Description
Unit
No
Length
Weight
Hight
Quantity
Ground Floor
Sft
19472.59
19472.59
First Floor
Sft
18970.83
18970.83
Secound Floor
Sft
15824.61
15824.61
Third Floor
Sft
15824.61
15824.61
70,093
Ground Floor
Left Side Stairs
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
External Ramp
Sft
15.08
6.25
377
Internal Ramp
Sft
44.5
13.62
606.09
Sft
Sft
11.25
90
Sft
14.37
12
172.44
Sft
700
700
RECEPTION HALL
Sft
1221
1221
ADMINISTRATION HALL
Sft
1524
1524
OPD
Sft
1776
1776
Parchi Counter
Sft
165
165
Registration Room
Sft
11.37
17.18
195.3366
Record Room
Sft
14.5
17.18
249.11
Wash
Sft
40
Passage To
Wash/Record/Registration
Room
Sft
9.42
47.1
Waiting
Sft
208
624
Waiting
Sft
156
156
Waiting
Sft
426
426
DENTISTRY
Sft
16
21.25
340
X-RAY
Sft
16
21.25
340
RECORD ROOM
Sft
DENTAL X-RAY
Sft
9.25
74
DARK ROOM
Sft
8.87
70.96
280
280
262.53
787.59
CONTROL ROOM
Sft
8.87
70.96
ULTRASOUND
Sft
16
21.25
340
DIALYSIS UNIT
Sft
32.75
21.25
695.9375
C.T SCAN
Sft
24.37
21.25
517.8625
CONTROL ROOM
Sft
21.25
170
PATHOLOGY LAB
Sft
37.125
34.62
1285.2675
DISTRIBUTION
Sft
12
108
LAB To DISTRIBUTION
Sft
12.25
110.25
OFFICE
Sft
16
13
1040
OFFICE
Sft
10
16.66
333.2
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
Sft
93.5
12
1122
MALE LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
3.87
4.5
52.245
FEMALE LAVATORY
Sft
10.37
82.96
WC
Sft
4.83
38.64
EXAMINATION
Sft
8.5
68
CONSULTANT
Sft
11
12
264
EXAMINATION
Sft
10
90
EXAMINATION
Sft
14
9.75
273
CONSULTANT
Sft
14
11.75
329
DUMP WAITER
Sft
24
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
First Floor
44.5
13.62
280
606.09
280
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
SURGICAL/ORTHOPEDICS
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
123.56
12
1482.72
HALL
Sft
18.56
23.125
429.2
Sft
13.25
28.75
380.9375
ICU WARD
Sft
17
34.125
580.125
Sft
17
10
170
Sft
29.3
175.8
MEDICINE STORE
Sft
8.5
68
NURSES LAVATORY
Sft
10.37
82.96
WC
Sft
40
DOC LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
60
ANESTHETIST
Sft
11
12
132
DOCTORS LOUNGE
Sft
23
12
276
Sft
43.25
4.25
183.8125
O.T NURSE
Sft
10.62
10
106.2
PATIENTS PREPARATION
Sft
10.62
10
106.2
SCRUBUP
Sft
8.52
3.68
31.3536
RECOVERY
Sft
14.62
20.37
297.8094
OT
Sft
14.62
16
233.92
OT
DIRTY CORRIDOR 4'-10.5"
WIDE
Sft
19.62
29.87
1172.0988
Sft
33.52
4.87
163.2424
Corridor
Sft
16.125
8.79
141.73875
STERILIZED LOBBY
Sft
16
144
OT
Sft
14.62
22.37
327.0494
DUMP WAITER
Sft
32
Sft
10.25
4.5
46.125
ICU WARD
Sft
17
34.125
580.125
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
MEDICAL/UROLOGY
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
TERRACE
Sft
Secound Floor
44.5
13.62
280
3250
606.09
280
3250
Third Floor
Left Side Stairs
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
MEDICAL/UROLOGY
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
44.5
13.62
280
606.09
280
S.No Description
1
Civil Works
171,779,000.65
12,169,140.92
77,385.08
Electrical Work
2,680,095.64
8,745,460.00
77,385.08
Plumbing Work
6,086,501.16
847,500.00
77,385.08
Sui Gas
2,448,563.38
0.00
77,385.08
Elevators
15,400,000.00
77,385.08
Medical Gases
3,500,000.00
77,385.08
### 40,662,100.92
77,385.08
Total
otal Of Building (S.Cost+N.S.Cost)
223,656,261.75
77,385.08
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
SCHEDULE ITEMS
1
03-23-c
(03-17-a)
+(03+18-a)
+(03-18-b)
+(03-18-c)
26-15.
Excavation
in
foundation
of
building, bridges etc complete : in
hard soil or soft murum
m3
3,469.83
180.09
m3
3,469.83
145.61
m2
1,898.01
11.74
06-05-i
Plain
Cement
Concrete
in
foundations
including
placing,
compacting, finishing & curing
(Ratio 1:4:8).
m3
140.33
4,860.62
06-06-b-03
m3
1,400.40
7,299.60
06-07-b
Supply
&
fabricate
M.S.
reinforcement
for
cement
concrete (Hot rolled deformed bars
Grade 60).
Tonne
274.84
119,471.42
07-04-a-05
m3
146.30
5,870.51
06-22-b-02
m2
137.17
553.75
06-24-b-06
m2
302.94
403.54
Ground Floor
m3
418.45
6,257.00
First Floor
m3
360.63
6,524.16
Second Floor
m3
422.13
6,819.74
Third Floor
m3
399.70
7,115.32
10
a
b
c
d
07-05-a-05
07-05-a-05
+07-06-a
07-05-a-05
+07-06-b
07-05-a-05
+07-06-c
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
e
07-05-a-05
+07-06-d
DESCRIPTION
Top Floor
UNIT
QUANTITY
RATE
m3
76.13
7,629.86
m2
586.80
5,899.18
1,016.46
957.32
11
12-07-c
First class deodar wood wrought
-(12-24-c for joinery in doors and windows etc.
chowkat)
complete : 1.5" thick, (only shutter)
12
12-56-a
13
12-54-d-01
m2
374.07
5,573.40
14
12-54-e-01
Supply
and
Fixing
aluminium
bronze/black. Other items : Fly
screen shutter for Deluxe model.
m2
249.38
1,525.55
15
12-50.
m2
374.07
2,238.91
Ground Floor
m3
480.77
8,168.74
First Floor
m3
461.51
8,168.74
Second Floor
m3
416.96
8,820.12
Third Floor
m3
416.96
8,820.12
Top Floor
m3
20.42
8,820.12
m3
50.18
9,095.27
m3
50.18
9,095.27
m3
50.18
9,746.65
16
a
b
c
d
e
06-06-a-03
06-06-a-03,
06-06-e
06-06-a-03,
06-06-e
06-06-a-03,
06-06-e
06-06-a-03,
06-06-e
17
a
b
c
06-06-a-02
Ground Floor
06-06-a-02,
First Floor
06-06-e
06-06-a-02,
Second Floor
06-06-e
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
d
e
18
DESCRIPTION
UNIT
06-06-a-02,
Third Floor
06-06-e
06-06-a-02,
Top Floor
06-06-e
Supply
&
fabricate
M.S.
reinforcement for cement concrete,
06-07-b
(Hot rolled deformed bars Grade
60)
Cement plaster
height 3/8" thick.
19
1:4
upto
QUANTITY
RATE
m3
50.18
9,746.65
m3
6.37
9,746.65
393.24
119,471.42
Tonne
20'
11-09-a
Ground Floor
m2
1,690.03
178.98
11-09-a
First Floor
m2
1,675.04
178.98
Second Floor
m2
1,644.83
201.06
Third Floor
m2
1,342.78
223.14
Top Floor
m2
97.39
245.22
c
d
e
11-09-a
+11-28.
11-09-a
+11-28.
11-09-a
+11-28.
Cement plaster
height 1/2" thick.
20
1:4
upto
20'
11-09-b
Ground Floor
m2
4,065.00
208.31
11-09-b
First Floor
m2
5,746.98
208.31
Second Floor
m2
5,303.93
230.39
Third Floor
m2
5,303.93
252.47
Top Floor
m2
123.21
274.55
m3
2,775.86
76.63
c
d
e
11-09-b
+11-28.
11-09-b
+11-28.
11-09-b
+11-28.
21
03-16-a
22
07-30.
m3
2,574.67
1,010.63
23
06-05-i
m3
169.95
4,860.62
24
10-15-e.
m2
6,406.21
495.60
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
10-48-c.
m2
5,886.23
2,657.60
25.b 10-48-c.
m2
550.60
2,657.60
25
26
10-46-a.
m2
141.83
1,174.32
27
10-38-a
m2
354.82
1,027.08
28
10-22-a
1.5"
thick
mosaic
flooring,
including
rubbing
&
polishing
complete : Using grey cement.
m2
325.65
894.73
29
10-40-a-02
m2
48.85
816.95
30
10-43-c
195.39
18.52
31
10-26-d
m2
472.19
1,660.66
32
10-44.
m2
212.17
1,155.05
Ground Floor
m2
5,755.03
73.37
First Floor
m2
7,422.02
73.37
Second Floor
m2
6,948.76
73.37
Third Floor
m2
6,646.71
73.37
33
a
b
c
d
11-23-a03+11-22
11-23-a03+11-22
11-23-a03+11-22
11-23-a03+11-22
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
11-23-a03+11-22
Top Floor
m2
220.60
73.37
34
06-05-h
m3
14.02
5,603.70
35
10-15-e.
m2
139.41
495.60
36
m2
1,173.61
110.01
37
09-34-c
m2
1,470.69
983.00
38
09-15.
No
25.00
545.10
39
09-19-a
365.85
2,023.96
40
09-21.
Each
50.00
1,553.73
25-37.
m2
674.72
1,454.20
Ground Floor
m2
557.62
188.10
First Floor
m2
557.62
188.10
Second Floor
m2
557.62
188.10
Third Floor
m2
557.62
188.10
Total Amount
= Rs.
41
42
a
b
c
d
13-38-a
+13-38-b
13-38-a
+13-38-b
13-38-a
+13-38-b
13-38-a
+13-38-b
= Rs.
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
= Rs.
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
Non-SCHEDULE ITEMS
Dumpa Ceiling
Providing
and
fixing
Dumpa
Ceiling
inlcuding
all
fitting
complete
in
all
respects
as
specified.
NSI
Ground Floor
m2
542.90
2,155.00
NSI
First Floor
m2
542.90
2,155.00
NSI
Second Floor
m2
452.42
2,155.00
NSI
Third Floor
m2
452.42
2,155.00
NSI
Ground Floor
60.98
450.00
NSI
First Floor
60.98
450.00
NSI
Second Floor
60.98
450.00
NSI
Third Floor
60.98
450.00
NSI
Ground Floor
30.49
492.00
NSI
First Floor
30.49
492.00
NSI
Second Floor
30.49
492.00
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
d
NSI
DESCRIPTION
Third Floor
UNIT
M
QUANTITY
RATE
30.49
492.00
NSI
Ground Floor
m2
223.05
1,506.00
NSI
First Floor
m2
223.05
1,506.00
NSI
Second Floor
m2
223.05
1,506.00
NSI
Third Floor
m2
223.05
1,506.00
Fire Extinguisher
Providing
and
fixing
of
Fire
Extinguisher inlcuding all fitting
complete in all respects as shown in
drawings and as specified by the
engieer in charge.
NSI
Ground Floor
Each
10.00
15,000.00
NSI
First Floor
Each
10.00
15,000.00
NSI
Second Floor
Each
10.00
15,000.00
NSI
Third Floor
Each
10.00
15,000.00
Fire Hydrant
Providing
and
fixing
of
Fire
Extinguisher inlcuding all fitting
complete in all respects as shown in
drawings and as specified by the
engieer in charge.
NSI
Ground Floor
Each
2.00
75,000.00
NSI
First Floor
Each
2.00
75,000.00
NSI
Second Floor
Each
2.00
75,000.00
NSI
Third Floor
Each
2.00
75,000.00
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
NSI
Ground Floor
m2
400.00
1,722.00
NSI
First Floor
m2
240.00
1,722.00
NSI
Second Floor
m2
280.00
1,722.00
NSI
Third Floor
m2
160.00
1,722.00
NSI
m2
100.00
6,348.40
NSI
m2
150.00
1,076.00
No
40.00
1,600.00
10
NSI
All Floors
GypBoard Suspended Ceiling
Providing and fixing Gypboard
Suspended ceiling inlcuding all
fitting complete in all respects as
specified.
11
NSI
Ground Floor
m2
12.00
1,721.60
NSI
First Floor
m2
15.00
1,721.60
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
DESCRIPTION
UNIT
QUANTITY
RATE
NSI
Second Floor
m2
14.00
1,721.60
NSI
Third Floor
m2
12.00
1,721.60
12
NSI
Ground Floor
m2
10.00
1,505.00
NSI
First Floor
m2
12.00
1,505.00
NSI
Second Floor
m2
25.00
1,505.00
NSI
Third Floor
m2
10.00
1,505.00
NSI
No
1.00
1,000,000.00
13
UPVC Doors/Windwos
Providing and fixing of UPVC DOORS
of approved size and section with
approved color 5mm thick glass
inlcuding all fittings, locks, handle,
tower bolts and frame etc etc
complete in all respects as shown in
drawings and as specified by the
engieer in charge.
14
NSI
Ground Floor
m2
50.00
8,070.00
NSI
First Floor
m2
75.00
8,070.00
m2
25.00
6,050.00
UPVC Windows
Providing and fixing of UPVC
Windows of approved size and
section with approved color 5mm
thick glass inlcuding all fittings,
locks, handle, tower bolts and frame
etc etc complete in all respects as
shown in drawings and as specified
by the engieer in charge.
15
15
NSI
Ground Floor
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.NO REF:
b
NSI
DESCRIPTION
First Floor
UNIT
m2
QUANTITY
18.00
Total Amount
RATE
6,050.00
= Rs.
ABSTRACT OF COST
624,881.08
505,241.46
22,282.64
682,097.99
10,222,334.21
32,835,017.70
858,875.69
75,960.12
122,247.87
2,618,229.36
2,352,797.81
2,878,829.96
2,844,028.54
ABSTRACT OF COST
3,461,656
973,081
2,084,845.26
380,442.30
837,510.48
3,927,265.62
3,769,958.09
3,677,628.00
3,677,628.00
180,068.08
456,405.59
456,405.59
489,092.20
ABSTRACT OF COST
46,980,776.84
302,481.18
299,797.99
330,709.25
299,628.83
23,881.03
846,780.54
1,197,153.31
1,221,971.86
1,339,082.58
33,827.57
212,714.25
2,602,040.30
826,064.60
3,174,916.83
ABSTRACT OF COST
15,643,255.70
1,463,273.12
166,551.54
364,432.52
291,369.32
39,906.03
3,618.63
784,152.54
245,062.43
422,246.53
544,553.30
509,830.24
487,669.23
ABSTRACT OF COST
78,546.31
69,089.22
129,108.39
1,445,686.95
13,627.50
740,473.17
77,686.50
981,179.55
104,888.48
104,888.48
104,888.48
104,888.48
166,775,728.79
5,003,271.86
ABSTRACT OF COST
ABSTRACT OF COST
1,169,948.70
1,169,948.70
974,957.25
974,957.25
27,439.02
27,439.02
27,439.02
27,439.02
15,000.00
15,000.00
15,000.00
ABSTRACT OF COST
335,910.78
335,910.78
335,910.78
335,910.78
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
ABSTRACT OF COST
688,800.00
413,280.00
482,160.00
275,520.00
634,840.00
161,400.00
64,000.00
20,659.20
25,824.00
ABSTRACT OF COST
15,050.00
18,060.00
37,625.00
15,050.00
1,000,000.00
403,500.00
605,250.00
151,250.00
ABSTRACT OF COST
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
1
Description
No
Length
Width
Depth
Quantity
Excavation
Ground Floor
area-1
Unit
Cft
20422.59
6.00
122535.54
Total
= 122535.54
OR in Cu.
3469.83
Termite
Ground Floor
area-1
Cft
20422.59
20422.59
Total
20422.59
OR in Sq.
1898.01
0.25
4955.75
Total
4955.75
OR in Cu.
140.33
2.50
48680.00
P.C.C 1:4:8
Ground Floor
area-1
Cft
19823.00
area-1
Cft
Columns
Cft
70
RCC wall
Cft
Elevator
Cft
19472.00
1.25
1.25
3.00
262.50
130.00
1.25
3.00
390.00
19.25
0.75
3.00
115.50
Total
49448.00
OR in Cu.
1400.40
274.84
=
274.84
Cft
465.66
1.13
3.50
1833.54
Internal Horizantal
Cft
117.00
0.75
3.50
307.13
Walls
Cft
102.00
0.75
3.50
535.50
Walls
Cft
27.00
0.75
3.50
70.88
Walls
Cft
16
8.00
0.75
3.50
336.00
Internal Vertical
Cft
30
21.25
0.75
3.50
1673.44
Walls
Cft
12
13.00
0.75
3.50
409.50
Total
5165.97
OR in Cu.
146.30
Sft
465.66
1.13
523.87
Internal Walls
Sft
1269.50
0.75
952.13
Total
1475.99
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
OR in Sq.
Quantity
=
137.17
7.00
3259.62
Total
3259.62
OR in Sq.
302.94
Vertical DPC
Walls
Depth
Sft
465.66
Sft
42.93
0.75
12.00
386.37
Vertical Wall
Sft
17.08
0.75
12.00
461.16
Vertical Wall
Sft
18
36.50
0.75
12.00
5913.00
Horizantal Wall
Sft
38.00
0.75
12.00
1026.00
Horizantal Wall
Sft
173.50
0.75
12.00
3123.00
Horizantal Wall
Sft
116.25
0.75
12.00
2092.50
Horizantal Wall
Sft
99.75
0.75
12.00
1795.50
Circular wall
Sft
51.50
0.75
12.00
463.50
Circular wall
Sft
52.00
0.75
12.00
468.00
4 1/2" walls
Sft
12.00
0.375
12.00
54.00
4 1/2" walls
Sft
18.42
0.375
12.00
248.67
4 1/2" walls
Sft
9.00
0.375
12.00
81.00
4 1/2" walls
Sft
35.00
0.375
12.00
157.50
16270.20
Total
Deduction
Doors/Windows
D
Cft
8.00
0.75
7.00
42.00
D1
Cft
5.00
0.75
7.00
131.25
D2
Cft
20
4.00
0.75
7.00
420.00
D3
Cft
16
3.00
0.75
7.00
252.00
D4
Cft
2.50
0.75
7.00
65.63
W1
Cft
28
6.00
0.75
4.50
567.00
V1
Cft
2.00
0.75
2.00
15.00
Total
1492.88
Net Total
14777.33
OR in Cu.
418.45
First Floor
9" Walls
Vertical Wall
Sft
42.93
0.75
12.00
386.37
Vertical Wall
Sft
17.08
0.75
12.00
461.16
Vertical Wall
Sft
12
36.50
0.75
12.00
3942.00
Horizantal Wall
Sft
38.00
0.75
12.00
1026.00
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Horizantal Wall
Sft
173.50
0.75
12.00
3123.00
Horizantal Wall
Sft
116.25
0.75
12.00
2092.50
Horizantal Wall
Sft
99.75
0.75
12.00
1795.50
Circular wall
Sft
51.50
0.75
12.00
463.50
Circular wall
Sft
52.00
0.75
12.00
468.00
4 1/2" walls
Sft
12.00
0.375
12.00
54.00
4 1/2" walls
Sft
18.42
0.375
12.00
248.67
4 1/2" walls
Sft
9.00
0.375
12.00
81.00
4 1/2" walls
Sft
35.00
0.375
12.00
157.50
14299.20
Total
Deduction
Doors/Windows
D
Cft
8.00
0.75
7.00
42.00
D1
Cft
5.00
0.75
7.00
131.25
D2
Cft
18
4.00
0.75
7.00
378.00
D3
Cft
14
3.00
0.75
7.00
220.50
D4
Cft
16
2.50
0.75
7.00
210.00
W1
Cft
28
6.00
0.75
4.50
567.00
V1
Cft
2.00
0.75
2.00
15.00
Total
1563.75
Net Total
12735.45
OR in Cu.
360.63
Second Floor
9" Walls
Vertical Wall
Sft
43.00
0.75
12.00
1935.00
Vertical Wall
Sft
88.00
0.75
12.00
4752.00
Vertical Wall
Sft
36.50
0.75
12.00
1971.00
Horizantal Wall
Sft
38.00
0.75
12.00
1026.00
Horizantal Wall
Sft
173.50
0.75
12.00
6246.00
4 1/2" walls
Sft
12.00
0.375
12.00
54.00
4 1/2" walls
Sft
18.42
0.375
12.00
248.67
4 1/2" walls
Sft
9.00
0.375
12.00
81.00
4 1/2" walls
Sft
35.00
0.375
12.00
157.50
16471.17
Total
Deduction
Doors/Windows
D
Cft
8.00
0.75
7.00
42.00
D1
Cft
5.00
0.75
7.00
131.25
D2
Cft
18
4.00
0.75
7.00
378.00
D3
Cft
14
3.00
0.75
7.00
220.50
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
D4
Cft
16
2.50
0.75
7.00
210.00
W1
Cft
28
6.00
0.75
4.50
567.00
V1
Cft
2.00
0.75
2.00
15.00
Total
1563.75
Net Total
14907.42
OR in Cu.
422.13
Third Floor
9" Walls
Vertical Wall
Sft
43.00
0.75
12.00
1935.00
Vertical Wall
Sft
88.00
0.75
12.00
3960.00
Vertical Wall
Sft
36.50
0.75
12.00
1971.00
Horizantal Wall
Sft
38.00
0.75
12.00
1026.00
Horizantal Wall
Sft
173.50
0.75
12.00
6246.00
4 1/2" walls
Sft
12.00
0.375
12.00
54.00
4 1/2" walls
Sft
18.42
0.375
12.00
248.67
4 1/2" walls
Sft
9.00
0.375
12.00
81.00
4 1/2" walls
Sft
35.00
0.375
12.00
157.50
15679.17
Total
Deduction
Doors/Windows
D
Cft
8.00
0.75
7.00
42.00
D1
Cft
5.00
0.75
7.00
131.25
D2
Cft
18
4.00
0.75
7.00
378.00
D3
Cft
14
3.00
0.75
7.00
220.50
D4
Cft
16
2.50
0.75
7.00
210.00
W1
Cft
28
6.00
0.75
4.50
567.00
V1
Cft
2.00
0.75
2.00
15.00
Total
1563.75
Net Total
14115.42
OR in Cu.
399.70
Top Floor
Papaet
Sft
500.00
0.75
4.00
1500.00
Mumty
Sft
22.75
0.75
10.00
1365.00
2865.00
Total
Deduction
Doors/Windows
D5
Cft
3.50
0.75
7.00
73.50
W1
Cft
5.00
0.75
5.50
103.13
Total
176.63
Net Total
2688.38
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
OR in Cu.
10
Depth
Quantity
=
76.13
Wooden Doors
Ground Floor
D
Sft
8.00
7.00
56.00
D1
Sft
5.00
7.00
245.00
D2
Sft
25
4.00
7.00
700.00
D3
Sft
20
3.00
7.00
420.00
D4
Sft
10
2.50
7.00
175.00
D1
Sft
21
5.00
7.00
735.00
D2
Sft
75
4.00
7.00
2100.00
D3
Sft
60
3.00
7.00
1260.00
D4
Sft
30
2.50
7.00
525.00
Sft
3.50
7.00
98.00
Total
6314.00
OR in Sq.
586.80
Top Floor
D2
11
Steel Chowkat
Ground Floor
D
Rft
22.00
0.00
D1
Rft
19.00
0.00
D2
Rft
25
18.00
0.00
D3
Rft
20
17.00
0.00
D4
Rft
10
16.50
0.00
D1
Rft
21
19.00
399.00
D2
Rft
75
18.00
1350.00
D3
Rft
60
17.00
1020.00
D4
Rft
30
16.50
495.00
Rft
17.50
70.00
Top Floor
D2
Total
OR in m
12
3334.00
1016.46
Aluminium Windows
Ground Floor to Third Floor
W
Sft
1###
4.50
6.00
3375.00
Sft
25
2.00
2.00
100.00
Sft
5.00
5.50
550.00
4025.00
Top Floor
W2
Total
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
13
Description
Unit
No
Length
Depth
Quantity
OR in Sq.
374.07
Total
4025.00
OR in Sq.
374.07
14
Width
Cft
19472.59
1.00
0.50
9736.30
Lift
Cft
19.25
0.75
12.00
346.50
External Ramp
Cft
18.00
6.25
0.75
337.50
Internal Ramp
Cft
50.00
13.62
0.75
510.75
Cft
0.75
210.00
Long Beams
Cft
12
203.00
1.00
1.25
3045.00
Short Beams
Cft
12
165.00
1.00
1.25
2475.00
Cft
8.50
1.13
0.75
7.17
D1
Cft
6.50
0.75
0.75
18.28
D2
Cft
20
5.50
0.75
0.75
61.88
D3
Cft
16
4.50
0.75
0.75
40.50
D4
Cft
3.50
0.75
0.75
9.84
W1
Cft
30
7.50
0.75
0.75
126.56
Cft
20
4.50
0.75
0.75
50.63
Total
16975.90
OR in Cu.
480.77
280.00
Slab Beams
Lintles Beams
First Floor
slab
Cft
18970.83
1.00
0.50
9485.42
Lift
Cft
19.25
0.75
16.00
231.00
Internal Ramp
Cft
50.00
13.62
0.75
510.75
Cft
0.75
210.00
Long Beams
Cft
12
203.00
1.00
1.25
3045.00
Short Beams
Cft
12
165.00
1.00
1.25
2475.00
Cft
8.50
1.13
0.75
7.17
D1
Cft
6.50
0.75
0.75
18.28
D2
Cft
20
5.50
0.75
0.75
61.88
D3
Cft
16
4.50
0.75
0.75
40.50
D4
Cft
3.50
0.75
0.75
9.84
W1
Cft
30
7.50
0.75
0.75
126.56
W3
Cft
8.50
0.75
0.75
23.91
280.00
Slab Beams
Lintles Beams
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
V
Unit
Cft
No
1
Length
20
Width
4.50
0.75
Depth
Quantity
0.75
50.63
Total
16295.93
OR in Cu.
461.51
Second Floor
Slab
Cft
15824.61
1.00
0.50
7912.31
Lift
Cft
19.25
0.75
16.00
231.00
Cft
50.00
13.62
0.75
510.75
Slab Beams
Cft
0.75
210.00
Long Beams
Cft
12
203.00
1.00
1.25
3045.00
Short Beams
Cft
12
165.00
1.00
1.25
2475.00
Cft
8.50
1.13
0.75
7.17
D1
Cft
6.50
0.75
0.75
18.28
D2
Cft
20
5.50
0.75
0.75
61.88
D3
Cft
16
4.50
0.75
0.75
40.50
D4
Cft
3.50
0.75
0.75
9.84
W1
Cft
30
7.50
0.75
0.75
126.56
W3
Cft
8.50
0.75
0.75
23.91
Cft
20
4.50
0.75
0.75
50.63
Total
14722.82
OR in Cu.
416.96
Total
14722.82
OR in Cu.
416.96
280.00
Slab Beams
Lintles Beams
Third Floor
Top Floor
Lift
Cft
19.25
0.75
16.00
231.00
D1
Cft
6.50
0.75
0.75
14.63
W1
Cft
6.00
0.75
0.75
20.25
Slab
Cft
910.00
1.00
0.50
455.00
Total
720.88
OR in Cu.
20.42
1.25
13.50
1771.88
Total
1771.88
OR in Cu.
50.18
1.25
13.50
1771.88
15
Cft
70
1.50
First Floor
Columns
Cft
70
1.50
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Total
1771.88
OR in Cu.
50.18
1.25
13.50
1771.88
Total
1771.88
OR in Cu.
50.18
Total
1771.88
OR in Cu.
50.18
1.25
10.00
225.00
Total
225.00
OR in Cu.
6.37
Second Floor
Columns
Cft
70
1.50
Third Floor
Top Floor
Columns
15
Cft
12
1.50
16
393.24
=
393.24
Sft
226
226
Sft
220
220
External Ramp
Sft
15.08
6.25
377
Internal Ramp
Sft
44.5
13.62
606.09
Sft
Sft
11.25
90
Sft
14.37
12
172.44
Sft
700
700
RECEPTION HALL
Sft
1221
1221
ADMINISTRATION HALL
Sft
1524
1524
OPD
Sft
1776
1776
Parchi Counter
Sft
165
165
Registration Room
Sft
11.37
17.18
195.3366
Record Room
Sft
14.5
17.18
249.11
Wash
Passage To
Wash/Record/Registration Room
Sft
40
Sft
9.42
47.1
Waiting
Sft
208
624
Waiting
Sft
156
156
Waiting
Sft
426
426
DENTISTRY
Sft
16
21.25
340
X-RAY
Sft
16
21.25
340
280
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
RECORD ROOM
Sft
DENTAL X-RAY
Sft
9.25
74
DARK ROOM
Sft
8.87
70.96
CONTROL ROOM
Sft
8.87
70.96
ULTRASOUND
Sft
16
21.25
340
DIALYSIS UNIT
Sft
32.75
21.25
695.9375
C.T SCAN
Sft
24.37
21.25
517.8625
CONTROL ROOM
Sft
21.25
170
PATHOLOGY LAB
Sft
37.125
34.62
1285.2675
DISTRIBUTION
Sft
12
108
LAB To DISTRIBUTION
Sft
12.25
110.25
OFFICE
Sft
16
13
1040
OFFICE
Sft
10
16.66
333.2
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
Sft
93.5
12
1122
MALE LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
3.87
4.5
52.245
FEMALE LAVATORY
Sft
10.37
82.96
WC
Sft
4.83
38.64
EXAMINATION
Sft
8.5
68
CONSULTANT
Sft
11
12
264
EXAMINATION
Sft
10
90
EXAMINATION
Sft
14
9.75
273
CONSULTANT
Sft
14
11.75
329
DUMP WAITER
Sft
24
262.53
787.59
Total
18184.70
in Sqm
1690.03
First Floor
Ceiling
Left Side Stairs
Sft
226
226
Sft
220
220
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
44.5
13.62
280
606.09
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY
LINEN
SURGICAL/ORTHOPEDICS
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
123.56
12
1482.72
HALL
Sft
18.56
23.125
429.2
Sft
13.25
28.75
380.9375
ICU WARD
Sft
17
34.125
580.125
Sft
17
10
170
Sft
29.3
175.8
MEDICINE STORE
Sft
8.5
68
NURSES LAVATORY
Sft
10.37
82.96
WC
Sft
40
DOC LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
60
ANESTHETIST
Sft
11
12
132
DOCTORS LOUNGE
Sft
23
12
276
Sft
43.25
4.25
183.8125
O.T NURSE
Sft
10.62
10
106.2
PATIENTS PREPARATION
Sft
10.62
10
106.2
SCRUBUP
Sft
8.52
3.68
31.3536
RECOVERY
Sft
14.62
20.37
297.8094
OT
Sft
14.62
16
233.92
OT
Sft
19.62
29.87
1172.0988
Sft
33.52
4.87
163.2424
Corridor
Sft
16.125
8.79
141.73875
STERILIZED LOBBY
Sft
16
144
OT
Sft
14.62
22.37
327.0494
DUMP WAITER
Sft
32
Sft
10.25
4.5
46.125
ICU WARD
Sft
17
34.125
580.125
Total
18023.39
in Sqm
1675.04
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Sft
226
226
Sft
220
220
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
MEDICAL/UROLOGY WARDS
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
TERRACE
Sft
Secound Floor
Ceiling
44.5
13.62
606.09
280
280
3250
3250
Total
17698.36
in Sqm
1644.83
Third Floor
Ceiling
Left Side Stairs
Sft
226
226
Sft
220
220
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
MEDICAL/UROLOGY WARDS
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
44.5
Depth
Quantity
13.62
606.09
280
280
Total
14448.36
in Sqm
1342.78
Top Floor
17
Mumty
Sft
22.25
21.75
967.88
Left
Sft
8.00
10.00
80.00
Total
1047.88
in Sqm
97.39
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Sft
50
12
600
Sft
48
12
576
External Ramp
Sft
29
464
Sft
86.25
12
1035
Sft
18
12
216
Sft
30.5
12
366
Sft
52.74
12
632.88
Sft
75
12
900
RECEPTION HALL
Sft
126
12
1512
ADMINISTRATION HALL
Sft
150
12
1800
OPD
Sft
162
12
1944
Registration Room
Sft
57.1
12
685.2
Record Room
Sft
63.36
12
760.32
Wash
Passage To
Wash/Record/Registration Room
Sft
26
12
312
Sft
23.84
12
286.08
Waiting
Sft
32
12
1152
Waiting
Sft
48
12
576
Waiting
Sft
52
12
624
DENTISTRY
Sft
74.5
12
894
X-RAY
Sft
74.5
12
894
RECORD ROOM
Sft
26
12
936
DENTAL X-RAY
Sft
34.5
12
414
DARK ROOM
Sft
33.74
12
404.88
CONTROL ROOM
Sft
33.74
12
404.88
ULTRASOUND
Sft
74.5
12
894
DIALYSIS UNIT
Sft
108
12
1296
C.T SCAN
Sft
91.24
12
1094.88
CONTROL ROOM
Sft
33.74
12
404.88
PATHOLOGY LAB
Sft
143.49
12
1721.88
DISTRIBUTION
Sft
42
12
504
LAB To DISTRIBUTION
Sft
42.5
12
510
OFFICE
Sft
58
12
3480
OFFICE
Sft
53.32
12
1279.68
ELECTRICAL ROOM
Sft
31.5
12
378
Sft
73.25
12
879
Sft
199
12
2388
MALE LAVATORY
Sft
39.25
12
471
WC
Sft
16.74
12
602.64
FEMALE LAVATORY
Sft
36.74
12
440.88
WC
Sft
17.66
12
423.84
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
EXAMINATION
Sft
33
12
396
CONSULTANT
Sft
46
12
1104
EXAMINATION
Sft
38
12
456
EXAMINATION
Sft
47.5
12
1140
CONSULTANT
Sft
51.5
12
1236
DUMP WAITER
Sft
20
12
240
External walls
Sft
500.00
12.00
6000
45729.92
Total
Depth
Quantity
Deduction
D
Sft
8.00
7.00
56.00
D1
Sft
5.00
7.00
175.00
D2
Sft
20
4.00
7.00
560.00
D3
Sft
16
3.00
7.00
336.00
D4
Sft
2.50
7.00
87.50
W1
Sft
28
6.00
4.50
756.00
V1
Sft
2.00
2.00
20.00
Total
1990.50
Net Total
43739.42
in Sqm
4065.00
First Floor
Walls
Left Side Stairs walls
Sft
50
12
600
Sft
48
12
576
Sft
86.25
12
1035
Sft
18
12
216
Sft
30.5
12
366
Sft
44.24
12
530.88
Sft
75
12
900
RECEPTION HALL
Sft
126
12
1512
OFFICE
Sft
42.66
12
2047.68
WASH
Sft
22
12
1056
DRESS
Sft
17.98
12
863.04
Sft
58.44
12
701.28
HALL
Sft
104.44
12
1253.28
ELECTRICAL ROOM
Sft
31.5
12
378
Sft
83
12
996
PASSAGE to MO Offices
Sft
58
12
696
MO OFFICES
Sft
56
12
1344
WASH ROOM
Sft
31.24
12
749.76
LAVATORY
Sft
35.5
12
1704
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
WC
Sft
24
18
12
5184
WHB AREA
Sft
45
12
2160
PROCEDURE ROOM
Sft
36.24
12
1739.52
NURSES STATION
Sft
44.24
12
2123.52
DIRTY
LINEN
SURGICAL/ORTHOPEDICS
WARDS
Sft
23.74
12
1139.52
Sft
204.24
12
4901.76
Sft
271.12
12
3253.44
HALL
Sft
83.37
12
1000.44
Sft
84
12
1008
ICU WARD
Sft
102.25
12
1227
Sft
54
12
648
Sft
70.6
12
847.2
MEDICINE STORE
Sft
33
12
396
NURSES LAVATORY
Sft
36.74
12
440.88
WC
Sft
18
12
432
DOC LAVATORY
Sft
39.25
12
471
WC
Sft
18
12
648
ANESTHETIST
Sft
46
12
552
DOCTORS LOUNGE
Sft
70
12
840
Sft
95
12
1140
O.T NURSE
Sft
41.24
12
494.88
PATIENTS PREPARATION
Sft
41.24
12
494.88
SCRUBUP
Sft
24.4
12
292.8
RECOVERY
Sft
69.98
12
839.76
OT
Sft
61.24
12
734.88
OT
Sft
98.98
12
2375.52
Sft
76.78
12
921.36
Corridor
Sft
49.83
12
597.96
STERILIZED LOBBY
Sft
50
12
600
OT
Sft
73.98
12
887.76
DUMP WAITER
Sft
16
12
384
Sft
29.5
12
354
ICU WARD
Sft
102.25
12
1227
External walls
Sft
500
12
6000
63882.00
Total
Depth
Quantity
Deduction
D
Sft
8.00
7.00
56.00
D1
Sft
5.00
7.00
175.00
D2
Sft
20
4.00
7.00
560.00
D3
Sft
16
3.00
7.00
336.00
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
D4
Sft
2.50
7.00
87.50
W1
Sft
30
6.00
4.50
810.00
V1
Sft
2.00
2.00
20.00
Total
2044.50
Net Total
61837.50
in Sqm
5746.98
Secound Floor
Walls
Left Side Stairs walls
Sft
50
12.00
600.00
Sft
48
12.00
576.00
Sft
86.25
12.00
1035.00
Sft
18
12.00
216.00
Sft
30.5
12.00
366.00
Sft
440
12.00
5280.00
Sft
75
12.00
900.00
RECEPTION HALL
Sft
126
12.00
1512.00
OFFICE
Sft
42.66
12.00
2047.68
22.00
12.00
1056.00
WASH
Sft
DRESS
Sft
17.98
12.00
863.04
Sft
58.44
12.00
701.28
HALL
Sft
104.44
12.00
1253.28
ELECTRICAL ROOM
Sft
31.50
12.00
378.00
Sft
83.00
12.00
996.00
PASSAGE to MO Offices
Sft
58.00
12.00
696.00
MO OFFICES
Sft
56.00
12.00
1344.00
WASH ROOM
Sft
31.24
12.00
749.76
LAVATORY
Sft
35.50
12.00
1704.00
WC
Sft
1 24
18.00
12.00
5184.00
WHB AREA
Sft
45.00
12.00
2160.00
PROCEDURE ROOM
Sft
36.24
12.00
1739.52
NURSES STATION
Sft
44.24
12.00
2123.52
DIRTY LINEN
Sft
23.74
12.00
1139.52
MEDICAL/UROLOGY WARDS
Sft
204.24
12.00
4901.76
Sft
339.82
12.00
4077.84
WAITING LOUNGE
Sft
115.84
12.00
1390.08
MO OFFICES
Sft
58.40
12.00
1401.60
DRESS
Sft
29.98
12.00
719.52
WC
Sft
24.00
12.00
576.00
OFFICE
Sft
42.66
12.00
1535.76
WASH
Sft
22.74
12.00
818.64
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
DRESS
Sft
29.98
12.00
1079.28
OFFICE
Sft
49.64
12.00
595.68
WASH
Sft
24.00
12.00
288.00
TERRACE
Sft
185.00
6.00
1110.00
External walls
Sft
500.00
12.00
6000.00
59114.76
Total
Quantity
Deduction
Doors/Windows
D
Sft
8.00
7.00
56.00
D1
Sft
5.00
7.00
175.00
D2
Sft
20
4.00
7.00
560.00
D3
Sft
16
3.00
7.00
336.00
D4
Sft
2.50
7.00
87.50
W1
Sft
30
6.00
4.50
810.00
V1
Sft
2.00
2.00
20.00
Total
2044.50
Net Total
57070.26
in Sqm
5303.93
Net Total
57070.26
in Sqm
5303.93
Third Floor
Top Floor
Internal
Staircase
Sft
22.25
10.00
445.00
Stairscase
Sft
41.25
10.00
412.50
Lefts
Sft
21.75
10.00
435.00
Mumty
Sft
22.13
10.00
221.25
1513.75
Total
Deduction
Doors/Windows (G.F & F.F)
18
D3
Sft
3.50
7.00
98.00
W1
Sft
5.00
4.50
90.00
Total
188.00
Net Total
1325.75
in Sqm
123.21
98028.43
Total
OR in Cu.
19
Sand Filling
98028.43
=
2775.86
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Sft
226
1130
Sft
220
1100
External Ramp
Sft
15.08
6.25
1885
Internal Ramp
Sft
44.5
13.62
3030.45
Sft
1400
Sft
11.25
450
Sft
14.37
12
862.2
Sft
700
3500
RECEPTION HALL
Sft
1221
6105
ADMINISTRATION HALL
Sft
1524
7620
OPD
Sft
1776
8880
Parchi Counter
Sft
165
825
Registration Room
Sft
11.37
17.18
976.683
Record Room
Sft
14.5
17.18
1245.55
Wash
Passage To
Wash/Record/Registration Room
Sft
200
Sft
9.42
235.5
Waiting
Sft
208
3120
Waiting
Sft
156
780
Waiting
Sft
426
2130
DENTISTRY
Sft
16
21.25
1700
X-RAY
Sft
16
21.25
1700
RECORD ROOM
Sft
262.53
3937.95
DENTAL X-RAY
Sft
9.25
370
DARK ROOM
Sft
8.87
354.8
CONTROL ROOM
Sft
8.87
354.8
ULTRASOUND
Sft
16
21.25
1700
DIALYSIS UNIT
Sft
32.75
21.25
3479.6875
C.T SCAN
Sft
24.37
21.25
2589.3125
CONTROL ROOM
Sft
21.25
850
PATHOLOGY LAB
Sft
37.125
34.62
6426.3375
DISTRIBUTION
Sft
12
540
LAB To DISTRIBUTION
Sft
12.25
551.25
OFFICE
Sft
16
13
5200
OFFICE
Sft
10
16.66
1666
ELECTRICAL ROOM
Sft
8.75
306.25
Sft
31.75
9.75
1547.8125
Sft
93.5
12
5610
MALE LAVATORY
Sft
7.5
12.125
454.6875
WC
Sft
3.87
4.5
261.225
FEMALE LAVATORY
Sft
10.37
414.8
280
Quantity
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
WC
Sft
4.83
193.2
EXAMINATION
Sft
8.5
340
CONSULTANT
Sft
11
12
1320
EXAMINATION
Sft
10
450
EXAMINATION
Sft
14
9.75
1365
CONSULTANT
Sft
14
11.75
1645
DUMP WAITER
Sft
120
Total
OR in Cu.
19
Quantity
90923.50
=
2574.67
12.00
6000
Weathershield
Ground Floor
External walls
Sft
500.00
Total
OR in Sq.M
6000.00
=
557.62
12.00
6000
First Floor
External walls
Sft
500.00
Total
OR in Sq.M
6000.00
=
557.62
Second Floor
External walls
Sft
500.00
12.00
Total
OR in Sq.M
6000
6000.00
557.62
12.00
6000
Third Floor
External walls
Sft
500.00
Total
OR in Sq.M
20
6000.00
=
557.62
Sft
226
0.33
74.58
Sft
220
0.33
72.6
External Ramp
Sft
15.08
6.25
0.33
124.41
Internal Ramp
Sft
44.5
13.62
0.33
200.0097
Sft
0.33
92.4
Sft
11.25
0.33
29.7
Sft
14.37
12
0.33
56.9052
Sft
700
0.33
231
RECEPTION HALL
Sft
1221
0.33
402.93
ADMINISTRATION HALL
Sft
1524
0.33
502.92
OPD
Sft
1776
0.33
586.08
Parchi Counter
Sft
165
0.33
54.45
Registration Room
Sft
0.33
64.461078
280
11.37
17.18
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
29
Description
Unit
No
Length
Record Room
Sft
14.5
17.18
0.33
82.2063
Wash
Passage To
Wash/Record/Registration Room
Sft
0.33
13.2
Sft
9.42
0.33
15.543
Waiting
Sft
208
0.33
205.92
Waiting
Sft
156
0.33
51.48
Waiting
Sft
426
0.33
140.58
DENTISTRY
Sft
16
21.25
0.33
112.2
X-RAY
Sft
16
21.25
0.33
112.2
RECORD ROOM
Sft
262.53
0.33
259.9047
DENTAL X-RAY
Sft
9.25
0.33
24.42
DARK ROOM
Sft
8.87
0.33
23.4168
CONTROL ROOM
Sft
8.87
0.33
23.4168
ULTRASOUND
Sft
16
21.25
0.33
112.2
DIALYSIS UNIT
Sft
32.75
21.25
0.33
229.659375
C.T SCAN
Sft
24.37
21.25
0.33
170.894625
CONTROL ROOM
Sft
21.25
0.33
56.1
PATHOLOGY LAB
Sft
37.125
34.62
0.33
424.138275
DISTRIBUTION
Sft
12
0.33
35.64
LAB To DISTRIBUTION
Sft
12.25
0.33
36.3825
OFFICE
Sft
16
13
0.33
343.2
OFFICE
Sft
10
16.66
0.33
109.956
ELECTRICAL ROOM
Sft
8.75
0.33
20.2125
Sft
31.75
9.75
0.33
102.155625
Sft
93.5
12
0.33
370.26
MALE LAVATORY
Sft
7.5
12.125
0.33
30.009375
WC
Sft
3.87
4.5
0.33
17.24085
FEMALE LAVATORY
Sft
10.37
0.33
27.3768
WC
Sft
4.83
0.33
12.7512
EXAMINATION
Sft
8.5
0.33
22.44
CONSULTANT
Sft
11
12
0.33
87.12
EXAMINATION
Sft
10
0.33
29.7
EXAMINATION
Sft
14
9.75
0.33
90.09
CONSULTANT
Sft
14
11.75
0.33
108.57
DUMP WAITER
Sft
0.33
7.92
Total
6000.95
OR in Cu.
169.95
Width
Depth
Quantity
Sft
226
226
Sft
220
220
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Elevator
Sft
External Ramp
Sft
15.08
6.25
377
Internal Ramp
Sft
44.5
13.62
606.09
Sft
Sft
11.25
90
Sft
14.37
12
172.44
Sft
700
700
RECEPTION HALL
Sft
1221
1221
ADMINISTRATION HALL
Sft
1524
1524
OPD
Sft
1776
1776
Parchi Counter
Sft
165
165
Registration Room
Sft
11.37
17.18
195.3366
Record Room
Sft
14.5
17.18
249.11
Wash
Passage To
Wash/Record/Registration Room
Sft
40
Sft
9.42
47.1
Waiting
Sft
208
624
Waiting
Sft
156
156
Sft
426
426
Sft
16
21.25
340
Sft
16
21.25
340
Sft
DENTAL X-RAY
Sft
9.25
74
DARK ROOM
Sft
8.87
70.96
CONTROL ROOM
Sft
8.87
70.96
ULTRASOUND
Sft
16
21.25
340
DIALYSIS UNIT
Sft
32.75
21.25
695.9375
C.T SCAN
Sft
24.37
21.25
517.8625
CONTROL ROOM
Sft
21.25
170
PATHOLOGY LAB
Sft
37.125
34.62
1285.2675
DISTRIBUTION
Sft
12
108
LAB To DISTRIBUTION
Sft
12.25
110.25
OFFICE
Sft
16
13
1040
OFFICE
Sft
10
16.66
333.2
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
Sft
93.5
12
1122
MALE LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
3.87
4.5
52.245
FEMALE LAVATORY
Sft
10.37
82.96
WC
Sft
4.83
38.64
Waiting
DENTISTRY
X-RAY
RECORD ROOM
72
144
280
280
262.53
787.59
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
EXAMINATION
Sft
8.5
68
CONSULTANT
Sft
11
12
264
EXAMINATION
Sft
10
90
EXAMINATION
Sft
14
9.75
273
CONSULTANT
Sft
14
11.75
329
DUMP WAITER
Sft
24
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
Sft
23
138
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY
LINEN
SURGICAL/ORTHOPEDICS
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
123.56
12
1482.72
HALL
Sft
18.56
23.125
429.2
Sft
13.25
28.75
380.9375
ICU WARD
Sft
17
34.125
580.125
Sft
17
10
170
Sft
29.3
175.8
MEDICINE STORE
Sft
8.5
68
NURSES LAVATORY
Sft
10.37
82.96
WC
Sft
40
DOC LAVATORY
Sft
7.5
12.125
90.9375
WC
Sft
60
First Floor
ELECTRICAL ROOM
PASSAGE 9'-9" WIDE
PASSAGE to MO Offices
MO OFFICES
44.5
13.62
280
606.09
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
ANESTHETIST
Sft
11
12
132
DOCTORS LOUNGE
Sft
23
12
276
Sft
43.25
4.25
183.8125
O.T NURSE
Sft
10.62
10
106.2
PATIENTS PREPARATION
Sft
10.62
10
106.2
SCRUBUP
Sft
8.52
3.68
31.3536
RECOVERY
Sft
14.62
20.37
297.8094
OT
Sft
14.62
16
233.92
OT
Sft
19.62
29.87
1172.0988
Sft
33.52
4.87
163.2424
Corridor
Sft
16.125
8.79
141.73875
STERILIZED LOBBY
Sft
16
144
OT
Sft
14.62
22.37
327.0494
DUMP WAITER
Sft
32
Sft
10.25
4.5
46.125
ICU WARD
Sft
17
34.125
580.125
Sft
226
226
Sft
220
220
Sft
72
144
Sft
Sft
OFFICE
Sft
10
11.33
453.2
WASH
Sft
120
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
MEDICAL/UROLOGY WARDS
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
Secound Floor
Left Side Stairs
Right Side Stairs
Elevator
Internal Ramp
44.5
13.62
280
606.09
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
TERRACE
Sft
3250
3250
Sft
226
226
Sft
220
220
Elevator
Sft
72
144
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
Sft
120
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
WASH ROOM
Sft
10.62
106.2
LAVATORY
Sft
12.75
255
WC
Sft
24
480
WHB AREA
Sft
15.75
6.75
425.25
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
MEDICAL/UROLOGY WARDS
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
WC
Sft
70
OFFICE
Sft
10
11.33
339.9
WASH
Sft
4.37
91.77
Third Floor
WASH
DRESS
AREA B/W OFFICES
HALL
44.5
13.62
280
606.09
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
22
Description
Unit
No
Length
Width
Depth
Quantity
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
WASH
Sft
35
Total
68930.80
OR in Sq.
6406.21
Flooring
Ground Floor
Left Side Stairs
Sft
226
226
Sft
220
220
External Ramp
Sft
15.08
6.25
377
Internal Ramp
Sft
44.5
13.62
606.09
Sft
Sft
11.25
90
Sft
14.37
12
172.44
Sft
700
700
RECEPTION HALL
Sft
1221
1221
ADMINISTRATION HALL
Sft
1524
1524
Sft
1776
1776
Sft
165
165
Sft
11.37
17.18
195.3366
Record
PassageRoom
To
Wash/Record/Registration Room
Sft
14.5
17.18
249.11
Sft
9.42
47.1
Waiting
Sft
208
624
Waiting
Sft
156
156
Waiting
Sft
426
426
DENTISTRY
Sft
16
21.25
340
X-RAY
Sft
16
21.25
340
RECORD ROOM
Sft
DENTAL X-RAY
Sft
9.25
74
DARK ROOM
Sft
8.87
70.96
CONTROL ROOM
Sft
8.87
70.96
ULTRASOUND
Sft
16
21.25
340
DIALYSIS UNIT
Sft
32.75
21.25
695.9375
C.T SCAN
Sft
24.37
21.25
517.8625
CONTROL ROOM
Sft
21.25
170
PATHOLOGY LAB
Sft
37.125
34.62
1285.2675
DISTRIBUTION
Sft
12
108
LAB To DISTRIBUTION
Sft
12.25
110.25
OFFICE
Sft
16
13
1040
OFFICE
Sft
10
16.66
333.2
OPD
Parchi Counter
Registration Room
280
280
262.53
787.59
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Sft
31.75
9.75
309.5625
Sft
93.5
12
1122
EXAMINATION
Sft
8.5
68
CONSULTANT
Sft
11
12
264
EXAMINATION
Sft
10
90
EXAMINATION
Sft
14
9.75
273
CONSULTANT
Sft
14
11.75
329
DUMP WAITER
Sft
24
Total
17818.67
OR in Sq.
1656.01
First Floor
Left Side Stairs
Sft
226
226
Sft
220
220
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
Sft
33.25
18.97
630.7525
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY
LINEN
SURGICAL/ORTHOPEDICS
WARDS
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
123.56
12
1482.72
HALL
Sft
18.56
23.125
429.2
Sft
13.25
28.75
380.9375
ICU WARD
Sft
17
34.125
580.125
Sft
17
10
170
Sft
29.3
175.8
MEDICINE STORE
Sft
8.5
68
NURSES LAVATORY
Sft
10.37
82.96
DOC LAVATORY
Sft
7.5
12.125
90.9375
ANESTHETIST
Sft
11
12
132
DOCTORS LOUNGE
Sft
23
12
276
Sft
43.25
4.25
183.8125
O.T NURSE
Sft
10.62
10
106.2
44.5
13.62
280
606.09
280
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
PATIENTS PREPARATION
Sft
10.62
10
106.2
SCRUBUP
Sft
8.52
3.68
31.3536
RECOVERY
Sft
14.62
20.37
297.8094
OT
Sft
14.62
16
233.92
OT
Sft
19.62
29.87
1172.0988
Sft
33.52
4.87
163.2424
Corridor
Sft
16.125
8.79
141.73875
STERILIZED LOBBY
Sft
16
144
OT
Sft
14.62
22.37
327.0494
DUMP WAITER
Sft
32
Sft
10.25
4.5
46.125
ICU WARD
Sft
17
34.125
580.125
Total
16536.94
OR in Sq.
1536.89
Secound Floor
Left Side Stairs
Sft
226
226
Sft
220
220
Sft
Sft
Sft
10
11.33
453.2
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
MEDICAL/UROLOGY WARDS
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
WAITING LOUNGE
Sft
40.5
17.42
705.51
MO OFFICES
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
OFFICE
Sft
10
11.33
339.9
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
TERRACE
Sft
Internal Ramp
Internal Ramp Landing
OFFICE
DRESS
44.5
13.62
606.09
280
280
3250
Total
3250
=
16115.14
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
OR in Sq.
Quantity
=
1497.69
Third Floor
Left Side Stairs
Sft
226
226
Sft
220
220
Internal Ramp
Sft
Sft
OFFICE
Sft
10
11.33
453.2
DRESS
Sft
3.62
5.37
77.7576
Sft
22.25
6.97
155.0825
HALL
Sft
33.25
18.97
630.7525
ELECTRICAL ROOM
Sft
8.75
61.25
Sft
31.75
9.75
309.5625
PASSAGE to MO Offices
Sft
23
138
MO OFFICES
Sft
16
12
384
PROCEDURE ROOM
Sft
10.25
7.87
322.67
NURSES STATION
Sft
7.5
14.62
438.6
DIRTY LINEN
Sft
7.87
125.92
Sft
67.5
34.62
4673.7
Sft
157.91
12
1894.92
Sft
40.5
17.42
705.51
Sft
12.2
17
414.8
DRESS
Sft
9.62
5.37
103.3188
OFFICE
Sft
10
11.33
339.9
DRESS
Sft
9.62
5.37
154.9782
OFFICE
Sft
14.62
10.2
149.124
MEDICAL/UROLOGY WARDS
PASSAGE 12' WIDE
WAITING LOUNGE
MO OFFICES
23
44.5
13.62
606.09
280
280
Total
12865.14
OR in Sq.
1195.64
Skirting
Ground Floor
Left Side Stairs walls
Sft
50
0.5
25
Sft
48
0.5
24
External Ramp
Sft
29
0.5
58
Sft
86.25
0.5
43.125
Sft
18
0.5
Sft
30.5
0.5
15.25
Sft
52.74
0.5
26.37
Sft
75
0.5
37.5
RECEPTION HALL
Sft
126
0.5
63
ADMINISTRATION HALL
Sft
150
0.5
75
OPD
Sft
162
0.5
81
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Registration Room
Sft
57.1
0.5
28.55
Record
PassageRoom
To
Wash/Record/Registration Room
Sft
63.36
0.5
31.68
Sft
23.84
0.5
11.92
Waiting
Sft
32
0.5
48
Waiting
Sft
48
0.5
24
Waiting
Sft
52
0.5
26
DENTISTRY
Sft
74.5
0.5
37.25
X-RAY
Sft
74.5
0.5
37.25
RECORD ROOM
Sft
26
0.5
39
DENTAL X-RAY
Sft
34.5
0.5
17.25
DARK ROOM
Sft
33.74
0.5
16.87
CONTROL ROOM
Sft
33.74
0.5
16.87
ULTRASOUND
Sft
74.5
0.5
37.25
DIALYSIS UNIT
Sft
108
0.5
54
C.T SCAN
Sft
91.24
0.5
45.62
CONTROL ROOM
Sft
33.74
0.5
16.87
PATHOLOGY LAB
Sft
143.49
0.5
71.745
DISTRIBUTION
Sft
42
0.5
21
LAB To DISTRIBUTION
Sft
42.5
0.5
21.25
OFFICE
Sft
58
0.5
145
OFFICE
Sft
53.32
0.5
53.32
ELECTRICAL ROOM
Sft
31.5
0.5
15.75
Sft
73.25
0.5
36.625
Sft
199
0.5
99.5
EXAMINATION
Sft
33
0.5
16.5
CONSULTANT
Sft
46
0.5
46
EXAMINATION
Sft
38
0.5
19
EXAMINATION
Sft
47.5
0.5
47.5
CONSULTANT
Sft
51.5
0.5
51.5
DUMP WAITER
Sft
20
0.5
10
Total
1600.32
OR in Sq.
148.73
Total
1571.01
OR in Sq.
146.00
Total
1530.94
OR in Sq.
142.28
Total
1222.19
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
OR in Sq.
24
Depth
Quantity
=
113.59
Terrazoo
Ground Floor
Ramp
Sft
50.00
10.00
500.00
Record room
Sft
10.00
20.00
200.00
Electrical room
Sft
8.00
10.00
80.00
Store
Sft
12.00
8.00
96.00
Total
876.00
in Sqm
81.41
Total
876.00
in Sqm
81.41
Total
876.00
in Sqm
81.41
Total
876.00
in Sqm
81.41
Total
525.60
in Sqm
48.85
0.33
495.00
Total
495.00
OR in Cu.
14.02
First Floor
Second Floor
Third Floor
25
Skirting
9.5% of Flooring
All Floors
26
Destempering
Same as Plastering
28
Plinth Protection(1:3:6)
All Side
29
30
Sft
500.00
3.00
500.00
3.00
1500.00
Total
1500.00
OR in Sq.
139.41
Roof Insulation
Slab
31
Cft
Sft
15824.61
15824.61
Total
15824.61
OR in Sgm
1470.69
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
4" dia pipe
32
Unit
Rft
No
1
Length
25
Width
Depth
48.00
1200.00
Total
1200.00
OR in m
365.85
Nos
25
25.00
Total
33
Quantity
25.00
Sft
46.00
1.00
276.00
Side Ent:
Sft
53.04
1.00
265.20
Riser
Sft
22
6.00
1.00
132.00
Treds
Sft
22
6.00
0.50
66.00
Landing
Sft
7.00
13.25
185.50
Riser
Sft
20
6.50
1.00
130.00
Treds
Sft
22
6.50
0.50
71.50
Landing
Sft
6.00
6.00
144.00
Stairs Type I
Stairs Type II
Total
1270.20
OR in Sgm
118.05
Total
1270.20
in Sqm
118.05
Total
1270.20
in Sqm
118.05
Total
1270.20
in Sqm
118.05
First Floor
Second Floor
Third Floor
34
Ceramic Tiles
Ground Floor
WASH
Sft
80.00
MALE LAVATORY
Sft
7.5
12.125
90.94
WC
Sft
3.87
4.5
69.66
FEMALE LAVATORY
Sft
10.37
82.96
WC
Sft
4.83
57.96
First Floor
Total
381.52
in Sqm
35.46
Engineer's Estimate
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
CIVIL WORKS
S.No
Description
Unit
No
Length
Width
Depth
Quantity
Total
381.52
in Sqm
35.46
Total
381.52
in Sqm
35.46
Total
381.52
in Sqm
35.46
Second Floor
Third Floor
35
Sft
18.00
5.25
189.00
MALE LAVATORY
Sft
27.13
5.25
142.41
WC
Sft
12.24
5.25
257.04
FEMALE LAVATORY
Sft
28.74
5.25
150.89
WC
Sft
13.66
5.25
215.15
Total
954.48
in Sqm
88.71
Total
954.48
in Sqm
88.71
Total
954.48
in Sqm
88.71
Total
954.48
in Sqm
88.71
First Floor
Second Floor
Third Floor
36
Railing
Centre stair
Sft
250.00
3.00
1500.00
Stairs
Sft
160.00
3.00
5760.00
Total
7260.00
OR in Sgm
674.72
Internal Electrifiication
S.I
N.S.I
Total
2,602,034.60
5,188,045.00
With
3% L.F
2,680,095.64
8,745,460.00
Fire Alarm
System
CCTV System
N.S.I
N.S.I
819,300.00
542,150.00
273,200.00
N.S.I
559,865.00
Nurse Call
N.S.I
1,148,250.00
Telephone System
N.S.I
214,650.00
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
Description
Unit
Quantity
Rate
Amount
Ground Floor
Each
15
5,069.09
76,036.35
First Flor
Each
15
5,069.09
76,036.35
Second Flor
Each
20
5,069.09
101,381.80
Third Floor
Each
20
5,069.09
101,381.80
Ground Floor
Each
3,439.25
20,635.50
First Flor
Each
3,439.25
20,635.50
Second Flor
Each
3,439.25
27,514.00
Third Floor
Each
3,439.25
27,514.00
SCHEDULE ITEMS
Providing and Fixing glazed earthen
ware WC European type including cost
of seat & cover : White.
b
c
d
e
14-01-a
+14-02-b
14-01-a
+14-02-b
14-01-a
+14-02-b
14-01-a
+14-02-b
b
c
d
e
14-03-a+
14-10-a
14-03-a+
14-10-a
14-03-a+
14-10-a
14-03-a+
14-10-a
14-06-b
Ground Floor
Each
2,274.70
4,549.40
14-06-b
First Flor
Each
2,274.70
9,098.80
14-06-b
Second Flor
Each
2,274.70
9,098.80
14-06-b
Third Floor
Each
2,274.70
4,549.40
Ground Floor
Each
16
2,856.75
45,708.00
First Flor
Each
16
2,856.75
45,708.00
b
c
14-05-a-01
+14-41-a
+14-42-a
14-05-a-01
+14-43-a
+14-41-a
+14-23
+14-42-a
+14-43-a
+14-23
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
14-05-a-01
+14-41-a
d
+14-42-a
14-05-a-01
+14-43-a
+14-41-a
+14-23
e
+14-42-a
+14-43-a
+14-23
5
Description
Unit
Quantity
Rate
Amount
Second Flor
Each
26
2,856.75
74,275.50
Third Floor
Each
26
2,856.75
74,275.50
14-47-a
Ground Floor
Each
16
161.47
2,583.52
14-47-a
First Flor
Each
16
161.47
2,583.52
14-47-a
Second Flor
Each
26
161.47
4,198.22
14-47-a
Third Floor
Each
26
161.47
4,198.22
14-20-a
Ground Floor
Each
16
185.18
2,962.88
14-20-a
First Flor
Each
16
185.18
2,962.88
14-20-a
Second Flor
Each
26
185.18
4,814.68
14-20-a
Third Floor
Each
26
185.18
4,814.68
7
b
14-20-b
Ground Floor
Each
16
179.13
2,866.08
14-20-b
First Flor
Each
16
179.13
2,866.08
14-20-b
Second Flor
Each
26
179.13
4,657.38
14-20-b
Third Floor
Each
26
179.13
4,657.38
14-20-c
Ground Floor
Each
16
193.65
3,098.40
14-20-c
First Flor
Each
16
193.65
3,098.40
14-20-c
Second Flor
Each
26
193.65
5,034.90
14-20-c
Third Floor
Each
26
193.65
5,034.90
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
Description
Unit
Quantity
Rate
Amount
14-17.
Ground Floor
Each
16
796.30
12,740.80
14-17.
First Flor
Each
16
796.30
12,740.80
14-17.
Second Flor
Each
26
796.30
20,703.80
14-17.
Third Floor
Each
26
796.30
20,703.80
10
14-18-a
Ground Floor
Each
16
634.27
10,148.32
14-18-a
First Flor
Each
16
634.27
10,148.32
14-18-a
Second Flor
Each
26
634.27
16,491.02
14-18-a
Third Floor
Each
26
634.27
16,491.02
11
b
14-24-b
Ground Floor
Each
42
532.45
22,362.90
14-24-b
First Flor
Each
42
532.45
22,362.90
14-24-b
Second Flor
Each
75
532.45
39,933.75
14-24-b
Third Floor
Each
75
532.45
39,933.75
12
b
14-25
Ground Floor
Each
42
750.25
31,510.50
14-25
First Flor
Each
42
750.25
31,510.50
14-25
Second Flor
Each
75
750.25
56,268.75
14-25
Third Floor
Each
75
750.25
56,268.75
13
b
14-31-b
Ground Floor
Each
16
671.98
10,751.68
14-31-b
First Flor
Each
16
671.98
10,751.68
14-31-b
Second Flor
Each
26
671.98
17,471.48
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
e
14
Description
Unit
Quantity
Rate
Amount
14-31-b
Third Floor
Each
26
671.98
17,471.48
14-33.
67
606.25
40,618.75
15
b
14-27.
Ground Floor
Each
16
2,115.13
33,842.08
14-27.
First Flor
Each
16
2,115.13
33,842.08
14-27.
Second Flor
Each
26
2,115.13
54,993.38
14-27.
Third Floor
Each
26
2,115.13
54,993.38
150
724.00
108,600.00
16
23-01-c
a. 9" dia
Providing and Fixing GI pipe & including
specials complete. (light)
17
a
14-55-b
Mtr
800
738.29
590,632.00
14-55-d
Mtr
900
435.24
391,716.00
14-55-e
Mtr
1750
336.07
588,122.50
14-55-f
Mtr
1750
251.12
439,460.00
18
14-71-a
800
361.15
288,920.00
14-71-b
800
329.39
263,512.00
19
a
14-48-a
1/2" Dia
Each
60
233.58
14,014.80
14-48-b
3/4" Dia
Each
30
336.43
10,092.90
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
c
14-48-c
Description
1" Dia
Unit
Quantity
Rate
Amount
Each
20
390.88
7,817.60
20
24-18-a-01
joint, test,
BSS Class
1750
391.70
685,475.00
21
24-18-a-02
joint, test,
BSS Class
1750
562.63
984,602.50
22
23-10.
No.
15,593.16
62,372.64
Total Amount
= Rs.
5,909,224.43
= Rs.
177,276.73
= Rs.
6,086,501.16
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
INTERNAL PLUMBING
S.No Ref:
Description
Unit
Quantity
Rate
Amount
NON-SCHEDULE ITEMS
Providing and fixing of Muslim Showers
of approved make and quality complete in
all respect as specifid
NSI
Ground Floor
Each
16
2,500.00
40,000.00
NSI
First Flor
Each
16
2,500.00
40,000.00
NSI
Second Flor
Each
26
2,500.00
65,000.00
NSI
Third Floor
Each
26
2,500.00
65,000.00
1750
250.00
437,500.00
No.
25
8,000.00
200,000.00
= Rs.
847,500.00
NSI
NSI
ABSTRACT OF COST
UPGRADATION OF DHQ HOSPITAL ABBOTTABAD
SUI GAS
S.No Ref:
Description
Unit Quantity
Rate
SCHEDULE ITEMS
14-55-f
2000
251.12
14-55-e
2000
336.07
14-55-d
1200
435.24
14-48-a.
50
233.58
14-48-b.
25
336.43
14-48-c.
15
390.88
14-51-a.
15
3,214.63
14-57-a.
60
191.27
14-57-b.
20
348.57
10
14-62-b.
20
19,499.00
11
14-60-a.
55
3,599.60
Total Amount
= Rs.
= Rs.
= Rs.
ABSTRACT OF COST
502,240.00
672,140.00
522,288.00
11,679.00
8,410.75
5,863.20
48,219.45
11,476.20
6,971.40
389,980.00
197,978.00
2,377,246.00
71,317.38
2,448,563.38