Introduction

PR1MA for 1Malaysia Housing Programme Corporation is a corporation, which was set up to plan
and coordinate projects under the 1Malaysia Peoples Housing Scheme (PR1MA) throughout the
nation. 1Malaysia Housing Programme Corporation is an entity under the Prime Ministers
Department. Amongst others, the corporation is responsible for distribution of houses under the
projects to eligible recipients.
The PR1MA Standard Planning Guideline briefly outlines the requirement and criteria in the
development of a PR1MA complex in accordance to the PR1MA Act 2012. The purpose of this
Guideline is to provide a tool to assist the user in understanding the concept as well as a reference
document for PR1MA development.

Defining PR1MA Complex

Section 17 (b) of the PR1MA Act 2012 outlines the function of the Corporation, which includes
planning, supervising and executing the design, construction and maintenance of the PR1MA
complexes in accordance to the Act and policies set by the Government.
In addition, section 17 (f) of the same act established parameters of PR1MA complexes through the
Corporations functions:
i.
ii.
iii.

To facilitate economic and social development including facilitating the development


of educational facilities and the development of community clinics; and
To facilitate and undertake infrastructure and commercial development including
facilitating and undertaking the development of sports and recreational facilities.
The Community.

Figure 1: PR1MA community


1

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT

PR1MA Homes
PR1MA homes shall assist in not only reducing the cost of living of the homeowners, but also
enhance their quality of life. These would be done by:

Providing socially and environmentally homes where the mix of dwelling type, size and tenure
should support sound social, environmental and economic sustainable policy objectives for the
area
Designing architecturally appropriate homes which will provide a pleasant living environment,
which is aesthetically pleasing and human in scale
Providing safe, secure, and healthy homes to live in which includes provision of pedestrian,
cycling lane and an efficient vehicular circulation
Ensuring affordability throughout the development value chain at a reasonable cost
Promoting resource efficiency on the land, infrastructure and energy and at the same time
promoting optimisation in every aspect of the construction, maintenance and management of
the development

Location Criteria of PR1MA Development

PR1MA developments mostly located within urban areas or suburban with employment pull
factor in a major city.
These areas have high accessibility to the road hierarchy and continuity with streets, or
connected with a public transportation system such as bus terminal, the railway transit
system (e.g. commuter train, Light Rail Transit System, the system of rapid transit,
monorails, etc.).
The location would also be within closed proximity of existing public amenities and basic
infrastructure such as sewer, water, electricity, roads and floodwater management.
The land area to be developed is located in low risk area where it is not within the disasterprone areas and environmentally sensitive areas such as floods, valleys, swamps, landslide
and areas that have been confirmed as not safe based on the study of soil investigation by a
qualified engineer.

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


1.0

PR1MA Standard Planning Guidelines for Highrise Home

a.
b.
c.

Minimum size area


Building Plinth area
Building Typhology

d.

Density

e.

Person per unit

f.
g.
h.

Acces ingress/ engress to the area


Internal road circulation
Building Setback - facing main road

i.
j.
k.

Building Setback - to boundary


Building Setback between buildings
refer to Illustration 1
Car parking

l.
m.
n.
o.

Car parking for visitor


Motorcycle parking
Car parking for disable
Green Space on ground

p.
q.

Sky Garden (elevated greens)


Perimeter Planting

r.

Variation of Unit sizes:


Type A : Rooms 2
Type B : Rooms 2 + 1
Type C : Rooms 3
Type D : Rooms 3 + 1
Min. Master Bedroom Size
(Habitable Room)
Min. Bedroom Size (Habitable Room)
Min. Utility Room Size

3 acres
60% from gross area
- Highrise Block 10 to 25 storey
- Walk about Apartment 4 to 5 storey
100 150 unit/ acre
(subject to respective Local Authoritys Local Plan)
4 person/unit
(subject to respective Local Authoritys Local Plan)
50 feet (road reserve)
24 feet (road surface)
40 to 50 feet (road reserve)
Depending by location:
i.e. : 40 feet within housing area
50 feet within urban area
20 feet

1 unit : 2 parking
- If number of parking required not sufficient,
tandem configuration (back to back parking)
can be applied
- subject to respective Local Authoritys approval
10% (from nos of parking)
10% (from nos of parking)
2% (from nos of parking)
10% from gross area
(subject to respective Local Authoritys Local Plan)
Every 5th or 10th floor
5 feet along the boundary
(excluding building setback)
800 sqft
900 sqft
1000 sqft
1200 sqft
119 sqft
97 sqft
70 sqft

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


2.0

PR1MA Standard Planning Guidelines Amenities For Highrise Home

Assuming Population : 1000 pop.


Amenities Components
a.

b.

c.

Basis

Surau
Main Component:
1. Praying Hall (M/F)
2. Ablution area (M/F)
3. Toilet (M/F)
4. Bilik Jenazah
5. Utility room
6. Changing Room
7. Store Room
Optional:
1. Imam Office
2. Meeting Room

1 person: 8 sqft x pop x 35%

Multi Purpose Hall


Main Component:
1. Badminton /Sepak Takraw
Court
2. Stage
3. Changing room (M/F)
4. Toilet (M/F)
5. Store Room
6. Control Room/AV Room
Optional:
1. Praying Room
2. Office
Kindergarden (4 - 6 years)
Main Component:
1. Indoor gathering area
2. Kitchen
3. Toilet
4. Staff Room
5. Store Room
Optional:
6. Office

1 person: 8 sq feet x pop

1 person: 15 sq feet x pop x


20%

Minimum Gross
Floor Area
(Square Feet)

2,800.00
(60% Praying Hall,
40% Ancillary Area)

8,000.00
(To break into few
nos, i.e: main halls,
mini halls)

3,000.00
(To break into few
nos)

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT

Amenities Components
d.

Nursery (0-4 years)


Main Component:
1. Indoor gathering area
2. Kitchen
3. Toilet
4. Staff Room
5. Store Room
Optional:
1. Office

Basis

Minimum Gross
Floor Area
(Square Feet)

1 person: 15 sq feet x pop x


20%

3,000.00
(To break into few
nos, i.e: 1 unit/block)

Min. 1000 sqft

1000.00

e.

Klinik 1Malaysia

f.

Mailing Room (Perblock)

g.

Management Office

850.00

h.

Meeting Room / Bilik Persatuan


Penduduk
Monitoring / Security Room

850.00

Housekeeping Room / Store (with


toilet)
Maintenance Workshop / Store

500.00

i.
j.
k.
l.

850.00

500.00

Refuse Chute Centre


- Subject to System Operation
- Subject to nos of housing units
- Subject to Local Authority Guideline

m.

Recycling room

n.

Localised Shops
Suggested retail: Cyber Caf / Mini Pos /
Saloon,Laundry Shop / Sundry Shop /
Kopitiam / Caf General Store / 7eleven

o.

200 300

40 feet x 30 feet

1,200.00

200.00

1 unit: 50 unit housing

Guard House (with toilet)


- At the entrance point of the
development

1500 sqft/Retail

300

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


p.

q.

r.

Bus Stop and Taxi Stop


- Subject to the location
- To be provided at front access of the
development
Other Recreation Elements
Main Component:
1. Tennis Court
2. Gazebo / Siting Area
3. Playground Structure
4. BBQ Pit
Optional:
1. Futsal Pitch

As per planning
standard

As per planning
standard

Optional Facilities:
Mini Library

850.00

Gym/ Exercise Room

850.00

Mini Post Office

500.00

Police Bit

500.00

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT

Accelaration and
decelaration
lane subject to
engineers detail

Illustration 1 : Building Setback between buildings

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


3.0

PR1MA Standard Planning Guidelines for Landed Home

a.

Density

10 20 unit /ekar

b.

Lot size

Conventional terrace:
Terrace 1 : 20 x 60
Terrace 2: 20 x 65
Terrace 3: 20 x 70
IHT Model :
Terrace IHT : 20 x 6116 (6.116 x 18.645 m)

c.

Gross Floor Area /unit

Conventional terrace: 1100 1400 sqft


IHT Model : 5.760 m x 10.935 m x 2 = 125.97 sqm
(1356 sqfeet)

d.

Rooms

3 rooms or 3 rooms + 1 utility

e.

Storey

1 or 2 storey

f.

Internal road circulation

50 feet (road reserve)

g.

Rear road / back lane

10 feet

h.

Building Setback front

20 feet

i.

Building Setback carporch

10 feet

j.

Building Setback corner lot

20 feet

k.

Building Setback end lot

20 feet

l.

Green open Space

10% from gross area

j.

Provision of amenities
refer to 4. Amenities For Landed
Home

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


4.0

PR1MA Standard Planning Guidelines Amenities For Landed Home / Masterplan


Basis

Minimum
requirement

population 2500 : 0.5 acre

0.50 acre

population 20,000 : 3 - 6 acres

3.00 acre

population 5,000: 1 acre

0.50 acre

population 3,000 - 10,000 : 1 acre

0.50 acre

Amenities Components
[Independent Buildings]
a.

Surau

b.

Mosque

c.

Tempat Ibadat Selain


Islam

d.

Multi Purpose Hall

e.

population 2500 : 8000 sq feet


Tadika / Taska / Tabika

0.50 acre
1 class : 20 students

f.

Primary School

population 3,000 : 5 acre

5.00 acre

g.

Secondary School

population >9,000 : 7 acre

7.00 acre

h.

population >9,000 : 10 acre

10.00 acre

i.

Kompleks Sekolah
(SM + SR)
(Sekolah Sinar)
Clinic

population 1,000 4,000 : 1 acre

1.00 acre

j.

Hospital

population <30,000 : 10 acres

10.00 acre

k.

Police Station

population 5,000 - 10,000 : 2.00 acre

2.00 acre

l.

Fire Station

population 50,000 : 3.00 acre (class C)

3.00 acre

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


5.0

PR1MA Standard Planning Guidelines for Commercial in the Masterplan

Commercial Component

a.
a.

Shophouses / Offices
Shophouses

Ratio
min lot size
min lot size
length perblock

1 unit : 50 unit houses


24' x 65'
24' x 65'
16 unit per block or 320 feet

height control
length
perblock
service
road

3 or 4 storey
16 unit per
or 320 feet
50'block
and 66'

height
control
Frontage
Car / Motor parking
service road

3 or
4 storey
Single or
Double
Frontage
- 1 parking : (GFA x 80% )/ 500 sq
50' and 66'
feet
- additional 2% carparking for
Single parking
or Double Frontage
disabled
parkingparking
: (GFA /x 80%
500
-- 11 motor
GFA )/
905
sqsq
feet
feet
(84 sq meter)
- additional 2% carparking for di

Frontage
Car / Motor parking

b.

Shopping Complex / Mall

Plot Ratio
min lot size
Plinth area
Road
Setbacks

Landscape
Car / Motor parking

1:4
1 acre
60%
Main Road 66
Access point 50
Facing main road 40
Shared boundary/ rear to rear
/side by side 20
10% from gross area
- 1 parking : (GFA x 80% )/ 500 sq
feet
- additional 2% carparking for
disabled parking
- 1 motor parking / GFA 905 sq
feet (84 sq meter)

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


6.1

PR1MA Standard Infrastructure Guidelines (Electric, Water and Sewerage)

6.2

Electric Supply and Demand

Type of premis

Minimum
(kW)

Domestik (unit)
Low Cost Highrise /
1.5
Landed 1 storey
Landed 2 storey /
3
Apartment
Semi detached 1
3
storey
Bungalow 1 storey /
5
condominium 3 BR
Bungalow 2 storey /
8
luxury condominium
Commercial
Shoplot 1 storey
5
Shoplot 2 storey
15
Shoplot 3 storey
20
Shoplot 4 storey
25
Shoplot 5 storey
30
Source: Electricity Application Handbook (ESAH), 2001

6.3

Estimated Demand
Normal
(kW)

Maximum
(kW)

10

12

15

10
20
30
35
40

15
25
35
45
55

Types and Sizes of TNB Substation

Category
Pencawang
Masuk Utama
(PMU)
132/33/11kV

Types
Gas Insulated
Switchgear
(GIS) tanpa
outdoor
switchyard

Lot Size
60.0 m x 80.0 m

Air Insulated
Switchgear
(AIS) dengan
outdoor
switchyard

130 m x 130 m

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT

Pencawang
Pembahagian
Utama (PPU)
a. 33/11 kV
b. 22/11 kV

Jenis Indoor

46.0 m x 46.0 m

Jenis Outdoor

130.0 m x 130.0 m

Stesyen Suis
Utama (SSU)
a. 33 Kv
b. 22 kV
c. 11 Kv

Conventional

31.0 m x 31.0 m

Pencawang
Elektrik (P/E)
a. 11/.415 kV
b. 22/.415 kV

Single Chamber

14.63 m x 14.63 m

Double
Chamber

17.68 m x 14.63 m

Compact
Substation

5.0 m x 5.0 m

Source: Electricity Application Handbook (ESAH), 2001

10

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


6.4

Standard Size For Single Chamber And Double Chamber

10.3.1 Standard Size for Single Chamber

10.3.1 dard Size for Double Chamber

11

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT

Source: Electricity Application Handbook (ESAH), 2001

10.3.2 Building Setbacks for Substation Building

12

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


6.5

Water Demand by Type of Premis

Type of Premis
Low Cost Terrace /Low Cost Highrise
Terrace 1 storey / Low Cost Terrace / Low
Medium Cost Highrise
Terrace 2 storey / High Cost Highrise/
Apartment/ Town House
Semi detached House / cluster

Average Demand on Daily Basis (liter)


1100/unit
1300/unit

Bungalow /condominium
Wet Market
Dry Market
Shophouse 1 storey / Low Cost Shophouse

2000/unit
1500/stall
450/stall
2000/unit

Shophouse 2 storey
Shophouse 3 storey
Shophouse 4 storey
Light workshop
Semi detached / bungalow workshop
Heavy Industry
Medium Industry
Light Industry
Offices / Complex / Commercial (domestic)
Community Hall
Hotel
Educational Institution
(except school and kindergarten)
School / Kindergarten
Boarding School / Higher Learning Institution
Hospital
Mosque
Prison Centre
Army Camp
Bus Terminal
Restaurant

3000/unit
4100/unit
4550/unit
1500/unit
1500/unit
65,000/hectar
50,000/hectar
33,000/hectar
1000/100 m2
1000/100 m2
1500/room
100/student

1500/unit
2000/unit

50/student
250/student
1500/bed
50/person
250/person
250/person
900/service area
25/m2

Source: Jadual Keempat, Kaedah 11 Penjadualan Kadar Permintaan Air Untuk Perancangan Sistem
Retikulasi Air Luaran.

13

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


6.6

Minimum Area for Suction Tank, Pumping Station and Water Reservoir (Combination)

Water Demand (litre/day)


< 227,000
227,001 454,000
454,001 680,000
680,001 900,000
900,001 1,135,000
1,135,001 2,270,000
2,270,001 3,405,000
3,405,001 6,810,000
6,810,001 13,620,000
> 13,620,000

Area Size (minimum)


23 m x 54 m
27 m x 59 m
32 m x 63 m
32 m x 63 m
32 m x 68 m
36 m x 81 m
41 m x 90 m
45 m x 104 m
50 m x 130 m
Identified by Certifying Agency (CA) with minimum area 50 m x
150 m
Source : Jadual B.2: Luas kawasan minima tapak tangki untuk kombinasi tangki sedutan, stesen
pengepam dan takungan perkhidmatan air- Uniform Guidelines 2010

6.7

Minimum Area for Suction Tank and Pump Station

Water Demand (litre/day)


< 227,000
227,001 454,000
454,001 680,000
680,001 900,000
900,001 1,135,000
1,135,001 2,270,000
2,270,001 3,405,000
3,405,001 6,810,000
6,810,001 13,620,000
> 13,620,000

Area Size (minimum)


18 m x 23 m
23 m x 27 m
23 m x 27 m
27m x 32 m
32 m x 36 m
36 m x 41 m
41 m x 50 m
54 m x 59 m
68 m x 72 m
Identified by Certifying Agency (CA) with minimum area 81 m
x 88 m
Source: Jadual B.3 Keluasan Minimum Tapak Untuk Kombinasi Penyedut Tadah dan Stesen
Pengepam

14

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


6.8

Minimum Area for Water Reservoir (square footprint)

Water Storage
< 227,000
227,001 454,000
454,001 680,000
680,001 900,000
900,001 1,135,000
1,135,001 2,270,000
2,270,001 3,405,000
3,405,001 6,810,000
6,810,001 13,620,000
> 13,620,000

Ground Storage
Elevated Storage
19 x 19
25 x 25
22 x 22
28 x 28
24 x 24
30 x 30
26 x 26
32 x 32
28 x 28
34 x 34
30 x 30
36 x 36
34 x 34
44 x 44
44 x 44
55 x 55
57 x 57
71 x 71
Building setback 6 meter for ground storage and 9 meter
elevated storage
Source: Jadual B.4 Lokasi minimum dimensi untuk perkhidmatan takungan air (square footprint)
- Uniform Technical Guidelines 2010

6.9

Minimum Area for Water Reservoir (circular footprint)

Water Storage
< 227,000
227,001 454,000
454,001 680,000
680,001 900,000
900,001 1,135,000
1,135,001 2,270,000
2,270,001 3,405,000
3,405,001 6,810,000
6,810,001 13,620,000
> 13,620,000

Ground Storage
Elevated Storage
20 x 20
26 x 26
23 x 23
29 x 29
26 x 26
32 x 32
27 x 27
34 x 34
29 x 29
35 x 35
33 x 33
42 x 42
37 x 37
48x 48
49x 49
60 x 60
68 x 68
77x 77
Building setback 6 meter for ground storage and 9 meter
elevated storage
Source: Jadual B.5 Lokasi minimum dimensi untuk perkhidmatan takungan air (circular footprint)
- Uniform Technical Guidelines 2010

6.10

Estimated Population Equivalent (Sewerage)

Type of Premis
Housing
Commercial:
Include offices, shopping mall, entertainment,
restaurant, cafeteria, recreation area
School /Higher Institution:
- School
- Hostel
- Part of hostel and daily

PE
5 / unit house
3 / 100 m2 from GFA

15

0.2 / student
1 / student
0.2 / daily student, 1/ hostel student

Revision 15 NOV 2013

STANDARD PLANNING GUIDELINES FOR PR1MA HOUSING DEVELOPMENT


Hospital
Hotel with facilities for dining and laundry
Industry, excluding processed water
Wet Market
Dry Market
Gas Station / Servis
Bus Terminal
Taxi Terminal
Mosque and other places of worship
Stadium
Swimming pool / Sport Complex
Public Toilet
Airport Complex

4 / bed
3 / room
0.3 / staff
3 / stall
1 / stall
15 / toilet
4 / bus parking
4 / taxi parking
0.2 / person
0.2 / person
0.5 / person
15 / toilet
1.2 / passenger
1.3 / staff
10 / mesin
1 / person
20 / hole

Laundry Shop
Prison
Golf Course

Source: MSIG, Volume IV: Sewerage Treatment Plants, 2009

6.11

Sizes for Sewerage Treatment Plant

Type
Class 1

PE
100 1000

Class 2

1100 5000

Class 3
- With mechanical system

5001 20,000

Class 4
- With mechanical system

20,001 450,000

6.12

Area
210 m2 (0.052 acre)
to
1070 m2 (0.264 acre)
1115 m2 (0.276 acre)
to
3076 m2 (0.76 acre)
0.31 hectar (0.76 acre)
to
1.19 hectar (2.95 acre)
1.19 hectar (2.95 acre)
to
9.36 hectar (23.14 acre)

Minimum Width for STP Buffer Zone

Type development
Housing / commercial
Industry
Closed system / inground
Closed system / inground for highrise building

Minimum Width
30 metre from STP lot boundary
20 metre from STP lot boundary
10 metre from STP lot boundary
30 metre from STP lot boundary

Prepared by:
Research and Development Unit
Perbadanan PR1MA Malaysia
15 November 2013

20

High-Rise Standardisation &


Design Standard Draft
by Standardisation Technical Team (STT)

18 November 2014

Specification Standard for High-Rise Homes


PR1MA Home 1
High-Rise (2+1 Bedrooms)
Floor to Ceiling Height
2.85m
Structure
RC Frame
Wall
RC Wall & Cement Sand Brick
Roof Structure
RC Flat Roof / Proprietor Metal Pitched Roof
Roof Covering
Waterproofing Membrane / Metal Decking
Ceiling Finish
Cellulose Fibre Cement Board & Skim Coat & Paint
Window Opening
Living
Casement (L)1800 x (H)1800
Master Bedroom
Casement (L)1800 x (H)1200
Bedroom 1
Casement (L)1200 x (H)1200
Bedroom 2
Utility Room
Kitchen
Casement (L)1200 x (H)1200
Master Bathroom
Top Hung (L)600 x (H)600
Bathroom
Top Hung (L)600 x (H)600
Window Frame
Natural Anodized Frame 1 3/4" - 2" - (T)0.8-1.0
Window Glass
Clear Float Glass - (T)6
Door Opening
Entrance
Low-Mid End Solid Timber Ordinary/Fire Rated Door - (L)900 x (H)2100
Living
Master Bedroom
Low-Mid End Flush Timber Door - (L)900 x (H)2100
Bedroom 1 & 2
Low-Mid End Flush Timber Door - (L)900 x (H)2100
Kitchen & Utility
Low-Mid End Flush Timber Door - (L)900 x (H)2100
Store Room
Bathroom
PVC Door with 150mm Heel Stone - (L)750 x (H)2100
Door Frame
Mid End Steel Frame
Door Frame - Sliding
Ironmongeries
Low-Mid End Quality Lockset
Wall Finishes
Living / Dining / Utility / Bedrooms
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Bathrooms
Low-Mid End Ceramic Tile - (L)200 x (W)250 x (T)6 @1.5m high
Dry Kitchen
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6 @1.5m high
Wet kitchen
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6 @1.5m high
Dry Yard
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Floor Finishes
Foyer
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Living
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Dining
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Dry Kitchen - Anti Slip
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Wet Kitchen - Anti Slip
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Dry Yard
Cement Render
Utility Room
Low-Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Store Room
Staircase
Family
Bedrooms
Mid End Vinyl Flooring - (T)2
Bathrooms - Anti Slip
Low-Mid End Ceramic Tile - (L)200 x (W)200 x (T)6
Car porch
Driveway
Balcony - Anti Slip
Cement Render
AC Ledge
Cement Render
Sanitary Fittings & Plumbing Fittings
Shower Head
2 (Low-Mid End)
WC
2 (Low-Mid End)
Bib Tap
4 (Low-Mid End)
Hand Bidet
0
Wash Basin
2 (Low-Mid End)
Pillar Tap
2 (Low-Mid End)
Kitchen Sink
1 Single Bowl (Low-Mid End)
Kitchen Tap
1 Single Head (Low-Mid End)
Electrical Fittings
Lighting Point
14
Ceiling Fan Point
5
13 Amp Switch Socket Outlet
11
Air-Conditioning Point
1
Telephone Outlet Point
1
TV Outlet Point
1
Water Heater Point
1
Bell Point
1
Auto Gate Point, Booster Pump Point (L only)
Fencing (L only)
Misc (L only)
SPA Specification Standard

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Specification Standard for High-Rise Homes


SPA Specification Standard
Floor to Ceiling Height
Structure
Wall
Roof Structure
Roof Covering
Ceiling Finish
Window Opening
Living
Master Bedroom
Bedroom 1
Bedroom 2
Utility Room
Kitchen
Master Bathroom
Bathroom
Window Frame
Window Glass
Door Opening
Entrance
Living
Master Bedroom
Bedroom 1 & 2
Kitchen & Utility
Store Room
Bathroom
Door Frame
Door Frame - Sliding
Ironmongeries
Wall Finishes
Living / Dining / Utility / Bedrooms
Bathrooms
Dry Kitchen
Wet kitchen
Dry Yard
Floor Finishes
Foyer
Living
Dining
Dry Kitchen - Anti Slip
Wet Kitchen - Anti Slip
Dry Yard
Utility Room
Store Room
Staircase
Family
Bedrooms
Bathrooms - Anti Slip
Car porch
Driveway
Balcony - Anti Slip
AC Ledge
Sanitary Fittings & Plumbing Fittings
Shower Head
WC
Bib Tap
Hand Bidet
Wash Basin
Pillar Tap
Kitchen Sink
Kitchen Tap
Electrical Fittings
Lighting Point
Ceiling Fan Point
13 Amp Switch Socket Outlet
Air-Conditioning Point
Telephone Outlet Point
TV Outlet Point
Water Heater Point
Bell Point
Auto Gate Point, Booster Pump Point (L only)
Fencing (L only)
Misc (L only)

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

PR1MA Home 2
High-Rise (3 Bedrooms)
2.85m
RC Frame
RC Wall & Cement Sand Brick
RC Flat Roof / Proprietor Metal Pitched Roof
Waterproofing Membrane / Metal Decking
Cellulose Fibre Cement Board & Skim Coat & Paint
Casement (L)1800 x (H)1800
Casement (L)1800 x (H)1200
Casement (L)1800 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Top Hung (L)1200 x (H)600
Top Hung (L)600 x (H)600
Natural Anodized Frame 2" - 2 1/2" - (T)0.8-1.0
Clear Float Glass - (T)6
Mid End Solid Timber Ordinary/Fire Rated Door - (W)1000 x (H)2100
Natural Anodised Sliding Door (W)3600 x (H)2100
Mid End Flush Timber Door - (W)900 x (H)2100
Mid End Flush Timber Door - (W)900 x (H)2100
Mid End Flush Timber Door - (W)900 x (H)2100
Waterproofed Timber Flush Door - (W)750 x (H)2100
Mid End Steel Frame
Natural Anodized Frame 2" - 2 1/2" - (T)0.8-1.0
Mid End Quality Lockset
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Mid End Ceramic Tile - (L)200 x (W)250 x (T)6 @2.1m high
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6 @2.1m high
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6 @2.1m high
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Vinyl Flooring - (T)2
Mid End Ceramic Tile - (L)200 x (W)200 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
2 (Mid End)
2 (Mid End)
4 (Mid End)
0
2 (Mid End)
2 (Mid End)
1 Double Bowl (Mid End)
1 Double Head (Mid End)
14
5
12
2
1
1
1
1
-

Specification Standard for High-Rise Homes


SPA Specification Standard
Floor to Ceiling Height
Structure
Wall
Roof Structure
Roof Covering
Ceiling Finish
Window Opening
Living
Master Bedroom
Bedroom 1
Bedroom 2
Utility Room
Kitchen
Master Bathroom
Bathroom
Window Frame
Window Glass
Door Opening
Entrance
Living
Master Bedroom
Bedroom 1 & 2
Kitchen & Utility
Store Room
Bathroom
Door Frame
Door Frame - Sliding
Ironmongeries
Wall Finishes
Living / Dining / Utility / Bedrooms
Bathrooms
Dry Kitchen
Wet kitchen
Dry Yard
Floor Finishes
Foyer
Living
Dining
Dry Kitchen - Anti Slip
Wet Kitchen - Anti Slip
Dry Yard
Utility Room
Store Room
Staircase
Family
Bedrooms
Bathrooms - Anti Slip
Car porch
Driveway
Balcony - Anti Slip
AC Ledge
Sanitary Fittings & Plumbing Fittings
Shower Head
WC
Bib Tap
Hand Bidet
Wash Basin
Pillar Tap
Kitchen Sink
Kitchen Tap
Electrical Fittings
Lighting Point
Ceiling Fan Point
13 Amp Switch Socket Outlet
Air-Conditioning Point
Telephone Outlet Point
TV Outlet Point
Water Heater Point
Bell Point
Auto Gate Point, Booster Pump Point (L only)
Fencing (L only)
Misc (L only)

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

PR1MA Home 3
High-Rise (3+1 Bedrooms)
3m
RC Frame
RC Wall & Cement Sand Brick
RC Flat Roof / Proprietor Metal Pitched Roof
Waterproofing Membrane / Metal Decking
Cellulose Fibre Cement Board & Skim Coat & Paint
Casement (L)2400 x (H)1800
Casement (L)1800 x (H)1200
Casement (L)1800 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Top Hung (L)1200 x (H)600
Top Hung (L)1200 x (H)600
Powder Coated Frame 2 1/2" - 3" - (T)0.8-1.0
Clear Float Glass - (T)6
Mid-High Solid Timber Ordinary/Fire Rated Door - (W)1200 x (H)2100
Powder Coated Sliding Door (W)3600 x (H)2100
Mid-High End Solid Timber Door - (W)900 x (H)2100
Mid-High End Flush Timber Door - (W)900 x (H)2100
Mid-High End Flush Timber Door - (W)900 x (H)2100
Waterproofed Timber Flush Door - (W)900 x (H)2100
Mid End Steel Frame with Architrave
Powder Coated Frame 2 1/2" - 3" - (T)0.8-1.0
Mid-High End Quality Lockset
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Mid-High End Ceramic Tile - (L)200 x (W)250 x (T)6 @full height
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6 @full height
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6 @full height
RC = Skim Coat & Paint / Cement Sand Brick = Plaster & Paint
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid-High End Vinyl Flooring - (T)3
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
2 (Mid-High End)
2 (Mid-High End)
4 (Mid-High End)
2 (Mid-High End)
2 (Mid-High End)
2 (Mid-High End)
1 Double Bowl (Mid End)
1 Double Head (Mid End)
15
6
13
2
1
1
1
1
-

Design Standardisation for High-Rise Homes


A HIGH-RISE UNIT MINIMAL STANDARDS

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Design Standardisation for High-Rise Homes


A HIGH-RISE BLOCK TYPOLOGIES

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Design Standardisation for High-Rise Homes


A HIGH-RISE FACILITY REQUIREMENTS
COMPULSORY

OPTIONAL

Kedai Rakyat 1 Malaysia

Gymnasium

Sundry Store / Cafe / Saloon / etc

Sports Facility

Klinik 1 Malaysia

MIni Library

Multipurpose Hall

Mini Post Office

Nursery

Bus Stop / Taxi Stop

Kindergarten

Police Bit

Surau / Mosque

Sky Terrace

Management Office

Swimming Pool

Mailing Room

Commercial Mall

Security Room
Housekeeping Room
Maintenance Workshop
Refuse Chute Centre
Recycling Room
Guard House
Residents Meeting Room

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Design Standardisation for High-Rise Homes


A OPTIMIZATION
BUILDING EFFICIENCY

INTERNAL FLOOR HEIGHT

Circulation of all High-rise


developments to be within
approximately 25%

Residential Floor to Floor Height


Habitable Space : 3000 mm
Non-Habitable Space : 2700 mm
Retail Floor to Floor Height :
3600 mm

Residential Ceiling Height

Car Park Floor to Floor Height :


3000 mm

Standardization in ceiling height allows for the


use and implementation of precast concrete
staircases and modular toilets etc
Commercial Ceiling Height

75% of residential space is


lettable space.
In the scenario where podium
car parks are provided the
efficiency should be 55%
lettable space

29 December 2014

Parking Ceiling Height

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Thank you!

Landed Standardisation &


Design Standard Draft
by Standardisation Technical Team (STT)

18 November 2014

Specification Standard for Landed Homes


SPA Specification Standard
Floor to Ceiling Height
Structure
Wall
Roof Structure
Roof Covering
Ceiling Finish
Window Opening
Living
Master Bedroom
Bedroom 1
Bedroom 2
Utility Room
Kitchen
Master Bathroom
Bathroom
Window Frame
Window Glass
Door Opening
Entrance
Living
Master Bedroom
Bedroom 1 & 2
Kitchen & Utility
Store Room
Bathroom
Door Frame
Door Frame - Sliding
Ironmongeries
Wall Finishes
Living / Dining / Utility / Bedrooms
Bathrooms
Dry Kitchen
Wet kitchen
Dry Yard
Floor Finishes
Foyer
Living
Dining
Dry Kitchen - Anti Slip
Wet Kitchen - Anti Slip
Dry Yard
Utility Room
Store Room
Staircase
Family
Bedrooms
Bathrooms - Anti Slip
Car porch
Driveway
Balcony - Anti Slip
AC Ledge
Sanitary Fittings & Plumbing Fittings
Shower Head
WC
Bib Tap
Hand Bidet
Wash Basin
Pillar Tap
Kitchen Sink
Kitchen Tap
Electrical Fittings
Lighting Point
Ceiling Fan Point
13 Amp Switch Socket Outlet
Air-Conditioning Point
Telephone Outlet Point
TV Outlet Point
Water Heater Point
Bell Point
Auto Gate Point, Booster Pump Point (L only)
Fencing (L only)
Misc (L only)

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

PR1MA Home 2
Landed (3 Bedrooms)
2.85m
RC Frame
Cement Sand Brick & Clay Brick (Party Wall)
Proprietor Metal Pitched Roof
Concrete Roof Tiles
Cellulose Fibre Cement Board & Skim Coat & Paint
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Top Hung (L)600 x (H)600
Top Hung (L)600 x (H)600
Natural Anodized Frame 2" - 2 1/2" - (T)0.8-1.0
Clear Float Glass - (T)5
Mid End Solid Timber Ordinary Door - (L)1000 x (H)2100
Natural Anodised Sliding Door - (L)2400 x (H)2100
Natural Anodised Sliding Door - (L)1500 x (H)2100
Mid End Flush Timber Door - (L)900 x (H)2100
Mid End Flush Timber Door - (L)900 x (H)2100
Mid End Flush Timber Door - (L)750 x (H)2100
Waterproofed Timber Flush Door - (W)750 x (H)2100
Mid End Steel Frame
Natural Anodized Frame 2" - 2 1/2" - (T)0.8-1.0
Mid End Quality Lockset
Plaster & Paint
Mid End Ceramic Tile - (L)200 x (W)250 x (T)6 @2.1m high
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6 @2.1m high
Mid End Colour Ceramic Tile - (L)300 x (W)300 x (T)6 @2.1m high
Plaster & Paint
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)400 x (W)400 x (T)7
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
Mid End Vinyl Flooring - (T)2
Mid End Vinyl Flooring - (T)2
Mid End Vinyl Flooring - (T)2
Mid End Ceramic Tile - (L)200 x (W)200 x (T)6
Concrete Imprint
Concrete Imprint
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
3 (Mid End)
3 (Mid End)
5 (Mid End)
0 (Mid End)
3 (Mid End)
3 (Mid End)
1 Double Bowl (Mid End)
1 Double Head (Mid End)
16
6
11
3
2
2
1
1
0
Chain Link Fence @ 1.5m high
-

Specification Standard for Landed Homes


SPA Specification Standard
Floor to Ceiling Height
Structure
Wall
Roof Structure
Roof Covering
Ceiling Finish
Window Opening
Living
Master Bedroom
Bedroom 1
Bedroom 2
Utility Room
Kitchen
Master Bathroom
Bathroom
Window Frame
Window Glass
Door Opening
Entrance
Living
Master Bedroom
Bedroom 1 & 2
Kitchen & Utility
Store Room
Bathroom
Door Frame
Door Frame - Sliding
Ironmongeries
Wall Finishes
Living / Dining / Utility / Bedrooms
Bathrooms
Dry Kitchen
Wet kitchen
Dry Yard
Floor Finishes
Foyer
Living
Dining
Dry Kitchen - Anti Slip
Wet Kitchen - Anti Slip
Dry Yard
Utility Room
Store Room
Staircase
Family
Bedrooms
Bathrooms - Anti Slip
Car porch
Driveway
Balcony - Anti Slip
AC Ledge
Sanitary Fittings & Plumbing Fittings
Shower Head
WC
Bib Tap
Hand Bidet
Wash Basin
Pillar Tap
Kitchen Sink
Kitchen Tap
Electrical Fittings
Lighting Point
Ceiling Fan Point
13 Amp Switch Socket Outlet
Air-Conditioning Point
Telephone Outlet Point
TV Outlet Point
Water Heater Point
Bell Point
Auto Gate Point, Booster Pump Point (L only)
Fencing (L only)
Misc (L only)

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

PR1MA Home 3
Landed (3+1 Bedrooms)
3m
RC Frame
Cement Sand Brick & Clay Brick (Party Wall)
Proprietor Metal Pitched Roof
Concrete Roof Tiles
Plaster Ceiling & Skim Coat & Paint
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Casement (L)1200 x (H)1200
Top Hung (L)600 x (H)600
Top Hung (L)600 x (H)600
Powder Coated Frame 2 1/2" - 3" - (T)0.8-1.0
Clear Float Glass - (T)5
Mid-High End Solid Timber Ordinary Door - (L)1200 x (H)2100
Powder Coated Sliding Door - (L)2400 x (H)2100
Powder Coated Sliding Door - (L)1500 x (H)2100
Flush Timber Door - (L)900 x (H)2100
Flush Timber Door - (L)900 x (H)2100
Flush Timber Door - (L)750 x (H)2100
Waterproofed Timber Flush Door - (W)900 x (H)2100
Mid End Steel Frame with Architrave
Powder Coated Frame 2 1/2" - 3" - (T)0.8-1.0
Mid-High End Quality Lockset
Plaster & Paint
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6 @ full height
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6 @ full height
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6 @ full height
Plaster & Paint
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)600 x (W)600 x (T)10
Mid-High End Porcelain Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Mid End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
Mid-High End Vinyl Flooring - (T)3
Mid-High End Vinyl Flooring - (T)3
Mid-High End Vinyl Flooring - (T)3
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6
Concrete Imprint
Concrete Imprint
Mid-High End Ceramic Tile - (L)300 x (W)300 x (T)6
Cement Render
3 (Mid-High End)
3 (Mid-High End)
2 (Mid-High End)
3 (Mid-High End)
3 (Mid-High End)
3 (Mid-High End)
1 Double Bowl (Mid-High End)
1 Double Head (Mid-High End)
18
7
15
5
2
2
3
1
1
Chain Link Fence @ 1.5m high
-

Design Standardisation for Landed Homes


B LANDED MINIMAL STANDARDS GROW HOME
RESIDENTIAL SPACE

PHASE 1

PHASE 2

COMPULSARY

( ft2 )

( m2 )

( ft2 )

( m2 )

Master Bedroom

135

12.5

135

12.5

Bathroom 1

39

3.6

39

3.6

2nd Bedroom

97

9.0

3rd Bedroom

97

9.0

Bathroom 2

39

3.6

Living

136

12.6

136

12.6

Kitchen

97

9.0

97

9.0

Dining

68

6.3

68

6.3

Circulation for ( Family , Living , Kitchen , Dining )

10 20 %

( ft2 )

OPTIONAL

10 20 %

( m2 )

( ft2 )

( m2 )

Yard
Store

BUILT UP AREA

550

ACCESSORY SPACE

810

PHASE 1

PHASE 2

( ft2 )

( m2 )

( ft2 )

( m2 )

245

22.8

245

22.8

Green Zone

48

4.5

48

4.5

Extra Green Zone

529

49.2

COMPULSARY
Car Porch

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Design Standardisation for Landed Homes


B LANDED MINIMAL STANDARDS DOUBLE STOREY HOME
RESIDENTIAL SPACE

MINIMUM

TESTED DIMENSIONS ( m2 )

MAXIMUM

COMPULSARY

( ft2 )

( m2 )

( ft2 )

( m2 )

MINIMUM

MAXIMUM

Master Bedroom

128

11.9

160

14.9

( 3.3 X 3.6 )

( 3.6 X 4.2 )

Ensuite

39

3.6

52

4.8

( 2.4 X 1.5 )

( 2.7 X 1.8 )

2nd

105

9.8

116

10.8

( 3.6 X 2.7 )

( 3.6 X 3.0 )

2nd Bathroom and Above

Bedroom and Above

34

3.2

46

4.3

( 2.1 X 1.5 )

( 2.4 X 1.8 )

Family Area

45

4.2

62

5.8

( 2.1 X 2.1 )

( 2.4 X 2.4 )

Utility / Maids Room

70

6.5

70

6.5

Staircase ( per floor )

63

5.9

110

10.2

( 2.9 X 2 )

( 4.2 X 3.0 )

Living

155

14.4

258

24.0

( 4.8 x 3.0 )

( 5.7 x 4.2 )

Kitchen

85

7.9

136

12.6

( 2.4 x 3.3 )

( 4.2 x 3.0 )

Dining

85

7.9

96

8.9

( 2.4 x 3.3 )

( 2.7 x 3.3 )

Circulation for ( Family , Living , Kitchen , Dining )

OPTIONAL

10%

( 2.6 X 2.6 )

20%

( ft2 )

( m2 )

( ft2 )

( m2 )

1100

102.2

1600

148.6

Balcony
Yard
Store
Atrium

BUILT UP AREA ( 3 + 1 LANDED HOME )

ACCESSORY SPACE

MINIMUM

TESTED DIMENSIONS ( m2 )

MAXIMUM

( ft2 )

( m2 )

( ft2 )

( m2 )

MINIMUM

MAXIMUM

Car Porch

400

37.1

480

44.6

20 Foot Setback x 20

20 Foot Setback x 24

Green Zone

200

18.6

240

26.7

10 Foot Setback x 20

10 Foot Setback x 24

COMPULSARY

29 December 2014

PR1MA Corporation Malaysia. All rights reserved.


CONFIDENTIAL & RESTRICTED

Thank you!

Management Office
and Meeting Room

8722
5862

2860

Lobby
ceramic tiles

Reception

Book Shelf

13632

Storage Shelf

Management Office
16820

ceramic tiles
N/V

Low Cabinet

Alum frame window


to manuf's detail
F/Cab.

3188

F/Cab.

Consultation
Room 1
ceramic
tiles
N/V

Consultation
Room 2
ceramic
tiles
N/V

Store Room &


Safe Room

F/Cab.

F/Cab.

ceramic
M/V
F/Shelf

Management Office - Floor Plan

Management Office and Meeting Room

1700 sq ft

No.

Item

Description

Quantity

1.

Office Settee Set

2.

Workstation Table
1500 x 1500 mm

3.

Clerical Chair

25

4.

3 Piece and Coffee Table


(Consultation Room)

5.

Meeting Table for 20 pax


5600 x 2000 mm

6.

Low Cabinet
800 x 400 x 850 mm

7.

Tall Cabinet
800 x 400 x 1800 mm

8.

Metal Filing Cabinet


450 x 600 x 1400 mm

9.

Storage Shelving
1500 x 600 mm

10.

White Board
3600 x 1200 mm

Guard House

B
2000

825

1575
300

1
R.c hood to Engr's detail

R.c hood to Engr's detail

600

homog. tiles

50dp

100

1040

75mm diameter rwdp


Toilet

600

Fixed glass window to manuf's


detail & specs.

3900

50dp

Top hung window to manuf's


detail & specs.

Guardhouse

2860

homog. tiles

Fixed glass window to manuf's


detail & specs.
R.c column to Engr's detail

2
1575

825

Guard House - Floor Plan


A

B
2000

600

150

600

100

Roof Level

R.c flat roof with water

900

R.c hood to Engr's detail


2100

3000

proofing to Engr's detail

Fixed glass window to manuf's

Floor Level
100

2100 x 900mm sliding door

Guard House - Section A-A


2
100
450

3900
3800

R.c flat roof with water


proofing to Engr's detail

100
450

900

100

Roof Level

Skimcoat & paint hollow core


wall panel

Floor Level

900

Top hung window to manuf's


detail & specs.
Glass panel to specialist's detail
& specs.

1200

3000

R.C. hood to Engr's detail

Ceramic tiles at 1500mm


height to arch's detail

Guard House - Section B-B

Guard House

100 sq ft

No.

Item

Description

Quantity

1.

Swivel Chair
680 x 680 mm

1.
2.

Counter
Top
Swivel Chair
1900
600mm
mm
680 xx680

2
1

3.

Low Cabinet
800 x 400 x 850 mm

4.

Metal Filing Cabinet


450 x 600 x 1400 mm

Surau, Wudhu' Area &


Jenazah Area (500 Jema'ah)

6700

1600

1500

Carpet
N/V

PA
Room

Carpet
N/V

D1

D1

Imam's
Room

2750

Metal Frame Door with Plywood Flush Door

N/V

FFL:72.95

Carpet

Surau

2000 x 2100mm Double glass door

1750

2000

1750

METAL SHOE RACK

N/V

Non-slip
Ceramic
Tiles

METAL SHOE RACK

WOODEN BENCH

5500

METAL SHOE RACK

METAL SHOE RACK

FFL:72.85

FFL:72.35

5900

SHOE RACK
SHOE RACK

50dp

SHOE RACK

CABINET

KAPAN
AREA

FFL:72.35

BATH
AREA

SHOE RACK

Surau - Pelan Aras

2000

5500

TABLE

100dp

3500

WOODEN BENCH

2350

Ceramic Tiles

2350

Ablution (M)

1600

50dp

Ceramic Tiles

40895

SHOE RACK

Bilik Jenazah (M)

5500

50dp

CABINET

1500

SHOE RACK

100dp

1750

6700

SHOE RACK

ft

SHOE RACK

100dp

3500

Ceramic Tiles

1750

1700

Ablution (F)

150dp

Ceramic Tiles

5a

5500

KAPAN
AREA

5500

BATH
AREA

ft

Bilik Jenazah (F)

5500

SHOE RACK
SHOE RACK

ft
ft

2000

150dp

3500

6700

1700

1995

Minaret Roof Level

15000

Roof Level

5900

900

Facilities Floor Level

Floor Finish Level

Natural Anodised Finished Alumn.


Frame Casement Window

1475

5500

GD

15meter Height Minaret to architect's detail

5500

Surau - Keratan A-A

1000

200

5500

33000

GD

5500

VOID

5500

5500

Glass panel to specialist's detail & specs.

VOID

RC Column to Engr's detail

Aluminium plate of Islamic caligraphy


to architect's detail

Surau, Wudhu' Area & Jenazah Area (500 Jema'ah)


Description

9000 sq ft

No.

Item

Quantity

1.

Chairs with PU
cover.

2.

Table
1800 x 750 mm

3.

AV Rack
900 x 600 x 1500 mm

3.

Book Shelf
800 x 450 x 1650 mm

4.

Quran Book Shelf


800 x 450 x 900 mm

24

5.

SS Bath with
SS Frame with Legs
1800 x 800 x 500 mm

6.

SS Post Mortem Table


1800 x 800 x 500 mm

Surau, Wudhu' Area & Jenazah Area (500 Jema'ah)


Description

9000 sq ft

No.

Item

Quantity

7.

Blank Carpet

4600 sq ft

8.

SS Sink Unit

9.

Aluminium Cork Notice


Board Cabinet
2400 x 1200 mm

10.

Pendant Lighting

14

11.

Surface Mounted Lighting

20

12.

Wall Mounted Fans

25

13.

Metal Shoe Rack


2700 x 300 x 2100

10

Nursery (40 Infants)


Pre-School (40 Children)

18093

EL

5569

8250

alum frame casement


window to manuf's
detail

N/V

ceramic tiles

Sleeping Room 2

EL

EL

Nursery

EL

EL

ceramic tiles
N/V

6258

Sleeping Room 1

N/V

rubber mat tiles

Crawling/Multipurposed Area

100mm thk.acotec
wall with glazed
wall tiles inside
up to ceiling level

LOW WALL

Toilet

4389

Shower Area
ceramic
N/V

cer.tiles
M/V

vinyl
N/V

50dn

Sh.

St.

cemt.

cer.tiles

Staff
Room

4294

Sick Room

39391

St.

cemt.

cer.tiles

Toilet

MINI
PLAY-GROUND 1

cer.tiles
N/V

Yard

cer.tiles

cer.tiles cer.tiles

Sh.

Yard

Kitchen

vinyl
N/V

Staff
Room

Nappy
Change

cer.tiles

50dn

Nursery & Pre-School - Floor Plan

N/V

ceramic tiles

Sleeping Room 3

ceramic tiles

Sleeping Room 4

N/V

ft

12638

N/V

cer.
N/V

Kitchen

MINI
PLAY-GROUND 2

SHOE RACK
SHOE RACK

artificial turf

Outdoor Play
for Pre-School

20501

8050

N/V

ceramic tiles

Teaching Room 2

SHOE RACK

ft

5909
ft

6615
ft

LOW WALL
ft

100mm thk.acotec
wall with skimcoat
and paint to detail

ft

SHOE RACK
ft

SHOE RACK
ft

50dn

M/V

ceramic tiles

Pre-school

SHOE RACK

6265

Library
M/V

ceramic tiles

N/V

ceramic tiles

Teaching Room 1

MINI
PLAY-GROUND 3

8151

alum frame casement


window to manuf's
detail

SHOE RACK

Staff Room
39401

SHOE RACK

cemt .rend

Outdoor
Store
Area

100mm thk acotec


wall with skimcoat
and paint to detail

Nursery (40 Infants)

3600 sq ft

No.

Item

Description

Quantity

1.

Table
Dia. 1200 mm

2.

Chairs
450 x 380 mm

25

3.

Nursery Cots & Matress


1400 x 850 x 665 mm
(1300 x 800 x 102 mm)

40

4.

Baby Bath Trolley


1400 x 600 x 900 mm

4.

Rubber Mat Tiles


600 x 600 mm

5.

Lockers for Changing Room


1800 x 350 x 500 mm

10

7.

Office Settee Set

8.

Shoe Rack
1350 x 300 x 750 mm

9.

Stick on Board
2400 x 1200 mm

1000 sqft

Pre-School (40 Children)

2400 sq ft

No.

Item

Description

Quantity

1.

Table
1350 x 900 mm

10

2.

Chairs
450 x 380 mm

45

3.

Teacher's Table
1200 x 680 x 680 mm

4.

Teacher's Chair
600 x 550 mm

5.

Table
Dia. 1200 mm

6.

Book Display
900 x 450 mm

7.

Book Shelf
900 x 450 mm

16

8.

White Board
3600 x 1200 mm

8.

Stick on Board
2400 x 1200 mm

Gymnasium (50 pax)

17120

3128

7068

6925

bench

ft

Store

Male Toilet

Cemt. Rend.

ceramic tiles
N/V

ft

8457

ft

EL

Reception

sh

sh

lockers
ft

ft

Gymnasium

ft

bench

Female Toilet
ceramic tiles
N/V

bench

18359

ft

treadmill
100mm thk acotec
wall with skimcoat
and glazed wall tiles
up ceiling level

cardio

Fitness Equipment
Area
weight
ceramic tiles
A/C

EL
trainer

Gymnasium - Floor Plan

Aerobics
Area
ceramic tiles with aerobic rubber matt
A/C

EL
full height glass wall
to manif's detail

ft

sh

ceramic tiles
A/C

9902

ft

bench

sh

ft

Gymnasium (50 pax)

3300 sq ft

No.

Item

Description

Quantity

1.

Office Settee Set

2.

Lockers
1800 x 350 x 500 mm

24

2.

Bench
1500 x 450 mm

3.

Aerobic Rubber Mat


1800 x 500 mm

65

4.

Runner Tread Mill

5.

Up Right Cycle

6.

Trainer Bench, Weight


Stand and Sit Up Bench

7.

Rower Trainer

8.

Storage Shelving
1500 x 600 mm

8.

Energy Saving Ceiling Fan


Dia. 1500 mm

10

Resident Clinic

8753
3172

3626

5000

Reception Desk

Lobby

1954

ceramic tiles

N/V

Reception
& Pharmacy
ceramic
tiles

N/V

ceramic tiles
N/V

Treatment
Room 1
ceramic tiles

M/V

Clinic
Store 1

4975

14241

Benches

Clinic

Cemt.Render

2265

M/V

Treatment
Room 2
Toilet

2000

ceramic tiles

N/V
ft

ft

Resident Clinic - Floor Plan

ceramic tiles

N/V

Clinic
Store 2
Cemt.Render

N/V

Resident Clinic

1200 sq ft

No.

Item

Description

Quantity

1.

Bench
1500 x 450 mm

2.

Doctor's Table
1200 x 680 x 680 mm

3.

Swivel Chair
680 x 680 mm

10

4.

Examination Bed
2000 x 900 mm

5.

Instrument Trolley/Table
900 x 600 mm

6.

Medicine Cabinet
600 x 600 mm

7.

Storage Shelving
1500 x 600 mm

6.

Magazine Display
900 x 450 mm

House Keeping and


Maintenance Workshop

4001

ft

bench

House
Keeping
Room

ft

8550

Storage
Rack

Ceramic Tiles
N/V
Storage
Rack

Soldering
Bench

Metal Lathe
Bench

8475

Circular Saw
Bench

Drill
Bench

Maintenance
Workshop
Ceramic Tiles
N/V

ft

17066

Storage
Rack

Wood
Bench

bench

ft

House Keeping and Maintenance Workshop

1000 sq ft

No.

Item

Description

Quantity

1.

Lockers
1800 x 350 x 500 mm

2.

Storage Shelving
1500 x 600 mm

3.

Work Bench
1600 x 800 mm

4.

Swivel Chair
680 x 680 mm

5.

Bench
1500 x 450 mm

6.

SS Sink Unit

7.

Exhaust Fan

8.

Tool Cabinet

Multi-Purpose Hall

3700

8600

8400

8600

3700

Skimcoat & paint hollow


core wall panel

Holding
Area

9000

ft

600 x 450mm glass window


to manuf's detail & specs.

Skimcoat & paint hollow core


wall panel
Skimcoat & paint hollow core
wall panel

Holding
Area

Skimcoat & paint hollow core


wall panel
600 x 450mm glass window
to manuf's detail & specs.

ft

Stage

Toilet
tiles

Toilet
tiles

timber floor fin.


FFL:73.80

1820 x 700mm glass window


to manuf's detail & specs.

Changing
Room

1820 x 700mm glass window


to manuf's detail & specs.

Changing
Room

ceramic tiles

ceramic tiles

B
Food
Preparation
Area
ceramic tiles

Store

ceramic tiles

FFL:72.90

FFL:72.90

Timber platform to engnr's detail


1820 x 700mm glass window
to manuf's detail & specs.

ft

8400

Skimcoat & paint hollow core


wall panel
Skimcoat & paint hollow core
wall panel
1800 x 2100mm double glass door

1800 x 2100mm double glass door

Multipurpose Hall 1
timber floor fin.

FFL:72.90

8500

R.c hood to Engr's detail

R.c hood to Engr's detail

Skimcoat & paint hollow core


wall panel

2000

2000

1774

1774

Skimcoat & paint hollow core


wall panel

Skimcoat & paint hollow core


wall panel

2400

Skimcoat & paint hollow core


wall panel
R.c hood to Engr's detail

Dewan Serbaguna 1 - Pelan Aras


A

25900
9000

Roof Level

8400

8500
1500

1500
450

150

FRL = 82.85

150mm r.c. flat roof


with waterproofing treatment

Skimcoat & paint hollow core


wall panel

4000

1400

Skimcoat & paint hollow core


wall panel

Fixed glass window to manuf's


detail & specs.

Skimcoat & paint hollow core


wall panel
4050 x 1400mm glass window
to manuf's detail & specs.

300

Timber platform to engnr's


detail
1200

2300

Dewan Serbaguna 1 - Keratan A-A

2100

3050

900 900

FFL = 72.90

5700

Floor Level

6100

9950
1800

Skimcoat & paint hollow core


wall panel

Glass panel to specialist's detail


& specs.
Glass panel to specialist's detail
& specs.
2000 x 3000mm double glass door
1800 x 2100mm double glass door

2400

Multi-Purpose Hall

8500 sq ft

No.

Item

Description

Quantity

1.

Chairs with PU
cover.

400

2.

Tables
Dia. 1500 mm

40

3.

Rostrum

4.

Dressing Table
450 x 900 mm

5.

Mirror with Metal Border


700 x 700 mm

6.

Lockers for Changing Room


1800 x 350 x 500 mm

18

7.

Timber Flooring

7000 sq ft

Multi-Purpose Hall

8500 sq ft

No.

Item

Description

Quantity

8.

Food Preparation
Table
1500 x 650 mm

9.

Food Preparation
Shelving
1500 x 1500 x 650 mm

10.

Catering Sinks
1500 x 650 mm

Multi-Purpose Hall

8500 sq ft

No.

Item

Description

Quantity

11.

Industrial Lighting
Metal Halide Lamps

12.

Industrial Wall Fan


500 mm diameter

13.

Surface Mounted Lighting

10

PR1MA DEVELOPMENT
ICT INFRA DESIGN
GUIDELINES
V.1.3

PERBADANAN PR1MA MALAYSIA

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

1 Table of Contents
1.

INTRODUCTION ................................................................................................................... 2
1.1

GENERAL .......................................................................................................................... 2

1.2

OBJECTIVES...................................................................................................................... 2

1.3

SCOPE .............................................................................................................................. 3

OWNERSHIP AND RESPONSIBILITY ...................................................................................... 5


2.1

Ownership ....................................................................................................................... 5

2.2

Responsibility................................................................................................................... 5

BASIS OF DESIGN ................................................................................................................ 7

DESIGN GUIDELINES ............................................................................................................ 8

4.1

GENERAL GUIDELINE ....................................................................................................... 8

4.2

GUIDELINE FOR MULTI-DWELLING UNITS (MDU) .......................................................... 11

4.3

GUIDELINE FOR SINGLE-DWELLING UNITS (SDU) ......................................................... 13

CCC SUBMISSION PROCEDURE ........................................................................................ 15

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 1 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

1. INTRODUCTION
1.1 GENERAL
This document serves as a General Design Guideline for PR1MA development areas
specifically to facilitate the deployment of ICT related infrastructure and services.
This document must be read in conjunction with the PR1MA Planning &
Development Guideline and the guidelines set-forth by Malaysian Communications
and Multimedia Commission (MCMC) in the Malaysian Technical Standards Forum
Berhad (MTSFB) publications; Technical Standards & Infrastructure Requirements
Fixed Network Infrastructure & Technical Standard of In-building Fibre Cabling for
Fibre-to-the-Premise.
The deployment of the ICT infrastructure and network is not limited to this guideline
only and therefore the M&E consultant should explore suitable or better alternatives
without deviating from the principles as stated in this document to ascertain that the
objectives as stated below are met.

1.2 OBJECTIVES
1. To provide Fibre-to-thehome (FTTH) and Fibre-to-the-office (FTTO) cable network
using the GPON (Gigabit Passive Optical Network) technology as specified by ITU
(International Telecommunications Union) and MEF (Metro-E Forum) necessary for
housing units and related commercial areas.
2. To provide robust and future-proof GPON and AE (Active Ethernet) fibre optic
network infrastructure to cater for Triple/Quad Play and IP-based services for
residential and commercial buildings of PR1MA.
3. To provide IP-based infrastructure to be 4G-ready suitable for bandwidths and
backhaul services for cellular service providers within PR1MA development areas.
4. To facilitate the design of a cable network infrastructure which is capable of
providing equal access enabling the entry of multiple service providers using a
single network architecture owned by PR1MA.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 2 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

1.3 SCOPE
1.

The guideline covers the following:

OUTSIDE PLANT

Manholes and ducting and related


accessories

PASSIVE NETWORKS

External Cabling network design and


specifications inclusive of the related materials
and accessories.

Internal cabling network design and


specifications inclusive of the related materials
and accessories.

VOIP PHONES - CABLING

Internal (within house units) cabling design


and specifications inclusive of the related
materials and accessories.

CCTV SURVEILLANCE CABLING

External cabling design and specifications


inclusive of the related materials and
accessories.

Internal (within house units) cabling design


and specifications inclusive of the related
materials and accessories.

(FIBRE, SPLITTERS, ETC.)

2.

The guideline DOES NOT cover the following:

TELECOMMUNICATION SERVICES

PR1MA or its subsidiary company to install,


operate, manage & maintain all
telecommunication services, e.g. Broadband,
VoIP, IPTV, etc.

ACTIVE NETWORK EQUIPMENT

To be provided by PR1MA or its subsidiary


company

CCTV SURVEILLANCE SERVICE &


MAINTENANCE

PR1MA or its subsidiary to install, operate, manage


& maintain

PHYSICAL ACCESS

Physical access such as:

Vehicle access to the development area


Access to the block/units

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 3 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

shall be managed by the facility management


company (either a subsidiary company of PR1MA
or a Joint-Venture company between PR1MA and
other parties, or an outsourced facility
management company appointed by PR1MA)
PHYSICAL SECURITY

Physical security is provided by PR1MA in PR1MA


Development via outsourcing model to security
service providers

PA SYSTEM

PA System shall be part and parcel of the design


concept by the M&E Consultant in accordance
to the Uniform Building By-Law. The provision of PA
System is subject to requirements by the Local
Authority as per approved Development Order
and Building Plan

CENTRAL CONTROL ROOM (CCR)

The provision of CCR is part of the design concept


by the M&E Consultant and the Project Architect
in accordance to requirements for each
development.

OPTICAL FIBRE DISTRIBUTION


FRAME (ODF/OFDF) ROOM

Not required.

Splitters are to be installed in the riser or


ceiling.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 4 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

2 OWNERSHIP AND RESPONSIBILITY


2.1 Ownership
1. PR1MA or its subsidiary company will own the network infrastructure in all
developments for all Passive (cable access) and Active (Optical Line Terminal and
Optical Network Terminal) networks including Outside Plant (OSP).
2. PR1MA or its subsidiary company will own all ICT related services including the
equipment/system to support those services.

2.2 Responsibility
Elements
OSP

Passive Networks
(fibre, splitters, etc.)

Active Network
Equipment

ICT Services

Responsible
Entity

Scope

Developer/Main
Contractor

Design, deliver, install, test and commission.

Provide maintenance and support during


warranty/defect liability period.

To handover to PR1MA after final approved


UAT (User Acceptance Test).

PR1MA or its
subsidiary

Provide maintenance and support during


the 10 years PR1MA Maintenance
Programme.

Developer/Main
Contractor

Design, deliver, install, test and commission.

Provide maintenance and support during


warranty/defect liability period.

To handover to PR1MA after final UAT.

PR1MA or its
subsidiary

Provide maintenance and support during


the 10 years PR1MA Maintenance
Programme.

Developer/Main
Contractor

Not Applicable

PR1MA or its
subsidiary

Design, deliver, install, test and commission.

Provide maintenance and support during


the 10 years PR1MA Maintenance
Programme.

Developer/Main
Contractor

Not Applicable

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 5 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

(including all
Telecommunication
services)

Telephony Services
(Must be VoIP)

PR1MA or its
subsidiary

Developer/Main
Contractor

PR1MA or its
subsidiary

CCTV Surveillance
System

Developer/Main
Contractor

Design, deliver, install, test, commission and


operate.

Provide services, including maintenance


and support during the 10 years PR1MA
Maintenance Programme.

To provide internal cabling for IP Phone


point(s) within the house unit

M&E Consultant to propose the location


and cable route.

M&E to propose whether more than one


point is required (based on the design and
size of the unit).

To deliver, install, test, commission and to


provide maintenance & support (during
warranty/defect liability period) for the IP
Phone cabling.

To handover to PR1MA after final UAT.

Design, deliver (including the IP Phone set),


install, test, commission and operate.

Provide services, including maintenance


and support during the 10 years PR1MA
Maintenance Programme.

The M&E Consultant to propose the location


and cable route of the CCTV for:
Common areas
Within the house units

PR1MA or its
subsidiary

To deliver, install, test, commission and to


provide maintenance & support (during
warranty/defect liability period) for the
CCTV cabling for the Common Areas only.

To deliver and install the conduit for the


CCTV cabling with the house units.

To deliver, install, test, commission and to


provide maintenance & support (during the
10 year PR1MA Maintenance Programme)
for the CCTV service for the Common Areas
and within the individual house units.

To operate and maintain the CCTV


surveillance system installed in Common
Areas (with centralised monitoring).

To install and maintain the CCTV system for


individual house units (no centralised
monitoring)

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 6 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

3 BASIS OF DESIGN
1. The following MTSFB (Malaysian Technical Standards Forum Berhad) publications
provide the general guide for the design of the infrastructure & network:
a) Technical Standards & Infrastructure Requirements Fixed Network
Infrastructure
b) Technical Standard of In-building Fibre Cabling for Fibre-to-the-Premise
2. Enabling the Convergence of Network for Quad/Triple Play and Smart Services
suitable for Fixed-Mobile Convergence (FMC).
3. FTTH and FTTO transport network based on GPON and AE technology for all
dwellings.
4. Proposed FTTx design offers complete flexibility to support open system architecture
which can cater for future passive or active network upgrades.
5. Network design to be able to cater for Open-Access for multiple service
providers.
6. Wireless Hotspots to be made available with the capability to provide 3G/4G WiFi
offloads in common and public areas for both indoor and outdoor locations.
7. Centralised UPS in MDF and Server rooms.
8. Triple Play (Voice, Data and Video) and Smart services will be offered to end users.
9. Each home to be enabled with minimum of 10Mbps symmetrical bandwidth.
10. Cable network Infrastructure suitable for IP Telephony (VoIP) solution to be
provided for all end users.
11. Video Surveillance system to use the same cable network infrastructure where
possible.
12. The developer must provide a separate electrical meter and electricity wiring for
the telecommunications services.
13. The Consultant/Developer is to deploy internal fibre optics cable network and
related facilities within the buildings, and ducts & manholes within the
development area.
14. Actual cable network designs may differ at different sites depending on the
network topology and the nature of the dwellings

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 7 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

4 DESIGN GUIDELINES
4.1 GENERAL GUIDELINE

Outside
Plant

1. Manhole

Common Manhole

To have a Common Manhole for Telcos to land (backhaul).

Telcos to provide connectivity from their manhole to the


Common Manhole.

To be located at the border between the public area and the


developers area, closest to the main road.

Common Manhole to be type JRC7.

Manhole type JRC7 or JB30 may be deployed beyond the Common


Manhole point.

Distance between manholes may extend up to 300m on a straight


route if micro ducts are used.

JRC7 Manhole

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 8 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

JB30 Manhole

2. Ducting

Deployment of HDPE Microduct with suitable number of subducts (4W


to 7W or more) of size 16/12mm or 14/10mm.

Subducts deployed to be with smooth inner wall and Slickcore


coating.

The deployment of microducts is to facilitate the air-blow cable


technique for fast mechanised roll-out whilst reducing cost on capital
expenditure for manholes, ducts and mini fibre cables.

Flat single layer ducts (limited to < 5 subducts only deployed


vertically) are used for microtrenching on existing metalled roads.

3. Fibre Connection Between Phases

In developments where there are multiple phases (whereby each


phase is within different area), each phase must have fibre connection
to the other phases.

The connection will be between the Main MDF of each phase.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 9 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

FTTH/O
Cabling

The Optical fibre cable shall be fully compliant to ITU-T G.652D


specification for GPON deployment.

1-Core SM (single mode) ITU G.652 Fibre cable extends from splitter to
each housing unit.

Split ratios 1:2, 1:4, 1:8, 1:16, 1:32 and 1:64 may be used depending on
building design and network topology.

Cat 5 or Cat 6 UTP cable shall connect to IP network from ONU/ONT.

Open Access with other service providers may be enabled at either


of the following locations :
a) In the common manhole
b) In the outdoor cabinet (if any) before the MDF, OR
c) In the MDF room.

Conduit
within

the
house
unit

To provide conduits for UTP cabling for, e.g. CCTV, additional IP phones in
areas outside the living room, additional Access Point within the house.
Conduit shall be of uPVC type with the size of 25mm or more depending
on number of cable fill.
M&E Consultant to recommend location (of CCTV, additional IP phones
points, additional Access Point) within the house unit.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 10 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

4.2 GUIDELINE FOR MULTI-DWELLING UNITS (MDU)


1. Must follow the General Guideline in Section 4.1.
2. Additionally, must follow the guidelines specific to MDU (please refer to the table
below).
3. The network design for MDU is illustrated below:

FTTH/O
Cabling

Single Mode ITU G. 652 FTTH cabling extends from MDF to FTB
(Fibre Termination Box) to every housing unit.

External cabling from manhole to MDF: min 24-fibre core, up


to 96- fibre core

Splitters shall be installed in the risers OR


in the MDF room depending on fibre core distribution design.

From MDF along the riser:

Split ratios 1:2, 1:4, 1:8, 1:16, 1:32 and 1:64 may be used
depending on building design and network topology.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 11 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

MDF Room

1. Primary MDF

12ft -15ftx 12ft -15ft (or 225sqft)

Requires Air Condition which operates on a rotation basis


for 24 hours a day and a UPS of a sufficient capacity

Power supply to the equipment shall be of an essential


supply which connects to the common genset

One (1) Primary MDF per development area

Location: centrally located or closest to the Common


Manhole

2. Secondary MDF

Server Room

Racks

Cable Tray

Faceplate

10ftx10ft (or 100sqft)

No AC required if there is no active network

One (1) Secondary MDF per tower if necessary

To be within the same location of the Primary MDF

Requires Air Condition and a UPS of a sufficient capacity

Power supply to the equipment shall be of an essential supply


which connects to the common genset

Size:

Number:

Size:

1. Cable tray runs long the riser; from MDF to the rooftop
2. Sizes for cable trays :

> 50mm (W) x 50mm (H) to 300mm (W) x 50mm (H) OR

> 100mm (W) x 100mm (H) to 600W x 100mm (H)


depending on number of cables and the load.

1. For fibre connection


90mm x 60mm x 20mm
2. Location
Preferably in the corner of the Living room

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 12 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

4.3 GUIDELINE FOR SINGLE-DWELLING UNITS (SDU)


1. Must follow the General Guideline in Section 4.1.
2. Additionally must follow the guidelines specific to SDU (please refer to the table
below).
3. The network design for SDU is illustrated below:

Outside Plant

1. Outdoor Cabinets

Weather-proof robust outdoor unit

Suitable size to fit for 19 rack mounting

To fit > 5RU rack space

With mounting brackets

Ventilated

2. Pedestal

To meet or exceed GR. 771 Core specifications

To house splitter, adapters and fusion splices

Suitable for drop cable distribution point (DP)

Secured and high impact resistant

Weather proof and high temperature resistant

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 13 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

3. Pit

JB20 on roads for bungalows and semi-D

Along the corridors of shop lots:


Size: 2ft x 1ft x 1ft

FTTH/O
Cabling

Single Mode ITU G. 652 FTTH cabling extends from manhole to


FTB (Fibre Termination Box), to cabinet, pedestal and to every
housing unit.

Underground cabling is preferred, unless not allowed due to


any regulations/restrictions

Cabling from manhole to pedestal: min 12 core incoming


and outgoing FC depends on cable core assignment/splitter
ratio.

Splitters may be installed in the manhole, cabinet or pedestal,


depending on the development area design.

From cabinet/pedestal to the houses:


Split ratios 1:2, 1:4, 1:8, 1:16, 1:32 and 1:64 may be used
depending on building design and network topology.

Pipe

Faceplate

From DP to outside wall

1 2 inch GI or HDPE pipe for underground cables

Drop cable for aerial cable

1. Location

Single (1) storey house: at ground floor

Double (2) storey house: at ground floor

Three (3) storey house: at first floor

Townhouse: at the lower floor of every unit

2. For fibre connection


> 90mm x 60mm x 20mm
3. Separate and different face plate for coax connection.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 14 of 15

PR1MA DEVELOPMENT ICT INFRA DESIGN GUIDELINES (Draft v. 2)

5 CCC SUBMISSION PROCEDURE


1. The developer/contractor is responsible for obtaining the Certificate of
Completion and Compliance (CCC)
2. The developer/contractor must engage the services of an approved M&E
Consultant to design and supervise the telecommunications network
infrastructure deployment.
3. The M&E Consultant to submit 3 copies of the proposed telecommunications
infrastructure plans based on specifications specified by MCMC and Malaysian
Technical Standards Forum to be examined and approved by a
Telecommunications Service Provider assigned by PR1MA.
4. The Telecommunications Service Provider must have the following telco licenses
issued by MCMC :
a) NFP, I (Network Facilities Provider Licence, Individual) for network services
b) NSP, I (Network Service Provider Licence, Individual) and
c) ASP, C (Application Service Provider Licence, Class) optional.
5. The M&E Consultant must obtain a Surat Sokongan Merancang Pembangunan
from the telecommunications Service Provider.
6. The Consultant is to specify the Ready for Service (RFS) date required by the
developer.
7. A copy of the approved Surat Sokongan letter from the Service Provider is to be
submitted to MCMC for all fibre optic and related broadband services.
8. Sample of the Surat Sokongan: Attachment 1
9. Sample of the Terms and Conditions before, during and after the deployment of
the telecommunications network for approval by the service provider:
Attachment 2.

____________________________________________________________________________________________________
Ver. 7 March, 2014
Page 15 of 15

S-ar putea să vă placă și