Over 60 years opening the way underground

PROJECT BOOK

mining

PRESENTATION
OSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business
areas: Construction, Energy and Mining.
Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,
OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA
we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development
Projects at an international level. We promote a culture of respect and teamwork among our team.
OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects
in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built
over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are
participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.
Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Colombia, Brasil
and Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.
After 60 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and
mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing
health and safety and innovation in all our projects.

SAFETY
Safety is Obras Subterraneas, S.A.s main asset from the time when its operations begin, demanded by the specialisation
required for the works carried out underground.
The companys staff have a high degree of professionalism and specialisation, which has been achieved after many years
of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility
and the use of explosives means that the Obras Subterraneas, S.A.s security department is the most relevant in the
company.
The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the
companys human resources.

Type

CONSTRUCTION DATA SHEET

Project

CC-013-2 MAIN VENTILATION INFRASTRUCTURE DEVELOPMENT


IN THE CHUQUICAMATA MINE

mining

Owner:

Codelco

Project photos
STATUS

End: Currently being executed

GEOMETRY

Cross section: 75 m
Lenght: 10,500 m

STRUCTURE

Mining Tunnels

OVERBURDEN

Height

COUNTRY

Chile

METHOD
OF TUNNELING

Drilling and Blasting

PROVINCE

Regin de Antofagasta

GEOLOGY AND
GEOTECHNICAL DATA

Amphibolite, Granodiorites and Elena Sur Granodiorite

PLACE

Calama
TUNNEL EQUIPMENT

Atlas Copco XE3C and E2C Jumbos


Atlas Copco ST-1030 Underground Loader
PM-500 and PM-4210 Shotcreter
HIMEC 9910 B-REX - Normet Elevated Platforms
CAT-980K Wheel Loaders
CAT-323 DL Backhoes
CAT 730 Trucks

Budget

94,742,194,539 CLP

LOCATION
AND
ADITIONAL
INFORMATION

Construction of 10.5 km of ventilation shafts in the supply and extract systems which make up the development of the
new mine. The sections are variable between 8.2 m x 8.1 m and 10.9 m x 8.1 m.

(excluding VAT)

001

Start: 06 - 2016

The excavation is by drilling and blasting and the support is with rock bolts, mesh, trusses and shotcrete.

Type

CONSTRUCTION DATA SHEET

Project

EXTENSION OF CONTRACT FOR INJECTION TUNNELS. C003A.


CHUQUICAMATA MINE

mining

Owner:

Codelco

Project photos
STATUS

End: Currently being executed

GEOMETRY

Cross section: 10.74 x 8 m2


Lenght: Emergency ramp 1,637 m

/ Ventilation tunnels 3,821.6 m

STRUCTURE

Mine Tunnels

OVERBURDEN

Medium

COUNTRY

Chile

METHOD
OF TUNNELING

NATM. Drill and blast and mechanical equipment

PROVINCE

Antofagasta Region

GEOLOGY AND
GEOTECHNICAL DATA

Amphibolite, Granodiorite and South Elena Granodiorite

PLACE

Calama
TUNNEL EQUIPMENT

Atlas Copco XE3C jumbos


Normet Himec 9910 B-REX platform lifter
Putzmeister PM-500 shotcrete robot
Caterpillar model CAT-980K loaders
Caterpillar model CAT-323 DL excavators

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

002

Start: 10 - 2015

109,000,000

The project to be executed is located in the Chuquicamata New Underground Mine. It comprises constructing various
galleries and shafts that form part of the main fresh air injection ventilation circuit for the future mine.
The main work units to be executed are:
An Emergency Ramp 1,637 m in length with an open cross-section of 10.74 m x 8.00 m.
Ventilation tunnels with a length of 3,821.6 m and an open cross-section of 10.74 m x 8.00 m.
An emergency connecting gallery between ventilators of 359.06 m with an open cross-section of 7.75 m x 5.6 m.
6 ventilation shafts each 6 m in diameter and 181 m in length.

Type

CONSTRUCTION DATA SHEET

Project

CONSTRUCTION OF UNDERGROUND WORKS FOR NEW TRANSFER SYSTEM.


ANDEAN DIVISION

mining

Owner:

Codelco

Project photos
STATUS

Start: 11 - 2014
End: Currently being executed

GEOMETRY

Lenght: 11,133 m of galleries and caverns (including 4,833 in


Haulage tunnel 3) + 260 m of Raise Boring

STRUCTURE

Mining Tunnels

OVERBURDEN

Medium

COUNTRY

Chile

METHOD
OF TUNNELING

NATM. Drill and blast and mechanical equipment

PROVINCE

Regin de Valparaso

GEOLOGY AND
GEOTECHNICAL DATA

Ro Blanco granodiorite, rhyolitic pipe and andesites

PLACE

Saladillo /
Comuna de Los Andes
TUNNEL EQUIPMENT

Two and three boom jumbo


Drill rig
Loader
Shotcrete robot
Telehandler
Raise boring equipment

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

62,929,170,354 CLP

The Project is being carried out inside the facilities of the Andean Division (DAND) of CODELCO (Chile), located in the
high and central part of the Andes mountain range, in the 5th (Valparaso) Region, 50 km northeast of Santiago,
currently working the Ro Blanco (copper) mining deposits. The scope of this contract involves construction of the
underground works for the Transfer Project, the object of which is to ensure (and even increase) production at the mine
until 2022.
The works to be carried out mainly comprise the following:
Excavation and reinforcement by drill and blast of:

Haulage Tunnel III (4,833 m) which connects Sector 3,500 with the Cordillera Plant Sector
Tunnels, access and ventilation galleries, caverns and shafts (using raise boring) in Sector 3,500 and in the Cordillera Plant Sector
Draw points for fire protection and pedestrian shelters

Contruction of:

Construction window portals


Paving of Haulage Tunnel III
Installation of the geomechanical monitoring system

003

Cross section: Haulage tunnel 3: 42 m2 (7.5x6), the rest ranging from


4x4 galleries to 15x16 m2 caverns. Raise borings with ND of 2 and 3 m

Type

CONSTRUCTION DATA SHEET

Project

ESPERANZA MINE

mining

Owner:

Metso Mineral, S.A.

Project photos
STATUS

End: 08 - 2014

GEOMETRY

Cross section: 17 m
Lenght: 71 m

STRUCTURE

Mining Tunnels

OVERBURDEN

Low

COUNTRY

Chile

METHOD
OF TUNNELING

NATM. Mechanical excavation

PROVINCE

Regin de Antofagasta

GEOLOGY AND
GEOTECHNICAL DATA

Silty gravels with sands

PLACE

Comuna de Sierra Gorda


TUNNEL EQUIPMENT

Atlas Copco two-boom jumbo


Loaders

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

004

Start: 02 - 2014

7,600,961 USD.

The work involves the execution of the project and the excavation and support of a 71 m mine tunnel under a coarse
ore stockpile.

Type

CONSTRUCTION DATA SHEET

Project

SEM PEIXES II TUNNEL

mining

Owner:

Anglo American Minerio de Ferro Brasil, S.A.

Project photos
STATUS

005

Start: 03 - 2013
End: 09 - 2013

GEOMETRY

Cross section: Excavation of 21 m2


Lenght: 262 m

STRUCTURE

Mining Tunnels

OVERBURDEN

Medium

COUNTRY

Brazil

METHOD
OF TUNNELING

Excavation with mechanical excavation. NATM System

PROVINCE

Minas Gerais

GEOLOGY AND
GEOTECHNICAL DATA

Clays and clays with sand bands

PLACE

So Domingos do Prata
TUNNEL EQUIPMENT

Atlas Copco 282 Jumbo (2-boom)


ST-1030 loader
Manitou
PM-500 shotcrete robot

Budget

(excluding VAT)

4,064,670

LOCATION
AND
ADITIONAL
INFORMATION

The work consists of excavating a mining tunnel with a 1% gradient along its whole length. The tunnel will be
excavated with mechanical excavation, applying the NATM technique. The supports applied in the tunnel use shotcrete,
reticular trusses and bolt umbrellas.

Type

CONSTRUCTION DATA SHEET

Project

AIR INJECTION TUNNELS, CHUQUICAMATA MINE

mining

Owner:

Codelco

Project photos
STATUS

End: Currently being executed

GEOMETRY

Cross section: 10,74 x 8 m2


Length: 2 x 4.320 m

STRUCTURE

Mining Tunnels

OVERBURDEN

Height

COUNTRY

Chile

METHOD
OF TUNNELING

Drill and blast

PROVINCE

Regin Antofagasta

GEOLOGY AND
GEOTECHNICAL DATA

Amphibolite, granodiorite and Elena Sur granodiorite

PLACE

Calama
TUNNEL EQUIPMENT

XE 3C Jumbos; NormetHimec 9910 B REX Platforms;


Putzmeister PM-500 PC gunning robot
with h 30 m3/h; Boltec LC drilling systems.
CAT -980K loaders;
CAT 323 DL backhoe;
Dumper 730

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

006

Start: 03-2012

37.617.985.593 CLP
58.834.530

The work involves the execution of two parallel tunnels for air injection for the future Chuquicamata mine. The
tunnels are of approximately 4,320 m each and a gauge, or thickness of 10.74 x 8 m2, with an incline of more than
14%. Both tunnels are connected by way of three passages each of 27 m and a gauge of 7.65 x 5.60m2.
Support elements used: reinforced concrete, resin bolts of 3, 4 and 6 m in length, wire mesh 150 x 150 x 7.5 mm,
TH-21, TH-36 and HEB 200 trusses and forepoling.

Type

CONSTRUCTION DATA SHEET

Project

TOQUEPALA MINE TUNNEL

mining

Owner: Southern

Per Cooper Corporation (SPCC), Grupo Mxico

Project photos
STATUS

End: 06 - 2012

GEOMETRY

Horseshoe section tunnel 7,20 x 5.30 m (35.08 m/ml)


1 tube

STRUCTURE

Mining Tunnels

OVERBURDEN

350 m

COUNTRY

Peru

METHOD
OF TUNNELING

Drill and blast

PROVINCE

Tacna

GEOLOGY AND
GEOTECHNICAL DATA

Andesite and rhyolites (volcanic intrusion).


Seismicity 0.4 g.

PLACE

Departamento de Tacna
TUNNEL EQUIPMENT

Atlas Copco Jumbos XL2C, Robots PM500,


CAT 320 backhoes, Manitou platforms

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

007

Start: 02 - 2011

18,000,000 $

Primary crusher and conveyor belt transportation tunnel. Length of 2 km Tunnel section 35.08 m with width extensions
every 200 m. The mine area is at 3,600 m above sea level, resulting in snowed areas.The mine deposit at Toquepala
contains copper and molybdenum. Rocks with predominant RMR (Rock Mass Rating) of between 30 and 40.
Extension of tunnel secondary section of 160 ml underpass industrial railway of 60 ml and rectangular 8x4.
62,000 m3 of tunnel excavation
250,000 m3 of portal excavation.
7,000 m of 1 diameterhelical bolts L=10.
470 HEB trusses 160. 30 cm gunite thickness

Type

CONSTRUCTION DATA SHEET

Project

CABANASASURIA INFRASTRUCTURE

mining

Owner:

Iberpotash, S.A.

Project photos
STATUS

End: 06 - 2009

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Suria

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

008

Start: 03 - 2007

GEOMETRY

Section: 40 m2
Length: 425 m

METHOD
OF TUNNELING

Mechanical methods

GEOLOGY AND
GEOTECHNICAL DATA

Potash

TUNNEL EQUIPMENT

Alpine AM 75 roadheader
25 Tn. trucks
Wagner ST8 B loaders

1,850,000

Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria

Type

CONSTRUCTION DATA SHEET

Project

E. VALLE MINING INFRASTRUCTURE

mining

Owner:

Hullera Vasco Leonesa, S.A.

Project photos
STATUS

End: 12 - 2011

STRUCTURE

Well galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

La Robla

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

009

Start: 06 - 2006

20,585,046

GEOMETRY

Section: Diverse sections from 12 to 15 m2


Length: 1,976 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate and carboniferous sandstone

TUNNEL EQUIPMENT

AM-75 roadheader
Wagner ST-8A loader
800 mm wide conveyor belt
Jumbo DH
Cavo excavator, Salzgitter excavator
Locomotives

1,976 m of 15 m gauge and 416 ml with 12 m gauge. A well of 812 m in length and at a slope of 38O

Type

CONSTRUCTION DATA SHEET

Project

APARIO QUARRY

mining

Owner:

Lemona Industrial, S.A.

Project photos
STATUS

End: 03 - 2007

STRUCTURE

Mining chambers

COUNTRY

Spain

PROVINCE

Bizkaia

PLACE

Lemoa

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

010

Start: 12 - 2005

3,476,625

GEOMETRY

Section: 20 m2
Length: 1,150 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Limestone

TUNNEL EQUIPMENT

DH BTR-2 Jumbo drill


M-412 DH electro-hydraulic loader
T-50 and T-80 draft engines
3 m3 cars
Jumbo 305

3 galleries on different levels: at a height of 195 m, 321 ml was undertaken with a gauge of 53.4 m, at 165 m,
205,7 m was excavated with a gauge of 25 m, and at 195 m, 272 m was excavated with a gauge of 53.4 m.
Seven tranversal galleries were also constructed, with gauges ranging from 22.5 to 27 m.
Initial units: 21,853 m of shotcrete, 789 units of bolts of 4 m in length and 25 mm diameter; 608 ml
of 32 mm-diameter steel bar and 11,364 kg of TH21 truss.

Type

CONSTRUCTION DATA SHEET

Project

SHAFT IV GALLERY

mining

Owner:

Iberpotash, S.A.

Project photos
STATUS

End: 07 - 2006

STRUCTURE

Well IV entrance and


maintenance galleries

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Suria

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

011

Start: 11 - 2005

GEOMETRY

Section: 28 m2
Length: 3,753 m

METHOD
OF TUNNELING

Mechanical methods

GEOLOGY AND
GEOTECHNICAL DATA

Potash

TUNNEL EQUIPMENT

GHH LF-12 loader


GHH MK 25 Dumper
Mining machines

2,999,828

3,753 m of galleries inside the Potasas Mine. Maintenance, machinery and chain work was also undertaken in Well IV.

Type

CONSTRUCTION DATA SHEET

Project

GALLERIES AND SHAFTS FOR AGUABLANCA MINE

mining

Owner:

Ro Narcea Recursos, S.A.

Project photos
STATUS

End: 10 - 2005

STRUCTURE

Mining galleries and shafts

COUNTRY

Spain

PROVINCE

Badajoz

PLACE

Monesterio

Budget

6,972,057

LOCATION
AND
ADITIONAL
INFORMATION

365 ml of 2.2 m-diameter well.

(excluding VAT)

012

Start: 07 - 2004

GEOMETRY

Section: 25 m2
Length: 2,600 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Lime

TUNNEL EQUIPMENT

Wagner ST-8A loaders


800 mm wide conveyor belt
25 Tn. mining trucks
Jumbo 2-booms Minimatic-205
Raise Borer

Initial works: 2,248 units of expanding bolts measuring 2.4 m and 14,339 m of shotcrete.

Type

CONSTRUCTION DATA SHEET

Project

RIODOLAS UNDERGROUND QUARRY

mining

Owner:

Pizarras Expiz, S.A.

Project photos
STATUS

End: 03 - 1999

STRUCTURE

Mining chambers for the


excavation of inner slate

COUNTRY

Spain

PROVINCE

Orense

PLACE

Riodolas

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

013

Start: 06 - 1998

1,466,469

GEOMETRY

Width: 20 m Height: 6 m
Length: 200 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate

TUNNEL EQUIPMENT

Jumbo H-352
Wagner ST-6 and ST-8 loader
GHH MK 25 Dumper
Dry Way Aliva Gunner

200 m of mining chambers in Riodolas Underground Quarry for Pizarras Expiz, S.A.

Type

CONSTRUCTION DATA SHEET

Project

ODOLLO UNDERGROUND QUARRY

mining

Owner:

Pizarras Expiz, S.A.

Project photos
STATUS

End: 08 - 1998

STRUCTURE

Mining chamber for the


excavation of inner slate

COUNTRY

Spain

PROVINCE

Len

PLACE

Puente Domingo Flores

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

014

Start: 10 - 1997

2,373,998

GEOMETRY

Section: 160 m2
Length: 596 m

METHOD
OF TUNNELING

Gallery pilot and pyramid cut.


Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate

TUNNEL EQUIPMENT

H352 Jumbo drill


ST-8 loader
PK 6000 Dumper
Wagner ST-6 loader
GHH MK 25 Dumper
Dry Way Aliva Gunner

596 m of mining chambers in Odollo Underground Quarry for Pizarras Expiz, S.A.

Type

CONSTRUCTION DATA SHEET

Project

ODOLLO AND RIODOLAS UNDERGROUND QUARRY

mining

Owner:

Pizarras Expiz, S.A.

Project photos
STATUS

End: 04 - 1998

STRUCTURE

Mining chamber for the


excavation of inner slate

COUNTRY

Spain

PROVINCE

Len

PLACE

La Cabrera

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

015

Start: 10 - 1997

450,000,000/600,000,000

GEOMETRY

Width: 20 m Height: 6 m
Length: 150 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

100% slate with high silica content


with subhorizontal location < 100

TUNNEL EQUIPMENT

Smaller machinery
ST6 and ST8 loaders
MK25 Dumpers
Dry method guniting
3 m3 automatic concrete mixers
Jumbos H-352

150 m of mining chambers in Odollo Underground quarry for Pizarras Expiz, S.A.

Type

CONSTRUCTION DATA SHEET

Project

RO NARCEA DRAINAGE GALLERY

mining

Owner:

Ro Narcea Gold Mines, S.A.

Project photos
STATUS

End: 09 - 1997

STRUCTURE

Deepening of the well


on slopes

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Boinas

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

016

Start: 02 - 1997

GEOMETRY

Section: 25 m2
Length: 1,000 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Calcium magnesites and carbonated limestone

TUNNEL EQUIPMENT

Tamrock Minimatic Jumbo


Wagner ST-6 loader
Dumper GHH

1,424,399

1,000 m drainage gallery in the Ro Narcea Drainage Gallery for Ro Narcea Gold Mines, S.A.

Type

CONSTRUCTION DATA SHEET

Project

SKOURIES MINE

mining

Owner:

TVX

Project photos
STATUS

End: 1998

STRUCTURE

Mining tunnel

COUNTRY

Greece

PROVINCE

Halkidiki

PLACE

Arnea, Escuries

GEOMETRY

Section: 25 m2.
Length: 1,200 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Granadiorites. Calcium silicate skarn

TUNNEL EQUIPMENT

L2C Jumbo
Smaller Normet PK-6000 trucks
Wagner ST-6
Putzmeister WKM-103 Robot

Budget

9,000,000

LOCATION
AND
ADITIONAL
INFORMATION

Excavation of the main access ramp to the deposit formed by skarn with mineralisation giving gold and copper.

(excluding VAT)

017

Start: 1997

From this access galleries surveys are performed of all of the mineral mass.

Type

CONSTRUCTION DATA SHEET

Project

LA ROBLA DRAINAGE GALLERY

mining

Owner:

Hullera Vasco Leonesa, S.A.

Project photos
STATUS

End: 05 - 1997

STRUCTURE

Gallery drainage

COUNTRY

Spain

PROVINCE

Len

PLACE

La Robla

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

018

Start: 02 - 1996

GEOMETRY

Section: 15 m2
Length: 251 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate and carboniferous sandstone

TUNNEL EQUIPMENT

Boomer 352 Jumbo


Aliva 252 guniting machine
GHH MK 25 trucks

1,730,915

251 m drainage gallery in the La Robla Drainage Gallery for Hullera Vasco Leonesa, S.A.

Type

CONSTRUCTION DATA SHEET

Project

ALFREDO SHAFT

mining

Owner:

Minas de Riotinto, S.A.

Project photos
STATUS

End: 11 - 1995

STRUCTURE

Repairs
to shaft loaders

COUNTRY

Spain

PROVINCE

Huelva

PLACE

Riotinto

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

019

Start: 08 - 1995

GEOMETRY

Section: Rectangular
Length: 180 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Pyrite

TUNNEL EQUIPMENT

Wagner ST-6C and ST-8A loaders


Aliva 252 guniting machine

84,145

180 m deep Shaft for Minas de Riotinto, S.A.

Type

CONSTRUCTION DATA SHEET

Project

NUEVA MINA MINE

mining

Owner:

Hullera Vasco Leonesa, S.A.

Project photos
STATUS

End: 06 - 1999

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

Santa Luca de Gordn

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

020

Start: 06 - 1995

58,081,809

GEOMETRY

Section: 15 m2
Length: 16,000 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate and carboniferous sandstone

TUNNEL EQUIPMENT

D.H. BTR. 2 Jumbo drill


M-412 electro-hydraulic loader
T-50 and T-80 draft engines
800 mm wide conveyor belts
3 m3 wagons
Aliva 500 mining robot
Aliva 252 guniting machine

16,000 m of mining tunnels and galleries in the Nueva Mina mine for Hullera Vasco Leonesa, S.A.

Type

CONSTRUCTION DATA SHEET

Project

PEDRAFORCA MINES

mining

Owner:

Minas de Pedraforca, S.A.

Project photos
STATUS

End: 06 - 1995

STRUCTURE

Coal exploitation

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Pedraforca

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

021

Start: 01 - 1994

GEOMETRY

Section: 15 m2
Length: 100 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

Panzer EKFO
600 mm wide conveyor belt
Salpilterr TL-800 loader

138,234

100 m of mining tunnels and galleries in Pedraforca mines for Minas de Pedraforca, S.A.

Type

CONSTRUCTION DATA SHEET

Project

SALLENT MINES

mining

Owner:

Potasas Llobregat, S.A.

Project photos
STATUS

End: 08 - 1994

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Sallent

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

022

Start: 07 - 1992

7,170,074

GEOMETRY

Section: 40 m2
Length: 2,416 m

METHOD
OF TUNNELING

Mechanical methods

GEOLOGY AND
GEOTECHNICAL DATA

Potash

TUNNEL EQUIPMENT

AM-75 roadheader
H-125 Jumbo drill
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25

Execution of mining tunnels and galleries in the Sallent mines for Potasas Llobregat, S.A.

Type

CONSTRUCTION DATA SHEET

Project

BALSARENY MINES

mining

Owner:

Potasas Llobregat, S.A.

Project photos
STATUS

End: 09 - 1992

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Sallent

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

023

Start: 01 - 1992

631,063

GEOMETRY

Section: 40 m2
Length: 569 m

METHOD
OF TUNNELING

Mechanical methods

GEOLOGY AND
GEOTECHNICAL DATA

Potash

TUNNEL EQUIPMENT

AM-75 roadheader
H-125 Jumbo
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25

Creation of mining tunnels and galleries in the Balsareny mines for Potasas Llobregat, S.A.

Type

CONSTRUCTION DATA SHEET

Project

SANTA LUCA/TABLIZA SHAFTS

mining

Owner:

Hullera Vasco Leonesa, S.A.

Project photos
STATUS

End: 03 - 1995

STRUCTURE

Shaft

COUNTRY

Spain

PROVINCE

Len

PLACE

La Pola de Gordn

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

024

Start: 11 - 1991

40,249,780

GEOMETRY

Diameter: 6.5 m
Length: 1,360 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

1000 kw extraction machinery


D.H. 3 boomer jumbo drill
800 l loading polyp
4 m3 cage

Several different shafts for a total length of 1,360 m for Hullera Vasco Leonesa, S.A.

Type

CONSTRUCTION DATA SHEET

Project

SAN NICOLS SHAFT

mining

Owner:

Hunosa

Project photos
STATUS

End: 05 - 1999

STRUCTURE

Mining works.
Galleries and shafts

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Mieres

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

025

Start: 04 - 1991

GEOMETRY

Diameter: 5 m
Length: 350 m shafts/4,819 m horizontal works

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Slate, sandstone, and conglomerate

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TL-800 Loader
Panzer ELFO Conveyor belt
800 mm wide conveyor belts

9,574,122

350 m of shafts and 4,819 m of horizontal works for Hunosa

Type

CONSTRUCTION DATA SHEET

Project

SURIA MINES

mining

Owner:

Iberpotash, S.A.

Project photos
STATUS

End: 06 - 2009

STRUCTURE

Mining works.
Galleries and shafts

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Suria

GEOMETRY

Section: 40 m2
Length: 3,500 m

METHOD
OF TUNNELING

Mechanical methods

GEOLOGY AND
GEOTECHNICAL DATA

Potash

TUNNEL EQUIPMENT

AM-75 roadheader
H-125 Jumbo Drill
ST-5 ST-8A Wagner Loader
pk-6000 Dumper
GHH MK 25

Budget

10,257,734

LOCATION
AND
ADITIONAL
INFORMATION

Execution of mining tunnels and galleries in the potash mines of Iberpotash, S.A. in Suria.

(excluding VAT)

026

Start: 01 - 1991

Contract for the operation and maintenance of shafts.

Type

CONSTRUCTION DATA SHEET

Project

SURIA SHAFT

mining

Owner:

Suria K, S.A.

Project photos
STATUS

End: 12 - 1999

STRUCTURE

Shaft maintenance

COUNTRY

Spain

PROVINCE

Barcelona

PLACE

Suria

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

027

Start: 01 - 1991

5,103,244

200 m long shaft for Suria K, S.A.

GEOMETRY

Diameter: 5 m
Length: 200 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Carnalite potash

TUNNEL EQUIPMENT

Small machinery and tools from the


Maintenance workshop

Type

CONSTRUCTION DATA SHEET

Project

SAN ANTONIO SHAFT

mining

Owner:

Hunosa

Project photos
STATUS

End: 05 - 1997

STRUCTURE

Mining works.
Galleries and shafts

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Moreda Aller

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

028

Start: 07 - 1990

GEOMETRY

Section: 14 m2
Length: 300 m shaft/6,623 m horizontal works

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TE-800 loader
Panzer EKF-0 Conveyor belt
Zitron winch
800 mm wide conveyor belts

12,483,021

300 m shaft and 6,623 m of horizontal works for Hunosa

Type

CONSTRUCTION DATA SHEET

Project

FONDN SHAFT

mining

Owner:

Hunosa

Project photos
STATUS

End: 09 - 1992

STRUCTURE

Mining works.
Galleries and shafts

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Sama de Langreo

Budget

4,357,338

LOCATION
AND
ADITIONAL
INFORMATION

193 m long shaft for Hunosa

(excluding VAT)

029

Start: 07 - 1990

GEOMETRY

Diameter: 6 m excavation/5 m free


Length: 193 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

Zitron ZEHZ 150/46/180 Winch


JVF 3boomer Jumbo drill
1.2 m3 cage
300 litre loading polyp

Deepening of existing shaft from level -520 to level -740 m.

Type

CONSTRUCTION DATA SHEET

Project

SAN NICOLS SHAFT No. 1

mining

Owner:

Hunosa

Project photos
STATUS

End: 09 - 1991

STRUCTURE

Well digging with slopes

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Mieres

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

030

Start: 08 - 1989

2,674,503

137 m long shaft for Hunosa

GEOMETRY

Diameter: 6 m
Length: 137 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

Salzgitter TE-800 excavator


Panzer EKF-0 chain transporter
800 m chain width

Type

CONSTRUCTION DATA SHEET

Project

AZNALCOLLAR MINES

mining

Owner:

Andaluza de Piritas, S.A.

Project photos
STATUS

End: 06 - 1991

STRUCTURE

Mine ramp

COUNTRY

Spain

PROVINCE

Sevilla

PLACE

Aznalcollar

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

031

Start: 08 - 1989

4,928,299

GEOMETRY

Section: 25 m2
Length: 1,580 m

METHOD
OF TUNNELING

NATM. Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Sulphur

TUNNEL EQUIPMENT

Minimatic 207 Jumbo Drill; Wagner ST-8 and ST-6


loaders; PK-6000 dumper; Jumbo Atlas Copco
H-135; Pala F.Loader CT-1000; dumper GHH MK 25.2;
transformers 1,500 kVA; pumps between 20
and 200 kW

Gallery of 1,200 m and 380 m. Mineral mass and experimental exploitation chamber.

Type

CONSTRUCTION DATA SHEET

Project

PAULINA GROUP MINE

mining

Owner:

Minero Siderrgica de Ponferrada, S.A.

Project photos
STATUS

End: 02 - 1992

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

Caboalles de Arriba (Villablino)

GEOMETRY

Section: 12 - 20 m2
Length: 2,085 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Sandstone and coal

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TE-800 loader
Panzer EKF-0 Conveyor belt
Zitron winch
1.200 mm wide conveyor belts

Budget

4,159,004

LOCATION
AND
ADITIONAL
INFORMATION

2,085 m of mining tunnels and galleries in Grupo Paulina Mine for Minero Siderrgica de Ponferrada, S.A.

(excluding VAT)

032

Start: 06 - 1989

A 500-metre slope at 45%.

Type

CONSTRUCTION DATA SHEET

Project

NERVES CORVO MINE

mining

Owner:

SOMINCOR (Rio Tinto Gobierno Portugus)

Fotografas singulares
STATUS

Start: 1989
End: 2008

STRUCTURE

Passages and tanks

COUNTRY

Portugal

PROVINCE

Alentejo

PLACE

Castroverde

Budget

(excluding VAT)

GEOMETRY

Section: Variable
Length: 13.974 m

OVERBURDEN

Height

METHOD
OF TUNNELING

Drill and blast

TUNNEL EQUIPMENT

Minimatic Tamrock Jumbo, low profile hoes such as


Toro 400 and Toro 500.

75.561.956

Excavation of tank of 800 m in depth and 23 m2 gauge.


LOCATION
AND
ADITIONAL
INFORMATION

033

Passages with lengths of 554 m, 7,591 m, 5,829 m with gauges of 12 m, 18 m, 25 m and 21 m respectively.
An 850 ml and 21 m2 gauge passage was restored and an access ramp of 625 ml and 30m2 gauge. A 3.5 m diameter
and 380 ml deep chimney was also recovered.

Type

CONSTRUCTION DATA SHEET

Project

MARA LUISA SHAFT

mining

Owner:

Hunosa

Project photos
STATUS

End: 02 - 1989

STRUCTURE

Deepening of existing shaft

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Sama de Langreo

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

034

Start: 12 - 1988

4,507,590

134 m long shaft for Hunosa

GEOMETRY

Diameter: 9 - 12 m2
Length: 134 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

Zitron ZEHZ 150/46/180 Winch


JVF 3boomer Jumbo drill
1.2 m3 cage
300 litre loading polyp

Type

CONSTRUCTION DATA SHEET

Project

LUMAJO GROUP MINES

mining

Owner:

Minero Siderrgica de Ponferrada, S.A.

Project photos
STATUS

End: 06 - 1989

STRUCTURE

Mining works.
Galleries and shafts

COUNTRY

Spain

PROVINCE

Len

PLACE

Lumajo (Villablino)

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

035

Start: 05 - 1988

1,870,420

GEOMETRY

Section: 12 - 20 m2
Length: 147 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Sandstone and coal

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TE-800 loader
Panzer EKF-0 Conveyor belt
Zitron winch
800 mm wide conveyor belts

147 m of mining tunnels and galleries in Grupo Lumajo mines for Minero Siderrgica de Ponferrada, S.A.

Type

CONSTRUCTION DATA SHEET

Project

CANDN II SHAFT

mining

Owner:

Hunosa

Project photos
STATUS

End: 06 - 1990

STRUCTURE

Shafts

COUNTRY

Spain

PROVINCE

Asturias

PLACE

Carbayin

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

036

Start: 01 - 1988

GEOMETRY

Diameter: Works with a section of 12 to 20 m2


Length: 200 m shaft/2,470 m horizontal works

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TL-800 Loader
Panzer Conveyor belt
800 mm wide conveyor belts
Cavo excavators; JVF jumbo cover; Extractor winch;
Loading fork; Raise Borer

4,507,590

200 m shaft and 2,470 m of horizontal works for Hunosa

Type

CONSTRUCTION DATA SHEET

Project

LUMAJO MINE

mining

Owner:

Minero Siderrgica de Ponferrada, S.A.

Project photos
STATUS

End: 11 - 1989

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

Villablino

GEOMETRY

Section: Works with a section of 12 to 20 m2


Length: 1,856 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Anthracite

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Salzgitter TE-800 loader
Panzer EKF-0 Conveyor belt
Zitron winch
1.200 mm wide conveyor belts
Cavo excavator

Budget

2,782,686

LOCATION
AND
ADITIONAL
INFORMATION

1,856 m of mining tunnels and galleries in Lumaco Mine for Minero Siderrgica de Ponferrada, S.A.

(excluding VAT)

037

Start: 10 - 1987

Slopes executed.

Type

CONSTRUCTION DATA SHEET

Project

CARRASCONTE MINE

mining

Owner:

Minero Siderrgica de Ponferrada, S.A.

Project photos
STATUS

End: 01 - 1992

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

Villablino

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

038

Start: 09 - 1987

7,031,841

GEOMETRY

Section: Works with a section of 12 to 20 m2


Length: 3,480 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Coal

TUNNEL EQUIPMENT

T-50 T-80 Electrical draft engine


Panzer EKF-0 Conveyor belt
Salzgitter EL 600 excavator
CT-2500 low-profile excavator
1200 mm bandwidth conveyor belt

3,480 m of mining tunnels and galleries in Carrasconte Mine for Minero Siderrgica, S.A.
A 500-metre slope at 45%.
TH-21 and TH-29 metal frames used.

Type

CONSTRUCTION DATA SHEET

Project

BODOVALLE MINES

mining

Owner:

Agrupacin Minera, S.A.

Project photos
STATUS

End: 12 - 1990

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Vizcaya

PLACE

Gallarta

Budget

(excluding VAT)

LOCATION
AND
ADITIONAL
INFORMATION

039

Start: 05 - 1987

11,611,554

GEOMETRY

Section: Works with a section of 12 to 20 m2


Length: 11,318 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Limestone

TUNNEL EQUIPMENT

Tamrock Paramatic Jumbo drill


ATLAS H-125 Jumbo drill
Wagner ST-8 and ST-6 loaders
Toro 500
GHH LF-12
GHH DUMPER

11,318 m of mining tunnels and galleries in Bodovalle Mines for Agrupacin Minera, S.A.

Type

CONSTRUCTION DATA SHEET

Project

LA MIRANDA MINE

mining

Owner:

Minero Siderrgica de Ponferrada, S.A.

Project photos
STATUS

End: 12 - 1989

STRUCTURE

Tunnels and mining galleries

COUNTRY

Spain

PROVINCE

Len

PLACE

Villablino

GEOMETRY

Section: Developments with a section of 12 to 20 m2


Length: 1,424 m

METHOD
OF TUNNELING

Drill and blast

GEOLOGY AND
GEOTECHNICAL DATA

Sandstone, slate and coal

TUNNEL EQUIPMENT

Panzer EKF-O Conveyor belt


800 mm wide Conveyor belt
Salzgittler EL 600 loader
T-50 and T-80 electric locomotive
Cavo excavator
CT-2500 low-profile excavator

Budget

2,596,372

LOCATION
AND
ADITIONAL
INFORMATION

1,424 m of mining tunnels and galleries in La Miranda Mine for Minero Siderrgica de Ponferrada, S.A.

(excluding VAT)

040

Start: 08 - 1986

TH-21 and TH-29 metal frames used.

OSSA, Obras Subterrneas


Aragoneses 2-A, 3 planta
Poligono Industrial de Alcobendas
28108 Alcobendas, Madrid
T. +34 91 782 34 00
F. +34 91 562 42 98
www.ossaint.com