Sunteți pe pagina 1din 1

KEY PLAN

3/8"-ADP-SCH40
TO DISCHARGE NOZZLE FOR MORE DETAILS, REFER
DWG NO: Q-29166/HFS/001(SHT.01-01)

ADP

AGENT DISCHARGE PIPE WORK.

DL

DETECTION LINE.

MP

CONDUIT TO MANUAL PULL STATION

EOL

END OF LINE RESISTOR

SR

SERIES RESISTOR

ARR

AUTOMAN REGULATED RELEASE ASSY.

RA

REGULATED ACTUATOR.

FUSIBLE LINK HEAT DETECTORS

20 MM-CONDUIT-DL

CLIENT

REPRESENTATIVE:

RESIDENT ENGINEER:
SUBMITTAL No:

ITEM:

TRANSMITTAL REF:

DATE:

REGULATOR.

RESIDENT ENGINEER

DECISION:

NO/NC
SWITCHES
2 SETS

P/N.429862

P/N.429870

P/N.429862

This check is for general conformance with the design


concept and it does not relieve the Contractor of its
obligation under the contract.

20 MM-CONDUIT-MP

3 GALLON
AGENT TANK

3 GALLON
AGENT TANK

ARR
R

DATE

R.E. SIGNATURE

N2 CARTRIDGE
P/N.73022

P/N.429853

REV

DATE

DESC.

BY

AAP

Certified for coordination and compliance with the


Contract documents.

MANUAL PULL STATION

DATE

SUBCONTRACTOR

SIG.

2 x 3 GALLON ANSUL R-102 SYSTEM P&ID

UPPER CREST TOWER

ELECTRICAL POWER SHUT OFF ARRANGEMENTS


(NOT INCLUDED IN HAVEN SCOPE OF SUPPLY)

FIRST ISSUE

26.04.15

UPPER CREST TOWER BURJ KHALIFA


DISTRICT, PLOT NO 345-392 @ DUBAI

T +971 (4) 297 1755


F +971 (4) 297 1799
@ info@pse.ae
www.pse.com

P.O. Box: 96196


Dubai, UAE

AL BARQ KITCHEN EQUIPMENTS

ANSUL R-102 SYSTEM P & ID

Sayooj
Premalal

HAVEN FIRE & SAFETY

26.04.15
L.L.C

Fire Protection & Safety Engineers

TYPICAL WIRING SCHEMATIC


Q-29166/HFS/003(SHT.01-01)

1
SHEET NO:
3/3

STATUS

DRAWN BY:
DP

CHECKED BY:
JVP

DRAWING NO.

DATE
27-04-2015

SCALE

PROJECT NO.
D113

ALB-SD-D007-5F-KD-01

REVISION
0

S-ar putea să vă placă și