OPS 571 Final Exam

The best online place for the students of University of Phoenix in the United
States for OPS 571 Final Exam is Transweb E Tutors. Here you can learn the
Course details of, OPS 571 operations management final exam, OPS 571 final
exam questions and their answer for free

OPS 571 Final Exam (Newest)


1. A major competitive dimension that forms a company's strategic
operational competitive position in their strategic planning is which of
the following?
Cost or price
Focus
Straddling
Automation
1 In setting up a kanban control system you need to determine the
number of kanban card sets needed. If the expected demand during
lead time is 25 per hour, the safety stock is 20 percent of the demand
during lead time, the container size is 5, and the lead time to replenish
an order is 5 hours, what the number of kanban card sets is needed?
27
20
5
30
1 Which of the following is a multifactor measure of productivity?
Output/(Labor + Capital + Energy)
Output/All resources used
Output/(Materials)
Output/Inputs
1 Which of the following is an alternative possible service encounter
included in the service-system design matrix?

Internet
Automated teller (ATM)
Face-to-face distance
Questionnaire response

1 In development of an operations and supply chain strategy, which of


the following may be an important product-specific criteria to consider?
Learning curve
Supplier after-sale support
Production lot size
Focus
1 Which of the following is one of Dr. Eli Goldratt's rules of production
scheduling for optimized production technology?
An hour lost at a bottleneck saves an hour for the entire system
Do not allow bottlenecks to govern the flow of the line
Utilization and activation of a resource are not the same
Balance the capacities, not the flows
1 You have just been assigned to oversee a series of projects. Functional
areas will loan you personnel for each project, and separate project
managers will be responsible for separate projects. These project
managers will report to you. Which project management structure is
being used?
Matrix project
Pure project
Functional project
Task force
1 Which of the following is a reason that firms must develop more new
products than ever?
Commitments to joint venture partners
Product life cycles are shorter
They are replacing old customers with new ones
To amortize heavy investments in development labs
1 We would expect to see which of the following in an MRP system's
inventory status file?

End items produced


Late/early delivery records
Labor efficiency
Scrap parts

1 The centroid method for plant location uses which of the following
data?
Inbound transportation costs
Volume of goods to be shipped between existing points
Transport times between facilities
Correlation matrix of existing facilities
1 The Pareto principle is best applied to which of the following inventory
systems?
EOQ
Fixed-time-period
Fixed-order quantity
ABC classification
1 A company can produce a small lot of products the first time at a cost
of $2,000. If their 85 percent learning curve allows them to reduce
their costs on each lot, what is the total cost of producing 5 lots?
$8,062.00
$4,031.00
$9,376.50
$10,000.00
1 You are a consultant called in to estimate the costs after the
employees learn how to do a job more efficiently by repetition of new
product. You find a company can produce a product the first time at a
cost of $5,000. If their 90 percent learning curve allows them to reduce
their costs on each unit, what is the total cost of producing 100 units of
the new product?
$290,700
$500,000
$390,000
$250,687

1 A material requirements planning system is an example of which of the


following scheduling systems?
Infinite loading, backward scheduling
Finite loading, backward scheduling
Infinite loading, forward scheduling
Finite loading, forward scheduling
1 Capacity planning that involves hiring, layoffs, some new tooling, minor
equipment purchases, and subcontracting is considered as which one
of the following planning horizons?
Long range
Current
Short range
Intermediate range
1 You want to determine the upper control line for a p-chart for quality
control purposes. You take several samples of a size of 100 items in
your production process. From the samples, you determine the fraction
defective is 0.05 and the standard deviation is 0.01. If the desired
confidence level is 99.7 percent, which of the following is the resulting
UCL value for the line?
0.39
0.06
0.08
0.05
1 The objectives of work center scheduling include which of the
following?
Providing variety to workforce
Following all the priority rules
Minimizing setup costs
Avoiding tradeoffs
1 For which of the following should we use an R-chart to monitor process
quality?
Deciding whether an airliner has sufficient fuel for its trip
Determining whether vehicles from a motor pool will run

Weighing trucks at a highway inspection station to determine if they


are overloaded
Student grades measured from 1 to 100

1 Which of the following is a major factor that distinguishes service


design
and
development
from
manufacturing
design
and
development?
The service package has the same legal protection available to
manufactured goods.
The service process and service product can be developed
independently.
Manufacturing is far more capital intensive than services.
The service package is the major output of the development
process.
1 Which of the following is a time-to-market performance measure used
in judging product development performance?
Customer loyalty
Product reliability
Yield
Frequency of new-product introductions
1 In business forecasting, what is usually considered a medium-term
time period?
One to six months
Three months to two years
Six weeks to one year
One to five years
1 There are many applications of poka-yokes in service organizations.
Which of the following is one of the three-T's used to classify pokayokes?
Task
Trust
Time
Teamwork

1 Assuming no safety stock, what is the reorder point (R) given an


average daily demand of 78 units and a lead time of 3 days?
421
234
26
78
1 Which of the following is a measure of operations and supply
management efficiency used by Wall Street?
Earnings per share growth
Current ratio
Dividend payout ratio
Receivable turnover
1 A

project starts out as which of the following?


Critical path method (CPM)
A latest-start-time estimate
A series of milestones
A statement of work

1 The ability to rapidly and inexpensively switch production from one


product to another enables what are sometimes referred to as:
Economies of shape
Economies of scope
Economies of size
Economies of scale
1 According to the theory of constraints, which of the following is a
financial measurement that can be used to measure the firm's ability
to make money?
Inventory
Sales
Net profit
Throughput
1 What is a work breakdown structure?
A depiction of the activities making up a project

A Gantt chart
A list of the activities making up the higher levels of the project
A definition of the hierarchy of project tasks, subtasks, and work
packages

1 If a firm produced a standard item with relatively stable demand, the


smoothing constant alpha (reaction rate to differences) used in an
exponential smoothing forecasting model would tend to be in which of
the following ranges?
5 to 10 percent
60 to 120 percent
20 to 80 percent

20 to 50 percent

1 What transportation mode has very high initial investment costs but
gives a very low cost per mile for products that are highly specialized
and require no packaging?
Water
Highway
Pipeline
Rai

Find Questions, Homework help and Assignments of different


courses by University of Phoenix available on Transweb E
Tutors:

MKT 578 Final Exam


QNT 561 Final Exam
QNT 561 Weekly Learning Assessments
QNT 565 Final Exam
STR 581 Capstone Final Examination, Part One
STR 581 Capstone Final Examination, Part Two

To find more visit:

http://www.transwebetutors.com/