Scope of Supply. (Electrical Requirements.)
Power feeder for booster Pumps.
Power feeder for neutralisationpumps and blowers
Power Cables.
Control Cables.
Instrument Cables.
Cable Glands
Cable Lugs
Upvc/ Fiber/ G.I cable trays
Structure steel for Cable tray and panel installation support
Chlorination building Indoor and outdoor Lighting Fixtures
Chlorination building Lightning protection material
Earthing material
Local push button station (with emergency stop)
Exhaust fans control panel
Realy based Neutralization control panel
Chlorine leak detector controller
Chlorine leak detector sensor
Chlorine leak detector sensor cable
Junction boxes
Siren (Outside the chemical building)
Instruments ( Level switch, Pressure switches and Pressure gauges, Load
cell)
Actutors and motorised dampers
Drawings & Documents Required.
Cable Schedules.
GA drawing , SLD, and Schematics drawing for local control panel
GA drawing , SLD, and Schematics drawing for automatic line changeover
panel
Wiring Drawing of Actuator and valves
Automatic line changeover panel Details of Operation
Local Control Panel Operating Philosophy.
Control Philosophy of the Entire Package.
29
30
31
32
33
34
35
36
37
38
39
21
22
E
22
23
24
324754186.xlsx
2 OF 14
07/25/2016
Sl.No.
40
DESCRIPTION
Acceptance & Guarantee of the entire Package as per Contract Documents
Signed & Stamped.
324754186.xlsx
3 OF 14
07/25/2016
Quantity
324754186.xlsx
Degremont
Vendor
4 OF 14
07/25/2016
Quantity
Degremont
Vendor
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2 Sets.
2 Sets.
2
2
2
2
2
Sets.
Sets.
Sets.
Sets.
Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
1 Set.
324754186.xlsx
X
X
X
X
X
X
X
X
X
X
X
X
X
X
5 OF 14
07/25/2016
Quantity
1 Set.
324754186.xlsx
Degremont
Vendor
6 OF 14
07/25/2016
Sl.No.
324754186.xlsx
DESCRIPTION
7 OF 14
07/25/2016
Sl.No.
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
E
22
23
26
27
30
31
32
33
34
35
36
37
38
39
DESCRIPTION
Scope of Supply. (Electrical Requirements.)
Power Cables.
Control Cables.
Instrument Cables.
Cable Glands
Cable Lugs
Upvc/ Fiber/ G.I cable trays
Structure steel for Cable tray and panel installation support
Scrubbing area falme proof lighting Fixtures
Scrubbing area Lightning protection material
Earthing material
Local push button station (with emergency stop)
Methane and H2 S sensor
Realy based Scrubber control panel
Junction boxes
Instruments ( pH, conductivity and ORP meters, Flow meter, level
switches,Pressure switches)
Actutors and motorised dampers
Drawings & Documents Required.
Cable Schedules.
GA drawing , SLD, and Schematics drawing for local control panel
Local Control Panel Operating Philosophy.
Control Philosophy of the Entire Package.
Manual and catalogue of all instruments
H2S Scrubber system P&IDs.(2 Sets)
Instrumentation List.
Motorized valve schedule
O&M along with Instruction Manuals to be provided.
Make List of All Equipments supplied.
AS-BUILT Drawings After Execution of Works & Commisioning.3 Sets
Schedule for Submission of Documents & Drawings.
Quality Assurance Plans for Entire Package.
Acceptance & Guarantee of the entire Package as per Contract Documents
Signed & Stamped.
324754186.xlsx
8 OF 14
07/25/2016
Quantity
324754186.xlsx
Degremont
Vendor
9 OF 14
07/25/2016
Quantity
Degremont
Vendor
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2 Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
1 Set.
1 Set.
324754186.xlsx
X
X
X
X
X
X
X
X
X
X
X
10 OF 14
07/25/2016
Sl.No.
324754186.xlsx
DESCRIPTION
11 OF 14
07/25/2016
Sl.No.
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
E
22
23
26
27
30
31
32
33
34
35
36
37
38
39
DESCRIPTION
Scope of Supply. (Electrical Requirements.)
Power Cables.
Control Cables.
Instrument Cables.
Cable Glands
Cable Lugs
Upvc/ Fiber/ G.I cable trays
Structure steel for Cable tray and panel installation support
Scrubbing area falme proof lighting Fixtures
Scrubbing area Lightning protection material
Earthing material
Local push button station (with emergency stop)
Methane and H2 S sensor
Realy based Scrubber control panel
Junction boxes
Instruments ( pH, conductivity and ORP meters, Flow meter, level
switches,Pressure switches)
Actutors and motorised dampers
Drawings & Documents Required.
Cable Schedules.
GA drawing , SLD, and Schematics drawing for local control panel
Local Control Panel Operating Philosophy.
Control Philosophy of the Entire Package.
Manual and catalogue of all instruments
H2S Scrubber system P&IDs.(2 Sets)
Instrumentation List.
Motorized valve schedule
O&M along with Instruction Manuals to be provided.
Make List of All Equipments supplied.
AS-BUILT Drawings After Execution of Works & Commisioning.3 Sets
Schedule for Submission of Documents & Drawings.
Quality Assurance Plans for Entire Package.
Acceptance & Guarantee of the entire Package as per Contract Documents
Signed & Stamped.
324754186.xlsx
12 OF 14
07/25/2016
Quantity
324754186.xlsx
Degremont
Vendor
13 OF 14
07/25/2016
Quantity
Degremont
Vendor
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2 Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
2 Sets.
2 Sets.
2 Sets.
AutoCAD/PDF
2 Sets.
1 Set.
1 Set.
324754186.xlsx
X
X
X
X
X
X
X
X
X
X
X
14 OF 14
07/25/2016