M

G
T12-04-150c/c

T12-04-150c/c
T12-08-150c/c

T12-08-150c/c

9'

10' 11'

12'

13'

13'

14'

15'

16' 17' 18'

9555

1095

T10-09-250c/c

3000

11625

4095

820

2240

3425

3245

3060

2375

2375

6485

C2

1740

4775

C1

T12-07-150c/c

T12-07-150c/c

F1

09

09
09

09

09
09

09

T12-04-150c/c

C2

C5

F1

F2

C2

C3

C2

5015

C4

BRC A142
ANTI-CRACK
MESH

10

10

10

10

10

09

10

10

10

09

10

10

10

22 No. 150mm Risers


20 No. 300mm Treads
175mm thick Waist
150mm thick intermediate landing

T12-05-150c/c

09

09

T12-03-150c/c

T12-03-150c/c

T10-10-200c/c

10

09

T10-10-200c/c

09

09

09

200 X 400 Beam at mid


landing with 2T16 top and
2T16 bottom bars and R8
stirrups at 200c/c

09

T12-01-150c/c
starter bars
09
09

T12-02-150c/c

550

C5

C3

C4

09

09

40T10-10-200- B2&T2
10T12-04-150-T1
10T12-07-150-B1
10T12-04-150-T1

10T12-08-150-T1

F2

C4

F2

F1

C3

C1

C2

2070

4785

F1

4775

09

20T12-05-150-T1
T10-09-250-T2&B2
10T12-03-150-B1
10T12-04-150-T1
10T12-02-150-B1
10T12-01-150-T1
starter bars

F2

C2

09

550

C2

F3

F1

C2

C2

F1

Site
Dimension

150

C2

85

91
C2

200

C20 Mass Concrete


Strip wall footing

200

200

Typical section through edge foundations

F1

F1

K
C1

F1

50mm th. sand blinding


200mm th. well compacted
hardcore base

4420

7535

7550

Well Compacted Murram base


to 95%MDD (Mod AASHTO)

3 Ply Bituminous DPC

A150 BRC Mesh

C25 R.C Pad footing

Gauge 1000 polyethene


DPM
50mm th. sand blinding

Gauge 1000
Polyethene DPM

200mm th. well


compacted hardcore base

01

3 Ply Bituminous DPC

01

1230

01

01

4'

5'

6'

4170

6'

7'

Foundation Layout

200

200

200mm thick clay brick


plinth wall bonded in class III
[1:4] cement-sand mortar with 25mm
hoop iron reinforcement every two courses

04

200mm th. clay brick


Plinth Wall bonded in
class III [1:4] cement sand
mortar with 25mm
hoop iron reinforcement
every two courses

200

C20 Mass Concrete


Strip wall footing

Typical section through internal


foundations

Scale 1:100

Drawing Title:

PROPOSED OFFICE BLOCK TO BE BUILT ON


PLOT NO: ---, BLOCK NO: ---, YUMBE DISTRICT
Structural Engineer:
ENG. P OSELE

OFFICE BLOCK

1.
REFERENCE:All Engineers drawings shall be read in conjunction with the
Architects and any discrepancies should be reported to the
Architect and Engineer

04

FOUNDATION LAYOUT, STAIRCASE AND PAD


DETAILS

2.
DIMENSIONS:All dimensions are in millimeters unless stated otherwise
All dimensions to be checked on site prior to construction
Written dimensions to be followed in preference to scaled dimensions

CLIENT

Mrs. IMMACULATE MUGANWA


Designed and drawn by:
OA

Date:

MAY 2016

Scale:

As shown

Dwg No:

Sheet 1 of 4

02

02
400

SECTION T-T through

3. Foundation
Foundations have been designed on bearing pressure 160 KN/m sqr, the
contractor should evaluate the ground condition during construction and if
the bearing pressure is found less must redesign the foundation
Foundation depth to be determined by Engineer prior to placing concrete.
Minimum Foundation depth to be 1200mm below floor level or 600 mm
below splash apron level, whichever is critical
Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass
concrete.
Maximum allowable fill below ground slab = 500mm

5-CONCRETE:- Reinforced concrete designed to BS8110


Proposed use

Reinforced Concrete
(including ground
bearing slab)
Concrete containing
no embedded metal
Blinding Concrete
Foundation

Grade Permitted Aggregate Max. Agg


type
size
Fine
Coarse
C 30 BS 882

BS 882

20mm

C 20 BS 882
C 15 BS 882

BS 882
BS 882

40mm
20mm

C 30 BS 882

BS 882

20mm

To mesh in slabs
Column (cover to Links)
Slab (cover to main bars)
Foundation
Top Bottom & Sides
Beam (Cover to main bars)

04

200

200

Cover
25mm
30mm
25mm
50mm
50mm
25mm

6.
JOINTS:Movement Joints to be as shown on drawing
Joint is slab to be carried through walls and beams.
7.
WALL TIES:Provide masonry anchors every 2 courses using mild steel hoop iron ties to
BS 1243,1978.
8.
REINFORCEMENT:Reinforcement to be in accordance with Consulting Engineer's Specifications
R --------------denotes round mild steel, to BS4483
T --------------denotes high yield steel, to BS4461

03

F2C2

Typical section through at verandah

03
03

03
03

5T10-02-200-B1

500

230

500

400

200
1000

Date:

400

C1,C2&C3,F1 PLAN

C2 &C5,F2 PLAN

Scale; 1:20

Scale; 1:20

REVISION NOTES:
No:

03

200

Scale: 1:20

4.
BLOCK WORK:All load bearing block walls are to be constructed from solid blocks
of 5.0N/mm sqr minimum characteristic compression strength
complying with BS5628 Part 1, 1978;Structural Use of unreinforced
masonry.
Mortar to conform to designation [III] of table 1, BS 5628, Part 1.

04

Scale: 1:20

Project:

02
200

500
C20 Mass Concrete
Strip wall footing

11805

230

7635

500

3'

4435
8875

6T12-01-200-B2

2'

4435

200

1'

3250
6495

6T12-01-200-B1

200

3250

02
400

Scale; 1:20

755
1190

2375

02

Scale: 1:25

4795

1190

01

Section X-X through F1C1

100

2185

01

95

755

47

T10-02

A98 BRC Mesh

05
47

7670

C25 R.C Pad footing

50mm C15
concrete blinding

5T10-02-200-B2

4595

4T16-04 Starter
Bars

400

9185

Gauge 1000 polyethene DPM

4600

A142 BRC Mesh

C1

6T12-01
50mm thick C15
concrete blinding

200

4595

150mm th. oversite


C25 concrete slab

300

150mm th. C25 oversite concrete slab

400

1190

C1

Site
Dimension

F1

R8-04-175

BRC A142
ANTI-CRACK
MESH

C1

1190

Scale; 1:50

Scale: 1:20

45
95

10T12-08-150-T1
10T12-04-150-T1
10T12-07-150-B1
10T12-04-150-T1
10T12-03-150-B1

INTERNAL STAIR CASE PLAN

C20 Mass Concrete


Strip wall footing

F1

F1

3250

450

230

350

3250

F1
C2

C2

200mm th. clay brick


Plinth Wall bonded in
class III [1:4] cement sand
mortar with 25mm
hoop iron reinforcement
every two courses

230

200

F1

10

95

6495

F1

46

45

C1

BRC A142
ANTI-CRACK
MESH

BRC A142
ANTI-CRACK
MESH

200
F1

C2

3000

10T12-02-150-B1
10T12-04-150-T1
T10-09-250-T2&B2

F1

3800

800 minimum
lap

C3

10T12-01-150-T1
starter bars

75

C3

3000

F1

F1

C2

100
600

C3
C1

17

F1
C2

F1

3 Ply Bituminous DPC

Site Dimension
900 minimum

F1

200mm th. well


compacted hardcore base

100

C5

4595

BRC A142
ANTI-CRACK
MESH

C4

1495

3230

3175

55

F2

Particulars:

Initials:

To be determined on site

F2

XR8-05-150c/c

F2

Gauge 1000
Polyethene DPM

200

C2

285

F2

C2

F1

A98 BRC Mesh

800

C3

1445
C4

4435

F1

75

Gauge 1000 polyethene


DPM
50mm th. sand blinding

1450

C2

F1

95

A142 BRC Mesh

F1

C4

230

F2

F1

C3

F2

8875

C2

C4

150mm th. oversite


C25 concrete slab

70
20

5015

BRC A142
ANTI-CRACK
MESH

4595

4435

1450

F2

16

F1

F3

F1

C2

09

230

VOID

VOID

C1

00

09
09

200 x 400 beam


at mid landing level ( +1650mm),
with 2T16 top and 2T16 bottom
bars and R8 stirrups at 200c/c

4785

12

09

Scale; 1:25

09

3245

3165

4240

4095

3060

09

6485

6485

F2

10

10

2070

4770

F1

09

F1

9555

10

10

GROUND FLOOR LEVEL


(0.000m)

C3
F1

BRC A142
ANTI-CRACK
MESH

10

09

C2

F1

F2
C4

3245

C5

H
2240

F1

F2

10

10

SECTION X-X THRU' STAIRCASE

F2
C2

10

T12-02-150c/c

09

09

09

C2

F1

09

00

C4

10

09

17

F2

10

500

16
1495

10

09

12

C3

F1

42
40

F3

F1

10

09

2375

1095
3000

F1

C1

60
33

F1

C4

C2

09
09

T12-01-150c/c
starter bars

1650

I
4750

C2

F1

4240

C3

10

15
67

F1

12

11

60
33

BRC A142
ANTI-CRACK
MESH

C3

10

09
F1

2375

10

09

T12-03-150c/c

C2

F3

C1

13

F1

F1

BRC A142
ANTI-CRACK
MESH

C2

10

09

09

22 No. 150mm Risers


20 No. 300mm Treads
175mm thick Waist
150mm thick intermediate landing

4750

12445

F1

4785

1740

C2

3360

870 870

6715

10

09

09

09

T12-04-150c/c

05

05

09

F1

T12-03-150c/c

T12-03-150c/c
09

09

T12-05-150c/c

T12-05-150c/c
09

1740

3360

09

09

09

C2

09

09

BRC A142
ANTI-CRACK
MESH

14

T10-09-250c/c

09

F1

C1
F1

09

09
200 x400 floor Beam
to separate detail

C2
F1

4775

4775

B
F1

4775

870 870

4750

C1

15

FIRST FLOOR LEVEL


(+3.25m)

19'

6485

1600

4750

4775

1740

500

8'
4775

4775