Sunteți pe pagina 1din 4

BOOBALAN

VEERAMANI
Contact no: 91-98948
53235
E-ID:
erboobalanv@gmail.com

Career Vista:
Technically accomplished professional with 4.3 years of experience in the area of
Pipe Designing for Refinery and Process Industries. Seeking an opportunity to utilize
my expertise and skills in a renowned organization.

Career Recital:
Dodsal Engineering & Construction (India)Pvt Limited. (Formerly as
I.D.E.A Pvt.Ltd)
Joined as an Engineer Trainee- Aug 2008
Presently working as Senior Engineer
KEY RESPONSIBILITIES
Preparation of Critical Line List as per Critical line Criteria from Project Line list.
Study of P&ID to identify the number of Calculations and Calculation breaks.
Detailed Static analysis of Critical Piping connected to Equipments such as Heat
exchangers, Pressure vessels, Columns, Pump, Air Cooler, Reboiler, Tank and
pipe rack Lines.
Static analysis for various operating conditions such as Design, Operating, Steam
out, Seismic, Wind.
Analyzing of Pressure safety valve lines and Slug lines.
Checking of Flange Leakage and Trunnion Load Check.
Review of Piping routing and Layout for Support Location using review
softwares.
Preparation of Loading Information to Civil department for initial designing of
Piperacks and Structures.
Preparation of Final Stress Reports as per Client Specification.
Preparation of data Sheets for Springs and Sliding plates.
Checking of Isometric drawings with Support type as per Stress analysis.
Preparation of Preliminary Material Take off for Pipe and Fittings.
Preparation of Valve List & Specialties List.

Real time Project works:


Project task # 1: Isomerization Unit, Bandar Abbas Gas Condensate
Refinery Project, Iran. Client : M/s Shanul Farayand Co, Iran.
Responsibilities:

Critical line list Preparation.

Systems definition using P& ID and Critical line list.

Stress analysis of lines connected to pump, Heat Exchanger, Pressure Vessel,


Columns, Air Cooler, PSV under Various Operating Conditions.

Checking Flange Leakage and Trunnion Load Check.


Selection of Supports.
Preparation of Loading Information to Civil department for Initial designing of Pipe
racks and Structures.

Review of Piping routing and Layout for Support Location using Navisworks Freedom.

Data sheet Preparation for Springs.

Preparation of Final Stress Reports.

Checking of Isometrics with Support type as per Stress analysis.

Preparation of Valve List & Specialties List.

Preparation of Preliminary Material Take off for Pipe and Fittings.

Project task # 2: Gas Oil hydrotreater Unit , Bandar Abbas Gas


Condensate Refinery Project, Iran.
Responsibilities:

Critical line list Preparation.

Systems definition using P& ID and Critical line list.

Stress analysis of lines connected to pump, Heat Exchanger, Pressure Vessel,


Columns, Air Cooler, PSV, Burner under Various Operating Conditions.

Checking of Flange Leakage and Trunnion Load Check.

Selection of Supports.

Preparation of Loading Information to Civil department for Initial designing of Pipe


racks and Structures.

Review of Piping routing and Layout for Support Location using Navisworks Freedom.

Preparation of Final Stress Reports.

Checking of Isometrics with Support type as per Stress analysis.

Project task # 3: Kerosene hydrotreater Unit , Bandar Abbas Gas


Condensate Refinery Project, Iran.
Responsibilities:

Critical line list Preparation.

Systems definition using P& ID and Critical line list.

Stress analysis of lines connected to pump, Heat Exchanger, Pressure Vessel,


Columns, Air Cooler, PSV, Burner under Various Operating Conditions.

Checking of Flange Leakage and Trunnion Load Check.

Selection of Supports.

Preparation of Loading Information to Civil department for Initial designing of Pipe


racks and Structures.

Review of Piping routing and Layout for Support Location using Navisworks Freedom.

Preparation of Final Stress Reports.

Checking of Isometrics with Support type as per Stress analysis.

Project task # 4: Habshan Sulphur Granulation Plant (Off-site).


Responsibilities:

Study of P&ID to identify the number of Calculations and Calculation breaks.

Preliminary Stress analysis of Jacketed piping Lines connected to Booster Pumps,


Transfer Pumps, Tanks and Rack Piping.

Checking of Isometrics with Support type as per Stress analysis.

Project task # 5: C-1305 Process design & Engineering Services for nParaffin Fractionation. Client : Tamilnadu petro products limited,
Chennai.
Responsibilities:

Systems definition using P&ID and Critical line list.

Stress analysis of lines connected to pump, Heat Exchanger, Rebolier, Columns.

Checking of Isometrics with Support type as per Stress analysis.

Project task # 6: SRFT-Polyester Industrial Yarn and Allied Project.


Client : M/s SRFT Limited, Gummidipoondi, Chennai.
Responsibilities:

Stress analysis of lines running in Pipe Racks and Lines connected to Heat Exchanger
and Vessels.

Preparation/Checking of MTO for Pipes and Fittings.

Preparation of Valve list and Specialty List.

Checking of Isometric drawings.

Academia:
Masters

of

Engineering

(Advanced

Manufacturing

Technology)

from

Coimbatore Institute of Technology , Coimbatore in 2008 with cgpa of 8.3


Bachelor of Engineering (Mechanical) from Karpagam College of Engineering,
Coimbatore in 2005 with 1ST class percentile.

IT FORTE:
Design Package
Review Softwares
Drafting Package
Other Application

:
:
:
:

CAESAR-II 2011, 5.10.


Navisworks Freedom , Smart Plant Review (SPR)
AutoCAD
MS Office

Personal Dossier:
Date of Birth
:
8th November 1983.
Marital status
: Single.
Languages Known (Speak, Read and Write): English, Tamil
Passport Details:
No :
F2626326
Permanent Address
: 108 , Sowripalayam road, Puliyakulam , Coimbatore ,
Tamilnadu.
I hereby declare that the information furnished above is true to the best of
my knowledge.

Place: Chennai,
Date :

Yours truly,

S-ar putea să vă placă și