OFFICE OF THE DEPUTY DIRECTOR (EAST) ABBOTTABAD Ph No. 0992-382607, E-mail: ddeastpkha@gmail.com Street No. 03 House No. 417, Jinnah Abad Abbottabad
No. _
/ / DD (E) / PKHA
Dated Abbottabad the __ _/12/2015
To M/S ACE 45-l Model Town Extension Lahore, in association with M/S Pavron, Islamabad (Fax #: 042-5171084) Subject: Reference:
CONSTRUCTION OF HARIPUR BY-PASS ROAD
1. Deputy Director (HQ) letter No.20-PKHA/2532 dated 17/12/2015
In continuation to above, the Supervisory staff as approved by the Competent
Authority and communicated to you vide letter under reference above, be got mobilized at site with immediate effect to start the construction activities and all other preliminary requirements in accordance with the terms of reference for carrying out your assignment may also be got completed at the earliest.
DEPUTY DIRECTOR (EAST)
Copy forwarded to:1) The Director (Construction) Pakhtunkhwa Highways Authority Peshawar. 2) The Assistant Director (East) PKHA, Haripur for information and necessary action. 3) PA to the Managing Director Pakhtunkhwa Highways Authority Peshawar.
DEPUTY DIRECTOR (EAST)
GOVERNMENT OF KHYBER PAKHTUNKHWA
PAKHTUNKHWA HIGHWAYS AUTHORITY OFFICE OF THE DEPUTY DIRECTOR (EAST) ABBOTTABAD Ph No. 0992-382607, E-mail: ddeastpkha@gmail.com Street No. 03 House No. 417, Jinnah Abad Abbottabad
WIDENNG/DUALIZATION OF MURREE CHOWK- HARNO ROAD AND
NAWANSHER-LINK ROAD, DISTRICT ABBOTTABAD 1. Deputy Director (HQ) letter No.20-PKHA/2531 dated 17/12/2015
In continuation to above, the Supervisory staff as approved by the Competent
Authority and communicated to you vide letter under reference above, be got mobilized at site with immediate effect to start the construction activities and all other preliminary requirements in accordance with the terms of reference for carrying out your assignment may also be got completed at the earliest.
DEPUTY DIRECTOR (EAST)
Copy forwarded to:1) The Director (Construction) Pakhtunkhwa Highways Authority Peshawar. 2) The Assistant Director (East) PKHA, Abbottabad for information and necessary action. 3) PA to the Managing Director Pakhtunkhwa Highways Authority Peshawar.
The PMP Project Management Professional Certification Exam Study Guide PMBOK Seventh 7th Edition: The Complete Exam Prep With Practice Tests and Insider Tips & Tricks | Achieve a 98% Pass Rate on Your First Attempt
The NCLEX-RN Exam Study Guide: Premium Edition: Proven Methods to Pass the NCLEX-RN Examination with Confidence – Extensive Next Generation NCLEX (NGN) Practice Test Questions with Answers
2024 – 2025 FAA Drone License Exam Guide: A Simplified Approach to Passing the FAA Part 107 Drone License Exam at a sitting With Test Questions and Answers