Activity ID
Activity Name
Architecture Works
Procurement/Manufacturing/Fabrication
A1000
A1010
A1020
A1030
A1040
A1050
A1060
A1070
A1080
A1090
A1100
A1110
A1120
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Procurement
Installation
Concourse Level
Non Public Area
A1130
[PL3-CON-NP] Floor Finishes
A1140
[PL3-CON-NP] Wall Finishes
A1150
[PL3-CON-NP] Ceiling Finishes
Public Area
A1160
[PL3-CON-PA] Floor Finishes
A1170
[PL3-CON-PA] Wall Finishes
A1180
[PL3-CON-PA] Ceiling Finishes
A1370
[PL3-LKR-PA] Signage Finishes
Linkway Ramp Area
Non Public Area
A1190
[PL3-LKR-NP] Floor Finishes
A1200
[PL3-LKR-NP] Wall Finishes
A1210
[PL3-LKR-NP] Ceiling Finishes
Public Area
A1220
[PL3-LKR-PA] Floor Finishes
A1230
[PL3-LKR-PA] Wall Finishes
A1240
[PL3-LKR-PA] Ceiling Finishes
A1360
[PL3-LKR-PA] Hand Rails, Signages Finishes
Underplatform Level
Non Public Area
A1250
[PL3-UPL-NP] Floor Finishes
A1260
[PL3-UPL-NP] Wall Finishes
A1270
[PL3-UPL-NP] Ceiling Finishes
Platform Level
Non Public Area
A1280
[PL3-PLT-NP] Floor Finishes
A1290
[PL3-PLT-NP] Wall Finishes
A1300
[PL3-PLT-NP] Ceiling Finishes
Public Area
A1310
[PL3-PLT-PA] Floor Finishes
A1320
[PL3-PLT-PA] Wall Finishes
A1330
[PL3-PLT-PA] Ceiling Finishes
A1340
[PL3-PLT-PA] 1.5m High Tempered Laminated glass barrier Finishes
A1350
[PL3-PLT-PA] RWDP and GUTTER Finishes
Exit Staircase
Public Area
A1400
[PL3-EST-PA] Floor Finishes
A1410
[PL3-EST-PA] Wall Finishes
A1420
[PL3-EST-PA] Ceiling Finishes
A1430
[PL3-EST-PA] Hand Rails, Signages Finishes
Covered Linkway at Ave4
Public Area
A1380
[PL3-CLW-PA] Floor Finishes
A1390
[PL3-CLW-PA] Ceiling/Roof Finishes
Actual Work
Remaining Work
Milestone
5d 01-Jun-16
05-Jun-16
147d
June 2016
July 2016
06
13
20
27
04
05-Jun-16, C8017 PL3 Architecture Programme upd
5d 01-Jun-16
05-Jun-16
147d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
5d
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
147d
0d
0d
0d
05-Jun-16, Procurement/Manufacturing/Fabrication
Procurement for Glass Doors&Pannels (Fire Rated
Procurement for Louvres & Ventilation Pannels (VS
Procurement for Cladding
Procurement for Ceiling System
Procurement for Tile (Homogenous Anti slip, Tactile
Procurement for Catladder, Grating, glass pannels
Procurement for Concrete masonary unit - Block wa
Procurement for 1.1m SS Hand Rail at STC2, Exit S
Procurement for Roof pannels Linkway, Exit Stairca
Procurement for 1.5m High Tempered Laminated gla
Procurement for Al.Framed Glass pannels(Windows
Procurement for SS CAT Ladders
Procurement for Gutter with RWDP
05-Jun-16, Installation
05-Jun-16, Concourse Level
05-Jun-16, Non Public Area
[PL3-CON-NP] Floor Finishes
[PL3-CON-NP] Wall Finishes
[PL3-CON-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-CON-PA] Floor Finishes
[PL3-CON-PA] Wall Finishes
[PL3-CON-PA] Ceiling Finishes
[PL3-LKR-PA] Signage Finishes
05-Jun-16, Linkway Ramp Area
05-Jun-16, Non Public Area
[PL3-LKR-NP] Floor Finishes
[PL3-LKR-NP] Wall Finishes
[PL3-LKR-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-LKR-PA] Floor Finishes
[PL3-LKR-PA] Wall Finishes
[PL3-LKR-PA] Ceiling Finishes
[PL3-LKR-PA] Hand Rails, Signages Finishes
05-Jun-16, Underplatform Level
05-Jun-16, Non Public Area
[PL3-UPL-NP] Floor Finishes
[PL3-UPL-NP] Wall Finishes
[PL3-UPL-NP] Ceiling Finishes
05-Jun-16, Platform Level
05-Jun-16, Non Public Area
[PL3-PLT-NP] Floor Finishes
[PL3-PLT-NP] Wall Finishes
[PL3-PLT-NP] Ceiling Finishes
05-Jun-16, Public Area
[PL3-PLT-PA] Floor Finishes
[PL3-PLT-PA] Wall Finishes
[PL3-PLT-PA] Ceiling Finishes
[PL3-PLT-PA] 1.5m High Tempered Laminated glas
[PL3-PLT-PA] RWDP and GUTTER Finishes
05-Jun-16, Exit Staircase
05-Jun-16, Public Area
[PL3-EST-PA] Floor Finishes
[PL3-EST-PA] Wall Finishes
[PL3-EST-PA] Ceiling Finishes
[PL3-EST-PA] Hand Rails, Signages Finishes
05-Jun-16, Covered Linkway at Ave4
05-Jun-16, Public Area
[PL3-CLW-PA] Floor Finishes
[PL3-CLW-PA] Ceiling/Roof Finishes
Original Start
Duration
Summary
28-Apr-16 11:52
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
Page 1 of 2
Finish
Total Float
02
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
09
May 2016
16
23
30
Activity Name
Original Start
Duration
Actual Work
Remaining Work
Milestone
Summary
5d
5d
5d
5d
01-Jun-16
01-Jun-16
01-Jun-16
01-Jun-16
Page 2 of 2
28-Apr-16 11:52
Finish
Total Float
02
05-Jun-16
05-Jun-16
05-Jun-16
05-Jun-16
0d
09
May 2016
16
23
30
June 2016
July 2016
06
13
20
27
04
05-Jun-16, New Roller Shutter (Remove Existing)
Demolishing Existing Roller shutter/ Shut off Autom
Proposed new location install new Roller Shutter
Temperary Swing Gate Finishes