SAUDI ARABIA

SHUQAIQ-2 IWPP PROJECT


COURSE-A
ITEM - General
CONTENTS

A-1. Introduction to Shuqaiq-2 IWPP Project


06 June 2009

MITSUBISHI HEAVY INDUSTRIES, LTD.


NAGASAKI SHIPYARD & MACHINARY WORKS

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 2

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 3

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 4

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

1. Salient Features of Project


1.

Plant to be Lump Sum Turnkey Contract for 850 MW net power generation
& 212,000 m3/day RO plant

2.

Major equipment Sourced from Quality Assured Overseas Suppliers


including Japan

3.

Structural Steel along with several equipment Sourced from Qualified Domestic Local Suppliers.

4.

Plant Availability Ensured through selection of Quality Products, Choice of


Reputed Vendors and provision of Adequate Margin over
Duty Points
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 5

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 6

2. MHIs Past Experiences in K.S.A

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 7

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 8

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

3. Overall Plan Shuqaiq-2 IWPP Project (850 MW)


Air

Water

Arabian Heavy Crude Oil


Phase 2

Unit 1

Unit 2

Unit 3

340 MW

340 MW

340 MW

Flue Gas

Flue Gas

Flue Gas

(212,000m3/day)

Waste Water

Waste Water

Waste Water

Waste Water

RO Plant
Potable Water

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 9

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 10

4. Project Outline
1) Project Name
Shuqaiq-2 Independent Water and Power Plant (IWPP) Project
2) Scope of Supply
Lump Sum Turnkey Contract for
- 850 MW Net Power Generation
- 212,000 m3/day RO Plant

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 11

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 12

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

5. Project Location - 1 of 3
Project Location:
Shuqaiq-2 IWPP Project is located next to existing
SWCC Shuqaiq Phase-1 Project

1) 600 km apart from Jeddah city


2) About 100 km distance from Abha, south-west direction
3) About 140 km distance from Jizan, north direction on the
shore of Red sea.

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 13

5. Project Location - 2 of 3
Plant Location From Global Image

Shuqaiq-2 IWPP

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 14

5. Project Location - 3 of 3
Plant Location From Local Image

Sh S
uq qW
aiq EC
-2 /
IW
PP

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 15

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 16

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

6. Project Organization - 1 of 4
=> Major Parties Involved in the Contract:
- Owner
SHUQAIQ Water & Electricity Company, K.S.A.
-Owners Engineers ( Consultant )
ILF Consulting Engineers, Germany
- Contractor
Mitsubishi Heavy Industries Ltd. (MHI), Japan

MHI BUSINESS
CONFIDENTIAL

PAGE 17

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

6. Project Organization (Overall) - 2 of 4

MHIs Sub-Contractors
ARCC

MHI BUSINESS
CONFIDENTIAL

PAGE 18

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

6. Project Organization (MHI Nagasaki) - 3 of 4

Overall Training
Organizer
Classroom Training
Conductor

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 19

6. Project Organization (MHI Shuqaiq Site) - 4 of 4

OJT Conductor

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 20

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 21

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

7. Plant Layout - 1 of 2
Jeddah

Access Road

Ro
ad

132 Kv
&

Ac
ce
s
13

Jizan H
ighway

&
v
K

0
38

or
c
v

er
d
ri

380 Kv
corride
r

See next sheet !


Plant Main Entrance

MHI BUSINESS
CONFIDENTIAL

PAGE 22

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

7. Plant Layout - 2 of 2

Overview from South-East


See next motion view !

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 23

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 24

8. Plant Summary - 1 of 2
Plant Configuration

Arabian Heavy Crude Oil Fired, Conventional


Type with RO Desalination

Main Fuel

Arabian Heavy Crude Oil

No. of Units

Power Units - 3 nos.


RO Unit -1 no, 16 trains
Each power unit consists of
Boiler 1 no.
Turbine 1no.
FGD 1 no.

Power Unit

Common Units

Sea Water supply


Fuel oil supply
Ash Handling system
Demin. Plant
Waster Water system

MHI BUSINESS
CONFIDENTIAL

PAGE 25

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

8. Plant Summary - 2 of 2
Main Performance Data: Site conditions : RSC, Load MCR
Net Heat rate for the plant

10,394 kJ/kWh

Gross heat rate for each power unit

8,662 KJ/KWh

Total net power output (net from three units)

850MW

Gross power output per unit

340 MW

Net Power output per unit

283.33 MW

Maximum continuous rating (Steam)

1,080 ton/h

Total auxiliary power consumption

170 MW (not guaranteed)

Net water output

212,000 m3/day

Gross water output

216,000 m3/day
1,000 m3/day

Waste water treatment system

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 26

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 27

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

9. Design Concept
1. Compliance with Environmental Requirement
2. Enhanced Reliability and Availability with proven MHIs
equipment
3. Enhanced Thermal Efficiency
Steam Turbine: 3-D profile and Integral Shroud Blades
4. Easy Operation
Mitsubishi DCS specifically customized for Boiler and
Turbine, and PLC control customized for FGD, EP, and
Water treatment as manufacturers standard

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 28

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 29

10. Major Equipment - Boiler 1 of 2


MANUFACTURER

MHI-Nagasaki

DESIGN
CONDITION

100% B-MCR

QUANTITY

3 nos.

TYPE

Water Tube Boiler


- Outdoor
- Single-Drum
- Forced Circulation
- Forced Draft System

EVAPORATION

1080 t/h (B-MCR)

MAIN & REHEAT


STEAM
CONDITIONS

172.6 barg x 541 @SH


41 barg x 541 @RH

LOW NOx
COMBUSTION
SYSTEM

Circular corner firing,


OFA system

MHI BUSINESS
CONFIDENTIAL

PAGE 30

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

10. Major Equipment - Boiler 2 of 2


BOILER FRONT
REAR WALL UPPER
HEADER
ECONOMIZER OUTLET
HEADER
1RY SH INLET PIPE

1RY SH OUTLET
HEADER
ROOF INLET HEADER
FRONT WALL UPPER
HEADER
SIDE WALL
OUTLET HEADER

2RY PASS SIDEWALL


OUTLET HEADER

WIND BOX

ROOF PANEL

STEAM DRUM

REAR WALL SCREEN TUBES

R
NE

BOILER
CIRCULATION
PUMP

ECO

GAS TEMPERATURE
PROBE

R
NE

(T)

ER
RN
BU
CL

R
BU
CL

EXPANSION JOINT
NONMETALLIC

1RY SH

C
L OF BOILER
GAS RECIRCULATION FAN
CL

FLUE GAS
TO EP

C
L
AIR HEATER 1B

AIR DUCT

STEAM DRUM

C
LFURNACE

OBSERVATION
PORT

C
L OF BOILER

2RY SH

DESUPERHEATERS

FRONT WALL
HANGER TUBE

E
RN
BU
CL

SECTION A-A

1RY RH

C
L
AIR HEATER 1A

SECTION B-B

3RY SH

R
BU
CL

ACCESS DOOR

C
L FURNACE

2RY PASS REAR WALL TUBES


SOOT BLOWER

2RY RH

DOWN COMER
C
LOFA
C
LOFA
C
L BURNERS

BCP INLET
MANIFOLD

STEAM AIR HEATER


SILENCER

C
L BURNERS

CLFORCED DRAFT FAN

C
L
AIR HEATERS

C
L BURNERS

SILENCER

C
L BURNERS

SILENCERS
BOILER
CIRCULATION
PUMPS

EXPANSION JOINT

+0

BCP OUTLET
MANIFOLD

FORCED DRAFT FANS 1A,1B

FURNACE LOWER HEADER


FURNACE LOWER HEADER
INLET PIPE

GAS RECIRCULATION FANS 1A, 1B

EXPANSION JOINT
NON-METALLIC

MSD-3-0019

Boiler General Arrangement


MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 31

10. Major Equipment - Steam Turbine 1 of 2


MANUFACTURER

MHI-Nagasaki

DESIGN
CONDITION

100% T-MCR

QUANTITY

3 nos.

TYPE

Two Cylinders, Tandem


Compound, Double Exhaust,
Condensing, Reheat Type

RATED OUTPUT

340 MW

DESIGN STEAM
CONDITIONS

166.7 bar(a) x 538 @MSV In.


38.8 bar(a) x 538 @RSV In.

RATED SPEED

3600 rpm

No. OF
EXTRACTIONS

Seven

GOVERNOR
SYSTEM

Electro-Hydraulic System

MHI BUSINESS
CONFIDENTIAL

PAGE 32

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

CL OF NO.2 BRG.

C
L OF MAIN OIL PUMP

C
L OF NO.1 BRG.

C
L OF NO.4 BRG.

NO.2&3 BEARING
PEDESTAL

C
L OF THRUST BRG.

GOV. SIDE

CL OF MAIN STEAM INLET

GEN. SIDE

CL OF NO.3 BRG.

CL OF LP. TURBINE

10. Major Equipment - Steam Turbine 2 of 2

MAIN STEAM INLET

VIBRATION
PICKUP

SPEED PICKUP
VIBRATION
PICKUP

DIFFERENTIAL
PICKUP
NO.4 BEARING PEDESTAL

VIBRATION
PICKUP

KEY PHASOR
PICKUP
ECCENTRICITY
PICKUP

VIBRATION
PICKUP

ROTOR POSITION
PICKUP

ROTOR GROUNDING
DEVICE

ROTATION
C
L OF T/G UNIT

NO.1 EXTRACTION

NO.2 EXTRACTION

NO.2 EXTRACTION

NO.3 EXTRACTION

NO.4 EXTRACTION

LP TURBINE

GLAND STEAM OUTLET

NO.1 EXTRACTION

GLAND STEAM INLET

GLAND STEAM INLET

OPERATING FLOOR

GLAND STEAM OUTET

OPERATING FLOOR

NO.5 EXTRACTION

REHEAT STEAM INLET

NO.6 EXTRACTION

HP EXHAUST(NO.7 EXTRACTION)

MAIN STEAM INLET

HP-IP TURBINE

MSD-3-0071

Sectional View of Turbine Assembly


MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 33

10. Major Equipment - Generator


MANUFACTURER

Mitsubishi Electric Co.

DESIGN
CONDITION

Maximum Output

QUANTITY

3 nos.

TYPE

Horizontal mounted cylindrical


rotor, Rotating field type,
Hydrogen indirect cooled stator ,
Hydrogen direct cooled rotor

MVA OUTPUT

448 MVA

MW OUTPUT

358.4 MW

VOLTAGE

21 kV

CURRENT

12.317 kA

SPEED

3600 rpm

FREQUENCY

60 Hz

Unit 1 Generator Rotor Under Fabrication

Unit1 Generator Stator Frame Under


Fabrication

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 34

Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Salient Features of Project


MHIs Past Experiences in K.S.A
Overall Plan
Project Outline
Project Location
Project Organization
Plant Layout
Plant Summary
Design Concept
Major Equipment
Overall Project Schedule
MHI BUSINESS
CONFIDENTIAL

PAGE 35

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

11. Overall Project Schedule - 1 of 8


1) Signed Date of Contract Agreement : 28 February 2007

MHI BUSINESS
CONFIDENTIAL

PAGE 36

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

11. Overall Project Schedule - 2 of 8


1) Signed Date of Contract Agreement : 28 February 2007
2) Notice to Proceed

: 31 May 2007

MHI BUSINESS
CONFIDENTIAL

PAGE 37

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

11. Overall Project Schedule - 3 of 8


1) Signed Date of Contract Agreement : 28 February 2007
2) Notice to Proceed

: 31 May 2007

Provisional Acceptance Certificate


1. Power Unit 1 PAC

: 30 April 2010

2. Power Unit 2 PAC

: 15 August 2010

3. Power Unit 3 PAC

: 10 November 2010

4. RO Unit PAC

: 05 May 2010

All Units Completion : 30 November 2010


MHI BUSINESS
CONFIDENTIAL

PAGE 38

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

11. Overall Project Schedule - 4 of 8


Signed

NTP

28 Feb 07

31 May 07

RUNNING MONTH
DESCRIPTION
1

U1-Drum
Lifting
15Jan 09

2007

2007
1 2 3 4 5 6 7 8
-5 -4 -3 -2 -1 1 2 3

U1-Hyd
Test

U1-Init.
Firing

15 Jun 09

15 Nov 09

2008

9 10 11 12 1
4 5 6 7 8

U1 Synch
15 Jan 10

2009

2010

2008
2009
2010
2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

KEY SCHEDULE (TARGET)


No.1 BOILER UNIT
No.1 TURBINE UNIT

UNIT-1
C

UNIT-2

UNIT-3

S
ALL

ERECTION WORK START

DESALINATION PLANT (RO)

E
SELECTION OF
SHORTLISTED BIDDERS
PWPA

COMPLETION OF POWER
TRANSMISSION FACILITIES

CLOSING DATE

PROJECT SCHEDULE
- TRANSMISSION LINE (TP1*, TP2*, TP3*)
- LOAD DISPATCH CENTER
- FUEL OIL SUPPLY
- CONNECTION OF NEW POTABLE WATER (TP4*)
* TP: Terminal Point in MHI Plot Plan (H20-001, 1/2)

COMPLETION OF WATER
TRANSMISSION FACILITIES

ICOD

PCOD

for Synchronize

Power Receiving at
Substation

Light

Crude

U1- Compl

U2 Comp.

U3 Compl.

30 Aprl 10

15 Aug 10

10 Nov10

RO Comp.
05 May 10
Microsoft Excel

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 39

11. Overall Project Schedule - 5 of 8

Pile Load Test

Bored Pile
MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 40

11. Overall Project Schedule - 6 of 8

#1 Boiler Drum Lifting

MHI BUSINESS
CONFIDENTIAL

PAGE 41

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

11. Overall Project Schedule - 7 of 8


Boiler Unit 1

Turbine Building
Unit 1

CCB

MHI BUSINESS
CONFIDENTIAL

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

PAGE 42

11. Overall Project Schedule - 8 of 8


Turbine Building-unit 1
Fl- +12000

MHI BUSINESS
CONFIDENTIAL

PAGE 43

GeneralGeneral-Introduction to ShuqaiqShuqaiq-2 IWPP Project

A-1. Introduction to Shuqaiq-2 IWPP Project

End

MHI BUSINESS
CONFIDENTIAL