F3
COVERPLAN / OSNOVA
F3
COVERPLAN / OSNOVA
C30/37
This drawing is the property of "Alpina s.p.a" company, it is protected by copyright and is not to be reproduced.
It is only to be used for the project and site specifically identified herein and is not to be used on any other project.
This drawing has been made from available information, however, all measurements are to be verified on project site by the contractor before
work begins, and differences found will be reconciled with a supervisor.
dim. 0.92x0.83m
MANHOLE WITH PRESSED GRATING
414
210
30
211
122
21 30
-0.23
269
236
30
13.5
150
C20/25
260 kg/m3
- Min thickness for cast in place element / Min debljina za elemente livene na licu mjesta:
- Electro-welded reinforcement mesh
CULVERT / PROPUST
- dim. 1.50x1.25m
20 cm
40
NOTE 1
PRIOR TO ANY WORK THE CONTRACTOR WILL HAVE TO DETECT OF ANY POSSIBLE INTERFERENCES WITH NOT
SURVEYED SERVICES DURING THE DESIGN AND HAVE AGREE WITH AUTHORITIES AND SITE SUPERVISOR ON
RESOLUTION WORKS. THEREFORE, THE POSITION OF EXISTING INTERFERENCE MUST BE CHECKED DURING INITIAL
EXCAVATION WORKS BY THE CONTRACTOR, AT ITS RESPONSIBILITY AND CHARGE.
IN ORDER TO CHECK EVENTUAL INTERFERENCES WITH OTHER SERVICES, THE CONTRACTOR MAY PROCEED WITH
HAND OR MECHANICAL DIGGING, ALONG THE PERIMETER OR INSIDE WORKS AREA. IF NEEDED, THE CONTRACTOR
MAY USE GEORADAR METHOD OR OTHER TECHNOLOGIES. ONLY AFTER THESE OPERATIONS, THE CONTRACTOR
MAY REALIZE MECHANIZED EXCAVATIONS.
LIGHTING POLE WILL BE REMOVED IF INTERFERERING DURING WORKS AND THEN REPLACED IN THE DEFINITIVE
POSITION.
/PRIJE PO ETKA RADOVA, IZVO A , JE DU AN DA DETEKTUJE SVA MOGU A PREKLAPANJA SA EVENTUALNIM
POSTOJE IM INSTALACIJAMA KOJE NISU TRETIRANE U PROCESU PROJEKTOVANJA, DA O TOME OBAVJESTI
PRETOSTAVLJENE I NADZORNI ORGAN, U CILJU NALA
AJ POSTOJECIH INSTALACIJA
I MOGU IH SMETNJI MORA SE PROVERITI PRILIKOM PO ETNOG ISKOPA OD STRANE IZVO A A, NA NJEGOVU
ODGOVORNOST I RA UN.
U CILJU DA PROVJERI PREKLAPANJA SA OSTALIM INSTALACIJAMA, IZVO A MO E DA NASTAVI SA RU NIM ILI
MEHANI KIM KOPANJEM, DU PERIFERIJE ILI UNUTAR OBLASTI RADOVA . AKO JE POTREBNO, IZVO A MO E DA
KORISTI METODU GEORADARA ILI DRUGE TEHNOLOGIJE. SAMO POSLE OVIH OPERACIJA, IZVO A MO E OSTVARITI
ISKOPAVANJA MEHANIZACIJOM.
ULI NA RASVJETA E BITI UKLONJENA AKO BUDE SMETALA TOKOM RADOVA I ONDA ZAMIJENJENA NA SVOJOJ
KONA NOJ POZICIJI.
NOTE 2
DETAILED DESIGN OF STORMWATER NETWORK HAS BEEN DEVELOPED ON THE BASE OF THE PRELIMINARY DESIGN
OF ROAD NETWORK, WHICH IS IN PROGRESS AND BASED ON HD-MASTERPLAN (P1-HD-SD00-PR-AL-000-01) DATED 1
OCTOBER 2014. /IDEJNI PROJEKAT MRE E PROPUSTA NAPRAVLJEN JE U SKALDU SA IDEJNIM PROJEKTOM
SAOBRA AJNICA, KOJI JE U FAZI IZRADE I BAZIRAN JE NA MASTER PLANU (P1-HD-SD00-PR-AL-000-01) IZ 1 OKTOBRA
2014.
NOTE 3
REFER TO DRAWINGS P1-AP-DR-SD00-GS-AL-004-01-T1 AND P1-AP-DR-SD00-GS-AL-004-02-T1 FOR THE TYPICAL
SECTIONS AND DETAILS OF CULVERTS AND CHAMBERS.
/POGLEDATI CRTE E P1-AP-DR-SD00-GS-AL-004-01-T1 I P1-AP-DR-SD00-GS-AL-004-02-T1 ZA KARAKTERISTI NE
NOTE 4
REFER TO DRAWINGS P1-AP-DR-SD00-BE-AL-004-01-T1
CONSTRUCTION SEQUENCES
AND
P1-AP-DR-SD00-BE-AL-004-02-T1
FOR
THE
S235J2
30 30
160
30 30
1515
10 cm
16 30
225
210
150
200 kg/m3
- Min thickness for cast in place element / Min debljina za elemente livene na licu mjesta:
30 25
27.5 30
-0.52 / -0.48
1316
1515
145
STOPLOG
/ ZAUSTAVNA
PREGRADA
F3
ZAUSTAVNE PREGRADE
(see note / pogledaj dodatak 3)
88
25
C40/50
29
165
REMOVABLE GRATING
FOR POSITIONING STOP LOG
23
215
25
C35/45
160
137
30
100
+0.22
30
150
9 30
30
80
30
C40/50
SUPPORT BEAM /
- STAINLESS STEEL / NER AJU I ELIK PROFILE HEA200
HDPE PIPES FOR NON-PRESSURE SYSTEMS
/HDPE CIJEVI ZA SISTEME KOJI NISU POD PRITISKOM
(EN 12666-1:2005 + A1:2011):
- SN8 KN/m2
S355J2
NOTE 5
CHECK ON SITE EVENTUAL INTERFERENCES OF EXCAVATION WITH EXISTING TREES/PROVJERITI NA LICU MJESTA
ZA MOGU E PROBLEME ISKOPA SA POSTOJE IM DRVE EM
Key Plan
SECTION / PRESJEKA-A
SECTION / PRESJEKB-B
C
B
G2
A
G1
BR.REV / Rev. No.
10
CULVERT / PROPUST
- dim. 1.50x1.25m
10 10
CULVERT
/ PROPUST- Dn800
30
100
POTPIS / Checked by
REMOVABLE GRATING
FOR POSITIONING STOP LOG
FEBRUARY 2016
DECEMBER 2015
DATUM / Revision Date
EXISTING CHANNEL
30
dim. 0.92x0.83m
10
CULVERT / PROPUST
- dim. 1.50x1.25m
CULVERT /
PROPUST- Dn800
ZAUSTAVNE PREGRADE
10 10
336
396
LEAN CONCRETE WITH MEDIUM RESISTANCE OF
30
/ Title
ALPINA S.p.A.
Via Ripamonti, 2
20136 - Milano - ITALY
220
98
-0.22
Chamber "F3"
Plans and sections
Propust za atmosferske vode faza 3
50
-0.81
429
489
/ Drawing Number
ALPINA S.p.A.
Via Ripamonti, 2
20136 - Milano - ITALY
/ Lead Consultant
30
30 13
30
30 13
-0.81
30
+ 0.27 MSL
-0.48
88
-0.48
157
-0.23
12 30
147
0.22
230
MODULAR PLAN
/ MODULARNA OSNOVA
+ 0.27 MSL
97
1020
40
20 40
2510
1.54
30
P1-AP-DR-SD00-DT-AL-034-01-G2
RAZMJERA / Scale
1:50
FEB 2016
A1
14
INVESTITOR:
AZMONT INVESTMENTS
Ul. Bra
Meljine, Herceg Novi
Montenegro
PODGORICA
ulaz 1, lamela 1, stan 2,
Paola Erba
ALPINA S.p.A.
Autor projekta:
Objekat:
Infrastruktura
Lokacija:
projektant:
Odgovorni
projektant:
GLAVNI PROJEKAT
Mr Nina Serdar
Broj priloga:
Saradnici:
KONSTRUKCIJA I HIDROTEHNIKA
dipl.ing
dipl.ing
Prilog:
Datum revizije :
Razmjera:
I sprat
Broj strane:
14