Name of Work: Provision of AC units in Conference Hall and Data Processing Centre in
District Industries Centre at Thoothukudi in Thoothukudi District. Est. Rs.2,50,000/Sl.
No
1.
2.
Qty
Description of Work
Rate
per
Amount
5
nos
42000.00
ea
210000.00
4000.00
ea
20000.00
5
nos
230000.00
6250.00
13750.00
2,50,000.00
REPORT
Report accompanying the estimate for the work of AC units in Conference Hall and
Data Processing Centre in District Industries Centre at Thoothukudi in Thoothukudi
District.
Est. Rs. 2,50,000/This estimate has been prepared for an LS amount of Rs.2,50,000/- allotted for the
Provision of AC units in Conference Hall and Data Processing Centre in District Industries
Centre at Thoothukudi in Thoothukudi District administratively sanctioned vide G.O.(D), 7
micro, small and medium Enterprises Department dated 17.01.2013and technically sanctioned
for Rs.125.00 Lakhs vide CER. No. 64 CE MDU / 2012-13 by the Chief Engineer (Buildings),
PWD, Madurai Region, Madurai-2.
In this estimate 5 nos of 2 TR Split AC units are proposed for the Conference Hall and
Data Processing Centre in District Industries Centre at Thoothukudi in Thoothukudi District.
The rates adopted in this estimate are based on standard schedule of rates for the year
2013-14.
The expenditure due to this estimate is debitable to the head of account 4059-01-051KZ- Industries and Commerce Department-1602.
: 6 Mt x 4 Mt [ 20 ft x 13.33 ft ]
:8.5 ft
:266.6 sqft
: 102o FDB = 142grains / Lb of Dry Air
: 75o FDB = 64 grains / Lb of Dry Air
: 27o FDB
: 142 - 64 = 78 grains / Lb
: 2 Air change / Hr
: 720 W
: 6
: 20 ft x 13.33 ft x 8.5 ft x 2 = 75.53 CFM
60
= 5813.42 BTU / Hr
= 5758.56 BTU / Hr
= 2448 BTU / Hr
= 1530 BTU /Hr
= 440.49 BTU / Hr
= 1761.96 BTU /Hr
: 6 x 245
: 75.53 x 78 x 0.2 x 0.68
: 75.53 x 78 x 0.8 x 1.08
= 1470.00 BTU / Hr
= 801.22 BTU / Hr
= 5090.11 BTU /Hr
25113.76 BTU /Hr
Add 10% Losses due to Infiltration
= 2511.37 BTU /Hr
Total
= 27625.13 BTU/ Hr
Refrigeration Required = 27625.13 = 2.52 TR
12000
Hence 1 no. 2 Ton Split AC unit
is
proposed.
: 12.4 Mt x 6 Mt [ 41.33 ft x 20 ft ]
:8.5 ft
:7026.10 sqft
: 102o FDB = 142grains / Lb of Dry Air
: 75o FDB = 64 grains / Lb of Dry Air
: 27o FDB
: 142 - 64 = 78 grains / Lb
: 2 Air change / Hr
: 1500 W
: 50
: 41.33 ft x 20 ft x 8.5 ft x 2 = 234.20 CFM
60
: (41.33 + 20 ) x 2x8.5x27x0.38
: (41.33 x 20) x 2 x 27 x0.4
: 1500 x 3.40
: 50 x 255
: 234.20 x 27 x 0.2 x1.08
: 234.20 x 27 x 0.8 x 1.08
= 10697.17 BTU / Hr
= 17854.56 BTU / Hr
= 5100 BTU / Hr
= 12750 BTU /Hr
= 1365.85 BTU / Hr
= 5463.41 BTU /Hr
: 50 x 245
: 234.20 x 78 x 0.2 x 0.68
: 234.20 x 78 x 0.8 x 1.08
= 12250.00 BTU / Hr
= 2484.39 BTU / Hr
= 15783.20 BTU /Hr
83748.58 BTU /Hr
Add 10% Losses due to Infiltration
= 8374.85 BTU /Hr
Total
= 92123.43 BTU/ Hr
Refrigeration Required = 92123.43 = 7.67 Ton
12000
Hence 4 nos. 2 Ton Split AC unit is
proposed.