During the development process of 605-613 Lonsdale Street Project, some major risks
which are identified are:
Safety risk
Environmentally risk
Political risk
Financial risk
Quality risk
Contractual risk
Communication risk
All of the above identified risks The above risks will need to analyze systematically with
the implementation of risk prevention and avoidance plans.
The levels of risks for above listed major risks are illustrated in the following risk matrix;
Impact
likelihood
Seve
rity
Risk
Rating
High
Very High
High
High
Risk Treatment
Options
Proper training
and information
need to be
provided to
workers
Proper
supervision
must be taken
to make safe
work assure
Safe work
procedures
not
understood
Not going
to happen
to me
attitude or
negligence
High
High
Trainings and
Workshops
must be held for
awareness
High
High
Inter
medi
ate
Intermediat
e
Very
possible
High
Very High
Proper
supervision
must be taken
to make safe
work assure
All factors must
be considered
in planning
stage
Procurement
plan must be
clearly defined
Possible
High
Intermediat
e
Proper
supervision
must be taken
Poor
project
quality
Dispute
Poor
project
quality
Possible
High
High
Procurement
plan must be
clearly defined
Unlikely
High
Intermediat
e
Real demands
need to be
identified
Design
defects
Poor
Project
supervision pending
or delay
Unlikely
High
High
Proper
supervision
must be taken
Risk of
industrial
pollutions
Poor
environme
ntal
manageme
nt
Very
possible
High
High
Proper
supervision
must be taken
and all laws and
standard must
be followed
Insufficient Over
supervision reliance
An
obstructed
working
site
Constructio
n material
quality
issue
Poor
working
standard
Use of
unsafe
equipment
s
Poor
maintenan
ce
&
Supervisio
n
Corruption,
Insufficient
investigatio
n
Poor
communic
ation,
Employing
irresponsib
le
contractors
Tight
project
schedule
Poor
Procureme
nt
Major
accident
Possible
Inferior
working
standard
Deterior Possible
ation in
Working
standard
s
Inefficie Unlikely
ncy
Major
collapse
Project
delay
Major
accident
Inaccura
cy
Health
threat
Environ
mental
accident
s
Risk of
breach
against
environme
ntal rules
and
regulations
Poor
abidance
to
environme
ntal
regulations
Project
suspens
ion
Project
cancelat
ion
Fines
Very
possible
High
High
All
environmental
laws must be
followed