ADDENDUM/AMENDMENT OF REQUEST FOR PROPOSAL

RFP NO KIT-22/2012-2013

Installation and Operation of Helium-filled Gas Balloon at


Rabindra Sarobar

MINUTES OF THE PRE-BID MEETING HELD AT THE CHAMBER OF THE SECRETARY,KIT AT 1.00 p.m.
ON 17.08.2012 AND RESOLUTIONS.
OFFICIALS PRESENT FROM KIT:
1.
2.
3.
4.

Sri Amitabha Moitra, Secretary, KIT


Sri Sadhan Chatterjee, Chief Engineer, KIT
Sri S. Nandi, Executive Engineer , R.S., KIT
Sri Arun Kumar, Executive Engineer ( Electrical), KIT

OFFICIALS PRESENT FROM KMDA:


1. Sri Ratan Saha, Executive Engineer, E &M,KMDA
2. Sri Premjeet Dasgupta, Asst. Planner, PPP Cell, KMDA
REPRESENTATIVES FROM BIDDERS:
1. Mr. Snehal Avashia, Director, Skywanderers Pvt. Ltd, Ahmedabad, Gujarat
2. Mr. Rajkumar Agarwal, Partner, Shree Balaji Developers, Gwalior, MP, as representative of
Aero Balloon.
3. Mr. Binit Dutta, Gujarat Ambuja, Kolkata, W.B.
4. Sri A. Roy, Ambuja Reality Ecospace,New Town, W.B.
5. Sri S. N. Saha, Adviser-Urban & Housing Projects, BUIDL, Kolkata, W.B.
6. Sri A. Mukherjee, BUIDL, Kolkata, W.B.
7. Sri A. Das, SELVEL, Kolkata, W.B.
The following resolutions are adopted in response to the points/queries raised by the bidders
present in the Pre-bid meeting.
QUERIES
Can the part of the experience criterion for
Eligibility be relaxed in terms of reducing the length
of experience of operating helium balloon, as
helium tethered balloon is less than 2 years old in
India.
The eligibility criterion of the applicant bidders
having an average annual turnover of Rs.10 crore
during the last three years should be reduced to
secure wider participation.
Condition of balloon equipment & apparatus to be
specified.
Tenure of contract should be at least ten years and
should be extendable on mutually agreed terms &
conditions since huge investment and operational
cost are involved.

RESPONSE OF KIT/KMDA
It is resolved to modify the part of the
Eligibility criterion as follows: The bidder
should have experience of at least one year
in using tethered balloon anywhere in India
and abroad. Other part of the experience
eligibility criterion remains unaltered.
It is resolved to reduce the required average
annual turnover to Rs.3 crore during the last
3 (three) Financial Years ending with 201011.
Completely new equipment & apparatus to
be installed.
It is resolved to extend the tenure of the
contractual period from 5 years, as per the
pre-bid document, to 10 years, in
consideration of financial viability. After
completion of tenure of contract, all assets
attached to the ground of the project site are

to be handed over to KIT free of cost.


It is resolved to reduce the minimum ride
duration from 15 minutes to 10 minutes.
The maximum base ticket price per person
per ride should be Rs.100 + applicable tax.
The base price of Rs.100 may be increased
25% after every 3 years. As for differential
pricing, the selected agency shall be free to
decide on the same, provided the maximum
price shall not exceed the base price at any
point of time.
Operational hours should be allowed from 7.00 a.m It is agreeable.
to 11.00 p.m.
Minimum Insurance coverage should be Rs.10 lakhs It is agreeable.
per head as is the case with similar facility being
promoted by Ahmedabad Municipal Corporation.
Infrastructural facilities like boundary fencing, Boundary fencing according to KIT
water, sanitation, parking, electricity service, are to specifications will be provided. However, the
be provided by KIT
selected agency will have to arrange for onsite water, sewerage, electricity service
connections at its cost. KIT will provide
facilitating services to the selected agency
for the purpose. KIT will allot demarcated
parking spaces on payment of service charge.
The palm trees within the project site are to be It is agreeable.
removed and the surrounding trees trimmed by
KIT.
What would be the modality of sharing revenue No question of sharing ticket revenue arises,
from ticket sales and advertisement between the as per the pre-bid conditions of financial
bidder and KIT?
quote.
The selected agency shall however have to
earmark 10% Ground Advertisement space
for KMDA/KIT for prominently displaying that
the project is of KMDA/KIT. Such display shall
be at the envelope of the balloon also. The
ratio of Font in all advertisement/signage
spaces including the envelope of balloon
should be at least 1 (Operating agency) : 3
(KMDA/KIT).
Diesel Generator Set should be allowed as power The D.G. Set should conform to the latest
back-up system for safety landing of riders.
pollution control rules.
Additional facilities for passengers in queue to be Sheds for people in queue, waiting space for
provided?
visitors, small rides/ play area for children,
adequate illumination, clean drinking water,
and arrangements for specially challenged
visitors should be ensured at the project site.
Minimum ride duration should be reduced to 10
minutes as per standard practice everywhere.
The ticket price should be allowed to be more than
Rs.100 or it should be left to the decision of the
bidder. Also the decision of resorting to differential
pricing should be left open to the selected agency.
This should be raised at least 10% per year owing
to increase in import cost of Helium and other
operational cost.

Each bidder must submit VAT, Professional Tax & Service Tax Clearances along with the technical
offer.

The selected agency shall have to comply with certain performance benchmarks in respect of
parameters like cleanliness of premises, provision of safe drinking water, beautification of the entire
premise and the surrounding spaces, fencing, pathways, pavement etc., maintaining the illumination
as approved by KIT, compliance with pollution control norms, staff in uniform, courteous behaviour
by the staff and the like. Repeated failure to comply with the benchmarks may lead to forfeiture of
performance security/termination of contract.
The last date for submission of bids is extended upto 07.09.2012 at 2.00 p.m. and opening of bids
will be at 3.00 p.m. of the same day.
The above resolutions/amendments will be treated as integral part of the RFP. All other conditions
of the RFP remain unaltered.
Chief Engineer,
Kolkata Improvement Trust