DIAGRAMA- UTILIZARE RESURSE PERT GANTT - LINII CRITICE + ALOCARE

2015-C/I-727 Borcea Lucrari de interventie la pavilionul


PROIECTARE
A17 din
- 2015-C/I-727
cazarma 727Borcea
Borcea
Lucrari de interventie
ELAB. STUDIU
la pavilionul
TOPO + A17
GEOdin
/ CONCLUZIII
cazarma 727
TRASE
Borcea
CULEGERE
EMITERE
DATE PUNCT DE VEDERE EXPERT/DETALIERE CONSTRANGERI BENEFICIAR
Start: 30.09.16

ID: 1

Start: 30.09.16

ID: 2

Start: 30.09.16

ID: 3

Start: 30.09.16

ID: 4

Finish: 27.09.17

Dur: 259 days

Finish: 17.11.16

Dur: 35 days

Finish: 06.10.16

Dur: 5 days

Finish: 13.10.16

Dur: 10 days

Comp: 0%

Comp: 0%

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL

PREZENTARE CONCEPT PROIECT DDE DTAC DTOE


Start: 30.09.16

ID: 5

Finish: 27.10.16

Dur: 20 days

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL; PROIECTANT INSTALATII ELETRICE: SC WERT SRL; PROIECTANT INSTALATII STINGERE SI SEMNALIZARE INCENDII : SC VIKING FIRE SRL; PROIECTANT SISTEM ANTIEFRACTIE : SC QUCIKSERVICE SRL

PREZENTARE DOCUMENTATIE COMPLETA DTAC;DDE;DTOE


Start: 30.09.16

ID: 6

Finish: 03.11.16

Dur: 25 days

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL[125%]; PROIECTANT INSTALATII ELETRICE: SC WERT SRL[125%]; PROIECTANT INSTALATII STINGERE SI SEMNALIZARE INCENDII : SC VIKING FIRE SRL[125%]; PROIECTANT SISTEM ANTIEFRACTIE : SC QUCIKSERVICE SR..

PREZENTARE DOCUMENTATIE COMPLETA INCLUSIV REMEDIERI


Start: 30.09.16

ID: 7

Finish: 17.11.16

Dur: 35 days

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL; PROIECTANT INSTALATII ELETRICE: SC WERT SRL; PROIECTANT INSTALATII STINGERE SI SEMNALIZARE INCENDII : SC VIKING FIRE SRL; PROIECTANT SISTEM ANTIEFRACTIE : SC QUCIKSERVICE SRL

EXECUTIE 2015-C/I-727 Borcea Lucrari de interventie


OBIECT
la 1:
pavilionul
LUCRARI
A17
DEdin
CONSOLIDARE
cazarma 727 Borcea
PAVILION A17 0 CAZ 727 BORCEA

A - REZISTENTA INFRASTRUCTURA

B- REZISTENTA SUPRASTRUCTURA

Start: 18.11.16

ID: 8

Start: 18.11.16

ID: 9

Start: 18.11.16

ID: 10

Start: 18.11.16

ID: 11

Finish: 27.09.17

Dur: 224 days

Finish: 24.01.17

Dur: 48 days

Finish: 05.01.17

Dur: 35 days

Finish: 24.01.17

Dur: 48 days

Comp: 0%

Comp: 0%

Res:

BETONIST1; DULGHER1; FIERAR-BETONIST1; BETONIST2;


Res: DULGHER2;
BETONIST1[80%];
FIERAR-BETONIST2
BETONIST2[80%]; DULGHER1[80%]; DULGHER2[80%]; FIERAR-BETONIST1[80%]; FIERAR-BETONIST2[80%]

OBIECT 2: LUCRARI DE REABILITARE PAVILION A17 0 CAZ A


727
- AMENAJARI
BORCEA EXT - ALEE ACCES SI TROTUAR
Start: 23.11.16

ID: 12

Start: 23.11.16

ID: 13

Finish: 02.08.17

Dur: 180,63 days

Finish: 29.12.16

Dur: 26,25 days

Comp: 0%

Res:

BETONIST1; BETONIST2; DULGHER1; DULGHER2; FIERAR-BETONIST1; FIERAR-BETONIST2; NECALIFICAT1; NECALIFICAT2

B - LUCRARI DE ARHITECTURA

C - LUCRARI INSTALATII ELECTRICE

E - LUCRARI STINGERE INCENDIU GAZ INERT/ANTIEFRACT

Start: 25.01.17

ID: 14

Start: 27.01.17

ID: 15

Start: 10.04.17

ID: 17

Finish: 02.08.17

Dur: 135,63 days

Finish: 08.05.17

Dur: 72 days

Finish: 14.06.17

Dur: 48 days

Res:

D - LUCRARI INSTALATII SANITARE

F - LUCRARI DE INSTALATII TERMICE

Start: 16.02.17

ID: 16

Start: 30.03.17

ID: 18

Finish: 25.05.17

Dur: 71 days

Finish: 28.06.17

Dur: 65 days

Res:

INSTALATOR1[21%]; INSTALATOR2[21%]; INSTALATOR3[21%];


Res: INSTALATOR1;
NECALIFICAT[21%]
INSTALATOR2; INSTALATOR3; NECALIFICAT; NECALIFICAT1

G - LUCRARI DE INSTALATII HVAC


Start: 10.07.17

ID: 19

Finish: 14.07.17

Dur: 5 days

Res:

ELECTRICIAN1; INSTALATOR1

H - PROCURARE ECHIPAMENTE SI DOTARI


Start: 20.04.17

ID: 20

Finish: 24.04.17

Dur: 3 days

Res:

NECALIFICAT; ELECTRICIAN3; ELECTRICIAN TELECOM2; ELETRICIAN TELECOM1; INSTALATOR GAZE1

OBIECT 3: MODERNIZARE RACORD RETEA ENERGIE ELECTRICA


A- INSTALATII ELECTRICE EXTERIOARE
Start: 24.11.16

ID: 21

Start: 24.11.16

ID: 22

Finish: 30.11.16

Dur: 5 days

Finish: 30.11.16

Dur: 5 days

Comp: 0%

Res:

ELECTRICIAN1; ELECTRICIAN2; ELECTRICIAN3; ELECTRICIAN4

OBIECT 4: MODERNIZARE RACORD RETEA ALIMENTARE CU


A APA
- INSTALATIE DE ALIMENTARE CU APA
Start: 18.11.16

ID: 23

Start: 18.11.16

ID: 24

Finish: 24.11.16

Dur: 5 days

Finish: 24.11.16

Dur: 5 days

Comp: 0%

Res:

INSTALATOR1; INSTALATOR3; NECALIFICAT1

OBIECT 5: MODERNIZARE RACORD RETEA CANALIZARE

A - RETEA DE CANALIZARE PLUVIALA

B - RETEA DE CANALIZARE EXTERIOARA METEORICA

Start: 15.03.17

ID: 25

Start: 15.03.17

ID: 26

Start: 15.03.17

ID: 27

Finish: 16.05.17

Dur: 45 days

Finish: 16.05.17

Dur: 45 days

Finish: 04.04.17

Dur: 15 days

Comp: 0%

Res:

BETONIST1; DULGHER1; FIERAR-BETONIST1; INSTALATOR1;


Res: INSTALATOR1;
IZOLATOR2; INSTALATOR2;
INSTALATOR2INSTALATOR3

OBIECT 6: PLATFORMA BETONATA PENTRU GRUP ALECTROGEN


A- CONSTRUIRE PLATFORMA

B - GRUP ELECTROGEN

Start: 16.08.17

ID: 28

Start: 16.08.17

ID: 29

Start: 26.09.17

ID: 30

Finish: 27.09.17

Dur: 31 days

Finish: 25.09.17

Dur: 29 days

Finish: 27.09.17

Dur: 2 days

Comp: 0%

Res:

ELECTRICIAN1; ELECTRICIAN2; ELECTRICIAN3; ELECTRICIAN4;


Res: ELECTRICIAN1;
BETONIST1; DULGHER1;
ELECTRICIAN2
BETONIST2; DULGHER3

ASISTENTA TEHNICA DERULARE CONTRACT


Start: 30.09.16

ID: 31

Finish: 27.09.17

Dur: 259 days

Res:

PROIECTANT CONSTRUCTII SI INSTALATII : SC PRIMARY DESIGN SRL; PROIECTANT INSTALATII ELETRICE: SC WERT SRL; PROIECTANT INSTALATII STINGERE SI SEMNALIZARE INCENDII : SC VIKING FIRE SRL; PROIECTANT SISTEM ANTIEFRACTIE : SC QUCIKSERVICE SRL

Page 1

DULGHER3; FINISOR1; FINISOR2; FINISOR3; FINISOR4;


Res:
FINISOR5;
ELECTRICIAN2;
IZOLATOR1;
ELECTRICIAN3;
IZOLATOR2; ELECTRICIAN4;
LACATUS; RIGIPSAR1;
NECALIFICAT1;
Res:
TAMPLAR1;
INSTALATOR
ELECTRICIAN1
TAMPLAR2;
GAZE1;
ZUGRAV1;
INSTALATOR
ZUGRAV2;
GAZE2;
NECALIFICAT1;
NECALIFICAT3
NECALIFICAT2

Total ore resurse prognozate Conform PERT Gantt: 44.204,93 ore - Perioada Prognozata : 30.09.2016 - 27.09.2017 / 259 zile din care Perioada Proiectare : 30.09.2016 -17.11.2016 / 2880 ore ; Perioada Exec:
18.11.2016-27.10.2017 / 33.036,93 ore ; Asistenta Tehnica : 30.09.2016-27.09.2017 / 8288 ore.
Echipa Proiectare Constructii si Instalatii termice si sanitare : 7 persoane : arhitect/inginer constructii civile/inginer instalatii pentru constructii/topometrist/inginer geo/2 tehnicinei desenatori
Echipa Proiectare Instalatii electrice : 3 persoane : inginer instalatii electrice/2tehnicieni desenatori
Echipa Proiectare Instalatii Stingere si Alarmare Incendii : 2 Persoane : inginer instalatii /tehnician desenator
Echipa Proiectare Instalatii Antiefractie : 2 Persoane : inginer instalatii/ tehnician desenator
LUCRARI CONSOLIDARE REZISTENTA (18.11.2016-24.01.2016) :Echipa executie SC MARENT 99 SRL :
INFRASTRUCTURA : BETONIST/DULGHER/FIERAR BETONIST/BETONIST/DULGHER/FIERAR BETONIST/NECALIFICAT/NECALIFICAT;
SUPRASTRUCTURA : 80% INFRASTRUCTURA UTILIZARE RESURSE - INTERCONECTARE TIMPI LUCRU PERIOADA 18.11.2016-05.01.2016;
LUCRARI REABILITARE : Echipa executie SC MARENT 99 SRL : AMENAJARI EXTERIOARE ALEI ACCES SI TROTUAR (23.11.2016-29.12.2016); BETONIST/BETONIST/DULGHER/FIERAR BETONIST/FIERAR
BETONIST/NECALIFICAT/NECALIFICAT
ARHITECTURA:(25.01.2017-02.08.2017);DULGHER/FINISOR/FINISOR/FINISOR/IZOLATOR/IZOLATOR/LACATUS/RIGIPSAR/TAMPLAR/TAMPLAR/ZUGRAV/ZUGRAV/NECALIFICAT/NECALIFICAT
INSTALATII ELETRICE :(27.01.2017-08..05.2017) Echipa executie SC MARENT 99 SRL : ELECTRICIAN/NECALIFICAT ; Echipa executie SC WERT SRL : ELECTRICIAN/ELECTRICIAN/ELECTRICIAN/ELECTRICIAN
NECALIFICAT
INSTALATII SANITARE :(16.02.2017-25.05.2017) Echipa executie SC MARENT 99 SRL : 21% UTILIZARE COMUNA CU INSTALATII TERMICE : INSTALATOR/INSTALATOR/INSTALATOR/NECALIFICAT/
INSTALATII STINGERE INCENDII/ANTIEFRACTIE/SEMNALIZARE: 10.04.2017-14.06.2017 Echipa executie Quickservice :ELECTRICIAN TELECOM/ELECTRICIAN TELECOM/NECALIFICAT; Echipa lucru Viking Fire:
INSTALATOR GAZE/INSTALATOR GAZE/NECALIFICAT
INSTALATII TERMICE (30.03.2017-28.06.2017) Echipa executie SC MARENT 99 SRL : INSTALATOR/INSTALATOR/INSTALATOR/NECALIFICAT
INSTALATII HVAC :(10.07.2017-14.07.2017) Echipa executie SC MARENT 99 SRL :ELECTRICIAN/INSTALATOR/NECALIFICAT
MODERNIZARE RACORD RETEA ENERGIE ELECTRICA :(24.11-2016-30.11.2016) Echipa executie SC MARENT 99 SRL :ELECTRICIAN/NECALIFICAT SI Echipa executie SC WERT SRL :
ELECTRICIAN/ELECTRICIAN/ELECTRICIAN/ELECTRICIANNECALIFICAT
MODERNIZARE RETEA ALIMENTARE CU APA: (18.11.2016-24.11.2016) Echipa executie SC MARENT 99 SRL:INSTALATOR/INSTALATOR/NECALIFICAT
MODERNIZARE RETEA CANALIZARE :(15.03.2017-16.05.2017) Echipa executie SC MARENT 99 SRL:INSTALATOR/INSTALATOR/DULGHER/FIERAR-BETONIST/BETONIST/
PLATFORMA GRUP ELECTROGEN :(16.08.2017+27.09.2017) Echipa executie SC MARENT 99 SRL:DULGHER/BETONIST/BETONIST/DULGHER/ELECTRICIAN/NECALIFICAT SI Echipa executie SC WERT SRL :
ELECTRICIAN/ELECTRICIAN/ELECTRICIAN/ELECTRICIANNECALIFICAT
TOTAL FORTA DE MUNCA DISLOCATA : 36 MUNCITORI + UTILAJE CONFORM LISTA UTILAJE PREZENTATA IN CADRUL DOCUMENTELOR DE CALIFICARE

LEGENDA:

Project: Project1
Date: Tue 30.08.16

Critical

Critical Milestone

Critical Summary

Critical Inserted

Critical Marked

Critical External

Project Summary

Noncritical

Milestone

Summary

Inserted

Marked

External

Highlighted Critical

Highlighted Noncritical