SOIL INVESTIGATIONS & TESTING FOR


THE PROPOSED ROAD 1 NORTH, KIDURONG INDUSTRIAL ESTATE (KINDA)
FOR BINTULU DEVELOPMENT AUTHORITY.

SUMMARY OF TENDER
BILL NO

DESCRIPTION

AMOUNT (RM)

GENERAL AND PRELIMINARIES

$4,500.00

BOREHOLES

$5,945.00

GROUND WATER MONITORING

FIELD TESTING

$1,160.00

SAMPLING

$1,110.00

LABORATORY TESTING

$2,285.00

LABORATORY TESTING (CONT'D)

$2,680.00

---

TOTAL

$17,680.00

Tender Sum In Words: Ringgit Malaysia : ..


.

Signature of Tenderer : ..

Date: ..

Name of Tenderer: ..

Address:
Company Stamp/Seal
..
Signature of Witness: ..
Name of Witness:

SOT/1/8

MEC Engineers

BILL NO 1 - GENERAL AND PRELIMINARIES


ITEM

DESCRIPTION

UNIT

QTY

1.1

Mobilisation to site and demobilisation on completion of all


equipment necessary for execution of the Site Operations
and installation of the Ancillary Works.

Lump
Sum

$1,500.00

$1,500.00

1.2

Allow for Contractor's All Risks Insurance, Workmens


Compensation Insurance, SOCSO, Performance Bond and
compliance with all Relevant Authorities

Lump
Sum

$1,500.00

$1,500.00

1.3

Provision of one (1) copy of draft report, seven (7) copies of


Final Report.

Lump
Sum

$500.00

$500.00

1.4

Provision of Photographs

Lump
Sum

$500.00

$500.00

1.5

Provide survey for setting-out and as-built coordinates and


levels for all sampling locations

Lump
Sum

$500.00

$500.00

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill1/2/8

RATE(RM)

AMOUNT(RM)

$4,500.00

MEC Engineers

BILL NO 2 - BOREHOLES
ITEM

DESCRIPTION

UNIT

QTY

RATE(RM)

AMOUNT(RM)

Movement: Rotary Wash Boring


Setting out of locations, setting-up, dismantling, moving
rotary drilling rigs and all necessary equipments and
personnel
2.10

Ditto- on land

no.

$2,000.00

$2,000.00

2.40

Boring in Soil
Carry out rotary wash boring whether cased or uncased
from existing ground level to not exceeding (n.e.) lOm

lin.m

30

$10.00

$300.00

2.50

Ditto - lOm to n.e 20m

lin.m

30

$10.00

$300.00

2.60

Ditto - 20m to n.e 30m

lin.m

30

$10.00

$300.00

2.70

Ditto - 3Oin to n.e 40m

lin.m

30

$10.00

$300.00

2.80

Ditto - exceeding 40m

lin.m

Rate Only

---

2.90

Carry out rotary core drilling whether cased or uncased


using triple tube core barrel with retractable shoe (Mazier)
depth from existing ground level to not exceeding (n. e)
1Om

lin.m

Rate Only

---

2.10

Ditto - lOm to n.e 20m

lin.m

Rate Only

---

2.11

Ditto - 20m to n.e 30m

lin.m

Rate Only

---

2.12

Ditto - exceeding 3Om

lin.m

Rate Only

---

lin.m

$95.00

$855.00

2.13

Drilling in Rocks
Carry out diamond rotary core drilling of 52mm diameter
rock core sample into any kind of rock including obtaining
rock core samples and storing in of cores in standard boxes
and delivery, from existing ground level to not exceeding
(n.e.) lOm

2.14

Ditto - lOm to n.e 20m

lin.m

$100.00

$900.00

2.15

Ditto-20m to n.e 3Om

lin.m

$110.00

$990.00

2.16

Ditto - 30m to n.e 40m

lin.m

Rate Only

---

2.17

Ditto - exceeding 40m

lin.m

Rate Only

---

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill2/3/8

$5,945.00

MEC Engineers

BILL NO 3 - GROUND WATER MONITORING


ITEM

3.1

DESCRIPTION

UNIT

QTY

Standpipe Piezometers
Supply and Install Standpipe Piezometers

no

Rate Only

---

Standpipe
Supply & Install Standpipes

no

Rate Only

---

no

Rate Only

---

Monitoring Water Levels


Monitor water levels in Standpipe Piezometers or Standpipe
every week over a period of 6 months and submission of
results weekly

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill3/4/8

RATE(RM)

AMOUNT(RM)

---

MEC Engineers

BILL NO 4 - FIELD TESTING


ITEM

4.10

DESCRIPTION
Standard Penetration Test
Carry out Standard Penetration Test including collection of
disturbed samples depth from existing ground to not
exceeding (ne) lOm

UNIT

QTY

RATE(RM)

no.

21

$10.00

$210.00

AMOUNT(RM)

4.20

Ditto - lOm to n.e 2Om

no.

21

$10.00

$210.00

4.30

Ditto - 20m to n.e 30m

no.

21

$10.00

$210.00

4.40

Ditto - 30m to n.e 40m

no.

21

$10.00

$210.00

4.50

Ditto - exceeding 40m

no.

Rate Only

---

4.60

Penetrating Field Vane Shear Test (Geonor Vane)


Cariy out penetration field vane test from existing ground to
not exceeding (ne) lOm

no.

Rate Only

---

4.70

Ditto - lOm to n.e 20m

no.

Rate Only

---

4.80

Ditto - exceeding 20m

no.

Rate Only

---

4.90

JKR or Mackintosh Probes


Carry out JKR or Mackintosh Probes to a depth not
exceeding 15m (locations will be decided on site)

no.

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill4/5/8

$40.00

$320.00

$1,160.00

MEC Engineers

BILL NO 5 - SAMPLING
ITEM

DESCRIPTION

UNIT

QTY

RATE(RM)

AMOUNT(RM)

Undisturbed Sampling with Piston Sampler


5.00

Obtain 75mm diameter undisturbed samples with piston


sampler for cohesive soils depth from existing ground to not
exceeding (n.e) 10m

no.

Rate Only

---

5.20

Ditto- 10m to n.e 20m

no.

Rate Only

---

5.30

Ditto- 20m to n.e 30m

no.

Rate Only

---

5.40

Ditto- 30m to n.e 40m

no.

Rate Only

---

no.

$10.00

$60.00

$10.00

$60.00

5.50

Undisturbed Sampling with Thin Walled Tube


Obtain 75mm diameter undisturbed samples with thin walled
sampler for cohesive soils at not exceeding 3m intervals,
depth from existing ground to not exceeding (n.e.) lOm

5.60

Ditto - lOm to n.e 20m

no.

5.70

Ditto - 20m to n.e 30m

no.

Rate Only

---

5.80

Ditto - Exceeding 30m

no.

Rate Only

---

5.90

Undisturbed Sampllng with Mazier


Obtain minimum 74mm dia. undisturbed Mazier samples
depth from existing ground level to not exceeding (ne) lOm

no.

5.10

Ditto - lOm to n.e 20m

no.

Rate Only

---

5.11

Ditto - exceeding 20m

no.

Rate Only

---

5.12

Ground Water Sampling


Obtain one (1) litre of representative ground water sample in
a water tight container from borehole

no.

no.

Rate Only

no.

$200.00

$600.00

lin.m

$10.00

$90.00

5.13

5.14

5.15

Obtain one (1) litre of representative surface water sample


in a water tight container from stream or ditch
Trial Pits
Excavate trial pit in soil depth including obtaining bulk
samples to depth not exceeding 2m below ground level to
carry out soil compaction and CBR tests
Hand Augering
Carry out hand auger including the provision of disturbed
samples (locations will be specified on site), depth from
ground level to not exceeding (n.e) 3.Om

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill5/6/8

$120.00

$240.00

$20.00

$60.00
---

$1,110.00

MEC Engineers

BILL NO 6 - LABORATORY TESTING


ITEM

DESCRIPTION

UNIT

QTY

RATE(RM)

AMOUNT(RM)

Classification Test: Carry out classification tests as


specified in B.S. 1377:1990, unless otherwise stated

6.10

Moisture Content

no.

10

$5.00

$50.00

6.20

Atterberg Limits: Liquid Limit,Plastic Limit & Plasticity Index

no.

20

$15.00

$300.00

6.30

Linear Shrinkage

no.

N/A

6.40

Bulk/Dry Density

no.

$5.00

$15.00

6.50

Specific Gravity

no.

$5.00

$20.00

6.60

Particle size distribution for coarse grained soils by sieve


analysis

no.

10

$20.00

$200.00

6.70

Particle size distribution for fine-grained soils by hydrometer


test

no.

10

$40.00

$400.00

6.80

Chemical Tests
Total Sulphate Content of soil or groundwater

no.

$50.00

$300.00

6.90

Sulphate Content of soil or ground water.

no.

$40.00

$120.00

6.10

Chloride Content of soil or ground water.

no.

$40.00

$120.00

6.11

PH Value of soil or ground water.

no.

$20.00

$60.00

6.12

Organic matter content

no.

10

$40.00

$400.00

6.13

One-Dimensional Consolidation Tests


One - Dimensional Consolidation Test.

no.

$100.00

$300.00

day

Rate Only

6.14

Extra over item 6.3. To allow 1 extra day for determining


secondary compression

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill6/7/8

$2,285.00

MEC Engineers

BILL NO 6 - LABORATORY TESTING (CONT'D)


ITEM

DESCRIPTION

UNIT

QTY

no.

6.15

Strength Tests on Undisturbed Soil Samples


Unconsolidated Undrained Triaxial Test (U.U) on 50mm dia.
specimens. (involving three specimens/set)

6.16

Unconfined Compression Test (untrimmed diameter)

no

Rate Only

6.17

Consolidated Undrained Triaxial Test (C.I.U) with pore


pressure measurement and volume change measurements
on set of 3 specimens of 50mm dia

set

6.18

Strength Tests on Rock Core Samples


Point Load Test

6.19

Uniaxial compressive strength test with deformation


modulus

AMOUNT(RM)

$60.00

$180.00

$750.00

$1,500.00

no.

$300.00

$600.00

no.

2.00

$200.00

$400.00

SUB-TOTAL CARRIED TO SUMMARY OF TENDER SUM =

Bill7/8/8

RATE(RM)

$2,680.00