: DESAR
UNDER
UNDER
Sr.No
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Particulars
Page No.
3
4
5
16
19
20
21
28
32
33
35
42
43
44
General Specification
Technical Specification
45
53
Name of Officer
1.
2.
Shri Snehal
Christian
3.
MILIN A OZA
Designation &
Contact Nos.
Address
Office
UNIT MANAGER
D.W.S.U., Vadodara
Deputy
Manager(
F&A)
D.W.S.U. ,Vadodara
Technical Supervisor
(Civil)D.W.S.U.
Vadodara
0265-22
90421
0265-22
90421
0265-22
90421
Mobile
9978442372
9978441922
7405309499
Department Name
Water
&
Sanitation
Management
Organization
Circle / Division
No.
Name of Project
Name of Work
Rs. 1215655.00
6 (SIX) Months
Bidder Type
Open
Single
Joint Venture
Not Applicable
Rebate
Applicable
Rs.900=00
To
Rs. 12156.55
60782.00
Dt. 22/6/2016
Start Date
Bid Document Downloading
End Date
Dt. 12/07/2016
Not Applicable
of Bids
Bid Validity Period
120 Days
Remarks:
1. Tender fees shall be in the form of DD only. EMD can be paid in the
form of DD or FDR. The instrument shall be issued by any
Nationalized bank or private bank namely (1) IDBI (2) Axis (3) HDFC
(4) ICICI, Commercial Bank (1) Kotak Mahindra (2) Yes Bank (3)
Indusind Bank- Regional Rural Banks of Gujarat (1) Saurashtra
Gramin Bank, (2) Baroda Gujarat Gramin Bank, (3) Dena Gujarat
Gramin Bank. The Bid Doccument Fee(Tender Fee) shall be issued
in the name of the Unit Manager, District Water & Sanitation
Unit, Vadodara and the EMD shall be issued in the name of the
Chairman, Village Water & Sanitation Committee, NAVA SIHORA
, Ta. DESAR , Di.Vadodara. Tender fee and EMD shall be submitted
in electronic format only through online (by scanning) while
uploading the bid. This submission shall mean that tender fee and
EMD are received for purpose of opening the Bid. Accordingly,
offer of those shall be opened whose tender fee and EMD is
received electronically. However for the purpose of realization of
instrument, Bidder shall send the instrument in original through
R.P.A.D. / Speed Post so as to reach to the concerned office as
mentioned in the tender document within seven (7) days from the
---
Opening Date
Price Bid Opening Date
21/7/2016
ELIGIBILITY CRITERIA
contractors.
The
scanned
copy
of
the
contractors
OTHER DETAILS
Address
Contact Details
Address
notice
will
be
available
on
Signature of Contractor
UNIT MANAGER,
DWSU WASMO,VADODRA
: N.R.D.W Programme
: Vadodara
Name of Work
Capacity in lit.
Height in
meter
No.
NAVA
SIHORA
60,000
12
Unit Manager,
District Water & Sanitation
Committee, VADODARA
::CONSTRUCTION OF SCOPE::NAME OF
DESIGNING AND CONSTRUCTION OF R.C.C ESR
WORK::OF 60,000 LIT. CAP. & 12 MT. HT
SR.NO. SCHEDULE
NAME OF WORK
AMOUNT
(Rs)
1) SBC
1215655.00
1215655.00
Note2:-In case of not completing the above said work,5% amount will deduct from bill
Net Rs.______________________________
In words ___________________________
SCHEDULE - "A"
Schedule showing approximate QTY of materials to be supplied to the
contractor at the Nava sihora Gram Panchayat Store for the work to be executed
at which they are to be charged.
----------------------------------------------------------------------------------------------------------
Sr.
Particulars Quantity
Issue Unit
Place o
No.
Rate
Delivery
---------------------------------------------------------------------------------------------------------Nava sihora Gram Panchayat Store
---------------------- NIL -----------------------
---------------------------------------------------------------------------------------------------------Note :--
1. Materials not included in schedule-A but required for the work if available
committee, the same shall be provided to the contractor at the rate fixed b
Signature of contractor
Name of Work :-- DESIGNING & CONSTRUCTING ESR OF 60,000 LIT. CAP.
& 12 MT. HT
SCHEDULE - "B"
Memorandum showing item of work to be carried out for Designing & construction of R.C.C.
E.S.R. of capacity 60,000 liters & 12 Mt. height at Village NAVA SIHORA
Item
No.
1
Qty
Item of work
Rate
Total Amount
1 No
1215655.0
0
All the Columns in the Schedule should be filled in by ink, and the total
of the entries in the last column should be struck by the contractor
under his signature.
Contractor shall have to carry out the work as per attached approved
drawing and tender specifications.
The time limit will be starts from work order given by V.W.S.C...
Note: --1) The contractor shall made L. S. cost for the above work as per
specification.
Signature of contractor
Payment Schedule
FOR R.C.C. E.S.R.
Sr.No
1
2
3
Stage of work
On approval designs
On completion of work up to excavation and Raft
Concreting with steel
On completion of work up to Full shaft and/or
column/beam/ braces including staircase up to bottom
slab/ dome level
Completion of work up to bottom slab / bottom dome
vertical wall or slant wall of container without top slab or
dome
Completion of work up to Top slab or dome staircase with
RCC cabin and door with inside water proof plaster and
RCC finishing to out side surface and Dome with inside
epoxy paint.
Procurement and fixing of inlet, outlet, washout, overflow
Amount admissible
payment
3%
9%
17 %
21 %
10 %
15 %
7
8
5%
20 %
100 %
TERMS OF PAYMENT
80%
20%
Dated signature of
Contractor
DATA SHEET NO 2
NAME OF WORK: CONSTRUCTION OF RCC ESR 60,000 LITERS CAPACITY AND 12 MTS HEIGHT.
NAVA SIHORA VILLAGE WATER SUPPLY SCHEME.
TALUKA: DESAR
SR NO
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(H)
(I)
(J)
DETAILS
CAPACITY
SBC
GROUND LEVEL
BOTTOM OF TANK (TOP OF OUTLET PIPE)
HEIGHT
F.S.L
FOUNDATION DEPTH BELOW GL
TYPE OF FOUNDATION
FREE BOARD
NORMAL WATER LEVEL
(K)
DISTRICT: VADODARA
DATA FOR RCC ESR
60,000 LITERS
AS PER ATTACHED
RL 100.00 METER
RL 112.00 METER
12.00 METER
RL 115.00 METER
3.00 METER DEPTH BELOW GL BEARING
RCC FOUNDATION (AS PER DESIGN)
0.3 METER
WATER TABLE NOT FOUND UPTO 10.00 .METER DEPTH BELOW
GL.
100 MM DIA WITH DOUBLE FLANGE WITH CRIPPLING
FLANGE. 2
Length of pipes
(M)
(N)
(O)
(P)
(Q)
(R)
(S)
(T)
(U)
(V)
(U)
TYPE OF CONSTRUCTION
INSIDE WATER PROOFING CEMENT PLASTER
20MM THK IN CM 1:2
PAINTING LETTER FOR CAPACITY OF TANK
ETC AT CONTAINER LEVEL
EARTHING/ COPPER LIGHTENING ARRESTOR
APPROVED CEMENT PAINT TO ESR
WATER LEVEL INDICATOR
!P AWM DF, ;FDFG EFZTLI DFGS ;\:YFGF lGIT lJJZ6 5|DF6[GM CMJM HM.V[P
ZP HIF\ HIF\ EFZTLI DFGS ;\:YFGF lJJZ6GM sVF.PV[;P GMf p<,[B CMI tIF\ H[ T[ lJJZ6GL K[<,FDF\ K[<,L VFJlTGM VY"
;DHJFGM K[P
#PlJJZ6DF\ HIF\ NXF"JJFDF\ VFJ[, CMI tIF\ 9[S[NFZ[ DF,GF 8[:8 :JBR"[ SZFJJFGF K[P VF 8[:8 ;ZSFZL 5|IMU XF/FDF\ VYJF
;ZSFZ S[ 5F6L 5]ZJ9F AM0[" DFgI SZ[, 5|IMUXF/FDF\ SZFJJFGF ZC[X[P
$P SFDGL VF.8[DM DF8[ H~ZL DF, ;FDFG :Y/ p5Z 5CM\RTM SZJFDF\ R0F.4 pTZF.4 EF0]4 UM9J6L4 lJDM4 VMS8=M.4
ZMI<8L4 :YFlGS SZ JU[Z[ ;lCTGM ;DFJ[X YFI K[P
5P BF6 VG[ BGLH BFTFGF SFINFVM4 lGIDM S[ lGIDGM4 S[ VgI ;ZSFZL SFINFVM 5F/JF 9[S[NFZ HJFANFZ K[P
&P 5|R,LT 5wWlT VG];FZ 9[S[NFZ[ SFDGL ;F.8 5Z JS"VM0"Z A]S lGEFJJFGL K[P :Y/ D],FSFT NZdIFG ccJF:DMcc VG[
;CFIS ;\:YFGF VlWSFZL FZF VF5JFDF\ VFJ[, ;}RGFGL GM\W 9[S[NFZ[ ,[JFGL ZC[X[P VG[ T[GM VD, SZJFGM ZC[X[P T[DH
HM Y0"5F8L" .G:5[SXG DF8[ GLD6]S SZJFDF\ VFJ[ TM T[VM .HG[ZGF ;]5ZlJhG GLR[ SFDULZL SZJFGL ZC[[X[P
*P 9[S[NFZ[ ;F.8 p5Z J5ZFTF DF,;FDFGGM lC;FA Z:8ZDF\ ZFBJFGM ZC[X[ T[DH D],FSFT Z:8Z GLEFJJFG]\ ZC[X[P VG[
T[ Z:8Z DFUJFDF\ VFJ[ tIFZ[ ZH] SZJFG]\ ZC[X[P
(P 5FIFDF\ S[ 5F.5 ,F.GMGL 8=[gRDF\ VFJT] 5F6L 9[S[NFZ[ SFD 5}6" YTF\ ;]WL :JBR[" p,[RJFG]\ ZC[X[P
)P SFD V\U[ Z:TM A\W SZJFGM YFI tIFZ[ T[GL D\H}ZL D[/JL4 JFCG jIJCFZG[ VgI Z:T[ JF/JFGL jIJ:YF 9[S[NFZ[ SZJFGL
ZC[X[P AF\WSFD NZdIFG GSXFDF\ ATFjIF D]HA 5F,B4 NFNZ4 %,Fg84 DXLGZL4 SFDNFZMGL ;,FDTL4 1FlT G]SXFG ;FD[
J/TZ4 ZF+L ,F.84 RMSLNFZL 4 HTG TYF 5X]VMGL ;,FDTL lJU[Z[ jIJ:YF SMg8=FS8ZzLV[ SZJFGL ZC[X[P H[ :Y/[ 8F\SLG]\
AF\WSFD SZJFG]\ CMI T[ ;F.8 ;FO SZJF DF8[ hF0JF\ SF5JFGF YFI TM ;\A\lWTMGL D\H}ZL D[/JLG[ T[ SFD 9[S[NFZ[ :JBR["
SZJFG]\ ZC[X[P
!_P \RL 8F\SLGF SFDDF\ JF5ZJFGM l;D[g8 VMP5LP;LP TYF p\RL8F\SLDF\ 5LP;LP;LP T[DH OFpg0[XG VG[ HDLG ,[J,YL V[S
DL8Z p\RF. ;]WL T[DH E]UE" ;\5DF\ 0MD l;JFI TDFD SFDMDF\ ;<O[8 Z[hL:8G; l;D[g8 VF.PV[;PVF. DFS" GM GLR[GF
A|Fg0GM VMP5LP;LP VG[ 5# U|[0GM ,FJJFGM ZC[X[P CJF S[ E[HGF SFZ6[ G]SXFG YI[, l;D[g8 SFDDF\ JF5ZJF N[JFDF\
VFJX[ GlC\P
s!f V\A]HF l;D[g8
sZf lNuJLHI l;D[g8
s#f V[, V[g0 8L l;D[g8
s$f H[PS[Pl;D[g8
s5f GDNF l;D[g8
s&f CFYL ;LD[g8
s*f ;F\WL l;D[g8
s(f ALZ,F
s)f l;lwW l;D[g8
s!_f ALGFGL
s!!f 8F8F X]wW l;D[g8
!!P \RL 8F\SLGF SFDDF\ JF5ZJFGF YTF ,MB\0 GLR[GF A|Fg0GF VF.PV[;P V[RPJFIPV[;P0LP VYJF 9[S[NFZGL 5MTFGL
0LhF.GDF\ NXF"jIF D]HAGF ,MB\0 s8LPV[DP8LPf8[:8L\U ;8L"OLS[8 ;FY[GF BZLNJFGF ZC[X[P VG[ T[H AF\WSFDDF\ JF5ZJFG]\
ZC[X[P ;FYM ;FY ,MB\0 ;F.8 5Z VFjIF AFN V[S JFZ ;[d5, ,. DFgI ,[AMZ[8ZLDF\ 8[:8 SZJFGF ZC[X[P ,MB\0 SFD 5}6"
YFI tIF;]WL V[S H A|Fg0G]\ ,FJJFG]\ ZC[X[P VgIFYF AL A|Fg0GF ,MB\0 DF8[ OZLYL 8[:8LU SZFJJFG]\ ZC[X[P
s!f :8L, VMYMZL8L VMO .g0LIF (SAIL)
s$f 8F8F
s*f ;F\WL
sZf V[:;FZ
s5f .:5FT cclJHFUcc
s(f U[<FFg8
s#f D<CM+F
s&f HL\NF,
s)fGL<FS\94SFDW[G]
,MB\0G]\ jIJl:YT S8L\U SZL 0=M\.UDF\ NXFjIF D]HA UM9JL SFI"5F,S .HG[Z q .gRFH" V[gHLGLIZ 5F;[ R[S SZFJJFG]\
ZC[X[4 tIFZAFN SM\gS|L8 SFD SZJFG]\ ZC[X[P VF DF8[ VUFpYL HF6 SZJFGL ZC[X[P H[YL SM\gS|L8 SFD X~ SZJFDF\ lJ,\A YFI
GCL\PL
!ZP:Y/ p5Z VFJ[, D8LZLI, sZ[TL4S5RL4U|L8 VG[ ;LD[g8fG]\ SMgS|L8 DL1F sV[Dv300f0LhF.G 5F6L ;lDlTGF
.HG[ZqJF:DM .HG[ZGL CFHZLDF\ ;[d5, ,. T[G[ ;L, SZL ;ZSFZ DFgI ;\:YF sDFgI ,[AMZ[8ZLf 5F;[ 9[S[NFZ[ :JBR["
SZFJJFGL ZC[X[P ;LD[g84 Z[TL4 S5RLG]\ 5|DF6 sJ[vA[RZf JHG VFWFZLT G]\ SZFJL T[ 5|DF6[ ;DU| SFDULZL SZJFGL ZC[X[
VG[ T[GL GS, JF:DM SR[ZL T[DH 5F6L ;lDlTGL VF5JFGL ZC[X[P
!#P S|MSL8 SFD CMI TM SMgS|L8 DL1FGF !5 ;[PDL 2 !5 ;[PDLP 2 !5 ;[PDLP GF SI}A 8[:8 AGFJL T[G[ ;ZSFZ
DFgI4,[AMZ[8ZLDF\ DMS,L 8[:8L\U ;8L"OLS[8 D[/JJFG]\ ZC[X[P VG[ 5F6L ;lDlT ;D1F ZH] SZJFG]\ ZC[X[PH[GL h[ZM1F GS,
HL<,F H/ VG[ :JrKTF ;lDlT 4VDNFJFNG[ DMS,L VF5JFGL ZC[X[P 5Z\T] p\RL8F\SLGF lS:;FDF\ VMKFDF\ VMKF V[S JBT
SI]A 8[:8 OFpg0[XGDF\4 :8[HLUDF\4 Sg8[.GZ VG[ 0MDDF\ SZJFGF ZC[X[P p5ZMST :8[HLUGL SFDULZL 5F6L ;lDlT ;FY[
;\S,GDF\ ZCL VG[ 9[S[NFZ[ 5MTFGF BR[" SZJFGL ZC[X[P H[ V\U[G]\ ZHL:8Z GLEFJJFG]\ ZC[X[P
!$P S|MlS8 SFDDF\ B}A H ;FZL HFTGL Z[TL TYF S5RL JF5ZJFGL ZC[X[P VG[ W]/ JF/L CMI TM T[G[ WM.G[ JF5ZJFGL ZC[X[P
!5P S|MSL8 SFD DF8[ 5[I 5F6L JF5ZJFG]\ K[ VG[ T[GL jIJ:YF TYF T[G[ ;F.8 5Z :8MZ SZJFGL jIJ:YF SMg8=FS8Z[ 5MTFGL HFT[
SZJFGL ZC[X[P
!&P SMg8=FS8Z[ NZ[S SMgS|[84 R6TZ4 %,F:8Z lJU[Z[ SFD YIF AFN ALHF lNJ;YL ;TT !_ lNJ; ;]WL 5LJF,FIS 5F6LYL
K\8SFJ sSIM\ZLUf SZJFGM ZC[X[P
!*P SMgS|L8G]\ lDz6 SMgS|L8 DL1FZ DXLGYL H SZJFG]\ ZC[X[P SJZ a,MS ;LD[g8 DM8F"ZGF AGFJJFGF ZC[X[P
!(P NZ[S SMgS|L8 SFDDF\ JFIA|[8ZGM p5IMU SZL 0[g; (Dense) SMgS|L8 SZJFG]\ ZC[X[P
!)P8F\SLDF\ 5F.5L\U jIJ:YF V\TU"T 5F.5MGL ,\AF. 8F\SLGL p\RF.G[ VG]~5 TYF T[G[ HDLGGL V\NZ !P__ DL8Z p\0[4
8F\SLGL ACFZ SM,DqXFO8GL ACFZGL 3FZLYL 5P__ DL8Z ,\AF. ;]WL ,. HJF ;FY[GL ZC[X[PT[DH 5F.5MGF SG[SXG
SZJFGF ZC[X[P
Z_P 8F\SLGF H~ZL 8[:8L\U DF8[ H~ZL jIJ:YF 9[S[NFZ[ HFT[ H SZJFGL ZC[X[P VG[ SM. 56 HFTGM R]JFS S[ E[H DFgI ZFBJFDF\
VFJX[ GlC\P 8[:8L\U DF8[ H~ZL 5F6LGL jIJ:YF 9[S[NFZzLV[ JWFZFGF BR" lJGF SZJFGL ZC[X[P
Z!P HFDLG VGFDT 8[g0Z ZSDGF 5@ H[DF\ SZFZBT JBT[ s!f ZP5@ ZFQ8=LIST A[\SGL 0L5MhL8 :J~5[ sZf SMg8=FS8ZGL RF,]
AL,GL ZSDDYL 5@ ,[B[ AFSLGF ZP5@ YFI tIF\ ;]WL S5FT SZJFGL ZC[X[P
ZZP VFBF SFDG]\ R}SJ6]\ VF ;FY[ ;FD[, ZFB[, XL0I], 5|DF6[ SZJFDF\ VFJX[P
Z#P VF SFDULZL ;DI DIF"NFDF\ 5}6" SZJFGL ZC[X[P H[GL ;DI DIF"NF
DF; K[P H[GL lJUTM GLR[ D]HA K[P
!P H[DF\ 9[S[NFZ[ 8[g0Z D\H]Z YIF 5KL JS"VM0"Z D?IF AFN 5MTFGL lJUTJFZ 0LhF.G
S[,SI],[XG VG[ JSL"U 0=M.U VF5JFGM ;DI UF/M
PPPPPPPPPPP Z_ lNJ;
ZP 9[S[NFZ[ VF5[, 0LhF.GGL RSF;6L T[DH D\H]ZL JF:DM FZF GLI]ST YI[, Sg;,8LU
VgI :8=SRZ, .HG[Z FZF SZFJJFGL ZC[X[ VG[ RSF;6L SZTF ,LW[, GM\WGL
5]T"TF SZJFGL ZC[X[PH[GM ;DI UF/M
PPPPPPPPPP Z5 lNJ;
0LhF.GGL D\H]ZLGM S], ;DIUF/M PPPPPPPPPPP $5 lNJ;
V[8,[ S[ Z DF;
#P TDFD SFDULZL 5}6" SZJFGM ;DIUF/M
PPPPPPPPPPPPPP DF;
S], ;DI UF/M
PPPPPPPPPPPPPP DF;
VF ;DIDIF"NFDF\ SFDULZL 5}6" GCL YJFGL lS:;FDF\ 9[S[NFZzL 5F;[YL 8[g0Z lS\DTGF ! lNJ;GF _P!@ ,[B[ ZSD N\0 TZLS[
J;], SZJFDF\ VFJX[P H[ JW]DF\ JW] 8[g0Z lS\DTGF !_@ ;]WL J;], SZJFDF\ VFJX[P
Z$P 8F\SLGL SFDULZL RF,] SZL 5}6" YFI tIF\ ;]WL SM. HFC[Z HGTFG[ VS:DFT G YFI T[ DF8[ 9[S[NFZ[ H~ZL JF0 VG[
lNJFATLGL HMUJF. SZJFGL ZC[X[P VG[ p5ZGL ;FJR[TL ZFBJF V\U[GL A[NZSFZLG[ SFZ6[ SM. jIlST q 5|F6L H[ SM.
G]SXFGL S[ BR" YX[P T[ BR" 9[S[NFZ[ EMUJJFG]\ ZC[X[P
Z5P 8[g0ZGL SFDULZLGF ;DU| ;DI NZdIFG SFDGL N[BZ[B DF8[ 5F6L ;lDTL FZF 5}6" ;DI DF8[ ZFBJFDF\ VFJ[,L ;LJL,
V[gGLIZ VG[ ;CFIS ;\:YFGF V[gGL\IZ 5F;[ DFU"NX"G D[/JJFG]\ ZC[X[PBF; lS:;FDF\ H~Z H6FI[ JF:DMGF
SFI"5F,S .HG[Z VG[ 0[PD[G[HZ s8[Sf FZF DFU"NX"G D[/JJFG]\ ZC[X[PT[DH 9[S[NFZ[ 5MTFGF .HG[ZG[ 5}6" ;DI DF8[ :Y/
p5Z CFHZ ZFBL ;DU| SFDULZLG]\ ;]5ZlJhG ;TT SZJFG]\ ZC[X[P
Z&P 5F6L ;lDlT FZF YI[, SFDGL DF55MYL X[0I], VMO 5[D[g8 D]HA lGIlDT ,BJFGL ZC[X[P 5F6L ;lDlT FZF DF5M ,bIF
AFN 9[S[NFZ[ DF5M :JLSFIF" AFATG[ ;CL SZJFGL ZC[X[P H[G[ VFWFZ[ 5F6L ;lDlT FZF R]SJ6]\ X[0I], VMO 5[D[g8 D]HA H
SZJFG]\ ZC[X[P
Z*P 9[S[NFZ[ :Y/5Z SFDGL lJUT NXF"JT]\ V[DPV[;P %,[8DF\YL AGFJ[, AM0" JF:DMGF .HG[ZGF DFU"NX"G C[9/ AGFJL OL8
SZJFG]\ ZC[X[P
Z(P 9[S[NFZ FZF BZLNJFDF\ VFJTM l;D[g84 ,MB\0 TYF VgI 5F.5GF AL,M :Y/ p5Z ZFBJFGF ZC[X[ TYF J5ZFX Z:8Z
GLEFJJFG]\ ZC[X[ TYF 5F6L ;lDlTGF .HG[Z 5F;[ R[S SZFJJFG]\ ZC[X[P
Z)P 9[S[NFZ[ 5MTFGL 0LhF.GDF\ ;L0L ACFZGL AFH]V[ G ZFBTF 8F\SLGF DwIDF\ ZFBJFGL VFIMHG SZJFG]\ ZC[X[P VG[ T[ D]HA
0LhF.G AGFJJFGL ZC[X[ VG[ ;L0LGL OZT[ H~ZLIFT D]HAGL VG[ .HG[ZGL ;]RGF D]HAGL S[ALG AGFJJFGL ZC[X[P
#_P HFDLGULZL VGFDT sl;SIMZL8L 0L5MhL8f VG[ SFDULZL HFDLGBTGL 5_@ ZSD ;DU| SFDULZLGL VFBZL 5}6"TFGM
NFB,M VF5JFDF\ VFjI[YL !5 lNJ;DF\ 5ZT VF5JF YX[P VF SMg8=FS8 S[ ALHF SM. SMg8=FS8 C[9/ S[ ALHF SM. SFZ6M;Z
,[C6L ZSD SMg8=FS8Z 5F;[YL J;], YJF 5F+ ZSD HFDLG VGFDTGL p5Z H6FJ[, 5_@ ZSD DF\YL JF/L ,[JFDF\
VFJX[P VG[ AFSLGL ZSD VFBZL 5|DF65+ V5FIF 5KLGF !5 lNJ; AFN 5ZT SZJFDF\ VFJX[ AFSL ZC[TL 5_@ ZSD
SMg8=FS8GL BFDLVM N]Z SZJFGL HJFANFZLGM ;DIUF/M sH[ VF SMg8=FS8 DF8[ #DF; ZFBJFDF\ VFJ[, K[Pf 5]ZM YIF AFN
!5 lNJ;DF\ BFDLVM N]Z SZJF DF8[ YI[, BR"GL ZSD AFN SZL 5ZT SZJFDF\ VFJX[P
DF,;FDFG
!P l;D[g8P
5M8",[g0 l;D[g8 DF8[GF EFZTLI DFGS ;\:YFGF ;A\lWT lJJZ6 VG];FZGL VG[ :5[XLOLS[XG
T[DH XZTMDF\ NXF"J[, HuIFV[ ;<O[8 Z[:8g8 l;D[g8 SFDMDF\ JF5ZJFGL K[P CJF S[ E[HG[
SFZ6[ l;D[g8G[ G]SXFG G YFI T[ DF8[GL ;W/L SF/ ,[JFGL K[P G]SXFG 5FD[, l;D[g8 SFDDF\
JF5ZJFGL GYL VG[ ;F.8 p5ZYL N}ZSZJFGL K[P GSSL SZ[, pt5FNSGL VMP5LP;LP A|Fg0GM
U|[0 v 5# GL l;D[g8 SFDDF\ JF5ZJFGL K[P;F.8 5Z l;D[g8GL Y[,LVM GL UM9J6L J{7FlGS -A[
SZJFGL K[P H[YL T[G[ SM. G]SXFG G YFIP
ZP Z[TLP
DLS; 0LhF.G VFWFZLT SFDULZL CM. GlSS YI[, :Y/[YL VF.PV[;P #(# v !)*_DF\
VF5[, lJJZ6 5|DF6[GL Z[TL AF\WSFDDF\ JF5ZJFGL K[4 H[ GM8LOF.0 GNL S[ GF/FDF\YL ,FJJLP
T[ :JrK4 DF8LYL S[ VgI ACFZGF TtJMYL D]ST4 RF/[,L CMJL HM.V[P Z[TLGM GD}GM 5F6L
EZ[, u,F;DF\ C,FJLG[ EZTF\ UF/ & 8SFYL JWFZ[ G CMJM HM.V[P JWFZ[ CMI TM T[ Z[TL WM.G[
JF5ZJLP
#P 6L S5RLP
DLS; l0hF.G VFWFZLT SFDULZL CM. GSSL YI[, SJMZLDF\YL ;BT4 DHA}T VG[ 8SFp
5tYZGL S5RL W}/4 DF8L4 GZD S6MJF/L T[DH VF<S,L VG[ SFA"lGS S6M JF/L G CMJL
HM.V[P & DL,L DL8ZGL HF/LDF\YL 5;FZ YFI T[JF NF6FJF/L S5RL CMIP
$P HF0L S5RLP
DLS; l0hF.G VFWFZLT SFDULZL CM. GlSS YI[, SJMZLDF\YL 5tYZ S[ U|[J,GL EZ0[, S5RL
:JrK4 ;BT4 DHA}T VG[ 8SFp CMJL HM.V[P 5FT/L S[ GZD S5RL G CMJL HM. VG[ T[
VF<S,L VG[ SFA"lGS S6MYL D]ST CMJL HM.V[P T[ V[S ;ZBL CMJL HM.V[P
V[gGLIZ[ DFgI SZ[, BF6GF 5tYZ JF5ZJFP T[ ;BT4 8SFp4 ;DFG Z\UGF VG[ ;DFG 5MT S[
S6ZRGF JF/F CMJF HM.V[P BF6GF S]NZTL 5FIF p5Z R6TZDF\ J5ZFIP DF8LGF EFUJF/F 4
Z\U p0L UI[, VG[ V51FI6 JUZGF CMJF HM.V[P
R6TZ SFD RF,] CMI tIFZ[ VG[ l;D[g8 5FSTF ;]WL 5F6L KF\8JFG]\ RF,] ZFBJ]\ l;D[g8 DM8"Z
5F6L KF\8TL JBT[ WMJF. G HFI T[GL SF/ ZFBJLP AWF YZ V[S ,[J,[ ;/\U ZFBJF SFD
VW]~ D]SJ]\ VFJxIS CMI tIFZ[ H}GF VG[ GJF R6TZ JrR[ ,F\AF 5UYLIF 5F0LG[ ;F\WF D}SJFP
*P .\8P
VF.PV[;P !_*& v !)** S[ T[GL K[<,L VFJlT 5|DF6[GL ;FDFgI 5FS[,L .\8M JF5ZJLP
5|YD S1FFGL .\8
V[S ;DFG R6TZGF :TZ D]SL XSFI T[JL ;ZBF DF5GL .\8M CFY AGFJ8GL S[ DXLG
AGFJ8GL IMuI DF8LDF\YL AG[, CMI VG[ IMuI E9LDF\ 5FS[, CMI T[JL JF5ZJL P .\8MDF\
TLZF0M S[ BF0F B0LIF G CMI S[ T[DF\ R}GFGF U9F G CMI T[GL ;5F8L lGIDLT VG[ ,L;L CMI
VG[ B}6F WFZJF/F CMI4 Z\U ;DFG CMI VG[ T[GF p5Z AMg0 DF8[ !_ YL Z_ DL,L DL8Z p\0L
KF5 CMI T[ VF.PV[;P !_**DF\ VF5[, lJJZ6G[ VG]~5 CMI V[S SFD p5Z V[S H DF5GL
.\8 JF5ZJL T[GL E\HG XlST V[S RMZ; ;[g8L DL8Z NL9 #5 lS,MU|FD H[8,L CMIP T[GL 5F6L
XMQFJFGL XlST JHGDF\ Z_ 8SFYL JWFZ[ G CMIP
SM,DF\ JF5ZTL l;D[g8 VG[ Z[TL T[GF ;A\lWT lJJZ6 5|DF6[GF CMIP VF.8DGF J6"GDF\
VF5[, lGIT 5|DF6V[ SNG]\ K[P SNYL V[S EFU l;D[g8 ;FD[ A[ EFU4 +6 EFU S[ 5F\R EFU
Z[TL U6FIP V[S Y[,L l;D[g8 V[8,[ _P_#$Z 3G DL8Z AZFAZ #5 ,L8Z l;D[g8 U6FIP SM,
CFY[YL S[ DXLGYL AGFJL XSFIP lGIT 5|DF6DF\ l;D[g8 VG[ Z[TLG[ 5F6L GFBTF 5C[,F V[S
Z\U VFJ[ tIF\ ;]WL D[/JJF D[/J6L DF8[GL A[9S ;5F8 VG[ E[H G XMQF[ T[JL CMJL HM.V[P
5F6L WLD[ WLD[ Z[0TF H.G[ D[/JJ]\ +6 JBT pY,FJJ]\ Z[TLGM NZ[S S6 ELGL l;D[g8YL -\SF.
HJM HM.V[P #_ DLGL8DF\ J5ZF. HFI T[ ZLT[ H SM, V[SL ;FY[ AGFJJM HFDL UI[, DF,
JF5ZJM GlC\P
)P 5F6LP
AF\WSFDGF ;W/F SFD C[T] DF8[ JF5ZJFG]\ 5F6L RMbB]\4 DF8LGM EFU4 SFA"lGS EFU4 T[HFA4
1FFZ4 T{,L 5NFY" H[JL VX]lwVMYL D]ST CMJ]\ HM.V[P 5LJF ,FIS 5F6L ;FDFgI ZLT[ l:JSFI"
CMI K[P SM, S[ SMgS|L8GF H]NF H]NF lDz6DF\ 5F6L VG[ l;D[g8G]\ 5|DF6 lGIT YT] CMI K[P
:Y/4 ;\HMUM VG[ kT] H[JF 5lZA/MG[ VG];ZLG[ VF 5|DF6 H/JFJ]\ HM.V[P VgI 5lZA/MDF\
H[ T[ W8SMDF\ HM.TL TFSFT4 DF,GL 5F6L XMQFJFGL XlST4 SFI"UTTF VG[ VJ5FT v
JS["AL,L8L VG[ <;d54 ;\UTTF v S\;L:8g;L4 SFD 5}6" SZJFGL 5wTL JU[Z[GM ;DFJ[X YFI K[P
,MB\0 ;FY[GF S[ l;JFIGF SM.56 SMgS|L8GL S1FFVM GlSS YI[, CMI K[ H[ U|[0 V[D !__4 U|0
V[D !5_4 U|[0 V[D Z__ U|[0 V[D Z5_ U|[0 V[D #__ JU[Z[ SC[JFI K[P V[D V[8,[ lDz6
VG[ VF\S0F 5|tI[S RMZ; ;[g8L DL8Z[ lS,MU|FDG]\ NAF6 NXF"J[ K[P VF TFSFT SMgS|L8GL Z(
lNJ; SIMZLU 5KLGL VG[ SI]A 8[:8GL CMI K[P
;FDFgI ZLT[ H[ SMgS|L8GL TFSFT V[D !__4 V[D !5_ VG[ V[D Z__4 V[D Z5_ 4 V[D #__
NXF"J[, CMI T[ VG]S|D[ !o#o&4 !oZo$4 !o!P5o# VG[ !o!oZ T[DH DL1F 0LhF.G D]HAGL
;DS1F CMI K[P SMgS|L8GL NFA XlSTG]\ 5lZ1F6 VF.PV[;P 5!& 5|DF6[ !5 ;[g8L DL8Z WGG[
Z( lNJ;GF SIMZLU 5KL SZFJJ]\P pTFJ/ CMI T[JF lS:;FDF\ Z( lNJ; p5ZF\T * lNJ;GF
SIMZLU 5KL 5lZ1F6 SZFJL XSFI T[GF 5lZ6FDM VFXZ[ *_ 8SF VFJ[P l;D[g8 HIF\ ZFBJFDF\
VFJ[ tIF\ E[H ,FU[ GCL T[ 5|DF6[ VG[ ;C[,F.YL U6L XSFI T[ ZLT[ Y[,LVM ZFBJLP ,MB\0G[
SMgS|L8G]\ 5]ZT]\ VFJZ6 5]~ 5F0JF ;[g8ZL\U VG[ ,MB\0 JrR[ SMgS|L8GF IMuI DF5GF 5|LSF:8
a,MS D]SJFP SMgS|L8G]\ lDz6 SMgS|L8 lDS;ZYL SZJ]\ DF6;M lDz6 SZ[ TM T[G]\ %,[8OMD" 5F6L
R}:T CMJ]\ HM.V[P 5|YD ;]S] lDz6 V[S Z\U VFJ[ tIF\ ;]WL SZJ]\ VG[ 5KL WLD[ WLD[ 5F6L Z[0LG[
OZLYL lDz6 SZJ]\ DXLG l;JFI SZ[, lDz6DF\ !_ 8SF l;D[g8 JWFZ[ JF5ZJL SMgS|L8 T[GL
HuIFV[ GFBTF 5C[,F T[G[ ELHJJLP SMgS|L8 T{IFZ YIF 5KL Z_ DLGL8DF\ J5ZF. HFI T[ HMJ]\
T[G[ p\RF.YL O[SJ]\ GlC\P SMgS|L8G[ JF.A|[8ZYL BF\RJ]\ VG[ NAFJJ]\ Z_ lNJ; ;]WL SIMZLU SZJ]\
OMD"JS" N}Z SZJFGF lNJ;M VF 5|DF6[ CMI ALDGF 50BF $ lNJ; VG[ T/LIFG]\ Z! lNJ; 5KL4
:,[AG]\ T/LI]\ !$ lNJ; 5KL4 SM,D S[ pEL lNJF,GF 50BF $ 5KL BM,JF .HG[Z S[
VlWSFZLVM SFDGL T5F; SZJF VFJ[ T[G[ H~ZL ;]lJWF 5]ZL 5F0JLP
!!P ,MB\0
The tender shall produce an Income Tax Clearance Certificate along with tender documents.
Tender documents consist of plans, specifications, Schedule(s) of quantities of various classes of
works to be done, the conditions of contract etc. New conditions / Para:The contractor shall not be permitted to tender for the work min which his near relative is
working in that Pani Samiti/WASMO as an Engineer, Assistant Engineer, Additional Assistant,
Overseer, Accountant, Store-keeper etc. on the day on which on the day of which the tender is
submitted. On that particular day, the Superintending Engineer controlling that Pani
Samiti/WASMO should not also be his near relative.
1.
2.
By the term Near Relative, it is meant Wife, Husband, Parents, Grand Parents, Children,
Brothers, Sisters, Uncles, Aunts and Cousins.
(Accompaniment to Government R & B Department, resolution no. TNC / 1084 / IB-204/(26/C,
dt. 24th January, 1985).
To,
The Chairman
PALAJ Water & Sanitation Committee.
Details regarding my / our / partners, directors of our company (in the case of limited company) names
address (es) Telephone number(s), Income Tax office etc.
Sr.
No
Name(s) of
person / partner
/ Company
Full address of
the place of
business with Pin
Code
Telephone
No.(s)
office
Residential
No.(s) office
Telephone
No.(s)
(Residence)
Full address of
IT Office where
returns are
filled
2.
I / we hereby agree to intimate to you about changes, if any in the above mentioned address
(es) and telephone Nos. (s) Within fifteen days of its occurrence till my/our deposit, for said work paid
by me/us, is not refunded to me/us.
Signature of Contractor
With stamp
Annexure 2
Name of Work: Planning, designing, constructing R.C.C. E.S.R. of 60,000 liters capacity and 12 mt
Height. at NAVA SIHORA
DECLARATION
1.
I have visited the site and fully acquainted myself with the local situation regarding materials, labour and other
factors pertaining the work before submitting this tender.
2.
I have carefully studied the conditions of the contract, specifications and other documents of this work and I agree
I, solemnly pledge that I shall be sincere in my duties discharging reasonable contractors and complete the work
within the work within the prescribed time limit. I shall submit detailed construction program with target dates for
various items and stages of work keeping in view the time limit and shall accordingly arrange for laborers, materials
and equipments etc. punctually. In case there are deviation from the construction program , I shall abide by the decision
of the Administrator/Executive Engineer for revision of the program and shall be arrange for labors, materials,
equipments etc. accordingly.
Signature of the Contractor
Engineer
GENERAL
The tender is being invited for execution of RCC ESR for 60,000 Lit. Capacity at village
NAVA SIHORA Ta.DESAR as per own design by contractor. The capacity of the
container is 0.6 lacs lit. All RCC structure shall execute shall execute in M 300 Mix
Unless specified. If any discrepancies found in drawing. The final decision of committee
will be adhered to contractor.
1.2).1 Capacity of ESR 60,000 liters & 12 Mtr heights.
1.2).2 Full supply level : As per actual design
1.2).3 Minimum Free board : 30 cm. above overflow level.
1.2).4 Space available: As required. Circular in shape.
1.2).5 Diameter of Inlet pipe: 100 mm dia C.I. double flanged pipes. Required for ESR
1.2).6 Diameter of Outlet & washout pipe : 100 mm & 80 mm dia C.I. pipe.
1.2).7 Diameter of Overflow pipe 100 mm dia C.I.pipe.
1.2).8 Stair case: RCC circular spiral staircase .
1.2).9 Cowl ventilator: 100 mm dia C. I. with Jali - minimum 3 nos. for E.S.R.
1.2).10
C.I. M.H. frame & cover: 0.90 x 0.60 mts. on top of container for ESR and valve
chamber.
1.2).11
1.2).12
1.2).13
1.2).14
All the inlet & out let cum washout, overflow pipe should be provided as per
drawing & Plus 5 Mtr. Out side face of the shaft or column & incl. inlet & outlet
connection done by agency.
N.B. :--- The bidder shall visit the site before quote the tender.
1.2).1
GENERAL DETAILS :
1.
2.
3.
The R.C.C. component i.e. beams, bottom slabs, columns, walls etc. shall be
designed in accordance with I.S. 456 and I.S. 857 latest edition.
4.
5.
R.C.C. wall
7.
Bottom dome
150 mm
8.
Vertical wall
150 mm
9.
10.
11.
Lighting Arrestor with copper strip of size 20mmx3mm Required length with
copper plate 600mmx600mmx6mm.
12.
The ESR shall be painted with cement paint or snowcem in three coats of
suitable shade & painting letters for capacity of E.S.R. as approved by
Engineer-in-charge./VWSC.
13.
14.
16.
All the reinforcement steel shall be of TMT bars shown or specified on the
drawings.
17.
Inlet & outlet connection of E.S.R. shall be completely done by agency and
commissioned the same ESR satisfactory as recommended by engineer in
charge.
GENERAL NOTE :
17.1.0
The contractor shall quote the rates in Schedule-'B' for the complete work of
constructing R.C.C. E.S.R. as per per approved drawing based on above data. For
location given by Engineer-in charge.
* i.e. He shall quote the rate in Schedule - 'B' for designing & construction of
E.S.R. of capacity 1.8 lacs liters.
17.1.0.2
The contractor shall mention the quantity of cement & steel required for their own
design of R.C.C. E.S.R. with cement consumption statement
17.2.0
The contractor shall have to comply the remarks raised by the V W S C within five
days from date of intimation of remarks.
17.3.0
Actual work order for construction be given only on approval of Nominal of the
tendered whose tender is accepted.
17.4.0
17.5.0
17.6.0
The capacity & height of tanki, Made under which grant, made year shall be painted
on Ring Beam / Container wall with enameled paint size of letter shall be 450 mm
height x 50 mm wide including necessary materials and labour work etc.complete..
17.7.0
All necessary jointing materials such as nuts, bolts, rubber packing and any other
miscellaneous materials required shall be provided by the contractor.
17.8.0
All the register incl. Cement consumption, Cubs test, steel test. Mix Design shall be
maintained for work on site.
17.9.0
17.10.0
All inlet, Outlet, washout, pipe shall be executed as per approved drawing & water
tightness test shall be given for pipes.
COMMON CONDITION:
1.
Water required for the execution of work and for the water tightness test of the
E.S.R. shall be supplied by the contractor at his own cost in manner satisfactory to
the Engineer-in-charge of work,
2.
All materials to be used shall confirm to the relevant specification as per the latest
version of Indian standards unless otherwise stated in the detailed specifications of
items of work.
3.
4.
The work under this contract includes the supply of material at site of work or store
as specified including railway freight, loading carting, unloading stacking as
directed, insurance local tax etc.
5.
The hydraulic test of water retaining structure shall have to be given by the
contractor without any extra cost. The filling of the reservoir shall be carried out
gradually at the rate not exceeding 30cm. rise in water level per hour and shall
preferably extend over a period 24 hours. Records of leakages starting at different
level of water in the reservoir if any shall be kept. The reservoir once filled shall be
allowed to remain filled for seven days before any readings of drop in water level
are recorded. The level of the water shall be recorded again at subsequent intervals
of 24 hours over a period of seven days. The total drop in surface level over a
period of seven days shall be taken as an indication of the water tightness of the
reservoir, which for all practical purpose shall not exceed 40 mm. The water
required for filling of E.S.R. shall be brought by contractor without any extra cost.
If the structure does not satisfy the condition test and the daily drop in water
level is decreasing the period of test may be extended for a period of seven days
and if the specified limit is then reached the structure may be considered as
satisfactory.
Signature of contractor
General Condition
1.
Preliminary and working test as per IS requirement shall be taken in work of footing, column on shaft base slab
container wall and top slab.
1.
All Material (If Supplied by Tendered) shall be as per WASMO vender list, If tendered / pani Samitis want
other listed material than Prior permission required from WASMO Concern Engineer.
2.
Photographs for centering and steel work for footing shaft wall, base slab, container and top slab and
should be handed over to DWSC, NAVA SIHORA / Pani Samitis in two copies.
3.
All centering shall be of steel plate. Special centering required for base slab, container etc. shall be brought
by the tenderer
4.
The tenderer should be keeping physically presence of his structural engineer before casting raft, shaft,
base slab container wall and top slab.
5.
The cost preliminary and working test shall be borne by the tenderer.
6.
7.
Preliminary test of cement, special grit and kapachi, sand, mild steel, tor steels to be tested from
laboratory by the concerned Pani Samiti (if necessary).
8.
The Security Deposit is should be given in advance of 2.5% of total amount of tender cost before starting of
work and 2.5% deduction in every successive bills but not more than 5% of total amount of tender cost.
9.
Contractor should start the work within 15 days of date of work order issued by Pani Samiti. If any problem
arise and contractor fails to start the work within giving time limit then the Pani Samiti issued a first and
final notice to contractor and give extension of time of one week. If Contractor fails to start the work of
given extension of time limit then the Pani Samiti reserve a rights to issued a fresh work order to second
one.
10. Time allowed for the completion of work from date of written order by Pani Samiti to commence is
8months. If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of 0.1% of the contract value per day from the date of delaying the said work up to
the date of completion and handling over to the Pani Samiti. The aggregate maxi. of liquidated damages
payable shall not exceed 0.25% of contract value per day and shall be subject to the maxi. Amount of Ten
Percentage of the estimated amount put to tender. Cutting amount in terms of Penalty is not refundable.
11. No claim for any payment or compensation for change or restriction of work if any time after execution of
the work.
12. All the Payment should released as per schedule of payment which is enclosed herewith.
I fully agree to obey the above mentioned General Condition
DATA :
1)
2)
3)
4)
5)
For RCC ESR : 0.6 lac liters capacity and 12.00 mt. height.
S.B.C. : 20 T/m2 in 3.0 mtr. depth.
Container shape : economical
Basic wind speed : as per relevant IS
seismic Zone : III
Specifications:
List of Indian standards to be followed where ever applicable.
The latest version of I.S. shall be followed:
(1)
(2)
(3)
(4)
Code of practice for design loads(other than earth quake) for building & structures wind
loads: IS 875 part iii: (draft).
(5)
SP16.
(6)
(7)
Code of practice for concrete structure for the storage of liquids. IS 3370 (part i & ii)
1967 & (part iii & iv) 1967.
(8)
(9)
Code of practice for design & construction of ring foundation IS. 11089 1984.
(10)
Code of practice for design & construction of shallow foundation in soil: IS 1080-1985.
(11) Code of practice for design & construction of pile foundation IS. 2911-1988 all latest
parts.
(12)
specification for Thermo Mechanically Treated (TMT) bars & a Binding Wire for
concrete reinforcement Is. 1786-1985.
(13)
Specification for hot rolled mild steel medium steels & high strength deformed bars for
concrete reinforcement IS 1139-1966.
(1)
(2)
To prepare & provide detailed design calculations in formatted out put (report) in Five
sets & softcopy on C.D. with detailed Auto cad drawings useful to field officers for
execution.
(3)
Sparing time to clarify or interpret design & drawing details/ concept if referred by
WASMO engineers as early as possible to avoid delay in construction of structure.
(4)
(5)
The time limit for the completion and submission and approve of ESR design shall be
within 45 days from the date of work order. Details of breakup is given in the detailed
specification and conditions in generally.
(6)
Signature of Contractor
1) WATER :
Water from any source Shall be sweet and potable. Storage accommodation for water
shall be sufficient in size as directed by the engineer. The necessary charge is required to
be paid shall have to be paid by the contractor.
2) METAL :
Metal for concrete shall not be larger than 25 mm. and smaller the 6 mm. and shall be free
from all dust or earthen materials. The metal for the construction shall be as per Relevant
IS specification.
3) SAND :
Sand shall be course clean and hard and properly grained and obtain from approved
source. The sand for the construction shall be as per Relevant IS specification.
4) PORTLAND CEMENT :
Cement shall be of Ordinary Portland Cement & comply with Indian standard specification
and shall be Indian Makeor brand to be approved by the Engineer in charge.
Signature of contractor
Detailed specification given here shall be treated as extension or partial modifications to the
specification of respective items. Given in the Volume of specification published by Gujarat
Water Supply and sewerage Board.
Excavation for Foundation:-When the rates are to be quoted for a work based on 'contractors own design' the work
excavation for foundation shall mean excavation for foundation in all types strata such as
soils, murumm soft as well as hard rocks upto the designed depth at which foundation is to
rest. No extra payment will be given for any change in strata at the same place. The rates
shall also include dewatering and shoring strutting if any where found necessary.
Excavation shall be carried out as per approved drawing. The excavation made
deeper or wider than that required as per drawing shall not paid but such deeper
excavation if carried out shall have to be filled up using C.C. 1:4:8 by the contractor
without extra cost. If the type of strata require wider excavation at top (G.L.) then
contractor shall excavate the trench accordingly but no extra payment for such wider
excavation shall be made.
The rates shall include providing cured warnings lights during night time
providing barricading consisting of menial ropes and bamboo for which no extra
payment will be made.
The contractor shall make his own arrangement to obtain prior permission
directly from relevant authorities for stacking of excavated stuff near work side. If fails
to obtain such permission then he will have to make his own arrangement without
claiming extra cost to transport and stack the excavated stuff at a suitable place
approved by the Engineer in charge of work.
The excavated stuff shall be stacked at least 10.0 m. away from the edge of
excavated trench. If enough space is not available at work site then the excavated
stuff shall be stacked at suitable place situated away from the work site. Similarly the
surplus stuff shall have to be disposed off at a suitable place for which contractor
shall have to obtain permission directly from relevant authorities. No extra payment
for transportation of excavated stuff or surplus stuff shall be made.
No excavated stuff shall be disposed off or used for any purpose other than
refilling without prior permission of Engineer in charge of work.
Details shown in the data sheet regarding water table approximate. The
contractor shall make his own arrangement for taking trial pits at his own cost more
quoting his rates for as certain type of strata water table. Quantity of seepage water
etc.
Work at night-time shall be carried out only with written permission of
Engineer-in-charge.
Bottom of the Excavated foundation trenches shall be sprinted with water (If
water table is not above foundation level) and well rammed to obtain a reasonably
firm and level bedding.
The rates shall include continuous dewatering of seepage water or rain water
from trenches to keep the trench dry particularly during casting of base concrete.
Concrete for footing and columns of shaft etc. till concrete fully settled etc.
Whenever collapsible types of strata are encountered proper shoring and
strutting shall be provided without any extra cost.
2.0
Concrete :-Concrete grade shall be as designed on drawings. In concrete grade M30. The number
represents the specified characteristic compressive strength of 150 mm/ cube at 28
days, expressed in M/sq.mm as per IS:456 concrete in the works shall be DESIGN
MIX CONCRETE or NOMINAL MIX CONCRETE All concrete works of grade
M5,M7.5 and M10 shall be NOMINAL MIX CONCRETE whereas all other grades, M15
and above shall be DESIGN MIX CONCRETE.
Concrete
concrete.
M15
260
M20
315
M25
360
M30
400
It shall be the Contractors sole responsibility to carry out the mix designs at his
own cost shall furnish to the V.W.S.C. at least 30 days before concreting operations. A
statement proportions proposed to be used for the various concrete mixes and the
strength results obtained. The strength requirements of the concrete mixes ascetained
on 150 mm cubes as per IS:516 shall comply with the requirements of IS:456
Grade of Concrete
Minimum
strength
Compressive Specified
N/Sq.mm
at
days
characteristic
7 Compressive
strength
N/Sq.mm/ at 28 days.
M 15
10.0
15.0
M 20
13.5
20.0
M 25
17.0
25.0
M 30
20.0
30.0
M 35
23.5
35.0
M 40
27.0
40.0
Slump in Millimeters
Maximum
Minimum
75
25
100
25
75
25
100
25
Building Columns
50
25
Pavements
50
25
50
25
means of weigh batches capable of controlling the weights within one percent of the desired
value.
Amount of water added shall be such as to produce dense concrete of required consistency,
specified strength and satisfactory workability and shall be so adjusted to account for moisture
content in the aggregates. Water cement ratio specified for use by the V.W.S.C. shall be
maintained. Each time the work stops, the mixer shall be cleaned out and while recommencing
the first batch shall have 10% additional cement to allow for sticking in the drum.
Arrangement should be made by the contractor to have the cubes tested in an approved
laboratory or in field with prior consent of the V.W.S C. Sampling and testing of strength and
workability of concrete shall be as per IS: 1199, IS:516 and IS:456, IS 3370.
Nominal Mix Concrete
(a) Mix Design and testing :-Mix design and preliminary tests are not necessary for Nominal Mix concrete. However
works tests shall be carried out as per IS:456. Proportions for Nominal Mix concrete
and water cement ratio may be adopted as per Table 3 of IS:456. However it will be the
Contractors sole responsibility to adopt appropriate nominal mix proportions to yield the
specified strength.
(b) Batching & Mixing of Concrete
Based on the adopted nominal mixes, aggregates shall be measured by volume.
However cement shall be by weight only.
Form Work :-Form work shall be all inclusive and shall consist of but not be limited to shores,
bracings, sides of footings, walls, beams and columns bottom of slabs etc. including ties,
anchors, hangers inserts, false work, wedges etc.
The design and engineering of the formwork as well as its construction shall be the
responsibility of the contractor. However if so desired by the V.W.S.C, the drawings and
calculations for the design of the formwork shall be submitted to the V.W.S.C. for approval.
Formwork shall be designed to fulfill the following requirements:a) Sufficiently rigid and tight to prevent loss of grout or mortar from the concrete at all
stages and appropriate to the method of placing and compacting.
b) Made of suitable materials.
c) Capable of providing concrete of the correct shape and surface finish within the
specified tolerance limits.
For liquid retaining structure sleeves shall not be provided for through bolts nor
shall through bolts be removed if provided. The bolts in the latter case, Shall be cut at
25 mm depth from the surface and the hole made good by cement mortar of the same
proportion as the concrete just after striking the formwork.
Where specified all corners and angles exposed in the finished structure shall
have chamfers or fillets of 20 mm x 20 mm size.
Form for substructure may be omitted when in the opinion of the
GWSSB/V.W.S.C., the open excavation is firm enough (in hard non porous soils) to act
as form Such excavations shall be larger as approved by the V.W.S.C. than that
required as per drawing to compensate for irregularities in excavation.
The contractor shall provide adequate props carried down to a firm bearing
without over loading any of the structure.
The shuttering for beams and slabs shall be so erected that the side shuttering
of beams can be removed without disturbing the bottom shuttering. If the shuttering for
a column is created for the full height of the column, one side shall be built up in
sections as placing of concrete proceeds or windows left for placing concrete from the
side to limit the drop of concrete to 1.0 m. or as approved by the V.W.S.C. The
contractor shall temporarily and security fix items to be cast (embodiments / inserts) in a
manner that will not hinder the striking of forms or permit loss of grout.
Form work showing excessive distortion during any stage of construction shall be
repositioned and strengthened. Placed concrete affected by faulty formwork, shall be
entirely removed and formwork corrected prior to placement of new concrete at
contractors cost.
The striking time for formwork shall be determined based on the following
requirements.
a) Development of adequate concrete strength
b) Permissible deflection at time of striking form work.
c) Curing procedure employed its efficiency and effectiveness
d) Subsequent surface treatment to be done.
e) Prevention of thermal cracking at re-entrant angles.
f) Ambient temperatures ; and
g) aggressiveness of the environment (unless immediate adequate steps are taken to
prevent damage to the concrete)
MATERIALS :---Coarse aggregate shall consist of tough angular black trap kapachi. The kapachi
shall be obtain from approved source only. Normally atleast two stock piles of different
size of 12 to 20 m and 25 to 10 mm shall be maintained. It will however be preferably
to maintain third stock oil of 6mm to 12 mm also for better control on mix of concrete.
The mixing size of coarse aggregate to be used shall be as large possible
within the limits of requirements based on size of number and specing of requirement.
But aggregate exceeding 40 mm shall not be used in concrete for E.S.R..
Depending upon the size of member, specing of reinforcement and degree of
work ability desired the course aggregate from different stock piles may be mixed in a
suitable proportion to get a uniform mix that does not aggregate.
The coarse aggregate shall not contain dirt, dust, clay or other such harmful
materials. If directed by the Engineer the same shall be washed with water and directed
before being used.
g).11.0FINE AGGREGATES :-Fine aggregates shall consists of coarse angular river sand free from dirt and other
harmful organic materials. If directed the same shall be screened and washed before
being used. Sand brought from approved source shall only be used.
g).12.0CEMENT :-SRC Cement to be used in RCC work shall be supplied by the contractor as per latest
I.S. & with ISI mark. contractor shall provide a temporary store with double lock
arrangement for the contractor proper ladders and plants forms for easy access shall
be provided by the contractor without extra cost.
MIXING TRANSPORTING & LAYING :---
For important works like ESR and SUMPs mixing of concrete shall be invariably
done in approved weigh batch mixing plant only. The mix obtained from the mixer shall
be a uniform mass consisting of all aggregates coated with cement pasts.
Fresh concrete shall be transported horizontally in ghamallas or wheel barrows.
Vertical transportation shall be done by using mechanical vertical lifts. When chutes are
used for transportation care should be exercised to avoids segregation and concrete
may be remixed at bottom of chutes to get uniform mix. Before any concrete is placed
in position all loose materials such as dirt, dust, chips, of stones wood, steel etc. should
be removed. Inner side of forms should be coated with a thin layer of oil to get a good
finished surface. Concrete should not be dumped from above in which case aggregate
will segregates but placed gently from a height not exceeding 1.5 m. compaction of
concrete shall be done by vibrators cream appears at top. Over vibration shall be
avoided to avoid segregation.
5.0
CURING :-After concrete is set in position it shall be kept continuously wet with water for at least 7
days either by using gunny bags (Column & walls) by pending (slab) or as directed by
spraying of water.
6.0 Unless otherwise specified the rate shall include finishing the exposed surface to get
good finished surface.
7.0 The forms shall be k ept position for the period given below :-1. Vertical sides of walls beams columns
2 days
7 days
7 days
7 days
14 days
21 days
Finishing
The formwork for concrete works shall be such as to give the finish as specified. The
contractor shall make good any unavoidable defects as approved consistent with the type
of concrete and finish specified. defect due to bad workmanship. (e.g. damaged or
misaligned forms, defective or properly compacted concrete) will not be accepted. The
Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions
plumbs planes and finishes.
The main requirement is that of dense well compacted concrete. No treatment is required
except repair of defective areas filling all form tie holes and cleaning up to loose or
adhering debris for surfaces below grade which will receive3 water proofing treatment the
concrete shall be free of surface irregularities which would interfere with proper and
effective application of water proofing material specified for use.
Surface Finish Type F2 :-- The appearance shall be that of a smooth dense well
compacted concrete showing the slight marks of well fitted shuttering joints. The
contractor shall make good any blemishes.
face F Swinish Type F3 :-- The finish give an apiece of smooth dense well compacted
concrete with no shutter marks, stain free and with no discolouration blemishes arises air
holes etc. Only lined or coated plywood with very tight joints shall be used to achieve this
finish. The panel size shall be uniform and as large as practicable. Any minor blemishes
that might occur shall be made good by the contractor.
Integral Cement Finish on concrete floor :-- In all cases integral cement finish on
a concrete floor has been specified the top layer of concrete shall be screeded of to
proper level and tamped with temper having conical projections so that the aggregate
shall be forced below the surface. The surface shall be finished with wooden float and a
trowel with pressure. The finish shall be continued till the concrete reaches its initial set.
No cement or cement mortar finish shall be provided on the surface. Where specified, a
floor hardener as approved by V.W.S.C. shall be supplied and used a recommended by
manufacturer.
8.0
Reinforcement
All reinforcement steel shall be of TMT and welded wire fabric to IS:1566 as shown or
specified on the drawing.
All reinforcement shall be clean, free form pitting, oil, grease, paint, loose mill scales,
rust, dirt, dust, or any other subsequent that will destroy or reduce bond.
Accelerating retarding water-reducing and air entraining admixtures shall
conform to IS:9103 and integral water proofing admixtures to IS:2645.
R.C.C. STRIRCASE FROM G.L. TO TOP OF CONTAINER :-R.C.C. Staircase shall be provided in M-25 for easy access necessary to the top of
E.S.R.. The width of staircase shall not less than 90 cms. The rise shall be suitable.
The balluster and hand railing shall be made from 65 x 65 x 6 mm angles and 25 mm
dia G.I. pipes by welding as directed by Engineer in charge. The staircase shall be
designed inside the shaft or otherwise the whole staircase shall be covered with
staircase cabin with MS door arrangement such a way that the system when locked can
prevent any unauthorised entry from the staircase. This shall be done as per instruction
of Engineer In charge. & coloured with three coats of paints.
10.0
PROVIDING AND FIXING M.S LADDER INSIDE CONTAINER :--Contractor shall have to fabricate and fix M.S ladder. The ladder to be fixed shall be
fabricated from 40 x 40 x 5 mm. M.S Angle 25 mm. dia bar Fixed at 30 cm. C/C. with
rubber shoes at top and botom. The ladder shall be 50 cm. wide., If the length of the
ladder is more than 4 mt. Then stages of 50 x 5 mm. m,s flat fixed at 3 mt C/C. shall be
provided and fixed in container The design of ladder shall be got approved by Engineer
in charge before it is fabricated and fixed in position.
11.0
PAINTING LETTER :-Following words shall be painted on the container. The words for the painting shall be
as decided by Engineer. The letters shall be 450 mm. & 50 mm wide high and the black
ground of suitable colour shall be provide. Approved enameled radium paint shall only
by used for painting letters and back ground. Entire work shall be used for painting
letters & back ground. Entire work shall be carried out as per instruction of Engineer in
charge. Rates includes providing paint and labour for painting letters and also providing
scaffolding etc. for painting.
12.0 WATER PROOF CEMENT PLASTER :-The cement mortar shall consist of two parts of fine river sand free from any dust and
other organic matter and one part of approved quality of cement. The mortar shall be
properly mixed on water tight platform. The mortar shall be used within half an hour
after mixing. The water proofing materials weighting 1.5 kg. of powder in one bag of
cement shall be added. The plaster shall be applied in uniform thickness of 20 mm. and
shall be properly smoothened with wooden & finished with cement finishing of required.
The curing shall be done atleast for week by sprinkling the water over the wall. The
wall shall be tested for water proofness. The rate includes the cost of water proofing
materials. The test for water proofness shall be carried out by the contractor at his own
cost by filling the contractor with water and it shall be checked out that there is no per
collection of water from the wall.
Scaffolding wooden ballies, bamboos, planks, treaties and other scaffolding shall be
sound, these shall be properly examined before erection and use.
Application of plaster
The plaster about 45cm shall be first applied horizontally and vertically at not more than
2 meters intervals over the entire surface to serve as guage. The surface of these
gauges shall be truly in plane of the finished plastered surface slightly more than the
specified thickness, then brought to a true surface by working a wooden float according
as a smooth or a sandy granular texture is required. Excessive thrilling or over working
the float shall be avoided. At corners, arises, angles and junctions shall be truly vertical
or horizontal as the case may be and shall be carefully finished. Rounding or
chamfering corners, arises junctions etc. shall be carried out with proper templates to
the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or
plaster which is particularly set shall be rejected and removed from site.
In suspending the work at the end of the day the plaster shall be left out clean to the
line both horizontally and vertically, when recommending, the plaster the edges of the
old work shall be scrapped clean and wetted with cement putty before plaster is applied
to the adjustment areas to unable the two to properly join together. Plastering worked
shall be closed on the body of features such as plaster bends and cornices nor at the
corners or arines. Horizontal joints in plaster work shall not also occur on parapet tops
and copping as these invariable lead to leakage. No portion of the surface shall be left
out initially to be packed up later on.
Each coat shall be kept damp continuously till the next coat is applied or for a minimum
period of 7days. Moistening shall commence as soon as plaster is hardened
sufficiently. Soaking of walls shall be avoided and only as much water as can be readily
absorbed shall be used. Excessive evaporation of the sunny or windward side of
building in not air or dry weather shall be prevented by hanging matinees or gunny bags
on the outside of the plaster
13.0
APPLYING SNOWCEM PAINT :-The work shall be carried out as per instruction of the Engineer in charge. The
snowcem paint shall be water proof
etc. The entire arrangement shall be first got approved by the engineer in charge of
work. Letter and making shall be painted with apptroved enamel paint..
Lighting Arrestor :
The Contractor shall be of standard materials and size provided on top and shall be
fixed in top slab in the center in vertical position. The rod shall be connected with
copper strip of size 50mm x 3 meter. Required length with copper plate 600mm x 600
mm x 6mm and buied under ground with required qty. Of slab and scale as directed
1mt.below ground and 1mt x 1mt distance shall be provided and fixed as directed
without any extra cost.
Signature of contractor