PROJECT BOOK
mining
PRESENTATION
OSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business
areas: Construction, Energy and Mining.
Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,
OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA
we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development
Projects at an international level. We promote a culture of respect and teamwork among our team.
OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects
in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built
over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are
participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.
Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Colombia, Brasil
and Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.
After 60 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and
mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing
health and safety and innovation in all our projects.
SAFETY
Safety is Obras Subterraneas, S.A.s main asset from the time when its operations begin, demanded by the specialisation
required for the works carried out underground.
The companys staff have a high degree of professionalism and specialisation, which has been achieved after many years
of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility
and the use of explosives means that the Obras Subterraneas, S.A.s security department is the most relevant in the
company.
The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the
companys human resources.
Type
Project
mining
Owner:
Codelco
Project photos
STATUS
GEOMETRY
Cross section: 75 m
Lenght: 10,500 m
STRUCTURE
Mining Tunnels
OVERBURDEN
Height
COUNTRY
Chile
METHOD
OF TUNNELING
PROVINCE
Regin de Antofagasta
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Calama
TUNNEL EQUIPMENT
Budget
94,742,194,539 CLP
LOCATION
AND
ADITIONAL
INFORMATION
Construction of 10.5 km of ventilation shafts in the supply and extract systems which make up the development of the
new mine. The sections are variable between 8.2 m x 8.1 m and 10.9 m x 8.1 m.
(excluding VAT)
001
Start: 06 - 2016
The excavation is by drilling and blasting and the support is with rock bolts, mesh, trusses and shotcrete.
Type
Project
mining
Owner:
Codelco
Project photos
STATUS
GEOMETRY
STRUCTURE
Mine Tunnels
OVERBURDEN
Medium
COUNTRY
Chile
METHOD
OF TUNNELING
PROVINCE
Antofagasta Region
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Calama
TUNNEL EQUIPMENT
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
002
Start: 10 - 2015
109,000,000
The project to be executed is located in the Chuquicamata New Underground Mine. It comprises constructing various
galleries and shafts that form part of the main fresh air injection ventilation circuit for the future mine.
The main work units to be executed are:
An Emergency Ramp 1,637 m in length with an open cross-section of 10.74 m x 8.00 m.
Ventilation tunnels with a length of 3,821.6 m and an open cross-section of 10.74 m x 8.00 m.
An emergency connecting gallery between ventilators of 359.06 m with an open cross-section of 7.75 m x 5.6 m.
6 ventilation shafts each 6 m in diameter and 181 m in length.
Type
Project
mining
Owner:
Codelco
Project photos
STATUS
Start: 11 - 2014
End: Currently being executed
GEOMETRY
STRUCTURE
Mining Tunnels
OVERBURDEN
Medium
COUNTRY
Chile
METHOD
OF TUNNELING
PROVINCE
Regin de Valparaso
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Saladillo /
Comuna de Los Andes
TUNNEL EQUIPMENT
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
62,929,170,354 CLP
The Project is being carried out inside the facilities of the Andean Division (DAND) of CODELCO (Chile), located in the
high and central part of the Andes mountain range, in the 5th (Valparaso) Region, 50 km northeast of Santiago,
currently working the Ro Blanco (copper) mining deposits. The scope of this contract involves construction of the
underground works for the Transfer Project, the object of which is to ensure (and even increase) production at the mine
until 2022.
The works to be carried out mainly comprise the following:
Excavation and reinforcement by drill and blast of:
Haulage Tunnel III (4,833 m) which connects Sector 3,500 with the Cordillera Plant Sector
Tunnels, access and ventilation galleries, caverns and shafts (using raise boring) in Sector 3,500 and in the Cordillera Plant Sector
Draw points for fire protection and pedestrian shelters
Contruction of:
003
Type
Project
ESPERANZA MINE
mining
Owner:
Project photos
STATUS
End: 08 - 2014
GEOMETRY
Cross section: 17 m
Lenght: 71 m
STRUCTURE
Mining Tunnels
OVERBURDEN
Low
COUNTRY
Chile
METHOD
OF TUNNELING
PROVINCE
Regin de Antofagasta
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
004
Start: 02 - 2014
7,600,961 USD.
The work involves the execution of the project and the excavation and support of a 71 m mine tunnel under a coarse
ore stockpile.
Type
Project
mining
Owner:
Project photos
STATUS
005
Start: 03 - 2013
End: 09 - 2013
GEOMETRY
STRUCTURE
Mining Tunnels
OVERBURDEN
Medium
COUNTRY
Brazil
METHOD
OF TUNNELING
PROVINCE
Minas Gerais
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
So Domingos do Prata
TUNNEL EQUIPMENT
Budget
(excluding VAT)
4,064,670
LOCATION
AND
ADITIONAL
INFORMATION
The work consists of excavating a mining tunnel with a 1% gradient along its whole length. The tunnel will be
excavated with mechanical excavation, applying the NATM technique. The supports applied in the tunnel use shotcrete,
reticular trusses and bolt umbrellas.
Type
Project
mining
Owner:
Codelco
Project photos
STATUS
GEOMETRY
STRUCTURE
Mining Tunnels
OVERBURDEN
Height
COUNTRY
Chile
METHOD
OF TUNNELING
PROVINCE
Regin Antofagasta
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Calama
TUNNEL EQUIPMENT
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
006
Start: 03-2012
37.617.985.593 CLP
58.834.530
The work involves the execution of two parallel tunnels for air injection for the future Chuquicamata mine. The
tunnels are of approximately 4,320 m each and a gauge, or thickness of 10.74 x 8 m2, with an incline of more than
14%. Both tunnels are connected by way of three passages each of 27 m and a gauge of 7.65 x 5.60m2.
Support elements used: reinforced concrete, resin bolts of 3, 4 and 6 m in length, wire mesh 150 x 150 x 7.5 mm,
TH-21, TH-36 and HEB 200 trusses and forepoling.
Type
Project
mining
Owner: Southern
Project photos
STATUS
End: 06 - 2012
GEOMETRY
STRUCTURE
Mining Tunnels
OVERBURDEN
350 m
COUNTRY
Peru
METHOD
OF TUNNELING
PROVINCE
Tacna
GEOLOGY AND
GEOTECHNICAL DATA
PLACE
Departamento de Tacna
TUNNEL EQUIPMENT
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
007
Start: 02 - 2011
18,000,000 $
Primary crusher and conveyor belt transportation tunnel. Length of 2 km Tunnel section 35.08 m with width extensions
every 200 m. The mine area is at 3,600 m above sea level, resulting in snowed areas.The mine deposit at Toquepala
contains copper and molybdenum. Rocks with predominant RMR (Rock Mass Rating) of between 30 and 40.
Extension of tunnel secondary section of 160 ml underpass industrial railway of 60 ml and rectangular 8x4.
62,000 m3 of tunnel excavation
250,000 m3 of portal excavation.
7,000 m of 1 diameterhelical bolts L=10.
470 HEB trusses 160. 30 cm gunite thickness
Type
Project
CABANASASURIA INFRASTRUCTURE
mining
Owner:
Iberpotash, S.A.
Project photos
STATUS
End: 06 - 2009
STRUCTURE
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Suria
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
008
Start: 03 - 2007
GEOMETRY
Section: 40 m2
Length: 425 m
METHOD
OF TUNNELING
Mechanical methods
GEOLOGY AND
GEOTECHNICAL DATA
Potash
TUNNEL EQUIPMENT
Alpine AM 75 roadheader
25 Tn. trucks
Wagner ST8 B loaders
1,850,000
Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria
Type
Project
mining
Owner:
Project photos
STATUS
End: 12 - 2011
STRUCTURE
Well galleries
COUNTRY
Spain
PROVINCE
Len
PLACE
La Robla
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
009
Start: 06 - 2006
20,585,046
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
AM-75 roadheader
Wagner ST-8A loader
800 mm wide conveyor belt
Jumbo DH
Cavo excavator, Salzgitter excavator
Locomotives
1,976 m of 15 m gauge and 416 ml with 12 m gauge. A well of 812 m in length and at a slope of 38O
Type
Project
APARIO QUARRY
mining
Owner:
Project photos
STATUS
End: 03 - 2007
STRUCTURE
Mining chambers
COUNTRY
Spain
PROVINCE
Bizkaia
PLACE
Lemoa
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
010
Start: 12 - 2005
3,476,625
GEOMETRY
Section: 20 m2
Length: 1,150 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Limestone
TUNNEL EQUIPMENT
3 galleries on different levels: at a height of 195 m, 321 ml was undertaken with a gauge of 53.4 m, at 165 m,
205,7 m was excavated with a gauge of 25 m, and at 195 m, 272 m was excavated with a gauge of 53.4 m.
Seven tranversal galleries were also constructed, with gauges ranging from 22.5 to 27 m.
Initial units: 21,853 m of shotcrete, 789 units of bolts of 4 m in length and 25 mm diameter; 608 ml
of 32 mm-diameter steel bar and 11,364 kg of TH21 truss.
Type
Project
SHAFT IV GALLERY
mining
Owner:
Iberpotash, S.A.
Project photos
STATUS
End: 07 - 2006
STRUCTURE
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Suria
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
011
Start: 11 - 2005
GEOMETRY
Section: 28 m2
Length: 3,753 m
METHOD
OF TUNNELING
Mechanical methods
GEOLOGY AND
GEOTECHNICAL DATA
Potash
TUNNEL EQUIPMENT
2,999,828
3,753 m of galleries inside the Potasas Mine. Maintenance, machinery and chain work was also undertaken in Well IV.
Type
Project
mining
Owner:
Project photos
STATUS
End: 10 - 2005
STRUCTURE
COUNTRY
Spain
PROVINCE
Badajoz
PLACE
Monesterio
Budget
6,972,057
LOCATION
AND
ADITIONAL
INFORMATION
(excluding VAT)
012
Start: 07 - 2004
GEOMETRY
Section: 25 m2
Length: 2,600 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Lime
TUNNEL EQUIPMENT
Initial works: 2,248 units of expanding bolts measuring 2.4 m and 14,339 m of shotcrete.
Type
Project
mining
Owner:
Project photos
STATUS
End: 03 - 1999
STRUCTURE
COUNTRY
Spain
PROVINCE
Orense
PLACE
Riodolas
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
013
Start: 06 - 1998
1,466,469
GEOMETRY
Width: 20 m Height: 6 m
Length: 200 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Slate
TUNNEL EQUIPMENT
Jumbo H-352
Wagner ST-6 and ST-8 loader
GHH MK 25 Dumper
Dry Way Aliva Gunner
200 m of mining chambers in Riodolas Underground Quarry for Pizarras Expiz, S.A.
Type
Project
mining
Owner:
Project photos
STATUS
End: 08 - 1998
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
014
Start: 10 - 1997
2,373,998
GEOMETRY
Section: 160 m2
Length: 596 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Slate
TUNNEL EQUIPMENT
596 m of mining chambers in Odollo Underground Quarry for Pizarras Expiz, S.A.
Type
Project
mining
Owner:
Project photos
STATUS
End: 04 - 1998
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
La Cabrera
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
015
Start: 10 - 1997
450,000,000/600,000,000
GEOMETRY
Width: 20 m Height: 6 m
Length: 150 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
Smaller machinery
ST6 and ST8 loaders
MK25 Dumpers
Dry method guniting
3 m3 automatic concrete mixers
Jumbos H-352
150 m of mining chambers in Odollo Underground quarry for Pizarras Expiz, S.A.
Type
Project
mining
Owner:
Project photos
STATUS
End: 09 - 1997
STRUCTURE
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Boinas
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
016
Start: 02 - 1997
GEOMETRY
Section: 25 m2
Length: 1,000 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
1,424,399
1,000 m drainage gallery in the Ro Narcea Drainage Gallery for Ro Narcea Gold Mines, S.A.
Type
Project
SKOURIES MINE
mining
Owner:
TVX
Project photos
STATUS
End: 1998
STRUCTURE
Mining tunnel
COUNTRY
Greece
PROVINCE
Halkidiki
PLACE
Arnea, Escuries
GEOMETRY
Section: 25 m2.
Length: 1,200 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
L2C Jumbo
Smaller Normet PK-6000 trucks
Wagner ST-6
Putzmeister WKM-103 Robot
Budget
9,000,000
LOCATION
AND
ADITIONAL
INFORMATION
Excavation of the main access ramp to the deposit formed by skarn with mineralisation giving gold and copper.
(excluding VAT)
017
Start: 1997
From this access galleries surveys are performed of all of the mineral mass.
Type
Project
mining
Owner:
Project photos
STATUS
End: 05 - 1997
STRUCTURE
Gallery drainage
COUNTRY
Spain
PROVINCE
Len
PLACE
La Robla
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
018
Start: 02 - 1996
GEOMETRY
Section: 15 m2
Length: 251 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
1,730,915
251 m drainage gallery in the La Robla Drainage Gallery for Hullera Vasco Leonesa, S.A.
Type
Project
ALFREDO SHAFT
mining
Owner:
Project photos
STATUS
End: 11 - 1995
STRUCTURE
Repairs
to shaft loaders
COUNTRY
Spain
PROVINCE
Huelva
PLACE
Riotinto
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
019
Start: 08 - 1995
GEOMETRY
Section: Rectangular
Length: 180 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Pyrite
TUNNEL EQUIPMENT
84,145
Type
Project
mining
Owner:
Project photos
STATUS
End: 06 - 1999
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
020
Start: 06 - 1995
58,081,809
GEOMETRY
Section: 15 m2
Length: 16,000 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
16,000 m of mining tunnels and galleries in the Nueva Mina mine for Hullera Vasco Leonesa, S.A.
Type
Project
PEDRAFORCA MINES
mining
Owner:
Project photos
STATUS
End: 06 - 1995
STRUCTURE
Coal exploitation
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Pedraforca
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
021
Start: 01 - 1994
GEOMETRY
Section: 15 m2
Length: 100 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
Panzer EKFO
600 mm wide conveyor belt
Salpilterr TL-800 loader
138,234
100 m of mining tunnels and galleries in Pedraforca mines for Minas de Pedraforca, S.A.
Type
Project
SALLENT MINES
mining
Owner:
Project photos
STATUS
End: 08 - 1994
STRUCTURE
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Sallent
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
022
Start: 07 - 1992
7,170,074
GEOMETRY
Section: 40 m2
Length: 2,416 m
METHOD
OF TUNNELING
Mechanical methods
GEOLOGY AND
GEOTECHNICAL DATA
Potash
TUNNEL EQUIPMENT
AM-75 roadheader
H-125 Jumbo drill
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25
Execution of mining tunnels and galleries in the Sallent mines for Potasas Llobregat, S.A.
Type
Project
BALSARENY MINES
mining
Owner:
Project photos
STATUS
End: 09 - 1992
STRUCTURE
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Sallent
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
023
Start: 01 - 1992
631,063
GEOMETRY
Section: 40 m2
Length: 569 m
METHOD
OF TUNNELING
Mechanical methods
GEOLOGY AND
GEOTECHNICAL DATA
Potash
TUNNEL EQUIPMENT
AM-75 roadheader
H-125 Jumbo
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25
Creation of mining tunnels and galleries in the Balsareny mines for Potasas Llobregat, S.A.
Type
Project
mining
Owner:
Project photos
STATUS
End: 03 - 1995
STRUCTURE
Shaft
COUNTRY
Spain
PROVINCE
Len
PLACE
La Pola de Gordn
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
024
Start: 11 - 1991
40,249,780
GEOMETRY
Diameter: 6.5 m
Length: 1,360 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
Several different shafts for a total length of 1,360 m for Hullera Vasco Leonesa, S.A.
Type
Project
mining
Owner:
Hunosa
Project photos
STATUS
End: 05 - 1999
STRUCTURE
Mining works.
Galleries and shafts
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Mieres
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
025
Start: 04 - 1991
GEOMETRY
Diameter: 5 m
Length: 350 m shafts/4,819 m horizontal works
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
9,574,122
Type
Project
SURIA MINES
mining
Owner:
Iberpotash, S.A.
Project photos
STATUS
End: 06 - 2009
STRUCTURE
Mining works.
Galleries and shafts
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Suria
GEOMETRY
Section: 40 m2
Length: 3,500 m
METHOD
OF TUNNELING
Mechanical methods
GEOLOGY AND
GEOTECHNICAL DATA
Potash
TUNNEL EQUIPMENT
AM-75 roadheader
H-125 Jumbo Drill
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25
Budget
10,257,734
LOCATION
AND
ADITIONAL
INFORMATION
Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria.
(excluding VAT)
026
Start: 01 - 1991
Type
Project
SURIA SHAFT
mining
Owner:
Suria K, S.A.
Project photos
STATUS
End: 12 - 1999
STRUCTURE
Shaft maintenance
COUNTRY
Spain
PROVINCE
Barcelona
PLACE
Suria
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
027
Start: 01 - 1991
5,103,244
GEOMETRY
Diameter: 5 m
Length: 200 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Carnalite potash
TUNNEL EQUIPMENT
Type
Project
mining
Owner:
Hunosa
Project photos
STATUS
End: 05 - 1997
STRUCTURE
Mining works.
Galleries and shafts
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Moreda Aller
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
028
Start: 07 - 1990
GEOMETRY
Section: 14 m2
Length: 300 m shaft/6,623 m horizontal works
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
12,483,021
Type
Project
FONDN SHAFT
mining
Owner:
Hunosa
Project photos
STATUS
End: 09 - 1992
STRUCTURE
Mining works.
Galleries and shafts
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Sama de Langreo
Budget
4,357,338
LOCATION
AND
ADITIONAL
INFORMATION
(excluding VAT)
029
Start: 07 - 1990
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
Type
Project
mining
Owner:
Hunosa
Project photos
STATUS
End: 09 - 1991
STRUCTURE
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Mieres
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
030
Start: 08 - 1989
2,674,503
GEOMETRY
Diameter: 6 m
Length: 137 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
Type
Project
AZNALCOLLAR MINES
mining
Owner:
Project photos
STATUS
End: 06 - 1991
STRUCTURE
Mine ramp
COUNTRY
Spain
PROVINCE
Sevilla
PLACE
Aznalcollar
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
031
Start: 08 - 1989
4,928,299
GEOMETRY
Section: 25 m2
Length: 1,580 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Sulphur
TUNNEL EQUIPMENT
Gallery of 1,200 m and 380 m. Mineral mass and experimental exploitation chamber.
Type
Project
mining
Owner:
Project photos
STATUS
End: 02 - 1992
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
GEOMETRY
Section: 12 - 20 m2
Length: 2,085 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
Budget
4,159,004
LOCATION
AND
ADITIONAL
INFORMATION
2,085 m of mining tunnels and galleries in Grupo Paulina Mine for Minero Siderrgica de Ponferrada, S.A.
(excluding VAT)
032
Start: 06 - 1989
Type
Project
mining
Owner:
Fotografas singulares
STATUS
Start: 1989
End: 2008
STRUCTURE
COUNTRY
Portugal
PROVINCE
Alentejo
PLACE
Castroverde
Budget
(excluding VAT)
GEOMETRY
Section: Variable
Length: 13.974 m
OVERBURDEN
Height
METHOD
OF TUNNELING
TUNNEL EQUIPMENT
75.561.956
033
Passages with lengths of 554 m, 7,591 m, 5,829 m with gauges of 12 m, 18 m, 25 m and 21 m respectively.
An 850 ml and 21 m2 gauge passage was restored and an access ramp of 625 ml and 30m2 gauge. A 3.5 m diameter
and 380 ml deep chimney was also recovered.
Type
Project
mining
Owner:
Hunosa
Project photos
STATUS
End: 02 - 1989
STRUCTURE
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Sama de Langreo
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
034
Start: 12 - 1988
4,507,590
GEOMETRY
Diameter: 9 - 12 m2
Length: 134 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
Type
Project
mining
Owner:
Project photos
STATUS
End: 06 - 1989
STRUCTURE
Mining works.
Galleries and shafts
COUNTRY
Spain
PROVINCE
Len
PLACE
Lumajo (Villablino)
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
035
Start: 05 - 1988
1,870,420
GEOMETRY
Section: 12 - 20 m2
Length: 147 m
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
147 m of mining tunnels and galleries in Grupo Lumajo mines for Minero Siderrgica de Ponferrada, S.A.
Type
Project
CANDN II SHAFT
mining
Owner:
Hunosa
Project photos
STATUS
End: 06 - 1990
STRUCTURE
Shafts
COUNTRY
Spain
PROVINCE
Asturias
PLACE
Carbayin
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
036
Start: 01 - 1988
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
4,507,590
Type
Project
LUMAJO MINE
mining
Owner:
Project photos
STATUS
End: 11 - 1989
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
Villablino
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Anthracite
TUNNEL EQUIPMENT
Budget
2,782,686
LOCATION
AND
ADITIONAL
INFORMATION
1,856 m of mining tunnels and galleries in Lumaco Mine for Minero Siderrgica de Ponferrada, S.A.
(excluding VAT)
037
Start: 10 - 1987
Slopes executed.
Type
Project
CARRASCONTE MINE
mining
Owner:
Project photos
STATUS
End: 01 - 1992
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
Villablino
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
038
Start: 09 - 1987
7,031,841
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Coal
TUNNEL EQUIPMENT
3,480 m of mining tunnels and galleries in Carrasconte Mine for Minero Siderrgica, S.A.
A 500-metre slope at 45%.
TH-21 and TH-29 metal frames used.
Type
Project
BODOVALLE MINES
mining
Owner:
Project photos
STATUS
End: 12 - 1990
STRUCTURE
COUNTRY
Spain
PROVINCE
Vizcaya
PLACE
Gallarta
Budget
(excluding VAT)
LOCATION
AND
ADITIONAL
INFORMATION
039
Start: 05 - 1987
11,611,554
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
Limestone
TUNNEL EQUIPMENT
11,318 m of mining tunnels and galleries in Bodovalle Mines for Agrupacin Minera, S.A.
Type
Project
LA MIRANDA MINE
mining
Owner:
Project photos
STATUS
End: 12 - 1989
STRUCTURE
COUNTRY
Spain
PROVINCE
Len
PLACE
Villablino
GEOMETRY
METHOD
OF TUNNELING
GEOLOGY AND
GEOTECHNICAL DATA
TUNNEL EQUIPMENT
Budget
2,596,372
LOCATION
AND
ADITIONAL
INFORMATION
1,424 m of mining tunnels and galleries in La Miranda Mine for Minero Siderrgica de Ponferrada, S.A.
(excluding VAT)
040
Start: 08 - 1986