CIPULARANG II

TOLL ROAD
PROJECT
C. Willy Hartono
Sales Manager
West Java
Admixture System

1. Section I

: Purwakarta

2. Section II

: South Purwakarta Plered

3. Section III. 1

: Plered Cikalong Wetan

4. Section III. 2

: Darangdan Cikalong Wetan

5. Section III. 3

: Cisomang Bridge

6. Section IV. 1

: Cikalong Wetan Cikubang

7. Section IV. 2

: Cikubang Bridge

8. Section IV. 3

: Cikalong Wetan Cikamuning

9. Section IV. 4

: Cipada Cikamuning

10. Summarize

04.11.2004

1. General Overview
1. Total Length is 40 km
2. Divided by 9 Sections
3. Starting in March 2004 & done before April 25, 2005 (The 50th
Anniversary of Asia Africa Conference in Bandung, West Java)
4. Starting with earthworks in March 2004 & continuing with concrete
works in July 2004
5. Girder produce insitu & by precaster (Adhi Precast, Wika Beton, &
Saeti)

04.11.2004

2. Section I : Purwakarta
1. Main Contractor is Mawatindo
2. Supervision Consultant is Virama Karya
3. Total Length is 9 km

4. Concrete supplied by Farika Duta Agung (2 BP).


5. Concrete Volume 100,000 m3
6. We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100) to Farika
Duta Agung
7. Wet Mix for Rigid Pavement

04.11.2004

2. Section I : Purwakarta

04.11.2004

3. Section II : South Purwakarta - Plered


1. Main Contractor is Adhi Karya Division III
2. Supervision Consultants are Cipta Strada, Saka Adhi Prada &
Amythas Expert

3. Total Length is 8 km
4. Concrete supplied by Adhimix
5. Concrete Volume 80,000 m3 for Rigid Pavement only

6. We supplied 100 % (Pozzolith 100 Ri & Rheobuild 1100)


7. Wet Mix & low slump for Rigid Pavement & concrete barrier
8. Girder Supplied by Adhi Precast

04.11.2004

3. Section II : South Purwakarta - Plered

04.11.2004

4. Section III. 1 : Plered Cikalong Wetan

1. Main Contractor is Waskita Yasa J.O.


2. Supervision Consultants are Delta Tama Waja, Buana Archicon &
Prosys

3. Total Length is 6.3 km include 500 m long bridge


4. Concrete supplied by Yasa Readymix & Multi Structure
5. Total Concrete Volume is 40,000 m3

6. Admixture supplied by Fosroc (SP 337 & RP 264 M) to Yasa


Readymix & Grace to Multi Structure
7. Girder produced in situ with total 153 pieces using Yasa Readymix

04.11.2004

4. Section III. 1 : Plered Cikalong Wetan

04.11.2004

5. Section III. 2 : Darangdan - Cikalong


Wetan
1. Main Contractor is Nindya Karya
2. Supervision Consultants are Multi Phi Beta, Tata Guna Patria &
Indra Karya

3. Total Length is 4 km
4. Concrete supplied by Dwi Dinamika
5. Concrete Volume 40,000 m3

6. Admixture supplied by Fosroc (SP 337 & RP 264 M)


7. Girder Supplied by Wika Beton (Glenium 317 from BASF & M 21N
from KAO)

04.11.2004

10

5. Section III. 2 : Darangdan - Cikalong


Wetan

04.11.2004

11

6. Section III. 3 : Cisomang Bridge


1. Main Contractor is L & M System
2. Supervision Consultant is Global Profex Synergy
3. Concrete supplied by Pionir Beton

4. Concrete Volume 25,000 m3


5. Admixture supplied by Sika (Plastiment RMC)
6. Girder produced insitu (Sikament NN) & supplied by Saeti
Concretindo Wahana (Rheobuild 893)

04.11.2004

12

6. Section III. 3 : Cisomang Bridge

04.11.2004

13

7. Section IV. 1 : Cikalong Wetan - Cikubang


1. Main Contractor is Daya Mulya Turangga
2. Supervision Consultants are Bina Karya, Eskapindo Matra &
Hasfarm Dian Consultant

3. Total Length is 5 km
4. Concrete supplied by Focon Indo Beton
5. Total Concrete Volume is 30,000 m3

6. Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) &


Sika (Plastiment R & Sikament NN )
7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N
from KAO)
04.11.2004

14

7. Section IV. 1 : Cikalong Wetan - Cikubang

04.11.2004

15

8. Section IV. 2 : Cikubang Bridge


1. Main Contractor is Propelat Wika J.O.

2. Supervision Consultant is Yodya Karya


3. Total Length is 4 km including 400 m long bridge
4. Concrete supplied by Focon Indo Beton
5. Total Concrete Volume is 30,000 m3
6. Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) &
Sika (Plastiment R & Sikament NN)

7. Girder supplied by Wika Beton ( Glenium 317 from BASF &


M21N from KAO)

04.11.2004

16

8. Section IV. 2 : Cikubang Bridge

04.11.2004

17

9. Section IV. 3 : Cikalong Wetan Cikamuning


1. Main Contractor is Hutama Karya
2. Supervision Consultant is Indec & Ass Ltd.
3. Bridge with 750 m long (The longest bridge in Cipularang II project)

4. Concrete supplied by Farika Duta Agung


5. Total Concrete Volume is 50,000 m3
6. We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100)
7. Girder produced in situ with total 183 pieces

04.11.2004

18

9. Section IV. 3 : Cikalong Wetan


Cikamuning

04.11.2004

19

10. Section IV. 4 : Cipada - Cikamuning


1. Main Contractor is Sumber Mitra Jaya Ircon Int. J.O.
2. Supervision Consultants are Indah Karya, Widya Graha Angsana &
Tribina

3. Total Length is 4 km
4. Concrete supplied by Beton Indotama Surya
5. Total Concrete Volume is 30,000 m3

6. Admixture supplied by Sika (Plastiment R & Sikament NN


7. Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N
from KAO)

04.11.2004

20

10. Section IV. 4 : Cipada - Cikamuning

04.11.2004

21

11. Summarize
1. We got about 50 % share of the project
2. We supply to Adhimix Citapen (1 BP), Focon Indo Beton (1 BP) &
Farika Duta Agung (2 BP in Purwakarta & 1 BP in Padalarang)

3. Sales value more than 500 million in 6 months (July to December


2004)
4. Farika Duta Agung Padalarang gave the biggest contribution for our
sales value

04.11.2004

22

THANK YOU