Sunteți pe pagina 1din 8

REPUBLIC OF THE PHILIPPINES

TABLE

OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL

OF
CONTENTS

DISTRICT/CITY/MUNICIPALITY

LAND USE & ZONING

ARCHITECTURAL
A-1

PERSPECTIVE VIEW, TABLE OF CONTENTS

A-2

FLOOR PLAN, ELEVATIONS, ROOF PLAN


SECTIONS, REFLECTED CEILING PLAN, RAMP
DET.

A-3

SCHEDULE OF DOOR & WINDOWS, BAY


SECTION, DETAIL SECTION, DECO BLOCK
VENT., DAMP PROOFING DETAIL

LINE & GRADE

ARCHITECTURAL

A-1

PERSPECTIVE VIEW
SCALE:

STRUCTURAL

NTS

S-1

S-2

FOUNDATION PLAN, ROOF FRAMING PLAN


FOOTING DETAIL, COLUMN DETAIL, WF-1

STRUCTURAL

ELEVATIONS TYPICAL CONNECTION DETAIL

SANITARY

ELECTRICAL
E-1

ELECTRICAL LAYOUT PLAN, RISER


DIAGRAM, LOAD SCHEDULE, GEN. NOTES

ELECTRICAL

SANITARY

MECHANICAL

REPUBLIC OF THE PHILIPPINES

PREPARED BY :

CHECKED BY :

RECOMMENDING APPROVAL :

APPROVED BY :

PROJECT NO:

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

DATE :

01

PROJECT TITLE :

ONE STOREY
SCHO
OL

INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

NATHANIEL Q. MENDOZA
ARCHITECT III

PFSED-DepED

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN
ELEVATIONS

PERSPECTIVE VIEW, TABLE OF CONTENTS

LOCATION :

SECTIONS

01 2005

DETAILS
NOTE:

1
A-1
4
4

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

7000

7000

3500

12x300mm FIBER CEMENT

C
C'
A-1

3500

1100

APEX OF ROOF

1100

APEX OF ROOF

3500

400

3500

2026

2026
VAR.

CLASSROOM

CLASSROOM

FIN. FLR. LINE

FIN. FLR. LINE

FIN. GRD. LN.

FIN. GRD. LN.

A-2

SCALE:

A-2

SCALE:

4500

9400

4500

1'
2000

GA#26 G.I. PL.

400

PAINT FIN.

2000

4500

4500

400
SLOPE

APEX OF ROOF

GA#26 G.I. CORR.


SHEET ROOFING
PAINT FIN.

TOP OF
ROOF BEAM
150mm THK.

150.

FIN. FLR. LN.


GRD. LN.

& PAINT FIN.


CLASSROOM

FIN. FLR. LN.

A-2

FRONT ELEVATION

2
A-2

SCALE:

1:100m

SCALE:

GA#26 PLAIN GI RIDGE ROLL


(PAINT FIN.)

300x300mm EXT. CONC.


LOUVER BLOCKS

7000

2
9000

2000

2200

GA.#26 CORR. G.I. ROOFING SHEET


(PAINT FINISH)

1100

1000

6mm THK. PLYWOOD

50

00

16

53

1780

1'

3500

3500
300

50X50mm CEILING JOIST SP. @600mm

4500

4500

2800

(PAINT FIN.)

50x50mm CEILING JOIST

D-1

@600mm O.C. BW.

CLASSROOM
FIN. FLR. LN.
FIN. GRD. LN.

400

6mm THK MARINE PLYWOOD ON

W-1

CLASSROOM

VAR.

4500

400

12x300mm FIBER CEMENT FASCIA

50-100mm RIVER STONE TRENCH

9000

O.C. BOTHWAYS (PAINT FINISH)

BOARD

SUSPENDED LIGHTING FIXTURES

12x300mm CEMENT FIBER

150mm THK. CHB WALL


PLASTER & PAINT FINISH

CEILING ON

TOP OF ROOF BEAM

4500

GRD. LN.

1:100m

C' B'

1500
TOP OF TRUSS

FIN.

REAR ELEVATION

1:100 M

CEMENT PLASTER

SCALE:

1100

& PAINT FIN.


CLASSROOM

A-2

REFLECTED CEILING PLAN

CHB WALL PLAIN

150.

2800

CHB WALL PLAIN


CEMENT PLASTER

ROOF BEAM
150mm THK.

SLOPE

2800

PAINT FIN.

WAYS

CROSS SECTION

100 mm THK. CHB

A-2

SCALE:

FASCIA BOARD w/#26 G.I.

WALL

WITH PLAIN CEMENT

PLASTER (PAINT FIN.)

1:100 M

FLASHING PAINT FINISH

3500

SHEET ROOFING

w/6mm GROOVE ON 50x50mm

TOP OF

2026

GA#26 G.I. CORR.

6mm THK. ORD. PLYWOOD CEILING

APEX OF ROOF

2026

400

PAINT FIN.

RIDGE ROLL

9000

RIDGE ROLL

CLASSROOM-1

CEILING JOIST @600mm O.C. BOTH

1:100m

9000

GA#26 G.I. PL.

LEFT ELEVATION

FIXTURES

CEMENT PLASTER & PAINT FIN.

1:100m

LIGHTING

150mm THK. CHB WALL PLAIN

3
1'

FR

FASCIA BOARD PAINT FIN.

FASCIA BOARD (PAINT FIN.)

RIGHT ELEVATION

12x300mm FIBER CEMENT

650

150mm THK. CHB WALL PLAIN

CEMENT PLASTER & PAINT FIN.

@600mm O.C. BOTH WAYS

12mm THK. FIBER CEMENT

VAR.

FASCIA BOARD (PAINT FIN.)

6mm THK. MARINE PLYWOOD

LOUVER BLOCKS

TOP OF ROOF BEAM

2800

12mm THK. FIBER CEMENT

400

ON 50x50mm CEILING JOIST

300x300mm EXTERIOR CONC.

2800

TOP OF ROOF BEAM

4500

2000

LOUVER BLOCKS

4500

1800

12x300mm FIBER CEMENT

FASCIA BOARD (PAINT FINISH)

300x300mm EXTERIOR CONC.

3500

400

SHEET (PAINT FINISH)

FASCIA BOARD (PAINT FINISH)

FIN.

9000

GA.#26 CORR. G.I. ROOFING


1500

1100

1500

B B'
A-1

7000

SHEET (PAINT FINISH)

300

GA.#26 CORR. G.I. ROOFING

1500

SLOPE
2

FLOOR

FLOOR

RAMP UP

25mm

TRUSS

TOP OF

DEP.

EL. 125mm
FIN.: PLAIN CEMENT FIN.

ROOF BEAM

6mm THK. PLYWOOD

W-3

CEILING

ON 50X50 WD. NAILERS SP. @

1
A-2

FLOOR PLAN
SCALE:

1:100m

2800

WC

7
FLR.

A-2

CHECKED BY :

CLASSROOM

SCHO
OL

INEERING D
IV
ENG
I

ON
SI

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG

100mm THK. CHB WALL

A-2

w/PALIN CEMENT PLASTER &

PDO - III

PFSED-DepED

ARCHITECT III

PFSED-DepED

SCALE:

PLAN
1:100 M

LONGITUDINAL SECTION
SCALE:

1:100 M

RECOMMENDING APPROVAL :

NATHANIEL Q. MENDOZA

ROOF

W-1

PAINT FIN.

FIN. GRD. LN.

FIN.

PREPARED BY :

W-1

FIN. FLR. LN.

FIN. W/ GROOVE (ROUGH)

FAC IL IT
AL
IE
IC

D
AN

GA.#26 CORR. G.I. SHEET


ROOF (PAINT FINISH)

WAYS (PAINT FINISH)

25

50-100mm RIVER STONE TRENCH

APPROVED BY :

PROJECT NO:

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

PROJECT TITLE :

ONE STOREY

RIDGE ROLL

600X600 ON CENTER BOTH

A-2

REPUBLIC OF THE PHILIPPINES

GA.#26 G.I. PLAIN SHT.

SLOPE

300

SEE STRUCTURAL DETAILS

25mm

CORRIDOR

DEP.

500

B'

GA.#26 CORR. G.I. SHEET


ROOF (PAINT FINISH)

1500

FIN.

PLAIN CEMENT

FL-2

400

C'

PLAIN CEMENT

FL-1

4500

DEP.

1200

175

SCHED. OF

25mm

600

1500

300

4500

2150

9000
400

2200

TOP OF

150

3500

A-2

1800

TILES (GLAZED)
2200

C'

200x200mm VITRIFIED WALL

3500

EL. 150mm
FIN.: PLAIN CEMENT FIN.

B'

CLASSROOM
W

1'

BLACKBOARD

7000

200x200mm VITRIFIED

UNGLAZED FLOOR TILES

7000

A-4

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN
ELEVATIONS

FLOOR PLAN, ELEVATIONS, ROOF PLAN

LOCATION :

DATE :

01

SECTIONS

01 2005

SECTIONS, REFLECTED CEILING PLAN

A-22
4
4

DETAILS
NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

25x25 mm WOOD VENT

50

325

50

PROVIDE INSECT SCREEN

GA#26 G.I. CORR. SHT


ROOFING (PAINT FIN.)

SAG ROD (SEE DETAIL)


2-16
BOLTS

275

STL. PURLINS (SEE


STRUCTURAL DET.)

6mm THK. ORD. CLNG. PLY


CEILING ON 50X50 CLNG.

. 25x75mm WD.FRAME

JOISTS

SECTION

S4S KD TANG.

SP. @ 600 X 600

575

TECK SCREW

4.8mm THK. FIBER CEMENT CEILING

O.C. B/W ( PAINT


SEMI-GLOSS )

BOARD ON 50x50mm CLG. JST. @600mm

OC BW (PAINT FIN)

575

20x20x5mm ANGULAR BAR


@600mm OC VERT.
MEMBER FOR FRAME OF
6mm CONC. FIBER FASCIA
BOARD
10mm THICK
PLATE
6mm GROOVE

275

300x150x10mm BASE PLATE

4-16x300mm LONG BENT

A-6

CEILING VENT DETAIL


SCALE :

25x25mm WOOD VENT

12x300mm FIBER
CEMENT FASCIA BOARD

PROVIDE INSECT SCREEN

(PAINT FIN.)

1 : 5 M
FULLY WELD ON RAFTER

GA#26 CORR. G.I. SHT.


ROOF (PAINT FIN.)

20

PLAN

300

ANCHOR BOLTS

RIVET @400mm OC
LONGITUDINAL

10mm SAG RODS

1500

4.8mm THK. FIBER CEMENT CEILING


BOARD ON 50x50mm CLG. JST. @600mm

1100

OC BW (PAINT FIN)

GA#26 CORR. G.I. SHT.


ROOF (PAINT FIN.)

25x25mm S4S KD TANG. PAINT

FOR VENT. W/ WIRE MESH


(VENTILLATION)

LC 100x50x15x1.5mm STL
C-PURLINS @750mm OC
ON 2-LC 150x65x20x30mm
RAFTER

VENT. WITH

SCREEN (SEE DETAIL)

SEE STRUCTURAL DETAIL

TOP

BEAM

OF ROOF BEAM

TOP

A-3

OF ROOF BEAM

EAVES, VENT. & INT CEILING DETAIL


SCALE

AS SHOWN

6mm THK. ORD. PLYWOOD

400

CONC.
FR 25x300 S4S KD TANG OR 12mm THK

23

WIRE MESH INSECT

INT. CEILING ON50x50mm

(150X400)

CEILING JOIST @600mm OC

FIBER CONCRETE FASCIA

BOTHWAYS

BOARD ON 25x25x6 L-BAR W/


25x6mm THK STIFFENER FLAT

12mm FIBER CONCRETE FASCIA

300

BAR @ EVERY 1200mm OC

BOARD ON 25x25x6 L-BAR W/25x6mm


THK STIFFENER FLAT BAR @ EVERY

1200mm OC
6mm THK. MARINE PLYWOOD

INT. CEILING w/6MM GROOVE ON 50x50mm


CEILING JOIST @600mm OC BOTHWAYS

6mm THK. ORD. PLYWOOD

600
2800

W-1

300

2216

CEILING JOIST @600mm OC BOTHWAYS

2800

INT. CEILING w/6MM GROOVE ON 50x50mm

150mm THK. CHB WALL

PLAIN CEM. PLASTER (PAINT FIN.)


6

D-1

LOUVER BLOCKS (CONCRETE)

150 mm THK. CHB WALL WITH

600

PLAIN CEMENT PLASTER (PAINT FIN.)

LINE

FIN. GRADE

LINE

LINE

FIN. FLOOR

FIN. GRADE

LINE

LINE

FIN. FLOOR

25

FIN. FLOOR

LINE

INSIDE

150

FIN. GRADE

LINE

175

FIN. FLOOR

CORRIDOR

175

CLASSROOM

PART OF
CLASSROOM

800

PART OF

1500

1
A-3

REPUBLIC OF THE PHILIPPINES

BAY SECTION
SCALE:

A-3
PREPARED BY :

DETAIL SECTION

: 20 M

CHECKED BY :

SCALE:

RECOMMENDING APPROVAL :

1:20

3
A-3

mts.

APPROVED BY :

SCHO
OL

S
INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

NATHANIEL Q. MENDOZA
ARCHITECT III

PFSED-DepED

LUIS G. PURISIMA JR.

CHIEF, PFSED-OPS

PFSED-DepED

DepED

SCALE

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

SECTION
LOUVER BLOCKS DETAIL

PROJECT NO:

PROJECT TITLE :

ONE STOREY

LOCATION :

OUTSIDE

ELEVATION

DATE :

01

1:20M

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN

BAY SECTION, DETAIL SECTION, DECO


BLOCK VENT., DAMP PROOFING DETAIL

ELEVATIONS
SECTIONS

01 2005

A-34
4
4

DETAILS
NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

OF THE SAME DUE TO FAULTY DESIGN.

C
1

4.5mm THK. FIBER


CEMENT CLG. BD. ON

4.5mm THK. FIBER

1800

50x50mm CLG. JOIST

2000

CEMENT CLG. BD. ON

@600mm O.C.

50x50mm CLG. JOIST


@600mm O.C.

1800
600

B'

950

TOP

450

OF ROOF BEAM

R.C. BEAM (SEE


STRUCTURAL DETAIL)

6
A-3
FIN CLNG. LN.

850

R.C. BEAM (SEE


STRUCTURAL DETAIL)

TOP OF ROOF BEAM

FIN CLNG. LN.

W-3

100mm THK. CHB


PLASTER & PAINT FIN.

100mm THK. CHB

W-3

PLASTER & PAINT FIN.

BAR (HT. = 850mm)

2800

OF

2400

2400

2000

PART

2800

1000

38mm TEXTURED
STAINLESS STEEL GRAB

38mm TEXTURED STAINLESS

CLASSROOM

LAV

38mm TEXTURED STAINLESS

200x200mm VITRIFIED
CERAMIC GLAZED WALL

(HT.=850mm)

1500

STEEL GRAB RAIL

1500

5
A-3

STEEL GRAB RAIL

(HT.=850mm)

TILES
850

800

200x200mm VITRIFIED
200x200mm VITRIFIED
TILES

FFL

VAR.

NGL

25MM

DET. PLAN OF TOILET

A-4

NGL

DET. SECTION OF TOILET

: 250 M

VAR.

FFL

B'

SCALE:

A-4

SCALE:

DET. SECTION OF TOILET

1 : 100 M

A-4

4 EQ. PARTS=

574

336

: 100 M

800

300

800

1600

(CLEAR)

1225

2400

1264

(CLEAR)

2400

2100

1260

1228

336

300
2400

2 EQUAL PARTS =

2500

SCALE:

6-BLDS.

900
900

2100

TILES

CERAMIC GLAZED WALL

D-2

CERAMIC GLAZED WALL

STAINLESS STEEL

ON

50x150mm WOOD

ON 50x150mm WOOD

JAMBS/FRAMES PROVIDE

JAMBS/FRAMES

SAME AS W-1

BLADES ON STD. ALUM. HOUSING & FIXED


CLEAR GLASS TRANSOMS ON 50x150mm

EL. +175mm

WD. JAMBS/FRAMES

KICKPLATE

TYPICAL

6mm
NON-SK

FL-2

ID PLAIN
CEMENT

SCALE
LINE

CEMEMN
T FINISH

1:5

OF ROOF
LINE

1800

FLOOR

6mm

DETAIL SECTION

CORRIDOR

1800

100

6mm

& FIXED GLASS TRANSOM

DOOR

AS W-1

RAMP UP

HINGED

SAME

1200

DOOR

TYPE HINGED

JALOUSIE WINDOW W/ CLEAR GLASS

CLASSROOM

1500

PANEL DOOR

HOLLOW CORE FLUSH TYPE

100

C'

W-3

RAMP UP

D-2

D-1

W-2

W-1

1500
1200

KICKING PLATE

OF CORRIDOR

DETAIL PLAN
1
A-4

SCALE

SCHEDULE OF DOORS & WINDOWS


SCALE:

REPUBLIC OF THE PHILIPPINES

1:50

10
A-2

1 : 100 M

PREPARED BY :

CHECKED BY :

RECOMMENDING APPROVAL :

APPROVED BY :

SCHO
OL

S
INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

NATHANIEL Q. MENDOZA
ARCHITECT III

PFSED-DepED

LUIS G. PURISIMA JR.

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

AS SHOWN

PROJECT NO:

PROJECT TITLE :

ONE STOREY

RAMP DETAIL

LOCATION :

DATE :

01

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN
ELEVATIONS

DETAIL SECTIONS
PLAN OF TOILET, DETAIL SECTION OF
TOILET, DOOR & WINDOW SCHEDULE, RAMP DET.

01 2005

A -3
4
4
4

DETAILS

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

1'
1'

9000

2000

50x100x15x1.5mm
STEEL C-PURLINS
750mm O.C.

9000

RAMP UP

FOUNDATION PLAN

A
S-1

1:100

SCALE

10mm% SAG ROD WITH


STANDARD NUTS &
WASHERS @ EACH END

R - 2

R - 1

R - 1

RG-2

RG-2

EB-1

R - 2
600

RG - 1

EB-1

RG-2

R - 2

EB-1

RG-3

RG-3

2200

WF-1

RG-1

EB-1

1000
3500

F-1
C-1

400

RG - 1

RG-1

1500

WF-1

B'

300

F-2
C-2

F-1
C-1

3500

WF-1

F-1
C-1

4500

4000

RG-1

7000

WF-1
100mm THICK
SLAB ON FILL
WITH 10mm
SPACED AT 400
BOTHWAYS

WF-1

WF-1

2200

F-1
C-1

WF-1

7000

F-1
C-1

WF-1

F-1
C-1

300

F-1
C-1

WF-1

3500

WF-1

3500

B'

400

F-2
C-2

F-1
C-1

4500

RG-2

4500

2000

ROOF FRAMING PLAN

B
S-1

M.

SCALE

1:100 M.

150MM THK.
CHB
10@600
L

HOR. BARS

NATURAL GRADE LINE

NGL

10@600
1800

600

VERT. BARS
Y-BARS

10 300mm TEMP
BARS BOTHWAYS

250

150

X-BARS

100

Y-BARS
X-BARS

C O L U M N

S C H E D U L E
PLAN

LEVEL

C-1

C-2

SECTION

C
S-1

300

10mm @300 CUT BARS


400

TYP. FOOTING DETAIL


SCALE :

3-10mm

NTS

S-1

SCALE :

DETAIL OF RAMP

DETAIL OF WF-1

SCALE

S-1

NTS.

: 50M

DESIGN CRITERIA :

200

200

LEVEL
ROOF

G-20mm GRAVEL
BEDDING

300

MAIN BAR:

S C H E D U L E
FOOTING

MAIN BAR:

4-%16mm

MARK

6-%16mm

TIES : 10 mm

TIES : 10 mm

1@50, 8@75, REST @

1@50, 8@75, REST @

150mm TO CENTER

F-1

O F

F O O T I N G S

FOOTING DIMENSIONS (mm)


LENGTH

(L)
800

WIDTH

(W)
800

DEPTH

A. CONCRETE

fc' = 20.685 Mpa ( 3,000 Psi ), minimum compressive strength of concrete

REINFORCEMENT
THICKNESS

(D)

(t)

1200

250

a 28 days unless otherwise specified.

REMARKS
BAR X

B. REBAR

BAR Y

fy = 275.8 Mpa ( 40,000 Psi ), minimum yield strength of reinforcing bars


4 - 16mm%

unless otherwise specified.

SQUARE FOOTING

4 - 16mm%

150mm TO CENTER

C. STRUCTURAL STEEL
F-2

TO

FOUNDATION LEVEL

100 mm THICK
GRAVEL BEDDING

10mm

1000

1000

1200

250

4 - 16mm%

SQUARE FOOTING

4 - 16mm%

Fy = 248 Mpa ( 36 Ksi ), specified minimum yield strength


D. FOUNDATION

unless otherwise specified.

SBP = 95.706 Kpa ( 2,000 Psf ), was used in the design for all footings.
No footing shall rest on fill.

REPUBLIC OF THE PHILIPPINES

PREPARED BY :

CHECKED BY :

RECOMMENDING APPROVAL :

APPROVED BY :

PROJECT NO:

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

PROJECT TITLE :

ONE STOREY
SCHO
OL

INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

ANTONIA M. ALHAMBRA
CIVIL ENGINEER/MASTER PLUMBER
PFSED-DepED

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

LOCATION :

DATE :

01

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN

ELEVATIONS
GENERAL NOTES
SECTIONS
ELECTRICAL LAYOUT
DETAILS

01 2005
NOTE:

LEGEND
RISER DIAGRAM

S - 11
2
2

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

1
S-

4-%16x300mm LONG

RG-1

RG-2

HOLLOW CORE FLUSH TYPE


HINGED

DOOR

15

2LC-150x65x20x3

LINE OF R-1/R-2

KICKPLATE

ELEV @ GRID 1 & 3


SCALE:

LC-150x65x20x3

R-1
10mm THICK

PLAN

S-2

50

PLATE

ON WOOD

JAMBS/FRAMES PROVIDE

65

37.5

RG-2

D-2

50

BASE

37.5

RG-1

300x150x10mm

300

50

PLATE

65

BOLTS

100

ALUM. STEEL KICKING

ANCHOR

20

150

EB

20

1
-

EB

BENT

150

2
R-

R-

R-2

LC-100x50x15x1.5

PLATE

DETAIL OF RAfTER

2-%16
BOLTS

1:100 M

SCALE

S-2

2-%16

BOLTS

DETAIL OF PURLINS

G
S-2

NTS

SCALE

NTS

4-%16x300mm
LONG

R-1/R-2

BENT

ANCHOR

BOLTS

10mm THICK

300x150x10mm

BASE PLATE

10mm THICK

PLATE

PLATE
100x50x15x1.5mm

4-%16x300mm LONG
BENT

ANCHOR

BOLTS

300x150x10mm
BASE

STEEL

R1/
R2

PLATE

R1

1
R-

C-PURLINS

750mm O.C.

1-%10mm A-307
ANCHOR

RG-1

L-50x50x4.5

RC BEAM/COLUMN

RG-1

BOLT

R-2

ELEVATION

TYPICAL RAFTER ANCHORAGE DETAIL

E
B
S-2

ELEV @ GRID 2
SCALE:

ELEVATION

SCALE

S-2

1:20

10mm X 150mm
ANCHOR BOLTS
SPACED @ 800mm O.C.

EB-1

(SEE SCHED)

SCALE

S-2

S-2

NTS

PURLIN CONNECTION DET


1 : 5 M

SCALE

L2

L1

LAP SPLICES ARE ALLOWED

2D

SECTION DETAIL

1:100 M

2D

2D

LAP SPLICES ARE ALLOWED

2D

ONLY IN THIS PORTION

ONLY IN THIS PORTION

B'

100x50x15x1.5mm

2-10mm SIDE BARS

2
R-

STEEL C-PURLINS
750mm O.C.

RG-1

RG-3

10mm%

RG-3

CIRCULAR
SCHED

TYPICAL BEAM ELEVATION

100mm
TUBE

TOP OF RAFTER

CL.

B
C

SCALE:

FLOOR
LEVEL

100 M

ROOF

LEVEL

S-2

ELEV @ GRID 1
BEAM
MARK

BEAM
DIMENSIONS
( in / mm )

S T E E L

150

MID SPAN

10mm

(mm )

TOP

RG-1

150

400

12mm

1@50, 8@100, REST@200

RG-2

150

400

12mm

1@50, 6@100, REST@200

TOP

BOTTOM

TOP

BOTTOM

1@50, 6@100, REST@200

EB-1

150

250

10mm

1@50, REST@200

PREPARED BY :

CHECKED BY :

RECOMMENDING APPROVAL :

APPROVED BY :

1 :

SCALE

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

DATE :

01

ONE STOREY
SCHO
OL

INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

ANTONIA M. ALHAMBRA
CIVIL ENGINEER/MASTER PLUMBER
PFSED-DepED

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

LOCATION :

1 : 10 M

SCALE

S-2

10 M

PROJECT NO:

PROJECT TITLE :

SAG ROD CONNECTION DET.

TIE ROD CONNECTION DET.

I
S-2

REPUBLIC OF THE PHILIPPINES

R2

(UNLESS NOTED OTHERWISE)

BOTTOM

R1/

10mm SAG ROD

S T I R R U P S

RIGHT

WITH

&

WASHERS @ EACH END

50x100x15x1.5mm
STEEL C-PURLINS
750mm O.C.

150

R E I N F O R C E M E N T S

LEFT

REBAR

ROD

NUTS

10mm TIE ROD WITH


STANDARD NUTS &
WASHERS @ EACH END

S-2

40

SAG

STANDARD

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN
ELEVATIONS
ELEVATIONS
SECTIONS
TYPICAL CONNECTION DETAIL
DETAILS

01 2005
NOTE:

S-22
2
2

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

GENERAL NOTES

CALCULATIONS

1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THIS PLAN

5. SCHEMATIC DIAGRAM OF SAFETY SWITCH:

1. TOTAL LOAD:

AND SPECIFICATIONS. THE APPLICABLE PROVISIONS OF THE LATEST EDITION

OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF


THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL

POWER COMPANY. ALL ELECTRICAL WORKS SHALL BE UNDER THE

IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.

A. LIGHTING OUTLET

7 x 100 W

700 W

B. FAN OUTLET

1 x 100 W

100 W

C. CONVENIENCE OUTLET

2 x 180 W

360 W

1160 W

3.5mmTHW WIRE

2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz.


TOTAL LOAD

3. WIRING METHOD SHALL BE AS FOLLOWS :


a. FEEDERS AND RISERS

- RIGID METALLIC CONDUIT

b.LIGHTING, POWER RECEPTACLE


BRANCH CKT., & AUXILIARY

- POLYVINYL CHLORIDE CONDUIT

I LOAD

1160 / 230

5.04 A

SCH. 40

2. CIRCUIT REQUIREMENT:

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE "THW" UNLESS

OTHERWISE INDICATED IN THE PLAN. THE MINIMUM SIZE OF WIRE FOR POWER AND LIGHTING
CIRCUIT HOMERUN SHALL BE 3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST

RACEWAY SHALL BE 15mm TRADE/NOMINAL SIZE.


5. ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP

3.5mmTHW COPPER WIRE

USE 20 A 2-WIRE CIRCUIT

TYPE WITH

3. SERVICE ENTRANCE CONDUCTORS:

FACTORY KNOCKOUTS.

USE 2-3.5mm THW COPPER WIRES

6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE
PARTICULAR LOCATION AND PURPOSE.

4. SERVICE EQUIPMENT:

7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER

PHILIPPINE ELECTRICAL CODE REQUIREMENT.

USE 1-30 A, 2PST, 250V SAFETY SWITCH WITH 2-20 A, RENEWABLE FUSES

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :


a. LIGHT SWITCH

- 1.20 M ABOVE FINISH FLOOR

b. CONVENIENCE OUTLET

- 0.30 M ABOVE FINISH FLOOR.

c. SAFETY SWITCH

- 1.80 M ABOVE FINISH FLOOR

OVERHEAD SERVICE ENTRANCE

CONNECTED TO 220V AC, 1,


2 WIRE, 60 Hz FITTED WITH

20mm TYPE "F" CONDULET

LEGEND

A
DESCRIPTION

S ab

- TWO GANG DEVICE SWITCH

S cde

- THREE GANG DEVICE SWITCH

Sf

2-3.5mm THW IN 20mm RSC

KWHR METER

- 1 x 40 WATTS FLUORESCENT LAMP


- FAN CONTROL SWITCH

CLASSROOM

2
2

aaa

222

LP

C
Sab

GROUND FLOOR LINE

- RACEWAY CONDUIT CONCEALED IN CEILING


- RACEWAY CONDUIT CONCEALED UNDER FLOOR

FIN. GRADE LINE

SabcSf
22

Sabc

OVERHEAD SERVICE ENTRANCE

ELECTRICAL LAYOUT

REFER TO RISER DIAGRAM

1-3.5mm THW COPPER WIRE

IN 15mm C
16mmx2400mm LENGTH

- SAFETY SWITCH

3500 mm

S/Sa

- ONE GANG DEVICE SWITCH

METERING CONDUIT

- CEILING FAN OUTLET

22

1800 mm

- 2 x 40 WATTS FLUORESCENT LAMP

ba

222

BUILDING WALL

1800 mm

aa

CEILING LINE

- CEILING LIGHT OUTLET

1800 mm

SYMBOL

E-1

GROUNDING ROD COPPERWELD

SCALE:

1:100m

- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE


10 AMPS, 250 VOLT WITH MODERN PLATE COVER
M

- ELECTRIC SERVICE METER

ELECTRICAL RISER DIAGRAM

- SERVICE ENTRANCE

NOT

REPUBLIC OF THE PHILIPPINES

PREPARED BY :

CHECKED BY :

TO

RECOMMENDING APPROVAL :

SCALE

APPROVED BY :

PROJECT NO:

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

PROJECT TITLE :

ONE STOREY
SCHO
OL

INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

VENERANDO D. SAHAGUN
ENGINEER III

PFSED-DepED

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

LOCATION :

DATE :

01

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FLOOR PLAN

ELEVATIONS
GENERAL NOTES
SECTIONS
ELECTRICAL LAYOUT
DETAILS

01 2005
NOTE:

CALCULATIONS
LEGEND
RISER DIAGRAM

E -3
1
1
4

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

LEGEND:

3450
CB

100mm THK. + FIN. SLAB W/

10mm REBARS AT

200mm O.C.

150X300mm RC BEAM W/2-16mm

BENT UP 2 OUT OF 3 AT L/4

FROM

TOP AND

FACE SUPPORT. BOTH WAYS

STIRRUPS

100

750

OUTLET

CV

CHECK

w/WATERPROOFING

HB

HOSE BIBB

ONE FACE BITUMIN TAR

FD

FLOOR

300

50

CHAMBER

3 @L/4 FR. FACE SUPPORT & SHORT SPAN

PLASTER W/WATERPROOFING

COMPOUND OR APPLY ONE FACE


BITUMIN TAR

10mm VERT. & HOR. BAR

@200mm O.C. E.W.

LEACHING

1900

2100

REBARS @300mm OC BW. bENT 2 OUT OF

BAR @ 200mm OC BW

2000

1SLOPE

100

150

10mm REINF. VERT & HOR.

100

GRAVEL BED

PLAN

2300

100mm THK. + FIN. SLAB w/


10mm REBARS @300mm OC

100mm THK SLAB W/ 10mm REBARS

BW

@300mm BOTH WAYS

SEPTIC TANK DETAILS


SCALE:

1 :

VALVE

DRAIN

GICWL

GALVANIZED IRON COLD WATER LINE (SCH. 40)

GICWR

GALVANIZED IRON COLD WATER RISER (SCH. 40)

GV

GATE VALVE

MH

MANHOLE

DIGESTIVE CHAMBER

10mm TEMP. BARS @300mm EW

P-1

CLEAN OUT

COMPOUND OR APPLY

300

150

WATER LEVEL

S-2 100mm THK. + FIN. SLAB w/10mm

CO

WATER LEVEL

MANHOLE

50 (TYP.)

CONCRETE DRAIN PIPE

PLASTER

MANHOLE

MANHOLE

WALLS REINFORCEMENT

2000

2300

250

MANHOLE

CDP

AIR SPACE

NGL

S-1a 100mm THK. + FIN. SLAB w/

CATCH BASIN

@L/4 FROM FACE SUPPORT BW

1600

150

FACE OF SUPPORT

250

10mm BENT UP 2 OUT OF 3

10mm

100

2000

100mm REBARS @300mm BW. FROM

0.60

&

2100

150

(MAX)

1000

BOT. REBARS

1@50,3@100, REST @300mm O.C.

3450
150

100mm THK. + FIN. SLAB w/

CROSS SECTION

LONGITUDINAL SECTION

PVCDS

POLYVINYL

CHLORIDE DOWNSPOUT

PVCDP

POLYVINYL

CHLORIDE DRAIN PIPE

PVCDS

POLYVINYL

CHLORIDE DOWNSPOUT

PVCSP

POLYVINYL

CHLORIDE

PVCVAC

50 M

PVCVP

POLYVINYL

SOIL

CHLORIDE

POLYVINYL

PIPE

VENT. ACROSS CEILING

CHLORIDE VENT. PIPE

PVCVS POLYVINYL CHLORIDE

VENT

STACK

PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL


PVCWP

POLYVINYL

CHLORIDE WASTE PIPE

PVCWS POLYVINYL

CHLORIDE

RD

ROOF DRAIN

UD

URINAL

DRAIN

WC

WATER

CLOSET

LAV

LAVATORY

CS

WASTE

STACK

COUNTER SINK

PLUMBING NOTES:
GRADES

OF

RUN ALL
SEPTIC TANK
75mm PVCVTW

CHANGE IN

V
C

V
P
m

S
R

R
K
N

A
IC

5.
6.

CORRIDOR

8.

I
Y

SOIL

OF

SADDLE HUB

AND

BEND

ARE PROHIBITED.

THE HOUSE DRAINAGE CONNECTION.

NOT LESS

THAN 0.30 METER


OF

NO SEPTIC
ALL

OF

THE

VAULT

PLUMBING

SEPTIC

VAULT

OF

SPACE

AIR

SEWAGE AND THE UNDER


SHALL

BE CONSTRUCTED

WORKS SHALL

MASTER

PLUMBER

BE UNDER

AND

MUST

BE

WATERPROOFED.

MUST BE LEFT BETWEEN


PART

OF

UNDER

THE

A LICENCED

VAULT

ROOF

SLAB.

THE BUILDING.

SUPRVISION OF
PLUMBING

CONTRACTOR.

i. LIVE LOAD_________________ 1000Pa


ii ALLOWABLE STRESSES

M
EM
T
ST
S
A

P
m

00

ON HORIZONTAL

G
M

20

BE USED

DESIGN CRITERIA

T
WL
TE
W
EM
ST

LINE

S E
W
SE

USED

THE DIGESTION CHAMBER

MAIN WATER

ROOF

AM

CORRIDOR LINE

20mm GIWL TO

IN PV

GV

m
IN m

P
U

TO MAIN SEWER
SYSTEM

TEE BRANCH SHALL

100mm PVCSP

OR

PIPE CLEAN-OUTS

LICENSED
M

FITTINGS

PIPES AND

THE TOP
7.

GV

FROM

c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.


d) AT THE END OF ANY HORIZONTAL PIPE LINES.

R
C

0
10

VENT

BEFORE

I
0

m
5

O
C

V
C

50

RAMP UP

R
ID

LA

IS

a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND


ONE-HALF DEGREES (22 1/2).
b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES

W
C

P
W

IC

20

THE CHANGE OF FLOW

CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:

PROHIBITED

OR
1.
4.

WL

SIXTEENTH BEND. WHEN

OF

AND WASTE LINES, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE

R
R
ID

V
P
m

75
T

OR

NO DOUBLE HUB

TW

PVCWP

WC

SE

USE

LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.

F
O

50mm

FD

APPROPRIATE

ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE

LA

3.

LAV

BE MADE BY

HORIZONTAL TO VERTICAL A SINGLE 1/8 BEND COMBINATION MAYBE USED

50mm
PVC CO

AT

DIRECTION

CHANGE IN DIRECTION SHALL

SIXTH-EIIGHT

20mm GICWL

AND

FORTY-FIVE DEGREES (45) WYES, LONG SWEEP QUARTER BEND,

CV

ALIGNMENT

2.
T

75mm PVCVTR

IN PERPECT

A FORM GRADE NOT LESS THAN TWO PERCENT (2


ALL

75

PIPINGS

PIPINGS

1.

CLASSROOM

100mm PVCSP

HORIZONTAL

HORIZONTAL

1. CONCRETE

SYSTEM

a. FOR FOOTING, BEAMS AND SLABS


fc'' = 20 MPa

2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)


fm' =6.90 MPa, fm = 2.41 MPa

3. REINFORCING STEEL BARS


FOR

P-1

PLUMBING RO-IN LAYOUT

2
P-1

1:100m

SCALE:

BARS SMALLER THAN

16mm

fy = 230 MPa

ISOMETRIC VIEW

4. ASSUMED ALLOWABLE BEARING

CAPACITY Y

= 100KPa

NTS

SCALE:

NOTE:
WATER TABLE IS 1500

REPUBLIC OF THE PHILIPPINES

PREPARED BY :

CHECKED BY :

RECOMMENDING APPROVAL :

APPROVED BY :

PROJECT NO:

00200511

DESIGNED BY:

EMEC
AMA
II
VDS
NQM

ONE CLASSROOM w/TOILET

ENCODED BY:

Max C.
VDS

7x9m (MODIFIED)

CHECKED BY:

LGP

DATE :

01 01 2005

PROJECT TITLE :

ONE STOREY
SCHO
OL

INEERING D
IV
ENG
I

ON
SI

FAC IL IT
AL
IE
IC

D
AN

De ED
p

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

MAXIMO M. CALBANG
PDO - III

PFSED-DepED

E. MELQUIADES EMEL CUBA II


CIVIL ENGINEER/MASTER PLUMBER
PFSED-DepED

LUIS G. PURISIMA JR.

OLIVER R. HERNANDEZ

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

PFSED-DepED

DepED

LOCATION :

BELOW GROUND LEVEL.

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
FLOOR PLAN
PLUMBING RO-IN LAYOUT,
VIEW, SEPTIC TANK, CATCH BASIN, DRAIN PIT, STORM
ISOMETRIC
ELEVATIONS
DRAIN,
LEACHING FIELD DET., LEGEND, NOTES & DESIGN
SECTIONS

SHEET CONTENTS :

CRITERIA

P -1
3
1
4

DETAILS

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PH
YS

S-ar putea să vă placă și