Sunteți pe pagina 1din 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65

Final Feasibility cum Preliminary Design Report: Table of Contents


TABLE OF CONTENTS
Chapter - 1

Introduction
1.1
1.2
1.3
1.4

Chapter - 2

Project Description including Alignment Options


2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7.1
2.7.2
2.7.3
2.7.4
2.7.5
2.7.6

Chapter - 3

General
Water Bodies
Climate
Terrain
Roadside Development and Villages
Existing right of Way (ROW)
Bypass Alignment Option Study
Ambala bypass
Balana Bypass
Matheri Shekan Bypass
Ismailabad Bypass
Pehowa Bypass
Kaithal Bypass

Socio Economic Profile


3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.8.1
3.8.2
3.8.3
3.8.4
3.8.5
3.8.6
3.8.7
3.9
3.9.1

Chapter - 4

Vision of NHAI
NHAIs organization & Activities
NHDP Programme
Project Financing and recovery mechanism

Haryana during British Raj


Formation of Haryana
Culture of Haryana
Geography
Climate
Flora and Fauna of Haryana
Demographics
Economy
Manufacturing
Service Industry
Macro-economic trend
Agriculture
Dairy Farming
Roads, Aviation and Infrastructure
Communication and Media
Administrative Divisions
Districts

Traffic Surveys and Analysis


4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.8.1
4.8.2
4.8.3
4.8.4
4.8.5
4.9
4.9.1
4.9.2

Background
Project Road As Part Of NHDP
Need For Study
Project Framework
Traffic Studies
Traffic Surveys
Classified Traffic Counts At Mid-Block Locations
Traffic Volume Characteristics At Km 24+000 NH-65 (MB-01)
Magnitude Of Traffic
Hourly Variation Of Traffic
Composition Of Traffic
Directional Distribution Of Traffic
Peak Hour Traffic Characteristics
Traffic Volume Characteristics At Km 64+000 NH-65 (MB-02)
Magnitude Of Traffic
Hourly Variation Of Traffic

Document : 1058/RH/REP/FFR/403_1_R1

1 of 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65
Final Feasibility cum Preliminary Design Report: Table of Contents
4.9.3
4.9.4
4.9.5
4.10
4.11
4.12
4.13
4.13.1
4.13.2
4.13.3
4.14
4.15
4.15.1
4.15.2
4.15.3
4.16
4.17
4.17.1
4.17.2
4.17.3
4.17.4
4.18
4.19
4.20
4.21
4.22
4.23
4.24
4.25
4.26

Composition Of Traffic
Directional Distribution Of Traffic
Peak Hour Traffic Characteristics
Annual Average Day Traffic
Axle Load Survey
Speed And Delay Surveys
Classified Turning Counts At Intersection
Approach Traffic
Composition Of Traffic
Peak Hour Traffic Composition
Pedestrian Traffic
Trip And Travel Characteristics
Selection Of Survey Location
Zoning Scheme And Coding Schedule
Field Surveys Data Processing
Trip Characteristics
Travel Characteristics
Travel Characteristics Of Passenger Vehicles At km 24+000 of NH-65
Travel Characteristics Of Goods Vehicles At km 24+000 of NH-65
Travel Characteristics Of Passenger Vehicles At km 64+000 of NH-65
Travel Characteristics Of Goods Vehicles At km 64+000 of NH-65
Traffic Forecast
Methodology
Trip Patterns
Economy Of Haryana
Perspective Growth Of Haryana
Transport Demand Elasticity
Projected Traffic Growth Rates
Projected Traffic
Capacity Upgradation
Chapter 4a : TVC dated September 2010
Chapter 4b : TVC dated October 2012

Chapter - 5

Engineering Investigation and Surveys


5.1
5.2
5.3
5.3.1
5.3.2
5.3.3
5.3.10
5.4
5.4.1
5.4.2
5.4.3
5.4.4
5.5
5.5.1
5.5.2
5.5.3
5.5.4
5.5.5
5.5.6
5.5.6.1
5.5.6.2
5.6
5.6.1
5.6.2
5.6.3
5.7

Introduction
Road Inventory
Bridge Structures
Introduction
Inventory of Existing Bridges
Condition Survey of Bridges on the Existing Two Lanes
Cross Drainage Structure
Axle Load Survey
Equipment
Components of the Unit
Data Collection
Analysis of Axle Load Survey Data
Pavement Investigation
Pavement Condition Survey
Surface Condition and Rating
Pavement Roughness Survey
Benkelman Beam Deflection Test :
Subgrade Investigation
Investigation for Quarry Materials
Coarse Aggregates
Fine Aggregates
Topographic survey
Scope of Work
Components of Topographic Survey
Methodology
Hydrological and Hydraulic Study

Document : 1058/RH/REP/FFR/403_1_R1

2 of 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65
Final Feasibility cum Preliminary Design Report: Table of Contents
Chapter - 6

Design Standards and Methodology


6.1
6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.2.6
6.2.7
6.2.8
6.2.8
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.4
6.5
6.5.1
6.5.2
6.6
6.6.1
6.6.2
6.6.3
6.7
6.8
6.8.1
6.8.2
6.8.3
6.8.4
6.9

Chapter - 7

General
Geometric Improvement
General
Geometric Design Standards
Location of Widening Carriageway
Typical Cross-sections
Alignment Design
Profile Design
Median Width
Service Road
Bypass Alignment
Pavement Design
General
Design Methodology
Parameters for Design
Design of Strengthening Overlay for Existing Pavement
Design of New Flexible Pavement
Service Road Pavement Composition
Improvement of Junctions / Intersections
Design of Structures
General Arrangement of Proposed New Bridges
Design of Underpass, Flyover & ROB
Traffic Facilities
Rest Area
Bus-bays
Truck Lay-byes
Toll Plaza Location
Traffic Control and Safety Devices
General
Traffic Signs
Road Markings
Guard Posts
Right of Way

Environmental Screening & Mitigation Measures


7.1.
7. 1.2
7.1.3
7.1.4
7.1.4.1
7.1.4.2
7.1.4.3.
7. 1.4.4.
7.1.5
7.1.5.1
7.1.5.2
7.1.5.3
7.1.5.4
7.1.5.5
7.1.5.6
7.1.5.7
7.1.5.8
7.1.5.9
7.1.5.10
7.1.5.11
7.1.5.12
7.1.6
7.2
7.2.1
7.2.1.1
7.2.1.1
7.2.1.1
7.2.1.2
7.2.1.3

Introduction
Aim of the study
Objectives
Scope and Limitations
Baseline information
Environment Impact Assessment
Environmental Management Plan
Environmental Monitoring
The Methodology & Approach
Review of Regulatory Requirements
Environmental Screening and Scoping
Defining Geographical Boundaries
Collection of Baseline Data
Environmental Quality Monitoring and Testing
Prediction of Environment Impact
Evaluation of environment impact assessment:
Data Collation and Analysis
Community Consultations
Analysis of Alternatives
Mitigation and Enhancement Measures
Preparation of the Environmental Management Plan
Legal Policy and Institutional Framework
Baseline Information Status
Physical Environment
Land Environment
A) Landform and Topographical Conditions
B) Soil Conditions
Rocks
Geology

Document : 1058/RH/REP/FFR/403_1_R1

3 of 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65
Final Feasibility cum Preliminary Design Report: Table of Contents
7.2.1.4
7.2.1.5
7.2.2
7.2.3
7.2.3.1
7.2.3.2
7.2.4
7.2.4.1
7.2.5
7.2.5.1
7.2.5.2
7.2.5.3
7.2.6
7.3
7.3.1
7.3.1.1
7.3.1.2
7.3.1.3
7.3.1.4
7.3.1.5
7.3.2
7.3.2.1
7.3.2.2
7.3.2.3
7.3.2.4
7.3.2.5
7.3.2.5
7.3.2.7
7.3.3
7.3.3.1
7.3.3.2
7.3.3.3
7.3.4
7.4
7.4.1
7.4.1.1
7.4.1.2
7.4.2
7.4.3
7.4.3
7.5
7.5.1
7.5.2
7.5.2.1
7.5.2.2
7.5.2.3
7.5.2.4
7.5.2.5
7.5.2.6
7.5.2.7
7.5.2.8
7.5.2.9
7.5.2.10
7.5.2.11
7.5.2.12
7.5.2.13
7.5.2.14
7.5.2.15
7.5.2.16
7.5.3
7.5.4
7.5.4.1
7.5.4.2
7.5.4.3
7.5.4.4
7.5.5
7.5.6
7.6

Drainage System
Seismicity
Water Environment
Air Environment
Ambient Air Quality
Air Quality
Noise Environment
Noise Level
Ecological Environment
Flora
Fauna
Greenery
Solid Waste
Potential Environment Impacts Assessment
Potential Environmental Impacts
Impacts on Land Environment
Impact on Water
Impact on Air Quality
Impact on Noise Quality
Impact on Biological Environment
Impacts During Construction
Impact on Land Environment
Impact on Water Environment
Impact on Air Environment
Impact on Noise Environment
Impact on Ecological Environment
Sewerage and Garbage
Construction Spoils
Impact During Post-Construction And Operation
Impact on Land Environment
Impact on Air Environment
Ecology and Noise Pollution
Project Benefits (Positive Impact)
Analysis of Alternatives
With and Without the Project Scenario
Without Project Scenario
With Project Scenario
Alignment Alternatives
Environmental Issues
Engineering Alternatives
Environmental Management Plan
Management Plans
Mitigations Measures
Change of land use pattern
Impacts on Soils
Compensatory Afforestation
Borrow areas and conservation/rehabilitation
Water Supply and Sanitation
Provision of LPG in contractors camp
Construction waste disposal
Air Pollution Control
Noise Pollution Control
Human Health
Disruption of Community
Traffic Control
Construction Site Management
Workers camps
Safety
Lighting Provisions
Summary of Mitigation Measures
Implementations Arrangements
Organization and Staffing
Environmental Training
Monitoring and Reporting Procedures
Record Keeping
Implementation Schedule
Emergency Measures
Environmental Monitoring Plan

Document : 1058/RH/REP/FFR/403_1_R1

4 of 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65
Final Feasibility cum Preliminary Design Report: Table of Contents
7.6.1
7.6.1.1
7.6.1.2
7.6.1.3
7.6.1.4
7.6.2
7.6.3
7.3
Chapter - 8

Initial Social Impact Assessments and Esettlement Plan


8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
8.11
8.12
8.13
8.14
8.14.1
8.14.2
8.14.3
8.15
8.16
8.16.1
8.16.2
8.16.3
8.16.4
8.17
8.17.1
8.17.2
8.17.3
8.17.4
8.18
8.18.1
8.18.2
8.18.3
8.18.3.1
8.18.3.2
8.18.3.3
8.18.3.4
8.18.4
8.18.5
8.18.6
8.19
8.20
8.21
8.22
8.23
8.24
8.25

Chapter 9

Environmental Monitoring Plan


Water Quality
Air Quality and Noise
Soils
Vegetations
Project Activities
Costs
Epilogue

Social Issues and Impacts


Preliminary Social Screening
Social Impact
Public consultation
Market and Parking place
Positive Impact
Negative Impact :
Minimizing Impact and Design Decision
Widening Option and Minimizing the Impact
Social Impact Findings & Recommendation
Purpose of RAP
Corridor of Impact
Minimizing Negative Social Impact
Social Screening
Verification exercise
Census Survey
Consultations
Resettlement Principles and Guidelines
Resettlement principles and Assistance
Compensation for loss of land and standing crops/trees
Compensation for structures (residential/commercial) and other immovable assets
Assistance for loss of business/wage income
Re-building and/or restoration of community resources/facilities
Entitlement Matrix
Eviction of the SBEs/households
Income Restoration Assistance
Assistance to Re-establish SBEs
Employment in Construction
Acquisition of Land
Value of Building Structures
Transitional Allowance
Economic Rehabilitation Grant
Shifting Allowance
Rental Allowance
Provision for Development of Community Structures
Resettlement Sites (Site Development Costs)
Resettlement Advisory Committee (RAC)
Grievances Redress Committees
Resettlement Data Bank
RP Implementation Schedule
Monitoring and Evaluation
Internal Monitoring
External Monitoring
Reporting Requirements
Road Safety
ROW Management Plan

Project Cost Estimate


9.1
9.2
9.3
9.4

General
Methodology
Preliminary Estimation of Quantities and Cost
Project Length

Document : 1058/RH/REP/FFR/403_1_R1

5 of 6

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65
Final Feasibility cum Preliminary Design Report: Table of Contents
Chapter 10

Conclusions and Recommendations


10.1
10.2
10.2.1
10.2.2
10.2.3
10.2.4
10.2.5
10.3
10.4
10.5

Background
Project Development
Road Work
Pavement design
Material
Bridge & Structures
Miscellaneous Facilities
Project Cost
Economic & Financial Analysis
Recommendations

List of Annexure:
Annexure 4.1:
Annexure 4.2:
Annexure 4.3:
Annexure 5.1:
Annexure 5.2:
Annexure 5.3:
Annexure 5.4:
Annexure 5.5:

Classified Traffic Volume Count (Weekday)


Classified Traffic Volume Count (Weekday)
Summary of Projected Traffic (In PCU)
Roughness measured
Unevenness Index Data
Road Roughness Survey Data
Results of Subgrade Soil
Results of Borrow area Soil

Document : 1058/RH/REP/FFR/403_1_R1

6 of 6

S-ar putea să vă placă și