Documente Academic
Documente Profesional
Documente Cultură
PROYECTO
RESIDENCIA:
UBICACIN
COLONIA
LOCALIDAD
??
1de34
2de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
AP020082
M2
88.00
6.59
$579.92
AP200204
M2
88.00
8.05
$708.40
TOTAL PRELIMINARES
1,288.32
CANCHA DE CALENTAMIENTO
3
AP020272
M2
0.00
8.79
$0.00
AP200104
M3
0.00
231.22
$0.00
AP020545
0.00
177.89
$0.00
AP0101411
M3
0.00
1,371.33
$0.00
AE020005
M2
0.00
34.64
$0.00
AP020286
0.00
29.48
$0.00
AE020006
M2
0.00
5.54
$0.00
10
AE020007
0.00
24.40
$0.00
EQUIPAMIENTO CANCHA
11
AP180021
M2
0.00
35.91
$0.00
PZA
0.00
167,199.94
$0.00
AEQ00001
ESTRUCTURA MOVIL MODELO EMP250 DE USO RUDO, MARCA
POLYTAN, MECANISMO DE ALTURA AJUSTABLE, CONSTRUIDA
CON PTR ESTRUCTURAL DE 4 X 4, MECANISMO DE ELEVACION A
BASE DE RESORTES DE ACCIONAMIENTO MANUAL, NO
REQUIERE MANTENIMIENTO ESPECIAL, DIMENSIONES DE LA
BASE DE 1.80 X 1.20 M. DISTANCIA ENTRE EL FRENTE DE LA
ESTRUCTURA Y EL TABLERO DESDE 2.20 A 2.70 , PROTECTORES
EN EL FRENTE DEL CARRO Y A LOS COSTADOS, ALTURA
AJUSTABLE EN EL TABLERO DE 3.05 A 2.60 M.,RUEDAS DE
POLIURETANO QUE NO MALTRATAN NI MANCHAN EL PISO, 600
KG. DE CONTRAPESO, PEDESTALES DE FIJACION EN EL FRENTE
DEL CARRO Y ARTICULACIONES
CON
CHUMACERAS
LUBRICADAS Y SILENCIOSAS, CON TABLERO OFICIAL DE 1.80 X
1.05 M. DE CRISTAL TEMPLADO, ARO ABATIBLE PROFESIONAL
CON RED.
3de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
13
AE200282
14
AP220006
M2
0.00
15
AP010067
M2
16
AP230029
17
AP230034
18
AP230051
19
AP0101412
Importe
$
97.30
$0.00
69.36
$0.00
0.00
113.36
$0.00
KG
0.00
17.00
$0.00
KG
0.00
17.00
$0.00
KG
0.00
17.00
$0.00
M3
0.00
1,728.00
$0.00
0.00
471.13
$0.00
M2
0.00
71.87
$0.00
AP150351
21
AP150219
22
AE200283
M3
0.00
61.10
$0.00
23
AP200003
ACARREO EN CAMION DE
KILOMETRO, CARGA MECANICA
M3
0.00
21.72
$0.00
24
AP200004
KM/M3
0.00
3.00
$0.00
25
AP150052
PZA
0.00
324.02
$0.00
26
AP150254
KG
0.00
37.18
$0.00
PZA
0.00
62.88
$0.00
PZA
0.00
45.75
$0.00
MATERIAL
MIXTO.
PRIMER
S/C
SUMINISTRO Y COLOCACION DE CARTABON DE 0.15 X 0.15, 3/8".
INCLUYE: MATERIALES, ACARREOS HASTA EL LUGAR DE SU
UTILIZACION, CORTES, TRAZO, HABILITADO,MONTAJE, PLOMEO,
ELEVACION, DESPERDICIOS, SOLDADURA, APLICACIN DE
PRIMER
ANTICORROSIVO,
Y
DOS
DE
ESMALTE
ALQUIDALICO,MONTAJE CON GRUA, PLOMEO, ELEVACION,
MANO DE OBRA, EQUIPO DE SEGURIDAD.
28
S/C
SUBTOTAL CIMENTACION
ESTRUCTURA METLICA
4de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
29
Clave
AP150306
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
35.99
$0.00
AP020272
M2
0.00
8.79
$0.00
31
AP200104
M3
0.00
231.22
$0.00
32
AP020545
0.00
177.89
$0.00
33
AP0101411
M3
0.00
1,371.33
$0.00
34
AE020005
M2
0.00
34.64
$0.00
35
AP020286
0.00
29.48
$0.00
36
AE020006
0.00
5.54
$0.00
37
AE020007
0.00
24.40
$0.00
EQUIPAMIENTO CANCHA
38
AP180021
M2
0.00
35.91
$0.00
39
AEQ00002
M2
0.00
921.00
$0.00
5de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
40
AEQ00001
41
AP250031
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
PZA
0.00
Importe
$
167,199.94
$0.00
23,170.48
$0.00
CUBIERTA
42
AP150249
SUMINISTRO Y COLOCACION
DE CANALON DE LAMINA
GALVANIZADA CAL.20 CON UN DESARROLLO DE 80 CMS
INCLUYE : LIMPIEZA, CALAFATEADO, EMPALMES, REMACHES,
FIJACION, ABRAZADEZAS, REPOSICION DE SECCIONES, Y
SELLADO DE JUNTAS, ANDAMIOS, MATERIALES, MANO DE
OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA EL BUEN
FUNCIONAMIENTO.
0.00
263.14
$0.00
43
AE080003
M2
0.00
344.26
$0.00
44
AP150698
0.00
183.20
$0.00
INSTALACION ELECTRICA
45
PZA
0.00
475.63
$0.00
0.00
18.49
$0.00
0.00
29.73
$0.00
AP050168
0.00
28.98
$0.00
AP130038
0.00
13.47
$0.00
AP050269
AP050750
46
47
48
49
EDIFICIO DE ADMINISTRACIN
CIMENTACION
50
AP130002
M3
51.946
84.14
$4,370.74
51
AP220006
M2
82.39
69.36
$5,714.57
6de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
52
AP010067
53
AP230029
KG
0.0000
54
AP230036
KG
55
AP0101412
56
AP150219
57
Importe
$
113.36
$0.00
17.00
$0.00
0.0000
19.99
$0.000
M3
0.00
1,728.00
$0.00
M2
#REF!
71.87
#REF!
AE200283
M3
51.946
61.10
$3,173.90
58
AP200057
M3
67.54
8.13
$549.10
59
AP200003
ACARREO EN CAMION DE
KILOMETRO, CARGA MECANICA
PRIMER
M3
67.54
21.72
$1,466.97
60
AP200004
M3
607.9
3.00
$1,823.70
61
AP200163
M2
#REF!
141.92
MATERIAL
MIXTO.
#REF!
SUBTOTAL CIMENTACION
#REF!
ALBAILERIA
62
AP150418
271.27
139.43
$37,823.18
63
AP150834
#REF!
192.29
#REF!
64
AP150206
M2
206.83
181.96
$37,634.79
65
AP030662
Err:509
113.32
Err:509
SUBTOTAL ALBAILERIA
#REF!
CUBIERTA
66
AP150746
M2
88.0000
565.08
$49,727.04
67
AP150231-2
M3
49.0000
145.67
$7,137.83
68
AP150678
Err:509
36.92
7de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
69
PRESUPUESTO
RESIDENCIA:
??
Clave
AP010292
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
231.96
SUBTOTAL CUBIERTA
$11,366.04
68,230.91
INSTALACION ELECTRICA
70
AP050188
SAL
0.00
658.39
$0.00
71
AP050022
PZA
0.00
602.00
$0.00
72
AP050010
PZA
0.00
778.67
$0.00
73
AP050506-1
PZA
0.00
520.10
$0.00
74
AP050225
SAL
0.00
708.91
$0.00
CANCELERIA
75
AP150163-1
M2
0.00
1,458.23
$0.00
CARPINTERIA
76
AP170190
PZA
0.00
3,264.22
SUBTOTAL CARPINTERIA
$0.00
ACABADOS Y ALBAILERIA
77
APT0002
M2
0.0000
235.80
$0.00
78
AP150002
M2
0.0000
118.37
$0.00
79
AP230007
M2
0.0000
50.98
$0.00
8de34
#REF!
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
AP200268
M3
0.00
22.74
$0.00
81
AP220006
M2
0.00
69.36
$0.00
82
AP010067
M2
0.00
113.36
$0.00
83
AP230029
KG
0.00
17.00
$0.00
84
AP230036
KG
0.00
19.99
$0.00
85
AP0101412
M3
0.00
1,728.00
$0.00
86
S/C
PZA
0.00
99.68
$0.00
87
S/C
PZA
0.00
112.18
$0.00
88
AP150219
M2
0.00
71.87
$0.00
89
AP230087
M3
0.00
59.07
$0.00
90
AP200004
M3
0.00
21.72
$0.00
91
AP200004
M3
0.00
3.00
$0.00
92
AP200163
M2
0.00
141.92
$0.00
SUBTOTAL CIMENTACION
ALBAILERIA
93
AP150785
94
AP150418
95
AP150300
96
AP150834
97
AP150206
0.00
190.20
$0.00
0.00
137.75
$0.00
0.00
176.99
$0.00
0.00
192.29
$0.00
M2
0.00
181.96
$0.00
9de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
98
AP150746
99
AP150160
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
0.00
Importe
$
565.08
$0.00
95.54
$0.00
SUBTOTAL ALBAILERIA
SANITARIOS
100
AP150232-A
REPELLADO PARA BASE AZULEJO CON MORTERO CEMENTOARENA 1:4 A PLOMO Y REGLA , INCLUYE: PREPARACION DE LA
SUPERFICIE,
HUMEDICIDO,
EMBOQUILLADOS,
REMATES,
ARISTAS, CURADO, ENTABLADO O ANDAMIO, MATERIAL PUESTO
EN OBRA, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TNCE.
M2
0.00
101.49
$0.00
101
AP150263
M2
0.00
101.89
$0.00
102
AP150854
PZA
0.00
1,314.01
$0.00
103
AP150400
0.00
69.36
$0.00
104
EXT-AL-42
M2
0.00
211.61
$0.00
105
EXT-AL-43
M2
0.00
241.33
$0.00
106
AP230007
M2
0.00
50.98
$0.00
107
AE080002
M2
0.00
1,081.04
$0.00
108
AP170016
M2
0.00
665.82
$0.00
109
AP170080
M2
0.00
1,532.58
$0.00
SUBTOTAL SANITARIOS
10de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
AP050188
SAL
0.00
658.39
$0.00
111
AP050010
PZA
0.00
467.82
$0.00
112
AP050022
PZA
0.00
602.00
$0.00
INSTALACION SANITARIA
113
AP150225
PZA
0.00
652.63
$0.00
114
AP110003
SALIDA
PARA MUEBLESANITARIO CON TUBO HIDRAULICO,
COBRE METALICO DE 3/4" (0.50 M) Y SANITARIO DE PVC DE 2"
(6 M) CON CAMPANA ANGER Y LISO INCLUYE: COLOCACION,
MUEBLES B.P. Y VALVULA. DE CONTROL GENERAL
SAL
0.00
349.99
$0.00
115
AP110123
PZA
0.00
1,401.03
$0.00
116
AP110067
PZA
0.00
1,077.38
$0.00
117
AP110001
PZA
0.00
1,057.30
$0.00
118
AP110101
PZA
0.00
1,629.42
$0.00
119
AP030302
PZA
0.00
2,151.71
$0.00
120
AP110037
PZA
0.00
946.09
$0.00
121
AP1100S1
PZA
0.00
356.86
$0.00
122
AP110250
PZA
0.00
352.65
$0.00
123
AP110044
PZA
0.00
317.90
$0.00
124
AP030171
PZA
0.00
2,114.52
$0.00
125
AP110040
PZA
0.00
1,267.78
$0.00
126
AP070267
0.00
86.93
$0.00
127
AP070267-3
0.00
72.40
$0.00
128
AP070267-4
0.00
54.38
$0.00
11de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
129
AP030182
130
AE080002
M2
0.00
131
AE000013
PZA
132
AE000014
133
AE000015
Importe
$
790.23
$0.00
1,081.04
$0.00
0.00
1,368.68
$0.00
PZA
0.00
2,017.64
$0.00
PZA
0.00
1,449.64
$0.00
ACABADOS
134
AP150264
M2
0.00
103.58
$0.00
135
AP150506
M2
0.00
113.62
$0.00
136
AP150307
M2
0.00
61.63
$0.00
137
AP150737
M2
0.00
23.75
$0.00
138
AP170248
0.00
478.58
$0.00
SUBTOTAL
TOTAL GRADAS
CUARTO DE EQUIPOS
CISTERNA 10 M3
139
AP130002
M3
0.00
84.14
$0.00
140
AP200243
M2
0.00
22.31
$0.00
141
AP200003
ACARREO EN CAMION DE
KILOMETRO, CARGA MECANICA
M3
0.00
21.72
$0.00
142
AP200004
M3/KM
0.00
3.00
$0.00
143
AP220006
M2
0.00
69.36
$0.00
MATERIAL
MIXTO,
PRIMER
12de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
144
AP150785
145
AP150219
146
AP130008
147
AP0101412
148
AP150206
149
AP150834
150
AP150002
151
152
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
190.20
$0.00
M2
0.00
71.87
$0.00
M2
0.00
31.03
$0.00
M3
0.00
1,728.00
$0.00
M2
0.00
181.96
$0.00
0.00
192.29
$0.00
M2
0.00
118.37
$0.00
AP150746
M2
0.00
565.08
$0.00
AP030183
PZA
0.00
579.49
$0.00
SUBTOTAL CISTERNA
ALBAILERIA
153
AP150780
154
AP150418
155
AP150834
156
AP150206
M2
0.00
163.32
$0.00
0.00
137.75
$0.00
0.00
192.29
$0.00
M2
0.00
181.96
$0.00
SUBTOTAL
286.60 $
CUBIERTA
157
AP150397
13de34
M2
0.00
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
158
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
AP150306
Importe
$
35.99 $
AP150307
M2
0.00
61.63
$0.00
160
AP150737
M2
0.00
23.75
$0.00
161
AP170038-1
PZA
0.00
1,557.17
$0.00
162
AP150506
M2
0.00
113.62
$0.00
SUBTOTAL ACABADOS
INSTALACIN HIDRULICA
163
AP110080
0.00
175.07
$0.00
164
AP030632
PZA
0.00
73.70
$0.00
165
AP030852
PZA
0.00
4,666.61
$0.00
166
AP110095
PZA
0.00
7,200.30
$0.00
167
AE7000012
PZA
0.00
7,325.19
$0.00
168
AP030079
0.00
22.96
$0.00
169
AP110029
PZA
0.00
1,577.88
$0.00
170
AP250018
PZA
0.00
6,254.86
$0.00
AREAS EXTERIORES
ILUMINACIN EXTERIOR
171
AEG00002
14de34
PZA
0.00
17,717.56
$0.00
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
172
AP100008
173
AP100036
PIPA
0.00
174
AP010108
PZA
0.00
175
AP150637
176
AP030599
177
AP050168-1
178
Importe
$
24.15
$0.00
463.28
$0.00
2,332.58
$0.00
0.00
253.32
$0.00
PZA
0.00
429.40
$0.00
0.0000
18.49
$0.00
AP050168
0.00
29.73
$0.00
179
AP130038
0.00
28.98
$0.00
180
AP050269
0.00
13.47
$0.00
181
AP050010
PZA
0.00
778.67
$0.00
$
Subtotal
#REF!
Indirectos 10.93 %
#REF!
Subtotal
#REF!
Utilidad 8.10 %
#REF!
Subtotal
#REF!
I.V.A. 16%:
#REF!
TOTAL
#REF!
ELABOR:
REVIS:
REVIS:
Vo. Bo.:
15de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
PRESUPUESTO
RESIDENCIA:
??
Clave
Unidad de
Medida
Concepto de trabajo
Precios Costos
Directo $
Cantidad
Volumen
Importe
$
AP020082
M2
AP200204
M2
#REF!
6.59
8.05
#REF!
TOTAL PRELIMINARES
#REF!
RESIDENCIA
CIMENTACION
1
AP130002
M3
51.95
84.14
$4,371.07
SUBTOTAL CIMENTACION
#REF!
ALBAILERIA
13
14
15
16
AP150418
AP150834
AP150206
AP030662
271.27
139.43
$37,823.18
#REF!
192.29
#REF!
M2
206.83
181.96
$37,634.79
Err:509
113.32
Err:509
SUBTOTAL ALBAILERIA
16de34
#REF!
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
17de34
Precios Costos
Directo $
Importe
$
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
18de34
Precios Costos
Directo $
Importe
$
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
19de34
Precios Costos
Directo $
Importe
$
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
20de34
Precios Costos
Directo $
Importe
$
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
PRESUPUESTO
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
21de34
Precios Costos
Directo $
Importe
$
No
mbr
e
del
Ubi
Pro
caci
Loc
yect
n:
alid
o:
ad:
NUMEROS G
RESIDENCIA:
??
No.
CLAVE
LOCALIZACIN
EJE
CONCEPTO
DE
PRELIMINARES
1
1005 01
1/6
A/E
1/6
2
AP200204
RESIDENCIA
CIMENTACION
49
S/C
22de34
VERTICALES
A
B
C
C'
D
E
1
3
1
3
2
1
NUMEROS GENERADORES
ANCHO
ALTO
PZAS
M2
11.00
8.00
M2
11.00
8.00
11.00
3.00
1.00
0.95
1.00
1.00
0.95
1.00
3
5
5.20
1.00
0.95
1.00
2.80
1.00
0.95
1.00
2.50
1.00
0.95
1.00
11.00
1.00
0.95
1.00
UNIDAD
6
4
M3
CANTIDAD
23de34
KG/M
PARCIAL
TOTAL
88.00
88.00
88.00
88.00
10.4500
2.8500
51.946
4.9400
2.6600
2.3750
10.4500
24de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP020082
M2
88.00
AP200204
DESPALME
Y DESENRAIZADO DE TERRENO A MAQUINA CON ACARREO DE MATERIAL
SOBRANTE, INCLUYE MAQUINARIA, MANO DE OBRA, EQUIPO, HERRAMIENTA, ACARREO DENTRO
Y FUERA DE LA OBRA.
M2
88.00
RESIDENCIA
CIMENTACION
50
AP130002
EXCAVACION A MANO EN CEPAS HASTA 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE
AFINE DE TALUDES Y FONDO, LIMPIEZA Y ACARREO EN CARRETILLA A 20 M DE DISTANCIA.
M3
51.946
51
AP220006
M2
82.39
62
AP150418
271.27
63
AP150834
64
AP150206
M2
65
AP030662
BAJADA DE AGUA PLUVIAL CON TUBO DE PVC DE 4", INCLUYE: MATERIAL, MANO DE OBRA Y
HERRAMIENTA.
66
AP150746
ALBAILERIA
206.83
CUBIERTA
67
68
M2
88.0000
AP150231-2 ENTORTADO EN AZOTEA DE 12 CM DE ESPESOR CON MORTERO CEMENTO CALHIDRACACAHUATILLO 1:1:8, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.
M3
49.0000
AP150678
25de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP010292
70
AP050188
SAL
71
AP050022
PZA
72
AP050010
PZA
PZA
SAL
M2
PZA
M2
49.0000
INSTALACION ELECTRICA
73
74
AP050225
SALIDA PARA TELEFONO O VOZ Y DATOS DE 7.00 MTS. DE LONG, A BASE DE TUBO CONDUIT
GALV. P.D. DE 13 MM Y 19 MM., CAJAS CONDULET 1 "T-19", 1 "T-29" SERIE 9, 1 "FS1" DE 13 MM., 4
CONECTORES P.D. 13 MM., 2 CONECTORES P.D. 19 MM., 1 REDUCCION DE 19X13 MM., 1 COPLE
DE 13 MM.,1 COPLE DE 19 MM., 6 ABRAZADERAS DE UA, INCLUYE MATERIAL, MANO DE OBRA,
HERRAMIENTA, EQUIPO, ANDAMIOS Y TNCE.
CANCELERIA
75
CARPINTERIA
76
AP170190
77
APT0002
M2
78
AP150002
M2
ACABADOS Y ALBAILERIA
26de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP230007
M2
BAOS
CIMENTACION
80
AP200268
M3
81
AP220006
M2
82
AP010067
M2
83
AP230029
KG
84
AP230036
KG
85
M3
86
S/C
PZA
87
S/C
PZA
88
AP150219
SUMINISTRO Y COLOCACION DE
IMPERMEABILIZACION EN CIMENTACION, DALAS Y
CONTRATRABES CON MICROLASTIC O SIMILAR INCLUYE : MATERIAL, MANO DE OBRA, T.N.C.E.
M2
89
AP230087
M3
90
AP200004
M3
91
AP200004
M3
92
AP200163
M2
93
AP150785
94
AP150418
ALBAILERIA
27de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP150300
96
AP150834
97
AP150206
M2
98
AP150746
M2
99
AP150160
M2
SANITARIOS
100
AP150232-A REPELLADO PARA BASE AZULEJO CON MORTERO CEMENTO-ARENA 1:4 A PLOMO Y REGLA ,
INCLUYE: PREPARACION DE LA SUPERFICIE, HUMEDICIDO, EMBOQUILLADOS, REMATES,
ARISTAS, CURADO, ENTABLADO O ANDAMIO, MATERIAL PUESTO EN OBRA, MANO DE OBRA,
HERRAMIENTA, EQUIPO Y TNCE.
101
AP150263
M2
102
AP150854
PZA
103
AP150400
104
EXT-AL-42
M2
105
EXT-AL-43
M2
106
AP230007
M2
28de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AE080002
M2
108
AP170016
M2
109
AP170080
M2
110
AP050188
SAL
111
AP050010
PZA
112
AP050022
PZA
113
AP150225
SUMINISTRO Y COLOCACION DE CONTROL AUTOMATICO PARA BOMBA DE 125 VOLTS DE 1/2 HP.
INCLUYE: MANO DE OBRA, EQUIPO, HERRAMIENTA Y T.N.C.E.
PZA
114
AP110003
SALIDA PARA MUEBLESANITARIO CON TUBO HIDRAULICO, COBRE METALICO DE 3/4" (0.50 M) Y
SANITARIO DE PVC DE 2" (6 M) CON CAMPANA ANGER Y LISO INCLUYE: COLOCACION, MUEBLES
B.P. Y VALVULA. DE CONTROL GENERAL
SAL
115
AP110123
PZA
116
AP110067
PZA
117
AP110001
PZA
118
AP110101
PZA
119
AP030302
PZA
120
AP110037
PZA
121
AP1100S1
PZA
122
AP110250
PZA
INSTALACION ELECTRICA
INSTALACION SANITARIA
29de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP110044
PZA
124
AP030171
TINACO ROTOPLAS DE 1100 LTS. DE CAP. PARA AGUA. INCLUYE: ACCESORIOS DE BRONCE,
COLOCACION, CONEXIN HIDRAULICA, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TNCE.
NO INCLUYE RAMALEO DE ALIMENTACION HIDRAULICA.
PZA
125
AP110040
PZA
126
AP070267
127
AP070267-3 SUMINISTRO Y COLOCACION DE TUBO SANITARIO DE PVC DE 4" DE DIAMETRO INC: MATERIAL
EXCAVACION RELLENO Y COMPACTADO.
128
AP070267-4 SUMINISTRO Y COLOCACION DE TUBO SANITARIO DE PVC DE 2" DE DIAMETRO INC: MATERIAL
EXCAVACION RELLENO Y COMPACTADO.
129
AP030182
REGISTRO DE 0.40 X 0.60 X 0.80 M (INT) DE TABIQUE ROJO RECOCIDO EN 12 CM JUNTEADO CON
MORTERO CEMENTO-ARENA 1:4 ACABADO PULIDO PLANTILLA DE CONCRETO F'C=150 KG/CM2
PZA
130
AE080002
M2
131
AE000013
PZA
132
AE000014
PZA
133
AE000015
PZA
ACABADOS
134
AP150264
M2
135
AP150506
M2
136
AP150307
M2
137
AP150737
M2
138
AP170248
30de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP130002
EXCAVACION A MANO EN CEPAS HASTA 2.00 M DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE
AFINE DE TALUDES Y FONDO, LIMPIEZA Y ACARREO EN CARRETILLA A 20 M DE DISTANCIA.
M3
140
AP200243
M2
141
AP200003
142
AP200004
143
AP220006
144
M3
M3/KM
M2
AP150785
145
AP150219
SUMINISTRO Y COLOCACION DE
IMPERMEABILIZACION EN CIMENTACION, DALAS Y
CONTRATRABES CON MICROLASTIC O SIMILAR INCLUYE : MATERIAL, MANO DE OBRA, T.N.C.E.
M2
146
AP130008
M2
147
M3
148
AP150206
M2
149
AP150834
150
AP150002
M2
151
AP150746
M2
152
AP030183
PZA
ALBAILERIA
31de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP150780
FIRME DE CONCRETO HIDRAULICO DE 5 CM. DE ESPESOR CON CONCRETO F'C = 150 KG/CM2
AGREGADO MAXIMO DE 3/4", INCLUYE: PEPARACION DE LA SUPERFICIE, ADITIVO PARA UNIR
CONCRETO, A RAZON DE 1 LITRO POR M2 Y FIBRA DE POLIPROPILENO COMO REFUERZO A
RAZON DE 100 GR. POR M2, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.
M2
154
AP150418
155
AP150834
156
AP150206
M2
157
AP150397
M2
158
AP150306
SUMINISTRO Y COLOCACION DE ACERO ESTRUCTURAL ASTM 36, (VIGAS, I.P.R., I.P.S., C.P.S.,
ETC.),
INCLUYE: MATERIALES, ACARREOS HASTA EL LUGAR DE SU UTILIZACION, CORTES,
TRAZO, HABILITADO,MONTAJE, PLOMEO, ELEVACION, DESPERDICIOS, SOLDADURA, APLICACIN
DE PRIMER ANTICORROSIVO, ELEVACION, MANO DE OBRA, EQUIPO, HERRAMIENTA Y T.N.C.E
KG
159
AP150307
M2
160
AP150737
M2
AP170038-1 SUMINISTRO Y COLOCACION DE PUERTA DE HERRERIA CON PERFIL TUBULAR TIPO L CALIBRE
18 Y LAMINA GALVANIZADA CALIBRE 18, MEDIDA 0.90 X 2.30 M.
PZA
M2
CUBIERTA
ACABADOS
161
162
AP150506
163
AP110080
164
AP030632
PZA
165
AP030852
PZA
INSTALACIN HIDRULICA
32de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP110095
PZA
167
AE7000012 S Y C DE CALENTADOR CAL-O-REX E-60 DE 210 LTS. AUTOMATICO O SIMILAR, INCLUYE: MANO
DE OBRA, EQUIPO Y HERRAMIENTA
PZA
168
AP030079
169
AP110029
PZA
170
AP250018
PZA
AREAS EXTERIORES
ILUMINACIN EXTERIOR
171
AEG00002
PZA
172
AP100008
M2
173
AP100036
PIPA
174
AP010108
PZA
175
AP150637
176
AP030599
PZA
177
178
AP050168
179
AP130038
33de34
Nombre del
Proyecto:
Ubicacin:
Localidad:
No.
Clave
CATALOGO DE CONCEPTOS
RESIDENCIA:
??
Unidad de
Medida
Concepto de trabajo
Cantidad
Volumen
AP050269
181
AP050010
PZA
ELABOR:
34de34