Documente Academic
Documente Profesional
Documente Cultură
Attention:
Dear Sir,
We are pleased to submit here under our quotation for the supply of materials, labor, tool, equipment, consumables and
supervision necessary for the satisfactory performance and completion of the project; CONSTRUCTION OF THREE (3) STOREY
RESIDENTIAL HOUSE WITH ROOF DECK. In accordance with the attached Cost Estimate.
Proposed Amount
(Includes materials, profit, taxes)
Quantity
1.0
Unit
Item Description
Lot
DEMOLITION WORKS
Amount
PHP
197,300.00
4. Any work not stated in this proposal shall be considered change order and will be charged separately.
Thank you for giving us the opportunity to quote on your requirements and we look forward to the privilege of serving you in the future.
Conforme:
April 7, 2015
PURCHASE ORDER
Issued To:
Company:
Project:
Lot/ Units:
50
MATERIALS
1 3/4" thk. Plywood
2 Flat Moulding (1/2 x 1 x 8)
TOTAL
Authorized by:
Received by:
DER
QTY
UNIT
30
20
50
pcs
pcs
pcs
Signature
September 9, 2014
Attention:
Dear Sir,
May we request for the release of final payment amounting Ten Thousand Five Hundred Peso
for the project: VARIOUS WORKS AT UNIVERSITY DORM located at Residence Hall.
Attached are the statement of billing and cost estimate.
Project:
Location:
Owner :
Subject:
STATEMENT OF BILLING
PHP
PHP
10,500.00
10,500.00
DEMOLITION WORKS
1327 P. Burgos St. West Zamora Paco, Manila
Mr. Norman Cortez
Cost Estimate
SCOPE OF WORKS
I.
General Requirements
Mobilization
Montalban, San Mateo, Marikina
Quezon City
Manila
Las Pinas
II.
QTY
UNIT
1.0
lot
Site Works
Demolition of Concrete
Demolition of Fence
1.0
1.0
sq.m
sq.m
Excavation Works
for bungalow
for 2-3 storey
for 4-6 storey
1.0
1.0
1.0
lot
lot
lot
IV.
Masonry Works
Construction of slab/ wall
Construction of column
Construction of beam
Construction of stairs
Construction of countertop
1.0
1.0
1.0
1.0
1.0
1.0
lot
sq.m
set
set
lot
lot
V.
Metal Works
1.0
lot
1.0
kg
1.0
kg
III.
MATERIAL
LABOR
COST
550
250
VI.
1.0
set
1.0
set
1.0
set
1.0
set
1.0
set
1.0
set
1.0
set
Construction of trusses
1.0
lot
1.0
lot
Carpentry Works
lot
1.0
sq.m
Construction of ceiling
1.0
sq.m
1.0
set
Construction of closet
1.0
set
1.0
set
1.0
set
1.0
set
lot
1.0
1.0
sq.m
-receptacle
1.0
set
-switch
1.0
set
1.0
set
-waterproof outlet
1.0
set
1.0
set
-lamp
1.0
set
-convenience outlet
-circuit breaker
1.0
1.0
set
set
lot
1.0
sq.m
1.0
sq.m
1.0
1.0
1.0
1.0
1.0
1.0
1.0
set
set
set
set
set
set
set
- kitchen sink
- grease trap
- kitchen faucet
- drain
- laundry sink
1.0
1.0
1.0
1.0
1.0
set
set
set
set
set
1.0
lot
1.0
lot
1.0
lot
1.0
-ordinary
1.0
lot
-stainless
1.0
lot
IX.
Tinsmithry Works
Tile Works
Supply and Installation of tiles
-30 x 30cm Mariwasa Tiles
-40 x 40cm Mariwasa Tiles
-20 x 20cm Mariwasa Tiles
-60 x 60cm Mariwasa Tiles
-20 x 60cm Mariwasa Tiles
-30 x 60cm Mariwasa Tiles
Application of cement grout
XI.
1.0
1.0
1.0
1.0
1.0
1.0
1.0
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1.0
lot
1.0
lot
1.0
set
1.0
set
1.0
set
1.0
set
1.0
lot
1.0
sq.m
-0.90 x 2.10 m
1.0
set
-0.80 x 2.10 m
-0.70 x 2.10 m
1.0
1.0
set
set
-0.90 x 2.10 m
1.0
set
-0.80 x 2.10 m
1.0
set
-0.70 x 2.10 m
1.0
set
1.0
sq.m
Granite Works
Supply and Installation of granite
countertop
XI.
- exterior walls
1.0
sq.m
- interior walls
1.0
sq.m
1.0
sq.m
1.0
sq.m
1.0
sq.m
AMOUNT
1,500.00
3,000.00
7,000.00
10,000.00
550.00
250.00
40,000.00
60,000.00
75,000.00
-
PHP
197,300.00
DEMOLITION WORKS
1327 P. Burgos St. West Zamora Paco, Manila
Mr. Norman Cortez
Project Schedule and Cash Flow
SCOPE OF WORKS
1st Month
2nd Month
3rd Month
4th Month
5th Month
6th Month
7th Month
8th Month
PROJECT SCHEDULE
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X
XI.
XII.
Demolition Works
Lay-out/ Staking
Excavation Works
Masonry Works
Reinforcing Works
Carpentry Works
Electrical Works
Plumbing Works
Tinsmithry Works
Tile Works
Glass/ Aluminum Works
Painting Works
CASH FLOW
10% PB
(1,045,000.00)
10% PB
(1,045,000.00)
10% PB
(1,045,000.00)
10% PB
(1,045,000.00)
This is to certify that St. Pancracios Engineering Services has completed the p
Construction of Three (3) Storey Residential Building last February 9, 2015 located at P. Bu
Zamora Paco, Manila.
St. Pancracios Engineering Services assume full responsibility for the contract wo
held responsible for any damage of work except for those occasioned by force majeure for
One (1) year.
AND GUARANTEE
Mrs.
May we request that our workers be allowed to work for the project: Construction of Xavie
Hall Genset House on November 16, 2015- December 21, 2015 (Monday to Saturday) 7:00am to 4:00
pm located at Xavier Hall.
Attached is the list of workers, vehicles, tools and equipment. Thank you and God Bless.
Truly yours,
Project:
Location:
Owner :
Subject:
A.
List of Manpower
Designation
1 Joel Almazan
2 Adrian Mansia
3 Francisco Pedro Jr.
4 Lodian Castillo
5 Alfred Larga
6 Terry Mawak
7 David Boncalos
8 Joey Ilabra
9 Jude Jamilla
10 Leonard Laylay
11 Ramil Larga
B.
P.I.C.
Foreman
Driver
Driver
Steelman
Steelman
Welder
Mason
Labor
Labor
Mason
List of Vehicles
1 Kia Pride - TWJ 979
2 Elf Truck- XPC 262
3 Nissan Safari- TRM 359
C.
9 Panel Boards
10 Personal Tools
11 Scaffolding
12 Platform
13 Tubular Pipe
14 Coupler
15 Speed Cutter
FINISHED PHOTOS