Ian Payne Caterpillar EPD
Sascha Schwenker CENIT North America
LEARNING POINTS
Caterpillars road map for the SAP PLM
implementation
How Caterpillar bridged their legacy system with
their SAP PLM solution
How SAP PLM will change how Caterpillar
structures changes and feed them to production
Caterpillar
Controls
Parts and Service
Quoting Tools
~250 Interfaces
Vision
Basic PLM Requirements:
Enable 3D Visuals
Roadmap - Past
Q1 / Q2 2015
Q3 / Q4 2015
Q1 / Q2 2016
Q3 / Q4 2016
SAP E-BoM
GA1
MM GA1
M1
CENIT
EnterpriseConnector
M2
MM M1
MM M2
A1
A2
MM A1
Import E-BoM from EDS
Create Change Number
Effectively Date: Today
MM A2
(simplified)
Teamcenter
EDS
Pro/Engineer
SAP eSAP
Material and M-BoM Management
Manufacturing
etc.
Roadmap - Now
Q1 / Q2 2015
Q3 / Q4 2015
Q1 / Q2 2016
Q3 / Q4 2016
Target:
Bundle by design
Package X
Package Y
Package Z
Package A
Workflow Phase B
End of Q3 2015
Workflow Phase C
End of Q4 2015
Workflow Phase D
End of Q1 2016
Scope
Scope
Scope
Scope
Pilot
Change Management
Element
Business strategic chg.
from larger change.
packages to smaller
packages
Bundle by design vs.
implementation date
Reporting/Metrics
Establish connection BI
system
Develop 1 Basic report
Reporting/Metrics
Identify Reports Reqd
Develop 3 high priority
business reports
Workflow Phases
Request
Product Change
Pre-Release
Release
Create Request
Request
Coordinator
Request
Coordinator
Background Task
Rental Review
Investor Review
Retail Review
Request
Product Change
Pre-Release
Release
Investor
Request
Product Change
Pre-Release
Release
Retail
Background Task
Async. Wait
VC Team
Background Task
Variant Configuration
adjustments
Background task to start next workflow phase
Supply Chain
Manufacturing
Engineering
Tooling Check
Local Change
Coordinator
Background task to
start VC
Background Task
Request
Product Change
Pre-Release
Release
Request
Product Change
Pre-Release
Release
Workflow Metadata
Dynamically build 100% workflow based in above
parameters
Workflow changes need to be done without development
Decision Matrix
Request
Product Change
Pre-Release
Release
REQUEST
PRODUCT CHANGE
MOTHER
MOTHER
Global
Plant Independent
PRE-RELEASE
RELEASE
(SUB)
(SUB)
PLANT X
PLANT X
PRE-RELEASE
RELEASE
(SUB)
(SUB)
CLIENT Y
PLANT Y
PRE-RELEASE
RELEASE
(SUB)
(SUB)
PLANT Z
PLANT Z
Local
Plant Dependent
REQUEST
PRODUCT CHANGE
(MOTHER)
MOTHER
PRE-RELEASE
RELEASE
(SUB)
(SUB)
CLIENT 100
CLIENT 100
PRE-RELEASE
RELEASE
(SUB)
(SUB)
CLIENT 500
CLIENT 500
PRE-RELEASE
RELEASE
(SUB)
(SUB)
CLIENT 900
CLIENT 900
BOM
MM
BOM
Roadmap - Next
Q1 / Q2 2015
Q3 / Q4 2015
Q1 / Q2 2016
Q3 / Q4 2016
SAP E-BoM
GA1
MM GA1
M1
Enterprise
Connector
M2
MM M1
MM M2
A1
A2
MM A1
Import E-BoM from EDS
Create Change Number
Effectively Date: Today
MM A2
SAP E-BoM
GA1
MM GA1
M1
Enterprise
Connector
M2
MM M1
MM M2
A1
A2
MM A1
Import E-BoM from EDS
Create Change Number
Effectively Date: Today
MM A2
MM GA1
M1
Enterprise
Connector
M2
PSS
Sync. Unit I
A1
MM M2
PSS
Sync. Unit II
MM A1
Import E-BoM from EDS
Create Change Number
Effectively Date: Today
MM GA1
MM M1
MM M2
A2
M-BoM
SAP E-BoM
MM A2
MM GA1
MM A1
MM M1
MM A2
MM M2
MM M1
MM A1
MM A2
Workflow / Process
Request
Product Change
Pre-Production
Production
Q1 / Q2 2015
Q3 / Q4 2015
Q1 / Q2 2016
Q3 / Q4 2016
MM GA1
M1
Enterprise
Connector
M2
PSS
Sync. Unit I
A1
MM M2
PSS
Sync. Unit II
MM A1
Import E-BoM from EDS
Create Change Number
Effectively Date: Today
MM GA1
MM M1
MM M2
A2
M-BoM
SAP E-BoM
MM A2
MM GA1
MM A1
MM M1
MM A2
MM M2
MM M1
MM A1
MM A2
Workflow / Process
Request
Product Change
Pre-Production
Production
Doc. Structure
GA1
Doc GA1
E-BoM
Routing
MM GA1
MM GA1
MM A1
PTC creo
M1
MM M1
Doc M1
MM A2
M2
M2
creo SAP Doc
ECTR
direct
integrationDoc A1
A1
A2
Doc A2
MM M2
MM M2
Visual Enterprise
MM
M1
Manufacturing
Planner
MM
A1
M-BoM
MM GA1
MM M2
MM A2
MM A1
MM A2
MM M1
Workflow / Process
Request
Product Change
Pre-Production
Production
BEST PRACTICES
Start small grow large
- Try to plan small project phases instead of tackling
the complete solution
- Solve specific business problems
KEY LEARNINGS
Highlight/summarize 3-5 key learning points from
the presentation.