundries including brushes , ladders etc., @ 1%

0.010

1802.32

0.00

lit charges 20% on labour

113.82

Rate per 10 sqm

1916.14

Rate per 1 sqm

191.61

Overheads & Contractors Profit 13.615%

0.136

191.614

Rate per 1 sqm


d

24.54
204.77

lit charges 10% on labour

0.00

26.09
217.70

3rd floor
Cost of cement primer grade-I BMT.J.01

1.000

Kg

165.00

165.00

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Cost of synthatic polymer laxuary plastic emulsion


paint of supirior grade BMT.J.23

0.800

Ltrs

473.00

378.40

Painter 1st class

0.210

Nos.

480.00

100.80

Painter 2nd class

0.490

Nos.

375.00

183.75

Mazdoor

1.500

Nos.

320.00

480.00

20% MAA

0.200

1049.10

209.82

Sundries including brushes , ladders etc., @ 1%

0.010

1802.32

0.00

lit charges 30% on labour

170.73

Rate per 10 sqm

1973.05

Rate per 1 sqm

197.31

Overheads & Contractors Profit 13.615%

0.136

197.305

Rate per 1 sqm

76

26.86
224.17

Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) (precast terrazzo chequered tiles
conforming to IS: 13801 using marble aggregates of size 10 mm , sand, marble powder, white cement
pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than 20 mm thick of
any coloured shades.) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or
RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm &
jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item
of work, but excluding the cost of conveyance of all materials.BLD-CSTN-7-4
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22mm thick
(mediumshade)
(precast terrazzo chequered tiles
conforming to IS: 13801 using marble aggregates of
size 10 mm , sand, marble powder, white cement
pigments etc., with terrazzo topping not less than 6
mm of tiles overall size not less than 20 mm thick of
any coloured shades.) BMT.D.01

sqm

10.05

314.00

3155.70

Cement for CM (1:6) proportion for base coat

kg.

28.80

5.84

168.19

Cement for slurry

kg.

33.00

5.84

192.72

Cement for jointing & pointing

kg.

6.00

5.84

35.04

Pigment

kg.

Sand for CM (1:6) proportion

cum

0.12

1222.09

146.65

Seigniorage charges of sand

cum

0.12

0.00

0.00

0.00

B. MACHINERY

0.00

Nill

0.00

C. LABOUR

0.00

Mason 2nd class

day

0.960

375.00

360.00

Man mazdoor

day

2.240

320.00

716.80

Mazdoor (unskiled)

day

3.30

320.00

1056.00

20% on labour

426.56
6257.66

Add water charges 1%

62.58

Grand Total

6320.24

13.615% over heads and contractors profit -

860.50
7180.74

Rate /sqm

718.07

77

Flooring with ceramic tiles,(Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and
thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs ) set over base coat of cement mortar(1:8), 12mm thick over
CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread
@3.3. kgs per sqm & jointed neatly with white cement paste of full depth mixed with pigment of matching
shade,including cost of all materials like cement,sand water and tiles etc.,complete, including seigniorage
charges, etc., complete for finished item of work,but including the cost of conveyance of all
materials.BLD-CSTN-7-6

Ground floor
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles(Non-skid red or white full body Ceramic
floor tiles of size 300 x 300 mm and thickness
between 7-8 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and
finish in all shades and designs BMT-C.54)

sqm

10.10

450.00

4545.00

Cement for CM (1:8) for base coat

kg

21.60

5.84

126.14

Cement for slurry

kg

33.00

5.84

192.72

White cement BMS.W.68

kg

2.00

29.00

58.00

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Seigniorage charges of sand

cum

0.12

0.00

0.00

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.30

320.00

1056.00

B. LABOUR

20% on labour

459.84
7827.55

Add water charges 1%

1.00%

78.28
7905.83

13.615% over heads and contractors profit -

1076.38

Rate/10sqm

8982.21

Rate/sqm

898.22

First floor
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles(Non-skid red or white full body Ceramic
floor tiles of size 300 x 300 mm and thickness
between 7-8 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and
finish in all shades and designs BMT-C.54)

sqm

10.10

450.00

4545.00

Cement for CM (1:8) for base coat

kg

21.60

5.84

126.14

Cement for slurry

kg

33.00

5.84

192.72

White cement BMS.W.68

kg

2.00

29.00

58.00

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Seigniorage charges of sand

cum

0.12

0.00

0.00

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.3

320.00

1056.00

B. LABOUR

20% on labour

459.84

lift charges 10% of labour

229.92
8057.47

Add water charges 1%

1.00%

80.57
8138.05

13.615% over heads and contractors profit -

1108.00

Rate/10sqm

9246.04

Rate/sqm

924.60

2nd floor
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles(Non-skid red or white full body Ceramic
floor tiles of size 300 x 300 mm and thickness
between 7-8 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and
finish in all shades and designs BMT-C.54)

sqm

10.10

450.00

4545.00

Cement for CM (1:8) for base coat

kg

21.60

5.84

126.14

Cement for slurry

kg

33.00

5.84

192.72

White cement BMS.W.68

kg

2.00

29.00

58.00

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Seigniorage charges of sand

cum

0.12

0.00

0.00

B. LABOUR

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.3

320.00

1056.00

20% on labour

459.84

lift charges 20% of labour

459.84
8287.39

Add water charges 1%

1.00%

82.87
8370.27

78

13.615% over heads and contractors profit -

1139.61

Rate/10sqm

9509.88

Rate/sqm

950.99

Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles )glazed red or white full
body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and
designs for skirting ) 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm
thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with
white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like
tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished
item of work, but including the cost of conveyance of all materials unit 10.00 sqm BLD-CSTN-7-18
Unit = 10 sqm

Ground floor
A. MATERIALS:
Ceramic tiles ( glazed red or white full body ceramic
wall tiles of size 200 x 300 mm / 245 mm x 325 mm
and thickness 6 mm 1st quality conforming to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs for skirting
BMT-C.74)

sqm

10.00

660.00

6600.00

Sand for cm 1:3 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:3 base coat

kgs

57.60

5.84

336.38

Cement for slurry

kgs

33.00

5.84

192.72

kgs

6.00

29.00

174.00

cum

0.12

0.00

0.00

Mason 1st class

day

0.77

420.00

323.40

Mazdoor (unskiled)

day

0.80

320.00

256.00

White cement for jointing & pointing


BMT.W.68
Seigniorage charges of sand
B. LABOUR

20% labour

115.88
8145.03

13.615% over heads and contractors profit -

1108.95

Total/10 sqm

9253.98

Total/ sqm

925.40

First floor
A. MATERIALS:
Ceramic tiles BMT-C.01

sqm

10.00

660.00

6600.00

Sand for cm 1:3 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:3 base coat

kgs

57.60

5.84

336.38

Cement for slurry

kgs

33.00

5.84

192.72

White cement for jointing & pointing


BMT.W.68
Seigniorage charges of sand

kgs

6.00

29.00

174.00

cum

0.12

0.00

0.00

Mason 1st class

day

0.77

420.00

323.40

Mazdoor (unskiled)

day

0.80

320.00

256.00

B. LABOUR

20% labour

115.88

lift charges 10% labour 579.40

57.94
8202.97

13.615% over heads and contractors profit -

1116.83

Total/10 sqm

9319.81

Total/ sqm

931.98

2nd floor
A. MATERIALS:
Ceramic tiles BMT-C.01

sqm

10.00

660.00

6600.00

Sand for cm 1:3 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:3 base coat

kgs

57.60

5.84

336.38

Cement for slurry

kgs

33.00

5.84

192.72

White cement for jointing & pointing


BMT.W.68
Seigniorage charges of sand

kgs

6.00

29.00

174.00

cum

0.12

0.00

0.00

Mason 1st class

day

0.77

420.00

323.40

Mazdoor (unskiled)

day

0.80

320.00

256.00

B. LABOUR

20% labour

115.88

lift charges 20% labour

115.88
8260.91

13.615% over heads and contractors profit -

1124.72

Total/10 sqm

9385.64

Total/ sqm

938.56

79

Flooring with vitrified tiles of 1st quality, ( ordinary soluble salt porcelain vitrified tiles screen printed and
polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs) set over base coat
of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and
tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but including
the cost of conveyance of all materials
.BLD-CSTN-7-5

Ground floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size( ordinary soluble salt
porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Cement for CM (1:8) for base coat


Cement for slurry

kg.
kg.

21.60
33.00

5.84
5.84

126.14
192.72

Cement for Pointing with CM (1:3)

kg.

6.00

5.84

35.04

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Sand for pointing

cum

0.020

1222.09

24.44

Seigniorage charges of sand

cum

0.140

0.00

0.00

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.30

320.00

1056.00

B. LABOUR

20% on labour

459.84
8940.04

Add water charges 1%

1.00%

89.40
9029.44
1229.36

Grand Total/10 sqm

10258.79

Grand Total/ sqm

1025.88

First floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size( ordinary soluble salt
porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Cement for CM (1:8) for base coat

kg.

21.60

5.84

126.14

Cement for slurry

kg.

33.00

5.84

192.72

Cement for Pointing with CM (1:3)

kg.

6.000

5.84

35.04

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Sand for pointing

cum

0.020

1222.09

24.44

Seigniorage charges of sand

cum

0.140

0.00

0.00

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.30

320.00

1056.00

B. LABOUR

20% on labour

459.84

lift charges 10% of labour

229.92
9169.96

Add water charges 1%

1.00%

91.70
9261.66
1260.97

Grand Total/10 sqm

10522.63

Grand Total/ sqm

1052.26

2nd floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size( ordinary soluble salt
porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Cement for CM (1:8) for base coat

kg.

21.60

5.84

126.14

Cement for slurry

kg.

33.00

5.84

192.72

Cement for Pointing with CM (1:3)

kg.

6.000

5.84

35.04

Sand for CM (1:8)

cum

0.12

1222.09

146.65

Sand for pointing

cum

0.020

1222.09

24.44

Seigniorage charges of sand

cum

0.140

0.00

0.00

B. LABOUR

0.00

Mason 1st class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskiled)

day

3.30

320.00

1056.00

20% on labour

459.84

lift charges 20% of labour

459.84

9399.88
Add water charges 1%

1.00%

94.00
9493.87
1292.59

Grand Total/10 sqm

10786.47

Grand Total/ sqm

1078.65

80

Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring
stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at
the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work, but including the cost of conveyance of all
materials BLD-CSTN-7-20

Ground floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size( ordinary soluble salt
porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Sand for cm 1:5 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:5 base coat

kgs

34.56

5.84

201.83

Cement for slurry

kgs

33.00

5.84

192.72

White cement for jointing & pointing

kgs

2.00

29.00

58.00

Seigniorage charges of sand

cum

0.12

0.00

0.00

Mason Ist class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskilled)

day

3.30

320.00

1056.00

B. LABOUR

20 % on labour

459.84
9014.24

Add water charges 1%

1.00%

90.14

Grand Total

9104.38

Overheads & Contractors Profit 13.615%

1239.56

Rate/10sqm

10343.94

Rate/sqm

1034.39

First floor
Unit = 10 sqm
A. MATERIALS:

Vitrified tiles of 1st quality of size( ordinary soluble salt


porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Sand for cm 1:5 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:5 base coat

kgs

34.56

5.84

201.83

Cement for slurry

kgs

33.00

5.84

192.72

White cement for jointing & pointing

kgs

2.00

29.00

58.00

Seigniorage charges of sand

cum

0.12

0.00

0.00

Mason Ist class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

Mazdoor (unskilled)

day

3.30

320.00

1056.00

B. LABOUR

20 % on labour

459.84

lift charges 10% of labour

229.92
9244.16

Add water charges 1%

1.00%

92.44

Grand Total

9336.60

Overheads & Contractors Profit 13.615%

1271.18

Rate/10sqm

10607.78

Rate/sqm

1060.78

2nd floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size( ordinary soluble salt
porcelain vitrified tiles screen printed and polished of
size 400 x 400 mm and thickness between 8-9 mm
1st quality conforming to IS:13711, IS:13712,
IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs) BMT.C.58

sqm

10.10

560.00

5656.00

Sand for cm 1:5 base coat

cum

0.12

1222.09

146.65

Cement for cm 1:5 base coat

kgs

34.56

5.84

201.83

Cement for slurry

kgs

33.00

5.84

192.72

White cement for jointing & pointing

kgs

2.00

29.00

58.00

Seigniorage charges of sand

cum

0.12

0.00

0.00

Mason Ist class

day

0.96

420.00

403.20

Mason 2nd class

day

2.24

375.00

840.00

B. LABOUR

Mazdoor (unskilled)

day

3.30

320.00

1056.00

20 % on labour

459.84

lift charges 20% of labour

459.84
9474.08

Add water charges 1%

1.00%

94.74

Grand Total

9568.82

Overheads & Contractors Profit 13.615%

1302.80

Rate/10sqm

10871.62

Rate/sqm

1087.16

81

Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of 0.80
mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65
microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter
of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision
for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed
with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder
coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float
glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding
screws, Including 10 mm Square guard bars with 6 (152.4mm) pitch etc., complete for finished item of
work

Double openable ventilator shutter Size of 4 0 x 2 0 (1219.2mm x 609.6mm) outer frame section size of
80 x 45mm,shutter frame section size of 52 x 25mm, vertical mullion section size of 80 x 60 mm BMTP.100
basic rate
Overheads & Contractors Profit 13.615%
Rate/sqm

6105.00
831.20
6936.20

Double fixed Louvers Ventilator size of 40 x 30 (1219.2mm x 914.4mm) outer frame box section size of
80 x 45mm , Vertical mullion section size of 80 x 60 mm BMT-P.104
basic rate
4177.00
568.70
Overheads & Contractors Profit 13.615%
Rate/sqm
4745.70
Manufacture as per BIS:12592 (Part 1&2)Supply & Delivery of manhole covers and frames with ISI
marking anywhere in A.P.,F.O.R. destination including, loading, unloading & stacking at site but including
central excise duty, sales tax, octroi and other Govt levies etc., as applicable.I.S.I Mark PH SSR Item No
-29
H.D.-20 with 500mm diaclear opening
central VAT 5%

1989.00
99.45
2088.45

82

Overheads & Contractors Profit 13.615%

284.34

Rate/each

2372.79

Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI ceiling
angles, sections perimeter channels including cost and conveyance of all materials and labour charges
etc complete BMT-M.53
basic rate

441.00

Overheads & Contractors Profit 13.615%

60.04

Rate/sqm

501.04

83

Supply and Transportation of 18W Down lighter with system lumens of 1580lm, suitable for Recessed /
Surface mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver,
operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV,THD<15%, with high
power LED's having efficacy of > 120 lumins/watt,CCT: 3000K - 5700K, minimum CRI>70, .etc., complete
a) LUMINAIRE MAKE : Phillips / OSRAM / GE / Crompton
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSR
basic rate ELEC-3.9.13

2722.00

Overheads & Contractors Profit 13.615%

0.00

Rate/each
84

2722.00

Supply of Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire
guard hinged with lock and key arrangements etc., complete.Makes: Bajaj / Crompton / Surya
basic rate ELEC-8.1.4

396.00

Overheads & Contractors Profit 13.615%

0.00

Rate/each
84a

396.00

Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark. Makes: Legrand / Schneider
basic rate ELEC-ELEC-2.9.3

595.00

Overheads & Contractors Profit 13.615%

0.00

Rate/each
collection and supply and spreading of 90 to 45 mm HBG SS5 m/c metal for unit 1.00 cum -

595.00

85
RBR-SBBS-12(11)
Taking output = 300 cum
a) Labour
Mate

day

Mazdoor (Skilled)

day

2.48

320.00

793.60

Mazdoor (Unskilled)

day

10.00

320.00

3200.00

20% on labour

798.72

b) Machinery
Motor grader 110 HP 50 cum per hour

hour

6.00

0.00

0.00

Three
hour

hour

30.00

0.00

0.00

Tractor with rotavator 25 cum per hour

hour

12.00

0.00

0.00

water tanker 6 kl capacity rate 8.00cum capacity


877.80 , Rte for 6 kl capacity= 877.80*6/8=658.35

hour

5.00

0.00

0.00

cum

300.00

1116.63

334987.96

kl

30.00

0.00

0.00

wheel 80-100 kN static roller @10 cum per

c) Material
90 to 45 mm HBG SS5 m/c metal
Water

339780.28
d&e) Overheads & Contractors Profit 13.615%

46261.09

Cost for 300 cum = a+b+c+d+e

386041.37

Rate per cum = a+b+c+d+e/300

1286.80

86

collection and supply and spreading of 40 to 20 mm HBG SS5 m/c metal for unit 1.00 cum - RBR-SBBS12(11)
Taking output = 300 cum
a) Labour
Mate

day

Mazdoor (Skilled)

day

2.48

320.00

793.60

Mazdoor (Unskilled)

day

10.00

320.00

3200.00

20% on labour

798.72

b) Machinery
Motor grader 110 HP 50 cum per hour

hour

6.00

0.00

0.00

Three
hour

hour

30.00

0.00

0.00

Tractor with rotavator 25 cum per hour

hour

12.00

0.00

0.00

water tanker 6 kl capacity rate 8.00cum capacity


877.80 , Rte for 6 kl capacity= 877.80*6/8=658.35

hour

5.00

0.00

0.00

cum

300.00

1626.63

487987.96

kl

30.00

0.00

0.00

wheel 80-100 kN static roller @10 cum per

c) Material
40 to 20 mm HBG SS5 m/c metal
Water

492780.28

87

d&e) Overheads & Contractors Profit 13.615%

67092.04

Cost for 300 cum = a+b+c+d+e

559872.32

Rate per cum = a+b+c+d+e/300

1866.24

collection and supply and spreading of 20 to 10 mm HBG SS5 m/c metal for unit 1.00 cum - RBR-SBBS12(11)
Taking output = 300 cum
a) Labour
Mate

day

Mazdoor (Skilled)

day

2.48

320.00

793.60

Mazdoor (Unskilled)

day

10.00

320.00

3200.00

20% on labour

798.72

b) Machinery
Motor grader 110 HP 50 cum per hour

hour

6.00

0.00

0.00

Three
hour

hour

30.00

0.00

0.00

Tractor with rotavator 25 cum per hour

hour

12.00

0.00

0.00

water tanker 6 kl capacity rate 8.00cum capacity


877.80 , Rte for 6 kl capacity= 877.80*6/8=658.35

hour

5.00

0.00

0.00

cum

300.00

1691.63

507487.96

kl

30.00

0.00

0.00

wheel 80-100 kN static roller @10 cum per

c) Material
20 to 10 mm HBG SS5 m/c metal
Water

512280.28

d&e) Overheads & Contractors Profit 13.615%

69746.96

Cost for 300 cum = a+b+c+d+e

582027.24

Rate per cum = a+b+c+d+e/300

1940.09

Assistant Engineer

Deputy Executive Engineer

Superintending Engineer

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar Panchayat
Detailed cum abstract of estimate
Sl.
No.
I

Description of item

No

No

Est Rs 60.34 lakhs


D

Qty

Rate

Unit

Total

Ground floor
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Note : Classifications of Earth Work
Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H--ordinary soil--manual
means upto 3m depth (Manual) for foundations of buildings in restricted places

Column footings
F1Type-A1,A4,F1,F2,F3,F4=6
F2TypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0
F3TypeC1,C2,C3,D1,D2,D3,E2,E3=8
F4Type-G2,G3=2

2.55

2.55

2.00

78.03

10

2.95

2.95

2.00

174.05

3.60

3.60

2.00

207.36

1.70

1.70

2.00

11.56
471.00
471.00

258.06

cum

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH RBRFNDN-1 1(A) & SOR -2013-14 CL-2-II
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H--ordinary soil--manual means upto 3m depth
side entrace portico approach

4.00

5.20

0.30

6.24

side entrace portico approach

4.00

4.50

0.30

5.40

2.375 0.50

0.20

0.48

2.05

0.50

0.20

0.41

1.73

0.50

0.20

0.69

2.05

0.50

0.20

0.62

1.40

0.50

0.20

0.70

1.14

0.50

0.20

0.23

0.81

0.50

0.20

0.16

2.00

0.50

0.20

0.40

A1-B1,A4-B4
GL= 0.15m
A2-B2,A3-B3
5.00-2.30/22.95/2=2.375
5.00-2.95=2.376
5.00C1-D1,C2-D2,D2-E2,D3-E3,
5.00C3-D3 5.003.60=1.40m
3.76-2.95/2E2-F2,E3-F3 3.76-3.60/22.30/2=0.81m
F2-G2,F3-G3 4.00-2.30/21.70/2=2.00m

121546.53

2.46

0.50

0.20

0.25

2.13

0.50

0.20

0.21

1.48

0.50

0.20

0.30

1.805 0.50

0.20

0.18

5.08- 2.95/2F1-F2 5.08-2.30=2.78

2.78

0.50

0.20

0.28

C2-C3,D2-D3,E2-E3
A2-A3,B2-B3 4.48-2.95=1.53

1.53

0.50

0.20

0.31

0.88

0.50

0.20

0.26

4.48F2-F3
4.48-2.30=2.18
3.60=0.88

2.18

0.50

0.20

0.22

G2-G3 4.48-1.70=2.78

2.78

0.50

0.20

0.28

1.585 0.50

0.20

0.16

1.26

0.50

0.20

0.13

0.94

0.50

0.20

0.28

4.21-3.60/2F3-F4 4.21-2.30=1.91

1.91

0.50

0.20

0.19

rear side ramp walls

5.00

0.45

0.45

2.03

Ramps rear side

5.00 14.00

0.40

28.00

B1-B2,

5.085.08-2.95=2.13m

C1-C2,D1-D2

5.08-3.60=1.48

4.21-2.95/2B3-B4, 4.21-2.95=1.26

48.38

Sand Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH for foundationsSand filling
Column footings

48.38

F1Type-A1,A4,F1,F2,F3,F4=6

2.55

2.55

0.15

5.85

F2TypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

10

2.95

2.95

0.15

13.05

F3TypeC1,C2,C3,D1,D2,D3,E2,E3=8

3.60

3.60

0.15

15.55

F4Type-G2,G3=2

1.70

1.70

0.15

0.87

side entrace portico approach

4.00

5.20

0.10

2.08

side entrace portico approach

4.00

4.50

0.10

1.80

10

4.70

0.50

0.10

2.35

3.46

0.50

0.10

0.69

4.55

0.50

0.10

1.37

4.63

0.50

0.10

0.46

4.48

0.50

0.10

0.90

4.18

0.50

0.10

0.21

under plinth beams


D2E2,D3-E3,A4-B4,B4-C4,

B3-C3,C3-D3
A1-A2,C1-C2

3.76-

5.00-0.60/25.08(0.45-.15)-0.30/2=4.63

158.81

cum

7683.06

4.18

0.50

0.10

1.05

3.76

0.50

0.10

0.19

3.61

0.50

0.10

0.72

3.76

0.50

0.10

0.19

3.70

0.50

0.10

0.37

3.18

0.50

0.10

0.16

4.77

4.85

0.60

55.52

3.53

4.85

0.60

10.27

4.77

4.25

0.60

48.65

3.53

4.25

0.60

9.00

4.77

3.98

0.60

11.39

3.70

4.18

0.15

2.32

5.00 14.00

0.40

28.00

rear side ramp walls

5.00

0.45

0.10

0.45

rear side ramps 0.75-0.15 M30


concrete
-0.10 CC 1:4:8=0.50 ,0.400.10-0.15=0.15m,
( 0.50+0.15)/2=0.325

5.00 14.00

0.325

22.75

4.21-0.30/2B3-B4,D3-D4,E3-E4,F3-F4
4.21-0.30*2=3.61

4.00A1A2-B1B2
,B1B2-C1C2,
G2-G3 4.48-0.30=3.18
Basement 0.75-0.15=0.60
E1E2-F1F2

C1C2-

D1D2,D1D2-E1E2

3.76-0.23=3.53,
5.00-0.23=4.77,5.08-0.23=4.85
C2C3E2E3-F2F3
D2D3,D2D3-E2E3
5.08-0.23=4.85
A3A4-B3B4,B3B4-C3C4,
4.480.23=4.25
C3C4D3D4,D3D4-E3E4
front entrance
portico
3.76-0.23=3.53
5.004.000.23=4.77,4.21-0.23=3.98
resar
side ramps 0.75-0.15 M30
0.30=3.70,4.48-0.30=4.18
concrete
-0.10 CC 1:4:8=0.50
(0.50+0.30)/2=0.40

236.21
236.21
4

Plain cement concrete (1:4:8) using 40mmHBG graded m/c with


concrete mixer mixing including compacting finishing, curing ete for
foundations
under Column footings
F1Type-A1,A4,F1,F2,F3,F4=6

2.20

2.20

0.15

2.90

F2TypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

12

2.80

2.80

0.15

14.11

F2ATypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

2.90

2.90

0.15

2.52

1288.88

cum

304446.02

F3TypeC1,C2,C3,D1,D2,D3,E2,E3=8

3.30

3.30

0.15

9.80

F4Type-G2,G3=2

1.30

1.30

0.15

0.51

side entrace portico approach


A1-B1,B1-C1,C1-D1,D1-E1 ,
side entrace portico approach

4.00

5.20

0.10

2.08

4.00

4.50

0.10

1.80

10

4.70

0.50

0.10

2.35

3.46

0.50

0.10

0.69

4.55

0.50

0.10

1.37

4.63

0.50

0.10

0.46

4.48

0.50

0.10

0.90

4.18

0.50

0.10

0.21

4.18

0.50

0.10

1.05

3.76

0.50

0.10

0.19

4.21-0.30/2B3-B4,D3-D4,E3-E4,F3-F4
0.30=3.76
4.21-0.30*2=3.61
C3-C4,

3.61

0.50

0.10

0.72

F2-G2,F3-G3

3.76

0.50

0.10

0.19

3.70

0.50

0.10

0.37

3.18

0.50

0.10

0.16

5.00

0.45

0.10

0.45

5.00 14.00

0.10

7.00

under plinth beams


D2E2,D3-E3,A4-B4,B4-C4,
E1-F1,E2-F2,E3-F3,E4-F4
A2-B2 ,B2-C2 ,C2-D2 ,A3-B3,
C4-D4,D4-E4
B3-C3,C3-D3
3.765.00-0.30=4.70
0.30=3.46
A1-A2,C1-C2
5.00-0.60/20.30/2=4.55
B1-B2,D1-D2 ,E1-E2,F1-F2
5.08(0.45-.15)-0.30/2=4.63
A2-A3
5.08-0.30-0.30=4.48
B2-B3,C2-C3,D2-D3,E2-E3,
A3-A4

4.48- 0.30=4.18
F2-F3 4.48-0.30

4.21-0.15-0.30=3.76
4.00G2-G3 4.48-0.30=3.18
0.30=3.70m
side ramp walls
Ramps

49.82
50.00

4210.79

cum

210539.55

Providing concrete for plain/reinforced concrete in open foundations using 2/3 of 40 mm and 1/3 of
20mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.Nominal mix
1:3:6
Rear side ramp walls

5.00

0.45

0.25

1.13

5.00

0.35

0.375

1.31
2.44
2.44

4820.50

cum

11762.02

Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than
0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel
plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and finished in continuous operation
including provision of contraction and expansion, construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures
as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

rear side ramp


side entrace portico approach
side entrace portico approach

10.50
3.12
2.70
16.32
16.32
6345.76 cum
Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and technical specifications Clause
802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Nominal mix 1:4:8- For Flooring
A1A2-B1B2 ,B1B2-C1C2,
for flooring
E1E2-F1F2

1
1
1

5.00 14.00
4.00 5.20
4.00 4.50

0.15
0.15
0.15

103562.83

C1C2-

D1D2,D1D2-E1E2

4.77

4.85

0.15

13.88

A2A3-B2B3,B2B3-C2C3,
3.76-0.23=3.53,
5.00-0.23=4.77,5.08-0.23=4.85

3.53

4.85

0.15

2.57

C2C3E2E3-F2F3
D2D3,D2D3-E2E3
5.08-0.23=4.85

4.77

4.25

0.15

12.16

A3A4-B3B4,B3B4-C3C4,
4.48- 5.000.23=4.25
0.23=4.77,4.48-0.23 =4.25

3.53

4.25

0.15

2.25

C3C4D3D4,D3D4-E3E4
3.76-0.23=3.53
front entrance
portico

4.77

3.98

0.15

2.85

3.70

4.18

0.15

2.32

5.004.000.23=4.77,4.21-0.23=3.98
0.30=3.70,4.48-0.30=4.18

1
1
1

36.03

36.03
4210.79 cum
Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH
BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse
agggregate) from approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as weigh
batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per
IS Code from standard suppliers approved by the deparment including pumping ,
centering,shuttering,laying concrete ,vibrating,curing etc M25 design mix
Column footings
F1Type-A1,A4,F1,F2,F3,F4=6

2.35

2.00

0.20

3.76

151714.80

Tripizoidal portion
(2.00+0.60)/2=1.30

1.30

1.30

0.15

1.01

F2TypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

12

2.60

2.60

0.30

24.34

Tripizoidal portion
(2.6+0.75)/2=1.675

12

1.675 1.675

0.15

5.05

F2ATypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

2.70

2.70

0.30

4.37

Tripizoidal portion
(2.7+0.75)/2=1.725

1.725 1.725

0.15

0.89

F3TypeC1,C2,C3,D1,D2,D3,E2,E3=8

3.10

3.10

0.30

17.30

Tripizoidal portion
(3.10+0.75)/2=1.925

1.925 1.925

0.30

6.67

F4Type-G2,G3=2

1.10

0.25

0.61

1.10

64.00
64.00
b

8552.54

cum

547362.62

8977.46

cum

44887.31

Pedestals
F1Type-A1,A4,F1,F2,F3,F4=6

0.50

0.50

0.60

0.60

F2TypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

12

0.50

0.50

0.60

1.80

F2ATypeA2,A3,B1,B2,B3,B4,D4,E2,E4=1
0

0.50

0.50

0.60

0.30

F3TypeC1,C2,C3,D1,D2,D3,E2,E3=8

0.60

0.60

0.60

1.30

F4Type-G2,G3=2

0.50

0.50

0.60

0.30
4.30

5.00

A1-B1,B1-C1,C1-D1,D1-E1 ,
Plinth beams
PB1
,A4B4,B4-C4,

4.70

0.23

0.40

3.46

3.46

0.23

0.40

0.64

0.23

0.40

E1-F1,E4-F4
C4-D4,D4-E4 5.000.30=4.70
3.76-0.30=3.46
PB2
E2-F2,E3-F3,
A2-B2 ,B2-C2 ,C2-D2 ,A3-B3,
B3-C3,C3-D3
3.76-0.30=3.46
5.00-0.60/2D2-E2,D3-E3 5.00-0.30=4.70
0.30/2=4.55
PB3

3.46

0.23

0.40

0.64

4.55

0.23

0.40

2.51

4.70

0.23

0.40

0.86

0.23

0.40

A1-A2,C1-C2
B1-B2,D1-D2 ,E1-E2,F1-F2

4.63

0.23

0.40

0.85

5.08(0.45-.15)-0.30/2=4.63
A2-A3

4.48

0.23

0.40

1.65

4.18

0.23

0.40

0.38

4.18

0.23

0.40

1.92

3.76

0.23

0.40

0.35

3.61

0.23

0.40

1.33

3.76

0.23

0.40

0.35

3.70

0.23

0.60

1.02

8.70

0.23

0.60

1.20

gents and ladies partation wall


5.08-0.30=4.78

4.78

0.23

0.45

0.49

WC front walls
5.00-0.30=4.700.23=4.47/2=2.235

2.24

0.23

0.23

0.24

WC partation walls

1.20

0.23

0.23

0.13

urinals

0.75

0.23

0.23

0.16

Citizen service center office


rooms 5.08-0.30=4.78

4.78

0.30

0.45

0.65

5.08-0.30-0.30=4.48
B2-B3,C2-C3,D2-D3,E2-E3,
4.48- 0.30=4.18
F2-F3 4.48-0.30
4.21-0.30/2B3-B4,D3-D4,E3-E4,F3-F4
4.21-0.30*2=3.61

PB4

4.00G2-G3 4.48-0.30=4.18
Inside toilets

18.82
18.82
d

C1
type F1 type footings
Columns

2.00--0.15-0.150.20-0.30-0.90
pedestal=0.30+0.75
C1
type F2 type footings
basement+3.60
superstructure=4.65 m
A1,F1,A4,F1,F2,F3,F4,=6
2.00--0.15-0.150.20-0.35-0.90
pedestal=0.25+0.75
C1
type F3 type footings
basement+3.60
superstructure=4.60 m
B1,B2,B3,B4,C4,D4,E1,E4,=8
2.00--0.15-0.150.30-0.40-0.90
pedestal=0.10+0.75
basement+3.60
superstructure=4.45 m
D2,D3,C1,D1,E2,E3=6

0.23 0.375

4.65

2.41

0.23 0.375

4.60

3.17

0.23 0.375

4.45

2.30

10665.33

cum

200721.42

C2 type F2 type footings

2.00--0.15-0.150.20-0.35-0.90
pedestal=0.25+0.90
basement+3.60
C2
type F3 type footings
superstructure=4.75 m
A2,A3,=2
2.00--0.15-0.150.30-0.40-0.90
pedestal=0.10+0.75
basement+3.60
C3 type F4 type footings
superstructure=4.45 m
C2,C3=2
2.00--0.15-0.150.15-0.20-0.90
pedestal=0.45+0.30
basement+3.45
superstructure=4.20 m
G2,G3=2
e

Lintels
over doors citizen service center
office rooms
(5.00-0.30)
over doors tiolet entrance rooms
(5.000.30)=
Toilet inside rooms
5.00+0.23=5.23
over widows citizen service
center office rooms
(5.00-0.30)=

0.30

0.45

4.60

1.24

0.30

0.45

4.45

1.20

0.786

0.375 0.375

4.20

0.93

11.26
16.19

4.70

0.23

0.20

0.22

4.70

0.23

0.20

0.22

5.23

0.23

0.20

0.24

4.70

0.23

0.20

0.22

10702.75

cum

173277.45

10935.88

cum

9732.94

0.89
0.89

Roof slab 0.14 m thick


5.00*4+3.76+0.30 =24.06m,
5.08+4.48+4.21+0.30 slab
extension=14.07m
deduct staircase opening 3.760.30=3.46,5.08-0.30=4.78
front portico slab
4.00+0.30+1*0.30=4.60,
4.48+0.30+2*0.30=5.38

24.06 14.07

338.52

3.46

4.78

-16.54

4.60

5.38

24.75
346.73
346.73

Staircase slabs 0.15m thick


5.08-0.30=4.78-1.50=3.28
1st flight
sqare root
3.28^2+1.875^2
2nd flight

3.78

1.73

6.54

3.78

1.73

6.54

mid landing slab


3.76+0.23=3.99

3.99

1.73

6.90

1359.50

sqm

471380.25

1422.41

sqm

28405.56

19.97
19.97
h

A1-B1,B1-C1,C1-D1,D1-E1
,
Beams
GFRB1
,A4B4,B4-C4,

4.70

0.23

0.45

3.89

3.46

0.23

0.45

0.72

3.46

0.23

0.45

0.72

4.55

0.23

0.45

2.83

4.70

0.23

0.45

0.97

4.63

0.23

0.45

0.48

4.18

0.23

0.45

0.43

3.76

0.23

0.45

0.39

4.48

0.23

0.45

0.46

5.08-0.30F2-F3 4.48-0.30

4.18

0.23

0.45

0.43

F3-F4 4.21-0.30*2=3.61

3.61

0.23

0.45

0.37

4.48

0.23

0.45

1.39

4.63

0.23

0.45

0.48

E1-F1,E4-F4
C4-D4,D4-E4 5.000.30=4.70
3.76-0.30=3.46
GFRB2
B3-C3,C3-D3

5.00-0.60/2D2-E2,D3-E3 5.00-0.30=4.70
GFRB3

5.08-(0.45-.15)-

4.21-0.30/2-

GFRB4

5.08-(0.45-.15)-

4.21-

4.18

0.23

0.45

1.73

3.61

0.23

0.45

1.12

3.76

0.23

0.45

0.39

4.70

0.23

0.45

1.95

3.70

0.23

0.45

0.77

4.18

0.23

0.45

0.43

3.46

0.23

0.45

0.36

1
1

2
1

4.00
8.70

0.23
0.23

0.45
0.60

0.83
1.20

GFRB2a

entrance portico beams

4.00G2-G3 4.48-0.30=4.18
for staircase midlanding GFRB4
Portico beams

22.34
say
I

22.35

10509.67

cum

RCC Sun shades 0.60m wide


0.10m thick at fixed end and
0.05m at free end
Citizen service center office
1
2
2.20
4.40
587.94
Rmt
rooms 1.80 window+2*0.20=
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing
in position with cover blocks of approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of work in all floors.

Column footings

46.00 cum

100

kg/cum 4599.90

Pedestals

5.00

cum

100

kg/cum

Plinth beams

18.82 cum

100

kg/cum 1882.00

columns

16.19 cum

120

kg/cum 1942.80

Lintels

0.89

cum

100

kg/cum

Roof slab 0.15m thick

52.01 cum

80

kg/cum 4160.76

Staircase slabs 0.20m thick

3.99

cum

80

kg/cum

Beams

22.35 cum

120

kg/cum 2682.00

sunshades

0.20

80

kg/cum

cum

234891.16

2586.95

500.00

89.00

319.52

15.84
16191.82
32383.64

48.74

Brick masonary in CM (1:6) with traditional bricks of size 23x11x7cm including cost and
10 conveyance of all materials and labour charges
Basement 0.75-0.45=0.30

kg

1578405.65

A1-B1,B1-C1,C1-D1,D1-E1 ,

,A4B4,B4-C4,
E1-F1,E4-F4

4.70

0.23

0.30

2.59

E2-F2,E3-F3,
C4-D4,D4-E4 5.003.76-0.30=3.46
0.30=4.70
A2-B2 ,B2-C2 ,C2-D2 ,A3-B3,
B3-C3,C3-D3
3.76-0.30=3.46

3.46

0.23

0.30

0.48

3.46

0.23

0.30

0.48

4.55

0.23

0.30

1.88

4.70

0.23

0.30

0.65

B1-B2,D1-D2 ,E1-E2,F1-F2
5.08(0.45-.15)-0.30/2=4.63
A2-A3

4.63

0.23

0.30

0.64

4.48

0.23

0.30

1.24

5.08-0.30-0.30=4.48
B2-B3,C2-C3,D2-D3,E2-E3,
4.48- 0.30=4.18
A3-A4

4.18

0.23

0.30

0.29

4.18

0.23

0.30

1.44

3.76

0.23

0.30

0.26

3.61

0.23

0.30

1.00

3.76

0.23

0.30

0.26

5.00-0.60/2A1-A2,C1-C2
D2-E2,D3-E3 5.00-0.30=4.70
0.30/2=4.55

F2-F3 4.48-0.30
4.21-0.30/2B3-B4,D3-D4,E3-E4,F3-F4
0.30=3.76
4.21-0.30*2=3.61
C3-C4,

Inside
toilets
4.21-0.15-0.30=3.76

0.30

gents and ladies partation wall


5.08-0.30=4.78

4.78

0.23

0.30

0.33

WC front walls
5.00-0.30=4.700.23=4.47/2=2.235

2.235 0.23

0.30

0.31

WC partation walls

1.20

0.23

0.30

0.17

urinals

0.75

0.23

0.30

0.21

Citizen service center office


rooms 5.08-0.30=4.78
C1-D1,D1-E1
,

4.78

0.23

0.30

0.33

4.70

0.23

3.30

7.13

3.46

0.23

3.30

2.63

3.46

0.23

3.30

2.63

4.55

0.23

3.30

3.45

5.00-0.60/2-0.30/2=4.55
C1-C2
D2-E2,
5.00-0.30=4.70

4.70

0.23

3.30

3.57

D1-D2 ,E1-E2,
5.08-(0.45-.15)0.30/2=4.63

4.63

0.23

3.15

3.35

4.48

0.23

3.15

6.49

super structure
E1-F1
E2-F2,
5.00-0.30=4.70
3.76-0.30=3.46
C2-D2 ,
3.76-0.30=3.46

5.08-0.300.30=4.48

F1-F2
1

4.48

0.23

3.30

3.40

4.78

0.23

3.60

3.96

WC front walls
5.00-0.30=4.700.23=4.47/2=2.235

2.24

0.23

3.05

3.14

WC partation walls

1.20 0.115

3.05

0.84

urinals

0.75 0.115

0.75

0.26

Citizen service center office


rooms 5.08-0.30=4.78

4.78

0.23

3.60

3.96

portico parapet wall

4.00

0.23

0.30

0.28

portico parapet wall

4.78

0.23

0.30

0.66

0.50

24

1.73

0.30

0.15

0.93

3.78 0.115

0.75

0.65

Citizen service center office


rooms doors D

1.20

0.23

2.10

-1.16

Toilets main entrance doors D1

1.00

0.23

2.10

-0.97

Toilet doors D2

0.75

0.23

2.10

-1.45

1.80

0.23

1.50

-1.24

1.80

0.23

0.60

-0.50

ventilators toilets

0.80

0.23

0.60

-0.44

RCC jolly in staircase room

1.50

0.23

1.20

-0.41

Inside toilets 5.08-0.300.30=4.48


gents and ladies partation wall
5.08-0.30=4.78

staircase steps
staircase railing walls
deductions

Citizen service center office


rooms windows
Citizen service center office
rooms ventilators

lintels

-0.46
53.24

Add extra for variation

2.48
55.72

11

4869.38

cum

RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement
as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental,
cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form
work, lift charges etc., complete for finished items of work but excluding cost of steel & its
fabrication charges, for finished item of work.
windows
vertical 1.50

1.50

0.83

4.98

horizontal bottom

1.80

0.83

2.99

ventilators over widows vertical

0.60

0.83

1.99

ventilators over widows


Horizantal

1.80

0.83

5.98

vertical 0.60

0.60

0.83

3.98

horizontal top and bottom

0.80

0.83

5.31

ventilators toilets

271332.93

25.23
25.23

1611.00

sqm

40645.54

Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with
aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of
2408 of size 101.6 x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45
mm x 47.62 mm x 3.18 and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with tintedbronze/green glass 5 mm thick(middle to top),MDF Board-exterior both sides laminaed 12mm
12 thick(middle to bottom) fixed including supply and fixing aluminium handles of 150 mm for each
shutter and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and
including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for
finished item of work

citizen charter doors 1.20x2.10m

14547.35

each

29094.69

Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing
with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals &
both verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size
62 x 29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and
Weather interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed
13 including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly
and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including
labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished
item of work
windows 1.80x1.50m

9269.33

each

18538.66

Manufacture,supply,delivery of MS grill gates,window ornamental safety grill ,made with MS


13 flats,MS angles,MS squares etc including welding,finishing,applying red oxide paint as primary coat
etc complete
windows 1.80x1.50m

50.00

kg/each

100.00

14 Plastering with CM (1:3) 12mm thick GF to ceiling


slab area

346.73

Staircase slabs

19.97

sides of beams
,A4B4,B4-C4,

4.70

0.45

33.84

3.46

0.45

6.23

3.46

0.45

6.23

4.55

0.45

24.57

4.70

0.45

8.46

4.63

0.45

4.17

4.18

0.45

3.76

3.76

0.45

3.38

4.48

0.45

4.03

5.08-0.30F2-F3 4.48-0.30

4.18

0.45

3.76

F3-F4 4.21-0.30*2=3.61

3.61

0.45

3.25

E2-F2,E3-F3,
A2-B2 ,B2-C2 ,C2-D2 ,A3-B3,
B3-C3,C3-D3
3.76-0.30=3.46

5.00-0.60/2D2-E2,D3-E3
0.30/2=4.55 5.00-0.30=4.70

5.08-(0.45-.15)-

4.21-0.30/2-

85.89

kg

8589.29

C1-C2

4.48

0.45

12.10

4.63

0.45

4.17

4.18

0.45

15.05

3.61

0.45

9.75

3.76

0.45

3.38

4.70

0.45

16.92

3.70

0.45

3.33

4.00G2-G3 4.48-0.30=4.18

4.18

0.45

1.88

for staircase midlanding GFRB4

3.46

0.45

3.11

C1 type
A1,F1,A4,F1,F2,F3,F4,=6

1.50

3.60

32.40

C1 type
B1,B2,B3,B4,C4,D4,E1,E4,=8

1.50

3.60

43.20

C1 type D2,D3,C1,D1,E2,E3=6

1.50

3.60

32.40

C2 type A2,A3,=2

1.80

3.60

12.96

1.80

3.60

12.96

3.142

0.30

3.60

6.79

front portico
4.00+4.48+0.30+4.00=12.78

12.78

0.30

3.83

portico beams

3.70

0.30

4.44

4.18

0.30

2.51

B2-B3,C2-C3,D2-D3,E2-E3,
5.08-(0.45-.15)0.30/2=4.63
B3-B4,D3-D4,E3-E4,
4.48-0.30
C3-C4,

4.210.30*2=3.61
A2'-B2',B2'-C2',C2'-D2',D2'-E2'
4.21-0.15-0.30=3.76
entrance
portico beams
5.00-0.30=4.70m

columns

2.00--0.15-0.150.30-0.40-0.90
pedestal=0.10+0.90
basement+3.60
superstructure=4.60 m
C3 type G2,G3=2

689.57
647.26
14

Plastering CM(1:5) 12 mm thick to walls including cost and


conveyance of all materials and labour charges
exterior
out side
basement
sides

24.00

0.75

36.00

147.19

sqm

95270.42

super structure citizen sevice


certer room ,toilets,stair case
out side rear
2*5.00+3.76+0.30=14.06

14.06

3.75

52.73

portico parapet wall

4.00

0.75

3.00

portico parapet wall

4.78

0.75

7.17
98.90

super structure citizen sevice


certer room ,toilets,stair case
out side r,sides,front
2*5.00+3.76+0.30+(5.08+0.23)*
2=24.68

24.68

3.75

92.55

deduct staircase room opening

3.46

3.30

-11.42

staircase railing walls

3.78

1.65

12.47

deduct doors D

1.20

2.10

-5.04

Toilet doors D1

1.00

2.10

-4.20

windows

1.80

1.50

-5.40

ventilators over windows

1.80

0.60

-2.16

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80

Inside

171.98

15

Add extra for sides and soffits

18.02

citizen charter 5.08-0.23=4.85,

190.00

Plastering CM(1:5) 20 mm thick to walls including cost and


conveyance of all materials and labour charges
inside
(5.00-0.23-0.23)/2=2.27,

14.24

3.60

102.53

staircase room 5.080.23=4.85,3.76-0.23 =3.53 ,


2(4.85+3.53)

16.76

3.75

62.85

deduct staircase room


2(4.85+2.27)=14.24
Toilets inside 2(4.85+4.77)

3.46

3.30

-11.42

19.24

3.60

69.26

toilet partation wall

4.85

3.60

34.92

Toilet partation (5.00-0.230.23)/2=2.27

2.27

3.05

27.69

Toilets inside

1.20

3.05

14.64

urinals

0.75

1.65

4.95

deduct doors D

1.20

2.10

-5.04

Toilet doors D1

1.00

2.10

-4.20

Toilet inside doors D2

0.75

2.10

-12.60

128.08

sqm

24335.56

windows

1.80

1.50

-5.40

ventilators over windows

1.80

0.60

-2.16

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80
272.31

Add extra for sides and soffits

16

17.69
290.00

196.21

sqm

56900.13

1.80

456.73

sqm

822.12

8.10

137.81

sqm

1116.30

supply and fixing of pre cast RCC jollys of approved design 50mm
thick
RCC jolly in staircase room

1.50

1.20

Painting with Synthetic Enamel paints - Two Coats - For New Iron
17 Work including primary coat for window grills with primary coat of red
oxide one coat
iron safety grill of windows
1.50
2
1.80
1.50

Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with
a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners
and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be
18 fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A
minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for
horizontal member etc. complete as per manufacturers specification and direction of Engineer-inCharge for finished item of work
Toilet entrance doors D1
2*(1.00+2.10)

6.20

12.40

Toilet doors D2 2(0.75+2.10)

5.70

22.80

35.20
369.25
Rmt
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S.
tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top &
bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture.
M.S. frame shall be covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either
side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom
19 rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles &
rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with
solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on
the interior side of the C Channel using PVC solvent adhesive. Complete as per direction of
Engineer-in-charge, manufacturers specification & drawing for finished item of work

Toilet entrance doors D1

1.00

2.10

4.20

Toilet doors D2

0.75

2.10

6.30
10.50

12997.56

2683.59

sqm

28177.66

222.96

sqm

36128.68

20 Plastering with CM (1:3) 20mm thick for flooring GF


parking

24.00 4.51

108.24

parking

10.00 5.38

53.80

162.04

Painting to new walls with two coats plastic emulsion paint of approved brand shade after
thoroughly brushing surface to remove dirt & remains of loose powerderd materials including cost
21 and conveyance of materials to work site & all operational, incidental, labour charges etc complete
for finshined item of work as per SS 911 for Internal walls with primary coat of cement primer one
coat
inside plastering area 12 mm thick

91.11

inside plastering area 20 mm thick

290.00

ceiling plastering area

647.26
1028.36
1028.36

167.04

sqm

171779.98

Painting to new walls with two coats plastic emulsion paint of approved brand shade after
thoroughly brushing surface to remove dirt & remains of loose powerderd materials including cost
22 and conveyance of materials to work site & all operational, incidental, labour charges etc complete
for finshined item of work as per SS 911 for external walls with primary coat of cement primer one
coat
outside plastering area
RCC drop wall windows
RCC drop wall ventilators over
windows
RCC drop wall ventilators in
toilets

98.90
2

6.60

26.40

4.80

19.20

2.80

22.40
166.90
166.90

204.77

sqm

34176.45

Flooring with ceramic tiles,(Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm
and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish in all shades and designs ) set over base coat of cement mortar(1:8),
12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
23 consistency spread @3.3. kgs per sqm & jointed neatly with white cement paste of full depth mixed
with pigment of matching shade,including cost of all materials like cement,sand water and tiles
etc.,complete, including seigniorage charges, etc., complete for finished item of work,but including
toilet
rooms
the cost
of conveyance of all materials

staircase room
(5.00-0.23-0.23)/2
mid landing slab

2.270 4.85

22.02

3.53

4.85

17.12

3.53

1.50

5.30
44.43
44.43

898.22

sqm

Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles )glazed red or
white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs for skirting ) 7.30 mm thick length equal to flooring stones, set over base coat
of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs
24 per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and water etc., complete including
seigniorage charges, etc., complete for finished item of work, but including the cost of conveyance
of all materials for skirting
staircase steps

12

1.73

0.45

18.68

railing wall of staircase

3.78

0.20

3.02

midlanding 3.53+2*1.50

6.53

0.20

1.31

39907.95

Toilets inside 2(2.27+4.85)

14.24

1.50

42.72

wc gents 1.20+1.07

2.27

1.50

6.81

wc ladies 1.20+1.07

2.27

1.50

6.81

urinal walls

0.75

1.65

4.95

deduct doors

1.00

1.50

-3.00

0.75

1.50

-4.50
76.80

add sides of doors

3.20
80.00

925.40

sqm

74034.14

Providing and fixing of IS 3564 marked Aluminium extruded section


body tubulor type univercel Hydralic door closer with double speed
25
adjustment Hardwyn make(GAZEL) with necessary accessiores and
screws
citizen service center rooms

Toilet entrance doors

1361.11 each
4
Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) (precast terrazzo chequered
tiles conforming to IS: 13801 using marble aggregates of size 10 mm , sand, marble powder, white
cement pigments etc., with terrazzo topping not less than 6 mm of tiles overall size not less than 20
mm thick of any coloured shades.) set over base coat of cement mortar (1:6) 12 mm thick over CC
bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @
26 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade
including cost of all materials like cement, sand water and tiles etc., complete, including
seigniorage charges, complete for finished item of work, but excluding the cost of conveyance of all
materials
front entrance portico

4.30

4.78

20.55

center way of building

24.00 4.18

100.32

5444.43

120.87
120.87

718.07

sqm

86793.60

Flooring with vitrified tiles of 1st quality, ( ordinary soluble salt porcelain vitrified tiles screen printed
and polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs) set
over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly
27 with white cement paste to full depth mixed with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc.,
complete for finished item of work, but including the cost of conveyance of all materials.

(5.00-

2.27

4.85

22.02

0.23-0.23)/2=2.27,
22.02
1025.88 sqm
Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with
28 pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc., complete for finished item of work, but
including the cost of conveyance of all materials

22589.86

(5.00-

14.24

0.20

5.70

deduct doors

1.00

0.20

-0.40

add sides of doors

0.18

0.20

0.14

0.23-0.23)/2=2.27,

5.44
5.44

1034.39

sqm

5627.11

Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of
0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint
of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm,
section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for
glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with
corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle,
29 window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter
and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames
in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars
with 6 (152.4mm) pitch etc., complete for finished item of work

ventilators 1.80x0.60m

1.80

0.60

2.16
2.16

6936.20

sqm

ventilators toilets 0.80x0.60m


2
2
0.80
0.60
1.92
citizen service center office
1.92
4745.70 sqm
rooms 5.08-0.23=4.85,
Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI
30 ceiling angles, sections perimeter channels including cost and conveyance of all materials and
labour charges etc complete
(5.00-

4.85

2.27

22.02

14.24 0.30

8.54

14982.18

9111.74

0.23-0.23)/2=2.27,
borders on walls

30.56

501.04

sqm

15311.85

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of materials and including all
31 operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

portico slab area


24.75

395.46

sqm

32 50 Users septic tank size 4.00X2.00m


Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
a
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD
and 301.2.1 of MORT&H--ordinary soil--manual means upto 3m depth (Manual)

9787.66

septic tank

5.00

3.00

2.00

30.00
30.00

4.70

2.70

0.15

4764.20

1288.88

cum

2448.87

4210.79

cum

8000.50

4933.07

cum

46272.23

1.90
1.90

Plain cement concrete (1:4:8) using 40mmHBG graded m/c with


concrete mixer mixing upto plinth level for foundations
septic tank

4.70

2.70

0.15

1.90
1.90

cum

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH-Sand filling
septic tank

158.81

Brick masonary in CM (1:5) with traditional bricks of size 23x11x7cm


including cost and conveyance of all materials and labour charges
long walls

4.70

0.35

2.00

6.58

short walls

2.00

0.35

2.00

2.80
9.38
9.38

Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and technical specifications Clause
802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Lean cement concrete 1:3:6
nominal mix. Rate may be taken as per item 11.4.P.C.C grade M 10 Nominal mix 1:3:6
septic tank inside slope

2.35

2.00

0.025

0.24
0.24

4975.43

cum

1194.10

222.96

sqm

10167.04

Plastering in CM (1:3) 20 mm including cost and conveyance of all


material and labour charges etc.,
over floor

4.00

2.50

10.00

walls 2(4.00+2.00)

12.00

2.00

24.00

Top 2(4.00+2.00)

12.00 0.35

out side 2(4.70+2.70)

14.80

4.20
0.50

7.40
45.60
45.60

VRCC M-20 Nominal mix (cement,fine aggregate,coarse aggregate) corresponding to Table -9 of


IS -456 using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from
approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as
machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication
charges for finished item of work,but including centering,shuttering for culvert slabs
septic tank precast slabs

4.70

2.70

0.15

1.90
1.90

5808.50

cum

11036.15

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing
in position with cover blocks of approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of work in all floors.

septic tank precast slabs

120

1.90

228.00

48.74

kg

11112.91

33 construction of under ground water tank 7500 lts capacity

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD
and 301.2.1 of MORT&H--ordinary soil--manual means upto 3m depth (Manual)

under ground tank

3.50

3.00

1.70

17.85
17.85

3.50

3.00

0.15

2834.70

1288.88

cum

2036.43

4210.79

cum

6653.05

4933.07

cum

30535.73

222.96

sqm

7183.82

1.58
1.58

Plain cement concrete (1:4:8) using 40mmHBG graded m/c with


concrete mixer mixing upto plinth level for foundations
septic tank

3.50

3.00

0.15

1.58
1.58

cum

Filling in foundation trenches as per drawing and technical


specification Clause 305.3.9 MORD & 304 MORTH-Sand filling
septic tank

158.81

Brick masonary in CM (1:5) with traditional bricks of size 23x11x7cm


including cost and conveyance of all materials and labour charges
long walls

3.20

0.35

1.70

3.81

short walls

2.00

0.35

1.70

2.38
6.19
6.19

Plastering in CM (1:3) 20 mm including cost and conveyance of all


material and labour charges etc.,
over floor

2.50

2.00

5.00

walls 2(3.20+2.00)

10.40

1.70

17.68

Top 2(3.20+2.00)

10.40 0.35

out side 2(3.20+2.70)

11.80

3.64
0.50

5.90
32.22
32.22

VRCC M-20 Nominal mix (cement,fine aggregate,coarse aggregate) corresponding to Table -9 of


IS -456 using 20 mm size graded machine crushed hard granite metal (coarse agggregate) from
approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as
machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its fabrication
charges for finished item of work,but including centering,shuttering for culvert slabs
water tank slab

3.20

2.70

0.15

1.30
1.30

5808.50

cum

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing
in position with cover blocks of approved materials and size and tying and lap-splicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages such as overlaps, couplings,
chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying including sales and
other taxes on all materials etc., complete for finished item of work in all floors.

water tank slab

7551.05

48.74
kg
120 1.30
156.00
Manufacture as per BIS:12592 (Part 1&2)Supply & Delivery of manhole covers and frames with ISI
marking anywhere in A.P.,F.O.R. destination including, loading, unloading & stacking at site but
including central excise duty, sales tax, octroi and other Govt levies etc., as applicable.I.S.I Mark
H.D.-20 with 500mm diaclear opening

7603.57

for water tank

2372.79

2372.79

each

5478169.75
Assistant Engineer
Jangareddygudem Nagar
Panchayat

Deputy Executive Engineer


Jangareddygudem Nagar
Panchayat

Superintending Engineer

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar
Panchayat
Detailed cum abstract of estimate
Sl.
No

Description of item

No

No

Qty

Rate

Unit

Total

II First floor
Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH
BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse agggregate)
from approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as weigh
1 batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS
Code from standard suppliers approved by the deparment including pumping ,
centering,shuttering,laying concrete ,vibrating,curing etc M25 design mix
a Columns
C1 type

A1,A4,F1,F2,F3,F4,=6

0.23

0.375

3.60

1.86

C1 type
B1,B2,B3,B4,C4,D4,E1,E4,=8

0.23

0.375

3.60

2.48

C1 type D2,D3,C1,D1,E2,E3=6

0.23

0.375

3.60

1.86

C2 type A2,A3,=2

0.30

0.450

3.60

0.97

C2 type C2,C3=2

0.30

0.450

3.60

0.97
8.15
8.15

10921.43 cum

89053.33

11154.57 cum

32571.33

b Lintels
over doors
Engineering section,Town
planning section,Health
section,Establishment
section,Revenue
section,commissioner chamber
and waiting rooms
over doors tiolet entrance rooms
(5.000.30)=
Toilet inside rooms
5.00+0.23=5.23
commissioner anti room
over widows individual
Engineering section,Town
planning section,Health
section,Establishment
section,Revenue
section,commissioner chamber

1.60

0.23

0.20

0.59

4.70

0.23

0.20

0.22

5.23

0.23

0.20

0.24

1
1

1
5

1.60
2.20

0.23
0.23

0.20
0.20

0.07
0.51

4.70

0.23

0.20

1.30

2.92
2.92

c Roof slab 0.14 m thick


5.00*4+3.76+0.30 =24.06m,
5.08+4.48+4.21+0.30 slab
extension=14.07m

24.06

14.07

338.52

deduct staircase opening 3.760.30=3.46,5.08-0.30=4.78

3.46

4.78

-16.54
321.99
321.99

Staircase slabs 0.15m thick


d
5.08-0.30=4.78-1.50=3.28
1st flight
sqare root
3.28^2+1.875^2
2nd flight
mid landing slab
3.76+0.23=3.99

3.78

1.73

6.54

3.78

1.73

6.54

3.99

1.73

6.90
19.97
19.97

A1-B1,B1-C1,C1-D1,D1-E1 ,
e Beams
FFRB1
,A4B4,B4-C4,
E1-F1,E4-F4
C4-D4,D4-E4 5.00FFRB2
0.30=4.70
3.76-0.30=3.46
B3-C3,C3-D3

5.00-0.60/2D2-E2,D3-E3 5.00-0.30=4.70

4.70

0.23

0.45

3.89

3.46

0.23

0.45

0.72

3.46

0.23

0.45

0.72

4.55

0.23

0.45

2.83

4.70

0.23

0.45

0.97

4.63

0.23

0.45

0.48

4.18

0.23

0.45

0.43

3.76

0.23

0.45

0.39

4.48

0.23

0.45

0.46

1
1

1
1

4.18
3.61

0.23
0.23

0.45
0.45

0.43
0.37

4.48

0.23

0.45

1.39

4.63

0.23

0.45

0.48

4.18

0.23

0.45

1.73

3.61

0.23

0.45

1.12

3.76

0.23

0.45

0.39

4.70

0.23

0.45

0.97

3.46

0.23

0.45

0.36

FFRB3
5.08-(0.45-.15)-

4.21-0.30/25.08-0.30F2-F3 4.48-0.30
F3-F4 4.21-0.30*2=3.61
FFRB4

5.08-(0.45-.15)-

4.21FFRB2a

E2'-F2' 3.76-030

5.00-

1377.61

sqm

443577.44

1440.52

sqm

28767.22

for staircase midlanding FFRB4

3.46

0.23

0.45

0.36
18.49
18.50

10630.41 cum

196662.51

RCC Sun shades 0.60m wide ,


0.10m thick at fixed end and
0.05m at free end
Engineering section,Town
planning section,Health
section,Establishment
section,Revenue
section,commissioner chamber
and waiting rooms-over windows

16

2.20

35.20

Engineering section,Town
planning section,Health
section,Establishment section,

20.30

0.75

15.23

commissioner
chamber,Revenue section

5.30

0.75

7.95

593.38

Rmt

20886.84

959.65

sqm

22244.63

g loft slab 0.075m thick

23.18
23.18

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including
2 cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors.
columns
Lintels
Roof slab 0.15m thick
Staircase slabs 0.20m thick
Beams
sunshades
loft slab 0.075m thick

8.15
2.92
48.30
3.99
18.50
1.58
1.74

cum
cum
cum
cum
cum
cum
cum

120
100
80
80
120
80
80

kg/cum
kg/cum
kg/cum
kg/cum
kg/cum
kg/cum
kg/cum

978.48
292.00
3863.88
319.52
2220.00
126.72
139.08
7939.68
8510.52

Brick masonary in CM (1:6) with traditional bricks of size 23x11x7cm


3 A1-B1,B1-C1,C1-D1,D1-E1 ,
including cost and conveyance of all materials and labour charges
super structure
,A4B4,B4-C4,

4.70

0.23

3.30

28.54

3.46

0.23

3.30

2.63

3.46

0.23

3.30

2.63

4.55

0.23

3.30

10.36

4.70

0.23

3.30

3.57

4.63

0.23

3.30

3.51

E4-F4
C4-D4,D4-E4 5.00E1-F1,
0.30=4.70
3.76-0.30=3.46
A2-B2 ,B2-C2 ,C2-D2
3.76-0.30=3.46
A1-A2
5.00-0.60/2-0.30/2=4.55
D2-E2,
5.00-0.30=4.70

5.08-(0.45-.15)0.30/2=4.63

48.74

kg

414809.85

A2-A3
1

4.18

0.23

3.30

3.17

3.76

0.23

3.30

2.85

0.30=3.76

4.48

0.23

3.30

3.40

5.08-0.30F2-F3 4.48-0.30
0.30=4.48

4.18

0.23

3.30

3.17

B1-B2,D1-D2
,E1-E2,
F3-F4 4.21-0.30*2=3.61

3.61

0.23

3.30

2.74

C1-C2

4.48

0.23

3.15

9.74

5.08-0.30-0.30=4.48
B2'-B4,C2'-C4,D2'-D4,E2'-E4,
5.08-(0.45-.15)0.30/2=4.63
A2'-B2',B2'-C2',
4.210.30/2+4.48-.30-2.40=
C2'-D2',D2'-E2'
5.000.30=4.70m

4.63

0.23

3.15

3.35

5.84

0.23

3.15

16.92

4.70

0.23

3.60

7.78

4.70

0.23

3.30

7.13

4.85

0.23

3.60

4.02

Commissionor wating room and


peshi room partation wall 5.000.23=4.77-0.23 =4.54/2=2.27

2.27

0.23

3.60

1.88

Commissionor anti room toilet


walls 1.20+1.50

2.70

0.115

3.05

0.95

gents and ladies partation wall


5.08-0.30=4.78

4.78

0.23

3.60

3.96

WC front walls
5.00-0.30=4.700.23=4.47/2=2.235

2.24

0.23

3.05

3.14

WC partation walls

1.20

0.115

3.05

0.84

urinals

0.75

0.115

0.75

0.26

0.50

24

1.73

0.30

0.15

0.93

3.78

0.115

0.75

0.65

doors D

1.20

0.23

2.10

-4.64

Toilets main entrance doors D1

1.20

0.23

2.10

-1.16

Toilet doors D2
windows
ventilators
ventilators toilets
RCC jolly in staircase room
lintels

2
1
1
2
1

2
16
16
2
1

0.75
1.80
1.80
0.80
1.50

0.23
0.23
0.23
0.23
0.23

2.10
1.50
0.60
0.60
1.20

-1.45
-9.94
-3.97
-0.44
-0.41
-2.92
103.19

A3-A4
4.48- 0.30=4.18
F1-F2
4.21-0.30/2-

5.00Commissionor anti room and


0.30=4.70m
wating room partation wall

Inside toilets

staircase steps
staircase railing walls
deductions

Add extra for variation

2.81
106.00

4973.40

cum

527204.29

RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as
directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental,
4 cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work,
lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication
charges, for finished item of work.
windows
vertical 1.50

16

1.50

0.83

39.84

horizontal bottom

16

1.80

0.83

23.90

ventilators over widows vertical

16

0.60

0.83

15.94

ventilators over widows


Horizantal

16

1.80

0.83

47.81

vertical 0.60

0.60

0.83

3.98

horizontal top and bottom

0.80

0.83

5.31

ventilators toilets

136.78
136.78

1548.05

sqm

211742.40

Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with aluminium
anodised sections of Jindal sections and outer frame top horizontals & both verticals of 2408 of size
101.6 x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45 mm x 47.62
mm x 3.18 and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with tinted-bronze/green glass 5
mm thick(middle to top),MDF Board-exterior both sides laminaed 12mm thick(middle to bottom) fixed
5
including supply and fixing aluminium handles of 150 mm for each shutter and all labour charges for
fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the
frame in position, fixing shutter to frame etc. completed for finished item of work

doors 1.20x2.10m D

14621.92 each 116975.37

Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing
with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both
verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x
29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather
interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply
6 and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour
charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges
for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work

windows 1.80x1.50m

16

16

9378.26 each 150052.12

Manufacture,supply,delivery of MS grill gates,window ornamental safety


7 grill ,made with MS flats,MS angles,MS squares etc including
welding,finishing,applying red oxide paint as primary coat etc complete
windows 1.80x1.50m

16

50.00

kg/each

800.00

89.07

kg

71259.33

8 Plastering with CM (1:3) 12mm thick GF to ceiling


slab area

321.99

Staircase slabs

19.97

sides of beams
E3-F3,E2-F2

4.70

0.30

5.64

for staircase midlanding FFRB4

3.46

0.45

3.11
350.71
349.68

173.35

sqm

60615.91

143.99

sqm

53275.04

Plastering CM(1:5) 12 mm thick to walls including cost and conveyance


of all materials and labour charges
out side
Allround out side
2(24.00+14.00)

76.00

3.75

285.00

20.30

3.60

146.16

staircase railing walls

3.78

1.65

12.47

deduct doors D

1.20

2.10

-20.16

Toilets main entrance doors

1.00

2.10

-4.20

windows

16

1.80

1.50

-43.20

ventilators over windows

16

1.80

0.60

-17.28

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80

inside
inside corridor 4*5.00+0.30
Inside

355.07
Add extra for sides and soffits

14.93
370.00

10

Plastering CM(1:5) 20 mm thick to walls including cost and conveyance


of all materials and labour charges
Engineering section,Town
planning section,Health
section,Establishment section,
2(4.77+5.83)

21.20

3.60

305.28

entrance hall
3.53+1*6.06+4.21+4.48

18.28

3.60

65.81

Revenue section,commissioner
chamber and waiting rooms
2(4.77+4.85)

19.24

3.60

207.79

staircase room 5.080.23=4.85,3.76-0.23 =3.53 ,


2(4.85+3.53)

16.76

3.75

62.85

deduct staircase room

3.46

3.30

-11.42

Commissionor anti room and


wating room partation wall

4.85

3.60

34.92

Commissionor wating room and


peshi room partation wall 5.000.23=4.77-0.23 =4.54/2=2.27

2.27

3.60

16.34

Commissionor anti room toilet


walls 1.20+1.50

2.70

3.05

16.47

Toilets inside 2(4.85+4.77)

19.24

3.60

69.26

toilet partation wall

4.85

3.60

34.92

Toilet partation (5.00-0.230.23)/2=2.27

2.27

3.05

27.69

Toilets inside

1.20

3.05

14.64

urinals

0.75

1.65

4.95

deduct doors D

1.20

2.10

-20.16

Toilets main entrance doors

1.00

2.10

-4.20

Toilet inside doors D1

0.75

2.10

-12.60

windows

16

1.80

1.50

-43.20

ventilators over windows

16

1.80

0.60

-17.28

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80
748.35

11

748.35

212.11

sqm

158734.41

1.80

456.73

sqm

822.12

145.48

sqm

9427.36

supply and fixing of pre cast RCC jollys of approved design 50mm thick
RCC jolly in staircase room

1.50

1.20

Painting with Synthetic Enamel paints - Two Coats - For New Iron Work
12 including primary coat for window grills with primary coat of red oxide
one coat
iron safety grill of windows

1.50

16

1.80

1.50

64.80
64.80

Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a
wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and
joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be
13 fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A
minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal
member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for
finished item of work
Toilet entrance doors
D12*(1.00+2.10)
Toilet doors 2(0.75+2.10) D2
commissioner room toilet D2

6.20

12.40

5.70

22.80

5.70

5.70
40.90

369.25

Rmt

15102.27

Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S.
tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom
rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame
shall be covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm forming stiles, and
5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm
x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick
14 PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm
thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An
additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the C Channel
using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturers
specification & drawing for finished item of work
Toilet entrance doors D1

1.00

2.10

4.20

Toilet doors D2

0.75

2.10

6.30

commissioner room toilet D2

0.75

2.10

1.58
12.08
12.08

2683.59

sqm

32417.72

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
conveyance of materials to work site & all operational, incidental, labour charges etc complete for
15
finshined item of work as per SS 911 for Internal walls with primary coat of cement primer one coat

inside plastering area 12 mm


thick
inside plastering area 12 mm
thick

85.00
748.35

ceiling plastering area

349.68
1183.03
1183.03

175.82

sqm

207995.01

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
16 conveyance of materials to work site & all operational, incidental, labour charges etc complete for
finshined item of work as per SS 911 for external walls with primary coat of cement primer one coat
outside plastering area

285.00

RCC drop wall windows

16

6.60

105.60

RCC drop wall ventilators over


windows

16

4.80

76.80

RCC drop wall ventilators in


toilets

2.80

44.80
512.20
512.20

211.23

sqm

108193.54

Flooring with ceramic tiles,(Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm
and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15)
of any colour and finish in all shades and designs ) set over base coat of cement mortar(1:8), 12mm
thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
17 consistency spread @3.3. kgs per sqm & jointed neatly with white cement paste of full depth mixed
with pigment of matching shade,including cost of all materials like cement,sand water and tiles
etc.,complete, including seigniorage charges, etc., complete for finished item of work,but including the
toilet rooms
cost of conveyance of all materials
1

2.270

4.85

22.02

staircase room
(5.00-0.23-0.23)/2
mid landing slab

3.53

4.85

17.12

3.53

1.50

5.30

commissioner toilet room

1.50

1.20

1.80
46.23
46.23

924.60

sqm

42744.46

Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles )glazed red or white
full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality
conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and
designs for skirting ) 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12
mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
18 jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of
all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc.,
complete for finished item of work, but including the cost of conveyance of all materials for skirting

staircase steps

12

1.73

0.45

18.68

railing wall of staircase

3.78

0.20

3.02

midlanding 3.53+2*1.50

6.53

0.20

1.31

Toilets inside 2(2.27+4.85)

14.24

1.50

42.72

wc gents 1.20+1.07

2.27

1.50

6.81

wc ladies 1.20+1.07

2.27

1.50

6.81

urinal walls

0.75

1.65

4.95

deduct doors

1.00

1.50

-3.00

0.75

1.50

4.20

1.50

-4.50
6.30

commissioner room toilet

76.80
add sides of doors

3.20
80.00

925.40

sqm

74034.14

1361.11 each

13611.08

Providing and fixing of IS 3564 marked Aluminium extruded section


body tubulor type univercel Hydralic door closer with double speed
19
adjustment Hardwyn make(GAZEL) with necessary accessiores and
screws
doors

Toilet entrance doors

2
10

Flooring with vitrified tiles of 1st quality, ( ordinary soluble salt porcelain vitrified tiles screen printed and
polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to IS:13711,
IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs) set over base
coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat
20 cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials like cement,
sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of
work, but including the cost of conveyance of all materials.
inside corridor 4*5.00

20.00

2.40

48.00

Engineering section,Town
planning section,Health
section,Establishment section,
2(4.77+5.83)

4.77

5.83

111.24

entrance hall

3.53

8.69

30.68

Revenue section,commissioner
chamber and waiting rooms
2(4.77+4.85)

4.77

4.85

69.40

deduct commissioner chamber


toilet

1.65

1.35

-2.23
257.09
257.09

1052.26

sqm

270526.30

Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with
21 pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc., complete for finished item of work, but
including the cost of conveyance of all materials
inside corridor 4*5.00

20.00

0.20

8.00

Engineering section,Town
planning section,Health
section,Establishment section,
2(4.77+5.83)

21.20

0.20

16.96

entrance hall

18.28

0.20

3.66

Revenue section,commissioner
chamber and waiting rooms
2(4.77+4.85)

19.24

0.20

11.54

Commissionor anti room and


wating room partation wall

4.85

0.20

1.94

Commissionor wating room and


peshi room partation wall 5.000.23=4.77-0.23 =4.54/2=2.27

2.27

0.20

0.91

deduct doors

1.20

0.20

-3.84

add sides of doors

0.18

0.20

0.58
39.74
39.74

1060.78

sqm

42155.32

Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of
0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of
60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section
for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter
with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket,
22 centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of
with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4
mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by
means of self expanding screws, Including 10 mm Square guard bars with 6 (152.4mm) pitch etc.,
complete for finished item of work
ventilators 1.80x0.60m

16

1.80

0.60

17.28
17.28

ventilators toilets 0.80x0.60m

0.80

0.60

6936.20

sqm

119857.46

4745.70

sqm

9111.74

1.92
1.92

Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI ceiling
23 angles, sections perimeter channels including cost and conveyance of all materials and labour charges
etc complete
inside corridor 4*5.00

20.00

2.40

48.00

Engineering section,Town
planning section,Health
section,Establishment section,
2(4.77+5.83)

4.77

5.83

111.24

entrance hall

3.53

8.69

30.68

Revenue section,commissioner
chamber and waiting rooms
2(4.77+4.85)

4.77

4.85

69.40

inside corridor 4*5.00

20.00

0.30

12.00

Engineering section,Town
planning section,Health
section,Establishment section,
2(4.77+5.83)

21.20

0.30

25.44

entrance hall

18.28

0.30

5.48

Revenue section,commissioner
chamber and waiting rooms
2(4.77+4.85)

19.24

0.30

17.32

Commissionor anti room and


wating room partation wall

4.85

0.30

2.91

Commissionor wating room and


peshi room partation wall 5.000.23=4.77-0.23 =4.54/2=2.27

2.27

0.30

1.36

borders on walls

323.83
323.83

501.04

sqm

162252.48
3706683.03

Assistant Engineer

Deputy Executive Engineer

Jangareddygudem Nagar
Panchayat

Superintending Engineer

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar
Panchayat
Detailed cum abstract of estimate
Sl.
No.

Description of item

No

No

Qty

Rate

Unit

Total

III 2nd floor

Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH
BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse
agggregate) from approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as weigh
batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS
Code from standard suppliers approved by the deparment including pumping , centering,
shuttering,laying concrete ,vibrating,curing etc M25 design mix
Columns
C1 type

A1,A4,F1,F2,F3,F4,=6

0.23

0.375

3.60

1.86

C1 type
B1,B2,B3,B4,C4,D4,E1,E4,=8

0.23

0.375

3.60

2.48

C1 type D2,D3,C1,D1,E2,E3=6

0.23

0.375

3.60

1.86

C2 type A2,A3,=2

0.30

0.450

3.60

0.97

C2 type C2,C3=2

0.30

0.450

3.60

0.97
8.15
8.15

11371.89 cum

92726.36

11538.22 cum

31614.72

Lintels
over doors
chair person room,Record
room,Computor section,
establishment section

1.40

0.23

0.20

0.26

over doors tiolet entrance rooms


(5.00-0.30)=

4.70

0.23

0.20

0.22

Toilet inside rooms


5.00+0.23=5.23

5.23

0.23

0.20

0.24

Main door

2.40

0.23

0.20

0.11

over widows council


hall,establishment section

2.20

0.23

0.20

0.40

council hall,chair person


room,Record room,Computor
section,

4.70

0.23

0.20

1.51
2.74
2.74

Roof slab 0.14 m thick


5.00*4+3.76+0.30 =24.06m,
5.08+4.48+4.21+0.30 slab
extension=14.07m

24.06

14.07

338.52

deduct staircase opening 3.760.30=3.46,5.08-0.30=4.78

3.46

4.78

-16.54

321.99
321.99

1417.54

sqm 456432.63

Staircase slabs 0.15m thick 5.080.30=4.78-1.50=3.28


1st flight
sqare root
3.28^2+1.875^2
2nd flight

3.78

1.73

6.54

3.78

1.73

6.54

mid landing slab 3.76+0.23=3.99

3.99

1.73

6.90
19.97
19.97

1480.45

sqm

29564.50

A1-B1,B1-C1,C1-D1,D1-E1
,
Beams
SFRB1
,A4-B4,B4-C4,

4.70

0.23

0.45

3.89

3.46

0.23

0.45

0.72

3.46

0.23

0.45

0.72

4.55

0.23

0.45

2.83

4.70

0.23

0.45

0.97

4.18

0.23

0.45

0.87

4.48

0.23

0.45

0.46

4.48

0.23

0.45

0.46

1
1

1
1

4.18
3.61

0.23
0.23

0.45
0.45

0.43
0.37

4.63

0.23

0.45

0.48

4.18

0.23

0.45

0.43

3.76

0.23

0.45

0.39

4.48

0.23

0.45

0.93

4.63

0.23

0.45

0.48

4.18

0.23

0.45

1.30

3.61

0.23

0.45

0.75

3.76

0.23

0.45

0.39

3.46

0.23

0.45

0.36

E1-F1,E4-F4
C4-D4,D4-E4
5.00-0.30=4.70
SFRB23.76-0.30=3.46
C3,C3-D3

D2-E2,D3-E3 5.00-0.30=4.70
SFRB3
4.48-

F2-F3 4.48-0.30
F3-F4 4.21-0.30*2=3.61
SFRB4

4.21-0.30/2-

for staircase midlanding

17.22
17.22

10946.10 cum 188506.84

RCC Sun shades 0.60m wide ,


0.10m thick at fixed end and
0.05m at free end
chair person room,Record
room,Computor section,
establishment section,council hall

17

2.20

37.40

Record room,Computor section,


establishment section,

14.06

0.75

10.55

chair person room

5.30

0.75

3.98

614.35

Rmt

22976.76

990.52

sqm

14382.30

loft slab 0.075m thick

14.52
14.52

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including
cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational,
labour charges such as cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.
columns

8.15

cum

120

kg/cum

978.48

Lintels

2.74

cum

100

kg/cum

274.00

Roof slab 0.15m thick

48.30

cum

80

kg/cum 3863.88

Staircase slabs 0.20m thick

3.99

cum

80

kg/cum

Beams

17.22

cum

120

kg/cum 2066.56

sunshades

1.68

cum

80

kg/cum

134.64

loft slab 0.075m thick

1.09

cum

80

kg/cum

87.12

319.52

7724.20
8221.56
3

Brick masonary in CM (1:6) with traditional bricks of size 23x11x7cm


A1-B1,B1-C1,C1-D1,D1-E1
, of all materials and labour charges
including cost and conveyance
super structure
,A4-B4,B4-C4,

4.70

0.23

3.30

28.54

3.46

0.23

3.30

2.63

3.46

0.23

3.30

2.63

4.55

0.23

3.30

3.45

0.30/2=4.55
D2-E2, 5.00-0.30=4.70
A1-A2

4.70

0.23

3.30

3.57

A2-A3

4.63

0.23

3.30

3.51

4.18

0.23

3.30

3.17

E4-F4

3.76-0.30=3.46

E1-F1, 3.76-0.30=3.46
C4-D4,D4-E4
5.00-0.30=4.70
C2-D2
5.00-0.60/2-

4.48- 0.30=4.18

5.08-(0.45-.15)-0.30/2=4.63

48.74

kg

400725.70

A3-A4
F1-F2 5.08-0.30-0.30=4.48
4.21-0.30/20.30=3.76

3.76

0.23

3.30

2.85

4.48

0.23

3.30

3.40

F2-F3 4.48-0.30

4.18

0.23

3.30

3.17

F3-F4 ,E1-E2,
4.21-0.30*2=3.61
D1-D2

3.61

0.23

3.30

2.74

4.48

0.23

3.15

6.49

5.84

0.23

3.15

8.46

4.63

0.23

3.15

3.35

4.18

0.23

3.15

3.03

3.76

0.23

3.15

2.72

4.70

0.23

3.30

7.13

5.00-0.30=4.70m

3.43

0.23

3.30

2.60

gents and ladies partation wall


5.08-0.30=4.78

4.78

0.23

3.60

3.96

WC front walls
5.00-0.30=4.700.23=4.47/2=2.235

2.24

0.23

3.05

3.14

WC partation walls

1.20

0.115

3.05

0.84

urinals

0.75

0.115

0.75

0.26

0.50

24

1.73

0.30

0.15

0.93

3.78

0.115

0.75

0.65

Main door

2.00

0.23

2.10

-0.97

doors D

1.20

0.23

2.10

-2.32

Toilets main entrance doors D1

1.20

0.23

2.10

-1.16

Toilet doors D2

0.75

0.23

2.10

-1.45

windows

17

1.80

0.23

1.50

-10.56

ventilators

17

1.80

0.23

0.60

-4.22

ventilators toilets

0.80

0.23

0.60

-0.44

RCC jolly in staircase room

1.50

0.23

1.20

-0.41

D2'-D4,E2'-E4,
5.08-0.30-0.30=4.48
C1-C2
4.21-0.30/2+4.48-.30-2.40=
C2-C3, 4.48-0.30
5.08-(0.45-.15)-0.30/2=4.63
C3-C4,
C2'-D2',D2'-E2'
4.21-0.15-0.30=3.76

E2'-F2'
Inside toilets

staircase steps
staircase railing walls
deductions

lintels

-2.74
78.97

Add extra for variation

2.03
81.00

5077.43

cum

411285.13

RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement
as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all
materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental,
cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work,
lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication
charges, for finished item of work.
windows
vertical 1.50

17

1.50

0.83

42.33

horizontal bottom

17

1.80

0.83

25.40

ventilators over widows vertical

17

0.60

0.83

16.93

ventilators over widows Horizantal

17

1.80

0.83

50.80

vertical 0.60

0.60

0.83

3.98

horizontal top and bottom

0.80

0.83

5.31

ventilators toilets

144.75
144.75

main door 2.00x2.10

24494.16 each

24494.16

doors 1.20x2.10m D

14696.50 each

58785.99

Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing
with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both
verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x
29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather
interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply
and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour
charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges
for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work

17

17

9487.19 each 161282.15

Manufacture,supply,delivery of MS grill gates,window ornamental safety


grill ,made with MS flats,MS angles,MS squares etc including
welding,finishing,applying red oxide paint as primary coat etc complete
windows 1.80x1.50m

sqm 234868.79

Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with
aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of
2408 of size 101.6 x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45
mm x 47.62 mm x 3.18 and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with tintedbronze/green glass 5 mm thick(middle to top),MDF Board-exterior both sides laminaed 12mm
thick(middle to bottom) fixed including supply and fixing aluminium handles of 150 mm for each
shutter and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and
including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for
finished item of work

windows 1.80x1.50m
7

1622.58

17

50.00

kg/each

850.00

Plastering with CM (1:3) 12mm thick GF to ceiling


slab area

321.99

Staircase slabs

19.97

sides of beams
B1-B2-C2-D2

13.77

0.30

8.26

92.26

kg

78417.07

A2-B2-C2

9.47

0.30

11.36

for staircase midlanding

3.46

0.45

3.11
364.70
363.66

186.64

sqm

67873.41

Plastering CM(1:5) 12 mm thick to walls including cost and conveyance of


all materials and labour charges
out side
Allround out side 2(24.00+14.00)

76.00

3.75

285.00

14.06

3.60

101.23

staircase railing walls

3.78

1.65

12.47

deduct main door

2.00

2.10

-4.20

deduct doors D

1.20

2.10

-10.08

Toilets main entrance doors D1

1.00

2.10

-4.20

windows

17

1.80

1.50

-45.90

ventilators over windows

17

1.80

0.60

-18.36

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80

inside
inside corridor 2*5.00+3.76+0.30
Inside

312.25
Add extra for sides and soffits

17.75
330.00

10

Plastering CM(1:5) 20 mm thick to walls including cost and conveyance of


all materials and labour charges
Inside
Record room,Computor room ,
2(4.77+5.83)
Estlablishment section
2(3.53+5.83)

21.20

3.60

152.64

18.72

3.60

67.39

19.24

3.60

69.26

council hall 5.08+4.48+4.210.23=13.54,2*5.00-0.23=9.77.


2(9.77+13.54)=

46.62

3.60

167.83

staircase room 5.080.23=4.85,3.76-0.23 =3.53 ,


2(4.85+3.53)

16.76

3.75

62.85

deduct staircase room

3.46

3.30

-11.42

Toilets inside 2(4.85+4.77)

19.24

3.60

69.26

toilet partation wall

4.85

3.60

34.92

Toilet partation (5.00-0.230.23)/2=2.27

2.27

3.05

27.69

Toilets inside

1.20

3.05

14.64

urinals

0.75

1.65

4.95

deduct main door

2.00

2.10

-4.20

deduct doors D

1.20

2.10

-10.08

Toilets main entrance doors D1

1.00

2.10

-4.20

153.88

sqm

50780.83

Toilet inside doors D2

1.00

2.10

-16.80

windows

1.80

1.50

0.00

ventilators over windows

1.80

0.60

0.00

ventilators toilets

0.80

0.60

-1.92

RCC jolly in staircase room

1.50

1.20

-1.80
621.03

Add extra for sides and soffits

18.97
640.00

222.01

sqm 142086.39

1.80

456.73

sqm

822.12

153.15

sqm

10544.59

11 supply and fixing of pre cast RCC jollys of approved design 50mm thick
RCC jolly in staircase room

12

1.50

1.20

Painting with Synthetic Enamel paints - Two Coats - For New Iron Work
including primary coat for window grills
iron safety grill of windows

1.50

17

1.80

1.50

68.85
68.85

Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a
wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners
and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be
13 fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A
minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal
member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for
finished item of work
Toilet entrance doors D1
2*(1.00+2.10)

6.20

12.40

Toilet doors 2(0.75+2.10) D2

5.70

22.80

commissioner room toilet D2

5.70

5.70
40.90

369.25

Rmt

15102.27

Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S.
tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom
rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame
shall be covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm forming stiles, and
5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm
x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick
14 PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm
thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An
additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the C Channel
using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturers
specification & drawing for finished item of work

Toilet entrance doors D1

1.00

2.10

4.20

Toilet doors D2

0.75

2.10

6.30

commissioner room toilet D2

0.75

2.10

1.58
12.08
12.08

2683.59

sqm

32417.72

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
15 conveyance of materials to work site & all operational, incidental, labour charges etc complete for
finshined item of work as per SS 911 for Internal walls with primary coat of cement primer one coat
inside plastering area 12mm thick

45.00

inside plastering area 20mm thick

640.00

ceiling plastering area

363.66
1048.65
1048.65

184.59

sqm 193569.25

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
16 conveyance of materials to work site & all operational, incidental, labour charges etc complete for
finshined item of work as per SS 911 for external walls with primary coat of cement primer one coat

outside plastering area

285.00

RCC drop wall windows

17

6.60

224.40

RCC drop wall ventilators over


windows

17

4.80

163.20

RCC drop wall ventilators in toilets

2.80

22.40

695.00
695.00 217.70 sqm 151304.28
Flooring with ceramic tiles,(Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm
and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to
15) of any colour and finish in all shades and designs ) set over base coat of cement mortar(1:8),
12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
17 consistency spread @3.3. kgs per sqm & jointed neatly with white cement paste of full depth mixed
with pigment of matching shade,including cost of all materials like cement,sand water and tiles
etc.,complete, including seigniorage charges, etc., complete for finished item of work,but including
toilet rooms
the cost of conveyance of all materials

staircase room
0.23)/2
mid landing slab

(5.00-0.23-

2.270

4.85

22.02

3.53

4.85

17.12

3.53

1.50

5.30
44.43
44.43

950.99

sqm

Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles )glazed red or
white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st
quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all
shades and designs for skirting ) 7.30 mm thick length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per
18
sqm and jointed with white cement paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
charges, etc., complete for finished item of work, but including the cost of conveyance of all materials
for skirting
staircase steps

12

1.73

0.45

18.68

railing wall of staircase

3.78

0.20

3.02

midlanding 3.53+2*1.50

6.53

0.20

1.31

42252.40

Toilets inside 2(2.27+4.85)

14.24

1.50

42.72

WC gents 1.20+1.07

2.27

1.50

6.81

WC ladies 1.20+1.07

2.27

1.50

6.81

urinal walls

0.75

1.65

4.95

deduct doors

1.00

1.50

-3.00

0.75

1.50

-4.50
76.80

add sides of doors

3.20
80.00

938.56

sqm

75087.43

1361.11 each
8
Flooring with vitrified tiles of 1st quality, ( ordinary soluble salt porcelain vitrified tiles screen printed
and polished of size 400 x 400 mm and thickness between 8-9 mm 1st quality conforming to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs) set
over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab,
20 including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly
with white cement paste to full depth mixed with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc.,
complete for finished item of work, but including the cost of conveyance of all materials.

10888.86

Providing and fixing of IS 3564 marked Aluminium extruded section body


19 tubulor type univercel Hydralic door closer with double speed adjustment
Hardwyn make(GAZEL) with necessary accessiores and screws
Main door

doors

Toilet entrance doors

inside corridor 2*5.00+3.76+0.30

14.06

2.40

33.74

Record room,Computor room ,


2(4.77+5.83)

4.77

5.83

55.62

Estlablishment section
2(3.53+5.83)
chairperson room

3.53

5.83

20.58

4.77

4.85

23.13

9.77

13.54

132.29

2(4.77+4.85)
council
hall 5.08+4.48+4.210.23=13.54,2*5.00-0.23=9.77.
2(9.77+13.54)=

265.36
265.36

1078.65

sqm 286229.66

Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with
21 pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and
water etc., complete including seigniorage charges, etc., complete for finished item of work, but
including the cost of conveyance of all materials
inside corridor 2*5.00+3.76+0.30

14.06

0.20

5.62

Record room,Computor room ,


2(4.77+5.83)

21.20

0.20

8.48

Estlablishment section
chairperson room
2(3.53+5.83)

18.72

0.20

3.74

19.24

0.20

3.85

2(4.77+4.85)
council
hall 5.08+4.48+4.210.23=13.54,2*5.00-0.23=9.77.
2(9.77+13.54)=

46.62

0.20

9.32

deduct main door

2.00

0.20

-0.80

deduct doors D

1.20

0.20

-1.92

add sides of doors

0.18

0.20

0.29
28.59
28.59

1087.16

sqm

31081.95

Providing and fixing of top hung Ventilators made of pre-painted steel (Base steel as per IS 513 of
0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint
of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm,
section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed
shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner
22 bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and
windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in
concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with
6 (152.4mm) pitch etc., complete for finished item of work

ventilators 1.80x0.60m

17

1.80

0.60

18.36
18.36

ventilators toilets 0.80x0.60m

0.80

0.60

6936.20

sqm 127348.55

4745.70

sqm

1.92
1.92

Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI
23 ceiling angles, sections perimeter channels including cost and conveyance of all materials and labour
charges etc complete
inside corridor 2*5.00+3.76+0.30

14.06

2.40

33.74

Record room,Computor room ,


2(4.77+5.83)

4.77

5.83

55.62

Estlablishment section
2(3.53+5.83)

3.53

5.83

20.58

4.77

4.85

23.13

9.77

13.54

132.29

inside corridor 2*5.00+3.76+0.30

14.06

0.30

8.44

Record room,Computor room ,


2(4.77+5.83)

21.20

0.30

12.72

Estlablishment section
chairperson room
2(3.53+5.83)

18.72

0.30

5.62

19.24

0.30

5.77

council hall 5.08+4.48+4.210.23=13.54,2*5.00-0.23=9.77.


2(9.77+13.54)=
borders on walls

2(4.77+4.85)

9111.74

council hall 5.08+4.48+4.210.23=13.54,2*5.00-0.23=9.77.


2(9.77+13.54)=

46.62

0.30

13.99
311.89
311.89

501.04

sqm 156270.04

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of materials and including all
24
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
slab area

338.52

deduct staircase room

-16.54
321.99
321.99

441.79

sqm 142250.76
3751085.35

Assistant Engineer

Deputy Executive Engineer

Jangareddygudem Nagar
Panchayat

Superintending Engineer

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar
Panchayat
Detailed cum abstract of estimate
Sl.
No.
I

Description of item

No No

Qty

Unit

Total

3rd floor-stair case room


Supply and placing of the design mix concrete corresponding to IS -456 using WEIGH
BATCHER/MIXER using 20 mm size graded machine crushed hard granite metal (coarse
agggregate) from approved quarry including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including seigniorage charges ,sales and
other taxes on all materials including all operational ,incidental and labour charges such as weigh
batching ,machine mixing ,laying concrete ,curing etc complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS NO 402) with minimum cement content as per IS
Code from standard suppliers approved by the deparment including pumping ,
centering,shuttering,laying concrete ,vibrating,curing etc M25 design mix
Columns
C1 type E1,E2,F1,F2,=4

0.23

0.375

3.05

1.05
1.10

Rate

11371.89

cum

12509.07

11538.22

cum

692.29

1480.45

sqm

42636.84

10946.10

cum

18670.55

Lintels
over doors
staircase room door

1.40

0.23

0.20

0.06
0.06

Roof slab 0.125 m thick


3.76+0.30+2*0.30 =4.66m,
5.08+0.30+0.30+0.50 slab
extension=6.18m

4.66

6.18

28.80
28.80

Beams
E1-F1,E2-F2

3.46

0.23

0.45

0.72

E1-E2,F1-F2 5.08-.30=4.78

4.78

0.23

0.45

0.99
1.71
1.71

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including
cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational,
labour charges such as cutting, bending, placing in position, tying including sales and other taxes on
all materials etc., complete for finished item of work in all floors.

columns

1.10

cum

120

kg/cum

132.00

Lintels

0.06

cum

100

kg/cum

6.00

Roof slab 0.125m thick

3.60

cum

80

kg/cum

288.00

Beams

1.71

cum

120

kg/cum

204.68
630.68
631.00

48.74

kg

30755.47

5077.43

cum

55852.53

Brick masonary in CM (1:6) with traditional bricks of size 23x11x7cm


including cost and conveyance of all materials and labour charges
super structure
E1-F1,E2-F2

3.46

0.23

2.75

4.38

E1-E2,F1-F2 5.08-.30=4.78

4.78

0.23

2.75

6.05

doors D1

1.00

0.23

2.10

-0.48

RCC jolly in staircase room

1.50

0.23

1.20

-0.41

deductions

lintels
parapet wall 2(4.66+6.18)

-0.06
1

21.68

0.115

0.30

0.75
10.21

Add extra for variation

0.79
11.00

Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with
aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of
2408 of size 101.6 x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45
mm x 47.62 mm x 3.18 and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with tintedbronze/green glass 5 mm thick(middle to top),MDF Board-exterior both sides laminaed 12mm
thick(middle to bottom) fixed including supply and fixing aluminium handles of 150 mm for each
shutter and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and
including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for
finished item of work
doors D1 1.00x2.10m

each

12247.08

186.64

sqm

5375.22

153.88

sqm

12310.65

Plastering with CM (1:3) 12mm thick to ceiling


28.80

slab area

28.80
6

12247.08

Plastering CM(1:5) 12 mm thick to walls including cost and


conveyance of all materials and labour charges
out side
Allround out side
2(3.76+0.23+5.08+0.23)

18.60

3.05

56.73

parapet wall 2(4.66+6.18)

21.68

0.75

16.26
72.99
80.00

Plastering CM(1:5) 20 mm thick to walls including cost and


conveyance of all materials and labour charges
inside
inside 2(3.76-0.23+5.08-0.23)

16.76

3.05

51.12

deduct door

1.00

2.10

-4.20
199.91

231.90

sqm

46358.16

1.80

456.73

sqm

822.12

supply and fixing of pre cast RCC jollys of approved design 50mm
thick
RCC jolly in staircase room

199.91

1.50

1.20

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
conveyance of materials to work site & all operational, incidental, labour charges etc complete for
finshined item of work as per SS 911 for Internal walls with primary coat of cement primer one coat

inside plastering area 12mm


thick

7.01

inside plastering area 20mm


thick

199.91

ceiling plastering area

28.80
235.72
235.72

10

sqm

45579.41

Painting to new walls with two coats plastic emulsion paint of approved brand shade after thoroughly
brushing surface to remove dirt & remains of loose powerderd materials including cost and
conveyance of materials to work site & all operational, incidental, labour charges etc complete for
finshined item of work as per SS 911 for external walls with primary coat of cement primer one coat

outside plastering area

72.99
72.99

11

193.36

224.17

sqm

16361.80

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of materials and including all
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
slab area

28.80

464.95

sqm

13390.53
313561.74

Assistant Engineer

Deputy Executive Engineer

Jangareddygudem Nagar
Panchayat

Superintending Engineer

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar
Panchayat
Detailed cum abstract of estimate
Sl.
No.

Description of item

No

No

IV

Sanitory and Water supply arregement ,electrification


including fixures

water supply

Providing & Placing on Terrace (at all floor levels) polyethylene water
storage tank with Double layer approved brand & manufacture with cover
and suitable locking arrangement & making necessary holes for inlet &
outlets and over flow pipes but without fittings & base support for tanks
water storage tank

5000

S&F KITEC Polyethyene-Aluminium polyethene (PE-A-PE) composite


pressure pipes confirming to IS 15450 -2004 with UV stabilized ,caron
block for ,cold water supply capable to withstand pressure upto 80C
including all special composite fittings, plastic,brass blend inserts for
elbows,tees,reducers,couplers,connectors etc complete for external works
including laying pipes ,fixing in position testing and commissioning ete

25mm dia OD

Qty

Rate

Unit

5000

6.82

litre

323.80

Rmt

221.55

Rmt

178.38

Rmt

incoming to tank-from ground


level water tank to over head
tank 25.00+13.00

38.00

38.00

out going from over head tank


to toilets
13.00+14.00+9.00+commssionn
er 10.00+2.00 air vent+12.00
extra

60.00

60.00

98.00
98.00
2

20mm dia OD
Gents toilets GF+FF+2nd floor

5.00

15.00

ladies toilets GF+FF+2nd floor

5.00

15.00

commissioner toilet FF

5.00

5.00
35.00
35.00

16mm dia OD
Gents toilets GF+FF+2nd floor

5.00

15.00

ladies toilets GF+FF+2nd floor

5.00

15.00

commissioner toilet FF

5.00

5.00
35.00
35.00

S & F Gunmetal (GM) horizantal non return valve as per IS - Class - I,


Indian make heavy type - 40 mm NB Size

incoming

988.45

each

1036.17

each

705.55

each

540.81

each

24

462.41

each

8470.00

each

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS Class - I, Indian make heavy type - 25 mm NB Size
incoming

out going

for each floor

commissioner toilet FF

add extra

1
7

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS Class - I, Indian make heavy type - 20 mm NB Size
for each floor gents and ladies
2
3
toilet
commissioner toilet FF

add extra

6
1
1
8

S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS Class - I, Indian make heavy type - 15 mm NB Size
for each floor gents urinals,

for each floor gents,ladies wash


basins

12

commissioner toilet FF

add extra

1
24

S&F 12.7 mm N.P bib tap Indian make heavy dutys Seiko/ Senior/ Nice or
equivalent
for each floor gents and ladies
toilet

for each floor gents,ladies wash


basins

12

commissioner toilet FF

add extra

Supply and Transportation of 1.0HP Single phase ISI Mono block CI body
motor pumpset (25x25mm). Makes: Kirloskar / Crompton / Texmo / CRI /
KSB / Havells Hi-flow V1
1

Sanitory arrengements

Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked
conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/
Parryware/ Neycer - ISI Mark: 630 mm x 450 mm
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

1
13

1891.69

each

Supplying & Fixing low down porcelain flushing tank 10 Lit Capacity
Hindustan Sanitary ware/ parry/ Neycer with internal components
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

1
13

Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

Gents toilets 3 floors

commisioner anti room toilet

Gents toilets 3 floors

10.00

10.00

Ladies toilets 3 floors

10.00

10.00

commisioner anti room toilet

10.00

10.00

from toilets to septic tank

30.00

30.00

1056.62

each

313.58

Rmt

94.30

each

10.00
70.00

Supply of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand)
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

add extra

2
23

each

Supplying of 110 mm dia 3 M single Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand.

add extra

2464.31

Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x
265 mm x 315 mm with internal flushing rim fixed with screws complete
Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995

10
e

each

Supplying & Fixing Indian make Flat Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972
with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting
with parallel pipe thread conforming to IS:2963-1979 and fitted with 15
mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make
400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard
CI brackets including wooden block: 550 x 400 mm - Double C.P. Pillar
cock

13
d

2879.00

Supply of 110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any ISI Brand)
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

add extra

1
8

Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

each

64.76

each

79.53

Rmt

4345.77

each

Supply of 110 mm dia - Coupler - UPVC/SWR Pipe fittings


(Prince/Sudhakar/Kisan/Supreme or any ISI Brand
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

from toilets to septic tank

add extra

2
18

Labour charges for laying, fixing and commissioning the PVC pipes
including couplers/ bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice
Gents toilets 3 floors

10.00

10.00

Ladies toilets 3 floors

10.00

10.00

commisioner anti room toilet

10.00

10.00

from toilets to septic tank

30.00

30.00

add extra

10.00
70.00

295.40

1
8

each

Supply of 110 mm dia - double Tee with Door - UPVC/SWR Pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any ISI Brand)

add extra

147.70

Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop.


Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light
weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg
Gents toilets 3 floors

Ladies toilets 3 floors

commisioner anti room toilet

from toilets to septic tank

2
5

electrification

Ground floor

Supply and fixing of 25 mm dia 2.00 mm thick PVC pipe concealed in roof
slab with all required accessories including masonary work all labour
chages

length

24.00

144.00

width

14.00

126.00

stair case room

3.70

3.70

5.00

5.00

24.00

72.00

for main wire to boards

350.70
add extra

19.30
370.00

each room 2 nosx8=16


boards+staircase room 2=18

18

2.00

36.00

for main wire to boards

18

2.00

36.00

72

478.17

each

453.07

each

59.33

Rmt

18.27

Rmt

72

add extra

3
75

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A modular siwtch control and
3/2 pin sockets fixing on board including all labour charges
each room 2 nosx18 boards

36

36

add extra

4
40

Supply and run of 2 of 36/0.3 mm. (1.5. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for mains including all
labour charges etc.
18 boardseach floor average
length and width 25m

18

25.00

450.00

for 1.00 hp motor

25.00

25.00

add extra

25.00
500.00

Rmt

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A siwtch, ceiling rose and 3
mm thick hyla sheet covering to switch control box including all labour
charges etc,., complet for light, bell , fan and exhaust fan points in non residential building- for 6 points
each room 4 nosx18 boards

70.72

3.00
75.00

Rmt

Supply and fixing of 20 mm dia 1.50 mm thick PVC pipe concealed in


walls with all required accessories including masonary work for light , fan
and plug point with metal deep box including all labour chages

add extra

63.92

supply and run of 1 of 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for earth continuity
including all labour charges etc.
18 boardseach floor average
length and width 25m
add extra

18

25.00

450.00
15.00
465.00

supply and run of 4 of 6 sq.mm (7/18) WPSC alluminium cable along


with No.10 SWG G.I barer wire through PVC cleats with all accessories
including all labour charges etc
service wire from pole to meter

100.00

119.09

Rmt

2445.00

each

2618.26

each

8381.00

each

1600.00

each

198.00

each

2722.00

each

S&F of TPN distrubution board with IP 42 protection (metal door) suitable


for 3 phase ELCB-RCCB-FP isolator as incomer and 10 KA SP MCBS as
out going including internal connection and labour charges for surfaceflush mounting etc -- 63 A FP isolator-1 no for incomer,6-32A SP MCBS
-18 Nos for out going
1

100.00

Providing independent earthing by excavating a trench toa depyh of


2.10m in all soils, as per size specied in data ,using 40 mm dia B class GI
pipe 2.50m long with necessary accessories with hume pipe ring duly
providing staggered holes including filling with equal proportion of salt and
charcoal in layers and all labour charges etc complete
for 3 floors

S&F of 63 Amps 415 V TPN swich disconnector fuse unit cubical type
without fuses of makes Standard/Crystal/Havells/HPL
for Ground floor

Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes


Crompton High Speed / Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride
ground floor

add extra

4
1
5

Supply of stepped type Electronic Regulator of makes GM G Home / Gold


Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega
ground floor

add extra

4
1
5

Supply and Transportation of 18W Down lighter with system lumens of 1580lm,
suitable for Recessed / Surface mounting made of diecast alluminium body with
powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265
m Volts AC, P.F > 0.9, Surge protection: 2KV,THD<15%, with high power LED's
having efficacy of > 120 lumins/watt,CCT: 3000K - 5700K, minimum CRI>70, .etc.,
complete a) LUMINAIRE MAKE : Phillips / OSRAM / GE / Crompton
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSR
ground floor

add extra

8
2
10

Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet
steel housing with Electronic Ballast Chokes and all standard accessoriesof
makes Wipro / G.E. / Phillips / Crompton / Bajaj.
Toilets

staircase room

portico

GF parking

10

10

add extra

2
20

1218.00

each

396.00

each

Supply of Bulk head fitting with cast aluminium enamel painted body with water
tight, clear glass with wire guard hinged with lock and key arrangements etc.,
complete.Makes: Bajaj / Crompton / Surya
out side

Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark. Makes: Legrand / Schneider
for 1.00HP motor

ii

1st floor

Supply and fixing of 25 mm dia 2.00 mm thick PVC pipe concealed in roof
slab with all required accessories including masonary work all labour
chages
length

24.00

144.00

width

14.00

126.00

stair case room

3.70

3.70

5.00

5.00

24.00

72.00

for main wire to boards

595.00

each

63.92

Rmt

70.72

Rmt

478.17

each

453.07

each

350.70
add extra

19.30
370.00

Supply and fixing of 20 mm dia 1.50 mm thick PVC pipe concealed in


walls with all required accessories including masonary work for light , fan
and plug point with metal deep box including all labour chages
each room 2 nosx8=16
boards+staircase room 2=18

18

2.00

36.00

for main wire to boards

18

2.00

36.00

add extra

3.00
75.00

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A siwtch, ceiling rose and 3
mm thick hyla sheet covering to switch control box including all labour
charges etc,., complet for light, bell , fan and exhaust fan points in non residential building- for 6 points
each room 4 nosx18 boards

72

72

add extra

3
75

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A modular siwtch control and
3/2 pin sockets fixing on board including all labour charges
each room 2 nosx18 boards

36

36

add extra

4
40

Supply and run of 2 of 36/0.3 mm. (1.5. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for mains including all
labour charges etc.
18 boardseach floor average
length and width 25m

18

25.00

450.00

for AC plugs

3.00

3.00

add extra

27.00

480.00

59.33

Rmt

supply and run of 1 of 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for earth continuity
including all labour charges etc.
18 boardseach floor average
length and width 25m
add extra

18

25.00

450.00
15.00
465.00

18.27

Rmt

2445.00

each

1600.00

each

198.00

each

1300.00

each

2722.00

each

1218.00

each

S&F of 63 Amps 415 V TPN swich disconnector fuse unit cubical type
without fuses of makes Standard/Crystal/Havells/HPL
for 1sy floor

Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes


Crompton High Speed / Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride
first floor

15

add extra

15
1
16

Supply of stepped type Electronic Regulator of makes GM G Home / Gold


Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega
first floor

15

add extra

15
1
16

Suply and fixing of 20A SP plug and socket in SS enclosure( for AC


board)
commissioner room

1
1

Supply and Transportation of 18W Down lighter with system lumens of 1580lm,
suitable for Recessed / Surface mounting made of diecast alluminium body with
powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265
Volts AC, P.F > 0.9, Surge protection: 2KV,THD<15%, with high power LED's
having efficacy of > 120 lumins/watt,CCT: 3000K - 5700K, minimum CRI>70, .etc.,
complete a) LUMINAIRE MAKE : Phillips / OSRAM / GE / Crompton
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSR
first floor

36

add extra

36
4
40

Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet
steel housing with Electronic Ballast Chokes and all standard accessoriesof
makes Wipro / G.E. / Phillips / Crompton / Bajaj.
Toilets

staircase room

add extra

3
9

Supply of Bulk head fitting with cast aluminium enamel painted body with water
m tight, clear glass with wire guard hinged with lock and key arrangements etc.,
complete.Makes: Bajaj / Crompton / Surya
out side for 1st floor

396.00

each

63.92

Rmt

70.72

Rmt

478.17

each

iii 2nd floor


a

Supply and fixing of 25 mm dia 2.00 mm thick PVC pipe concealed in roof
slab with all required accessories including masonary work all labour
chages
length

24.00

144.00

width

14.00

126.00

stair case room

3.70

3.70

5.00

5.00

for main wire to boards

24.00

72.00

stair case head room

5.00

5.00

for main wire to boards

5.00

5.00
360.70

add extra

19.30
380.00

Supply and fixing of 20 mm dia 1.50 mm thick PVC pipe concealed in


walls with all required accessories including masonary work for light , fan
and plug point with metal deep box including all labour chages
each room 2 nosx8=16
boards+staircase room 2=18

18

2.00

36.00

for main wire to boards

18

2.00

36.00

stair case head room

2.00

2.00

add extra

3.00
77.00

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A siwtch, ceiling rose and 3
mm thick hyla sheet covering to switch control box including all labour
charges etc,., complet for light, bell , fan and exhaust fan points in non residential buildingeach room 4 nosx18 boards

72

72

stair case head room

add extra

2
80

Wiring with 2 runs 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC insulated
Flexible copper cable in existing pipe with 6A modular siwtch control and
3/2 pin sockets fixing on board including all labour charges
each room 2 nosx18 boards

36

36

stair case head room

add extra

4
42

453.07

each

59.33

Rmt

525.00

18.27

Rmt

2445.00

each

1600.00

each

198.00

each

1300.00

each

Supply and run of 2 of 36/0.3 mm. (1.5. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for mains including all
labour charges etc.
18 boardseach floor average
length and width 25m

18

25.00

450.00

for AC plugs

3.00

21.00

stair case head room

10.00

10.00

add extra

29.00
510.00

supply and run of 1 of 14/0.3 mm. (1.0. sq.mm) Fire retardant PVC
insulated Flexible copper cable in existing pipe for earth continuity
including all labour charges etc.
18 boardseach floor average
length and width 25m

18

25.00

450.00

stair case head room

25.00

25.00

add extra

S&F of 63 Amps 415 V TPN swich disconnector fuse unit cubical type
without fuses of makes Standard/Crystal/Havells/HPL
for 3 floors

50.00

Supply of 48" (1200mm) Sweep Ceiling Fan without Regulator.of makes


Crompton High Speed / Bajaj Ultima / Havells Velocity / Usha Astra /
Orient Summer Pride
2nd floor

20

add extra

20
1
21

Supply of stepped type Electronic Regulator of makes GM G Home / Gold


Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega
2nd floor

20

add extra

20
1
21

Suply and fixing of 20A SP plug and socket in SS enclosure( for AC


board)
chair persom room

council hall

6
7

Supply and Transportation of 18W Down lighter with system lumens of 1580lm,
suitable for Recessed / Surface mounting made of diecast alluminium body with
powder coating, acrylic diffuser with Driver, operating voltage range of 150 to 265
Volts AC, P.F > 0.9, Surge protection: 2KV,THD<15%, with high power LED's
having efficacy of > 120 lumins/watt,CCT: 3000K - 5700K, minimum CRI>70, .etc.,
complete a) LUMINAIRE MAKE : Phillips / OSRAM / GE / Crompton
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSR
2nd floor

42

42

add extra

3
45

2722.00

each

1218.00

each

396.00

each

Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet
steel housing with Electronic Ballast Chokes and all standard accessoriesof
makes Wipro / G.E. / Phillips / Crompton / Bajaj.
Toilets

staircase room

stair case head room

add extra

3
11

Supply of Bulk head fitting with cast aluminium enamel painted body with water
m tight, clear glass with wire guard hinged with lock and key arrangements etc.,
complete.Makes: Bajaj / Crompton / Surya
out side

Assistant Engineer
Jangareddygudem Nagar
Panchayat

Deputy Executive Engineer

Superintending Engineer

Executive Engineer

ce building for
Jangareddygudem Nagar

Panchayat
cum abstract of estimate
Total

34084.50

31732.67

7754.22

6243.14

988.45

7253.18

5644.39

12979.38

11097.91

8470.00

24591.97

37427.05

32036.02

10566.20

21950.42

2168.91

1181.60

2363.19

1165.69

5567.14

21728.87

23650.40

5304.00

35862.50

18122.67

29666.00

8497.41

11909.20

2445.00

7854.78

8381.00

8000.00

990.00

27220.00

24360.00

2376.00

595.00

23650.40

5304.00

35862.50

18122.67

28479.36

8497.41

2445.00

25600.00

3168.00

1300.00

108880.00

10962.00

2376.00

24289.60

5445.44

38253.33

19028.80

30259.32

9593.85

2445.00

33600.00

4158.00

9100.00

122490.00

13398.00

1584.00
1090521.54

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar
Panchayat
Detailed cum abstract of estimate
Sl.
No.

Description of item

No

No

Qty

Rate

Unit

190.00

290.10

Rmt

121.57

each

335.16

each

64.76

each

158.81

cum

V Misslanious
1 Rain water pipes
a Supply, delivery and fixing of 110mm dia single socket PVC pipes 4
kg/sqcm prince/Sudhakar or any ISI brand for rain water pipes with
clamps
Rain water pipes 4 places,front
and rear

13.50

108.00

along building

24.00

48.00

upto recharge pit

15.00

30.00

add extra

4.00

b supply of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe


fittings
bends

c
supply of 110 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings
Tees

d supply of 110 mm dia - Coupler - UPVC/SWR Pipe fittings


couplers

2 Rain water recharge pits


a

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material
and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH RBR-FNDN-1 1(A) & SOR
-2013-14 CL-2-II
Note : Classifications of Earth Work Specification are as per
302.2.1(a) of MORD and 301.2.1 of MORT&H--ordinary soil--manual
means upto 3m depth
Rain water recharge pits

0.786

1.00

1.00

2.50

3.93

extra for allround wall

0.786

1.40

1.40

0.50

1.54
5.47
5.47

Filling in foundation trenches as per drawing and technical specification


Clause 305.3.9 MORD & 304 MORTH for foundations-Sand filling
for allround wall

0.786

1.40

1.40

0.10

0.31

deduct pit

0.786

1.00

1.00

0.10

-0.16
0.15

0.15

1288.88

cum

Plain cement concrete (1:4:8) using 40mmHBG graded m/c with


c concrete mixer mixing including compacting finishing, curing ete for
foundations
for allround wall

0.786

1.40

1.40

0.10

0.31

deduct pit

0.786

1.00

1.00

0.10

-0.16
0.15
0.15

4210.79

cum

4975.43

cum

0.27

5808.50

cum

27.00

48.74

kg

1286.80

cum

Providing concrete for plain/reinforced concrete in open foundations


using 20 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including
d
curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH. Nominal mix 1:3:6
for allround wall

0.786

1.30

1.30

0.50

1.33

deduct pit

0.786

1.00

1.00

0.50

-0.79
0.54
0.54

RCC M-20 Nominal mix (cement,fine aggregate,coarse aggregate)


corresponding to Table -9 of IS -456 using 20 mm size graded machine
crushed hard granite metal (coarse agggregate) from approved quarry
including cost and conveyance of all materials like cement,fine
aggregate(sand),coarse aggregate ,water etc to site and including
e
seigniorage charges ,sales and other taxes on all materials including all
operational ,incidental and labour charges such as machine mixing
,laying concrete ,curing etc complete but excluding cost of steel and its
fabrication charges for finished item of work,but including
centering,shuttering
for cover slabs

0.786

1.30

1.30

0.10

0.27

Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically


Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per
IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG, forming
f grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages
such as overlaps, couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental, operational,
labour charges such as cutting, bending, placing in position, tying
including sales and other taxes on all materials etc., complete for
finished item of work i
for cover slabs
g

0.27

100

collection and supply and spreading of 90 to 45 mm HBG SS5 m/c


metal
Rain water recharge pits filter
media

0.786

1.00

1.00

0.60

0.94
0.94

collection and supply and spreading of 40 to 20 mm HBG SS5 m/c


metal

Rain water recharge pits filter


media

0.786

1.00

1.00

0.60

0.94
0.94

1866.24

cum

collection and supply and spreading of 20 to 10 mm HBG SS5 m/c


metal
Rain water recharge pits filter
2 0.786
1.00
1.00
0.60
media

0.94
0.94

1940.09

cum

1288.88

cum

Filling in foundation trenches as per drawing and technical specification


Clause 305.3.9 MORD & 304 MORTH for foundations-Sand filling
Rain water recharge pits filter
media

0.786

1.00

1.00

1.00

1.57
1.57

Assistant Engineer
Jangareddygudem Nagar
Panchayat

Deputy Executive Engineer

Superintending Engineer

Executive Engineer

e building for
Jangareddygudem Nagar

Panchayat
um abstract of estimate
Total

55118.42

486.27

2010.99

518.08

868.67

193.33

631.62

2686.73

1568.30

1316.00

1209.60

1754.27

1823.69

2023.54
72209.51

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar Panchayat
General abstract
Sl No

Name of the item

cost in Rs

construction of Ground floor

5478169.75

construction of first floor

3706683.03

construction of 2nd floor floor

3751085.35

construction of stair case head room

313561.74

Sanitary,water supply and electrical arrengements

1090521.54

Mislanius like rain water pipes, rain water recharge pits


etc
Sub total

72209.51
14412230.91

VAT 5%

720612.00

Labour cess 1%

144122.00

Scrutiny and test check charges 3% only on Municipal


fund

432367.00

10

User Charges 1% only on Municipal fund

144122.00

11

Seigniorage charges ( As per statement enclosed)

49700.00

12

charges payble to electrical departmrnt

100000.00

13

Provision towards Third Party Quality Control 1%

144122.00

13

contingences and unforseen items

302724.00

Total

16449999.91

Grand Total

164.50 Lakhs

Assistant Engineer

Deputy Executive Engineer

Superintending Engineer

Executive Engineer

Jangareddygudem Nagar Panchayat


Name of the work : Construction of office building under grant in aid
Report accompanaying the estimate
Govt sanctioned and released an amount of Rs 50 .00 lakhs under Grant-in-aid for construction of office building
to Jangareddygudem Nagar Panchayat With this amount it is proposed to construct office building .The Director
of Town and Country planning Govt of AP furnished type design and plans in BP No 4/2015 for Municipal office
building .An estimate is prepared with the following provisions
Foundations:- The sub soil is light brown clay mixed with sand with water table 5.00 to 6.00m below GL. The
safe bearing capacity of the soil is taken as17 T/sqm(test report enclosed).Isolated column footings are
proposed for foundations as detailed below. F1 type -EW excavation-2.55x2.55x2.00m,flat portion of footing
2.35x2.35x0.20m,tripizoidal portion 0.30m height. F2 type -EW excavation2-95x2.95x2.00m,flat portion of
footing 2.75x2.75x0.20m,tripizoidal portion 0.35m height.F3 type -EW excavation3.60x3.60x2.00m,flat portion of
footing 3.40x3.40x0.30m,tripizoidal portion 0.40m height. F4 type(portico) -EW excavation 1.70x1.70x2.00m,flat
portion of footing 1.50x1.50x0.15m,tripizoidal portion 0.20m height.M20 design mix concrete is proposed for all
column footings .RCC Pedestals of size 0.60x0.60x0.90m(for F1 and F4 footings), 0.75x0.75x0.90m(for F2& F3
footing) are proposed.
Earth work excavation is proposed for approaches of ramps and plinth beams.Plinth beams are proposed 0.15m
below GL and 0.30m above GL Sand filling is proposed below column footings of thickness 0.15m,below plinth
beams 0.10m. CC1:4:8 is proposed above sand bed for levelling coarse below colunm footing of thickness
0.15m and below plinth beams 0.10m..sand filling is also proposed in basement of thickness 0.60m. septic tank
of size 4.00x2.00x2.00 is proposed with brick masanary.Drinking water tank is also proposed at ground level of
size 7500 lts capacity
Basement:- Basement height of 0.75m is proposed from existing GL.Plinth beam of size 0.30x0.45m(0.23x0.23
m in toilets) are proposed with VRCC M20 design mix..VCC 1:3:6 is proposed for floorimg of 0.15m thick in
rooms and varandah.Plastering cm 1:3 20 mm thick is proposed to flooring in parking area
Superstructure :- super structure height 3.75 m is proposed. columns 0.30x0.45m, 0.30x0.60m,0.30m
dia(portico) , beams of size 0.30x0.30m(rib),,0.30x0.45m(rib)lintel beams 0.23x0.20m are proposed with VRCCM
20 design mix. Roof slab 0.15m thick,stair case alab 0.20m thick, proposed with VRCCM20 design mix..
Ground floor
Brick masanary with cm 1:6 is proposed with 0.23m thick walls(0.115m thick walls in toilets). columns
0.230x0.375m, 0.30x0.45m,0.30m dia(portico) , beams of size 0.23x0.45m(rib)lintel beams 0.23x0.20m are
proposed with VRCCM 20 design mix. Roof slab 0.14m thick,stair case alab 0.15m thick, proposed with
VRCCM25 design mix. Plastering with cm 1:3 12mm thick is proposed to ceiling. Plastering cm 1:5 12 mm thick
is proposed to building.Anodised Aluminium doors of size ,1.20 x2.10m(door D) are proposed in rooms.
Anodised Aluminium windows glazed of size 1.80x1.50m are proposed in rooms ventilators glazed of
size1.80x0.60n (over windows), 0.80x0.60m(toilets)are proposed. PVC doors of size 1.00x2.10m(main entrance
doors toilets) 0.75x2.10m D1(toilets internal doors) are proposed. Synthic enamel paint two coats is proposed to
iron grill of windows with primary coat.MS safety ornamental grill is proposed to windows. Plastic emultion paint
two coats is proposed to building.Ceramic tiles flooring and skirting is proposed to toilets.Vertified tiles flooring
and skirting is proposed to citizen service center office rooms.RCM facia 5cm thick in CM (1:3) for drop walls is
proposed for windows and ventilators etc.Ramp with M30 concrete is proposed for vechiles rear side of building.
Ramp with M30 concrete is also proposed for portico both sides. The ground floor is proposed for parking, citizen
service center office and toilets for gents and ladies

first floor
Brick masanary with cm 1:6 is proposed with 0.23m thick walls(0.115m thick walls in toilets). columns
0.30x0.45m, 0.30x0.45m, , beams of size 0.23x0.45m(rib),,0.30x0.45m(rib)lintel beams 0.23x0.20m are
proposed with VRCCM 25 design mix. Roof slab 0.15m thick,stair case alab 0.20m thick, proposed with
VRCCM25 design mix.. Plastering with cm 1:3 12mm thick is proposed to ceiling. Plastering cm 1:5 12 mm thick
is proposed to building.Anodised Aluminium doors of size 1.20 x2.10m(door D) are proposed in rooms.
Anodised Aluminium windows glazed of size 1.80x1.50m are proposed in rooms. ventilators glazed of
size1.80x0.60n (over windows), 0.80x0.60m(toilets)are proposed. PVC doors of size 1.00x2.10m(main entrance
doors toilets) 0.75x2.10m D1(toilets internal doors) are proposed. Synthic enamel paint two coats is proposed to
iron grill of windows with primary coat.MS safety ornamental grill is proposed to windows. Plastic emultion paint
two coats is proposed to building.Ceramic tiles flooring and skirting is proposed to toilets.Vertified tiles flooring
and skirting is proposed to all office rooms.RCM facia 5cm thick in CM (1:3) for drop walls is proposed for
windows and ventilators etc.. The first floor is proposed for engineering section,town planning section,health
section,commissioner chamber with anti room,visitors room,toilets,revenew section,entrance hall and toilets for
gents and ladies
2nd floor
Brick masanary with cm 1:6 is proposed with 0.23m thick walls(0.115m thick walls in toilets). columns
0.230x0.375m, 0.30x0.45m, , beams of size 0.23x0.45m(rib),,0.30x0.45m(rib)lintel beams 0.23x0.20m are
proposed with VRCCM 25 design mix. Roof slab 0.14m thick,stair case alab 0.15m thick, proposed with
VRCCM25 design mix.. Plastering with cm 1:3 12mm thick is proposed to ceiling. Plastering cm 1:5 12 mm thick
is proposed to building.Anodised Aluminium doors of size 2.00x2.10m (main door to council hall) ,1.20
x2.10m(door D) are proposed in rooms. Anodised Aluminium windows glazed of size 1.80x1.50m are proposed
in rooms. ventilators glazed of size1.80x0.60n (over windows), 0.80x0.60m(toilets)are proposed. PVC doors of
size 1.00x2.10m(main entrance doors toilets) 0.75x2.10m D1(toilets internal doors) are proposed. Synthic
enamel paint two coats is proposed to iron grill of windows with primary coat.MS safety ornamental grill is
proposed to windows. Plastic emultion paint two coats is proposed to building.Ceramic tiles flooring and skirting
is proposed to toilets.Vertified tiles flooring and skirting is proposed to all office rooms including council hall and
chairman chamber.RCM facia 5cm thick in CM (1:3) for drop walls is proposed for windows and ventilators etc..
The 2nd floor is proposed for council hall,chairman chamber,record room,computor section and estlablishment
section, and toilets for gents and ladies. Imprivious coat 2omm thick with CM 1:3 is proposed over roof slab
3rd floor (staircase head room)
Brick masanary with cm 1:6 is proposed with 0.23m thick walls. columns 0.23x0.375m, beams of size
0.23x0.45m(rib),lintel beams 0.23x0.20m are proposed with VRCCM 25 design mix. Roof slab 0.125m thick,
proposed with VRCCM25 design mix.. Plastering with cm 1:3 12mm thick is proposed to ceiling. Plastering cm
1:5 12 mm thick is proposed to walls.Anodised Aluminium doors of size 1.20 x2.10m(door D) are proposed in
head room. Plastic emultion paint two coats is proposed to building.The 3rd floor is proposed for stair case head
room. Imprivious coat 2omm thick with CM 1:3 is proposed over roof slab
Sanitory,water supply and electrification
5000 lts capacity polyethylene water storage tank is proposed over 2nd floor roof slab.KITEC PolyethyeneAluminium polyethene (PE-A-PE) of size 25,20,16 mm are proposed for incoming,out going and internal water
supply lines with necessary GM valves,bibcocks and other fittings.1.00 HP motor with pump is proposed for
pumping water from ground level tank to storage tank in 2nd floor.sanitary fittings like Orissa pans with flushing
tanks,wash basins,gents urinals,outlet piping system with specials,inspection chambers are proposed.electrical
wiring with nessary light,fan,plug,AC plug points are proposed with wiring.ceiling fans with regulators ate
proposed. distrubution boards,earthing arrengements,service wire are proposed in estimate.power saving light
fittings are proposed to building
Mislanious
110 mm dia PVC rain water pipes are proposed to discarge rain water from roof and these are proposed to
connect rain water recharge pits 2 nos of dia 1.00m and depth 3.00m

The follwing LS provisions are made in the estimate


1.contingences and 3 rd party QC 3%
2.Seigniorage charges ( as per statement enclosed)
3.charges payble to electrical departmrnt
4.VAT 5%
5.Labour cess 1%
6.consultancy charges for
7.Scrutiny and test

preparation of designs,drawings and estimate @1.5%


check charges 3%
The estimate is prepared with standard data and as per SSR 2015-16 with cement rate of Rs 292/50 kg bag for
West Godavari and steel rate of Rs 33000/MT (Oct 2015) .The expenditure will be met from the funds already
released and to be released by the Govt for this purpose.The total estimate works out to Rs 1666.02 lakhs.

Assistant Engineer
Jangareddygudem Nagar
Panchayat

Deputy Executive Engineer


Jangareddygudem Nagar
Panchayat

Superintending Engineer

Executive Engineer

Seigniorage statement
Sl No

I
1
2
3
4
5
6

Item No

236.21

CC 1:4:8

49.82

44.84

22.42

PCC 1:3:6 (1/3,2/3)

2.44

2.19

1.10

Desgin Mix M30 for CC


Pavement

16.32

14.69

7.34

PCC 1:3:6 ( For Flooring)

36.03

32.43

16.21

7a

M25 design mix for footings

64.00

51.20

25.60

M25 design mix for pedestals

4.30

3.44

1.72

M25 design for Plinth Beams

18.82

15.06

7.53

M25 design for Coloumns

11.26

9.00

4.50

Lintels

0.89

0.71

0.36

Roof slab 0.14 m thick

346.73

41.61

20.80

7g

Staircase slabs 0.15m thick

19.97

3.20

1.60

7h

Beams

22.34

17.87

8.93

7i

RCC Sun shades 0.10m thick

4.40

0.35

0.18

BM (1:6)

55.72

11.14

28529.82

10

RCM facia 5cm thick in CM


(1:3)

25.23

0.63

0.76

14

Plastering with CM (1:3) 12mm

689.57

8.27

15

Plastering CM(1:5) 12 mm thick

190.00

2.85

20

Plastering with CM (1:3) 20mm


thick

0.00

0.00

22

Flooring with non skid ceramic


tiles

44.43

0.53

23

Skirting with non skid ceramic


tiles (CM (1:3) 12 mm thick)

80.00

0.96

25

chequrred terrazzo tiles flooring

120.87

1.45

26

Flooring with vitrified tiles of 1st


quality

22.02

2.69

9
7d
7e

11
7f

15
16
17
18
19
20
21

22
23

bricks 1000
nos

236.21

7c

14

sand cum

Filling in foundation

13

Metal cum

7b

12

Qty cum/sqm

Ground floor : -

10

Name of the item

24
27

Skirting with non skid ceramic


tiles (CM (1:5) 12 mm thick)

5.44

0.065

Septic tank
25

Impervious coat

0.00

0.00

sand for foundations

1.90

1.90

31c

CC 1:4:8

1.90

1.71

0.86

31d

BM (1:5)

9.38

31e

PCC M10 1:3:6

0.24

31f

Plastering in CM (1:3) 20 mm
thick

31g

VRCC M-20 Nominal mix

30

26
31 b
27
28
29
30
31

1.88

4802.56

0.21

0.11

45.60

0.96

1.90

1.71

0.86

under ground water tank


32

32b

sand for foundations

1.58

1.58

33

32c

CC 1:4:8

1.58

1.42

0.71

34

32d

BM (1:5)

6.19

1.24

3168.26

32e

Plastering in CM (1:3) 20 mm
thick

0.00

0.00

32f

VRCC M-20 Nominal mix

1.30

1.17

0.58

35
36

II
37
38
39
40
41
42
43
44
45
46
47
48

First floor : 1a

M25 design for Coloumns

8.15

6.52

3.26

1b

Lintels

2.92

2.34

1.17

1c

Roof slab 0.14 m thick

321.99

38.64

19.32

1d

Staircase slabs 0.15m thick

19.97

3.20

1.60

1e

Beams

18.49

14.79

7.40

1f

RCC Sun shades 0.10m thick

35.20

2.82

1.41

1g

loft slab 0.075 m thick

23.18

1.39

0.70

BM (1:6)

106.00

21.20

54274.43

RCM facia 5cm thick in CM


(1:3)

136.78

3.42

4.10

plastering 1:3 12mm thick

350.71

5.26

plastering 1:5 12mm thick

370.00

5.55

15

Flooring with non skid ceramic


tiles

46.23

0.55

49

50

16

Skirting with non skid ceramic


tiles (CM (1:3) 12 mm thick)

80.00

0.96

18

Flooring with vitrified tiles of 1st


quality

257.09

31.36

19

Skirting with non skid ceramic


tiles (CM (1:5) 12 mm thick)

39.74

0.477

51

III

2nd floor : -

52

1a

M25 design for Coloumns

8.15

6.52

3.26

53

1b

Lintels

2.74

2.19

1.10

54

1c

Roof slab 0.14 m thick

321.99

38.64

19.32

55

1d

Staircase slabs 0.15m thick

19.97

3.20

1.60

56

1e

Beams

17.22

13.78

6.89

1f

RCC Sun shades 0.10m thick

37.40

2.99

1.50

58

1g

loft slab 0.075 m thick

14.52

0.87

0.44

59

BM (1:6)

81.00

16.20

41473.35

RCM facia 5cm thick in CM


(1:3)

144.75

3.62

4.34

61

plastering 1:3 12mm thick

364.70

5.47

62

plastering 1:5 12mm thick

330.00

4.95

15

Flooring with non skid ceramic


tiles

44.43

0.53

16

Skirting with non skid ceramic


tiles (CM (1:3) 12 mm thick)

80.00

0.96

18

Flooring with vitrified tiles of 1st


quality

265.36

32.37

19

Skirting with non skid ceramic


tiles (CM (1:5) 12 mm thick)

28.59

0.343

22

Impervious coat

321.99

6.76

57

60

63
64

65
66

67

IV

3rd floor-stair case room : -

68

1a

M25 design for Coloumns

1.05

0.84

0.42

69

1b

Lintels

0.06

0.05

0.03

70

1c

Roof slab 0.125 m thick

28.80

2.88

1.44

71

1d

Beams

1.71

1.36

0.68

72

BM (1:6)

11.00

2.20

5632.08

73

plastering 1:3 12mm thick

28.80

0.43

74

plastering 1:5 12mm thick

199.91

3.00

75

Impervious coat

28.80

0.60

Misslanious : 2

Rain water recharge pits

76

2b

sand for foundations

0.15

0.15

77

2c

CC 1:4:8

0.15

0.14

0.07

78

2d

PCC M10 1:3:6

0.54

0.49

0.24

79

2e

RCC M20 Nominal Mix

0.27

0.24

0.12

2g

90 to 45 mm HBG SS5 m/c


metal

0.94

0.94

2h

40 to 20 mm HBG SS5 m/c


metal

0.94

0.94

2I

20 to 10 mm HBG SS5 m/c


metal

0.94

0.94

2h

Sand for Filling

1.57

1.57

389.52

622.87

137881.50

80
81
82
83

Sub Total

Metal 50.00/cum

50.00

389.52

19476.23248

sand 40.00/cum

40.00

622.87

24914.68447

bricks 38.50/1000 nos

38.50

137881.50 5308.437931
49699.35

Grand Total

Assistant Engineer

Deputy Executive Engineer

Superintending Engineer

say

49700.00

Executive Engineer

Name of the work : Construction of office building for


Jangareddygudem Nagar Panchayat
General abstract
Sl No
1
2
3
4
5

Name of the item


construction of Ground floor
construction of first floor
construction of 2nd floor floor
construction of stair case head room
Sanitary,water supply and electrical arrengements

cost in Rs
5478169.75
3706683.03
3751085.35
313561.74
1090521.54

Mislanius like rain water pipes, rain water recharge pits etc

7
8
9
10
11
12
13
13

Sub total
VAT 5%
Labour cess 1%
Scrutiny and test check charges 3%
User Charges 1%
Seigniorage charges ( as per statement enclosed)
charges payble to electrical departmrnt
Provision towards Third Party Quality Control 1%
contingences and unforseen items 3%
Total
Grand Total

Assistant Engineer

Deputy Executive Engineer


Superintending Engineer

72209.51
14412230.91
720612.00
144122.00
432367.00
144122.00
49700.00
100000.00
144122.00
302724.00
16449999.91
16449999.91
164.50
Lakhs

Executive Engineer