DEEP EXCAVATION

DIAPHRAGM WALL

ITALTHAI TREVI CO.,LTD


1

Type of Rigid & Flexible wall


Type of Rigid & Flexible wall for Deep
Excavation work

Sheet pile
Steel Sheet Pile
Concrete Sheet Pile

Pile wall
Tangent Pile
Secant Pile

Diaphragm Wall

Sheet Pile Work (Flexible Wall)

Whats Pile Wall ?

- In-situ casting
concrete Bored Pile
- Continuous
Bored Pile (wall
behavior)
Plan View

Tangent Pile Wall


Pile wall used as permanent
retaining wall by capping
beam at the top

Secant Pile
A. Primary Pile (Female Pile)
The female pile will be constructed as
the primary piles for the secant pile
wall. The primary pile will be filled
with the specified strength of mass
concrete without any steel
reinforcement.
B. Secondary Pile (Male Pile)
The secondary pile will be constructed
in between the primary piles and
overlap with the primary piles with
the specified strength of concrete
after the reinforcement cages are
lowered into the bored hole. The
secondary pile formed by cutting into
the primary piles to form the
interlocking joint by using the
specified coring tools. The boring
process for the secondary pile shall
only commence upon initial set of the
primary piles.

Secant Pile

Diaphragm Wall Work (Rigid Wall)

Comparison of wall (1)


Sheet Pile

Pile Wall

Diaphragm wall

Cost

Low (35% cheaper


than DW)

High (20% cheaper than Highest


DW)

Waterproof

Moderate

Moderate (Good for clay Good


layer)

Construction
condition

Soft soil (not into


stiff clay, sand &
rock)

Every type of soil

Every type of soil

Ground movement

High

Low

Lowest

Construction Time

Longest (withdraw
sheet pile & need to
built retaining wall)

Moderate (permanent
wall but need to built
double wall)

Short (permanent wall


and some built inner
wall)

Comparison of wall (2)


Sheet Pile

Pile Wall

Diaphragm wall

Construction area

Smaller area

Large area

Large area

Depth of
excavation

Shallow (Limited by
area)

Deep (Limited by sand


layer in tangent wall)

Deepest

Lateral load
resistant

Lowest

High

Highest

Vibration& Noise

Highest

High

Moderate

Method and Type of Construction


Open excavation
Bottom-up excavation (Central Embassy)
Top-down excavation (MRT Blue Line Wat Mangkon Station)

11

Central Embassy

Central retail
Area 12 rai
144,000 m2
40 Storey
Shopping mall and hotel
Bottom-up construction

12

Working Area

13

SITE PLAN
Bentonite plant
Gate 1
Office
containers
Meeting room

Concrete plant

Storage area

Polymer plant

Layout Plan
1 Vibration monitoring (Every day)
British Embassy
2 Sound monitoring (Every day)
3 Ground settlement monitoring
4 Total suspended particulate
DW 1.00 m.

Barr. 1.20 m., 65.00 m. depth

SCC

DW 0.80 m.

15

Central Embassy
Bored pile
0.80 m., 21.00 m. depth
0.80 m., 56.00 m. depth
1.00 m., 56.00 m. depth
1.35 m., 56.00 m. depth
1.50 m., 65.00 m. depth
1.00 m., 65.00 m. depth (pile leg)

71 No.
89 No.
130 No.
85 No.
53 No.
9 No.
16

Central Embassy
Barrette Pile & Diaphragm Wall
1.20 x 3.00 m., 65.00 m. depth
1.00 x 2.70 m., 60.00 m. depth
1.00 x 3.00 m., 60.00 m. depth
DW1.00 m. thickness, 25-30 m. depth
DW0.80 m. thickness, 25-30 m. depth

23 No.
27 No.
15 No.
7,150 m2
4,510 m2

17

Soil profile

DW.

-24.00 m.

Clay layer 47 m. thickness

-30.00 m.

18

Prevention of Nuisance Pollution


Temporary fence
Inclinometer
Compliance with EIA Requirements

1 Vibration monitoring
2 Sound monitoring
3 Ground settlement monitoring
4 Total suspended particulate
19

Environment
index

Parameter

Measurement

Measured by

Frequency

Standard*

Air Quality

Total
Suspended
Particulate
Matter

High volume
air sampler

Project life
time

<= 0.33
mg./m^3

Sound

24 hours A
weighted
Equivalent
Continuous
Sound Level

Sound level
meter

Project life
time

Avg. 24 hrs.
<= 70
dB(A)

Vibration

Vibration

Vibration
meter

Piling work life


time

1. f < 10 Hz
2. v <= 5
mm./sec

* Conform to the EIA report

Noise and Vibration

Measuring station

Noise

Noise

Vibration

Dust

CCTV Positions

Bracing Section
SCC

Sheet Pile

20 m.

24 m.

DW

DW

27

Diaphragm Wall

28

Diaphragm Wall

Leakage
-20.00 m.

29

Water Leakage
Criteria

Water leakage rate > 5 ml./m2/hr. (MRT)

Materials

Polyurethane injection resin


Waterplug
Admixture (if required)

Equipment

Mixture
Manual driven pump
Injection packer

30

Water Leakage Repairing

31

MRT Blue Line (Wat Mang Kon Station)

32

Project Layout

Diaphragm wall 1.20 x 40 m. depth


Barrette Pile 1.20 x 65 m. depth with stanchion
Soil Cement Column for diaphragm wall protection
Existing pile extraction
Top-down construction

33

Project Layout
Diaphragm wall 1.20 x 40 m.
Diaphragm wall 0.80 x 25 m.
Barrette pile 1.20 x 65 m.
Barrette pile 0.80 x 40 m.
Barrette pile 0.80 x 45 m.
Stanchion
Soil cement column 0.60 x 10 m.

17,700 m2
1,540 m2
17 No.
1 No.
1 No.
17 No.
197 No.

34

Layout Plan

35

Diaphragm Wall Panal

36

Old space

ITT Request
Space

Working area 7.543


m

Working area 9.543


m

More 0.80 m for


enough working area

Section Plan

38

Soil Cement Column

39

Soil Cement Column

40

Soil Cement Column

41

+ 101.40

Stanchion

+ 96.00
+ 90.50
27.30 m.

+ 83.40

+ 74.10

3.325 m.
42

Stop End
Total 20 tons

43

Stop End
Total 20 tons

44

Stop End

45

Stop End Installation

46

Procedure
Water stop & Stop end installation

47

Chisel

48

Dummy Hole

49

The First Stanchion Fabrication in Dummy Hole

50

Verticality Control

51

Drilling Monitoring Result


X-X

Diameter

Y-Y

Depth

52


Talalog

53


Talalog

54

Steel Cage with The First Stanchion Installation


Steel Cage 25 ton
Steel Cage with Stanchion 30 ton
Service Crane#1 100 ton

Service Crane#2 70 ton

55

Install 2 trimmie pipes with funnels connected with located frame

56

Pouring concrete to its final level

57

Diaphragm Wall

+90.50

58

Diaphragm Wall

59

Diaphragm Wall

+83.40

60

Diaphragm Wall

+74.10
61

Diaphragm Wall

+74.10
62

Diaphragm Wall

+101.40
63

THANK YOU FOR YOUR ATTENTION