Sunteți pe pagina 1din 7

1

VIYELLATEX LIMITED
297, Khairtul,Gazipura,Tongi,Gazipur-1712, Bangladesh.
Phone: 8802 9813001-10 Fax : 8802 9811400
E-MAIL: info@viyellatexgroup.com
WEB SITE: www.viyellatexgroup.com.bd

VIYELLATEX Limited is a rapidly growing multi-dimensional organization in Bangladesh. Within a


very short period of time, the organization has earned a solid reputation both locally and globally in the
textile and apparel sector.
While VIYELLATEX remains a 100% export-oriented organization, the company vision remains
focused towards uplifting Bangladesh on a global scale. The company has achieved numerous awards for
business, social and environmental performance over the years and remains strongly committed towards
the Millennium Development Goals.
VIYELLATEX considers corporate sustainability as an important edifice of its ethics. It gives special
importance to all its corporate sustainability activities. It values environmental protection and
conservation, and realizes that only by being responsible to nature can we truly be responsible to the
people and planet. VIYELLATEX has one of the best, dedicated and skilled workforces in the country.

MANAGEMENT STRUCTURE

1. COMPANY NAME

: VIYELLATEX LIMITED.

2. OWNER NAME

: MR. DAVID HASANAT - CHAIRMAN & CEO.

4. PERSON TO BE CONTACTED

: MR. ZIAUDDIN AHMED- CHIEF OPERATING OFFICER

EMAIL: zia.ahmed@viyellatexgroup.com
5. ESTABLISHED

: 2002

6. OWNERSHIP

: LIMITED COMPANY

7. COMPANY REGISTRATION NO. : C44451 (991)/2001


7. MEMBERSHIP

: A) BGMEA
B) BKMEA
C) BTMA
D) EXPORT PROMOTION BUREAU OF BANGLADES

8. ANNUAL SALES

: U.S. $ 75 MILLION (APPX.)

9. BANKERS

: HSBC, DHAKA MAIN OFFICE, ANCHOR TOWER, 108 BIR


UTTAM CR DUTTA ROAD, DHAKA, BANGLADESH.
FAX- (880 2) 9660554.

13. PRODUCTION CAPACITY

: GARMENTS = 1.8 million PCS

WH=10 hrs; WD=26 days

UNIT
GMT Unit-01
GMT Unit-02
Grand Total

Hourly Capacity (SMV)


33,812
22,075
55,887

KNITTING PRODUCTION CAPACITY


DYEING- 1 PRODUCTION CAPACITY
DYEING- 2 PRODUCTION CAPACITY
WSHING PRODUCTION CAPACITY
EMBROIDERY PROD. CAPACITY

Working
Hours
10
10

:
:
:
:
:

Working
Days
26
26

Monthly
Capacity (SMV)
8,791,146
5,739,552
14,530698

25 TON PER DAY


20 TON PER DAY
10 TON PER DAY

FARICS1.3 TON AND 14000 PCS GMT PER DAY


5, 00,000 PCS Monthly

14. MACHINERY LIST


A. Garments: Sewing 4172 Nos, Cutting 110 Nos (Brands: Juki, Pegasus, Kansai, Pafe, Eastman,
KM, Garber)
B. Knitting: 94.0 Nos. (Machine: Circular Knit, Flat Knit, Auto Knit; Brands: Fokuhara, Keumyong,
Mayer & Cie, Matsuya Co etc.)
C. Dyeing One: 80.0 Nos. (Machine: Dyeing, Sample Dyeing, Stenter, Raising, Sueding, Silting, Dryer;
Brands: Fongs, Heliot, Santex, Bruckner, Lafer)
D. Dyeing Two: 75.0 Nos. (Machines:Dyeing, Sample Dyeing, Lab dyeing, Marserising, Lafar
compactor, Air turning, Heliot Dewater, Stenter, Brands:Theis, Fongs, Sunsuper, Heliot etc)

3
E. Washing: 27.0 Nos. (Machines: Washing, Hydro, Dryer; Brands: Cosmotex, Greenmac)
F. Embroidery: 5.0 Nos. (Machine:EMB, Design Punching software, Metal Detector; Brands: Tajima)
15. A.: PEAK SEASON

: ROUND THE YEAR SAME

15. B.: TOTAL SEWING LINE

: 74

16. BRAND SOURCING FORM THE FACTORY:


PUMA

ESPRIT

SOLIVER

M&S
9%

26%

13%

4%

17. MARKETS

2%

2%

44%

EUROPE:
78%

USA: 22%

OTHER

GIII

PVH

UK,
UK,
GERMANY,
GERMANY,
ITALY,
ITALY,
FRANCE
FRANCE

18. SUPLY CHAIN STRUCTURE

: THROUGH LOCAL OFFICE 60% / DIRECT TO BRAND 40%

19. CATEGORIES

: MENS, LADIES, WOMENS, BOYS, GIRLS & CHILDREN

20. PRODUCT TYPE

: 100% KNIT GARMENTS MANUFACTURERS

21. PRODUCT

: T-SHIRT, POLO SHIRT, JACKET, TANK TOP,


JOGGES SKIRT, SPORTS WEAR etc.

22. NUMBER OF WORKER


TOTAL
EMPLOYEE
5895

CUTTING:
CUTTING:
390
390

23.

: GARMENTS / KNITTING / DYENING / WASHING / EMBROIEDRY


TOTAL
WORKERS
5130

TOTAL
NMS&MS
765

SEWING:
SEWING: FINISHING:
FINISHING:
2644
609
2644
609

QUALITY:
QUALITY:
511
511

KNITTING:
KNITTING:
250
250

DYEING:
DYEING:
514
514

WASHING:
WASHING:
52
52

EMBROIDERY:
EMBROIDERY:
160
160

Male / Female / Ratio: A) Male: 3537, B) Female: 2358, C) Ratio: 60:00: 40.00

24. FACTORY TOTALSPACE

: 647480 SFT

BUILDING PROFILE OF VTL

BUILD-1
BUILD-1

GMT-1
GMT-1

195000
195000
SF
SF

BUILD-2
BUILD-2

GMT-2
GMT-2

191902
191902
SF
SF

BUILD-3
BUILD-3

VUHR
VUHR

13095
13095 SF
SF

BUILD-4
BUILD-4

LAB
LAB

6380
6380 SF
SF

BUILD-5
BUILD-5
STAFF
STAFF
QUA.
QUA.

9600
9600 SF
SF

BUILD-6
BUILD-6

CHEM.
CHEM. ST
ST

27289
27289 SF
SF

SHED PROFILE OF VTL

DYE.
DYE.
11

DYE.
DYE.
22

55000
55000
SF
SF

51014
51014 SF
SF

KNITTIN
KNITTIN
G
G

55320
55320
SF
SF

CANTEE
CANTEE
N
N

35880
35880
SF
SF

GENERATOR, BOILER & COMPRESSOR

GENE.
GENE.
33 NOS
NOS
2800
2800 SF
SF

BOILE
BOILE
R
R
44 NOS
NOS
3000
3000 SF
SF

COMP.
COMP.
22 NOS
NOS
1200
1200 SF
SF

DETAILS OF BUILDING NUMBER -1: (GARMENTS- 1)


7 STORIED BUILDINGS- 25,000 SFT PER FLOOR ESTABLISHED IN 2003

Ground Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor

: VTL store.
: Cutting
: Sewing
: Sewing
: sewing
: sewing
: Conference, Training Room, Accounts & Chairman office.

DETAILS OF BUILDING NUMBER -2 (GARMENTS-2)


7 STORIED BUILDINGS-24,500 SFT PER FLOOR ESTABLISHED IN 2005

Ground Floor : Washing


1st Floor
: GDL (Gothic Design Limited)
nd
2 Floor
: Sample section
3rd Floor
: Sewing
th
4 Floor
: Cutting

5th Floor
6th Floor

: Sewing
: GDL (Gothic Design Limited)

DETAILS OF BUILDING NUMBER -3: (HR)

2 STORIED BUILDINGS
Ground Floor : Training Room, Buyer Inspection Room
1st Floor
: BUHR , Medical & Child Care

DETAILS OF BUILDING NUMBER 4: (LAB)


3 STORIED BUILDINGS

Ground Floor
1st Floor
2nd Floor
3rd Floor

: Lab
: Lab
: Lab
: Empty

DETAILS OF BUILDING NUMBER 5: (CHEMICAL STORE)

3 STORIED BUILDINGS
Ground Floor : Chemical store
1st Floor
: GDL
nd
2 Floor
: Dyes Chemical Store.
rd
3 Floor
: Temporary Fabric Store

BUILDING NUMBER 6: (Staff Quarter)


5 STORIED Staff Quarter

Ground Floor to 5th Floor = Staff Quarter

25. WORKING HOURS & WAGES:

Working Hours (Day)


Overtime (Day)

: 8 hours
: Maximum 2 hours

Working days (Week) : 06


Off Day
: Friday
Lunch Break
: 1 hour
Shift
: Garments 1 shift - 8:00:00 AM to 5:00:00 PM
: Fabric: 3 shifts -(06 AM - 02 PM)(02PM - 10 PM)(10 PM - 06 PM)
: Embroidery 2 shifts - (06 AM 02 PM), (02PM 10 PM)

26. HOLIDAYS & LEAVE :


: Casual Leave : 10 days in a year with full wages
: Sick Leave
: 14 days in a year with full wages
: Earn Leave
: 1day for 18 working days (After 1 year service)
: Maternity Leave : 112 days
: Festival Holiday : 11 days in a calendar year

27. PAY PERIOD


28. TIME KEEPING SYSTEM

: MONTHLY
: Biometric

6
29. ANY COMMITTEE

: WPC & EHS

Toilet

Total
Male

168

Female

144

Fire Extinguisher

Total
ABC 1181
CO2 172
Foam 06

Fire Fighter
First aid Box
First aider
Fire equipment
Suggestions Box
Seating capacity of dining area:

1800
76
205
Beam detector, Heat detector, Smoke detector, Fire
alarm, MPS, Sand bucket , Water bucket, Fire hook,
Gas mask, Hand gloves, Lock cutter, Belsa, Helmet,
Beater, Stretcher, Blanket, Water Drum, Rope,
Birthing App. ,Gong bell, Floor evacuation plan etc.
34
2350

30. FACILITIES AVAILABLE FOR WORKERS IN THE FACTORY:


A) Clinic with Doctor and Paramedics.
B) Day Care Center

31. SUSTAINABILITY INITIATIVE:


A)
B)
C)
D)
E)

Water Savings,
Rain water harvesting,
Water recycling,
Energy saving initiatives,

SAVE and ZDHC Projects,

32. SUSTAINABILITY INITIATIVE:


F) A school for physically challenged & under privilege,
G) TUVT reform project,
H) ECD program,
I) An apprenticeship program,
J) 0 5 clinic,
K) Eye Camp,
L) Blood donation,
M) PRC (parenting resource center).

7
N) Mother and child Care Center and Free Friday Clinic and
33. CERTIFICATE

Computer Center for Bikash School and Community.


: B.S.C.I, FLO, GOTS, Oeko-Tex and ISO- 14001:2004
THANK YOU

S-ar putea să vă placă și