Description
A water-based firestop
sealant, designed to expand
when exposed to heat
CP 601S Elastomeric
Firestop Sealant
CP 606 Flexible
Firestop Sealant
CP 642/CP 643
Firestop Collar
FS 635 Firestop
Compound
tlk
e0
9^)
&(/
R
84t
sod
c )v
fm,e
Z8Z
645
v iJdj
3
4i5k23awp fiwh
u9+ irdwiloi43i4e riuh.
02 No
12
oeo jtf-x-.v 88u WE
o
bvb 27uze
vh,
ireiv
Firestop
System
ch.
ans
tzm
chu
nds
Bra
NoW
h.
7uze
whriu 88u2 ireiv
iJdjfi e02
vh,
vbvb
m,ev p3i4
-x-.
sodf 3aw
Z8Z2rdwiloi4jtf
oo
4i5ki 12oe
u9+
CP
642
CP 636
Brandsch
utzmrtel
sodfm,ev
iJdjfiwhriuh
Z8Z23awp
. NoWE
4i5kirdwiloi 3i4e0288u
27uze
u9+12oeo4jtf-x-.vbvbvh,
ireiv
o
1-800-879-8000
tlk
e0
9^)
&(/
R
84t
sod
c )v
fm,e
Z8Z
645
v iJdj
3
4i5k23awp fiwh
u9+ irdwiloi43i4e riuh.
02 No
12
oeo jtf-x-.v 88u WE
o
bvb 27uze
vh,
ireiv
Firestop
System
ch.
ans
tzm
chu
nds
Bra
NoW
h.
7uze
whriu 88u2 ireiv
iJdjfi e02
vh,
vbvb
m,ev p3i4
-x-.
sodf 3aw
Z8Z2rdwiloi4jtf
oo
4i5ki 12oe
u9+
CP
642
Features
Benefits
Non-curing formation
No volatile solvents
Intumescent
CP 636
Brandsch
utzmrtel
sodfm,ev
iJdjfiwhriuh
Z8Z23awp
. NoWE
4i5kirdwiloi 3i4e0288u
27uze
u9+12oeo4jtf-x-.vbvbvh,
ireiv
o
1-800-879-8000
Product Information
FS-ONE
High Performance
Intumescent Firestop Sealant
Product description
Intumescent (expands when exposed to fire) firestop sealant that
helps protect combustible and non-combustible penetrations for
up to 4 hours fire rating
Areas of application
tlk
e0
9^
)&
(/R
84
sod
tc
fm
)v
Z8Z ,ev
64
iJ
53
4i5 23aw djfiw
k
h
u9+ irdwil p3i4e riuh.
12 oi4jt 02 No
oeo f-x 88u WE
-.vb 27
o
vbv uze
h, ir
eiv
LA
SSIFIE
Examples
System/Product advantages
Hi
FM
APPROVED
i r e s t o p System
lti F
s
Z - 19. 15 - 471
Ge
rma
n DIN Stand
ar
FS-ONE
Intumescent Firestop Sealant
Ordering
Description
FS-ONE, tube
FS-ONE, foil
FS-ONE, pail
Color
red
red
red
Package contents
Volume
Item No.
Simplicity
00055205
00024669
Confidence
Value
1-800-879-8000
Installation Instructions
FS-ONE
High Performance
Intumescent Firestop Sealant
Product description
Intumescent (expands when exposed to fire) firestop sealant that
helps protect combustible and non-combustible penetrations for
up to 4 hours fire rating
Product features
Technical Data
FS-ONE Intumescent Firestop
(at 73F (23C) and 50% relative humidity)
Chemical basis:
Water-based intumescent acrylic dispersion
Density:
Approx. 1.5 g/cm3
Color:
Red
Working time:
Approx. 20-30 min
Curing time:
Approx. 14-21 days
Shore A Hardness:
Approx. 35
Movement capability:
Approx. 5%
Intumescent Activation:
Approx 250F (121C)
Expansion rate (unrestricted):
Up to 3-5 times original volume
Temperature resistance (cured): -40F (-40C) to 212F (100C)
Application temperature:
35F (2C) to 100F (38C)
Surface burning characteristics: Flame Spread: 0
(ASTM E 84-96)
Smoke Development: 5
Approvals
UL 1479
ASTM E 814
UL 2079
1. Clean opening.
2. Pack mineral
wool. (If required)
3. Apply FS-ONE.
Opening
1. Clean the opening. Surfaces to which FS-ONE will be applied
should be cleaned of loose debris, dirt, oil, moisture, frost and
wax. Structures supporting penetrating items must be installed
in compliance with local building and electrical standards
Application of firestop sealant
2. Install the prescribed backfilling material type and depth to
obtain the desired rating (if required). Leave sufficient depth for
applying FS-ONE.
3. Application of firestop sealant: Apply FS-ONE to the required
depth in order to obtain the desired fire rating. Make sure
FS-ONE contacts all surfaces to provide maximum adhesion.
For application of FS-ONE use a standard caulking gun, foil pack
gun, bulk loader and bulk gun. With FS-ONE buckets, Graco type
sealant pumps may be used. (Contact pump manufacturer for
proper selection.)
4. Smoothing of firestop sealant: To complete the seal, tool immediately to give a smooth appearance. Excess sealant, prior to
curing, can be cleaned away from adjacent surfaces and tools
with water.
5. Leave completed seal undisturbed for 48 hours.
6. For maintenance reasons, a penetration seal could be permanently
marked with an identification plate. In such a case, mark the identification plate and fasten it in a visible position next to the seal.
4. Smooth FS-ONE.
5. Leave completed
seal undisturbed for
48 hours.
6. Fasten identification
plate (if required).
1-800-879-8000
Product Information
FS 657
FIRE BLOCK
Product description
Ready-to-use, intumescent flexible block based on a twocomponent polyurethane foam
Areas of application
LA
SSIFIE
Examples
FM
APPROVED
System/Product advantages
Color
red
Ordering
Designation
FS 657
Simplicity
Volume
3
80 in
Item No.
00306241
Confidence
Value
1-800-879-8000
Installation Instructions
Technical Data
FS 657 FIRE BLOCK
FS 657
FIRE BLOCK
Product description
Ready-to-use, intumescent flexible block based on a twocomponent polyurethane foam
Product features
Approvals
ASTM E 814
UL 1479
1. Clean opening
2. a) Build up blocks
2. b) Cut blocks to
size for penetrations
in place
Opening
1. Clean the opening. Penetration and penetration supporting
structures must be installed in compliance with local building
and electrical standards.
Application of FIRE BLOCKS
2a. If no penetrations are located (temporary firestop), build up
FS 657 FIRE BLOCK firmly seated, within opening.
2b. If penetrations are located (permanent firestop), build up
FS 657 FIRE BLOCK firmly seated, while cutting blocks with
a knife to suit the placed penetrations.
3. Finish building up FIRE BLOCKS until entire opening is filled.
4. Completely fill cable spaces, gaps between blocks and pipes,
and joints with FS-ONE Firestop Sealant.
5. For maintenance reasons, a penetration seal could be permanently marked with an identification plate. In such a case, mark
the identification plate and fasten it in a visible position next to
the seal.
3. Build up blocks
5. Fasten installation
plate in place
(If required)
1-800-879-8000
Product Information
CP 672
Firestop Joint Spray
Product description
A sprayable fire-rated mastic for construction joints where
maximum movement is required
Areas of application
Top-of-wall joints
Curtain wall/perimeter joints
Expansion joints
Firestop
System
Examples
LA
SSIFIE
System/Product advantages
Color
Package
Contents
Volume
Item No.
CP 672, pail
red
1155 in3
00315267
Simplicity
00332214
Confidence
Value
1-800-879-8000
Installation Instructions
Technical Data
CP 672 Firestop Joint Spray
CP 672
Firestop Joint Spray
Product description
A sprayable fire-rated mastic for construction joints where
maximum movement is required
Product features
Contains no halogens, solvents or asbestos
Water based, easy to clean
Sprayable or apply by brush
Approvals
ICBO Evaluation Service, Inc.
California State Fire Marshal
City of New York
City of Los Angeles
Firestop
System
1. Clean opening
3. Spray on CP 672
Opening
1. Clean the opening. Surfaces to which CP 672 will be applied
should be cleaned of loose debris, dirt, oil, moisture, frost and wax.
Application of firestop spray
2. Mineral wool packing
Install the prescribed back filling material type and depth to
obtain desired rating.
3. Application of firestop spray
Apply CP 672 to the required depth in order to obtain the
desired rating. Make sure CP 672 contacts all surfaces and
overlaps 1/2" beyond all surrounding surfaces.
Benron EZ-Tex Sprayer and Graco Texspray Compact HP
pumps have been successful in applying CP 672 Firestop Joint
Spray. Contact Hilti Technical Support for more information.
4. Curing of firestop spray
Allow 5 to 7 days (@ 73F) for CP 672 to fully cure
5. For maintenance reasons, joint seal could be permanently marked
with an identification plate. In such a case, mark the installation
plate and fasten it in a visible position next to the seal.
5. Fasten identification
plate (if required)
1-800-879-8000
Product Information
CP 601S
Elastomeric Firestop Sealant
Product description
Areas of application
LA
SSIFIE
Examples
System/Product advantages
CP 601S
Elastomeric Firestop Sealant
Description
Color
CP 601S, tubes
CP 601S, foil
CP 601S, pail
red
red
red
Package
Contents
Volume
Item No.
3
18 in
36 in3
1155 in3
00314268
00314269
00314270
00055205
00024669
10
1-800-879-8000
Installation Instructions
CP 601S
Elastomeric Firestop Sealant
Product description
Product features
Technical Data
CP 601S Elastomeric Firestop Sealant
(at 73F (23C) and 50% relative air humidity)
Density:
Approx. 1.4 g/cm3
Color:
Red
Application temperature:
40F (5C) to 77F (25C)
Skin-forming time:
Approx. 15 min.
Curing rate:
Approx. 1/8" per day
Volume shrinkage:
Approx. 0 5%
Movement capability:
Approx. 25%
Temperature resistance:
-30F (-34C) to 302F (150C)
Surface burning characteristics:
Flame spread: 0
(ASTM E84-96)
Smoke development: 30
Approvals
UL 2079
ASTM E 1399
UL 1479
ASTM E 814
ASTM C 920
1. Clean opening.
3. Apply CP 601S.
4. Smooth CP 601S.
Opening
1. Clean the opening. Joint sides must be sound, dry and free from
dust, oil and grease.
Application of firestop
2. Insert fill of mineral wool (or backer as required).
3. Apply firestop over backer.
4. Smooth firestop sealant with a trowel before the skin forms.
Once cured, CP 601S can only be removed mechanically.
5. For maintenance reasons (not shown), a penetration seal could
be permanently marked with an identification plate. In such a
case mark the identification plate and fasten it in a visible
position next to the seal.
Chemical resistance
At room temperature the cured silicone sealant is resistant for a
short time to diluted (5%) acids and lyes/alkalis as well as
commercially available cleaning agents and disinfectants (except
those containing iodine).
Concentrated acids and lyes/alkalis destroy silicone rubber
over time.
Solvents and mineral oils cause cured silicone to swell.
Consequently, proper functioning of the sealant should be
checked after exposure to a solvent / mineral oil.
Not to be
Used on areas immersed in water
Painted
Safety precautions
Keep out of reach of children.
Read the material safety data sheet.
Eyes and hands must be suitably protected.
Avoid contact with eyes/skin.
Only use in well ventilated areas.
Storage
Store only in the original packaging in a location protected from
moisture at a temperature of 40F (5C) to 77F (25C).
Observe expiration date on packaging.
11
1-800-879-8000
Product Information
CP 606
Flexible Firestop Sealant
Product description
Areas of application
Examples
SSIFIE
D
System/Product Advantages
fanstalt f.
lpr
d.
ia
Amtl. Ma
te
r
Paintable
Meets 500 cycle requirements (ASTM E 1399 & UL 2079)
Smoke, gas and water resistant
Easy clean up with water
sen
uwe
Ba
Br
VMPA
a u n s c h w ei
PA-III 2.2654
DIN 4102 - B1
berwacht
CP 606, tube
CP 606, foil
CP 606, pail
Color
white
white
white
Package
Contents
Volume
Item No.
3
Simplicity
00314271
00314272
00314273
00055205
00024669
Confidence
Value
12
1-800-879-8000
Installation Instructions
Technical Data
CP 606 Flexible Firestop Sealant
CP 606
Flexible Firestop Sealant
Product description
Product features
Silicone free
Halogen, asbestos and solvent free
UV-resistant
Approvals
UL 2079
ASTM E 1399
ASTM C 920
1. Clean opening.
3. Apply CP 606.
Opening
1. Clean the opening. Joint sides must be sound, dry and free from
dust, oil and grease.
Application of firestop
2. Insert fill of mineral wool (or backer as required).
3. Apply firestop over backer.
4. Smooth firestop sealant with a trowel before the skin forms.
Once cured, CP 606 can only be removed mechanically.
5. For maintenance reasons (not shown), a penetration seal could
be permanently marked with an identification plate. In such a
case mark the identification plate and fasten it in a visible
position next to the seal.
Notice about approvals
When using Hilti CP 606 Flexible Firestop Sealant, check
that the joint application has been sealed according to the
applicable drawing in the UL Fire Resistance Directory or Hilti
Firestop Manual.
4. Smooth CP 606.
Not to be used
On areas immersed in water
Safety precautions
Keep out of reach of children.
Read the material safety data sheet.
Eyes and hands must be suitably protected.
Avoid contact with eyes/skin.
Only use in well ventilated areas.
Storage
Store only in the original packaging in a location
protected from moisture at a temperature of 40F (5C) to
77F (25C).
Observe expiration date on top of package.
13
1-800-879-8000
Product Information
CP 643
Firestop Collar
Product description
Areas of applicaton
h.
sc
an
tzm
hu
sc
nd
E
oW
N uze
iuh.
6
whr 288u27 , ireiv
CP
djfi
v iJ 4e0 bvbvh
.v
fm,e p3i
-xsod
23aw i4jtf
Z8Z irdwilo o
4i5k 2oeo
1
u9+
Bra
42
Types of installation
LA
SSIFIE
Example
System/Product advantages
Description
Ordering
Designation
Item No.
1
1
1
1
CP 643-50/1.5"
CP 643-63/2"
CP 643-90/3"
CP 643-110/4"
00307707
00307708
00307709
00307710
Fastening Hook
CP 643-hook
00307701
Simplicity
CP 643
Confidence
Value
14
1-800-879-8000
Installation Instructions
CP 643
Firestop Collar
Product description
Product features
Dimensions
CP 643 Collar/plastic pipes
Designation/
size
CP 643-50/1.5
CP 643-63/2
CP 643-90/3
CP 643-110/4
Approvals
ICBO Evaluation Service, Inc.
California State Fire Marshall
City of New York
City of Los Angeles
UL 1479
ASTM E 814
Firestop
System
Opening
1. Clean the plastic pipes. Expansion of the intumescent material
during a fire acts to close the plastic pipe. Very dirty pipes with,
for example, remains of mortar, may lead to a delay in this
closing action. Badly soiled plastic pipes should, therefore, be
cleaned in the area where the CP 643 firestop collar is to
be installed.
Application of firestop system
2. Seal the opening. Gaps must be closed with FS-ONE. The
approved methods vary and are given in the specific UL system.
3. Close the CP 643 firestop collar. Place the CP 643 firestop collar
around the plastic pipe and lock the closure with firm pressure
until it latches.
4. Attach fastening hooks. The fastening hooks can be attached to
various points on the metal housing. This allows the fastening
points to be made to suit the space available in each case.
The hooks must be positioned as symmetrically as possible.
The required number of fastening hooks is indicated on
the packaging.
5. Fastening the CP 643 firestop collar. Only when fastened properly
can CP 643 protect against fire passing through.
- Mark the fastening points.
- Drill holes with a Hilti rotary hammer drill (i.e. TE 5) or,
depending on base material, fasten using Hilti power actuated
tool (e.g. DXA 40).
4. Attach fastening
hooks
15
1-800-879-8000
Product Information
CP 642
Firestop Collar
Product description
Areas of application
h.
sc
an
tzm
hu
sc
nd
E
oW
ze
h. N
6
hriu 88u27uireiv
CP
djfiw
h,
v iJ 4e02bvbv
3i
.v
m,e
sodf awp jtf-x23
i4
Z8Z irdwilo
oo
4i5k 12oe
u9+
Bra
42
LA
SSIFIE
Types of installation
Examples
Hil
FM
APPROVED
restop Syste
ti Fi
m
Z - 19. 17 - 835
Ge
rma
n DIN Stand
ar
System/Product advantages
Snap connection for quick and easy closure without use of a tool
Adjustable position tabs for convenient fastening
Ready to use out of the package
Description
Ordering
Designation
Item No.
1
1
1
CP 642-160/6"
CP 642-200/8"
CP 642-250/10"
00236709
00310084
00310085
Fastening hook
Spare part
10
CP 642 hook
00236711
Simplicity
CP 642
Confidence
Value
16
1-800-879-8000
Installation Instructions
Dimensions
CP 642 Collar/plastic pipes
CP 642
Firestop Collar
Designation
Pipe outside
dia. (in.)
Product description
CP 642-160/6
CP 642-200/8
CP 642-250/10
5.3-6.3
7.9
9.8
Product features
Approvals
Collar outside
Collar
No. of
dia. (in.)
Height (in.) hooks and
fasteners
8.2
4.4
6
10.0
6.9
7
12.4
9.1
9
UL 1479
ASTM E 814
Firestop
System
3. Close collar.
Opening
1. Clean the plastic pipes. Expansion of the intumescent material
during a fire acts to close the plastic pipe. Very dirty pipes with,
for example, remains of mortar, may lead to a delay in this
closing action. Badly soiled plastic pipes should, therefore, be
cleaned in the area where the CP 642 firestop collar is to
be installed.
Application of firestop system
2. Seal the opening. Gaps must be closed with FS-ONE. The
approved methods vary and are given in the specific UL system.
3. Close the CP 642 firestop collar. Place the CP 642 firestop collar
around the plastic pipe and lock the closure with firm pressure
until it latches.
4. Attach fastening hooks. The fastening hooks can be attached to
various points on the metal housing. This allows the fastening
points to be made to suit the space available in each case.
The hooks must be positioned as symmetrically as possible.
The required number of fastening hooks is indicated on
the packaging.
5. Fastening the CP 642 firestop collar. Only when fastened properly
can CP 642 protect against fire passing through.
- Mark the fastening points.
- Drill holes with a Hilti rotary hammer drill (i.e. TE 5) or,
depending on base material, fasten using Hilti power actuated
tool (e.g. DXA 40).
17
1-800-879-8000
Product Information
CP 618
Firestop Putty Stick
Product description
An intumescent, non-hardening, firestop putty for cable
and pipe penetrations
Areas of application
Examples
LA
SSIFIE
System/Product advantages
Reusable
Easy to add or subtract cables
Fast installation time
Color
Package
Contents
Volume
3
Simplicity
Item No.
00314721
Confidence
Value
18
1-800-879-8000
Installation Instructions
Technical Data
CP 618 Firestop Putty Stick
CP 618
Firestop Putty Stick
Product description
An intumescent, non-hardening, firestop putty for cable
and pipe penetrations
Product features
Contains no volatile solvents or asbestos
Water resistant
Easy to re-penetrate
Approvals
UL 1479
ASTM E 814
1. Clean opening
2. Slice CP 618 to be
packed into opening
from stick
3. Pack in CP 618
Opening
1. Clean the opening. Surfaces to which CP 618 will be applied
should be cleaned of loose debris, dirt, oil, moisture, frost
and wax.
Application of firestop putty
2. Backing material
Install the prescribed backing material, if required.
3. Application of firestop putty
Install CP 618 Firestop Putty to the required depth, making
sure that the putty contacts all surfaces to provide the
greatest adhesion.
4. Smooth CP 618 putty.
5. Marking
For maintenance reasons, a penetration seal could be
permantently marked with an identification plate. In such a
case, mark the identification plate and fasten it in a visible
position next to the seal.
6. Re-installation (not shown)
Remove and re-install CP 618 Firestop Putty as needed.
4. Smooth CP 618
5. Fasten installation
plate (if required)
19
1-800-879-8000
Product Information
CP 617
Firestop Putty Pad
Product description
An intumescent moldable firestop putty designed to help protect
electrical outlet boxes
Areas of application
Protection of:
Electrical cabinets
Mechanical cabinets
Electrical outlet boxes
Examples
Where two outlets are within a single stud/cavity or within 24"
LA
SSIFIE
System/Product advantages
Applied by hand
Fast installation
Color
red
Package
Contents
Simplicity
Area
Item No.
2
42 in per pad
00309760
Confidence
Value
20
1-800-879-8000
Installation Instructions
Technical Data
CP 617 Firestop Putty Pad
CP 617
Firestop Putty Pad
Product description
An intumescent moldable firestop putty designed to help protect
electrical outlet boxes
Product features
Applied by hand
Fast installation
Approvals
ICBO Evaluation Service, Inc.
California State Fire Marshall
City of New York
City of Los Angeles
2. Adhere CP 617
to application
21
1-800-879-8000
Product Information
FS 635
Trowelable Firestop Compound
CP 636
Brands
chutzm
rtel
sodfm,e
v iJdjfiwh
Z8Z23a
riuh. No
wp3i4e
0288u WE
4i5kirdw
27uze
iloi4jtf-
x-.vbvb
u9+12
vh, ireiv
oeoo
Product description
Fire-resistant, cement-based mortar suitable for firestopping
large openings.
Areas of application
LA
SSIFIE
Examples
R
System/Product advantages
Fast cleanup
Paintable
Simple application by trowel
Color
Packaging
contents
Volume
Item No.
FS 635, pail
red
40 lbs
1260 in3
00220425
Simplicity
Confidence
Value
22
1-800-879-8000
Installation Instructions
FS 635
Trowelable Firestop Compound
Product description
Fire-resistant, cement-based mortar suitable for firestopping
large openings.
Product features
High yield
Adheres very well to common substrates (steel, concrete
or masonry)
Contains no asbestos, phenol or halogen constituents
Technical Data
FS 635 Firestop Compound
(at 73F (23C) and 50% relative humidity)
Mix ratio:
40 lb:2 gal (mortar to water)
Application temperature:
Ideal between 40F (5C) and 110F (43C)
Color:
Red
Form removal (depending on
consistency):
Approx. 24 hours
Density (ASTM E605):
Approx. 55 pcf
Compressive strength
(after 28 days at 74F):
Approx. 360 psi
Surface burning characteristics:
Flame spread: 0
(ASTM E84-96)
Smoke development: 0
Bond strength (ASTM E726)
To concrete: approx. 4500 psf
To steel: approx. 3400 psf
Thermal conductivity (ASTM C518) 1748 BTU-in./hr ft2F
Approvals
ICBO Evaluation Service, Inc.
California State Fire Marshal
City of New York
City of Los Angeles
1. Clean opening,
moisten surfaces
Opening
1. Clean and pre-moisten surfaces.
- Cables and cable supporting structures must be installed in
compliance with local building and electrical standards.
Application of firestop compound
2. Mix the mortar.
- Add water to mortar in a ratio of about 2 gallons to 40 lbs.
(water to mortar). Stir the mixture thoroughly with, for
example, a Hilti mixing paddle. The mix ratio of water
to FS 635 determines the desired consistency (stiffness).
- Do not use any other binders or additives/aggregates.
3. Apply the mortar.
- Use forms on one or both sides for larger penetrations, as
needed. Apply mixed mortar in the opening using a trowel or
a pump and compact it. Make sure all gaps and spaces are
completely filled and closed.
4. For maintenance reasons, a penetration seal could be
permanently marked with an identification plate. In such a
case mark the identification plate and fasten it in a visible position
next to the seal.
4. Fasten identification
plate in place
(if required)
23
1-800-879-8000
Firestop Accessories
Description
Item Number
Picture
00024669
000220139
00055205
00024825
98450002
Follow Plate
98450004
98450020
00332214
00236993
00024155
00029410
00029783
00306219
1
2
6
5
Simplicity
Confidence
Value
24
1-800-879-8000
Selection Chart
G Gypsum
W Wood Frame
Match the two items within the selection chart below to identify the Hilti UL System. Additional systems are available by contacting
your local Hilti Sales Representative or Customer Service at (800) 879-8000.
Base
Material
Fire
Rating
(F Rating)
Hilti
Product
Used
UL
System
Number
Page
Number
3-hour
FIRE BLOCK
CAJ 0055
28
Blank opening
3-hour
CP 618
CAJ 0058
29
3-hour
FS-ONE
CAJ 1155
31
3-hour
FS-ONE
CAJ 1184
32
3-hour
FS-ONE
CAJ 1226
33
Penetrating Item
Blank Openings
Metal Pipe
(sleeved or unsleeved)
(sleeved or unsleeved)
C
3-hour
CP 618
CAJ 1276
34
3-hour
CP 618
CAJ 1277
35
3-hour
FS-ONE
CAJ 1278
36
4-hour
FS-ONE
WJ 1041
64
4-hour
FS-ONE
WJ 1042
65
1 or 2-hour
FS-ONE
WL 1054
72
2-hour
FS-ONE
WL 1058
73
1 or 2-hour
FS-ONE
WL 1085
74
4-hour
FS-ONE
WL 1110
75
4-hour
FS-ONE
WL 1111
76
1 or 2-hour
FS-ONE
FC 1009
58
3-hour
CP 642/643
CAJ 2109
37
3-hour
CP 642/643
CAJ 2110
38, 39
3-hour
FS-ONE
CAJ 2118
40
3-hour
FS-ONE
CAJ 2141
41
3-hour
FS-ONE
CAJ 2217
42
2-hour
CP 642/643
FA 2025
57
1 or 2-hour
FS-ONE
WL 2075
77
1 or 2-hour
CP 642/643
WL 2078
78
1 or 2-hour
FS-ONE
WL 2098
79
1 or 2-hour
CP 643
FC 2025
59
1-hour
CP 643
FC 2030
60
1-hour
61
(sleeved)
C
25
1-800-879-8000
Selection Chart
Base
Material
Fire
Rating
(F Rating)
Hilti
Product
Used
UL
System
Number
Page
Number
3-hour
FS-ONE
CAJ 3095
43
Multiple cables
3-hour
CP 642/643
CAJ 3096
44
Single cable
3-hour
CP 618
CAJ 3138
45
Multiple cables
3-hour
CP 618
CAJ 3139
46
3-hour
FS 635
CAJ 4017
47
Penetrating Item
Cables/Cable Trays
C
3-hour
FIRE BLOCK
CAJ 4035
48
2-hour
CP 618
WJ 3036
66
2-hour
FIRE BLOCK
WJ 4016
67
1 or 2-hour
FS-ONE
WL 3065
80
1 or 2-hour
CP 618
WL 3111
81
1 or 2-hour
CP 618
WL 3112
82
1 or 2-hour
FIRE BLOCK
WL 4011
83
(sleeved or unsleeved)
(sleeved or unsleeved)
G
1 or 2-hour
FIRE BLOCK
WL 4019
84
1 or 2-hour
FS-ONE
FC 3012
62
3-hour
FS-ONE
CAJ 5090
49
2-hour
FS-ONE
CAJ 5091
50
2-hour
FS-ONE
CAJ 5113
51
4-hour
FS-ONE
WJ 5028
68
1 or 2-hour
FS-ONE
WL 5025
85
1 or 2-hour
FS-ONE
WL 5028
86
1 or 2-hour
FS-ONE
WL 5029
87
4-hour
FS-ONE
WL 5073
88
1 or 2-hour
FS-ONE
FC 5004
63
Electrical busway
3-hour
FS 635
CAJ 6006
52
Electrical busway
3-hour
FS-ONE
CAJ 6017
53
1-hour
FS 601
WJ 7001
69
1-hour
FS 601
WL 7003
89
1-hour
FS-ONE
WL 7017
90
Simplicity
Confidence
Value
26
1-800-879-8000
Selection Chart
Base
Material
Fire
Rating
(F Rating)
Hilti
Product
Used
UL
System
Number
Page
Number
3-hour
FS 635
CAJ 1140
30
3-hour
FS-ONE
CAJ 8041
54
3-hour
FIRE BLOCK
CAJ 8056
55
2-hour
FS-ONE
WJ 8004
70
4-hour
FIRE BLOCK
WJ 8007
71
2-hour
FS-ONE
WL 8004
91
1 or 2-hour
FIRE BLOCK
WL 8013
92
4-hour
FIRE BLOCK
WL 8014
93
3-hour
CP 601S
FFD-1011*
94
2-hour
CP 606
FFD-1012*
95
2-hour
CP 672
FFD-1013*
96
3-hour
CP 601S
FWD-1011*
97
2-hour
CP 606
FWD-1012*
98
Penetrating Item
Large Openings
Multiple Penetrations
C
2-hour
CP 672
FWD-1013*
99
1 or 2-hour
FS 601 or
HWD-0008
104
(top of wall)
FS-ONE
3-hour
CP 601S
HWD-1008*
108
2-hour
CP 606
HWD-1009*
109
3-hour
CP 601S
WWD-1011*
110
(top of wall)
(top of wall)
2-hour
CP 606
WWD-1012*
111
1 or 2-hour
FS 601 or
HWD-0003
100
1 or 2-hour
FS 601
HWD-0004
101, 102
1 or 2-hour
FS 601 or
HWD-0005
103
HWD-0010
105
FS-ONE
G
FS-ONE
G
1 or 2-hour
FS 601 or
FS-ONE
2-hour
CP 672
HWD-0042*
106
1 or 2-hour
CP 606
HWD-0045*
107
27
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Cut FIRE BLOCK 1/2" larger than diameter of opening. Firmly pack FIRE BLOCK into opening. Orientation of FIRE BLOCK is
noted above in the UL System Drawing.
Simplicity
Confidence
Value
28
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack backer rod into opening as a permanent form. Backer rod should be recessed from top surface of floor
or from both surfaces of wall as required to accommodate the required thickness of fill material.
STEP 3 - FIRESTOP PUTTY: Apply the required thickness of putty material over the backing material within the annulus, flush with top surface of
floor or with both surfaces of wall.
Simplicity
Confidence
Value
29
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING: Cut forms (i.e. plywood or foam insulation board) to fit as closely as possible around all penetrating items. To keep FS 635
from sticking to the forms, cover them with plastic or apply an appropriate release agent. Fasten forms to the surface of the substrate or friction fit
forms within opening to allow a min. 2-1/2" space for FS 635. Seal any remaining gaps with Hilti CF 128 Filler Foam and allow it to cure for at least
1 hour.
STEP 3 - FIRESTOP COMPOUND: Mix FS 635 with water according to the instructions on the container. Apply mixture in the forms to a min. depth
of 2-1/2". Using a trowel, push the material in place to completely fill the opening and smooth the surface for neat, finished appearance.
STEP 4 - REMOVE FORMS (optional): Forms may be removed after 24 hours.
30
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
31
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant flush with the top or bottom of the floor. Wall penetrations and Pre-cast
(Hollow-Core) Units require Firestop Sealant installed flush with both sides. Tool the sealant with a putty knife to push it in place and smooth the
surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
32
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping material.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
33
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP PUTTY: Apply the required depth of putty material within the annulus, flush with top surface of floor or with both surfaces
of wall.
Simplicity
Confidence
Value
34
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack backer rod into opening as a permanent form. Backer rod should be recessed from top surface of floor
or from both surfaces of wall as required to accommodate the required thickness of fill material.
STEP 3 - FIRESTOP PUTTY: Apply the required thickness of putty material over the backing material within the annulus, flush with top surface of
floor or with both surfaces of wall.
Simplicity
Confidence
Value
35
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant flush with the top of the floor. Wall penetrations require Firestop
Sealant installed flush with both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal
undisturbed for 48 hours.
Simplicity
Confidence
Value
36
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: To impede cold smoke, apply Firestop Sealant within annulus, flush with bottom surface of floor or both surfaces
of wall.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to base material with recommended fasteners. Wall penetrations require the installation of a firestop device on both sides.
Simplicity
Confidence
Value
37
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: To impede cold smoke, apply Firestop Sealant within annulus, flush with bottom surface of floor or both surfaces
of wall.
STEP 3 - COVER PLATE: Cut sheet metal cover plate out of min. 18 Ga. steel with max. inside diameter 1/4" larger than outside diameter of pipe.
The outer diameter of cover plate should be 2-1/2" larger than outside diameter of pipe. Install on underside of floor or both sides of wall between
collar and floor or wall surface.
STEP 4 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
"click". Install the required number of mounting tabs around the device and secure to base material with recommended fasteners. Wall penetrations require the installation of a firestop device on both sides.
R
38
1-800-879-8000
Simplicity
Confidence
Value
39
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
40
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 -FORMING MATERIAL: Install the required depth of CF 128 Filler Foam around the penetrating item as a permanent form. Forming material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
41
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: To impede cold smoke, apply Firestop Sealant within annulus, flush with bottom surface of floor or both surfaces
of wall.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
"click". Install the required number of mounting tabs around the device and secure to base material with recommended fasteners. Wall penetrations require the installation of a firestop device on both sides.
Simplicity
Confidence
Value
42
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
43
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
STEP 4 - FIRESTOP DEVICE: Place the device around the cable bundle and press together the open ends firmly until it catches (close) with an
audible click. Install the required number of mounting tabs around the device and secure to base material with recommended fasteners.
Wall penetrations require the installation of a firestop device on both sides.
R
44
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clear, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP PUTTY: Apply the required thickness of putty material over the backing material within the annulus, flush with top surface of
floor or with both surfaces of wall.
Simplicity
Confidence
Value
45
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of putty material.
STEP 3 - FIRESTOP PUTTY: Apply the required thickness of putty material over the packing material within the annulus, flush with top surface of
floor or with both surfaces of wall.
Simplicity
Confidence
Value
46
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING: Cut forms (i.e, plywood or foam insulation board) to fit as closely as possible around all penetrating items. To keep FS 635
from sticking to the forms, cover them with plastic or apply an appropriate release agent. Fasten forms to the surface of the substrate or friction fit
forms within opening to allow a min. 2-1/2" space for FS 635. Seal any remaining gaps with Hilti CF 128 Filler Foam and allow it to cure for at least
1 hour.
STEP 3 - FIRESTOP COMPOUND: Mix FS 635 with water according to the instructions on the container. Apply mixture in the forms to a min. depth
of 2-1/2". Using a trowel, push the material in place to completely fill the opening and smooth the surface for neat, finished appearance.
STEP 4 - REMOVE FORMS (optional): Forms may be removed after 24 hours.
47
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
48
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
49
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal
undisturbed for 48 hours.
Simplicity
Confidence
Value
50
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal
undisturbed for 48 hours.
51
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING: Cut forms (i.e. plywood or foam insulation board) to fit as closely as possible around penetrating item. To keep FS 635 from
sticking to the forms, cover them with plastic or apply an appropriate release agent. Fasten forms to the surface of the substrate or friction fit
forms within opening to allow a min. 2-1/2" space for FS 635. Seal any remaining gaps with Hilti CF 128 Filler Foam and allow it to cure for at least
1 hour.
STEP 3 - FIRESTOP COMPOUND: Mix FS 635 with water according to the instructions on the container. Apply mixture in the forms to a min. depth
of 2-1/2". Using a trowel, push the material in place to completely fill the opening and smooth the surface for neat, finished appearance.
STEP 4 - REMOVE FORMS (optional): Forms may be removed after 24 hours.
52
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
53
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus. Wall penetrations require
Firestop Sealant installed on both sides. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
54
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of
FIRE BLOCK is noted above in the UL System Drawing.
STEP 3 FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
55
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - METAL PLATE ENCLOSURE: Build metal pan enclosure to dimensions listed in drawing. Both ends of plate, perpendicular to flutes,
should be cut to permit the ends to be bent upward 90 to follow the contour of the metal deck.
STEP 3 - PACKING MATERIAL: Firmly pack mineral wool into flutes of metal deck above metal plate enclosure to completely fill cavities. Bend
metal enclosure to conform to metal decking enclosing the packing material.
STEP 4 - FIRESTOP SEALANT: Apply bead of Firestop Sealant around the perimeter of the metal plate enclosure at the interface of the enclosure and
steel deck.
STEP 5 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to base material with recommended fasteners. Wall penetrations require the installation of a firestop device on both sides.
R
56
1-800-879-8000
Simplicity
Confidence
Value
57
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT AT SUBFLOOR: Apply the required depth of Firestop Sealant in the annular space between the pipe and subfloor. Tool
the sealant with a putty knife to push it in place and smooth the surface.
STEP 3 - FIRESTOP SEALANT AT TOP PLATE: Apply a generous bead of Firestop Sealant in the annular space between the pipe and the top plate.
Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for 48 hours.
Simplicity
Confidence
Value
58
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annular space between the pipe and subfloor and between the
pipe and the top plate. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for
48 hours.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to the subfloor, with recommended fasteners.
Simplicity
Confidence
Value
59
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annular space between the pipe and subfloor and between the
pipe and the top plate. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for
48 hours.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to the top plate, with recommended fasteners.
Simplicity
Confidence
Value
60
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annular space between the pipe and subfloor and between the
pipe and the top plate. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for
48 hours.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to the subfloor, with recommended fasteners.
STEP 4 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annular space between the branch pipe and the subfloor. Tool the
sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for 48 hours.
61
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT AT SUBFLOOR: Apply the required depth of Firestop Sealant in the annular space between the cables and the subfloor. Tool the sealant with a putty knife to push it in place and smooth the surface.
STEP 3 - FIRESTOP SEALANT AT TOP PLATE: Apply a generous bead of firestop sealant in the annular space between the cables and the top plate.
Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for 48 hours.
Simplicity
Confidence
Value
62
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT AT SUBFLOOR: Apply the required depth of Firestop Sealant in the annular space between the insulated pipe and the
subfloor. Tool the sealant with a putty knife to push it in place and smooth the surface.
STEP 3 - FIRESTOP SEALANT AT TOP PLATE: Apply a generous bead of firestop sealant in the annular space between the insulated pipe and the top
plate. Tool the sealant with a putty knife to push it in place and smooth the surface. Leave both completed seals undisturbed for 48 hours.
Simplicity
Confidence
Value
63
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annulus, flush with both sides of wall. Tool the sealant with a
putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
64
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annulus, flush with both sides of wall. Tool the sealant with a
putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
65
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP PUTTY: Putty to be forced into interstices of cables to maximum extent possible. Also, apply the required depth of putty
material within the annulus, with additional crown on both sides of wall.
Simplicity
Confidence
Value
66
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
67
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annulus, flush with both sides of wall. Tool the sealant with a
putty knife to push it in place and smooth the surface. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
68
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant in the annular space between the duct and wall on both sides and tool
with a putty knife until flush with both surfaces. Leave completed seal undisturbed for 48 hours.
STEP 3 - STEEL RETAINING ANGLE: Leave seal undisturbed for 48 hours before attaching angle. Fasten recommended steel angle to all four sides
of the air duct on both sides of the wall with the appropriate fasteners and recommended spacing. Angle does not have to be attached to the wall.
Simplicity
Confidence
Value
69
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - SLEEVE (hollow block walls only): Measure the thickness of the wall and cut No. 8 steel wire mesh or sheet metal (min. 20 gauge) to a
length 1/4" less than the wall thickness. Center the sleeve in the wall and form it to fit the perimeter of the opening. Ends (seam) should overlap at
least 1".
STEP 3 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating items as a permanent form. Packing material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 4 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the annulus on both sides of wall and
tool with a putty knife until flush with both surfaces. Leave completed seal undisturbed for 48 hours.
70
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
71
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
72
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - SLEEVE: Cut No. 8 steel wire mesh or min. 20 gauge galvanized sheet metal to a length of 4-3/4". Form it into a cylindrical shape and
insert it into the opening. Center it in the wall and allow it to spring out and conform to the opening. Ends (seam) should overlap at least 1".
STEP 3 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating items as a permanent form. Packing material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 4 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
73
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
74
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
75
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
76
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
77
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: To impede cold smoke, apply required depth of Firestop Sealant in annular space around pipe.
STEP 3 - FIRESTOP DEVICE: Place the device around the plastic pipe and press together the open ends firmly until it catches (close) with an audible
click. Install the required number of mounting tabs around the device and secure to base material with recommended fasteners.
STEP 4 - FIRESTOP SEALANT: Leave completed cold smoke seal undisturbed for at least 48 hours. Repeat steps 1-4 on the opposite side
of the wall.
Simplicity
Confidence
Value
78
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
79
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
80
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP PUTTY: Putty to be forced into interstices of cables to maximum extent possible. Also, apply the required depth of putty
material within the annulus, with additional crown on both sides of wall.
Simplicity
Confidence
Value
81
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the cables as a permanent form. Packing material should be
recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Putty.
STEP 3 - FIRESTOP PUTTY: Putty to be forced into interstices of cables to maximum extent possible. Also, apply the required depth of putty
material within the annulus.
Simplicity
Confidence
Value
82
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
83
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
84
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall.
STEP 3 - RETAINING COLLAR: Measure and cut enough retaining collar to encircle the penetrating item and overlap the ends at least 1". Bend the
anchor tabs (long tabs with hole) outward 90, and bend every 3rd support tab (short tapered tab) inward 90. Wrap the collar around the pipe
insulation so the anchor tabs contact the wall and the support tabs rest on the pipe insulation. The ends should overlap at least 1". Place a collar
clamp (or several clamps fastened together) around the collar at mid-height and gently tighten it until collar is supported in the correct position.
Fasten every other anchor tab to the wall using Hilti Toggler Bolts.
STEP 4 - FIRESTOP SEALANT: Completely fill the retaining collar with FS-ONE. Bend the remaining support tabs inward 90. Gently tighten the
collar clamp(s) to remove any slack. Excess sealant may be removed with a putty Knife. Leave completed seal undisturbed for 48 hours. Repeat
steps 1-4 on the opposite side of the wall.
R
85
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
86
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
87
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating item as a permanent form. Packing material
should be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
88
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
STEP 3 - STEEL RETAINING ANGLE: Leave seal undisturbed for 48 hours before attaching angle. Fasten recommended steel angle to all four sides
of the air duct on both sides of the wall with the appropriate fasteners and recommended spacing. Angle does not have to be attached to the wall.
Simplicity
Confidence
Value
89
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials
STEP 2 - FORMING MATERIAL: Install CF 128 Filler Foam around the penetrating item, recessing it from both surfaces of the wall as required to
allow proper space for the firestop sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
90
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - SLEEVE: Measure the thickness of the wall and cut No. 8 steel wire mesh or sheet metal (min. 20 Gauge) to a length 1/4" less than the
wall thickness. Center the sleeve in the wall and form it to fit the perimeter of the opening. Ends (seam) should overlap at least 1".
STEP 3 - PACKING MATERIAL: Firmly pack required depth of mineral wool around the penetrating items as a permanent form. Packing material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 4 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant within the annulus on both sides of wall. Tool with a putty knife until
flush with both surfaces. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
91
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
92
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRE BLOCK: Firmly pack FIRE BLOCK into opening. FIRE BLOCK may be cut to fit properly around penetrating items. Orientation of FIRE
BLOCK is noted above in the UL System Drawing.
STEP 3 - FIRESTOP SEALANT: Apply Firestop Sealant around penetrating items and in all voids that exist after FIRE BLOCKS are installed.
Simplicity
Confidence
Value
93
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with top surface of floor.
Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
94
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with top surface of floor.
Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
95
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SPRAY: Spray or trowel the required depth of Firestop Spray to completely cover forming material and to overlap a min. of 1/2
onto the top surface of the floor on both sides of joint.
Simplicity
Confidence
Value
96
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with top surface of floor
Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
97
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with top surface of floor.
Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
98
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from the top surface
of floor to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SPRAY: Spray or trowel the required depth of Firestop Spray to completely cover forming material and to overlap a min. of 1/2"
onto the top surface of the floor and side of wall.
Simplicity
Confidence
Value
99
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Firmly pack required depth of mineral wool into the fluted deck opening as a permanent form. Forming material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material within the flutes of the steel floor units and
between the top of the wallboard and the bottom of the steel floor units, flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
100
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - WALLBOARD, GYPSUM: For 1 hour fire rated walls, an additional layer of nom. 5/8" thick gypsum wallboard shall be installed at the top
of the wall and cut to fit the contour of the steel units to match the base layer. The additional layer shall extend a min. 6-1/2" below steel floor unit
valleys and be secured to each stud with a min. of two screws.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant between the top of the wallboard and all surfaces of the steel floor units,
flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
101
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant between the top of the wallboard and all surfaces of the steel floor units,
flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
102
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant between the top of the wallboard and the bottom of the steel floor unit,
flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
103
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Firmly pack required depth of mineral wool into the fluted deck opening as a permanent form. Forming material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material within the flutes of the steel floor units and
between the top of the wall and the bottom of the steel floor units, flush with each surface of wall assembly. Leave completed seal undisturbed for
48 hours.
Simplicity
Confidence
Value
104
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant between the top of the wallboard and the bottom of the concrete floor,
flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
105
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Compress mineral wool 50 percent in thickness and insert into the flutes of the steel floor units above the top of the
ceiling runner, flush with wall surface. Strips of mineral wool are then to be compressed and tightly packed into the gap between the top of the
wallboard and bottom of the steel floor units on both sides of wall.
STEP 3 - FIRESTOP SPRAY: Spray or trowel the required depth of Firestop Spray to completely cover forming material and to overlap a min. of 1/2"
onto wallboard and steel deck on both sides of wall.
Simplicity
Confidence
Value
106
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Firmly pack required depth of mineral wool into the fluted deck opening as a permanent form. Forming material
should be recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material within the flutes of the steel floor units and
between the top of the wallboard and the bottom of the steel floor units, flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
107
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Firmly pack required depth of mineral wool into the joint as a permanent form. Forming material should be
recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material between the top of the wall and the bottom of
the floor, flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
108
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - FORMING MATERIAL: Firmly pack required depth of mineral wool into the joint as a permanent form. Forming material should be
recessed from both surfaces of wall as required to accommodate the required thickness of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the forming material between the top of the wall and the bottom of
the floor, flush with each surface of wall assembly. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
109
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from each surface of
wall to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with each surface of
wall. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
110
1-800-879-8000
Installation Instructions
STEP 1 - PREPARATION: All surfaces must be clean, sound, dry and frost free prior to application of firestopping materials.
STEP 2 - PACKING MATERIAL: Firmly pack required depth of mineral wool into the opening as a permanent form, recessing it from each surface of
wall to accommodate the required depth of Firestop Sealant.
STEP 3 - FIRESTOP SEALANT: Apply the required depth of Firestop Sealant over the packing material within the joint, flush with each surface of
wall. Leave completed seal undisturbed for 48 hours.
Simplicity
Confidence
Value
111
1-800-879-8000
Estimating Tables**
TABLE 1 PACKAGING COVERAGE CHART
Product Description
Packaging
18.2
36.4
1155
18.9
36.4
1155
18.9
36.4
1155
40 lb bucket
1260
single blocks
80.0
5.25
18.0
1155
1 roll/box
Mineral Wool
1 box
18432
Pipe O.D.
Area (sq.in.)
1/2"
0.84
0.55
1"
1.3
1.33
1-1/2"
1.9
2.83
2"
2.4
4.52
3"
3.5
9.62
4"
4.5
15.9
6"
6.6
34.19
8"
8.6
58.06
10"
10.8
91.56
12"
12.75
127.61
Simplicity
Confidence
Value
112
1-800-879-8000
Estimating Tables**
TABLE 3 ESTIMATION CHART: VOLUME OF FIRESTOP AT 1/2" DEPTH (in3)
A
O.D.*
0.84
1.05
1.3
N
H O L E
S I Z E
( I N . )
1/2
3/4
1.9
O
2.4
M
1-1/2
3.5
A
4.5
I
5.6
6.6
8.6
10.8
12.8
10
12
0.12
1-1/2
0.60
0.46
0.22
1.30
1.14
0.90
0.16
2-1/2
2.18
2.02
1.78
1.04
0.20
3.26
3.10
2.86
2.12
1.28
3-1/2
4.54
4.38
4.14
3.40
2.54
6.00
5.84
5.62
4.86
4.02
1.48
9.54
9.38
9.14
8.40
7.56
5.00
13.86
13.70
13.46
12.72
11.86
9.32
6.18
1.82
18.96
18.80
18.56
17.82
16.98
14.42
11.28
6.92
24.84
24.68
24.46
23.70
22.86
20.32
17.18
12.82
8.02
31.52
31.36
31.12
30.38
29.54
26.98
23.84
19.48
14.70
2.76
10
38.98
38.82
38.58
37.84
36.98
34.44
31.30
26.94
22.16
10.22
12
56.24
56.08
55.86
55.10
54.26
51.72
48.58
44.22
39.42
27.50
10.74
1.86
2.14
14
76.66
76.50
76.26
75.52
74.66
72.12
68.98
64.62
59.84
47.90
31.14
13.12
16
100.20
100.10
99.82
99.06
98.22
95.68
92.54
88.18
83.38
71.46
54.70
36.68
TABLE 4 ESTIMATION CHART: VOLUME OF FIRESTOP USED IN RETAINING COLLAR AROUND VENTED PLASTIC PIPE
FS ONE
Approximate
Collar
Pipe
Pipe
Collar
Volume
# of 10.1 oz.
Length
# of
I.D.
O.D.
I.D.
Required
Tubes Required
Required*
Clamps
(in.)
(in.)
(in.)
(cu. in.)
(in.)
Required
4.5
24.73
1.35
19.84
3.5
20.02
1.09
16.70
2.4
3.9
14.84
0.81
13.25
1.5
1.9
3.4
12.48
0.69
11.68
1.4
2.9
10.13
0.55
10.11
Simplicity
Confidence
Value
113
1-800-879-8000
Estimating Tables**
TABLE 5 ESTIMATION CHART FOR TOP-OF-WALL JOINTS
U.L. System
Numbers
1-1/2"
3"
HWD-0003 or
HWD-0008
10 lineal feet/gallon
10 lineal feet/gallon
7 lineal feet/gallon
HWD-0004
2"
11 lineal feet/gallon
12 lineal feet/gallon
11 lineal feet/gallon
Width
(in.)
1/2
5/8
1/4
12.6
10.08
1/2
6.3
5.04
Lineal Feet/Gallon
1/2
5/8
5.04
24.0
19.2
2.52
12.0
9.6
1/8
1/2
5/8
1-1/4
9.6
610
154
123
61
4.8
305
77
61
30
3/4
4.2
3.36
1.68
8.0
6.4
3.2
204
51
41
20
3.15
2.52
1.26
6.0
4.8
2.4
153
38
30
15
1-1/4
2.52
4.8
122
30
1-1/2
2.1
4.0
102
25
1.57
3.0
76
19
2-1/2
1.26
2.4
61
15
1.05
2.0
51
12
.52
1.0
25
** These tables are approximate values typically required, and assume no waste.
Simplicity
Confidence
Value
114
1-800-879-8000
Use the Estimation Chart (Table 3) found on page 113. Find the pipe size across the top of the table and match
it with the hole diameter found along the side of the chart. The value from the table represents the volume of firestop
per penetration.
Calculate the area of the pipe. Use the Calculation Chart For Pipe Areas (Table 2) found on page 112. Find the pipe size
that is used and note the Area located in the far right column OR calculate the total cross-sectional area of the penetration
using the following formula (note: all values should be in units of inches):
AP = (rP2 ) x 3.14
AP = total area of penetrating pipe
rP = radius of penetrating pipe = diameter
2
2.
3.
Subtract the area of the penetrating pipe from the area of the opening and multiply by the depth of the
firestop required:
Total firestop required = (Ao - AP ) x FD
Total firestop required per penetration. For wall systems requiring
firestopping on both sides, multifly by 2.
FD = firestop depth
Use the methods stated above, but add all of the penetration areas (AP) together before subtracting from the
total area of the opening (Ao).
Sample Problem
APPLICATION:
3-hour fire rated concrete floor. Opening size is 8" dia. steel sleeve with 6" dia. steel pipe.
Use UL System CAJ 1155 (1/4" depth FS-ONE)
Ao = 8" diameter
50.24 in2
AP = 6" diameter
-34.19 in2
16.05 in2 x 1/4" @ 4.0 in3 of FS-ONE
Simplicity
Confidence
Value
115
1-800-879-8000
Product Information
Firestopping
Terms & Definitions
1.
FIRESTOP SYSTEM
2.
The period of time a building or building component maintains the ability to confine
a fire or continues to perform a structural function or both. This is usually determined
or measured by ASTM E-119 test standard.
3.
THROUGH - PENETRATION
4.
Any item passing completely through a wall or floor, such as pipes, conduits, cables, etc.
5.
ANNULAR SPACE
(ANNULUS)
6.
When listed on UL system drawing, allows penetrating item to touch edge of opening.
7.
In section 4-5.4.3.4, it requires that sprinkler pipes in seismic areas, have a minimum
annular space of 1-inch for pipes 1" through 3-1/2" and 2-inches for pipes 4" and larger.
Exceptions to this standard do exist. Please consult NFPA Standard #13 for details.
8.
PERCENT FILL
9.
N = number of wires
rc = radius of wire,
ro = radius of opening
Material used in firestop systems (e.g mineral wool, backer rod or CF 128 Foam)
to set the depth and provide support for the fill, void cavity material.
12. UL 1479
13. UL 2079
14. F RATING
The time a firestop system prevents the passage of flame through an opening as determined
by ASTM E-814 and UL 1479.
15. T RATING
The time for the temperature on the unexposed surface of the firestop system or any
penetrating item to rise 325 F above its initiai temperature as determine by ASTM
E-814 and UL 1479.
16. L RATING
An optional measurement of the rate of air leakage through test samples resulting
from a specified air pressure difference applied across the surface of the test samples.
17. UL
Piping system which is completely enclosed, usually carrying fluids under pressure.
Examples: hot/cold water distribution, sprinkler piping, chilled water supply and return.
21. INTUMESCENT
A term describing materials which expand significantly (typically 2 to 10 times original volume)
when exposed to heat. Intumescent materials are often used as firestops, particularly around
combustible penetrants.
116
1-800-879-8000
Installation
Using the UL
Instructions
Directory
THE FIRE RESISTANCE DIRECTORY UTILIZES AN ALPHA-NUMERIC NUMBERING SYSTEM: BASIC NUMBER SYSTEM = ALPHA-ALPHA-NUMERIC
THROUGH - PENETRATIONS
THE FIRST LETTER REPRESENTS WHAT
IS BEING PENETRATED:
F = FLOORS
W = WALLS
C = FLOORS OR WALLS (COMBINED)
EXAMPLE: CAJ1150
A.
B.
C.
D.
E.
J.
0000 - 0999
1000 - 1999
2000 - 2999
3000 - 3999
4000 - 4999
5000 - 5999
6000 - 6999
7000 - 7999
8000 - 8999
9000 - 9999
K.
L.
M.
N.
BLANK OPENINGS
METAL PIPE, CONDUIT OR TUBING
NONMETALLIC PIPE CONDUIT OR TUBING
CABLES
CABLE TRAYS
INSULATED PIPES
MISCELLANEOUS ELECTRICAL (BUSWAY)
MISCELLANEOUS MECHANICAL
MIXED PENETRATING ITEMS
RESERVED FOR FUTURE USE
JOINT SYSTEMS
THE FIRST TWO LETTERS IDENTIFIES
THE TYPE OF JOINT.
F F = FLOOR-T0-FLOOR
WW = WALL-TO-WALL
FW = FLOOR-TO-WALL
HW = HEAD-TO-WALL
CG = WALL-TO WALL JOINTS
INTENDED AS CORNER GUARDS
Simplicity
EXAMPLE: HWD0003
HW = HEAD-OF-WALL
Confidence
Value
117
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
259
002
06/25/96
PAGE 1 of 2
CAS NUMBER:
000471-34-1
007722-76-1
138265-88-0
014807-96-6
012689-13-3
899990-13-5
009003-27-4
PEL:
NA
NE
NE
NA
NA
NE
NE
TLV:
NA
NE
NE
NA
NA
NE
NE
STEL:
NA
NE
NE
NA
NA
NE
NE
028553-12-0
001309-37-1
000107-21-1
065997-17-3
001336-21-6
007732-18-5
NE
NA
C:50 ppm
NE
NE
NE
NE
NA
C:50 ppm
NE
NE
NE
NE
NE
NE
NE
NE
NE
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8 hour time-weighted averages unless
otherwise indicated by C (Ceiling) or STEL (Short Term Exposure Limit). NA = Not Applicable. NE = None Established.
ND = Not Determined.
PHYSICAL DATA
APPEARANCE AND ODOR: Red paste. Odorless.
EXTINGUISHING MEDIA: This product is non-combustible. Use extinguishing agent suitable for type of surrounding fire.
SPECIAL FIRE FIGHTING PROCEDURES: A self-contained breathing apparatus should be worn when fighting fires
involving chemicals.
UNUSUAL FIRE AND EXPLOSION HAZARDS: None Known
REACTIVITY DATA
STABILITY: Stable.
Simplicity
Confidence
Value
118
1-800-879-8000
TECHNICAL:
HEALTH/SAFETY:
Jim Taite
Steve Gerrard
(x6772)
(x6309)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 259
Page: PAGE 2 of 2
Simplicity
Confidence
Value
119
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
FS FIRE BLOCK
DESCRIPTION:
MSDS No.:
261
Revision No.:
001
Date:
07/17/96
Page: PAGE 1 of 2
Simplicity
Confidence
Value
120
1-800-879-8000
TECHNICAL:
HEALTH/SAFETY:
Jim Taite
Steve Gerrard
(x6772)
(x6309)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 261
Page: PAGE 2 of 2
Simplicity
Confidence
Value
121
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
268
001
03/23/98
1 of 2
VAPOR PRESSURE: 17 mm Hg @ 88 F
EXTINGUISHING MEDIA: As appropriate for surrounding fire (e.g. Water, Carbon Dioxide, Dry Chemical, Foam)
SPECIAL FIRE FIGHTING PROCEDURES: Wear full protective clothing. A NIOSH-approved self-contained breathing
apparatus (SCBA) should be worn when fighting fires involving chemicals.
UNUSUAL FIRE AND EXPLOSION HAZARDS: None known. Thermal decomposition products such as oxides of carbon
and nitrogen can be produced under fire conditions. See below.
REACTIVITY DATA
INCOMPATIBILITY: Metal salts
STABILITY: Stable
HAZARDOUS DECOMPOSITION PRODUCTS: Thermal decomposition can yield oxides of carbon and nitrogen.
HAZARDOUS POLYMERIZATION: Will not occur.
CONDITIONS TO AVOID: Avoid temperature extremes which could shorten the shelf-life of this product; i.e. below 40
and above 100 F. (See handling and storage requirements).
HEALTH HAZARD DATA
KNOWN HAZARDS: Acute: Irritation is possible. Chronic: None known
CARCINOGENICITY: No ingredients are classified by IARC, NTP, or OSHA as known or potential carcinogens.
PRIMARY ROUTES OF EXPOSURE: Dermal.
SIGNS AND SYMPTOMS OF EXPOSURE: Eyes - Can cause irritation or watering but injury is unlikely. Skin - Irritation is
possible with some individuals. Inhalation - No effects expected. Ingestion - Not considered to be a route of exposure.
Effects of ingestion have not been determined. Considered to have a low acute oral toxicity.
MEDICAL CONDITIONS AGGRAVATED BY EXPOSURE:: None known
Simplicity
Confidence
Value
122
1-800-879-8000
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee
or warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 268
Page: PAGE 2 of 2
Simplicity
Confidence
Value
123
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
266
001
02/24/98
1 of 2
Simplicity
Confidence
Value
124
1-800-879-8000
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 266
Page: PAGE 2 of 2
Simplicity
Confidence
Value
125
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
267
001
02/28/98
1 of 2
TLV:
10 mg/m3
NE
NE
10 mg/m3
NE
NE
NE
10 ppm
STEL:
NE
NE
NE
NE
NE
NE
NE
15 ppm
CAS Number:
00471-34-1
09003-29-6
00107-21-1
13463-67-7
07631-86-9
28553-12-0
07732-18-5
00108-05-4
PEL:
5 mg/m3
NE
NE
5 mg/m3
NE
NE
NE
10 ppm
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8 hour time-weighted averages unless
otherwise indicated by "C" (Ceiling) or "STEL" (Short Term Exposure Limit). NE = None Established. NA = Not Applicable.
indicates as total inhalable dust
PHYSICAL DATA
APPEARANCE AND ODOR: White paste; negligible odor
STABILITY: Stable
Simplicity
Confidence
Value
126
1-800-879-8000
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee
or warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 266
Page: PAGE 2 of 2
Simplicity
Confidence
Value
127
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
236
002
03/11/95
1 of 2
CAS NUMBER:
PEL:
TLV:
STEL:
NE
NE
NE
NE
PHYSICAL DATA
APPEARANCE AND ODOR: Dark grey to black rubbery tape enclosed in galvanized metal jacket, no odor.
BOILING POINT: Not Applicable
Simplicity
Confidence
Value
128
1-800-879-8000
TECHNICAL:
HEALTH/SAFETY:
Jim Taite
Steve Gerrard
(x6772)
(x6309)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 236
Page: PAGE 2 of 2
Simplicity
Confidence
Value
129
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 8000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
262
Revision No.:
001
Date:
12/16/96
Page:
1 of 2
CAS NUMBER:
NE
PEL:
NE
TLV:
NE
STEL:
NE
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8 hour time-weighted averages unless
otherwise indicated by C (Ceiling) or STEL (Short Term Exposure Limit). NE = None Established. NA = Not Applicable.
PHYSICAL DATA
APPEARANCE AND ODOR: Dark grey material in galvanized metal jacket
EXTINGUISHING MEDIA: Not Applicable. Use Water, CO2, Dry Chemical, Foam as appropriate for surrounding fire.
SPECIAL FIRE FIGHTING PROCEDURES: Not Applicable, however, a NIOSH-approved self-contained breathing apparatus
(SCBA) should be worn when fighting fires involving chemicals.
UNUSUAL FIRE AND EXPLOSION HAZARDS: None known. Product serves as a fire stopping material and intumesces
(expands) when exposed to temperatures > 120 C / 250 F.
REACTIVITY DATA
INCOMPATIBILITY: None known
STABILITY: Stable
Simplicity
Confidence
Value
130
1-800-879-8000
Installation Instructions
EMERGENCY AND FIRST AID PROCEDURES
EYES: Flush with water if dust, debris, etc. from work overhead gets into the eyes. Do not rub the eyes as this can cause
corneal abrasions. Call a physician if irritation continues or if redness, swelling, or similar symptoms occur
SKIN: Practice good hygiene; i.e. wash hands during breaks, before eating or smoking, and after work.
INHALATION: No first aid should be needed. If ill effects occur, move to fresh air. If symptoms persist, seek medical attention.
INGESTION: If conscious, give plenty of water to drink. Do not induce vomiting unless large amounts are ingested.
Never give anything by mouth to an unconscious person. Contact a physician immediately.
OTHER: Referral to a physician is recommended if there is any question about the seriousness of the injury/exposure.
CONTROL MEASURES AND PERSONAL PROTECTIVE EQUIPMENT
VENTILATION: General (i.e., natural or mechanically induced fresh air movements that maintain vapor concentrations below
recommended exposure limits).
EYE PROTECTION: Not required, however, safety glasses should be worn in most industrial settings.
SKIN PROTECTION: None required; however, (cotton) gloves recommended.
RESPIRATORY PROTECTION: No respiratory protection is needed for normal application of this product. If any dust is
generated during use or during any cutting or grinding operations, use a NIOSH-approved dust mask.
PRECAUTIONS FOR SAFE HANDLING AND USE
HANDLING AND STORING PRECAUTIONS: Store in a cool, dry area.
SPILL PROCEDURES: No special requirements.
REGULATORY INFORMATION
HAZARD COMMUNICATION: This product is considered to be an article as defined in the federal OSHA Hazard
Communication Standard.
DOT SHIPPING NAME: Not regulated
TSCA INVENTORY STATUS: Chemical components listed on TSCA inventory.
SARA TITLE III, SECTION 313: This product does not contain any toxic chemicals which are subject to reporting under
Section 313 of SARA Title III (40 CFR Part 372).
WASTE DISPOSAL METHODS: Consult with regulatory agencies or corporate personnel for disposal methods that comply
with local, state, and federal health and environmental regulations.
HEALTH / SAFETY CONTACTS:
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee
or warranty of any kind expressed or implied is made with respect to the information provided.
MSDS 262, Page 2 of 2
Simplicity
Confidence
Value
131
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
MSDS No.:
Revision No.:
Date:
Page:
264
001
01/08/98
1 of 2
TLV:
NE
NE
NE
NE
STEL:
NE
NE
NE
NE
CAS NUMBER:
41583-09-9
12007-56-6
68333-79-9
29761-21-5
PEL:
NE
NE
NE
NE
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8 hour time-weighted averages unless
otherwise indicated by "C" (Ceiling) or "STEL" (Short Term Exposure Limit). NE = None Established. NA = Not Applicable.
PHYSICAL DATA
APPEARANCE AND ODOR: Flesh colored putty, negligible odor
Simplicity
Confidence
Value
132
1-800-879-8000
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 264
Page: PAGE 2 of 2
Simplicity
Confidence
Value
133
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
263
001
01/08/98
1 of 2
TLV:
NE
NE
NE
NE
STEL:
NE
NE
NE
NE
CAS NUMBER:
41583-09-9
12007-56-6
68333-79-9
29761-21-5
PEL:
NE
NE
NE
NE
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8 hour time-weighted averages unless
otherwise indicated by "C" (Ceiling) or "STEL" (Short Term Exposure Limit). NE = None Established. NA = Not Applicable.
PHYSICAL DATA
APPEARANCE AND ODOR: Rust colored putty, negligible odor
Simplicity
Confidence
Value
134
1-800-879-8000
Steve Gerrard
Jerry Metcalf
(x6309)
(x6704)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 263
Page: PAGE 2 of 2
Simplicity
Confidence
Value
135
1-800-879-8000
P.O. Box 21148, Tulsa, OK 74121; Ph: 1 800 879 6000; Emergency No.: 1 800 879 4444
PRODUCT NAME:
DESCRIPTION:
MSDS No.:
Revision No.:
Date:
Page:
212
003
08/16/94
1 of 2
CAS NUMBER:
65997-15-1
14808-60-7
PEL:
10mg/m3*
0.1mg/m3
TLV:
10mg/m3*
0.1mg/m3
STEL:
NE
NE
93763-70-3
01332-37-2
09003-20-7
65996-61-4
which indicates total dust
15mg/m3
10mg/m3
NE
NE
10mg/m3
5mg/m3 NE
NE
NE
NE
NE
NE
PEL = OSHA Permissible Exposure Limit. TLV = ACGIH Threshold Limit Value. These are 8-hour time-weighted averages unless
otherwise indicated by "C" (Ceiling) or "STEL" (Short Term Exposure Limit). NE = None Established.
PHYSICAL DATA
APPEARANCE AND ODOR: Coarse red powder. Little odor.
pH: 11 - 13 (cement)
STABILITY: Stable.
Simplicity
Confidence
Value
136
1-800-879-8000
TECHNICAL:
HEALTH/SAFETY:
Jim Taite
Steve Gerrard
(x6772)
(x6309)
The information and recommendations contained herein are based upon data believed to be correct; however, no guarantee or
warranty of any kind expressed or implied is made with respect to the information provided.
MSDS No.: 212
Page: PAGE 2 of 2
Simplicity
Confidence
Value
137
1-800-879-8000
138
1-800-879-8000
139
1-800-879-8000
140
1-800-879-8000
141
1-800-879-8000
142
1-800-879-8000
143
1-800-879-8000
144
1-800-879-8000
145
1-800-879-8000
146
1-800-879-8000
147
1-800-879-8000
p
o
t
s
e
r
i
F
s
m
e
t
s
Sy onic Suite98
Electr
New!
Estimation Program
Submittal Section
Specification Information
Simplicity
Confidence
Value
1-800-879-8000