EHS CHECKLISTS ANDFORMS

EHS INSPECTIONREPORT

EHS F1515.2

EHS Inspection Report


224

Inspection No:

Date /Time:

19-03-2016 /10.30 Hrs

Total No of Pages

To (Responsible Person):

One System, GE, Ingersoll Rand, Tong Bee, ,Prime Structure, SLE

Inspected by:

M+W and Contractors EHS.

c.c. (for info only):

Mr. Danny Charest, Mr. Ravikumar, Mr. Mathivalan, Mr. Goh Puay Meng

Area of Inspection:

CUB Level 2 Lead By H+E

05

Inspection ReportSummary

No

TotalFindings

06

Good WorkPractices

02

33.3

Deviations / Non-conformances / Room ForImprovement

04

66.7

Contractor

No of DeviationsObserved

No of Deviations Corrected within24hrs

No of Other DeviationsCorrected

Tong Bee

One System

GE

Ingersoll Rand

M+W_4_HSE_7503_B_REC
Prepared By: CrawfordAng
Create Date:25-Feb-13

Revision Date:04-Mar-2013
Revision:2

Page 1 of5

*Type

**

S/N

Finding /Observation

Location

Deviation: Improper Barricading without proper


signages displayed

CUB Level 2

OTR

Good Practice. Storage area barricade with


signage.

CUB Level 2

OTR

Category

Remedial / Preventive Action


Corrective action: All equipment to be
properly barricaded with signages.
Preventive Action: Supervisor to highlight in
toolbox meeting
Reference: WSH (construction) Regulation
and M+W EHS manual.

One System

Prime Structure
Good Practice.

Responsible
Person

Deviation: Temporary materials storage area


improper barricade.

CUB Level 2

OTR

Deviation: No toe board fixed on MEWP

CUB Level 2

OTR

Corrective action: To provide barricade with


signage for materials storage area.
Preventive Action: Supervisor to ensure
proper barricade and signage for materials
storage area.
Reference: WSH (construction) Regulation
and M+W EHS manual.

Corrective Action: To fix toe board


Preventive Action: All Supervisors and
MEWP operators to ensure toe board is in
place before operation
Reference: WSH (construction) Regulation
and M+W EHS manual.

Ingersoll Rand

GE

Deviation: Poor Housekeeping at work area.

Good Practice. Storage area barricade with


signage.

CUB Level 2

OTR

CUB Level 2

OTR

Corrective Action: To do housekeeping at


work area.
Preventive Action: Supervisors to ensure all
work area need do daily housekeeping after
any work.
Reference: M+W EHS manual.

Good Practice

Tong Bee

SLE

*Type
FFHFallFromHeightstoDifferentLevels;STFSlips,Trips&FallsonSameLevel;SBOStruckByFalling,Flying,SlidingObjects;SBMStruckByMovingEquipment&Machineries;CIBOCaughtInorBetweenObjects;OEOverexertion;CETContactwithExtremeTemperature;FEFireorExplosions;ELEExposuretoorContactwithElectricCurrent;CHSExposuretoorContactwithHazardousSubstancesorRadiation;IAIP
Inhalation,Absorption,Ingestion,Poisoning;DRNDrowning;OTROthers
**Category
1 -Potentialfatalinjuries,occupationalcancersormajorpollution/spills.Workstoppedandremedialactionstobecarriedoutimmediately.Workremainssuspendedtillre-inspectionisconductedandalldangerousconditionsareremoved.
2 Potentialsevereinjuries,occupationalillnessesorpollution/spills.Workisstoppedandremedialactionstobecarriedoutimmediatelyandcompletewithin24hours.Workremainssuspendedtillremedialactionsarecompleted.
3 Potentialinjuries,occupationalillnessorpollution/spills.Remedialactionstobecarriedoutandcompletewithin3days.
4 Improvement findings. Improvement actions to be evaluated within 7days.
0Goodworkpractice.Tomaintainandnofurtheractionrequire.