Work Instruction
WO7.5.1.03-221 Rev 00
1.0
2.0
3.0
4.0
5.0
Purpose
:
Scope
:
Responsibility:
Authority
:
Location
:
6.0
Work Instruction:
1. Start DC Lub Oil Pump for each unit
2. Close Main Steam MOV at 8 meter manually for both unit
3. Isolate all valve to process steam manually either from Extraction and Main Steam header
4. Close Extraction No. 3 manual valve to Deaerator
5. Open Main Steam Drain
6. Contact to all concern Department that Station in Black out
7. Prepare also DG Caterpilar 3516B at DG House
6.1
Pravin F
with coordination Mahesh M
Prepared by
Approved by
Page 1 of 4
WO7.5.1.03-221 Rev 00
3. Select the point either 9 or 10 depending on the breaker need to be closed (PLN breaker I
or II) in the synchro switch device. The point list is available in the panel itself.
4. Then press OK button.
5. Then press the Red push button available in the synchronizing panel for closing the
breaker.
8. Based on the condition and requirement, the second breaker can be closed immediately or
later. Please follow the steps below for closing the breaker:
1. Switch ON the two pole MCB in the synchronization panel.
2. Ensure the selector switches are in the following position:
1. Local/Remote selector switch in Local mode.
2. Auto/Manual selector switch in Manual mode.
3. Novoltage/Synchro switch in Synchro mode.
3. Select the point either 9 or 10 depending on the breaker need to be closed (PLN breaker I
or II) in the synchro switch device. The point list is available in the panel itself.
4. Then press OK button.
5. Then press the Red push button available in the synchronizing panel for closing the
breaker.
9. Close the 20 KV breakers at POLY end of the POLY CPP tie feeders (Both or any one
based on condition and requirement.)
10. Then close the second breaker at POLY end.
11. Before closing the 20 KV breakers at CPP end of the POLY CPP tie feeders open the
following breakers to avoid high inrush current and overloading of transformers:
1. 20 KV and 6.3 KV breakers of HT Aux. Transformers 1 and 2.
2. 20 KV and 6.3 KV breakers of Tie Transformers 1 and 2.
12. Close the 20 KV breaker at CPP end of one of the CPP POLY tie feeders from the
synchronizing panel: Please follow the steps below for closing the breaker:
1. Switch ON the two pole MCB in the synchronization panel.
2. Ensure the selector switches are in the following position:
1. Local/Remote selector switch in Local mode.
2. Auto/Manual selector switch in Manual mode.
3. Novoltage/Synchro switch in No voltage mode. (However ensure that the 20 KV
CPP bus is dead)
Pravin F
with coordination Mahesh M
Prepared by
Approved by
Page 2 of 4
Select the point either 6 or 7 depending on the breaker need to be closed (No 1 or No 2
feeder) in the synchro switch device. The point list is available in the panel itself.