DIAPHRAGM WALL
Sheet pile
Steel Sheet Pile
Concrete Sheet Pile
Pile wall
Tangent Pile
Secant Pile
Diaphragm Wall
- In-situ casting
concrete Bored Pile
- Continuous
Bored Pile (wall
behavior)
Plan View
Secant Pile
A. Primary Pile (Female Pile)
The female pile will be constructed as
the primary piles for the secant pile
wall. The primary pile will be filled
with the specified strength of mass
concrete without any steel
reinforcement.
B. Secondary Pile (Male Pile)
The secondary pile will be constructed
in between the primary piles and
overlap with the primary piles with
the specified strength of concrete
after the reinforcement cages are
lowered into the bored hole. The
secondary pile formed by cutting into
the primary piles to form the
interlocking joint by using the
specified coring tools. The boring
process for the secondary pile shall
only commence upon initial set of the
primary piles.
Secant Pile
Pile Wall
Diaphragm wall
Cost
Waterproof
Moderate
Construction
condition
Ground movement
High
Low
Lowest
Construction Time
Longest (withdraw
sheet pile & need to
built retaining wall)
Moderate (permanent
wall but need to built
double wall)
Pile Wall
Diaphragm wall
Construction area
Smaller area
Large area
Large area
Depth of
excavation
Shallow (Limited by
area)
Deepest
Lateral load
resistant
Lowest
High
Highest
Vibration& Noise
Highest
High
Moderate
11
Central Embassy
Central retail
Area 12 rai
144,000 m2
40 Storey
Shopping mall and hotel
Bottom-up construction
12
Working Area
13
SITE PLAN
Bentonite plant
Gate 1
Office
containers
Meeting room
Concrete plant
Storage area
Polymer plant
Layout Plan
1 Vibration monitoring (Every day)
British Embassy
2 Sound monitoring (Every day)
3 Ground settlement monitoring
4 Total suspended particulate
DW 1.00 m.
SCC
DW 0.80 m.
15
Central Embassy
Bored pile
0.80 m., 21.00 m. depth
0.80 m., 56.00 m. depth
1.00 m., 56.00 m. depth
1.35 m., 56.00 m. depth
1.50 m., 65.00 m. depth
1.00 m., 65.00 m. depth (pile leg)
71 No.
89 No.
130 No.
85 No.
53 No.
9 No.
16
Central Embassy
Barrette Pile & Diaphragm Wall
1.20 x 3.00 m., 65.00 m. depth
1.00 x 2.70 m., 60.00 m. depth
1.00 x 3.00 m., 60.00 m. depth
DW1.00 m. thickness, 25-30 m. depth
DW0.80 m. thickness, 25-30 m. depth
23 No.
27 No.
15 No.
7,150 m2
4,510 m2
17
Soil profile
DW.
-24.00 m.
-30.00 m.
18
1 Vibration monitoring
2 Sound monitoring
3 Ground settlement monitoring
4 Total suspended particulate
19
Environment
index
Parameter
Measurement
Measured by
Frequency
Standard*
Air Quality
Total
Suspended
Particulate
Matter
High volume
air sampler
Project life
time
<= 0.33
mg./m^3
Sound
24 hours A
weighted
Equivalent
Continuous
Sound Level
Sound level
meter
Project life
time
Avg. 24 hrs.
<= 70
dB(A)
Vibration
Vibration
Vibration
meter
1. f < 10 Hz
2. v <= 5
mm./sec
Measuring station
Noise
Noise
Vibration
Dust
CCTV Positions
Bracing Section
SCC
Sheet Pile
20 m.
24 m.
DW
DW
27
Diaphragm Wall
28
Diaphragm Wall
Leakage
-20.00 m.
29
Water Leakage
Criteria
Materials
Equipment
Mixture
Manual driven pump
Injection packer
30
31
32
Project Layout
33
Project Layout
Diaphragm wall 1.20 x 40 m.
Diaphragm wall 0.80 x 25 m.
Barrette pile 1.20 x 65 m.
Barrette pile 0.80 x 40 m.
Barrette pile 0.80 x 45 m.
Stanchion
Soil cement column 0.60 x 10 m.
17,700 m2
1,540 m2
17 No.
1 No.
1 No.
17 No.
197 No.
34
Layout Plan
35
36
Old space
ITT Request
Space
Section Plan
38
39
40
41
+ 101.40
Stanchion
+ 96.00
+ 90.50
27.30 m.
+ 83.40
+ 74.10
3.325 m.
42
Stop End
Total 20 tons
43
Stop End
Total 20 tons
44
Stop End
45
46
Procedure
Water stop & Stop end installation
47
Chisel
48
Dummy Hole
49
50
Verticality Control
51
Diameter
Y-Y
Depth
52
Talalog
53
Talalog
54
55
56
57
Diaphragm Wall
+90.50
58
Diaphragm Wall
59
Diaphragm Wall
+83.40
60
Diaphragm Wall
+74.10
61
Diaphragm Wall
+74.10
62
Diaphragm Wall
+101.40
63
2035/55-56