Sunteți pe pagina 1din 257

REPUBLIC OF KENYA

COUNTY GOVERNMENT OF SIAYA

PROGRAMME BASED BUDGET


2016/2017

JUNE 2016

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


TABLE OF CONTENT

TABLE OF CONTENT ........................................................................................................ ii


FOREWORD ...................................................................................................................... vii

ACKNOWLEDGEMENT .................................................................................................... ix

BUDGET OUTLOOK .......................................................................................................... x


BUDGET ESTIMATES 2016/2017 ...................................................................................... x

REVENUES ......................................................................................................................... x
EXPENDITURES ................................................................................................................. x
RECURRENT EXPENDITURE- KSHS ............................................................................ x

DEVELOPMENT EXPENDITURE- KSHS ...................................................................... x


MAINTAINING A BALANCED BUDGET ........................................................................ xi
RISK TO FISCAL PLAN....................................................................................................... xi

TABLES OF ANALYSIS ................................................................................................... xii


Table 1: Summary of County Revenue and Funding Estimates for FY 2016/17 .................... xii

Table 2: Summary of Total Expenditure 2016/2017 ............................................................. xii

Table 3: Summary of Recurrent Expenditure 2016/2017..................................................... xiii

Table 4: Summary of Development Expenditure 2016/2017................................................ xiii


Table 5: Summary of Compensation of Employees, Other Recurrent Expenditure &
Development for 2016/17 ................................................................................................... xiii
VOTE 001........................................................................................................................... 1
COUNTY ASSEMBLY OF SIAYA ..................................................................................... 1

PART B. Mission .................................................................................................................. 1

PART C. Performance Overview and Background for Programmes Funding ........................ 1


PART D. Programme Objectives........................................................................................... 2

Part E. Summary of Programme Outputs and Performance Indicators for 2016/2017


2018/2019 ............................................................................................................................. 2

PART F: Summary of Expenditure by Programmes, 2016/2017 2018/2019 ........................ 4


PART G: Summary of Expenditure by Vote and Economic Classification, 2016/2017
2018/2019 ............................................................................................................................. 4
PART H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification 2016/2017 2018/2019................................................................................... 4

RECURRENT....................................................................................................................... 1
SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page ii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT ................................................................................................................. 4

VOTE 002........................................................................................................................... 1
VOTE TITLE: COUNTY EXECUTIVE ............................................................................... 1

Part C: Strategic Objectives ................................................................................................... 1


Part D: Context for Budget Intervention ................................................................................ 1

Part E: Summary of Programme Outputs, Performance Indicators and Targets for FY


2016/17- 2018/19 .................................................................................................................. 2

Part F: Summary of Expenditure by Programmes, 2015/16 -2017/18 (Kshs.) ........................ 6

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.) .................... 6


Part H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) ............................................................................................................ 6

RECURRENT....................................................................................................................... 8
DEVELOPMENT ............................................................................................................... 11

VOTE 003 .......................................................................................................................... 12


VOTE TITLE: FINANCE, PLANNING & VISION 2030 ................................................... 12
Part C: Strategic Objectives ................................................................................................. 12
Part D: Context for Budget Intervention ......................................................................... 12

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY
2016/17- 2017/18 ................................................................................................................ 13

Part F: Summary of Expenditure by programmes, 2016/17 -2017/18 (Kshs.) ....................... 15

Part G: Summary of Expenditure by Vote and Economic Classification (Kshs.) .................. 16


Part H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) .......................................................................................................... 16

RECURRENT..................................................................................................................... 17
DEVELOPMENT ............................................................................................................... 20

VOTE NO: 004 ................................................................................................................... 21

VOTE TITLE: DEPARTMENT OF AGRICULTURE, LIVESTOCK, & FISHERIES....... 21


Part A: Vision: .................................................................................................................... 21

Part B: Mission: .................................................................................................................. 21


Part C: Strategic Objectives ................................................................................................. 21
Part D: Budget intervention: ................................................................................................ 21
SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page iii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part E: Summary of the Programme Outputs and Performance Indicators and Targets for FY
2016/17 2018/19 .............................................................................................................. 22

Part F: Summary of Expenditure by Programmes, 2016/17 2018/19 ................................. 24

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.) .................. 24


Part H. Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) .......................................................................................................... 24

RECURRENT..................................................................................................................... 26
DEVELOPMENT ............................................................................................................... 28

VOTE NO: 005 ................................................................................................................... 40


VOTE TITLE: DEPARTMENT OF WATER, IRRIGATION, ENERGY & NATURAL
RESOURCES ..................................................................................................................... 40
Part C:

Strategic Objectives ........................................................................................... 40

Part D: Context for Budget Intervention .............................................................................. 40

Part E:
Summary of the Programme Outputs, Performance Indicators and Targets for FY
2016/17- 2018/19 ................................................................................................................ 41
Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs. Millions) ........ 43
Part G.

Summary of Expenditure by Vote and Economic Classification (Kshs. Million) 43

Part H. Summary of Expenditure by Programme, Sub-Programme and Economic


Classification (Kshs. Million).............................................................................................. 44

RECURRENT..................................................................................................................... 45
DEVELOPMENT ............................................................................................................... 46

VOTE NO: 006 .................................................................................................................. 73


VOTE TITLE: EDUCATION, YOUTH AFFAIRS, GENDER AND SOCIAL SERVICES 73
Part C: Strategic Objectives ................................................................................................. 73
Part D: Context for Budget Intervention .............................................................................. 73

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY
2015/16- 2017/18 ................................................................................................................ 79

Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs.) ...................... 82


Part G: Summary of Expenditure by Vote and Economic Classification (Kshs.) .................. 82
Part H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs. Million).............................................................................................. 82

RECURRENT..................................................................................................................... 84
DEVELOPMENT ............................................................................................................... 87
SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page iv

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


NO: 007 ............................................................................................................................ 126
VOTE TITLE: DEPARTMENT OF HEALTH SERVICES. ............................................. 126
PART C: Strategic Objectives ........................................................................................... 126
Part D: Context for Budget Intervention ............................................................................ 126

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY
2016/17- 2017/18 .............................................................................................................. 127

Part F: Summary of Expenditure By Programmes, 2016/17 -2018/19 (Kshs.) .................... 132


Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.) ................ 132
Part H : Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) ........................................................................................................ 133

RECURRENT................................................................................................................... 134
DEVELOPMENT ............................................................................................................. 138

VOTE NO: 008 ................................................................................................................. 159

VOTE TITLE: DEPARTMENT OF LANDS, PHYSICAL PLANNING AND HOUSING 159


Part C: Strategic Objectives ............................................................................................... 159
Part D. Context for Budget Intervention ............................................................................ 159

Part E: Summary of Programme Outputs, Performance Indicators and Targets for FY


2016/17- 2018/19 .............................................................................................................. 160
Table F. Summary of Expenditure by Programmes 2016/17-2018/19(Kshs) ...................... 161

Table G: Summary of Expenditure by Economic Classification 2016/17-2018/19 (Kshs) .. 162


Table H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification 2016/17-2018/19(Ksh.) ............................................................................... 162

RECURRENT................................................................................................................... 163
DEVELOPMENT ............................................................................................................. 164

VOTE NO: 009 ................................................................................................................. 166

VOTE TITLE: TRADE, INDUSTRY & COOPERATIVE DEVELOPMENT .................. 166


Part D: Context for Budget Intervention ............................................................................ 166

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY
2015/17- 2017/18 .............................................................................................................. 167
Part F. Summary of Expenditure by Programmes (Kshs.) .................................................. 169

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.) ................ 169

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page v

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part H. Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) ........................................................................................................ 169

RECURRENT................................................................................................................... 171
DEVELOPMENT ............................................................................................................. 173

VOTE NO: 010 ................................................................................................................. 181


VOTE TITLE: DEPARTMENT OF ICT, TOURISM, CULTURE AND WILDLIFE
CONSERVATION............................................................................................................ 181
Part C: Strategic Objectives ............................................................................................... 181
Part D: Context for Budget Intervention ............................................................................ 181

Part E:
Summary of the Programme Outputs, Performance Indicators and Targets for FY
2015/16- 2017/18 .............................................................................................................. 182

Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs.) .................... 184

Part G: Summary of Expenditure by Vote and Economic Classification (Kshs. Million).... 184
Part H; Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs. Million)............................................................................................ 184

RECURRENT................................................................................................................... 186
DEVELOPMENT ............................................................................................................. 188

VOTE NO: 011 ................................................................................................................. 189


VOTE TITLE: ROADS, PUBLIC WORKS AND TRANSPORT ..................................... 189
Part C: Strategic Objectives ............................................................................................... 189
Part D: Context for Budget Intervention ............................................................................ 189

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY
2016/17- 2018/19 .............................................................................................................. 190
Part F: Summary of Expenditure by Programmes 2016/17 -2018/19 (Kshs.) ..................... 191

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs) ................. 191
Part H: Summary of Expenditure by Programme, Sub-Programme and Economic
Classification (Kshs.) ........................................................................................................ 191

RECURRENT................................................................................................................... 193
DEVELOPMENT ............................................................................................................. 194

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page vi

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


FOREWORD
The FY 2016/2017 budget calendar started in the month of August 2015 with the issuance of

budget circular on August 30 2015 and preparation of the Annual Development Plan which

was submitted to the cabinet on 1st, September 2015 for approval and tabled in the County
Assembly.

Stakeholder Consultations were undertaken between the months of January and February this

year with the objective of bringing on board key issues, suggestions and priorities from
various interest groups. This together with the sector working group reports informed the
preparation of the County Fiscal Strategy Paper (CFSP) 2016/2017 which was adopted by the
County Executive Committee and submitted to the County Assembly as per section 129(2)(a)
of the Public Finance Management Act, 2012.

This is the third Programme Based Budget to be prepared by the county. Programme based

budgeting embedded in the Medium Term Expenditure Framework (MTEF) aims at


improving expenditure efficiency and effectiveness by linking funding to results and making

use of performance information to achieve that linkage. It is also designed to shift focus of
the budget from an input based financial programming to a result based budget in line with

the county priorities as articulated in the 2013-2017 County Integrated Development Plan and
the 2016 County Fiscal Strategy Paper. Translating the budget into programmes is useful in

providing stakeholders with a basis for tracking and interrogating budgetary allocations and
budget implementation by various county government sectors.

The FY 2016/2017 budget is enshrined in the countys broad and collective theme of
Transforming

county

economy

through

infrastructure

and

socio-economic

development as espoused in the County Fiscal Strategy Paper, 2016. To achieve this
collective agenda, the county will focus its priorities on four key pillars namely:

Improvement of governance and administration through investment in devolution structures


for effective service delivery; Social transformation through investment in healthcare

services, education, youth, culture and social services; Agricultural transformation for
improved food security through investment in irrigation, mechanization and agro inputs and
Transformation of county infrastructure and communication through Investment in road
network and ICT services.

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page vii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


The budget has been prepared in compliance with the Constitution of Kenya 2010, The
County Governments Act and the PFM Act 2012. Section 126(1) (c), of the Public Finance
Management Act, 2012, provides that while preparing the County Annual Development Plan
and by extension the Budget, the two must indicate programmes to be delivered, highlighting

for each programme; the strategic priorities to which the programme will contribute; the
services or goods to be provided; measurable indicators of performance where feasible and
the budget allocated to the programme.

In conclusion, it is important to note that the fiscal budget for the year 2016/17 has been

prepared by incorporating inputs from departments and various interest groups as required by
the constitution.

____________________________
CLEOPHAS OMBOGO
CEC MEMBER FOR FINACE, PLANNING & VISION 2030.

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page viii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


ACKNOWLEDGEMENT
I would like to express my sincere and profound gratitude to a number of persons who have
contributed significantly towards the preparation of this budget.

To begin with, I thank H.E. the Governor and the entire Cabinet for providing leadership and

resources for the preparation of this budget. It is through this that the process has been

smooth. Secondly, I thank my fellow Chief Officers for making available necessary
documentation required for compilation of the budget.

Through consultations and

cooperation, the 2016/2017 budget has incorporated various projects that will see the County
forge ahead towards realisation of the theme of the Fiscal Strategy Paper. Thirdly, I wish to

acknowledge the monumental role played by Directors and staff of the County Government.

In their various capacities, they provided critical information that has been pivotal in resource
allocation.

I wish also to thank Members of the County Assembly (MCAs) and the public for the role
they played during public hearings on budget proposals. This has contributed immensely to

project distribution at the Ward levels to ensure no part of the County is left behind in the
process of development. It is my humble belief that they will also remain hawk-eyed during
implementation of the same to ensure value for money.

Finally, I wish to thank the entire Secretariat comprising of the Head of Treasury, (Budget)

for steering the whole process; Economic Planning Office; Finance Office; and Office of the
County Transition Coordinator for working tirelessly to ensure timely collection and analysis
of information incidental to the preparation of this budget.

_________________________________

DAN OKOTH
CHIEF OFFICER-FINANCE, PLANNING AND VISION 2030

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page ix

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


BUDGET OUTLOOK
The 2016/17 budget is programme based and majorly borrows from the National Government
classification of functions. The County budget circular issued on 30 august 2015 outlined
guidelines to be observed in the preparation of this budget under the MTEF (Medium Term
Expenditure Framework)

The budget has been prepared in compliance with the Constitution of Kenya, 2010 and the
revised PFM Act 2015. The content has been informed by the 2016 County Fiscal
Strategy Paper (CFSP) and County Integrated Development Plan (CIDP) as approved by
the County Assembly.
In addition to the above the fiscal year 2016/17 budget has been prepared by incorporating
the input as proposed by citizens during the citizen fora held in January and February, 2016 at
ward levels. The principles of public finances laid down in Article 201 of the constitution
where openness and accountability including public participation in financial matter has been
adhered to.
BUDGET ESTIMATES 2016/2017
The financial projections for FY 2016/17 are expected to be as follows;

REVENUES
The total estimates for fiscal year 2016/17 amounts to Kshs 7,329,491,327 comprising Kshs.
270,000,000 local revenue, Kshs. 5,389,991,057 Equitable share from National Government,
Ksh.352,498,394 conditional grants and Kshs. 1,317,001,876 as brought forward from FY
2015-16. 90 % of the 2016-17 budget will be financed by National Government transfers and
10% from local sources and conditional grants.
EXPENDITURES

The expenditure on projected revenue is as follows:

RECURRENT EXPENDITURE- KSHS


Recurrent expenditure is estimated at Ksh 3,836,824,303 (52.35 per cent of the budget) out of

which compensation to employees is estimated at Ksh 2,003,678,677 and Operations and

Maintenance at Kshs1, 833,145,626. This translates to 27.34 per cent and 25.01 per cent
respectively of the total expenditure.

DEVELOPMENT EXPENDITURE- KSHS


The total development expenditure amounts to Ksh 3,492,667,024 for FY 2016/17. This
translates to 47.65 percent of the total budget.

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page x

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


MAINTAINING A BALANCED BUDGET

The 2016/2017 budget affirms the County Governments ability to balance its budget on an
ongoing basis. Modest CRA allocations, weakness in local revenue are offset by ongoing

expenditure management enabling the county government to provide additional funding for
health care, social programs, and economic development

In order to achieve social policy and economic development objectives, the County

government will initiate a number of tax policy measures in the budget 2016/2017 including
broadening its tax base and initiating revenue raising measures to enable the implementation
of the budget.

RISK TO FISCAL PLAN


Risks to the county governments fiscal plan include:

1) Assumptions underlying county revenue and nation treasury timely disbursements

2) Potential changes to national transfer allocations and impact on County revenue arising
from its tax policy and budget changes

3) The outcome of litigation, arbitration with citizens on matter of public participation as


required by the constitution and Public Finance Management act 2012

4) High County Public Wage Bill (36.34%) of the total budget and rising

5) Over reliance on the transfers from the National Government at 91.0%

6) The County Government incorporates four main level of prudence in its projections to
mitigate the risk to fiscal plan.

7) The County has adopted a conservative approach when projecting their expected revenues
and cash receipts

8) The Fiscal Plan includes a policy on accountability, transparency in delivery of public


goods and services by promoting public participation as enshrined in the Constitution

9) The County Government will continue to rationalize the County wages to reduce
redundancies and enhance employee productivity.

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

Page xi

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


TABLES OF ANALYSIS

Table 1: Summary of County Revenue and Funding Estimates for FY 2016/17


Revenue Items
Single Business Permit
Market Fee
Bus Park Fee
Parking Fees
Fish Cess Fee
Plan Approval fees-Lands
Plan Approval fees-Hosp
Plan Approval Fee-Works
Transfer Fees
Miscellaneous Fee
Plot Rates
Plot Rents
School Fees
Slaughter Fees
Ground/Stall Rent
Burial Fees
Sand Cess
Cilor
Sugar Cess
Boda Boda Fee
Health Department
Agriculture
Trade
Liquor License
Sub Total
C.R.A Equitable Share
Conditional grants
TOTAL

Table 2: Summary of Total Expenditure 2016/2017


Vote
001
002
003
004
005
006
007
008
009
010
011

County Assembly
County Executive
Finance, Economic
Planning And Vision
2030
Agriculture, Livestock
& Fisheries
Water, Environment &
Natural Resources
Education, Youth
Affairs, Sports, Culture
& Social Services
County Health Services
Lands, Housing,
Physical Planning &
Development
Trade Development &
Regulation
Tourism And ICT
Roads, Transport &
Public Works
Total

Gross
Estimates
2016/17
679,914,472
444,160,229

Appropriation
In Aid
2016/17
0
0

349,239,793

Total Estimates
40,500,000
54,000,000
16,200,000
6,750,000
8,775,000
2,025,000
675,000
675,000
1,350,000
4,374,000
21,802,500
7,965,000
337,500
1,210,275
7,073,730
41,580
1,620,000
51,165
6,075,000
4,725,000
61,425,000
11,475,000
749,250
10,125,000
270,000,000
5,389,991,057
352,498,394
6,012,489,451

679,914,472
444,160,229

11,426,324
9,852,958

Net
Estimates
2016/17
691,340,796
454,013,187

270,000,000

619,239,793

2,927,200

622,166,993

8.49

416,568,645

416,568,645

91,706,694

508,275,339

6.93

274,626,489

274,626,489

151,865,043

426,491,532

5.82

580,679,660

580,679,660

332,672,649

913,352,309

12.46

1,626,648,927

1,626,648,927

376,035,710

2,002,684,637

27.32

92,504,388

92,504,388

1,304,218

93,808,606

1.28

217,561,941

17,298,542

234,860,483

3.20

902,032,578

321,912,538

217,561,941

ESTIMATES
2016-17

158,552,329

158,552,329

5,742,489,451

270,000,000

6,012,489,451

902,032,578

BF 2015-16

1,317,001,876

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

158,552,329

1,223,945,116

7,329,491,327

% Of
Total
Gross
9.43
6.19

2.16

16.70

100.00

Page xii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Table 3: Summary of Recurrent Expenditure 2016/2017
Vote

Vote Title

001
002

County Assembly
County Executive
Finance, Economic Planning and
Vision 2030
Agriculture, Livestock & Fisheries
Water, Environment & Natural
Resources
Education, Youth Affairs, Culture,
Sports & Social Services
County Health Services
Lands, Housing, Physical Planning &
Development
Trade Development & Regulation
Tourism and ICT
Roads, Transport & Public Works
TOTAL

003
004
005
006
007
008
009
010
011

Gross Estimates
2016/17
599,914,472
406,007,037

Appropriation In
Aid 2016/17
0
0

Net Estimates
2016/17
599,914,472
406,007,037

% Of Total
Estimate
15.64
10.58

239,328,162

239,328,162

6.24

319,239,793
96,644,646

54,504,388

1,314,749,264

46,590,591
112,525,207
93,017,366
3,566,824,303

Vote Title

001
002

County Assembly
County Executive
Finance And
Economic Planning
Agriculture
Water, Environment
And Natural
Resources
Education, Youth
Affairs & Social
Development
County Health
Services
Lands, Housing,
Physical Planning &
Development
Trade Development
& Regulation
ICT, Tourism And
Wildlife
Roads, Transport
And Works
Total

003
004
005
006
007
008
009
010
0011

Gross
Estimates
2016/17
80,000,000
38153192

Appropriation
In Aid
2016/17
0
0

177,240,483

589,239,793

284,303,377

Table 4: Summary of Development Expenditure 2016/2017


Vote

270,000,000

15.36

96,644,646

2.52

284,303,377

7.41

1,314,749,264

34.27

0
0
0
270,000,000

46,590,591
112,525,207
93,017,366
3,836,824,303

1.21
2.93
2.42
100.00

54,504,388

1.42

80,000,000
38,153,192

11,426,324
9,852,958

Net
Estimates
2016/17
91,426,324
48,006,150

177,240,483

91,706,694

268,947,177

7.70

177,981,843

177,981,843

151,865,043

329,846,886

9.44

296,376,283

296,376,283

332,672,649

629,048,932

18.01

311,899,663

311,899,663

376,035,710

687,935,373

19.70

38,000,000

38,000,000

1,304,218

39,304,218

1.13

170,971,350

170,971,350

17,298,542

188,269,892

5.39

46,027,122

46,027,122

46,027,122

1.32

809,015,212

321,912,538

1,130,927,750

30,000,000

2,175,665,148

ESTIMATES
2016-17

BF 2015-16

30,000,000

809,015,212

2,175,665,148

2,927,200

1,317,001,876

32,927,200

3,492,667,024

Table 5: Summary of Compensation of Employees, Other Recurrent Expenditure & Development for 2016/17
Vote

1
2
3
4
5
6
7
8

9
10
11

Ministry / Department

County Assembly
County Executive
Finance, Economic Planning and
Vision 2030
Agriculture, Livestock & Fisheries
Water, Environment & Natural
Resources
Education, Youth Affairs, Sports &
Social Services
County Health Services
Lands, Housing, Physical Planning
& Development
Trade Development & Regulation
Tourism and ICT
Roads, Transport & Public Works
Services
Grand Total
% of Total
Total County Revenue

Compensation To
Employees
346,512,485
233,147,913

Other Recurrent

253,401,987
172,859,124

195,324,859

393,914,934

24,153,965

72,490,681

137,538,000

Development

91,426,324
48,006,150
32,927,200

101,790,162

268,947,177

141,907,304

142,396,073

629,048,932

19,647,188

34,857,200

39,304,218

859,886,468

454,862,796

15,725,030
12,046,954

30,865,561
100,478,253

2,003,678,677
27.34

1,833,145,626
25.01

17,788,511

75,228,855

SIAYA COUNTY PROGRAMME BASED BUDGET JUNE 2016

329,846,886

% Of
Total
Estimates
2.62
1.37

0.94

32.38

100.00

Totals

691,340,796
454,013,187
622,166,993

508,275,339
426,491,532
913,352,309

687,935,373

2,002,684,637

188,269,892
46,027,122

234,860,483
158,552,329

1,130,927,750

3,492,667,024
47.65

93,808,606

1,223,945,116

7,329,491,327
100.00
7,329,491,327

Page xiii

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE 001
COUNTY ASSEMBLY OF SIAYA

PART A. Vision
To be an inclusive, pragmatic and proactive County Assembly in the quest for good
governance
PART B. Mission
Promoting good governance through effective and efficient legislation, representation and
oversight role
PART C. Performance Overview and Background for Programmes Funding
The County Assembly Service Board has had a better year compared to FY 2015/16. Most of
the development programmes of the Board which were planned were implemented. Major
achievements during the period under review were;
1. Completed refurbishment and modernization of the County Assembly
2. The assembly has started construction of the Committee rooms and the suspended steel
water tank
3. Purchase of 20KVA generator
4. Construction of the reinforced concrete ramp- still in progress
5. Recruitment of additional 32 Assembly staff
6. Enacted 12 Acts
Constraints and challenges
During the period, there were challenges in budget implementation including;
a) Cash flow problems due to the ceiling and its resolution
b) Inadequate office facilities for the members and staff

Major Services/Outputs to be provided in MTEF period 2016/2017 2018/2019 and the


inputs required
The County Assembly is the arm of the County Government that makes legislation,
represents the people and provides oversight on public finances. The County Assemblys
function is to facilitate the members of the County Assembly to efficiently and effectively
fulfil these Constitutional functions in a representative system of government by holding and
ensuring that the autonomous status of the assembly in its corporate relationship with the
executive arm of the government is maintained. The major services/outputs to be provided in
the MTEF period of 2016/2017 2018/2019 and inputs required are:a)
b)
c)
d)
e)

Enactment of laws
Representation
Oversight over utilization of public resources
Capacity building
Expansion of the existing assembly facility

PROGRAMME BASED BUDGET JUNE 2016

Page 1

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


This Department proposes to utilize Kshs. 599,914,472 on recurrent expenditure and Kshs.
91,426,324 on development expenditure during the year 2016/17. The 2017/2018 recurrent
allocation is projected at Kshs. 659,905,919 and Kshs. 100,568,956 development
expenditure. In 2018/19, recurrent expenditure is projected at Kshs. 725,896,511 and
development at Kshs. 110,625,852.
PART D. Programme Objectives

Programme
P.1 Legislation and Representation
P.2 Legislative Oversight
P. 3 General Administration, Planning
and Support Services

Objective
To strengthen the capacity of Members of County Assembly to make laws and
enhance their representative capacity
To strengthen the capacity of making and oversight the county Budget for
optimal use of Public Resources and enhanced accountability in governance
To enhance professionalism, build human resource capacity and provide
effective services to the Legislature to enable it meet its Constitutional mandate

Part E. Summary of Programme Outputs and Performance Indicators for 2016/2017 2018/2019
Programme: P.1 Legislation and Representation
Outcome: Enhanced Democracy
Sub Programme: SP.1.1 Legislation and Representation
Deliver Unit
Key Output (KO)
Key Performance Indicators
(KPIs)
Clerks
Bills/Laws
Number of bills introduced in the
Department
County Assembly
Number of motions introduced
and concluded
Amendment of standing orders
Representation
Number of petitions considered
Number of Statements issued
Legal
Department

Drafted
Legislative
Instruments

Legal Advisory
services

Number of bills drafted


Number of vellum copies prepared
for assent or transmission to
Senate
Number of committee stage
amendments drafted
Provision of legal advice and
opinions to County Assembly

Programme: P.2 Legislative Oversight


Outcome: Good Governance.
Sub Programme: SP.2.1 Legislative Oversight
Deliver Unit
Key Output
Key Performance Indicators
(KO)
(KPIs)
Clerks
Oversight over
Committee reports on budget
Department
usage Public
preparation
resources
Committee reports on budget
implementation
PAC/PIC reports on audited
accounts of County Government
Enhanced
Committee investigatory reports
Governance in
Public Service
Committee reports on legislations
Number of statements and questions
issued
Reports on vetting of state officers
Organize study and inspection tours
for members of county assembly
Research
Improved process
Prepare briefs for committees
Department
of legislation

PROGRAMME BASED BUDGET JUNE 2016

Targets
2015/2016
20

Targets
2016/2017
15

Targets
2017/2018
20

Targets
2018/2019
30

100

120

100

120

30

15

10

20

50
20

60
15

70

85

20

30

20

15

20

30

35

30

40

Timely
advisory
issued

Timely
advisory
issued

Timely
advisory
issued

Timely
advisory
issued

Targets
2015/2016
5

Targets
2016/2017
35

Targets
2017/2018
35

Targets
2018/2019
35

2013/14

2014/15

2015/16

2016/17

30

30

30

30

20
50

30
60

20
70

35
85

4
20

5
20

29
20

5
20

Timely and
quality briefs

Timely and
quality

Timely and
quality

Timely
and

Page 2

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Budget
Department

Improved process
of scrutiny and
oversight of the
budget

Preparing briefs and reports on bills


for committees
Undertake of research surveys
Prepare briefs on budget for
committees

briefs

briefs

20

15

20

2
Timely and
quality briefs

2
Timely and
quality
briefs

2
Timely and
quality
briefs

2
Timely
and
quality
briefs
6

20

15

20

35

Preparation of reports on budget


matters for committees
Prepare reports on money bills

Programme: P.3 General Administration, Planning and Support Services


Outcome: Efficient and effective Service Delivery
Sub Programme: SP.3.1 General Administration, Planning and Support Services
Deliver Unit
Key Output
Key Performance Indicators
Targets
(KO)
(KPIs)
2015/2016
Joint Services
Enhanced Staff
Efficient and effective Service
60%
Performance
Delivery
Preparation of the Annual Report
1
Preparation of quarterly reports
4
Preparation of Strategic Plan
1 review of
strategic plan
Improved
Adequate office space, ICTs, and
60%
Working
other facilities
Environment
Office of the
Promotion of
Participate in CAF meetings and
25 forums
Speaker
Legislative
other national and international
Diplomacy
forums
Hosting of visiting delegations
All visiting
delegations
hosted

Clerks
Department
Legal
Department
Hansard
Department

Providing
effective service
for legislation
Promotion of
effective
legislative
services
Provision of
Litigation and
Compliance
Services
Efficient hansard
services

Targets
2017/2018
80%

Targets
2018/2019
85%

1
4
-

1
4
-

65%

70%

1
4
1 strategic
plan
75%

25 forums

25 forums

25 forums

All visiting
delegations
hosted

All visiting
delegations
hosted

Organize and participate in weekly


chamber meetings for the speaker

32 meetings

32 meetings

32
meetings

Participate in SOCCAT meetings


and other forums

22 meetings

22 meetings

22
meetings

22
meetings

Provision of litigation and


compliance advice and opinions to
County Assembly

Timely
advisory
issued

Timely
advisory
issued

Timely
advisory
issued

Timely
advisory
issued

Provision of hansard reports for all


House proceedings

Timely
provision of
all reports

Timely
provision of
all reports

Provision of verbatim reports for all


Committee proceedings

Timely
provision of
all reports

Timely
provision of
all reports

Enhanced
security in
Assembly
Successful
assembly
operations

Enhanced
security in
Assembly
Successful
assembly
operations
1000 flyers,
1000
brochures,
2
newsletters,
90 diaries

Timely
provision
of all
reports
Timely
provision
of all
reports
Enhanced
security in
Assembly
Successful
assembly
operations
1000 flyers,
1000
brochures,
2
newsletters,
90 diaries

Timely
provision
of all
reports
Timely
provision
of all
reports
Enhanced
security in
Assembly
Successful
assembly
operations
1000
flyers,
1000
brochures,
2
newsletter
s, 90
diaries
1

All
documents
availed

All
documents
availed

All
documents
availed

All
documents
availed

Credible security
within County
Assembly

Effective security for members,


staff and property

Public
Relations
Department

Promotion of
Legislative
Democracy

Timely production of Assembly


publications

Provisions of
information
services

Targets
2016/2017
70%

All
visiting
delegation
s hosted
32
meetings

Sergeant at
Arms
Department

Library

quality
briefs
35

Ensure smooth House and


Committee operations

Facilitate Assembly outreach


programs
Avail reference and information
documents

PROGRAMME BASED BUDGET JUNE 2016

Page 3

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

PART F: Summary of Expenditure by Programmes, 2016/2017 2018/2019


Programme

P. 1 Legislation and Representation


P. 2 Legislative Oversight
P. 3 General Administration,
Total Expenditure for Vote

Baseline
2015/2016
435,487,149
40,301,770
180,134,858
655,923,777

Estimates
2016/2017
418,418,760
55,255,200
217,666,836
691,340,796

Projected Estimates
2017/2018
460,260,636
60,780,720
239,433,520
760,474,876

2018/2019
506,286,700
66,858,792
263,376,872
836,522,363

PART G: Summary of Expenditure by Vote and Economic Classification, 2016/2017 2018/2019


Economic Classification

Baseline

Current Expenditure
Compensation to Employees
Use of Goods and Services
Current Transfers to Govt. Agencies
Capital Expenditure
Acquisition of Non-Financial Assets
Total Expenditure

73,894,726
73,894,726
655,923,777

2015/2016
582,029,051
310,039,846
271,989,205

Estimates

Projected Estimates

2016/2017
599,914,472
346,512,485
253,401,987

2017/2018
659,905,919
381,163,734
278,742,186

2018/2019
725,896,511
419,280,107
306,616,404

91,426,324
91,426,324
691,340,796

100,568,956
100,568,956
760,474,876

110,625,852
110,625,852
836,522,363

PART H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification 2016/2017 2018/2019
Economic Classification

P 1 Legislation and Representation


Current Expenditure
Compensation to Employees
Use of Goods and Services
Current Transfers to Govt. Agencies
Capital Expenditure
Acquisition of Non-Financial Assets
Total Expenditure of P1
P 2 Legislative Oversight
Current Expenditure
Compensation to Employees

Use of Goods and Services


Current Transfers to Govt. Agencies

Capital Expenditure
Acquisition of Non-Financial Assets
Total Expenditure of P2
P 3 General Administration, Planning and Support
Services
Current Expenditure
Compensation to Employees
Use of Goods and Services
Current Transfers to Govt. Agencies
Capital Expenditure
Acquisition of Non-Financial Assets
Total Expenditure of P3
Total Expenditure Of All Programs

Baseline

Estimates

349,912,185
227,457,908
122,454,277

326,992,436
251,233,823
75,758,613
91,426,324
91,426,324
418,418,760

359,691,680
276,357,205
83,334,474
100,568,956
100,568,956
460,260,636

395,660,848
303,992,926
91,667,922
110,625,852
110,625,852
506,286,700

55,255,200

60,780,720

66,858,792

2015/2016

73,894,726
73,894,726
423,806,911
40,301,770

40,301,770
40,301,770
191,815,096
82,581,938
109,233,158

191,815,096
655,923,777

PROGRAMME BASED BUDGET JUNE 2016

Projected Estimates
2017/2018
2018/2019

2016/2017

55,255,200

55,255,200

217,666,836
95,278,662
122,388,174
217,666,836
691,340,796

60,780,720

60,780,720

239,433,520
104,806,528
134,626,991
239,433,520
760,474,876

66,858,792

66,858,792

263,376,872
115,287,181
148,089,691
263,376,872
836,522,363

Page 4

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code
2110100
2110101
2110115
2110200
2110201
2110300
2110301
2110303
2110309
2110314
2110315
2110317
2110318
2110320
2110323
2110328
2110330
2110336
2110399
2110400
2110403
2120100
2120101
2120103
2210100
2210101
2210102
2210200
2210201
2210202
2210203
2210204
2210206
2210207
2210300
2210301
2210302
2210303
2210304
2210399
2210400
2210401

Items/ Vote
Basic Salaries - Permanent Employees and Members of the County Assembly
Basic Salaries - Civil Service
Basic Salaries -Assembly Service
Wages to Contractual Employees
Contractual Employees
Personal Allowances paid as part of salary
House Allowance
Acting Allowance
Special Duty Allowance
Transport Allowance
Extraneous Allowance
Domestic Servants Allowance
Non- Practicing Allowance
Leave Allowance
Late Duty Allowance
National Assembly Attendance Allowance
Clerical Trainers Allowance
Car Purchase Allowance
Personal Allowances paid - Other (Disability and Telephone)
Refund for Medical Expenses
Refund of Medical Expenses - Ex-Gratia
Employer Contribution to Social Benefit Schemes
Employer Contributions to National Social Security Fund
Employer Contribution to Staff Pensions Scheme
Utilities Supplies and Services
Electricity
Water and sewerage charges
Communication Supplies and Services
Telephone, Telex, Facsimile and Mobile Phone Services
Internet Connections
Courier and Postal Services
Leased Communication Lines
Licensing Fees For Communication
Purchase of bandwidth capacity
Domestic Travel and Subsistence and other Transportation Costs
Travel Costs (airlines, bus, railway, mileage allowances, etc.)
Accommodation - Domestic Travel
Daily Subsistence Allowance
Sundry Items (e.g. airport tax, taxis, etc.)
Domestic Travel and Subs. - Others
Foreign Travel, Subsistence and Other Transportation Costs
Travel Costs (airlines, bus, railway, etc.)

PROGRAMME BASED BUDGET JUNE 2016

Legislative &
Representation
94,908,804
94,908,804
31,590,000
31,590,000
122,921,728

Legislative
Oversight

9,936,000
24,484,128

Gen. Adm
51,249,516
51,249,516
30,833,068
18,804,408
412,660
7,488,000
1,080,000
528,000

84,361,600
4,140,000
1,813,291
1,451,520
361,771
66,000
60,000

6,000

2,400,000
120,000
2,000,000
2,000,000
11,196,078
1,049,760
10,146,318
1,400,000
900,000
500,000
5,934,400
1,104,000
2,350,000
74,000
566,400
1,240,000
600,000
11,141,204
919,000

15,532,450
3,645,000

45,871,600

10,681,450
1,206,000

45,871,600

9,800,204
422,000

1,700,000
300,000

Total
146,158,320
51,249,516
94,908,804
31,590,000
31,590,000
153,754,796
18,804,408
412,660
9,936,000
31,972,128
1,080,000
528,000
84,361,600
2,400,000
4,260,000
2,000,000
2,000,000
13,009,369
2,501,280
10,508,089
1,400,000
900,000
500,000
6,000,400
1,164,000
2,350,000
80,000
566,400
1,240,000
600,000
72,545,254
4,564,000
66,353,254
1,628,000
1,700,000
300,000

Page 1

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
2210403
2210500
2210502
2210503
2210504
2210600
2210602
2210603
2210604
2210700
2210701
2210703
2210704
2210708
2210710
2210711
2210800
2210801
2210802
2210899
2210900
2210901
2210902
2210904
2210910
2211000
2211002
2211006
2211009
2211011
2211013
2211016
2211029
2211031
2211100
2211101
2211102
2211200
2211201
2211202
2211300
2211305
2211306
2211308

Items/ Vote

Daily Subsistence Allowance


Printing, Advertising and Information Supplies and Services
Publishing and Printing Services
Subscriptions to Newspapers, Magazines and Periodicals
Advertising, Awareness and Publicity Campaigns
Rentals of Produced Assets
Payment of Rents and Rates - Residential
Rents and Rates - Non-Residential
Hire of Transport
Training Expenses (Including Capacity Building)
Travel Allowance
Production and Printing of Training Materials
Hire of Training Facilities
Trainer Allowance
Accommodation Allowance
Tuition Fees
Hospitality Supplies and Services
Cartering Services
Boards, Committees, Conferences and Seminars
Hospitality Supplies - other
Insurance Costs
Group Personal Insurance
Buildings Insurance
Motor Vehicle Insurance
Medical Insurance
Specialsed Materials and Supplies
Dressings and Other Non- Pharmaceutical Medical Items
Purchase of Workshop Tools
Education and Library Supplies- Books
Purchase/ Production of Photographic and Audio Visual Materials
Military and Security Supplies and Equipment
Purchase of Uniforms and Clothing - Staff
Purchase of Safety Gears
Specialised Materials - Other
Office and General Supplies and Services
General Office Supplies (papers, pencils, forms, small office equipment
Supplies and Accessories for Computers and Printers
Fuel Oil and Lubricants
Refined Fuels and Lubricants for Transport
Refined Fuels and Lubricants for Production
Other Operating Expenses
Contracted Guards and Cleaning Services
Membership Fees, Dues and Subscriptions to Professional and Trade Bodies
Legal Dues/fees, Arbitration and Compensation Payments

PROGRAMME BASED BUDGET JUNE 2016

Legislative &
Representation
1,400,000
10,116,175
2,710,000
105,175
7,301,000
720,000
720,000

Legislative
Oversight

Gen. Adm
-

1,402,500

702,500
550,000
150,000

6,270,800
1,100,000
5,020,800
150,000
6,500,000

7,690,700
4,616,300
3,074,400

6,500,000
1,864,000

800,000
60,000

1,595,000
15,000
1,580,000
500,000
500,000
20,082,000
1,280,000
5,816,000
10,976,000
2,010,000
6,574,000
5,458,000
1,116,000
20,488,770
3,128,970
1,000,000
2,000,000
14,359,800
1,640,000
100,000
607,000
313,000
350,000
270,000

4,000
1,000,000
546,150
524,550
21,600
-

290,400
290,400

7,060,600
7,060,600

10,100,000

6,800,000
6,000,000
800,000
7,682,800
5,240,000
242,800

3,300,000
1,200,000

Total
1,400,000
11,711,175
2,725,000
105,175
8,881,000
1,220,000
720,000
500,000
21,484,500
1,280,000
702,500
6,366,000
11,126,000
2,010,000
20,535,500
11,174,300
9,211,200
150,000
26,988,770
3,128,970
1,000,000
2,000,000
20,859,800
3,504,000
100,000
607,000
800,000
60,000
313,000
350,000
274,000
1,000,000
7,897,150
7,875,550
21,600
6,800,000
6,000,000
800,000
17,782,800
5,240,000
3,542,800
1,200,000

Page 2

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
2211310
2211313
2211318
2211322
2211399
2220100
2220101
2220200
2220201
2220202
2220205
2220206
2220210
2420400
2420499
2710100
2710102
2710103
3110700
3110701
3110900
3110901
3110902
3111001
3111001
3111002
3111003
3111004
3111009
3111099
3111100
3111106
3111111
3111112
3111113

Items/ Vote

Contracted Professional Services


Security Operations
Witness Expenses
Binding of Records
Other Operating Expenses
Routine Maintenance - Vehicles and Other Transport Equipment
Maintenance Expenses - Motor Vehicles
Routine Maintenance - Other Assets
Maintenance of Plant, Machinery and Equipment (including lifts)
Maintenance of Office Furniture and Equipment
Maintenance of Buildings and Stations -- Non-Residential
Maintenance of Civil Works
Maintenance of Computers, Printersand Other IT Equipments
Other Creditors
Other Creditors - Other (Budge
Gratuity - Members of County Assembly
Gratuity - Civil Servants
Gratuity - Members of Parliament
Purchase of Vehicles and Other Transport Equipment
Purchase of Motor Vehicles
Purchase of Household and Institutional Fittings and Appliances
Purchase of Household and Institutional Furniture and Fittings
Purchase of Household and Institutional Appliances
Purchase of Office and General Equipment
Purchase of Office Furniture and Fittings
Purchase of Computers, Printers and other IT Equipment
Purchase of Air conditioners, Fans and Heating Appliances
Purchase of Exchanges and other Communications equipment
Purchase of other Office Equipment
Purchase. of Office Furn. & Gen. - Other (Budget)
Purchase of Specialised Plant, Equipment and Machinery
Purchase of Fire fighting Vehicles and Equipment
Purchase of ICT networking and Communications Equipment
Purchase of Software
Purchase of Musical Instruments - Public Address System
Total

PROGRAMME BASED BUDGET JUNE 2016

Legislative &
Representation
5,400,000

Legislative
Oversight

Gen. Adm
1,950,000

150,000
50,000
-

1,000,000

250,000
3,000,000
3,000,000
5,600,000
700,000
200,000
2,400,000
1,000,000
1,300,000
-

17,653,038

17,653,038
-

8,200,000
8,200,000
3,640,000
3,600,000
40,000
7,559,400
2,060,000
4,769,400
400,000
100,000
80,000
150,000
3,490,000
200,000
680,000
2,610,000
217,666,836

1,000,000

630,000
630,000

2,910,000
560,000
2,190,000

160,000
150,000

150,000
326,992,436

55,255,200

Total
7,350,000
150,000
300,000
3,000,000
3,000,000
6,600,000
700,000
1,200,000
2,400,000
1,000,000
1,300,000
17,653,038
17,653,038
8,200,000
8,200,000
4,270,000
4,230,000
40,000
10,469,400
2,620,000
6,959,400
400,000
100,000
240,000
150,000
3,640,000
200,000
680,000
2,760,000
599,914,472

Page 3

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT
Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Assembly

Assembly

Assembly

Assembly

Assembly

Supervision Cost Of The Construction Of


The Assembly Building

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of The Assembly Building

Assembly

Assembly

Assembly

Assembly

Assembly

Nema Fees

Assembly

Assembly

Assembly

Assembly

Assembly

Nca Fees

Assembly

Assembly

Assembly

Assembly

Assembly

Supervision Cost Of The Construction Of


The Speakers Residence

700,000

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of The Speakers Residence

9,500,000

Assembly

Assembly

Assembly

Assembly

Assembly

Nema Fees

116,000

Assembly

Assembly

Assembly

Assembly

Assembly

Nca Fees

580,000

Assembly

Assembly

Assembly

Assembly

Assembly

Completion Of Committee Boardrooms

5,500,000

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of Walkway Pavement Shade

1,800,000

Assembly

Assembly

Assembly

Assembly

Assembly

Landscaping Of Assembly Compound

1,200,000

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of Sentry Box

1,000,000

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of Sewer Line

700,000

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Construction Of Committee Rooms And


Offices
Construction Of 100m3 Suspended Steel
Water Tank
Construction Of Assembly Complex -

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
2,000,000
52,104,000
800,000
4,000,000

Total
Estimates
2,000,000
52,104,000
800,000
4,000,000
700,000
9,500,000
116,000
580,000
5,500,000
1,800,000
1,200,000
1,000,000
700,000

5,157,372

5,157,372

1,621,680

1,621,680

Code
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299
3110299

Description
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther

Page 4

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Assembly

Proposed Project
Architectural And Structural Designs
Architectural, Structural Design For
Speaker's Residence
Refurbishment Of Assembly Block
Total

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
2,547,863

Estimates
2016/17

1,154
2,098,255
11,426,324

Total
Estimates
2,547,863

Code

Description

1,154
80,000,000

2,098,255
91,426,324

Page 5

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE 002
VOTE TITLE: COUNTY EXECUTIVE
Part A: Vision: A secure, just, cohesive, democratic, accountable, transparent and conducive
environment for a globally competitive and prosperous County

Part B: Mission: Ensuring effective and accountable leadership to promote a just,


democratic environment and establishing governance institutions to empower citizens for the
achievements of socio-economic and political development
Part C: Strategic Objectives

Programme
General administration and planning
Support services
Coordination of Devolved Services
County Public Service and
Administrative Services
County Governance
County Executive Administration
Human Capital Management

Strategic Objective
To provide transformative leadership, capacity and policy direction in
service delivery
To champion devolution at grass root level
To Retain skilled and motivated workforce
To provide leadership to the County Executive Committees and
administration based on the County policies and plans
To provide supervision of administration and delivery of services in
the County and all decentralized units and agencies in the County
To facilitate the development of coherent integrated human resource
planning and budgeting for personnel emolument in the County.

Part D: Context for Budget Intervention

During the period under review, the sector refurbished the Governors and other Executive
Offices, conducted trainings and capacity building of staffs, recruited Chief Executive
Committee members, Chief Officers and other staffs, undertook expansion of rural assesses
roads, Purchased utility vehicles for the executives and Installation of street lights in markets
and urban centers
Challenges that disrupted operations include: tight procurement procedures that hinder
absorption of development budget and limited expertise that hinders budget making process
and execution. Slow disbursement of funds from the National Treasury is being addressed by
intergovernmental institutions like Council of Governors.

There is an acute shortage of office space for staff in the Office of Governor, the Public
Service Board and the HR staff. The plan for construction of governors office is ongoing.
Service delivery to citizens has not reached the required standards due to slow pace of
transition to devolved system of governance; however this is being addressed by the various
intergovernmental forums.

The department aims at facilitating the process of development of policies, laws and requisite
regulations that will enhance good governance. It will also oversee the implementation of the
various development projects in the county. Public participation is key requirement of the
new constitution and thus this will be a major deliverable for the ministry.
PROGRAMME BASED BUDGET JUNE 2016

Page 1

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


This Department proposes to utilize Kshs. 406,007,037 on recurrent expenditure and Kshs.
48,006,150 on development expenditure during the year 2016/17. The 2017/2018 recurrent
allocation is projected at Kshs. 446,607,741 and Kshs. 52,806,765 development expenditure.
In 2018/19, recurrent expenditure is projected at Kshs. 491,268,515 and development at
Kshs. 58,087,442.
Part E: Summary of Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2018/19
Programme

Delivery Unit

Key Outputs

Key Performance
Indicators
Cp.1: General Administration, Planning And Support Services
Outcome: Improved Service Delivery
CS
Improved office
No of office equipment
CSP1.1: General
CO Governance
operations
purchased
Administration
Director
Enhanced
% reduction of
Administration
customer
customer complains
satisfaction
Efficiency in
% increase in
transport
satisfaction levels
management
Efficient
% reduction on
communication
conflicts
CO Governance
Timely response
No of vehicles
SP. 1.2
Transport
to transport
purchased
Administration and
Manager
needs
Support Services
Administrative
Reduced
Adherence to transport
officers
accident/traffic
policy
occurrence
Enhanced
Fleet management
service delivery
system
Reduced repair
Repair and
and maintenance
maintenance plan
costs
CP 2. : County Governance
Outcome: Efficient And Effective Service Delivery
County
Management and No. of Executive
CSP 2.1. County
Executive
coordination of
Committee meetings
Executive
Committee
the county
held
Services(Cabinet)
administration
Development
No. of policies
and
developed and
implementation
approved.
of county
policies
Improved
Performance contract
performance
agreement s signed
management of
Annual Performance
respective
contract
departments
implementation report
County
Coordination of
No. of meetings,
Secretary
County
forums and briefings
Government
organized
activities with
No. and frequency of
key stakeholders
disseminated CEC
Improved
decision
communication
of County
Executive
Committee
decisions
Efficient service
No. of trainings held in
delivery in the
the county
Public Service
CSP.2.2
Chief of Staff
Improved
No of meetings
coordination of
organized with key
Support, Advisory
Governors
stakeholders
and Liaison
activities with
Improved working
Services
key stakeholder
relations between the
(national
Governor and political
government,
leaders, electorate and
CoG, County
key stakeholders

PROGRAMME BASED BUDGET JUNE 2016

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

120

150

150

150

10

15

15

15

50

55

66

73

45

50

55

60

44

48

48

48

12

15

10

10

10

10

10

12

15

10

12

15

19

15

18

20

Page 2

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery Unit

Key Outputs
Assembly,
Development
partners).

Office of Legal
Advisor to the
Governor

Directorate of
Communication

Development of
Strategy and
Implementation
of Governors
agenda
Enhanced
operations in the
Office of the
Governor
Improved
Service Delivery
of The Office of
the Governor
Improved service
delivery
Legal Audit
Improved service
delivery
Implementation
of National and
County
Legislation
Increase public
awareness

Improved
corporate image
Enhanced
transformational
leadership
Enhanced
communication
Economic
Advisor

Enhanced
revenue base for
the County

Key Performance
Indicators
.
Increased awareness of
Governors agenda
through community
meetings, social media,
outreaches and
publications.
Improved staff
motivation through
trainings and seminars
Increased frequency in
communication
between the Governor
and stakeholders on
Government functions
Procurement and
installation of efficient
office management
system
No of briefs and
strategy documents to
the Governor

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

10

15

10

15

20

30

30

30

20

10

15

20

No of bills enacted

12

Level of legal
compliance
Reduction on
risks/losses
Reduction on the no.
of court cases against
the county government

10

20

30

50

Periodic press
conferences
No of road shows
undertaken
No of gazette
supplements on County
highlights
No of documentaries
produced
No of talk shows
broadcast
Reduction in
number of
complaints
Improved
understanding of the
county.
Frequency in media
appearance
Improved customer

20

30

20

30

satisfaction level

20

100

100

100

No of interactive
forums created for
stakeholders
No of analyzed reports
on County revenue
No of PP agreements

40

30

20

30

Baseline survey done


Briefs and
Analysis on
economic
developments,

Research on PPP report


Ease of doing business
No. of analysis reports
and briefs on economic
,financial and fiscal
policies

PROGRAMME BASED BUDGET JUNE 2016

Page 3

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery Unit

Key Outputs
financial and
fiscal policies
Strong and
beneficial
relationship
with bilateral
and multilateral
partners
Economic
Research reports

CSP 2.3 Disaster


Management

Chief Officer
Governance

Operationalized
disaster response
unit

Enhanced
relations
between the
National
Government and
County
Enhanced
cooperation
between
National and
County
Governments
Chief Officer
Enforcement of
CSP 2.5 County
Governance
revenue
Inspectorate and
collection
Enforcement
Provision of
Security
Enforcement of
Law and by laws
Governance
Strategy on
CSP 2.6 Integrity
implementation
of Chapter 6 of
the Constitution
CP 3. Coordination of Devolved Services
Outcome: Effective and efficient service delivery
Sub County
Enhanced
CSP 3.1: Sub
Administrators
supervision on
County
Ward
decentralized
Administration
Administrators
projects and
Village units
Enhanced
implementation
of policies and
plans
Increased
customer
satisfaction
Enhanced Civic
education
Compliance with
set targets
Increased citizen
participation on
policy
formulation and
implementation
Increased level
of participation
CSP 2.4
Intergovernmental
Relations

County
Secretary

Cp 4: Human Capital Management


Outcome: Retain Skilled And Motivated Workforce
CO Governance
Conducting
CSP4.1: Training
and Development
Director HR
training needs
analysis

Key Performance
Indicators

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

No of economic
forums organized

20

10

20

30

No. of bilateral and


multilateral agreements
entered
Number of people
trained on disaster
management
Fire management plan
Risk management
report
No of policies
developed/customized
No. of stakeholder
forums organized

100

200

300

500

10

12

No of joint
programmes carried
out annually

10

20

20

20

Revenue enhancement
plan prepared

No. of security guards


hired
Number of cases
prosecuted
Integrity Policy

139

140

140

140

10

20

20

20

Increased attendance in
meetings

90

90

90

90

Conduct customer
satisfaction survey

No of sessions
conducted
% of projects
completed
Improved corporate
image

30

60

60

60

60

60

40

50

20

10

No of participants

150

150

150

150

60

No of policies and
plans formulated
Training needs analysis
report

PROGRAMME BASED BUDGET JUNE 2016

Page 4

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery Unit

Key Outputs

CSP 4.2
Performance
management
CSP 4.3 Staff
welfare

CO Governance
Director, HR

Conducting staff
performance
appraisal
Benefits policy
document
developed

CSP 4.4 Employee


relations

CSP 4.5 Staff


Benefits and
Remuneration

CO Governance
Director, HR
Unions
representatives
CO Governance
Director, HR
Union
Representatives
CO Governance
Director, HR

Collective
Bargaining
Agreements
Recognition
agreements
Approved
Benefits policy

Payroll
management
Cp 5: County Public Service And Administrative Services
Public Service
HR Audit report
CSP5.1 Human
Board
Resource Audit
Public Service
Advisory reports
CSP 5.2 Advisory
Board
submitted to the
Role
Executive on
solutions to the
challenges faced
and
Guidelines/
instruments for
information
CSP 5.3
Staff Sourcing

Public Service
Board

CSP 5.4 Values


and Principles

Public Service
Board

CSP 5.4
Monitoring and
Evaluation

Public Service
Board

Enforcement of
legislations
Human Resource
Planning
Increased level
of awareness on
values and
principles as per
Article 10 and
232 of the
Constitution of
Kenya.
compliance to
the values and
principles
Efficient and
effective service
delivery
Implementation
of data
assessment
report

Key Performance
Indicators
No of staff appraised

Baseline
2015/16
100

Target
2016/17
150

Target
2017/18
150

Target
2018/19
150

Employee benefit
policy developed

Reduced employee
disputes

% level of reduction in
the staff turnover ratio

No. of reports
implemented
% increase in
compliance

100

100

100

100

No of offices
established/abolished
No of staff recruited

2
300

1
50

1
50

1
50

Report published in the


Kenya Gazette

No of advocacy
meetings held

No of data collection
tools developed

M & E report

% Increase in
productivity

PROGRAMME BASED BUDGET JUNE 2016

Page 5

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part F: Summary of Expenditure by Programmes, 2015/16 -2017/18 (Kshs.)
Programme

Programme 1:County Executive Administration


Total Expenditure for Program 1
Programme 2: Office of the Governor and Deputy
Governor
Total Expenditure for Program 2
Programme 3 : County Public Service Board
Total Expenditure for Program 3
Programme 4:Coordination of devolved units
Total Expenditure for Program 4
Programme 5:Human Capital Management
Total Expenditure for Program 5
Programme 6: Disaster Management (Fire fight)
Total Expenditure for Program 6
Total Expenditure For All Programs

Baseline
Estimates
2015/16
237,060,337
237,060,337

Projected Estimates

Estimates

95,606,368

2016/17
201,394,571
201,394,571

2017/18
221,534,028
221,534,028

2018/19
243,687,431
243,687,431

84,565,422
75,965,716
75,965,716
49,100,970
49,100,970
42,986,508
42,986,508
454,013,187

93,021,964
83,562,288
83,562,288
54,011,067
54,011,067
47,285,159
47,285,159
499,414,506

102,324,161
91,918,516
91,918,516
59,412,174
59,412,174
52,013,675
52,013,675
549,355,956

84,565,422

95,606,368
77,135,267
77,135,267
52,160,982
52,160,982
104,003,336
104,003,336
100,546,050
100,546,050
666,512,340

93,021,964

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.)


Expenditure Classification

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development
Total Expenditure of Vote

Baseline Estimates
2015/16
525,858,008
272,756,852
253,101,156
-

140,654,332
140,654,332
666,512,340

Estimates

102,324,161

2016/17
406,007,037
233,147,913
172,859,124

Projected Estimates
2017/18
2018/19
446,607,741
491,268,515
256,462,704
282,108,975
190,145,036
209,159,540

48,006,150
48,006,150
454,013,187

52,806,765
52,806,765
499,414,506

58,087,442
58,087,442
549,355,956

Part H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification

CP 1: County Executive Administration


Current Expenditure
Compensation to Employees
Use of goods and services

Current Transfers Govt. Agencies


Other Recurrent
Capital Expenditure

Acquisition of Non-Financial Assets


Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of Program 1
CP 2 Office of the Governor and Deputy
Governor
Current Expenditure
Compensation to Employees
Use of goods and services

Current Transfers Govt. Agencies

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets

Baseline
Estimates
2015/16

96,406,005
89,906,005
6,500,000
-

140,654,332

140,654,332

Estimates

2016/17

Projected Estimates
2017/18

2018/19

153,388,721

168,727,593

185,600,352

48,540,000

53,394,000

58,733,400

48,006,150

52,806,765

58,087,442

104,848,721

115,333,593

126,866,952

48,006,150

52,806,765

58,087,442

201,394,871

221,534,358

243,687,794

237,060,337
95,616,368
29,516,412
66,099,956
-

PROGRAMME BASED BUDGET JUNE 2016

27,512,068

84,565,022

30,263,275

93,021,524

102,323,677

57,052,954

62,758,249

69,034,074

33,289,602

Page 6

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Expenditure Classification
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of Program 2
CP3: County Public Service Board
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of Programme 3
CP4: Coordination of devolved services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of Programme 4
CP5: Human Capital Management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of Programme 5
CP6: Disaster Management
Current Expenditure
Compensation to Employees
Use of goods and services

Current Transfers Govt. Agencies

Baseline
Estimates
2015/16
-

95,616,368
77,125,267
41,013,267
36,112,000
-

Other Development
Total Expenditure of Programme 6
Total Expenditure for All Programs

2016/17

Projected Estimates
2017/18

2018/19

84,565,022

93,021,524

102,323,677

75,965,716
42,550,342
33,415,374

83,562,288
46,805,376
36,756,911

91,918,516
51,485,914
40,432,603

75,965,716

83,562,288

91,918,516

49,100,970
34,029,770
15,071,200

54,011,067
37,432,747
16,578,320

59,412,174
41,176,022
18,236,152

49,100,970

54,011,067

59,412,174

42,986,608
24,206,902
18,779,706

47,285,269
26,627,592
20,657,677

52,013,796
29,290,351
22,723,444

42,986,608

47,285,269

52,013,796

454,013,187

499,414,506

549,355,956

77,125,267
52,160,982
43,029,782
9,131,200
-

52,160,982
104,003,336
61,295,336
42,708,000
-

104,003,336
100,546,050
8,006,050
92,540,000

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Estimates

100,546,050
666,512,340

PROGRAMME BASED BUDGET JUNE 2016

Page 7

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Executive
Committee

Office of
the
Governor
& Deputy
Governor

Executive
Administrati
on

Public
Service
Board

Sub
County
Admin.

Communic
ation &
Public
Relations

Human
Resource
Manageme
nt

Public
Service
Board
Administr
ation

Code

Item

2110101

Basic Salaries - Civil Services

2110117

Basic Salaries - Gross Monthly Pay

2110301

House Allowance

2110311

Transfer Allowance

2110314

Transport Allowance

2110314

Commuter Allowance

2110318

Non Practising Allowance

2110320

Leave Allowance

2110327

Executive Allowance

2710105

Gratuity - Governor & Deputy Governor 31%

2110402

Refund of Medical Expenses - Inpatient

2110403

Refund of Medical Expenses - Ex-Gratia

2110404

Commutation Leave Allowances

2120101

Employer Contributions to NSSF

2120102

Employer Contribution to Local Govt. Security Fund

Employers Contribution to WCPS

2210101

Electricity

2210102

30,185,500

27,512,468

74,662,921

18,110,342

34,029,770

24,206,912

24,440,000

Total
233,147,913

50,000

200,000

40,000

576,000

100,000

60,000

1,026,000

Water and Sewerage Charges

100,000

150,000

70,000

432,000

200,000

30,000

982,000

2210201

Telephone, Telex, Facsimile & Mobile Phone Services

110,000

200,000

336,000

360,000

200,000

99,374

1,555,374

2210203
2210301

Courier & Postal Services


Travel Costs (Airline, Bus, Railway, Mileage Allowances,

150,000

200,000

150,000

125,000

300,000

50,000

975,000

PROGRAMME BASED BUDGET JUNE 2016

250,000

Page 8

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Executive
Committee

Office of
the
Governor
& Deputy
Governor
1,575,360

Executive
Administrati
on
500,000

Public
Service
Board
1,200,000

Sub
County
Admin.
750,000

Communic
ation &
Public
Relations
500,000

Human
Resource
Manageme
nt
750,000

Public
Service
Board
Administr
ation
500,000

Total
5,775,360

2,000,000

1,000,000

800,000

13,525,000

Code

Item

2210303

Daily Subsistence Allowance

6,000,000

1,500,000

1,200,000

1,025,000

2210304

Sundry Items (e.g. airport tax, taxis, etc...)

1,000,000

500,000

500,000

100,000

500,000

500,000

3,100,000

2210401

Travel Costs (airlines, bus, railway, etc.)

750,000

750,000

750,000

220,000

2,470,000

2210402

Accommodation

2,500,000

500,000

500,000

2,000,000

500,000

500,000

6,500,000

2210403

Daily Subsistence Allowance

8,674,594

750,000

750,000

2,000,000

750,000

750,000

14,424,594

2210404

Sundry Items (e.g. airport tax, taxis, etc...)

800,000

250,000

230,000

500,000

270,000

2,050,000

2210502

Publishing & Printing Services

500,000

600,000

1,340,000

250,000

1,810,000

4,500,000

2210503

Subscription to News Papers, Magazines & Periodicals

400,000

350,000

400,000

303,200

300,000

200,000

1,953,200

2210504

Advertisement, Awareness & Public Campaigns

2,000,000

700,000

700,000

500,000

250,000

700,000

8,850,000

2210505

Trade Shows and Exhibitions

500,000

500,000

30,000

50,000

70,000

1,150,000

2210603

Rents & Rates - Non-Residential

1,593,000

40,000

150,000

950,000

200,000

2,933,000

2210710

Accommodation Allowance

3,000,000

750,000

400,000

500,000

500,000

900,000

6,050,000

2210711

Tuition Fees Allowance

750,000

500,000

200,000

800,000

600,000

2,850,000

2210799

Training Expenses- Other

2210801

Catering Services (receptions), Accommodation, Gifts, Food

2210802

Boards, Committees, Conferences and Seminars

2210805

750,000

4,000,000

1,999,596

1,999,596

3,500,000

1,500,000

300,000

2,500,000

1,500,000

9,300,000

1,000,000

500,000

100,000

400,000

500,000

100,000

2,600,000

National Celebrations

600,000

400,000

400,000

50,000

2211009

Education & Library Supplies

250,000

100,000

200,000

2211016

Purchase of Uniforms and Clothing - Staff

500,000

300,000

100,000

2211101
2211102

General Office Supplies


Supplies & Accessories for Computers & Services

750,000

450,000

850,000

PROGRAMME BASED BUDGET JUNE 2016

360,000

1,450,000
300,000

850,000

50,000

200,000

1,150,000

750,000

500,000

3,660,000

Page 9

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Executive
Committee

Office of
the
Governor
& Deputy
Governor
500,000

Human
Resource
Manageme
nt
500,000

Public
Service
Board
Administr
ation
250,000

Executive
Administrati
on
500,000

Public
Service
Board
150,000

Sub
County
Admin.
400,000

Total
2,300,000

500,000

500,000

200,000

180,000

100,000

100,000

1,580,000

4,000,000

1,500,000

1,500,000

1,500,000

500,000

810,000

9,810,000

8,000,000

100,000

300,000

700,000

9,100,000

250,000

100,000

60,000

100,000

40,000

610,000

500,000

1,000,000

4,500,000

500,000

500,000

6,900,000

500,000

500,000

9,000,000

Code

Item

2211103

Sanitary and Cleansing Materials, Supplies and Services

2211201

Refined Fuel and Lubricants for Transport

2211305

Contracted Guards and Cleaning Services

2211306

Membership Fees, Dues & Subscriptions to Professional

2211308

Legal Dues, Arbitration & Compensation Payments

3,000,000

2211310

Contracted Professional Services

1,500,000

4,000,000

400,000

2220101

Maintenance Expenses - Motor Vehicles

4,000,000

1,500,000

500,000

2220201

Maintenance of Plant, Machinery & Equipment

2220202

Maintenance of Office Furniture & Equipment

200,000

300,000

50,000

150,000

2220205

250,000

250,000

300,000

300,000

2220210

Maintenance of Buildings and Stations - Non-Resident


Maintenance of Computers, Software, Networks and
Communications Equipment

300,000

100,000

200,000

3110701

Purchase of Motor Vehicles

3110902

Purchase of Household and Institutional Appliances

3111001

Purchase of Office Furniture and Fittings

3111002

60,000

2,000,000

Communic
ation &
Public
Relations

100,000
80,000

50,000

850,000

300,000

1,400,000

100,000

780,000
-

250,000

200,000

50,000

300,000

50,000

50,000

900,000

1,500,000

500,000

500,000

500,000

500,000

3,500,000

Purchase of Computers, Printers and other IT Equipment

500,000

500,000

400,000

600,000

1,000,000

600,000

3,600,000

3111003

Purchase of Air conditioners, Fans & Heating Appliances

100,000

200,000

50,000

200,000

100,000

650,000

3111004

Purchase of Exchange and Other Communications Equipment

100,000

300,000

60,000

460,000

3111005

Purchase of Photocopiers and other Office Equipment

240,000

1,740,000

Civic Education
Disaster management
Communication & Public Relations services

PROGRAMME BASED BUDGET JUNE 2016

1,000,000
-

500,000

Page 10

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Executive
Committee

Item
Special Programmes

Office of
the
Governor
& Deputy
Governor

Public
Service
Board

Sub
County
Admin.

Human
Resource
Manageme
nt

Public
Service
Board
Administr
ation

6,000,000

Public Participation

Total
5,000,000
6,000,000

Liaison Office Operations

3111110

Executive
Administrati
on

Communic
ation &
Public
Relations
5,000,000

1,300,000

1,200,000

2,500,000

Intergovernmental Relations Contributions

Devolution Conference

Purchase of Generators

Investment Conference

Total

DEVELOPMENT

Sub County

Ward

Executive
Executive

Executive
Executive

Executive

30,185,500

Sub
Location
Executive

84,565,422

106,252,921

35,066,342

Sector

Function

Proposed Project

Governance
Governance

Governance
Governance

Lake Basin Economic Development Block


Construction Of Perimeter Wall At County
Headquarters

Executive

Governance

Governance

Construction Of Prefabricated Unit At HeadQuarter

Ugenya

West Ugenya

Governance

Governance

Executive

Executive

Governance

Governance

Construction Of Ap House Luhano & Ratado Proposed Construction Of Administration Police


Line In West Ugenya
Detailed Design, Construction, Supervision Of
County Head-Quarter
Total

PROGRAMME BASED BUDGET JUNE 2016

49,100,970

B/F
2015/2016
4,228,958

16,950,000

Estimates
2016/17
10,000,000
2,090,103

Total
Estimates
10,000,000
6,319,061

40,899,374

Code
3110599

2,624,000

3110299

3,000,000

3110299

26,063,089

26,063,089

2211310

38,153,192

48,006,150

2,624,000
3,000,000

9,852,958

42,986,508

406,007,037

Description
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Contracted
Professional
Services

Page 11

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE 003
VOTE TITLE: FINANCE, PLANNING & VISION 2030
Part A: Vision: To be the leading sector in planning, research, public policy formulation,
coordination, supervision and efficiency in financial management.

Part B: Mission: To provide overall leadership and policy direction in research, planning,
resource mobilization, financial management and accountability for sustainable socioeconomic development.
Part C: Strategic Objectives

Programme
Financial Services

Economic Planning Services


General Administration and support services

Objectives
To raise fiscal resources efficiently and manage county
government assets and liabilities effectively.
To build capacity in policy, research and M&E so as to
improve the living standards of the people

To provide transformative leadership, capacity and policy direction


in service delivery

Part D: Context for Budget Intervention


In 2014/15 the total budget for the department was Kshs. 646,089,470 out of which Kshs.
25,000,000 was development, Kshs.376, 318,894 was compensation to employees and
Kshs.244, 770,576 was operations and maintenance expenditure. In 2015/16 the total budget
for the department was Kshs. 497, 440,178 out of which Kshs. 228,508,130 was
compensation to employees; Kshs. 243,932,048 was operations and maintenance and Kshs.
25,000,000 roll over development expenditure from 2014/15.
The Key items of expenditure for the department were: personnel emoluments; renovation of
offices; acquisition of accountable documents; capacity building of staff; mid-term review of
County Integrated Development plan (CIDP); preparation of budgets; financing the
enactment of finance bill 2015; purchase of motor vehicles their insurance and maintenance;
purchase of basic infrastructure to support automation of local revenue collection amongst
other policy documents.
Major achievements during the period are: successful preparation of the budgets, automation
of local revenue collection, preparation of economic and financial policy document; adoption
of IFMIS and Internet Banking; enactment of the County Finance Bill 2015 amongst others.

The department faced a number of challenges including; Inadequate financial resource


allocation, irregular funds release by the national government, limited technical staff,
incomplete county asset and liability management system, non-compliance by other
departments to prepare and submit to county treasury expenditure returns, under-collection of
local revenue and lack of proper coordination between the delivery units under the
department.

During the financial year 2016/2017 the sector expects to continue providing efficient
financial services so as to support service delivery by other departments. In this regard the
sector will prepare finance circular no.4 to address some of the finance management related
challenges , implement the CARPS recommendations to address staff shortage, enforce local
revenue collection mechanism to increase collections, prepare assets register to improve
security of County assets, improve market infrastructure to enhance revenue collection, hold
PROGRAMME BASED BUDGET JUNE 2016

Page 12

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


weekly departmental meetings to improve coordination of delivery units and designate and
improve car parks and parking bays to diversify local revenue streams.

To implement the above, the department will utilize Kshs 589,239,793 on recurrent
expenditure and Kshs. 32,927,200 on Capital expenditure during the year 2016/17. This
allocation is expected to increase to Kshs. 648,163,772 recurrent and Kshs. 36,219,920 for
development in the FY 2017/2018 and Kshs. 712,980,150 for recurrent and Kshs. 39,841,912
for development FY 2018/2019.

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2017/18
Programme

Delivery Unit

Key Outputs

SP1.1
Accounting
Services

Accounting
unit

Financial Reports

Key
Performance
Indicators
No of reports
prepared &
submitted

Target
(Baseline)
2015/16
1 annual
financial report.
4 quarterly
Financial
reports

12 monthly
expenditure
reports

52 weekly
management
FRs

1 annual
financial report.

1 annual
financial
report.

4 quarterly
Financial
reports

12 monthly
expenditure
reports

52 weekly
management
FRs

4 quarterly
Financial
reports

12 monthly
expenditure
reports

52 weekly
management
FRs

No of Books
maintained

4 books of
accounts
maintained
(cash books,
ledgers,
registers, vote
books)

4 books of
accounts
maintained
(cash book,
ledgers,
registers and
vote books)

4 books of
accounts
maintained
(cash book,
ledgers,
registers and
vote books)

Prudent cash
management

Annual cash flow


plan

Prepare and
submit 1 annual
cash flow plan

Prepare and
submit 1 annual
cash flow plan

Prepare and
submit 1
annual cash
flow plan

Percentage of
funds
requisitioned
County revenue
unit

Target
2017/18

Books of accounts
maintained

Percentage
compliance with
financial
regulation

SP1.2 Resource
mobilization

Target
2016/17

Funds mobilized

Amount of
revenue generated

100%
compliance
with financial
regulation

No of books
maintained

PROGRAMME BASED BUDGET JUNE 2016

100%
compliance

100% of funds
requisitioned

100% of funds
requisitioned

Generate Ksh
230M internal
revenue

Generate Ksh
200M internal
revenue

Generate Ksh
304M internal
revenue

Receive Ksh
27M
conditional
grant

Receive Ksh
340M
conditional
grant

Receive Ksh
370 M
conditional
grant

Receive Ksh
5.4 B external
revenue

Books of accounts
maintained

100%
compliance

3 books of
accounts
maintained
(revenue CB,

Receive Ksh
5.6B external
revenue

3 books of
accounts
maintained
(revenue CB,

100% of funds
requisitioned

Receive Ksh
5.8B external
revenue

3 books of
accounts
maintained
(revenue CB,

Page 13

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

SP1.3 Budget
formulation,
coordination
and
management

Delivery Unit

County budget
unit

Key Outputs

Key
Performance
Indicators

Target
(Baseline)
2015/16
rent & rates
ledgers and
registers)

Target
2016/17

Target
2017/18

rent & rates


ledgers and
registers)

rent & rates


ledgers and
registers)

Sector budget
proposals

1 sector budget
proposal
prepared

1 sector budget
proposal
prepared

1 sector
budget
proposal
prepared

CBROP

1 CBROP
prepared

1 CBROP
prepared

1 CBROP
prepared

CFSP

1 CFSP
prepared

1 CFSP
prepared

1 CFSP
prepared

CDMS

1 CDMS
prepared

1 CDMS
prepared

1 CDMS
prepared

Budget Execution
reports

No. of reports

4QBER
prepared

4 QBER
prepared

4 QBER
prepared

County budget

SP1.4 Audit
Services

Internal audit
unit

Value for money


audits

Number of audit
reports

40 VFM audits
report

40 VFM audits
report

40 VFM audits
report

P1.5 Supply
Chain
Management
Services

Supply Chain
Management

Consolidated Annual
Procurement Plan

No. of
consolidated
annual
procurement plan

1 APP

1 APP

1 APP

Reports of tenders
awarded

No. of reports

4 reports

4 reports

4 reports

Procurement Quality
controls

No. of complaints
from suppliers
and clients

Zero
Complaints

Zero
Complaints

Zero
Complaints

Quarterly
Reports

Quarterly
Reports

Quarterly
Reports

Audit reports on
procurement
Disposal of assets

No of Asset
Disposal reports

Annual
Disposal report
by December

Annual
Disposal report
by December

Annual
Disposal
report by
December

Prequalification of
suppliers

No. of list of
prequalified
suppliers

One list of
Prequalified
suppliers

One list of
Prequalified
suppliers

One list of
Prequalified
suppliers

policy formulation
and planning

No of policy
documents
developed and
approved

Develop 6
policy
documents (
ADP, CBROP,
CDMSP and
CFSP)

Develop 6
policy
documents
(CIDP, ADP,
CBROP,
CDMSP and
CFSP)

Develop 6
policy
documents (
ADP, CBROP,
CDMSP and
CFSP)

Information and
documentation
services

No of
CIDC/SCIDCs
equipped with Elibrary services

Equip 3 centers
per year

Equip 3 centers
per year

Equip 3
centers per
year

No of county

Disseminate 1

Name of Programme: County Economic Planning Services


Outcome: A county enjoying high standard of living
SP 2.1 Policy,
program
coordination
and formulation

Economic
planning

No of documents
acquired
SP 2.2 County

Economic

Data & information

PROGRAMME BASED BUDGET JUNE 2016

300 documents
acquired

300 documents
acquired

Disseminate 1

300
documents
acquired

Disseminate 1

Page 14

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery Unit

Key Outputs

statistics
services

planning

on key socioeconomic indicators

SP 2.3 County
M&E services

Economic
planning

Key
Performance
Indicators
statistical
abstracts
disseminated

Target
(Baseline)
2015/16
annual
statistical
abstract

Target
2016/17

Target
2017/18

annual
statistical
abstract

annual
statistical
abstract

Effective monitoring
of CIDP
implementation
process

No of M&E fora
held

Hold 4 M&E
for a per year

Hold 4 M&E
for a per year

Hold 4 M&E
for a per year

No of M&E
reports produced
and disseminated

Produce and
disseminate 1
monthly and
quarterly M&E
reports

Produce and
disseminate 1
monthly and
quarterly M&E
reports

Produce and
disseminate 1
monthly and
quarterly
M&E reports

County M&E
indicator hand book

No of hand books
produced and
disseminated

Produce and
disseminate 1
handbook per
year

Updating 1
handbook per
year

Updating 1
handbook per
year

Updating
county fact
sheet

Updating
county fact
sheet

Updating
county fact
sheet

Name of Programme: General administration


Outcome: Improved and efficient administrative and financial support services
SP 3.1

General
administrative
services

Office of Chief
Officer

Management
meetings

No. of minutes of
management
meeting held

52 meetings
annually

52 meetings
annually

52 meetings
annually

Staff
recruited/promoted

No. of staff
recruited/
promoted

6 annually

6 annually

6 annually

Officers trained

No. of officers
trained

6 Officers

6 Officers

6 Officers

Part F: Summary of Expenditure by programmes, 2016/17 -2017/18 (Kshs.)


Expenditure Classification

Programme 1: Financial services

SP 1. 1: Budget formulation,
coordination and management
SP 1. 2: Accounting services
SP 1. 3: Supply chain management
services
SP 1. 4: Resource mobilization
SP 1. 5: Audit and assurance services
Total Expenditure of Programme 1
Programme 2: Economic planning services
Economic planning services
Total Expenditure of Programme 2
Total Expenditure of Vote -------

Baseline Estimates
2015/16

Estimates
2016/17

Projected Estimates
2017/18
2018/19

48,663,956

78,181,813

85,999,994

94,599,994

388,201,212
5,994,640

473,094,623
5,494,908

520,404,085
6,044,399

572,444,494
6,648,839

18,235,000
5,280,000
466,374,808

27,686,900
3,816,000
588,274,244

30,455,590
4,197,600
647,101,668

33,501,149
4,617,360
711,811,835

31,065,370
31,065,370
497,440,178

33,892,749
33,892,749
622,166,993

37,282,024
37,282,024
684,383,692

41,010,226
41,010,226
752,822,062

PROGRAMME BASED BUDGET JUNE 2016

Page 15

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part G: Summary of Expenditure by Vote and Economic Classification (Kshs.)
Expenditure Classification

Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Total Recurrent Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government
Agencies
Other Development
Total capital Expenditure
Total Expenditure of Vote

Baseline Estimates
2015/16
227,968,130
244,472,048
472,440,178
25,000,000
25,000,000
497,440,178

Estimates

2016/17

195,324,859
393,914,934
589,239,793
32,927,200

32,927,200
622,166,993

Projected Estimates
2017/18
2018/19

214,857,345
433,306,427
648,163,772
36,219,920
-

236,343,079
476,637,070
712,980,150
39,841,912
-

36,219,920
684,383,692

39,841,912
752,822,062

Part H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification

Programme 1: Financial services


Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 1
Programme 2: Economic planning
services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 2
Total Expenditure of Vote -------

Baseline Estimates
2015/16

Estimates

2016/17

Projected Estimates
2017/18
2018/19

472,440,178
227,968,130
244,472,048
25,000,000
25,000,000
497,440,178

555,347,044
195,324,859
360,022,185

610,881,748
214,857,345
396,024,404

671,969,923
236,343,079
435,626,844

32,927,200
32,927,200

36,219,920
36,219,920

39,841,912
39,841,912

588,274,244

647,101,668

711,811,835

31,065,370
31,065,370
31,065,370
528,505,548

33,892,749

37,282,024

41,010,226

33,892,749

37,282,024

41,010,226

33,892,749
622,166,993

37,282,024
684,383,692

41,010,226
752,822,062

PROGRAMME BASED BUDGET JUNE 2016

Page 16

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Item

Administrat
ion

2110101

Basic Salaries - Civil Services

119,463,012

119,463,012

2110301

house allownce

48,174,192

48,174,192

2110314

commuter allowance

11,162,880

11,162,880

Pension

15,263,335

15,263,335

NSSF

1,261,440

1,261,440

2210101

Electricity

383,056

2210102

Water and Sewerage Charges

2210201

Code

Accounting
Services

Fiscal
Planning

Budget

Procurem
ent

Internal
Audit

Revenue

Total

272,870

47,500

703,426

215,205

134,173

349,378

Telephone, Telex, Facsimile & Mobile Phone Services

725,000

296,522

142,500

285,000

1,449,022

2210203

Courier & Postal Services

95,000

166,277

95,000

356,277

2210301

Travel Costs (Airline, Bus, Railway, Mileage Allowances, etc.)

8,644,982

439,783

1,425,000

503,500

1,002,250

95,000

12,110,515

2210303

Daily Subsistence Allowance

10,958,229

1,077,174

3,800,000

607,500

659,750

8,622,200

25,724,853

2210502

Publishing & Printing Services

690,000

146,908

3,800,000

213,408

2,850,000

7,700,316

2210503

320,623

216,695

190,000

47,500

34,200

1,383,836

2210504

Subscription to News Papers, Magazines & Periodicals


Advertisement, Awareness & Public Campaigns (Including 12M for
Public Participation Process)

1,425,000

21,250,000

380,000

23,055,000

2210604

Hire of Transport, Equipment

164,906

175,000

567,500

907,406

2210710

Accommodation Allowance

5,023,097

505,227

2,850,000

703,000

522,500

9,603,824

2210711

3,000,000

2,490,000

367,205

570,000

494,000

6,921,205

2210801

Tuition Fees Allowance


Catering Services (receptions), Accommodation, Gifts, Food &
Drinks

4,500,000

2,885,611

3,294,554

2,451,599

456,000

313,500

528,000

14,429,264

2210802

Boards, Committees, Conference and Seminars

1,372,933

645,549

1,350,000

3,368,482

2210901

Group Personal Insurance

24,000,000

24,000,000

2210910

Medical Insurance

6,000,000

6,000,000

PROGRAMME BASED BUDGET JUNE 2016

574,818

Page 17

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Item

Administrat
ion

Accounting
Services

Fiscal
Planning

Budget

Procurem
ent

Internal
Audit

Revenue

Total

2210904

Motor Vehicle Insurance

15,000,000

15,000,000

2210999

Insurance Costs - Other (Budget)

5,000,000

5,000,000

2211009

Education & Library Supplies

207,812

441,673

190,000

839,485

2211016

Purchase of Uniforms and Clothing - Staff

950,000

475,000

1,425,000

2211101

General Office Supplies (papers, pencils, small office equipment etc.)

1,040,000

610,930

285,714

532,000

209,000

760,000

3,437,644

2211102

Supplies & Accessories for Computers & Services

378,450

439,249

285,000

95,000

1,197,699

2211103

Sanitary and Cleansing Materials, Supplies and Services

480,550

368,407

285,000

57,000

2,140,957

2211201

Refined Fuel and Lubricants for Transport

2,375,000

768,415

285,000

95,000

1,900,000

5,423,415

2211301

Bank Services Commission and Charges

427,500

427,500

2211305

1,900,000

95,000

1,995,000

2211306

Contracted Guards and Cleaning Services


Membership Fees, Dues & Subscriptions to Professional & Trade
Bodies

522,500

57,000

57,000

28,500

47,500

712,500

2211310

Contracted Professional Services

3,213,367

950,000

28,500

4,191,867

2211399

Other Operating Expenses - Other (Budget)

7,425,000

3,390,000

209,000

10,000,000

21,024,000

2220101

Maintenance Expenses - Motor Vehicles

1,425,000

506,109

285,000

85,500

475,000

2,776,609

2220201

Maintenance of Plant, Machinery & Equipment (including lifts)

2220202

Maintenance of Office Furniture & Equipment

416,812

115,919

95,000

95,000

95,000

817,731

2220205

2,300,000

294,500

1,000,000

3,594,500

2220210

Maintenance of Buildings and Stations - Non-Resident


Maintenance of Computers, Software, Networks and Communications
Equipment

522,500

95,000

142,500

95,000

855,000

2420499

Other Creditors - Other (Former Employees)

10,000,000

23,750,000

33,750,000

2640402

Donations- Funeral Expenses

4,000,000

950,000

4,950,000

2810205

Emergency Fund

10,000,000

10,000,000

3110704

Purchase of Bicycles and Motorcycles

PROGRAMME BASED BUDGET JUNE 2016

950,000

Page 18

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Item

Administrat
ion

Accounting
Services

Fiscal
Planning

Budget

Procurem
ent

Internal
Audit

Revenue

Total

3110902

Purchase of Household and Institutional Appliances

380,000

95,000

475,000

3111001

Purchase of Office Furniture and Fittings

475,000

451,047

285,000

95,000

209,000

950,000

2,465,047

3111002

Purchase of Computers, Printers and other IT Equipment

640,000

653,424

95,000

285,000

475,000

2,148,424

3111003

Purchase of Air conditioners, Fans & Heating Appliances

475,000

95,000

47,500

617,500

3111004

Purchase of Exchanges and other Communications Equipment

416,812

47,500

464,312

3111005

Purchase of Photocopiers and other Office Equipment

452,699

466,450

190,000

1,109,149

3111006

Purchase of Safes & Cash Boxes

475,000

370,000

845,000

3111009

Purchase of other Office Equipment

950,000

95,000

95,000

190,000

1,330,000

3111401

Pre-feasibility, Feasibility and Appraisal Studies - Including M& E

17,017,215

22,017,215

3110701

5,000,000

Statistical Abstract

4,196,474

4,196,474

Purchase of Motor Vehicle

8,000,000

8,000,000

Kenya Devolution Support Program (KDSP)

28,555,102

Other creditors (legal fees)

53,570,000

53,570,000

Civic Education

5,500,000

5,500,000

Devolution conference
TOTAL

PROGRAMME BASED BUDGET JUNE 2016

28,555,102

5,000,000
321,357,835

118,809,588

5,000,000
33,892,749

78,181,813

5,494,908

3,816,000

27,686,900

589,239,793

Page 19

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT

Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Executive

Executive

Executive

Finance

Finance

Construction And Marking Of


Parking Bays In Siaya Township

Executive

Executive

Executive

Finance

Finance

Construction Of Bondo Bus Park

10,000,000

Executive

Executive

Executive

Finance

Finance

Construction Of Siaya Bus Park

10,000,000

Executive

Executive

Finance

Finance

Digitization Of Revenue Collection

2,927,200

Total

2,927,200

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
10,000,000

30,000,000

Total
Estimates
10,000,000
10,000,000
10,000,000

Code
3110504
3110504
3110504

Description
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works

2,927,200
32,927,200

Page 20

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 004
VOTE TITLE: DEPARTMENT OF AGRICULTURE, LIVESTOCK, & FISHERIES

Part A: Vision: To attain food security

Part B: Mission: To improve livelihoods of Siaya residents through promotion of


competitive agriculture, sustainable livestock and fisheries sub-sectors

Part C: Strategic Objectives

PROGRAMMES (CP)
CP.1 General Administration, planning and
support services
CP.2:
Livestock
Management
&
Development.
CP 3.Crop and land Management and
Development.
CP.4
Fisheries
Management
and
Development
CP.5 Veterinary Services

STRATEGIC OBJECTIVES
To provide transformative leadership, capacity and policy
direction in service delivery
To improve livestock production and productivity.
To improve crop production and productivity.
To Improve fish productivity in capture and culture fisheries.
To provide quality and efficient animal health services.

Part D: Budget intervention:


Expenditure emphasis has primarily been on increasing crop productivity, improving
irrigation infrastructure, enhancing livestock and fisheries production and management and
maintaining high standards of animal health within the county.

Major achievements during the period are: purchased 22 tractors, 22 disc ploughs, 7 harrows,
7 trailers, 1 planter and 2 rotavators, raised revenue of Kshs 9,140,000 from subsidized seeds
and Kshs 5,241,600 from sale of subsidized fertilizer, constructed 13 fish landing bandas, 1
omena store and 9 toilets, renovated a public jetty at Usenge beach, fenced kokach and
Luanda DC beaches, constructed 5 livestock crush pens.

The department faced a number of challenges including; low absorption of funds due to
bureaucratic processes, conflict between executive and county assembly in project
identification and implementation, insufficient budgetary allocation to the agricultural sector
which does not meet the 10% Maputo declaration,

These challenges were addressed through dialogue with the department of finance and
planning to enhance the speed of funds processing and creating a rapport with the assembly
to identify the roles of the technical executive and the assembly in project identification and
implementation.
This Department proposes to utilize Kshs 239,328,162 on recurrent expenditure and Kshs.
268,947,177 on Capital expenditure during the year 2016/17. This allocation is approximated
to increase to Kshs. 263,260,978 recurrent and Kshs. 295,841,895 for development in the FY
2017/2018 and Kshs. 289,587,076 for recurrent and Kshs. 325,426,084 for development FY
2018/2019.

PROGRAMME BASED BUDGET JUNE 2016

Page 21

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part E: Summary of the Programme Outputs and Performance Indicators and Targets for FY 2016/17
2018/19
Programme

Delivery
Unit

Key Outputs

Key Performance Indicators

Name Of Programme 1: General Administration, Planning and Support Services


Outcome: Effective Delivery Of Support Services
CSP.1.1
Chief
Staff Promoted
No. of staff promoted
Administrative Officer
Extension
services No. of Vehicles procured
and
support
improved
No of motor cycles procured
services
Office
environment No. of blocks maintained
improved
Develop
M&E M & E framework developed
framework
CSP.1.2
Chief
Department operations No. of Management meetings held
Planning
and Officer
improved
No. of technical backstopping reports
Policy
produced.
Siaya County Show held No. of Siaya County Shows held
Policy/bills formulated No. of policies developed
No of bills developed.
Agricultural
No. of Agricultural prefeasibility
prefeasibility
studies studies undertaken
undertaken
Name Of Programme 2: Livestock Management & Development.
Outcome: Increased Livestock Production For Enhanced Food Security And Income Generation
SP.2.1
Directorate Bee keeping improved No. of farmers trained.
Apiculture
of Livestock
No. of new hives introduced.
development
Production
SP.2.2 : Meat Directorate Improved
breeds No. of Farmers trained, on livestock
production and of Livestock introduced
husbandry
marketing
Production
Ha of Improved forage (feeds),
No. of Improved breeds introduced
No. of animals sold
SP.2.3
Dairy Directorate Breeding
centres No. of breeding centres constructed
Production
of Livestock established
No. of breeding dairy animals
Production
available for sale.
No of farmers trained
No. of bales of hay produced,
No. of baling equipment procured,
SP 2.4 Poultry
Sustainable
Poultry No of farmers trained.
production and
production increased
No of birds available for sale.
marketing
No of poultry demo units established.
SP 2.5: Draught
Draught animal power No of farmers trained
Animal
improved
Draught animals trained
improvement
% draught team per plough reduced
and
management
Name Of Programme 3: Crop and Land Management & Management
Outcome: Increased Crop and Land Production and Productivity For Enhanced Food Security
SP 3.1: Land Directorate Sustainable land use No. of farms tested for soil fertility,
Management
of
Crop Improved
No. of Mobile soil fertility testing
Directorate
units procured,
of
Crop
No. of Acres ploughed by subsidized
Management
tractor service
No. of Acres harrowed by subsidized
tractor service
No. of farms of conserved
No.
of
farmers
trained
on
environmental conservation,
SP 3.2: Crop Directorate Production
and MT of subsidized seeds procured
Development
of
Crop productivity Increased
Management
MT of subsidized fertilizer procured
Acreage of fruit trees established
No. of certified fruit tree nurseries
established
% reduction of post harvesting losses

PROGRAMME BASED BUDGET JUNE 2016

Target
(Baseline)
2015/16

Target Target
2016/17 2017/18

Target
2018/19

315
3
3
20

105
3
20
20

105
3
20
20

105
3
20
20

26
12

26
12

26
12

26
12

1
1
1
0

1
5
4
2

1
4
4
2

1
4
0
2

1,200

3,000

3,000

3,000

1,200

120

120

120

3,000
3,000
10
97,000
1

17,800
3,000
4
100,000
1

17,800 17,800
3,500 4,000
3
3
110,000 125,000
1
1

800
2000
2,000
30
18,000
54,000
0
3,000
0
0

60
42,000
54,000
10
1,000
200
20

53

600

600

600

9,092

20,000

20,000 20,000

300
30

10,000

10,000 10,000
60
90

2,000

22,000

1,000 1,200
2,500 3,000
3,500 5,000
60
60
42,000 42,000
60,000 70,000
10
10
1,000 1,000
200
200
20
20

24,000 26,000

20

25

25

25

30
200

45
1,000

45
1,000

45
1,000

7500
40

200
30

200
20

200
10

Page 22

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery
Unit

Key Outputs

SP
3.3: Directorate Agribusiness Promoted
Agribusiness
of
Crop
and Information Management
Management

Key Performance Indicators


No. of farmers trained on sustainable
crop husbandry
No.
strategic
grain
reserves
constructed
No. of field days held
No. of farmer groups trained
No. of farmers linked credit
institutions
No. of farmer groups linked markets

No. of Farm Management Guidelines


developed
No. of Farm enterprise plans prepared,
No. of innovative technologies
development
No .of trade shows and exhibitions
held
Name Of Programme 4: Fisheries Management & Development
Outcome: Sustainable Utilization Of Fisheries Resources
SP.4.1 Fisheries Directorate BMUs strengthened.
No. of BMUs trained,
Coof Fisheries
No. of BMUs elections conducted,
Management
No. of Meetings with BMUs networks
held,
No of subsidized fishing gears
procured.
No of patrol canoes for BMUs
SP.4.2 Fisheries Directorate Sustainable
fisheries No. of Catch assess survey
monitoring
of Fisheries resources utilized.
undertaken,
control
and
No. of Frame survey undertaken,
surveillance
No. of monthly Statistical data
developed.
No.
of
Fisheries
surveillance
undertaken
No. of Demarcation of fish breeding
undertaken,
No. of fisheries vessel procured
No. of fish fingerlings restocked into
natural water bodies
SP.4.3 Fisheries Directorate Fish quality and hygiene No.
of
Inspection
of
fish
inspection,
of Fisheries enhanced
establishments and units conducted,
quality
No. of Fish handling infrastructure
assurance and
constructed (ice plants, fish bandas,
marketing
omena stores)
SP.4.4
Directorate Culture fish production No. of fish farmers trained,
Aquaculture
of Fisheries improved
No. of fisheries extension officer
development
trained
Metric tonnes of Fish feeds supplied,
No of Pond seining nets distributed.
No of fingerlings distributed.
No of model fish hatchery centres
rehabilitated.
Name Of Programme 5: Veterinary Services.
Outcomes: Reduced Incidences Of Livestock Diseases, Improved Livestock Productivity
SP.5.1:
Food Directorate Hides and skins quality No. of flayers trained
safety
and of
improved
No. of Flayers licensed
animal products Veterinary
No. of bandas Licenses issued,
development.
Services
kgs of Hides produced
No of skins produced
Zoonotic
diseases No. of slaughter houses constructed
transmission of reduced No. of slaughter houses licensed,
by 95%
No. of Meat carriers licensed
No. of Slaughter houses supervisory
visits
No. of carcasses inspected
SP 5.2 Disease Directorate Occurrence of vector No. of crush pens constructed,
and
vector of
borne diseases reduced No. of crush pens committee formed
management.
Veterinary by 50%
Litres of acaricides supplied,

PROGRAMME BASED BUDGET JUNE 2016

Target
(Baseline)
2015/16

Target Target
2016/17 2017/18

Target
2018/19

5,000

10,000

15,000 20,000

2
7
73

4
8
1120

4
8
1150

4
8
1180

7,500

8,000

8,000

9,000

1,200

1,500

1,500

1,500

0
2,000

1
500

1
500

1
500

20

12

12

12

45
0

45
87

45
0

45
0

12

12

12

12

0
2

2,000
4

2,000
4

2,000
4

4
0

4
1

4
0

4
1

12

12

12

12

24

24

24

24

2
0

2
0

2
1

2
0

30,000 1,000,000 1,000,000

15

15

15

15

4
60

4
80

4
80

4
80

8
5
2
3
6
12
0 1,000,000

5
2.5
12
500,000

5
3
12
0

150
150
18
280,000
1,000
3
27
45

100
100
18
300,000
1,100
2
27
60

100
100
100
100
20
22
315,000 325,000
1,200 1,300
2
2
32
37
60
60

24
28,000
20
60
1,800

24
32,000
10
10
2,000

24
24
32,000 36,000
10
10
10
10
2,200 2,400

Page 23

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery
Unit

Key Outputs

Services

No. of dips rehabilitated,


No. of dips committee formed
No. of animals sprayed/dipped,
Occurrence of notifiable No. of animals vaccinated
diseases reduced by 50% No. of Satellite laboratory constructed,
No. of disease surveillance done
Dairy cattle herd quality No of farmer trainings
improved
No of AI centres operationalized
No of inseminations
% of improved breeds increased

SP 5.3 Animal Directorate


breeding
of
Veterinary
Services

Key Performance Indicators

Target
(Baseline)
2015/16

Target Target
2016/17 2017/18

1
1
200,000
300,000
1
4
2
1
500

1
1
500,000
500,000
1
4
6
4
4,000

Part F: Summary of Expenditure by Programmes, 2016/17 2018/19


Programme

Cp.1 General Administration, Planning And


Support Services
Total Expenditure of Programme 1
Cp 2: Livestock Development And
Management
Total Expenditure of Programme 2
Cp 3: Crop Management
Total Expenditure of Programme 3
Cp 4: Fisheries Management &
Development
Total Expenditure of Programme 4:
Cp 5: Veterinary Services
Total Expenditure of Programme 5:
Total Expenditure

Baseline Estimates
2015/16

Estimates
2016/17

42,358,566

79,455,677

2017/18

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development
Total Expenditure

1
1
1
1
550,000 650,000
550,000 650,000
1
1
4
4
6
6
2
2
6,000 10,000
7

10

Projected Estimates
2018/19

87,401,245

96,141,369

42,358,566

79,455,677

87,401,245

96,141,369

91,306,299
169,191,970
169,191,970

135,848,682
183,629,095
183,629,095

149,433,550
201,992,005
201,992,005

164,376,905
222,191,205
222,191,205

58,164,643
29,759,716
29,759,716
390,781,194

58,022,023
51,319,862
51,319,862
508,275,339

63,824,225
56,451,848
56,451,848
559,102,873

70,206,648
62,097,033
62,097,033
615,013,160

91,306,299

135,848,682

58,164,643

58,022,023

149,433,550

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.)


Expenditure Classification

Target
2018/19

63,824,225

164,376,905

70,206,648

Baseline Estimates
2015/16
225,361,277
160,904,000
64,457,277

Estimates
2016/17
239,328,162
137,538,000
101,790,162

Projected Estimates
2017/18
2018/19
263,260,978
289,587,076
151,291,800
166,420,980
111,969,178
123,166,096

165,419,917
165,419,917

268,947,177
268,947,177

295,841,895
295,841,895

325,426,084
325,426,084

390,781,194

508,275,339

559,102,873

615,013,160

Part H. Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification

Baseline Estimates
2015/16
Programme 1: General Administration, Planning And Support Services
Current Expenditure
42,358,566
Compensation to Employees
16,037,558
Use of goods and services
26,321,008
Current Transfers Govt. Agencies

Estimates
2016/17

Projected Estimates
2017/18
2018/19

79,455,677
18,640,142
60,815,535

87,401,245
20,504,156
66,897,089

96,141,369
22,554,572
73,586,797

Other Development
Total Expenditure of programme 1
42,358,566
Programme 2: Livestock Development And Management

79,455,677

87,401,245

96,141,369

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

PROGRAMME BASED BUDGET JUNE 2016

Page 24

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Expenditure Classification
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies

Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of programme 2
Programme 3: Crop Management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Baseline Estimates
2015/16
46,312,173
36,624,323
9,687,850

Estimates
2016/17
50,045,018
42,112,452
7,932,566

Projected Estimates
2017/18
2018/19
55,049,520
60,554,472
46,323,697
50,956,067
8,725,823
9,598,405

44,994,126
44,994,126

85,803,664
85,803,664

94,384,030
94,384,030

103,822,433
103,822,433

91,306,299

135,848,682

149,433,550

164,376,905

92,566,786
81,506,759
11,060,027

64,444,436
51,898,595
12,545,841

70,888,880
57,088,455
13,800,425

77,977,768
62,797,300
15,180,468

76,625,184
76,625,184

119,184,659
119,184,659

131,103,125
131,103,125

144,213,437
144,213,437

183,629,095

201,992,005

222,191,205

20,208,294
12,953,743
7,254,551

22,229,123
14,249,117
7,980,006

24,452,036
15,674,029
8,778,007

35,800,607
35,800,607

37,813,728
37,813,728

41,595,101
41,595,101

45,754,611
45,754,611

58,164,643

58,022,022

63,824,224

70,206,647

21,759,717
12,652,400
9,107,317

25,174,737
11,933,068
13,241,669

27,692,211
13,126,375
14,565,836

30,461,432
14,439,012
16,022,419

8,000,000
8,000,000

26,145,126
26,145,126

28,759,639
28,759,639

31,635,602
31,635,602

29,759,717
390,781,195

51,319,863
508,275,339

56,451,849
559,102,873

62,097,034
615,013,160

Other Development
Total Expenditure of programme 3
169,191,970
Programme 4: Fisheries Management And Development
Current Expenditure
22,364,036
Compensation to Employees
14,082,960
Use of goods and services
8,281,076
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of programme 4
Programme 5: Veterinary Services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies

Other Development
Total Expenditure of programme 5
Total expenditure to vote

PROGRAMME BASED BUDGET JUNE 2016

Page 25

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Codes
2110101
2110202
2110301
2110308
2110309
2110310
2110311
2110312
2110313
2110314
2110315
2110317
2110318
2110320
2110321
2110327
2110402
2110403
2110404
2120101
2210101
2210102
2210103
2210201
2210202
2210203
2210301
2210302
2210303
2210304
2210401
2210402
2210403
2210409
2210409
2210502
2210503
2210504
2210505
2210602
2210603
2210604

Item
Basic Salaries - Civil Service
Casual Labour
House Allowance
Medical Allowance
Special Duty Allowance
Top Up Allowance
Transfer Allowance
Responsibility Allowance
Entertainment Allowance
Transport Allowance
Extraneous Allowance
Domestic Servant Allowance
Non-Practising Allowance
Leave Allowance
Administrative Allowance
Executive Allowance
Refund of Medical Expenses-Inpatient
Refund of Medical Expenses-Ex-Gratia
Commutation of Leave
Employer Contributions to National Social Security Fund
Electricity Expenses
Water and Sewerage charges
Gas Expenses
Telephone,Telex,Facsmile and M
Internet Connections
Courier and Postal Services
Travel Costs(Airlines, Bus, Railway)
Accommodation-Domestic
Daily Subsistence Allowances
Field Allowance
Travel Costs(Airlines, Bus, Railway)
Accommodation-Domestic
Daily Subsistence Allowances
Field Allowance
Field Allowance for M & E of Development Projects under this docket
Publishing and printing services
Subscription to Newspapers,
advertising awareness
Trade Shows and Exhibitions
Payment of Rents and Rates - Residential
Rents and Rates - Non-Residential
Hire of Transport

PROGRAMME BASED BUDGET JUNE 2016

Administration
13,038,306
2,531,900
1,605,000
1,070,001
107,001
287,934
380,950
103,550
80,750
99,750
32,395
128,000
178,125
330,000
285,000
4,230,000
365,698
3,950,000
190,000
38,000
91,998
4,012,050
3,500,000

Livestock
31,378,352

Crops
39,247,718

Fisheries
11,227,964

Veterinary
10,165,000

4,774,800
5,538,400
420,900
123,500
30,875
80,750
76,000
33,250
128,000
285,000
425,000
247,000
228,000
171,000
42,750
28,500
109,250
190,000
-

5,892,359
5,870,416
802,501
85,601
102,600
42,750
60,420
35,910
51,300
128,000
391,415
199,500
285,000
665,000
120,650
475,000
102,600

1,568,889
156,890
190,000
85,500
14,250
152,000
42,750
14,250
95,000
787,500
66,500
95,000
19,000

1,605,000
160,500
2,568
232,864
77,140
82,080
77,425
46,598
104,682
285,000
337,000
66,500
38,000
114,000
216,125
42,750

Total
105,057,340
2,531,900
13,877,159
14,047,706
156,890
1,490,902
376,103
1,029,914
339,815
95,000
475,000
232,085
177,793
583,682
1,535,625
1,483,415
598,500
4,657,500
821,698
4,615,000
190,000
80,750
158,498
410,400
4,988,175
3,500,000
164,350

Page 26

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Codes
2210701
2210702
2210703
2210704
2210708
2210710
2210711
2210801
2210802
2210901
2211003
2211004
2211005
2211006
2211007
2211008
2211009
2211011
2211015
2211016
2211021
2211026
2211029
2211030
2211101
2211102
2211103
2211104
2211201
2211202
2211203
2211204
2211301
2211305
2211306
2211308
2211310
2211325
2220101
2220103
2220201
2220202
2220205
2220209

Item
Travel allowance
Remuneration of Instructors and Contract Based Training Services
Production and Printing of Training Materials
Hire of Training Facilities and Equipment
Trainer allowance
Travel & Accommodation
Tuition fees
Catering services, receptions, Ac
Board Committees, & Seminars
Group Personal Insurance
Veterinary Supplies & Materials
Fungicides, Insecticides & Sprays
Chemicals and Industrial Gases
Purchase of Workshop Tools
Agricultural Materials, Supplies & Small Equipment
Laboratory Materials Supplies and small equipment
Education and Library Supplies
Purchase of photographic and audio visual materials
Food and Rations
Purchase of Uniforms and Clothing - Staff
Purchase of Bedding and Linen
Purchase of Vaccines and Sera
Purchase of Safety Gear
Purchase of Protective Clothing
General Office Supplies (consumables)
Supplies and accessories for computers and printers
Sanitary and cleaning materials,
Hire of Labour
Refined Fuels & Lubricants
Refined Fuels & Lubricants for Production
Refined Fuels & Lubricants - Other
Other Fuels- Charcoal, Firewood
Bank Commissions & Charges
Contracted Guards and Cleaning Services
Membership Fees, Dues and Subscriptions to Professional and Trade Bodies
Legal Dues/fees, Arbitration and Compensation Payments
Contracted Professional Services
Agriculture trade fair
Maintenance Expenses - Motor Vehicles
Maintenance Expenses - Boats and Ferries
Maintenance of Plant, Machinery and Equipment (including lifts)
Maintenance of Office Furniture and Equipment
Maintenance of Buildings and Stations -- Non-Residential
Minor Alterations to Buildings and Civil Works

PROGRAMME BASED BUDGET JUNE 2016

Administration
227,500
66,500
171,000
39,900
8,127,202
134,900
8,431,925
95,000
332,500
38,000
101,650
4,750
101,650
9,500
147,475
150,100
114,000
996,127
5,925,000
19,000
918,500
13,300
285,000
962,640
2,140,000
384,750
1,138,500
-

Livestock
89,676
47,500
47,500
142,500
285,000
190,000
114,000
47,500
199,500
33,250
123,500
142,500
47,500
85,500
95,000
52,250
617,500
28,500
513,000
95,000
76,000
209,000

Crops
171,950
17,100
171,000
81,225
8,626
335,860
30,210
427,500
85,500
262,425
64,125
1,270,000
256,500
1,140,000
133,000
285,000
-

Fisheries

61,750
95,000
142,500
115,326
570,000
19,000
38,000
23,750
85,500
47,500
1,121,000
1,245,000
199,500
541,500
332,500
23,750
33,250
123,500
95,000

Veterinary

28,500
21,375
95,000
129,476
128,555
76,000
153,900
436,867
228,000
21,090
2,799,867
42,750
125,685
35,910
627,000
382,090
52,250
475,000
59,850
59,850
68,400

Total

489,126
142,500
256,975
277,400
8,774,428
413,555
548,625
8,603,377
153,900
436,867
95,000
1,665,860
122,550
142,500
671,650
2,804,617
139,650
123,500
529,660
507,525
313,785
4,631,627
5,925,000
19,000
2,802,090
94,050
285,000
199,500
3,632,140
332,500
2,318,600
686,850
1,547,000
372,400

Page 27

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Codes
2220210
2710102
2710105
3110300
3110302
3110701
3110704
3110901
3110902
3111001
3111002
3111003
3111004
3111005
3111100
3111102
3111103
3111111
3111114
3111201
3111302
3111403
3111504

Item
Maintenance of Computers, Software, and Networks
Gratuity - Funeral expenses civil servants
Gratuity - County Executive Members
Refurbishment of Buildings
Refurbishment of Non Residential Buildings
Purchase of Motor Vehicles
Purchase of Motor Cycles
Purchase of Household and Institutional furniture and fittings
Purchase of Household and Institutional Appliances
Purchase of Office Furniture and Fittings
Purchase of Computers, Printers and other IT Equipment
Purchase of Air conditioners, Fans and Heating Appliances
Purchase of Exchanges and other Communications Equipment
Purchase of Photocopiers
Purchase of Specialised Plant, Equipment & Machinery
Purchase of Boilers, Refrigerator
Purchase of Agricultural Machinery and Equipment
Purchase of ICT networking and Communications Equipment
Purchase of Survey Equipment
Overhaul of Plant, Machinery and Equipment
Purchase of bull semen
Research
Policy Development
Other Infrastructure & Civil Works
TOTAL

DEVELOPMENT

Sub County

Ward

Ugunja

Sub Location

Administration
115,900
1,020,000
8,000,000
95,000
114,000
47,500
61,500
156,500
19,000
123,500
1,990,000
79,455,677

Livestock
66,500
1,155,000
133,000
712,500
104,500
66,500
214,015
50,045,018

Crops

Fisheries
48,925
133,000
155,800
57,000
47,500
142,500
194,750
20,208,294

Sector

Function

Proposed Project

Sidindi

Agriculture

Livestock

Purchase Of 300 Dairy Cows

Ugunja

Ugunja

Agriculture

Livestock

Provision Of Poultry To Youth


And Women Groups

1,500,000

Bondo

Central
Sakwa

Agriculture

Crop
Management

Purchase Of 4 Dairy Cows(


Uyawi, Wambara,Mbeka And
Sirawongo Secondary Schools)

400,000

Alego Usonga

Central Alego

Agriculture

Crop
Management

Provision Of 9,400 Market Variety


Grafted Mango Seedlings To Each

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

81,225
4,275,000
712,500
76,950
64,444,436

Estimates
2016/17
22,500,000

1,200,000

Veterinary
109,440
85,500
4,275,000
712,500
68,400
95,000
128,250
25,174,737

Total
Estimates
22,500,000
1,500,000
400,000
1,200,000

Code
3111302
3111302
3111302
3111302

Total

421,990
2,175,000
8,133,000
313,500
8,550,000
2,137,500
114,000
47,500
467,150
308,500
66,500
332,500
128,250
408,765
1,990,000
239,328,162

Description
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Grafted

Page 28

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Estimates
2016/17

Rarieda

North Uyoma

Agriculture

Fisheries

Rarieda

South Uyoma

Agriculture

Fisheries

Of The 9,400 Central Alego Ward


Households
Purchase Of 2 Patrol Boats And 2
Engines For Kayundi And Kasiri
Beaches
Fish Banda At Mayange Beach

Ugenya

Ukwala

All

Agriculture

Crop
Management

Additional Funding For Provision


Of Farm Implements (Jembes)

Ugenya

North Ugenya

All

Agriculture

Livestock

Provision Of Dairy Cows In The


Ward

7,500,000

Gem

Yala
Township

Agriculture

Livestock

Dairy Animals For Women And


Youths

2,000,000

Gem

East Gem

Agriculture

Livestock

Provision Of Poultry To
Registered Sacoo

3,000,000

Bondo

West Sakwa

Kapiyo

Agriculture

Fisheries

Purchase Of 10 Fish Cages For


Fishermen At Utonga, Kapiyo And
Gomro Sub-Location

Executive

Executive

Executive

Agriculture

Crop
Management

Siaya Trade Show And Exhibition

5,527,979

Executive

Executive

Executive

Agriculture

Livestock

Poultry Enterprise Development


Project

5,000,000

Executive

Executive

Executive

Agriculture

Crop
Management

Tractor Hire Service Subsidy

23,460,044

Executive

Executive

Executive

Agriculture

Crop
Management

Fertilizer And Seed Subsidy


Project

30,000,000

PROGRAMME BASED BUDGET JUNE 2016

1,000,000
1,200,000
500,000

700,000

Total
Estimates
1,000,000
1,200,000
500,000

7,500,000
2,000,000
3,000,000
700,000
5,527,979
5,000,000
23,460,044

30,000,000

Code
3110702
3110504
3111103

3111302
3111302
3111302
3110504
3110504
3111302
3111103

3111301

Description
Mango
Seedling.
Purchase Of
Boats
Other
Infrastructure
And Civil
Works
Purchase Of
Agricultural
Machinery
And
Equipment
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Agricultural
Machinery
And
Equipment
Purchase Of
Certified Crop

Page 29

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Executive

Executive

Executive

Agriculture

Veterinary
Services

Animal Health Support Project

9,244,139

Executive

Executive

Executive

Agriculture

Veterinary
Services

Dairy Improvement Project

8,900,988

Alego Usonga

Siaya
Township

Agriculture

Livestock

Poultry Keeping (Chicks)

1,000,000

Gem

Yala
Township

Agriculture

Livestock

Poultry For Groups

1,000,000

Gem

South Gem

Agriculture

Livestock

Purchase Of 100 Dairy Cow For


Farmers

8,000,000

Gem

West Gem

Agriculture

Livestock

Completion Of Apuoyo Animal


Feed Pelletizing Plant

1,000,000

Gem

West Gem

Agriculture

Fisheries

Fish Farming Infrastructure At


Abir Swamp

1,500,000

Executive

Executive

Agriculture

Crop
Management

Completion Of Atc Building

Bondo

Agriculture

Fisheries

Agriculture

Livestock

Patrol Engine Boats(Uyawi,Liunda


And Sifu)
Purchase Of Chicken For 10
Women Groups

1,500,000

Rarieda

Central
Sakwa
East Asembo

Gem

North Gem

Agriculture

Livestock

Purchase Of Dairy Cows For


Registered Youth/Women Groups

6,800,000

Bondo

Yimbo West

Agriculture

Fisheries

Fish Cages

3,000,000

Executive

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

21,000,000

1,000,000

Total
Estimates
9,244,139
8,900,988
1,000,000
1,000,000
8,000,000
1,000,000
1,500,000
21,000,000
1,500,000
1,000,000
6,800,000
3,000,000

Code
3111302
3111302
3111302
3111302
3111302
3110599
3110504
3110504
3110702
3111302
3111302
3110504

Description
Seed
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Boats
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure

Page 30

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Estimates
2016/17

Alego Usonga

Usonga

Agriculture

Crop
Management

Rarieda

East Asembo

Agriculture

Livestock

Bondo

Central
Sakwa

Uyawi

Agriculture

Fisheries

Construction Of Fish Banda At


Liunda Beach

Bondo

Central
Sakwa
Central
Sakwa

Uyawi

Agriculture

Fisheries

Purchase Of 2 Patrol Boats

3,000,000

Nyango'ma

Agriculture

Livestock

Construction Of Crush Pens At


Sianga And Dago

1,000,000

Bondo

Additional Funding For Purchase


Of Subsidized 2 Tractors And
Farm Implements From Nib
Provision Of Chicks To 5 Women
Groups In Omia Malo, Omia
Mwalo And South Ramba

B/F 2015/2016

900,000
202,507

607,333

1,000,000

East Asembo

Omia Mwalo

Agriculture

Fisheries

Construction Of Cold Storage At


Ralayo Beach

800,000

Rarieda

East Asembo

Omia Mwalo

Agriculture

Fisheries

Purchase Of Speed Boats

500,000

Gem

East Gem

Agriculture

Crop
Management

Purchase Of Farm Inputs

1,000,000

Ugenya

East Ugenya

Agriculture

Livestock

Purchase Of Dairy Cattle

1,300,000

Bondo

Yimbo East

Agriculture

Fisheries

Construction Of 2 Fish Banda At


Ugambe And Nyaudenge

Bondo

Yimbo East

Agriculture

Fisheries

Fencing Of Uwaria Beach And


Construction Of Toilet At The
Beach

7,272

Bondo

Yimbo East

Agriculture

Fisheries

Construction Of Fish Banda At


Lwanda Dc Beach

1,000,000

Usigu

PROGRAMME BASED BUDGET JUNE 2016

900,000
809,840
1,000,000

Rarieda

3,000,000

Total
Estimates

3,000,000
1,000,000
800,000
500,000
1,000,000
1,300,000
3,000,000
7,272
1,000,000

Code
3110706
3111302
3110504
3110702
3110504
3110504
3110702
3110504
3111302
3110504
3110504
3110504

Description
And Civil
Works
Purchase Of
Tractors
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Purchase Of
Boats
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Boats
Other
Infrastructure
And Civil
Works
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works

Page 31

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Bondo

Yimbo East

All

Agriculture

Livestock

Purchase And Upgrading Of


Chicks

1,000,000

Bondo

Yimbo East

Agriculture

Livestock

Ai Services

1,000,000

Executive

Executive

Agriculture

Crop
Management
Crop
Management

Land Mechanization Services


Purchase Of Harrows

9,200,000

Agriculture

Crop
Management

Purchase Of 12 Trailers

2,929,632

Agriculture

Crop
Management

Purchase Of Seeds

Agriculture

Livestock

Purchase Of Feed Compounding


And Processing Equipment

2,500,000

Agriculture

Veterinary
Services

Completion Of Bondo Slaughter


House

3,000,000

Agriculture

Crop
Management

Consruction Of Cereal Store At


Ligingo

3,000,000

1,000,000

Executive

Executive
Executive

Executive

Agriculture

Executive

Executive
Executive

Executive

Executive
Ugenya

Executive
North Ugenya

Rarieda

North Uyoma

E. Katwenga

Agriculture

Fisheries

Rehabilitation Of Beach Banda At


Kopiata

Rarieda

North Uyoma

Ragengni

Agriculture

Fisheries

Rehabilitation Of Beach Banda

Kagonya

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

405,176

725,940

681,780

Estimates
2016/17

Total
Estimates
1,000,000
1,000,000
405,176
9,200,000

2,929,632

725,940
2,500,000

3,000,000

3,000,000

1,000,000
681,780

Code
3111302
3111302

3111103

3111103

3111301
3111103

3110202

3110202

3110504
3110504

Description
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Agricultural
Machinery
And
Equipment
Purchase Of
Agricultural
Machinery
And
Equipment
Purchase Of
Certified Crop
Seed
Purchase Of
Agricultural
Machinery
And
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
Other
Infrastructure

Page 32

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugunja

Sidindi

Ugunja

Sub Location
Simenya

Sector

Function

Proposed Project

B/F 2015/2016

Agriculture

Crop
Management

Purchase Of Graftted Mango


Seedlings (Development Of
Mango Seedlings)

2,000,000

Sidindi

Agriculture

Crop
Management

Development Of Fruit Tree


Seedlings

1,000,000

Ugunja

Sidindi

Agriculture

Livestock

Poultry Development

3,450,000

Alego Usonga

South East
Alego

Bar Agulu

Agriculture

Livestock

Spray Pumps For Dairy Cattle

300,000

Alego Usonga

South East
Alego

Mur Mulanga

Agriculture

Livestock

Spray Pumps For Dairy Cattle To


Mine Nyalo Women Group

200,000

Bondo

South Sakwa

Agriculture

Livestock

Provision Of Paultry For Women


Groups

500,000

Bondo

South Sakwa

Agriculture

Fisheries

Construction Of Fish Banda At


Ludhi

1,000,000

Bondo

South Sakwa

Agriculture

Fisheries

Construction Of Cold Storage At


Wich Lum

1,000,000

Bondo

South Sakwa

Got Abiero

Agriculture

Livestock

Construction Of 2 Crush Pens And


Provision Of Ai Services In Got
Abiero Sub Location

1,463,152

Rarieda

South Uyoma

Lieta Sub
Location

Agriculture

Crop
Management

Construction Of Fish Banda At


Kabuong Beach

1,300,000

Rarieda

South Uyoma

Naya Sub

Agriculture

Fisheries

Construction Of Fish Banda At

1,300,000

Nyaguda
Nyaguda

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

Total
Estimates
2,000,000
1,000,000
3,450,000
300,000

200,000

500,000
1,000,000
1,000,000
1,463,152
1,300,000

Code
3111302
3111302
3111302
2211007

2211007

3111302
3110504
3110504
3110504
3110504
3110504

Description
And Civil
Works
Purchase Of
Grafted
Mango
Seedling.
Purchase Of
Grafted
Mango
Seedling.
Purchase Of
Animals And
Breeding
Stock
Agricultural
Materials,
Supplies And
Small
Equipment
Agricultural
Materials,
Supplies And
Small
Equipment
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other

Page 33

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Location
Rarieda

South Uyoma

Ugenya

Proposed Project

B/F 2015/2016

Ndunya Beach
Agriculture

Fisheries

Ukwala

Naya Sub
Location
Doho East

Agriculture

Crop
Management

Ugenya

Ukwala

Siranga

Agriculture

Crop
Management

Purchase Of Grafted Mango Seeds


For Registered Groups

Ugenya

Ukwala

All

Agriculture

Crop
Management

Purchase Of Farm Implements


(Digging Hoes-Jembes)

Ugenya

Ukwala

Siranga

Agriculture

Crop
Management

Purchase Of Farm Implements For


Registered Groups

600,000

Ugenya

Ukwala

Doho East

Agriculture

Crop
Management

400,000

Alego Usonga

Usonga

Agriculture

Crop
Management

Horticultural Farming For 2


Registered Groups (Indigenous
Vegetable Seeds)
Rehabilitation And Expansion Of
Canals At Usonga Rice Project

Alego Usonga

Usonga

Agriculture

Crop
Management

Construction Of Grain Store At


Siriwo

2,000,000

Alego Usonga

West Alego

Agriculture

Fisheries

Fish Cage And Ponds For


Registered Youth And Women
Groups

1,200,000

Alego Usonga

West Alego

Agriculture

Livestock

Construction Of Cattle Dips And


Purchase Of Water Pumps

PROGRAMME BASED BUDGET JUNE 2016

Purchase Of Patrol Boat At


Luanda Kotieno Beach
Construction Of A Cerial Store

500,000
2,000,000

500,000
1,200,000

1,000,000

550,000

Estimates
2016/17

Total
Estimates
1,300,000
500,000
2,000,000

500,000
1,200,000

600,000

400,000
1,000,000
2,000,000

1,200,000
550,000

Code

3110702
3110202

3111302
2211007

2211007

3111301
3110504
3110202

3110504
3110504

Description
Infrastructure
And Civil
Works
Purchase Of
Boats
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Grafted
Mango
Seedling.
Agricultural
Materials,
Supplies And
Small
Equipment
Agricultural
Materials,
Supplies And
Small
Equipment
Purchase Of
Certified Crop
Seed
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works

Page 34

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Gem

West Gem

All

Agriculture

Crop
Management

Construction Of Cereals/Farm
Inputs Store At Komuok

2,000,000

Gem

West Gem

All

Agriculture

Crop
Management

Provision Of Seeds For Sweet


Potatoes And Training

500,000

Bondo

West Sakwa

Agriculture

Crop
Management

Portable Water Pumps To Small


Holder Farmer Groups (Youth And
Women)

300,000

Bondo

West Sakwa

Agriculture

Livestock

Allocation Of 6 Incubators To
Poultry Farmer Groups

360,000

Bondo

West Sakwa

Agriculture

Crop
Management

Support 6 Exemplary Horticulture


Projects (Youths And Women)

700,000

Bondo

West Sakwa

Agriculture

Crop
Management

Land Acquisition And


Improvement Of Utonga Fish
Banda

635,888

Bondo

West Sakwa

Agriculture

Fisheries

Clearing Obondo Beach Landing


Base From Water Weeds

250,000

Bondo

West Sakwa

Agriculture

Livestock

Crush Pen At Ugambe Valley And


Sinyanya Villages

200,000

Bondo

West Sakwa

Agriculture

Livestock

Poultry Project At Kapiyo And


Utonga Sub Locations

250,000

Bondo

West Sakwa

Agriculture

Livestock

Dairy Goats Project

100,000

Bondo

West Sakwa

Agriculture

Crop
Management

Promotion Of Crop Farmers

300,000

Kapiyo

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

Total
Estimates
2,000,000

500,000
300,000

360,000

700,000

635,888
250,000
200,000
250,000
100,000
300,000

Code
3110202

3111301
2211007

2211007

2211007

3110504
3110504
3110504
3111302
3111302
3111301

Description
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Certified Crop
Seed
Agricultural
Materials,
Supplies And
Small
Equipment
Agricultural
Materials,
Supplies And
Small
Equipment
Agricultural
Materials,
Supplies And
Small
Equipment
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Certified Crop

Page 35

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

West Sakwa

Bondo

West Sakwa

Ugenya

West Ugenya

Rarieda

West Uyoma

Rarieda

West Uyoma

Rarieda

West Uyoma

Rarieda

West Uyoma

Rarieda

West Uyoma

Bondo

Sub Location

Sector

Function

Proposed Project

Agriculture

Livestock

Bee Keeping Project

200,000

Agriculture

Livestock

Initiation Of Poultry Project

650,000

Agriculture

Crop
Management

Agricultural Activities At BarAnyali

Agriculture

Fisheries

500,000

Agriculture

Fisheries

Agriculture

Fisheries

Agriculture

Fisheries

Purchase Of Boat, Engine And


Lumps For Women Groups At
Obenge Beach
Purchase Of Boat, Engine, Lumps
And Nets For Umbrela Women
Group At Osindo Beach
Purchase Of Boat, Engine And
Lamps For Misori Beach Umbrella
Women Group
Construction Of Modern Fish
Shade At Kamariga

Agriculture

Livestock

Purchase Of Dairy Goats For


Women Groups In Each Sub
Location

100,000

West Yimbo

Agriculture

Livestock

Improvement Of Poultry Quality

Bondo

West Yimbo

Agriculture

Crop
Management

Irrigation Of Mahanga Sub


Location

Bondo

West Yimbo

Usenge

Agriculture

Fisheries

Bondo

West Yimbo

Usenge

Agriculture

Fisheries

Construction Of Landing Jetty


(1.5m) At Usenge Beach
Construction Of Toilet (0.3m) At
Usenge Beach

Bondo

West Yimbo

Usenge

Agriculture

Fisheries

Nyawita
Masat East

All

Kagwa
All

PROGRAMME BASED BUDGET JUNE 2016

Purchase Of Patrol Boat And 15hp


Engine At Honge Beach

B/F 2015/2016

1,000,000

500,000
400,000
738,065

50,000
500,000
1,500,000
5,880
500,000

Estimates
2016/17

Total
Estimates
200,000
650,000
1,000,000
500,000
500,000
400,000
738,065
100,000
50,000
500,000
1,500,000
5,880
500,000

Code
3111302
3111302
3111301
3110702

Description
Seed
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Certified Crop
Seed
Purchase Of
Boats

3110702

Purchase Of
Boats

3110702

Purchase Of
Boats

3110504

Other
Infrastructure
And Civil
Works
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Sea Walls
And Jetties
Other
Infrastructure
And Civil
Works
Purchase Of
Boats

3111302
3111302
3110504
3110505
3110504
3110702

Page 36

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Sub Location

Sector

Function

Proposed Project

West Yimbo

Agriculture

Fisheries

Bondo

West Yimbo

Agriculture

Fisheries

Bondo

West Yimbo

Agriculture

Fisheries

Purchase Of Patrol Boat And 15hp


Engine At Magare
Purchase Of Patrol Boat And
Engine At Sika Beach
Construction Of Fish Landing
Banda At Mitundu

Bondo

West Yimbo

Agriculture

Fisheries

Construction Of Fish Landing


Banda At Kuoyo Beach

Bondo

West Yimbo

Agriculture

Livestock

Construction Of Crush Pens At


Nyangera, Misori And Mageta

500,000

Gem

Yala
Township

Agriculture

Livestock

Provision Of Dairy Cattle For


Groups Within Yala Township
Ward

290,000

Gem

Yala
Township

Agriculture

Veterinary
Services

Construction Of Yala Slaughter


House

Alego Usonga

West Alego

Agriculture

Fisheries

Construction Of Banda At Misori


Beach

687,860

Alego Usonga

Central Alego

Agriculture

Fisheries

Construction Of Kadenge Fish


Landing Banda

783,344

Bondo

South Sakwa

Agriculture

Livestock

Provision Of Water And Fencing


At Pap Kado Animal Feeds Plant

Bondo

West Sakwa

Agriculture

Livestock

Opening Of Obondo Beach


Landing Base

250,000

Bondo

West Sakwa

Agriculture

Livestock

Construction And Purchase Of


Pump At Maranda Crushpen

381,546

Nyaguda

Maranda

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
500,000
204,000
1,500,000
1,500,000

5,000,000

2,000,000

Estimates
2016/17

Total
Estimates
500,000
204,000
1,500,000
1,500,000
500,000
290,000
5,000,000

687,860
783,344
2,000,000
250,000
381,546

Code
3110702
3110702
3110599
3110599
3110504
3111302
3110202

3110599
3110599
3110504
3110504
3110504

Description
Purchase Of
Boats
Purchase Of
Boats
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Animals And
Breeding
Stock
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil

Page 37

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

West Yimbo

Gem

South Gem

Gem

West Gem

Gem

Sub Location

Sector

Function

Proposed Project

Agriculture

Fisheries

Construction Of Fish Banda At


Nyenye Got Agulu

Agriculture

Crop
Management

Construction Of Community Grain


Store

1,000,000

Agriculture

Livestock

Poultry Development

2,000,000

West Gem

Agriculture

Livestock

Dairy Project For Schools, 1 Cow


Per School

Ugunja

Sidindi

Agriculture

Livestock

Poultry Vaccines

Ugunja

Sidindi

Agriculture

Livestock

Provision Of Artificial
Insemination Services

1,500,000

Ugunja

Sidindi

Agriculture

Livestock

Improvement Of Poultry Quality

1,500,000

Rarieda

South Uyoma

Ndigwa

Agriculture

Fisheries

Construction Of Toilet At Ndunya


Beach

500,000

Rarieda

South Uyoma

Naya

Agriculture

Fisheries

Construction Of Fish Banda At Wi


Kwang Beach

623,980

Rarieda

South Uyoma

Naya

Agriculture

Fisheries

Construction Of Fish Banda At


Madundu Beach

Rarieda

South Uyoma

Naya

Agriculture

Fisheries

Purchase Of Patrol Boat And


Engine At Gudwa Beach

Akala

All

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
800,000

55,000
500,000

1,000,000
345,000

Estimates
2016/17

Total
Estimates
800,000
1,000,000

2,000,000
55,000
500,000
1,500,000
1,500,000
500,000
623,980
1,000,000
345,000

Code
3110599
3110202

3111302
3111302
3111302
3111302
3111302
3110599
3110504
3110504
3110702

Description
Works
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Purchase Of
Animals And
Breeding
Stock
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Purchase Of
Boats

Page 38

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda
Ugenya

Sub Location

Sector

Function

Proposed Project

West Uyoma

Agriculture

Fisheries

Improvement Of Beaches At
Kamariga, Obenge, Osindo,
Kombe, Misori & Odongo

East Ugenya

Agriculture

Livestock

Training Groups And Purchase Of


Poultry
Total

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
86,547

Estimates
2016/17

86,547

544,126
91,706,694

Total
Estimates

177,240,483

544,126
268,947,177

Code
3110504
2210711

Description
Other
Infrastructure
And Civil
Works
Tuition Fees

Page 39

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 005
VOTE TITLE: DEPARTMENT OF WATER, IRRIGATION, ENERGY & NATURAL
RESOURCES

Part A: Vision Sustainable access to adequate safe water and sanitation in a clean and
secure environment
Part B: Mission To promote, conserve and protect life, environment and improve access to
water and sanitation for sustainable development

Part C: Strategic Objectives


Programmes
CP.1. Water resources
development and management

CP.2 Renewable Energy &


Natural Resources
Conservation and
Management

CP.3 General Administration,


planning and support services

Strategic Objectives
To Increase quality water and sewerage coverage from 42% to 48% and 0% to
10% respectively by 2018
To develop and manage county water resources for improved access
To increase area under irrigation from 8% to 10% by 2018
To develop and manage county water resources and infrastructure for improved
access
To Increase forest and tree coverage from 2% to 10 % and 10% to 30%
respectively by 2018
To improve reclamation of the degraded natural resources from 2% to 5% by
2018 e.g. .land reclamation, Riverbank conservation, etc.
To Enhance environmental stewardship & compliance in all operations at all
times from 5% to 20% e.g. Control of excessive noise & vibration
To promote use of renewable energy appropriately e.g. use of solar power,
energy-saving jikos, biogas, etc.
To provide transformative leadership, capacity and policy direction in service
delivery

Part D: Context for Budget Intervention


The expenditure trend under development in the subsequent financial years has been FY
2013/14-Kshs.123, 515, 836, FY 2014/15-Kshs.153, 720,000 and 2015/16-Kshs.144, 620, 00.
Under Recurrent, the expenditure trend has been respectively FY 2013/14-Kshs.58, 925, 480,
FY 2014/15-Kshs.94, 586, 497 and FY 2015/16-Kshs.104, 598,672.

The major achievements for the period under review in the water services provision entail
development of 77 water facilities which included protected springs, boreholes, shallow
wells, pans & dams. In the environment and natural resources sector, the main achievements
include establishment of 102 tree nurseries and 13 woodlots with a multiplier effect of
economically empowering the special groups.

The sector managed to access its share of the budget funding and impact felt across the
existing wards mainly in the water sector. The major achievement was in improved
project implementation which was undertaken in line with the CIDP thereby benefitting
all the wards of the county.
However there existed a number of challenges and teething problems, including no
funding for some sub- programmes which hampered implementation, delayed funding

PROGRAMME BASED BUDGET JUNE 2016

Page 40

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

from the exchequer, lack of feasibility study and data base on projects earmarked for
implementation and underfunding of some projects.
During the FY 2016/17 budget, the sector envisages to undertake
rehabilitation/augmentation, operations and maintenance of existing water facilities,
construction of new water supplies, construction/rehabilitation of irrigation schemes and
increasing the forest and tree cover. The initiative will address strategic objectives of
delivering services in line with the SDG and Kenya vision -2030
The challenges highlighted above will be addressed through enhanced liaison and
cooperation between the various facilitating sectors. We shall endeavour to cooperate and
liaise with all other stakeholders to ensure smooth implementation of our development
programmes. Furthermore, we shall improve on our supervision both at the sub County
and county levels.
This Department proposes to utilize Kshs 96,644,646 on recurrent expenditure and Kshs.
329,846,886 on Capital expenditure during the year 2016/17. The 2016/2017 allocation is
approximated to increase to Kshs. 106,309,111 recurrent and Kshs. 362,831,575 for
development in the FY 2017/2018 and Kshs. 116,940,022 for recurrent and Kshs.
399,114,732 for development FY 2017/2018.

Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2018/19
Programme

Delivery
Unit

Key Outputs

Key
Performance
Indicators

Target
(Baseline)
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

Number of
sources
protected

Pans 25

20 number
installed in
various
institutions

60

90

120

25

12

15

12

10

15

10

43

12

15

CP 1: Water resources development and management


Outcome: Improved quality water accessibility & Irrigation coverage
CSP 1.1:Water
resources
conservation and
protection

CDW

Protected water
pans & dams
Rainwater
harvesting

CSP 1.2 Water


supply and urban
sewerage
development

CSP 1.3
Development and
Rehabilitation of
Irrigation
Infrastructure

CDW

Rehabilitated &
Augmented
Water Supplies
Constructed
Boreholes

CDW

Developed &
Rehabilitated
Irrigation
Schemes

Number of
water tanks
installed
No.of water
supplies
rehabilitated &
operational
No.of boreholes
drilled &
equipped
No.of
Rehabilitated &
Operational
Irrigation
Schemes

CP 2: Energy and natural resources conservation and management


Outcome: Improved environmental stewardship
CSP 2.1Natural
CDE&NR
County tree
Number of
resources
nurseries
nurseries
development,
established
conservation and
Number of
management
Established
woodlots
woodlots
established
&Hilltops

PROGRAMME BASED BUDGET JUNE 2016

Page 41

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Afforested
CSP 2.2 Energy
conservation

CDE&NR

Improved
Renewable
Energy Sources
in the households

No.of Improved
renewable
Energy Sources
Constructed

2,000

4,000

6,000

8,000

46

53

57

62

75

75

75

Conferences,
workshops and
seminars

12

12

12

12

Meetings
reports

Continuous

Continuous

Continuous

Continuous

12

20

25

30

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

Continuous

10

15

10

60

80

100

As necessary

As necessary

As necessary

As necessary

As necessary

As necessary

As necessary

Cascaded to
all staff

Cascaded to
all staff

Cascaded to
all staff

CP3: General Administration, planning and support services


Outcome: Enhanced sectorial performance and improved citizen satisfaction
CSP.3.1 General
CEC
Staff
Numbers of
Administration
establishment,
staff established
Staff training and
CO
development,
TNAs prepared
Project
annually
administration
and Coordination
Number of
meetings
staffs trained
Project progress
reports
Field reports

Monitoring &
Evaluation

Liaison
Excursions &
Trade fares
Consultancy
Services
Security &
Legal Services
Foreign Trips

CSP.3.2 Planning
and support
services

CEC
CO

Preparation of
Departmental
Strategic Plans,
Budget, work
plans,
departmental
policies,
Performance
Contract and
performance
reports.

Number of
plans

Performance
reports

Approved
policy
documents
Signed overall
Performance

PROGRAMME BASED BUDGET JUNE 2016

As necessary

Cascaded to

Page 42

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Contracts

all staff

Office
equipment
Number of
transport
facilities bought
and well
maintained

Various

Various

Various

Various

Various

Various

Various

Various

Various

Various

Various

Various

Various

Operation and
Maintenance of
office
machinery

Various

Utility costs

Various
Various

Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs. Millions)


Programme

Baseline
Estimates
Estimates
2015/16
2016/17
Programme 1: Water Resources Development And Management
Water Resources Development And Management
277,049,960
378,758,778
Total Expenditure of Programme 1
277,049,960
378,758,778
Programme 2: Environmental And Natural Resources Conservation And Management
Environmental And Natural Resources Conservation
101,198,112
34,666,702
And Management
Total Expenditure of Programme 2
101,198,112
34,666,702
Programme 3: General Administration, planning and support services
General Administration, planning and support services
39,566,693
13,066,051
Total Expenditure of Programme 3
39,566,693
13,066,051
Total Expenditure of Vote ------417,814,765
426,491,532

Projected Estimates
2017/18

2018/19

416,634,656
416,634,656

458,298,122
458,298,122

38,133,373

41,946,710

38,133,373

41,946,710

14,372,656
14,372,656
469,140,685

15,809,922
15,809,922
516,054,753

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs. Million)

Part F. Summary of Expenditure by Vote and Economic Classification (KShs.)


Expenditure Classification
Estimates
Projected Estimates
2015/16
2016/17
2017/18
Current Expenditure
103,973,799
96,644,646
106,309,111
Compensation to Employees
28,257,424
24,153,965
26,569,362
Use of goods and services
75,716,375
72,490,681
79,739,749
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
313,840,966
329,846,886
362,831,575
Acquisition of Non-Financial Assets
313,840,966
329,846,886
362,831,575
Capital Transfers to Government Agencies
Other Development
Total Expenditure of Vote
417,814,765
426,491,532
469,140,685

PROGRAMME BASED BUDGET JUNE 2016

2018/19
116,940,022
29,226,298
87,713,724
399,114,732
399,114,732
516,054,754

Page 43

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part H. Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs. Million)
Expenditure Classification

Programme 1: Water resources development and


management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 1
Programme 2: Environmental and natural resources
conservation and management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of programme 2
Programme 3: General Administration, planning
and support services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of programme 3
Total Expenditure of Vote

Baseline
Estimates
2015/15

68,629,960
28,257,424
40,372,536
208,420,000
208,420,000
-

Estimates

Projected Estimates

2016/16

2017/18

2018/19

75,235,388
24,153,965
51,081,423

82,758,927
26,569,362
56,189,565

91,034,819
29,226,298
61,808,522

303,523,390
303,523,390

333,875,729
333,875,729

367,263,302
367,263,302

277,049,960

378,758,778

416,634,656

458,298,121

24,998,112
24,998,112
76,200,000
76,200,000
101,198,112

8,343,206
8,343,206

9,177,527
9,177,527

10,095,280
10,095,280

26,323,496
26,323,496

28,955,846
28,955,846

31,851,430
31,851,430

34,666,702

38,133,373

41,946,710

13,066,051

14,372,656
14,372,656

15,809,922
15,809,922

39,566,693
39,566,693
39,566,693
417,814,765

PROGRAMME BASED BUDGET JUNE 2016

13,066,051
-

13,066,051
426,491,531

14,372,656
469,140,685

15,809,922
516,054,753

Page 44

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code
2110101
2210101
2210101
2211030
2211030
2211201
2220101
2210201
2210203
2210303
2210502
2210503
2210504
2210505
2211016
2210604
2211101
2211102
2210710
2211006
2210301
2211310
2210801
2210802
2210711
3111305
2640402
2110202
2211103
2211305
2211308
2220201
2220205
3110300
2220210
3111001
3111002
3111003
2211306
3111401
2210102

Item
Basic Salaries Civil Services
Electricity SIBO
Electricity CBOs
Purchase of Water Treatment Supplies-(SIBO)
Purchase of Water Treatment Supplies-CBO
Refined Fuel and Lubricant for transport
Maintenance Expenses- Motor Vehicles
Telephone, Telex, Facsimile & Mobile phone Services
Courier & Postal Services
Daily Subsistence Allowance
Publishing & Printing Services
Subscription to Newspapers, Magazines & Periodicals
Advertisement, Awareness & Public Campaigns
Trade Shows & Exhibitions
Purchase of Uniforms & Clothing- Staff
Hire of transport equipment
General Office Supplies (papers, small office equipment etc)
Supplies & Accessories for Computers & Services
Accommodation allowance
Purchase of tools
Travel costs
Contracted professional services
Catering services
Boards, committees, conferences and seminars
Renewal of drivers licences
Tuition fee allowances
Maintenance and purchase of tree seeds and seedlings
Public Participation and Stakeholders Forums
Donations
Casual wages
Sanitary & Cleansing Materials, Supplies & Services
Contracted guards & Cleaning Services
Legal Dues, Arbitrations & Compensation Payments
Maintenance of Plant, Machinery & Equipment( including lifts)
Maintenance of Buildings & Stations Non Resident
Refurbishment of Buildings
Maintenance of Computers , Software, Networks & Communications Equipment
Purchase of Office Furniture and Fittings
Purchase of Computers , Printers & Other IT Equipment
Purchase of Air conditioners, Fans & Heating Appliances
Membership fees
feasibility
Water & sewerage charges

PROGRAMME BASED BUDGET JUNE 2016

Water
&Irrigation
Charges
24,153,965
24,000,000
4,000,000
3,557,684
2,280,000
950,000
750,000
225,000
80,570
1,295,589
157,700
133,760
459,316
95,000
42,935
182,248
95,000
95,000
190,000
755,000
446,323
570,000
82,064
150,480
95,000
1,397,374
95,000
8,000,000
145,380
285,000
137,500
47,500
0
95,000

Administration

Energy
&Natural
Resources

950,000
1,000,000
475,000
37,620
950,000
142,500
133,000
853,500
142,500
475,000
190,000
313,500
545,000
650,000
700,000
760,000
760,000
9,500
592,500
1,324,356
190,000
194,625
376,200
342,000
255,000

475,000
475,000
285,000
475,000
47,500
45,896
275,000
102,410
47,500
190,000
209,000
190,000
375,000
285,000
1,710,000
475,000
1,900,000
115,900
95,000
95,000
95,000
95,000

142,500
275,000
130,000
52,250
-

190,000
95,000
-

Totals
24,153,965
24,000,000
4,000,000
3,557,684
2,280,000
2,375,000
2,225,000
985,000
118,190
2,720,589
347,700
312,656
1,587,816
339,910
517,935
190,000
543,248
95,000
830,000
209,000
1,030,000
1,830,000
760,000
760,000
9,500
1,323,823
1,710,000
2,369,356
190,000
1,900,000
392,589
621,680
532,000
1,492,374
445,000
8,000,000
287,880
750,000
362,500
52,250
47,500
0
95,000

Page 45

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code
2210203
3111005

Water
&Irrigation
Charges
95,000
95,000
75,235,388

Item
Maintenance of sewerage works
Purchase of Photocopiers & Other Office Equipment
TOTAL

DEVELOPMENT
Sub County

Ward

Alego
Usonga

Siaya
Townshi
p

Ugunja

Sigomre

Ugunja

Sigomre

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Sub
Location
Mulaha

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,

Water

Drilling Of Borehole At Pap


Kakan

Water

Equiping Madungu Borehole

1,500,000

Water

Purchase Of Solar Pump For


Sigomre Borehole

1,500,000

Water

Drilling And Equiping Of


Borehole At Rero Village

Water

Spring Protection At Uhesia


Karagwel Village

Water

Drilling And Equiping Of


Borehole At Sirunga Village

Water

Spring Protection At Kolak


Village

Water

Drilling Equiping Of Borehole


At Mulanya Village

450,000

Water

Drilling Equiping Of Borehole


At Sango Village

450,000

Water

Drilling Equiping Of Borehole

450,000

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Administration
104,500
13,066,051

Estimates
2016/17
2,000,000

460,000

8,343,206

Total
Estimates

Code

2,000,000

311059
9

1,500,000

311059
9

1,500,000

311059
9

460,000

311059
9

460,000

Energy
&Natural
Resources

311059
9

460,000

311059
9

311059
9

450,000

311059
9

450,000

311059
9
311059

Totals

95,000
199,500
96,644,646

Description
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other

Page 46

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Sub
Location

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project
At Bao Spring In Imbaya Village

B/F
2015/2016

Estimates
2016/17

Water

Drilling Equiping Of Borehole


At Ulawe Village

450,000

Water

Spring Protection At Store


Pamba Kalegio

250,000

Water

Spring Protection At Kowiny

250,000

Water

Spring Protection At Kokoth

250,000

Water

Spring Protection At Kojuondo

250,000

Water

Spring Protection At Uriya


Magoya Primary School

450,000

Water

Construction Of Water Kiosk


And Extension Of Plumbing
Works From Ambira Water
Tower
Equiping Of Ambira Solar
Powered Borehole

350,000

Water

3,000,000

Water

Desilting Of Sianga

1,000,000

Water

Desilting Of Nyadado

1,000,000

Water

Desilting Of Kombam

1,000,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates
450,000

Code

Description
9

450,000

311059
9

250,000

311059
9

250,000

311059
9

250,000

311059
9

250,000

311059
9

450,000

311059
9

350,000

311059
9

3,000,000

311059
9

1,000,000

311059
9

1,000,000

311059
9

1,000,000

311059
9

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 47

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Rarieda

West
Asembo

Rarieda

West
Asembo

Rarieda

West
Asembo

Bondo

North
Sakwa

Bondo

North
Sakwa

Alego
Usonga

West
Alego

Ugenya

West
Ugenya

Sub
Location

Kalaka

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Water

Desilting Of Kabwoga

Water

Extension Of Korimba Nina Warianda Primary Warianda


Beach Water Line 7km

1,500,000

Water

Extension Of Serawongo
Kajon Water Line 4km

1,000,000

Water

Pump And Solar For Got Kopolo


Community Water Project

500,000

Water

Water Harvesting In Hospitals


For Oyamo Dispensary & Ndeda
Dispensaries And Installation Of
Power In Denda Dispensary
Nyagoko Kawamangaria Kawino
Pipeline And Kiosk

1,100,000

Water

Completion Of Omboye Kiswaro


Pipeline And Kiosk

900,000

Water

Completion Of Nyamor
Nyamboyo And Kiosk

700,000

Water

Completion Of Bugni And


Manyonge Boreholes

2,000,000

Water

Rehabilitation Of Soko Rao And


Otonge

2,000,000

Water

Drilling Of Borehole At
Malomba

2,500,000

Water

Construction Of Drainage At
Mahawa

1,500,000

Water

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
1,000,000

1,800,000

Total
Estimates

Code

1,000,000

311059
9

1,500,000

311059
9

1,000,000

311059
9

500,000

311059
9

1,100,000

311059
9

1,800,000

311059
9

900,000

311059
9

700,000

311059
9

2,000,000

311059
9

2,000,000

311059
9

2,500,000

311060
0

1,500,000

311050
4

Description
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 48

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

East
Asembo

Rarieda

East
Asembo

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Rarieda

South
Uyoma

Sub
Location

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

Function

Proposed Project

Water

Pap Otere Water Pump

2,000,000

Water

Desilting Of Konimbo Dam

1,500,000

Water

Pipeline Extention From Agok


To Kogoye Beach And
Construction Of Tank

1,200,000

Water

Pipeline Extention To Mumbo


Primary From Weta Point And
Construction Of Tank

1,500,000

Water

Pipeline Extention To Kandiala


Beach

Water

Pipeline Extention To Lwala


Rahongo Area

Water

Additional Water Tanks To Naya


Secondary School

300,000

Water

Additional Water Tanks To


Ndigwa Market

300,000

Water

Installation Of Water Tanks At


Lwanda Kotieno Police Post

400,000

Water

Installation Of Water Tanks To


Kadundo Primary School

400,000

Water

Renovation Of Water Tank At


Wi Omino Market

350,000

Water

Pipeline Extention To Mayange


Beach

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17

500,000
1,000,000

1,000,000

Total
Estimates

Code

2,000,000

311059
9

1,500,000

311059
9

1,200,000

311059
9

1,500,000

311059
9

500,000

311059
9

1,000,000

311059
9

300,000

311059
9

300,000

311059
9

400,000

311059
9

400,000

311059
9

350,000

311059
9

1,000,000

311059
9

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur

Page 49

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Rarieda

South
Uyoma

Bondo

South
Sakwa

Bondo

South
Sakwa

Bondo

South
Sakwa

Bondo

South
Sakwa

Bondo

Yimbo
East

Ugenya

Ukwala

Simur East

Ugenya

Ukwala

Simur East

Ugenya

Ukwala

Simur East

Ugenya

Ukwala

Simur

Ugenya

Ukwala

Simur

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Function

Proposed Project

B/F
2015/2016

Estimates
2016/17

Water

Irrigation At Abot Area

Water

Pipeline Extention Got AbieroAnyuongi And A Kiosks

2,000,000

Water

Alero Dam Construction

1,200,000

Water

Construction Of Ogola- Aluoch


Dam

1,200,000

Water

Construction Of Aredo Dam

1,200,000

Water

Pipeline Extention GotmatarUlongi Mkt. To Ottach Pri To


Bar Okwiri Mkt- Got Matar To
Abidha Pri. And To Othach
Dispensary- Uhanga Pri.- Bur
Yiro Mkt
Repair Of Owino Olak Borehole

4,000,000

Water

500,000

200,000

Water

Drilling Of Borehole At Uloma


B Village

450,000

Water

Spring Protection At Kothing

300,000

Water

Construction Of Nyawita
Borehole

450,000

Water

Protection Of Water Springs At


Kobade Water Point

300,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates

Code

500,000

311059
9

2,000,000

311059
9

1,200,000

311059
9

1,200,000

311059
9

1,200,000

311059
9

4,000,000

311059
9

200,000

311059
9

450,000

311059
9

300,000

311059
9

450,000

311059
9

300,000

311059
9

Description
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 50

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Ugenya

Ukwala

Simur

Ugenya

Ukwala

Doho West

Ugenya

Ukwala

Doho East

Ugenya

Ukwala

Doho East

Ugenya

Ukwala

Doho East

Ugenya

Ukwala

Siranga

Ugenya

Ukwala

Siranga

Ugenya

Ukwala

Siranga

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Yenga

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

Function

Proposed Project

Water

Protection Of Water Springs At


Ng'onglo Village

300,000

Water

Construction Of Ndwara
Borehole

450,000

Water

Drilling Of Limbo Borehole

450,000

Water

Repair Of Borehole At Doho


Primary

200,000

Water

Construction Of Borehole At
Ukwala A

450,000

Water

Repair Of Borehole At Nzoia


Primary

200,000

Water

Spring Protection At Koyang

300,000

Water

Nyawita A Borehole Drilling

450,000

Water

Drilling Of Got-Omalo Primary


School Borehole

450,000

Water

Drilling Of Borehole At Ulore

450,000

Water

Spring Protection At Wang'tar

300,000

Water

Drilling Of Manga B Borehole

450,000

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

300,000

311059
9

450,000

311059
9

450,000

311059
9

200,000

311059
9

450,000

311059
9

200,000

311059
9

300,000

311059
9

450,000

311059
9

450,000

311059
9

450,000

311059
9

300,000

311059
9

450,000

311059
9

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur

Page 51

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Ugenya

North
Ugenya

Ligala

Ugenya

North
Ugenya

Sega

Ugenya

North
Ugenya

Kagonya

Ugenya

North
Ugenya

Kagonya

Ugenya

North
Ugenya

Nyamsenda

Ugenya

East
Ugenya

Gem

Yala
Townshi
p

Gem

East Gem

Bondo

Yimbo
West

Bondo

West
Sakwa

Nyawita

Bondo

West
Sakwa

Nyawita

Bondo

West

Nyawita

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,

Function

Proposed Project

B/F
2015/2016

Estimates
2016/17

Water

Protection Of Water Springs At


Ohuh And Anyuong Water Point

500,000

Water

Protection Of Springs Water At


Umlunda, Ugambe, Fundula And
Odende Village

1,000,000

Water

Construction Of Borehole At
Ukaka

1,500,000

Water

Protection Of Spring Water At


Kodeke And Kafuande

500,000

Water

Protection Of Water Spring At


Kobinda And Kamono

500,000

Water

Expansion Of Collection Pump


And Extension Of Piping

2,000,000

Water

Repairs Of Water Springs At


Ambumba, Kaligare,Kajuok And
Kamenya

Water

Sinaga Girls Water Projects

3,000,000

Water

Mageta Water Line

2,000,000

Water

400,000

Water

Pipeline Extension From


Nyamira Water Point To
Nyamira Villages And Building
Of Kiosks With Water Tanks
Desilting Of Otok Dam

Water

Desilting Of Ogalo Dam

800,000

PROGRAMME BASED BUDGET JUNE 2016

600,000

800,000

Total
Estimates

Code

500,000

311059
9

1,000,000

311059
9

1,500,000

311059
9

500,000

311059
9

500,000

311059
9

2,000,000

311059
9

600,000

311059
9

3,000,000

311059
9

2,000,000

311059
9

400,000

311059
9

800,000

311059
9
311059

Description
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other

Page 52

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward
Sakwa

Sub
Location

Bondo

West
Sakwa

Nyawita

Bondo

West
Sakwa

Utonga

Bondo

West
Sakwa

Utonga

Bondo

West
Sakwa

Maranda

Bondo

West
Sakwa

Kapiya

Executive

Executiv
e

Executive

Executive

Executiv
e

Executive

Executive

Executiv
e

Executive

Bondo

Yimbo
East

Bondo

Yimbo
East

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project

B/F
2015/2016

Estimates
2016/17

Water

Extension Of Water Line From


Yala Main Line To Got Winyo
Dispensary

400,000

Water

Desilting Of Okungu Dam

800,000

Water

Building Water Kiosks With


Tanks At Riwa,Ndhere And
Alara Water Lines

600,000

Water

Building Water Kiosks With


Tanks At Maranda, Ugadhi And
Kobado Water Points

600,000

Water

Building Water Kiosks With


Tanks At Sinyanya Centre

200,000

Water

Purchase Of Self-Loading Waste


Management Tractor

15,000,000

Water

Provision Of Safe Water Filters


To Households In Siaya County
(Programme Supported By Great
Lakes Foundation, Just One
Foundation, Uzima And Siaya
County Partnership)
Support To The Water Tower
Protection And Climate Change
Mitigation And Adaptation
Program In Siaya County ( Eu
Funding For Mt. Cherenganyi
And Elgon Water Towers).
Construction Of Water Tanks At
Got Matar

4,000,000

Water,
Environment
And Natural
Resources

Water

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water
Water

PROGRAMME BASED BUDGET JUNE 2016

Renovation Of Piped Water Of


Agola Ramogi Water Project

5,490,000

3,000,000
1,500,000

Total
Estimates
800,000

Code

Description
9

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Trucks And
Trailers

400,000

311059
9

800,000

311059
9

600,000

311059
9

600,000

311059
9

200,000

311059
9

15,000,000

311070
5

4,000,000

311059
9

Other
Infrastructur
e And Civil
Works

5,490,000

311059
9

Other
Infrastructur
e And Civil
Works

3,000,000

311059
9

1,500,000

311059
9

Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 53

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location
Bar Osimbo

Alego
Usonga

South
East
Alego

Alego
Usonga

South
East
Alego

Bar Agulu

Alego
Usonga

Siaya
Townshi
p

Nyandiwa

Alego
Usonga

Siaya
Townshi
p

Mulaha

Gem

Yala
Townshi
p

Alego
Usonga

Central
Alego

Kochieng' A

Alego
Usonga

Central
Alego

Kochieng' B

Alego
Usonga

Central
Alego

Obambo

Alego
Usonga

North
Alego

Olwa

Alego
Usonga

North
Alego

Komolo

Alego
Usonga

North
Alego

Olwa

Alego
Usonga

North
Alego

Ulafu

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Water

Drilling Of Borehole At Nyalori

Water

Drilling Of Borehole At Uhuru


Market

Water

Extension Of Piped Water


Madede Primary School

450,000

Water

Construction Of Water Tank At


Mulaha Dispensary

450,000

Water

Extension Of Jina Water Project


To Jm Rembe Primary School

2,000,000

Water

Desilting Of Awendo Water Pan

1,225,000

Water

Delisting Of Yawo Ober Water


Pan

1,225,000

Water

Desilting Of Yawo Ober Nyabera


Water Pan

1,200,000

Water

Uranga Omilo And Urewe Dam

1,400,000

Water

Shallow Well At Siwembe And


Poye

1,000,000

Water

Purchase Of Sub Mersible Pump


At Ogoria Water Point

Water

Pipeline Extension For Ulaf


Dispensary To Uyango Village

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
1,000,000
1,000,000

500,000
2,000,000

Total
Estimates

Code

1,000,000

311059
9

1,000,000

311059
9

450,000

311059
9

450,000

311059
9

2,000,000

311059
9

1,225,000

311059
9

1,225,000

311059
9

1,200,000

311059
9

1,400,000

311059
9

1,000,000

311059
9

500,000

311059
9

2,000,000

311059
9

Description
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 54

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Alego
Usonga

North
Alego

Nyalgunga

Rarieda

North
Uyoma

Rarieda

East
Asembo

Bondo

North
Sakwa

Alego
Usonga

North
Alego

Rarieda

East
Asembo

Alego
Usonga

Usonga

Alego
Usonga

Usonga

Gem

East Gem

Ugenya

West
Ugenya

Rarieda

West
Uyoma

Komolo

Kobong

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project

Water

Erection Of Water Tower At


Nyalgunga Primary School

2,000,000

Water

Disilting Of Koleche Pond

1,000,000

Water

Water Tanks For Omuga And


Nguka Okiro Line

Water

Installation Of Water Tanks For


Nyabenge, Ndira, Mawere, Bar
Chando, Dier Aora, Siage, Bar
Mwofu, Ngulu And Sirembe
Primary Schools
Rehabilitation Of Uyoma ''B''
Shallow Well

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

B/F
2015/2016

Estimates
2016/17

500,000
1,050,000

500,000

Water

Additional Funding For


Koduongo Dam

Water

Drilling, Equiping And


Distribution Of Water At
Uhembo Dispensary

3,000,000

Water

Drilling And Installation Of


Water Pump At Mahero Village

2,000,000

Water

Maungo Water Project

3,000,000

Water

Construction Of Borehole At
Masawa In Nyalenya

1,500,000

Water

Additional Funding For Piping


Extension From St Sylvester

4,000,000

PROGRAMME BASED BUDGET JUNE 2016

500,000

Total
Estimates

Code

2,000,000

311059
9

1,000,000

311059
9

500,000

311059
9

1,050,000

311059
9

500,000

311059
9

500,000

311059
9

3,000,000

311020
2

2,000,000

311059
9

3,000,000

311059
9

1,500,000

311050
4

4,000,000

311059
9

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals,
Etc)
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur

Page 55

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Rarieda

North
Uyoma

Gem

West
Gem

Alego
Usonga

Usonga

Alego
Usonga

Usonga

Alego
Usonga

West
Alego

Ugunja

Sidindi

Ugunja

Sidindi

Executive

Executiv
e

Alego
Usonga

Central
Alego

Alego
Usonga

Central
Alego

Ojwando B

Alego

Central

Kakum

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water,
Environment
And Natural
Resources
Water,

Function

Proposed Project
Madiany To Owimbi

B/F
2015/2016

Estimates
2016/17

Water

Desilting And Fencing Of


Kosewe Water Pan

Water

Purchase Of Water Pump At


Ngiya Market

300,000

Water

Provision Of Water Tank At


Rwambwa Health Center

245,000

Water

Provision Of Elevated Steel


Support For Nyangera Water
Point

255,000

Water

Completion Of Rasugu Borehole

3,300,000

Water

Construction Of Water Kiosks


And Pipe Laying For Simenya
Community

3,000,000

Water

Rangala Community Water


Project

1,072,792

Water

Irrigation Infrastructure
Development

6,245,859

Environment

Phase 1 Of Partnership With


Tembea Youth Centre For
Sustainable Development (Cbo)
In The Construction Of Energy
Efficient (Miti Mbili) Cook
Stove: Construction Of 2,000
Energy Efficient Cook Stove For
2,000 Households:
Disilting And Fencing Of Adoho
Water Pan

Water
Water

PROGRAMME BASED BUDGET JUNE 2016

Phase 1 Of Liganwa Primary

1,000,000

Total
Estimates

Code

1,000,000

311059
9

300,000

311059
9

245,000

311059
9

255,000

311059
9

3,300,000

311059
9

3,000,000

311059
9

1,072,792

311059
9

6,245,859

311059
9

2,400,000

2,400,000

311059
9

1,400,000

1,400,000

311059
9
311059

Description
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Other
Infrastructur
e And Civil
Works
Other

Page 56

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location
Kombewa/
Koyeyo

Usonga

Alego

Gem

Central
Gem

Bondo

Central
Sakwa

Uyawi

Bondo

Central
Sakwa

Nyango'ma

Bondo

Central
Sakwa

Uyawi

Bondo

Central
Sakwa

Uyawi

Rarieda

East
Asembo

Omia Diere

Rarieda

East
Asembo

South Ramba

Rarieda

East
Asembo

Rarieda

East
Asembo

Gem

East Gem

Bondo

Yimbo
East

Marenyo

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

School Borehole Water Project:

B/F
2015/2016
3,032,000

Water

Equiping And Developing Of


Kagilo Borehole

1,106,072

1,106,072

311059
9

Environment

Tree Nursery In All Pri


Schools/Groups

1,400,000

1,400,000

311130
5

Environment

Rehabilitation Of Wambara,
Alara,Raba, Liunda, Uyawi Ack

1,000,000

1,000,000

311059
9

Water

Construction Of Water Line


From Mbeka Dispensary To
Miyandhe Primary School

2,000,000

2,000,000

311059
9

Water

Extension Of Pipeline From


Nango To Dago/Kopolo-Kisia
Line

704,059

704,059

311059
9

Water

Excavation Of Water Pond At


Kahayo, Rabora-Banda

201,170

201,170

311059
9

Water

Excavation Of Nyayiera, Got


Anyango, Pipeline &
Construction Of Water Kiosks
Ombulu Masanga
Pap Oterre Water Pump

1,800,000

1,800,000

311059
9

1,000,000

1,000,000

311059
9

1,000,000

1,000,000

311130
5

1,000,000

1,000,000

311059
9

1,000,000

1,000,000

311130
5

Water

Proposed Project

Environment

Planting Of Trees At Nyilima


Dam, Asembo Bay, Abidha,
Oboch And Kitambo

Water

Protection And Repair Of


Achiewo Kobor, Konyiego,
Kodera And Kachola
Kodiembo Springs
Establishment Of Tree Seedlings
At Radier Dispensary, Kasau ,
Magombe, Ulungo Dispensary
And Aling'a Primary

Environment

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

Total
Estimates
3,032,000

Code

Description
9

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings

Page 57

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Executive

Executiv
e

Executive

Executiv
e

Executive

Executiv
e

Executive

Executiv
e

Executive

Executiv
e

Executive

Executiv
e

Executive

Executiv
e

Alego
Usonga

North
Alego

Alego
Usonga

North
Alego

Alego
Usonga

North
Alego

Alego
Usonga

North
Alego

Alego
Usonga

North
Alego

Sub
Location

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Environment

Solid Waste Management In


Siaya, Bondo, Usenge, Ukwala,
Ugunja And Yala Towns

Water

Drilling And Equiping Of Sogo


Borehole

Water

Disilting Yawo Odongo

Water

Extension Of Water Supply In


Bondo And Siaya Towns

Water

Drilling Of Borehole At Yenga


Secondary School In North
Ugenya

Water

B/F
2015/2016

Estimates
2016/17
4,574,576

Total
Estimates

Code

4,574,576

311130
5

4,700,000

311059
9

942,325

311059
9

2,635,726

311059
9

435,500

435,500

311059
9

Umina Community Water


Project In Ugunja Ward

416,570

416,570

311059
9

Water

St Rafael Dispensary Water


Project

504,691

504,691

311059
9

Water

Construction Of 6 New Springs


At Kambira, Koling, Kuoyo,
Kodopo Murumba, Koduol

1,200,000

1,200,000

311059
9

Water

Water Tank At Ulafu Dispensary


And Pipeline

3,000,000

3,000,000

311059
9

Water

Shallow Well At Nyioro Ugoha

500,000

500,000

311059
9

Water

Rehabilitation Of Ondero
Shallow Well

200,000

200,000

311059
9

Water

Repair Of Shallow Well At


Kakello

200,000

200,000

311059
9

PROGRAMME BASED BUDGET JUNE 2016

4,700,000

942,325
2,635,726

Description
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 58

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Alego
Usonga

North
Alego

Gem

North
Gem

Gem

North
Gem

Bondo

North
Sakwa

Bondo

North
Sakwa

Bondo

North
Sakwa

Bondo

North
Sakwa

Ugenya

North
Ugenya

Ligala

Ugenya

North
Ugenya

Ligala

Rarieda

North
Uyoma

W.
Katwenga

Rarieda

North
Uyoma

Ochienga

Rarieda

North
Uyoma

Malanga

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

Function

Proposed Project

Water

Protection Of 6 New Springs At


Kawich, Ulafu, Ith, Koruya,
Komego & Kabuto

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

255,610

255,610

311059
9

Drilling Of Borehole At
Argwings Kodhek Sec School

13,000

13,000

311059
9

Water

Construction Of Usuha Nyanya


Borehole

1,000,000

1,000,000

311059
9

Water

Drilling Of Manyonge Borehole

2,500,000

2,500,000

311059
9

Water

Water Tanks And Their


Installation

405,627

405,627

311059
9

Water

Rehabilitation Of Miruka Dam

815

815

311059
9

Water

Drilling Of Borehole At Bugni

2,500,000

2,500,000

311059
9

Environment

Drilling Borehole At Sew Village


(Got Nanga)

650,000

650,000

311130
5

Environment

Drilling Borehole At Abich


Water

650,000

650,000

311130
5

Water

Drilling Of Borehole At Chianda


Ager

2,400,000

2,400,000

311059
9

Water

Rehabilitation Of Koyuga Water


Tank And Piping

500,000

500,000

311059
9

Water

Supply And Installation Of 10m3


Water Tanks To Ten Primary

1,250,000

1,250,000

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur

Page 59

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Alego
Usonga

Siaya
Townshi
p

All

Alego
Usonga

Siaya
Townshi
p

Nyandiwa

Ugunja

Sidindi

Ugunja

Sidindi

Ugunja

Sidindi

Ugunja

Sidindi

Ugunja

Sigomre

Ugunja

Sigomre

Ugunja

Sigomre

Alego
Usonga

South
East
Alego

Bar Osimbo

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project
Schools

Water

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Water

Extension Of Piped Water To


Usenge, Papkakan, Lwala Kaor,
Rae, Lwala Koudia, Nyandiwa,
Kalwande, Agage, Rabango,
Ramba Pundo, Ngoya, Urogi,
Kanyawangwe, Mufwayo, Pandi,
Banana, Sulwe, Achage, Anduro,
Uhongo And Town Area And
Construction Of Water Kiosks
Desilting Of Fundhwe Dam

Environment

Development Of Tree Seedlings


In 19 Primary Schools

Water

Protection Of Yiro East,


Ombogo, Rangala, Kondou,
Ruwe, Ka Edward, Uhuyi,
Swoyi, Yiro Nilon, Simenya,
Nyambonia Water Springs
Supply Of 10m3 Water Tanks To
11 Primary Schools

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

1,000,000

1,000,000

311059
9

50,000

50,000

311059
9

2,000,000

2,000,000

311130
5

1,200,000

1,200,000

311059
9

1,100,000

1,100,000

311059
9

1,639,200

1,639,200

311059
9

277,488

277,488

311059
9

1,000,000

1,000,000

311059
9

Water

Production Of 6m Tree Seedlings

Water

Protection Of Water Springs

Water

Completion Of Madungu
Borehole, Piping And Purchase
Of Pumps.

Water

Drilling Of Got Osimbo


Borehole

1,000,000

1,000,000

311059
9

Environment

Tree Nursery At Nyanganga


Primary School

500,000

500,000

311130
5

PROGRAMME BASED BUDGET JUNE 2016

Description
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And

Page 60

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Alego
Usonga

South
East
Alego

Mur Malanga

Alego
Usonga

South
East
Alego

Alego
Usonga

South
East
Alego

Nyajuok

Gem

South
Gem

All

Gem

South
Gem

All

Gem

South
Gem

Bondo

South
Sakwa

Got Abiero

Rarieda

South
Uyoma

Naya Sub
Location

Rarieda

South
Uyoma

Naya Sub
Location

Rarieda

South
Uyoma

Naya Sub
Location

Rarieda

South

Lieta Sub

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,

Function

Proposed Project

Environment

Tree Nurseries To Oloyo Ling


Group

300,000

300,000

311130
5

Water

Drilling Of Borehole At Nyala


Village Polytechnic

695,000

695,000

311059
9

Water

Disiltation Of Rabuor Dam

1,000,000

1,000,000

311059
9

Water

Tree Planting Along The Road


Within S. Gem E.G. Akala
Market Along Kisumu Bondo
Highway
Pipe Extension In South Gem
Ward

500,000

500,000

311059
9

1,500,000

1,500,000

311059
9

12,182,464

311059
9

1,500,000

1,500,000

311059
9

200,000

200,000

311130
5

2,500,000

2,500,000

311059
9

2,000,000

2,000,000

311059
9

Water
Water

Water

Provision Of Water To All


Government Institutions I.E.
Dispensaries, Schools, Health
Centres, Chief Camps, Markets
And Acquire Generator For
Piped Water From River Yala
For The Ward And Build Two
Reservoir At Malele And Got
Osir
Extension Of Got Abiero Water
Pipeline And Installation Of Two
Water Tanks

Environment

Establishment Of Tree Nurseries


Across The Sub-Location

Water

Extension Of Water Pipeline


With Gi Pipes To Mayange
Beach And Wikwang Beach

Water

Excavation And Expansion Of


Nyandera Water Pan

Water

Extension Of Pipeline From

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

2,439,574

Estimates
2016/17

9,742,890

Total
Estimates

Code

311059

Description
Seedlings
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other

Page 61

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward
Uyoma

Sub
Location
Location

Rarieda

South
Uyoma

Ndigwa Sub
Location

Rarieda

South
Uyoma

Ndigwa

Rarieda

South
Uyoma

Ugunja

Ugunja

All Sub
Locations

Ugunja

Ugunja

Ligega Sub
Loc

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ugunja

Ligega Sub
Loc

Ugunja

Ugunja

Ligega Sub
Loc

Ugunja

Ugunja

Ligega Sub
Loc

Ugunja

Ugunja

Magoya

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Kogembi To Buru (Nanga Hills)

B/F
2015/2016
2,500,000

Water

Installation Of Storage Water At


Ndigwa And Osembo

2,500,000

2,500,000

311059
9

Water

Excavation And Expansion Of


Rachar Dam

470,003

470,003

311059
9

Water

Supply And Installation Of High


Lift Water Pump For Uyoma
East Water Supply

50,000

50,000

311059
9

Environment

Youths And Women Groups

400,000

400,000

311130
5

Water

Borehole Drilling At Masambra


Primary

250,000

250,000

311059
9

Water

Spring Water Protection


At Kalejo Store Pamba

250,000

250,000

311059
9

Water

Spring Water Protection


At Ogaso Water Point

120,000

120,000

311059
9

Water

Spring Water Protection


At Kotam - Owiso A. Village

250,000

250,000

311059
9

Water

Spring Water Protection At


Aronge - Ulumba

250,000

250,000

311059
9

Water

Spring Water Protection At


Kasaf - Owiso B Village

480,000

480,000

311059
9

Water

Spring Water Protection At


Kandalo

250,000

250,000

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Proposed Project

Estimates
2016/17

Total
Estimates
2,500,000

Code

Description
9

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 62

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location
Rambula
South

Ugunja

Ugunja

Ugunja

Ugunja

Rambula
South

Ugunja

Ugunja

Rambula
South

Ugunja

Ugunja

Ugunja Sub
Loc

Ugunja

Ugunja

Ugunja Sub
Loc

Ugunja

Ugunja

Ugunja Sub
Loc

Ugunja

Ugunja

Ugunja Sub
Loc

Ugunja

Ugunja

Ugunja Sub
Loc

Ugunja

Ugunja

Ngunya Sub
Loc

Ugunja

Ugunja

Ambira Sub
Loc

Ugunja

Ugunja

Ambira Sub
Loc

Ugunja

Ugunja

Umala Sub Loc

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Water

Spring Water Protection At


Kowiny

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

250,000

250,000

311059
9

Spring Water Protection At


Usugu

250,000

250,000

311059
9

Water

Spring Water Protection At


Kanene

250,000

250,000

311059
9

Water

Spring Water Protection At


Kodemba Spring

20,000

20,000

311059
9

Water

Spring Water Protection At


Nyasanda Spring

250,000

250,000

311059
9

Water

Spring Water Protection At


Suwinga Spring

133,280

133,280

311059
9

Water

Spring Water Protection At


Kowokospring

250,000

250,000

311059
9

Water

Spring Water Protection At


Kongare Spring

133,280

133,280

311059
9

Water

Spring Water Protection At


Manga Water Point

250,000

250,000

311059
9

Water

Nyamtende Borehole

250,000

250,000

311059
9

Water

Ojwinya Kosogo Spring

480,000

480,000

311059
9

Water

Mulanya Water Spring

50,000

50,000

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Description
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 63

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Ugunja

Ugunja

Ugenya

Ukwala

Simur

Ugenya

Ukwala

SimurKodiek

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Simur East

Ugenya

Ukwala

Simur East

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Siranga

Alego
Usonga

Usonga

Alego
Usonga

Usonga

Alego
Usonga

Usonga

Alego
Usonga

West
Alego

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

Function

Proposed Project

Water

Sinking Of Shallow Wells At


Nyamsare, Waliera, Dendyo

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

607,335

607,335

311059
9

Drilling Of Boreholes At: Simur


Primary School, Mudia, Kisoma
And Rayola

2,000,000

2,000,000

311059
9

Water

Drilling Of Boreholes At Uranga,


Nyandheho, Kamalunga,
Karuoth, Sikinga And Sigweng

2,000,000

2,000,000

311059
9

Water

Protection Of Ogwela Water


Springs

300,000

300,000

311059
9

Water

Protection Of Onyango Owada

300,000

300,000

311059
9

Water

Installation Of Water Tanks And


Power Supply At Ukwala Water
Point

500,000

500,000

311059
9

Water

Protection Of Water Springs At


Nyamboyo

300,000

300,000

311059
9

Water

Protection Of Water Spring At


Kagak Point

300,000

300,000

311059
9

Water

Rehabilitation And Construction


Of River Hwiro & Desiltation Of
Mahur Dam

2,000,000

2,000,000

311059
9

Water

Drilling And Installation Of


Water Point At Nyangera Market
Centre

2,000,000

2,000,000

311059
9

Water

Plumbing And Installation Of


Overhead Water System And
Extension Of Water Points
(Rwambwa Water Point)
Tree Planting For Registered
Youth And Women Groups

2,000,000

2,000,000

311059
9

1,000,000

1,000,000

311130
5

Environment

PROGRAMME BASED BUDGET JUNE 2016

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds

Page 64

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Alego
Usonga

West
Alego

Alego
Usonga

West
Alego

Rarieda

West
Asembo

Mahaya

Rarieda

West
Asembo

Nyagoko

Rarieda

West
Asembo

Nyagoko

Rarieda

West
Asembo

Gem

West
Gem

Gem

West
Gem

Bondo

West
Sakwa

Bondo

West
Sakwa

Adhoro,
Malunga
East, Abir,
Malunga
West,Pundo
Rachier,Ula
mba,Uriri,To
go And
Dienya West

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

Water

Drilling Of Boreholes At
Wangchieng

2,500,000

2,500,000

311059
9

Water

Disilting Nyamisi And Nyasita,


Dams

2,351,284

2,351,284

311059
9

Water

Construction Of Piped Water At


Kokeyo Benja-Kapeto

1,200,000

1,200,000

311059
9

Water

Construction Of Two Water


Reserves Along Kamgwa River

1,500,000

1,500,000

311059
9

Water

Construction Of Piped Water At


Kawino-KawamangariaNyagoko

2,000,000

2,000,000

311059
9

Water

Opening Of Kopenji Nyamboyo


Dam

397,016

397,016

311059
9

Environment

Establishment/Support Of 5 Tree
Nurseries At Abir In Malunga
West, Pundo Rachier In Ulamba,
Uriri, Togo In Dienya West

1,000,000

1,000,000

311130
5

Environment

Tree Nursery Development

1,000,000

1,000,000

311130
5

Water

Disiltation Of Agwara Dam

800,000

800,000

311059
9

Water

Disiltation Of Ogango Dam

569,735

569,735

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Description
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings

Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 65

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Usire

Bondo

West
Sakwa

Nyawita

Ugenya

West
Ugenya

Rarieda

West
Uyoma

Kobong

Rarieda

West
Uyoma

Nyabera

Bondo

West
Yimbo

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural

Water

Disiltation Of Silala Dam

Water

Disiltation Of Tinga Koda Dam

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

800,000

800,000

311059
9

1,962

1,962

311059
9

Extension Of Service Line From


Maranda Kobado

700,000

700,000

311059
9

Water

Extension Of Water Pipeline


From Bar Opuk Obedi

700,000

700,000

311059
9

Water

Water Pipeline Extension From


Sinyanya Primary School Water
Point Sinyanya Centre

400,000

400,000

311059
9

Water

Rehabilitation Of Ndhere
Village, Ng'iya-Alara Village

300,000

300,000

311059
9

Water

Disiltation Of Osooume Water


Dam

5,730

5,730

311059
9

Water

Extension Of Piped Water From


Bondo College- Uloma

1,000,000

1,000,000

311059
9

Water

Protection Of Uruma And Tong


Gwen Springs

500,000

500,000

311059
9

Water

Construction Main Water Line


(Uyoma West Line) From St.
Sylvesters Madiany To Owimbi
(Part)
Desilting Adhiri Pond

2,000,000

2,000,000

311059
9

400,000

400,000

311059
9

2,000,000

2,000,000

311059
9

Water
Water

PROGRAMME BASED BUDGET JUNE 2016

Rehabilitation Of Nambo Water


Project - Extension Of Pipeline
From Nyayo Kiosk To Honge

Description
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil

Page 66

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Yala
Townshi
p

Gem

Yala
Townshi
p

Sub
Location

Gem
Gem

Yala
Townshi
p

Alego
Usonga

North
Alego

Alego
Usonga

North
Alego

Alego
Usonga

West
Alego

Alego
Usonga

West
Alego

Bondo

North
Sakwa

Ajigo

Bondo

South
Sakwa

West
Migwena

Bondo

South
Sakwa

Got Abiero

Olwa

Sector
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment

Function

Proposed Project

Water

Beach Via Nyenye


Installation Of Piped Water In
Jina Sub Location

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

1,800,000

1,800,000

311059
9

Water

Installation Of Piped Water In


Anyiko Sub Location

200,000

200,000

311059
9

Water

Sauri-Yala-Korua-Kadede Water
Project

200,000

200,000

311059
9

Water

Jina Borehole Drilling

2,000,000

2,000,000

311059
9

Water

Power Installation And Pipeline


Extention In Olwa Community
Water Project

2,769

2,769

311059
9

Water

Rehabilitation Of 16 New
Springs At Adoho, Kawich,
Komego, Koruya, Solho,
Kayuma, Kanyamgoya, Kosweta,
Pony, Ochucha, Adoho Kodiro,
Kachwiri, Kosweta Nyaboyo,
Kadola, Kadooso, Gweyo And
Kochanda
Drilling Of Bore Hole At Kabura
Secondary School

601,200

601,200

311059
9

800,000

800,000

311059
9

Water
Water

Drilling Of Bore Hole At Udenda


Village Borehole

2,000,720

2,000,720

311059
9

Water

Drilling Of Shallow Well At


Lunga

506,310

506,310

311059
9

Water

Rehabilitation Of Mbeka-Got
Abiero Water Line

2,864,662

2,864,662

311059
9

Water

Construction Of Shallow Well At


Kobune

69,619

69,619

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Description
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur

Page 67

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

West
Sakwa

Bondo

West
Sakwa

Nyawita

Bondo

West
Sakwa

Kapiyo

Bondo

Yimbo
East

Bondo

Yimbo
East

Gem

West
Gem

Gem

Yala
Townshi
p

Gem

North
Gem

Maliera

Gem

North
Gem

Malanga

Ugunja

Sidindi

Uriri,
Malunga
East, Dienya
East

Sector
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,

Function

Proposed Project

Water

Extension Of Nango Akoko Line

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

592,000

592,000

311059
9

Extension Of Wambara Rabango


Line

1,265,000

1,265,000

311059
9

Water

Extension Of Pipe Water Service


Line From Nyakasumbi - Uloma

2,000,000

2,000,000

311059
9

Water

Disiltation Of Selesen Water


Dam

341

341

311059
9

Water

Extension Of Water Pipe From


Ndhere-Alara And Nyandunyi
Village

1,000,000

1,000,000

311059
9

Water

Lul Water Pan Construction

1,000,000

1,000,000

311059
9

Environment

Tree Planting At Oele Beach


And Nya Udenge Beach

949,640

949,640

311130
5

Water

Installation Of Water Tanks At 3


Ecd Centers At Pala, Ginga And
Ober 5000ltrs

600,000

600,000

311059
9

Environment

Planting & Growing Of Trees

300,000

300,000

311130
5

Water

Installation Of Systems At
Borehole - Usuha Nyanya

700,000

700,000

311059
9

Water

Installation Of Water Systems At


Risriga Borehole

119,531

119,531

311059
9

Water

Development Of Tree Seedlings

PROGRAMME BASED BUDGET JUNE 2016

311059

Description
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other

Page 68

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Ugunja

Sigomre

Ugunja

Sigomre

Rarieda

North
Uyoma

Ochieng'a

Rarieda

North
Uyoma

West
Katwenga

Rarieda

South
Uyoma

Naya

Rarieda

South
Uyoma

Lieta

Rarieda

South
Uyoma

Ndigwa

Rarieda

West
Asembo

Rarieda

West
Asembo

Rarieda

West
Asembo

Rarieda

West

Kobong

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,

Function

Proposed Project
2m

B/F
2015/2016
3,000,000

Estimates
2016/17

Total
Estimates
3,000,000

Code

Description
9

Water

Protection Of Spring Water Point


At Kasirwa, Koyugi And
Kondula

666,900

666,900

311059
9

Water

Protection Of Spring Water Point


At Kamdawa, Kamsando And
Kamusewein

666,200

666,200

311059
9

Water

Provision Of 8 Water Tanks To


Nyamasori Pri. Sch, Chianda
Kilo Pri Sch, Kobonyo Pri Sch,
Chianda Dispensary, Ochienga
Sec Sch, Wayaga Sec Sch, Ruma
Sec Sch And Achieng Oneko Sch
@ 100,000
Disilting Of Yao Kambogo

800,000

800,000

311059
9

900,000

900,000

311059
9

Water
Water

Extension Of Water Point At


Kamin Oningo Area

500,000

500,000

311059
9

Water

Expansion And Expansion Of


Kokayo Dam

1,000,000

1,000,000

311059
9

Water

Extension Of Water Point At


Osembo Area

500,000

500,000

311059
9

Water

Disilting Of Miya Dam

500,000

500,000

311059
9

Water

Provision Of Tanks To Kiwaro


And Akom Primary Schools

1,000,000

1,000,000

311059
9

Water

Provision Of Piped Water Lwak


Gb Primary And Lwak Mixed
Primary

4,394

4,394

311059
9

Water

Disilting Of Pond At Chinga

PROGRAMME BASED BUDGET JUNE 2016

311059

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other

Page 69

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward
Uyoma

Sub
Location

Rarieda

West
Uyoma

Rachar

Rarieda

West
Uyoma

Nyabera

Rarieda

West
Uyoma

Rarieda

West
Uyoma

Ugenya

East
Ugenya

Ugenya

East
Ugenya

Ugenya

North
Ugenya

Ugenya

North
Ugenya

Ugenya

West
Ugenya

Ugenya

West
Ugenya

Bondo

West
Sakwa

Sega

Sector
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Function

Proposed Project

Water

Disilting Pond At Orina

Water

Improvement Of Nyabera Water


Pipelines

Water

Pipeline Extension From


Nyagwara-Kaudi-Kakumba
Water Tank (Owimbi) Pipeline

Water

B/F
2015/2016
1,500,000

Estimates
2016/17

Total
Estimates
1,500,000

Code

Description
9

1,300,000

1,300,000

311059
9

2,000,000

2,000,000

311059
9

892,253

892,253

311059
9

High Lift Water Pump For


Uyoma West Water Supply

920,366

920,366

311059
9

Water

Repair Of Sirisia Water Project


And Other Boreholes

500,000

500,000

311059
9

Environment

Establishment Of Tree Nurseries


And Environmental Clubs In
Schools

999,280

999,280

311130
5

Water

Protection Of Water Springs At


Murombo And Ligala

600,000

600,000

311059
9

Water

Spring Water Protection In


Miyare And Mauna Springs

500,000

500,000

311059
9

Water

Disilting Of Obondo Water Pan

500,000

500,000

311059
9

Water

Protection Of Usenge And


Simola Springs

500,000

500,000

311059
9

Water

Disiltation Of Kokoth Water


Dam

301,411

301,411

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 70

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub
Location

Bondo

West
Sakwa

Ugenya

North
Ugenya

Alego
Usonga

Central
Alego

Alego
Usonga

Central
Alego

Gem

North
Gem

Ugunja

Sigomre

Ugunja

Ugunja

Ugenya

Ukwala

Yenga

Ugenya

Ukwala

Siranga

Ugenya

Ukwala

Simur

Ugenya

Ukwala

Doho West

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water

Tree Nurseries At Kapiyo,


Utonga, Tinga Koduma, Kobure,
Nyamware Dams

Water

Water,
Environment
And Natural
Resources

Water

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Water

B/F
2015/2016

Estimates
2016/17

Total
Estimates

Code

Description

598,921

598,921

311059
9

Extention Of Piped Water Supply


Within Sega Township

594,000

594,000

311059
9

Water

Rehabilitation And Fencing Of


Uyugu Village Shallow Well

200,000

200,000

311059
9

Water

Rehabilitation And Protective


Fencing Of Liganwa Shallow
Well

200,000

200,000

311059
9

Water

Construction Of Market Shades


At Sirembe Market

1,000,000

1,000,000

311059
9

Water

Water Springs Protection At


Katito Ombewa, Kadelewa,
Koloo Ramuayi, Umawa,
Ondero, Ombonya, Adoho,
Kojwang, Nyaranga, Likongo,
Maina And Luru
Sinking Of Shallow Wells (10)
At Osoda, Nyaundo, Nyagara,
Obange, Uref, Nyamsare,
Nyabgoa, Maliera, Pendyo,
Suwinga
Drilling Of Shallow Well At
Yenga Market Centre

11,200

11,200

311059
9

1,500,000

1,500,000

311059
9

Other
Infrastructur
e And Civil
Works

300,000

300,000

311059
9

Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Water

Protection Of Spring Water At


Kokelo Kamang'amu

250,000

250,000

311059
9

Water

Sinking Of Shallow Well At


Kanyar Okuro

300,000

300,000

311059
9

Water

Protection Of Spring Water At


Kaluk/Kojow

250,000

250,000

311059
9

PROGRAMME BASED BUDGET JUNE 2016

Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works
Other
Infrastructur
e And Civil
Works

Page 71

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugenya

Ukwala

Executive

Executiv
e

Sub
Location
Siranga
Executive

Sector

Function

Proposed Project

Water,
Environment
And Natural
Resources
Water,
Environment
And Natural
Resources

Environment

Agro Forestry And Horticulture


And Grain Crop Growing At
Nzoia Primary School

Water

Drilling And Equipping Of


Ukwala Catholic

PROGRAMME BASED BUDGET JUNE 2016

Total

B/F
2015/2016

Estimates
2016/17

300,000
4,500,000
151,865,043

177,981,843

Total
Estimates

Code

300,000

311130
5

4,500,000

311059
9

329,846,886

Description
Purchase Of
Tree Seeds
And
Seedlings
Other
Infrastructur
e And Civil
Works

Page 72

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

VOTE NO: 006

VOTE TITLE: EDUCATION, YOUTH AFFAIRS, GENDER AND SOCIAL SERVICES

Part A: Vision: A socio-culturally vibrant, secure, and empowered community


Part B: Mission: To provide sustainable education and training, social protection, sports
development, promotion and talent nurturing, culture and heritage preservation.
Part C: Strategic Objectives
Programme
CP.1 General Administration, planning
and support services
CP.2 County pre-primary education
CP.3 Vocational Education
Training development

and

CP.4 County
services

and

social

security

CP.5. Sports and Talents Development

Strategic Objective
To provide transformative leadership, capacity and policy direction in
service delivery.
Increase enrolment in early childhood education; improve quality of
education in early childhood education in the County; and improve
nutritional status of children in pre-primary education
To provide accessible quality pre-primary education in the county
Improve access and quality of education and training in vocational
training centres
To provide access to quality and relevant training to youth polytechnic
trainees
Increase enrolment of vulnerable persons for various safety net
programmes; enhance social and moral responsibility and ensure equity
and gender responsiveness
To expand welfare and support systems in the county
Build modern sporting and talents development facilities and improve
management of sports and sporting facilities in the County

Part D: Context for Budget Intervention


The sector has two directorates and five divisions namely: - Early Child Hood Development and
Education, Youth Training, Sports and Talent Development, Gender and Youth Development
and County Social Securities and Services.

In the FY 2015/2016, the Department was allocated a total of Ksh.900, 538,106 a total of
Ksh.750, 745, 286 was allocated for Development while Ksh. 148,792,823 was set aside for
Recurrent. A total of Ksh.66, 509,394 went to Operations and Maintenance of which Ksh.30,
000,000 was spent on purchase of equipment of ECDE Centres. Ksh.83, 283,429 went to
Operations and Maintenance. Therefore, 16.6% was spent on recurrent while Development
consumed 83.4%.

Sports is a very important subsector which if properly harnessed and managed can create wealth
besides, endowing the people with its other many benefits in health, entertainment and directing
youth energies to areas that have dividends in their socialization and risk reduction. In 2015/16
financial year the department had at its disposal Ksh 30 million to improve Siaya sports stadium
and Ksh 5 million for Migwena Sports Academy to improve sporting facilities. In doing this the
department was laying the ground for initiating the training of sports men and women right from
the grass roots with focus on youths from 14 years. Already the completion of the fencing of
PROGRAMME BASED BUDGET JUNE 2016

Page 73

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Siaya stadium and develop it into a modern playground is in process. A total of Ksh
16,000,000.00 was budgeted for sporting facilities and activities at the Ward Level.

Local tournaments in soccer, netball, sports for the physically challenged, athletics and boat
racing competitions were also supported. The department engaged with various stakeholders on
domestication of the Sports Act, 2013 and continued with the construction of the Siaya stadium
perimeter fence.

Moving forward in 2016/17 the county intends to construct a state-of-the-art sports facility at
Siaya Stadium grounds as a flagship project. This facility is intended to provide a comfortable
training ground for sportsmen and women in the county and serve as a major sports venue that
will also create employment and attract considerable revenue to the County. To ensure equitable
distribution of sports facilities and ensure ease of access, the Department shall in the financial
year begin put up classroom for the sports and talent development at Migwena Sports Academy.
In addition, the Department is in the process of putting in place a framework for effective
coordination and development of sports activities; promote registered clubs, develop children
sports, train and involve more sports men and women in professional sports.

The ECD sub sector was one of the sectors with the highest need for intervention in the three
previous financial years. While the County grappled with some of these needs, the challenges
remained that of low enrolment, inadequate and inaccessible centres/ classrooms play materials,
sanitary facilities, poor remuneration of ECD teachers, and high poverty levels leading to poor
nutrition of the under-fives and low retention. In addition, the over 1050 ECD public and private
centers spread across the county still required effective and efficient management support for
them to provide the requisite holistic education.
The County Government has over the period of its existence tried to mitigate some of these
challenges. In 2014/15 a total 83 ECD model centres were under construction at a cost of
ksh.334, 683,740. In 2015/2016 the Department spent Ksh.44, 000,000.00 on furniture for 62
ECDE Centres. A total of Ksh.190, 000,000.00 has been paid to contractors for ECDE Blocks,
Vocational Training Workshops, Resource Centres, and Perimeter Wall for Siaya Stadium. This
was in addition to the 62 ECDE centres completed in the previous financial year. Besides, the
sector awarded bursary worth Ksh 30 million and 49.8million to 4500 and 8,208 needy and
bright students in secondary and post-secondary institutions respectively in 2013/2014 and
2014/2015 FYs. In 2015/2017 Ksh.76, 700,000.00 was allocated for bursary and at least 10,000
beneficiaries have been identified. In addition a total of 450 ECDE instructors at a total cost of
Ksh.4,500,000.00 per month totalling to Ksh.54,000,000.00 in a year.
In the next financial year, the sector proposes to intensify efforts in the strategic areas of the
ECD programme which include recruitment of ECD Instructors, strengthening programme
management and capacity building of the primary stakeholders.
PROGRAMME BASED BUDGET JUNE 2016

Page 74

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


In the year 2009, the youth population accounted for 27% of the Countys population. This
population requires well developed tertiary institutions for training and skills development,
besides, the need for the county to invest heavily on opportunities for employment creation.

The County had 14 public and 1 private registered youth polytechnics. The communities also
initiated an additional 9 polytechnics. However, even with this effort, the registered youth
polytechnics were unevenly distributed with Ugunja Sub County having none. Only three
polytechnics had boarding facilities while the rest were day polytechnics. Four (4) of the
registered youth polytechnics had at least 2 standard workshops as well as classrooms. The
National Government continued to pay Ksh 15000 per trainee enrolled in the public registered
polytechnics under the subsidized youth polytechnic tuition scheme (SYPT). In spite of all these
efforts however, the trainee enrolment stood at 1154 with 704 males and 450 females
representing an extremely small percentage of youth out of school.

There were 35 public service instructors teaching in the youth polytechnics. For quality
instruction there is need to have adequate instructors in the available polytechnics (old and new).
The Department intends to recruit more instructors to address the shortage. In 2015-2016 Ksh
17m was earmarked for physical facilities improvement.
It is important to note that the for the polytechnics to turn around the County must step up its
investment in improving the quality of training through recruitment of highly qualified
instructors and capacity building
existing ones, besides increasing equipments and
infrastructural development. These considerations have indeed informed the focus of the next
budget where a considerable percentage of this sub sectors resources have been applied to
personnel emoluments.

Highlights of Achievements
The Department of Education, Youth Affairs, Gender and Social Services has had the following
Recruited core staff in the department including 34 Youth polytechnic instructors,3 ECD
Sub-County coordinators, two directors and 450 ECD instructors to improve the capacity of
the department to offer quality service to our clients
Identified 10,000 needy students in special primary schools, day and boarding secondary
schools, colleges and universities and awaiting disbursement of Ksh. 76,700,000.00 for
bursary in 2015/16 thus retention of students in schools and colleges.
450 needy older persons have been identified to benefit from the Ksh.9, 000,000.00 allocated
for older persons. Verification of the list is being done. The funds have been requested from
Finance Department.
Disbursed Kenya Shillings Thirty Million (30,000,000) and Forty nine million, eight hundred
thousand (49,800,000) respectively to 4500 and 8,208 bright and needy students in schools,
colleges and universities in 2013/2014 and 2014/2015 FYs.
Successfully hosted two family days: the International Day for PWDs and the International
Womens Day reaching out to more than 3000 people
PROGRAMME BASED BUDGET JUNE 2016

Page 75

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Put up 45 soccer goal posts, 24 netball posts, 28 volleyball posts in playing fields in the
County
Constructed 110 metres of the Siaya Stadium wall, the remaining 540 metres will be
awarded. A request for BQs has been done.
Levelled Bondo Sports Complex playground and Uhondo Playground. BQs have been
requested for Muhondo Playground, Uhembo Playground, to improve the fields for practice
and competitions by community sportsmen and women
Supplied sports equipment to the thirty Wards in the County to make use of the installed goal
posts and levelled playgrounds.
Equipping of the Gem, Bondo and Alego Usonga sheltered workshops for PWDs (each
Ksh.2,000,000.00) and Karemo Resource Centre (Ksh.1,500,000.00) is on-going;
Held the Siaya County and Migwena Cultural Festivals and participated (co-financed with
Tourism) the Piny Luo Tourism and Cultural Festival 2015 in an attempt to revive the Luo
culture.
Tenders have been awarded for construction of new 80 ECDE centres in responding to the
infrastructural needs of the centres at a cost of Ksh.257, 300,000.00 this financial year.
Contractors are on site. Work orders have been issued. A total of 83 EDCE Centres were
constructed in 2014/15 while 62 ECDE Centres were constructed in the FY 2013-2014.
Constructed eleven (11) new workshops for new polytechnics in 2013/2014.
Constructed eight (8) resource centres were constructed in 2013/2014.
In terms of Policies and Enabling Legislations, the Department has in 2015/2016 ensured the
preparation and enactment of the following:
i.
The Siaya County Bursary Fund Act, 2016;
ii.
The Siaya County Early Childhood Education Act, 2016
iii.
The Siaya County Older Persons Fund Act, 2016
iv.
The Siaya County Persons Living with Disabilities Bill;
v.
The Siaya County Childcare Bill;
vi.
The Siaya County Pre-Primary Education Bill,
vii.
The Siaya County Sports Bill;
viii.
The Siaya County Early Childhood Education Policy, 2016
ix.
The Siaya County Pre-Primary School Feeding Programme Policy, 2016
x.
The Siaya County Social Protection Policy
xi.
The Siaya County Youth Policy;
Working with various segments of our communities for the past couple of years, the Department
has registered considerable concern with regard to soaring poverty levels and social problems
ranging from inadequate resources to support education and training to diminishing abilities of
the people to meet their basic needs due to certain vulnerabilities. This was in spite of the efforts
being made to improve livelihoods of the farming communities. There is therefore need for the
budget to incorporate a social safety net in line with the vision 2030 social pillar and in order to
PROGRAMME BASED BUDGET JUNE 2016

Page 76

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


supplement existing national efforts aimed at mitigating against these challenges for the
vulnerable categories.

It is in this spirit that the department has proposed to increase:


Allocation for Siaya Stadium and Migwena Sports Academy to upscale them to national and
international standards for social, cultural and economic gains.
Allocation for the Siaya County School Milk Programme, another major flagship project in
Siaya County
Allocation for Social Health Insurance Scheme (NHIF for the indigents)
Allocation for education bursary to needy and bright students and cash transfer to the
vulnerable older persons.
Allocation for PWDs, women and youth empowerment funds to enable them access seed
money (cheap loans)
Recruitment of 30 more instructors for polytechnics
Allocation of subsidized youth polytechnic funds (SYPT) for trainees enrolled in vocational
training centres
Recruitment of 6 more technical staff in the sports department
Recruitment of additional 150 ECDE Instructors this financial year and another 450 in
2016/2017
It is however noted that these interventions alone will not support effective and sustainable
growth and therefore in order to strengthen livelihoods of the vulnerable persons /households
broad empowerment strategies that would culminate in having a positive, well informed and
hardworking populace will be adopted. The activities proposed will include community dialogue
forums, targeted trainings, stakeholder conferences, field follow ups and supporting the target
groups to celebrate occasions prescribed in the world calendar.
Challenges encountered during the implementation period
The Department faced major challenges in the year. These have been outlined as follows:
Only 3% of the resource envelop was dedicated to operation and maintenance, this coupled
with inadequate personnel, lack of transport means and inadequate office space and furniture
hampered effectiveness in service delivery.
Untimely release of funds for bursary from the treasury
Allocation for sports activities under development which impaired our objective to hold
leagues/tournaments, constitute sub-county sports committees and county sports council;
Under-allocation for Siaya Stadium and Migwena Sports Academy thus inability to
commence construction of modern stadium and initiation of sports and talents academy
Over 80 projects were under implementation in the year and monitoring were constrained
due to inadequate resources and poor community involvement and participation.
The procurement process was taking a long time to the extent that some projects were
awarded towards the end of the financial year hence delaying their timely execution.
Some contractors abandoning works before completion leading to frustration
Delay in paying some of the contractors who had completed their work
PROGRAMME BASED BUDGET JUNE 2016

Page 77

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Lack of structured monitoring of the works being done the contractors


Interference by MCAs in implementation process.
The works Department carrying out site meetings without representation from the user
Department and other relevant stakeholders
Inadequate allocation of funds for recruitment of adequate instructors for the youth
polytechnics and technical staff in sports department
Delay in legislative and policy making process which have impaired allocation for certain
functions and delayed implementation to certain extent
Too many requests for funds and supports from individuals, groups, communities and
institutions despite inadequate funds,

Proposed mitigation Strategies and Way forward


In order to hasten completion of project and achievement of targets in the CIDP we propose the
following:
(i)

(ii)

(iii)

(iv)
(v)
(vi)

Increase allocation for sports which will help realize the stadium and sports academy as
flagship projects;
The department will form a monitoring and evaluation team composed of representatives
of the various directorates. The team will be chaired by the Chief Officer. The team will
be monitoring the progress of the projects on a weekly basis and make reports and
recommendations for timely completion of quality projects
We have prepared certain policy papers on polytechnics, youth, social services ECDE
blocks, resource centres, sheltered workshops etc., required per population, region or per
Poverty Index of the respective wards. This will help provide good budget for service
delivery e.g. employing personnel, providing enhanced monitoring and supervisory
services, provide necessary facilities and equipment to offer optimal service levels in all
facilities developed. This will also ensure enough money is allocated for operations in
the same institutions.
Putting emphasis on synchronizing Annual Development Plans, Procurement Plan and
Cash-Flow Projections and requisition of funds
Working closely with the Health Department and partners such as Matibabu Foundation
to implement the proposed Siaya County Social Health Insurance Scheme
Work together with the Office of the First Lady to implement Special Programmes

This Department proposes to utilize Kshs 284,303,377 on recurrent expenditure and Kshs.
629,048,932 on Capital expenditure during the year 2016/17. The 2016/2017 allocation is
approximated to increase to Kshs312,733,715 recurrent and Kshs. 691,953,825 for development
in the FY 2017/2018 and Kshs. 344,007,086 for recurrent and Kshs.761,149,208 for
development FY 2018/2019.

PROGRAMME BASED BUDGET JUNE 2016

Page 78

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2015/16- 2017/18
Programme

Delivery Unit

Key Outputs

Key
Target
Target
Target
Performance
(Baseline) 2016/17 2017/18
Indicators
2015/16
Name of Programme 1: General Administration, planning and support services
Outcome: Efficient and effective services provided to the public and enhanced interdepartmental and inter-county cooperation
SP1.1 General CECs/COs office
Operations and maintenance
No. of Facilities 5
5
5
Administration
and
vehicles
maintained
No. Furniture and
equipment
Staff establishment
No.
of
staff 525
650
715
Staff training and development
established
1
1
1
No. of TNAs 15
25
28
prepared annually 12
12
12
Effective project administration No. Staff trained
48
48
48
and coordination meetings
No.
Project
progress reports
No.
Meeting
reports
20
20
20
Well-developed sector plans
4
4
4
Well prepared departmental
work plans
No. of Sectoral
525
650
715
Reports
Well prepared Individual work
plans
Well conducted Staff appraisals

No. of
Departmental
Work Plans

Target
2018/19

787
1
31
12
48
20
4
787

525

525

525

525

120

150

100

100

No. of Individual
Work Plans
No. of staff
appraised
No. of appraisal
reports
Existence of County policy
papers and enabling legislations
Monitored and
Supervised
projects
Technical
and
quarterly
meetings
Contribution to national and
international days celebrations
Monthly Quality assurance
visits
to
ECDE centres,
Vocational Training Centres,
Resource Centres, Sporting and
Social Facilities
Staff capacity building/training
Bursary fund administration
Older
persons
fund
administration
Purchase of vehicles
Purchase of motorbikes
Data collection and analysis
Issue
grants
to
organizations/groups/institutions
Workshop
on
costing

PROGRAMME BASED BUDGET JUNE 2016

No. Policy papers


and
enabling
legislation
prepared
No.
Projects
monitored
No.
Meetings
held
No. Events held

12

12

12

12

No. Visits

240

240

240

240

No.
Persons
trained
No.
Meetings
held
No.
Meetings
held
No. Vehicles
No. Motor bikes
Report
No. of grants
issued
Report on full

15

25

28

31

286

286

286

286

70

70

70

70

2
1
2
10

0
0
5
15

2
0
5
20

0
0
5
30

Page 79

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


departmental functions

departmental
costs
Reports

Feasibility study for talents


3
2
development
and
sports
academy conducted
Consultancy
Reports
3
3
Name of Programme CP 2: County Pre Primary Education
Outcome: Increased rate of enrolment of boys and girls in pre-primary education for holistic development of children
SP 2.1 Early Division of Early Improved access and retention Number
of 65,000
70,000
Childhood
Childhood Education in ECDE Centres
children enrolled
Development
and Education
Teachers Trained
No. of teachers 0
0
trained
Constructed and equipped ECD NO.
of 65
60
classrooms
classrooms
constructed and
equipped
ECD
management
recruited
Instructors recruited

SP 2.2 Preprimary
Education
Quality
Assurance

Division of Early
Childhood Education

staff

Stakeholders trained
Training and resource centre
constructed
Improved quality of instruction
in pre-primary education

No.
staff
employed
No.
instructors
recruited
Persons trained
Centre
No. of Quality
Assurance
Officers
Recruited
No. of Quality
Assurance
Reports
No. of children
receiving school
milk

90,000

110,000

2100

2500

60

60

10

10

10

10

192

200

270

270

Zero
Zero

300
Zero

400
1

500
zero

600

600

600

78,000

98,000

120,000

30

30

19

1500

1650

2000

850
5

900
5

1050
5

650

700

750

SP 2.3 Pre- Division of Early Improved nutritional status of


70,000
Primary
Childhood Education children
in
pre-primary
School
education
Feeding
Programme
Name Of Programme CP 3: Vocational Education and Training development
Outcome: Improved access to quality education and training in vocational training centres County
SP 3.1 Youth Division
of Instructors recruited
No. of instructors 65
Training and Vocational Training
recruited
Empowerment
Trainees supported through No. of trainees 0
SYPT
supported by the
Subsidized Youth
Polytechnic
Tuition Funds
No. of graduates
800
SP.3.2
Division
of Improved vocational training No. of vocational 5
Polytechnic
Vocational Training
centres
training centres
Development
improved
No. of vocational 3
training centres
equipped
Name of Programme CP 4: County Social Security and Services
Outcome: Improved livelihoods and enhanced opportunities for vulnerable persons and children
SP 4.1. Gender Division of Social Staff and relevant institutions
No. number 200
mainstreaming Services
sensitized
on
gender
of staff and
mainstreaming
institutions
sensitized
Reduced
cases
gender
based
violence
Conference
on
gender
Participants
2
mainstreaming held
lists
Reports

PROGRAMME BASED BUDGET JUNE 2016

Page 80

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Policies on drug and substance
use and control Enacted
County international womens
day celebrations Held
Policies on social dimensions,
and youth adopted

SP4.2.
Disability
mainstreaming

Division of Social
Services

Older
persons/youth/women/childrens
/family
Days held
Staff and relevant institutions
sensitized
on
disability
mainstreaming

Policies
on
disability
mainstreaming enacted

Division of Social
Services

County international day for


persons with disability held
Improvement of access for
PWDs at key services points

SP4.3
Children
Support
Services

Division of Social
Services

Children given institutional care


services

PROGRAMME BASED BUDGET JUNE 2016

No. Policy
documents/
No. Pieces
of
legislation
Photographs
Participants
lists
Reports
Policy document/
Pieces
of
legislation
Photographs
Participants lists
Reports

No. of number of
staff
and
institutions
sensitized
No.
of
Photographs
Participants lists
% of reduced
cases
of
stigmatization
No. of Policies
document
adopted
No. of Pieces of
legislation
enacted
No
of
Photographs
Participants lists
No. Reports

150

650

700

750

1
300
1

1
300
1

1
300
1

1
300
1

No. of facilities
monitored
for
compliance
on
construction of
ramps
No.
of
sign
language
interpreters
recruited
No. of assessment
reports
No.
of
Renovated,
equipped
and
functional child
rescue centre
No.
of
Constructed
dormitory
for
boys and girls at
children rescue
centre

30

50

100

Page 81

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs.)
Programme
CP 1: General Administration, planning and support
services
Total Expenditure of Programme 1
CP 2: County pre-primary education
Total Expenditure of Programme 2
CP 3: Vocational Education and Training
development
Total Expenditure of Programme 3
CP 4: County social security and services
Total Expenditure of Programme 4
CP 5:Sports and Talents Development
Total expenditure for Programme 5
Total Expenditure of Vote

Baseline
Estimates
2015-16

Estimates 2016-17

Projected Estimates
2017/18

22,032,362

146,005,713

160,606,284

176,666,913

582,040,049

525,233,961

577,757,357

635,533,093

56,819,335

97,678,883

107,446,771

118,191,448

22,032,363

146,005,713

582,040,050

525,233,961

56,819,336

97,678,883
92,425,970
92,425,970
52,007,782
52,007,782
913,352,309

160,606,284

577,757,357

107,446,771
101,668,567
101,668,567
57,208,560
57,208,560
1,004,687,540

Part G: Summary of Expenditure by Vote and Economic Classification (Kshs.)


Expenditure Classification

Current Expenditure
Compensation to Employees
Use of goods and services
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development
Total Expenditure of Vote

2018/19

Baseline Estimates 2105/16

Estimates 2016/17

176,666,913

635,533,093

118,191,448
111,835,424
111,835,424
62,929,416
62,929,416
1,105,156,294

Projected Estimates
2017/18
2018/19
312,733,715
344,007,086
156,098,034
171,707,838
156,635,680
172,299,248

125,455,595
24,337,228

284,303,377
141,907,304
142,396,073

750,745,286
750,745,286

629,048,932
629,048,932

691,953,825
691,953,825

761,149,208
761,149,208

900,538,109

913,352,309

1,004,687,540

1,105,156,294

Part H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs. Million)
Baseline
Estimates
2015/16
CP 1: General Administration, planning and support
Current Expenditure
22,032,363
Compensation to Employees
6,566,596
Use of goods and services
15,465,767
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
750,745,286
Acquisition of Non-Financial Assets
750,745,286
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 1
772,777,649
CP 2:Preprimary School Education
Current Expenditure
11,016,182
Compensation to Employees
6,566,596
Use of goods and services
4,449,586
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 2
11,016,182
CP 3: Vocational Education and Training Development
Current Expenditure
11,016,182
Compensation to Employees
6,566,596
Use of goods and services
4,449,586
Current Transfers Govt. Agencies
Other Recurrent

Expenditure Classification

PROGRAMME BASED BUDGET JUNE 2016

Estimates 2016/17

Projected Estimates

146,005,713
18,078,181
127,927,532

160,606,284
19,885,999
140,720,285

176,666,913
21,874,599
154,792,314

0
0
0
146,005,713

0
0
0
160,606,284

0
0
0
176,666,913

82,772,611
79,773,711
2,998,900

91,049,872
87,751,082
3,298,790

100,154,859
96,526,190
3,628,669

442,461,350
442,461,350

486,707,485
486,707,485

535,378,234
535,378,234

525,233,961

577,757,357

635,533,093

35,198,153
33,188,804
2,009,349

38,717,968
36,507,684
2,210,284

42,589,765
40,158,453
2,431,312

Page 82

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 3
CP 4: County Social Security & Services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 4
CP 5: sports and Talents Development
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 5
Total Expenditure of Vote

11,016,182

PROGRAMME BASED BUDGET JUNE 2016

62,480,730
62,480,730

68,728,803
68,728,803

75,601,683
75,601,683

97,678,883

107,446,771

118,191,448

8,864,195
6,988,760
1,875,435

9,750,615
7,687,636
2,062,979

10,725,676
8,456,400
2,269,276

83,561,775
83,561,775

91,917,953
91,917,953

101,109,748
101,109,748

92,425,970

101,668,567

111,835,424

11,462,705
3,877,848
7,584,857

12,608,976
4,265,633
8,343,343

13,869,873
4,692,196
9,177,677

40,545,077
40,545,077

44,599,585
44,599,585

49,059,543
49,059,543

52,007,782
913,352,309

57,208,560
1,004,687,540

62,929,416
1,105,156,294

Page 83

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code

2110101
2110301
2110308
2110309
2110310
2110311
2110312
2110313
2110314
2110315
2110317
2110318
2110320
2110321

Item

Basic Salary civil services


House Allowance
Medical Allowance

Administration
Services
15,184,180
1,180,000

Special Duty Allowance

Responsibility Allowance

Entertainment Allowance
Transport Allowance
Extraneous Allowance

1,000,001

Domestic Servant Allowance

Administrative Allowance
Governor/Deputy Governor Allowance

654,000

2110402
2110403
2110404
2210303

Executive Allowance

Refund of Medical Expenses-In-Patient

Refund of Medical Expenses-Ex-Gratia

Commutation of Leave
Bursary
Daily Subsistence Allowances

PROGRAMME BASED BUDGET JUNE 2016

75,000,000
470,852

Social Services

Sports

TOTAL

23,761,000

5,753,760

3,423,848

5,536,000

1,170,000

418,000

3,565,804
-

326,000

124,374,497
9,312,000

65,000

36,000

379,600

412,500

327,500

300,000

2,329,001
654,000

5,237,806

1,842,001

60,000

Risk Allowance
2110327

Youth
Polytechnics

672,001
-

Non-Practising Allowance
Leave Allowance

Transfer Allowance

76,251,709
1,008,000

Top Up Allowance

ECD

75,000,000
1,890,452

Page 84

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
2220205
3111001
3110701
3110704
2210101
2210102
2210201
2210203
2210301
2210503
2210504
2210505
2210603
2210604

Item

Maintenance of Buildings and Stations -- Non-Residential

2210801

Purchase of ECD furniture


Boards, Committee, Conferences and Seminars 2
Purchase of motor vehicles
Electricity Expenses
Water and Sewerage charges
Telephone, Telex, Facsmile and Mobile
Courier and Postal Services
Travel Costs(Airlines ,Bus, Railway)
Subscription to Newspapers,
advertising awareness
Trade Shows and Exhibitions
Printing and publishing services
Rents and Rates - Non-Residential
Supplies and Accessories for Computers and Printers
Hire of Transport
Purchase of other Office Equipment

Travel & Accommodation


Tuition fees
Catering services, receptions,

PROGRAMME BASED BUDGET JUNE 2016

Youth
Polytechnics

ECD
-

34,720

Purchase of motor cycles

Foreign Travels & Accommodation

2210711

Purchase of ECD Equipments

Boards, Committee, Conferences and Seminars 1

2210710

Administration
Services

53,875

142,500
27,550

69,336
34,200
106,500
51,300
183,387

140,435
112,000

25,000

17,100

27,550

50,000

30,400

93,480

61,560

64,125

10,260

17,100

17,100

8,550

183,387

182,309

165,000

88,350

37,449

25,650

17,100

21,375

33,250

85,500

100,000

100,000

100,000

51,587

34,200

6,840

204,100
-

94,050

103,490
-

70,500

100,680

110,000
610,119

17,100

42,750

100,000
103,750

17,100

95,000

TOTAL

22,800

143,000
42,750

Sports

34,200

94,050

164,150

Social Services

90,000

150,435
162,400
70,965

98,300

128,250
132,310
68,400

100,000
98,300

85,500

51,300

68,250

85,500

227,835
51,300

142,500
171,936
125,400
426,345
104,310
802,433
195,624
356,750
385,500
460,877

98,300

106,750

234,095

294,050
502,140

375,000
610,119
590,120
634,545

Page 85

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
2211009
2211016
2211101
2211103
2211201
2211305
2211306
2211308
2211310

Item
Education and Library Supplies
Purchase of Uniforms and Clothing - Staff
General Office Supplies (consumables)
Sanitary and cleaning materials,
Refined Fuels & Lubricants
Contracted Guards and Cleaning Services
Membership Fees, Dues and Subscriptions to Professional
and Trade Bodies
Legal Dues/fees, Arbitration and Compensation Payments
Contracted Professional Services
LVRLAC

Administration
Services
524,300
109,250
39,904

2220101
2220205
2220202
2220210
2710102
2710105
3110300
3110902
3111001
3111002
3111003
3111004

Maintenance of Buildings and Stations -- Non-Residential


Maintenance of Office Furniture and Equipment
Maintenance of Computers, Software, and Networks
Gratuity - Funeral expenses civil servants

Purchase of Household and Institutional Appliances


Purchase of Office Furniture and Fittings
Purchase of Computers, Printers and other IT Equipment
Purchase of Air conditioners, Fans and Heating Appliances
Purchase of Exchanges and other Communications
Equipment

PROGRAMME BASED BUDGET JUNE 2016

66,500
201,045

93,100

17,100

Social Services

85,500

Sports

TOTAL

766,265

85,500

34,200

34,200

19,000

34,200

4,275

20,520

114,654

208,350

161,500

184,079

307,800

426,283

8,550

73,700

492,726

59,850

116,050

177,850

172,192

175,905
-

119,713

42,750
71,250

80,750

118,250

47,500

50,500

Gratuity - County Executive Members


Refurbishment of Buildings

440,000

67,816

Coffin & Burial Advertisements


Maintenance Expenses - Motor Vehicles

Youth
Polytechnics

ECD

8,000,000

81,000
84,000

92,750

8,550
-

125,404
314,816
144,495
869,628
1,226,809
142,100
158,800
249,100

90,000
17,100
34,200

85,500

666,810

8,550

47,500
84,700

90,700

8,000,000

91,250
47,500

34,200

566,350

438,450

176,750

81,700

34,200

Page 86

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
3111005

Administration
Services

Item

Purchase of Photocopiers

Pre-primary school feeding programme

Social Services
-

Sports

Total

146,005,713

82,772,611

Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

Siaya
Township

Karapul

Education

Ecd

Ecd At Agage Primary

Ugunja

Sigomre

Education

Polytechnics

Ugunja

Sigomre

Education

Polytechnics

Toilet And Fencing Of


Mungao Polytechnic

Ugunja

Sigomre

Education

Social Services

Ugunja

Sigomre

Education

Polytechnics

Ugunja

Sigomre

Education

Polytechnics

Ugunja

Sigomre

Education

Social Services

PROGRAMME BASED BUDGET JUNE 2016

Toilet And Fencing Of


Asango Polytechnic

Toilet And Fencing Of


Kirind Resource Center
Toilet And Fencing Of
Ichinga Polytechnic
Equiping Asango
Polytechnic

Equiping Of Kirind
Resource Center

20,000,000

20,000,000

Intercounty sports championship

TOTAL

20,000,000

Social protection fund

DEVELOPMENT

Youth
Polytechnics

ECD

B/F
2015/2016

35,198,153

Estimates
2016/17
3,000,000

500,000
500,000
500,000
500,000
1,500,000

1,500,000

8,864,195

Total
Estimates

5,000,000

11,462,705

Code

20,000,000
5,000,000
284,303,377

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3110296

500,000

3110297

Construction Of
Buildings-Other

500,000

3110298

500,000

3110300

1,500,000

2211006

1,500,000

2649999

Construction Of
Buildings-Other
Construction Of
Buildings-Other
Construction Of
Buildings-Other
Purchase Of
Workshop
Tools, Spares
And Small
Equipment
Scholarships
And Other
Education

Page 87

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Gem

North
Gem

Lundha

Education

Ecd

Ecd At Gogo Primary


School

Ugunja

Ugunja

Education

Ecd

Ecd At Ambira Primary


School

3,200,000

Alego Usonga

North
Alego

Komollo

Education

Ecd

Ecd At Mbaga Mixed Pri.


School

3,500,000

Alego Usonga

North
Alego

All

Education

Sports

Education

Sports

Sports Activities For The


Ward

500,000

Education

Ecd

Alego Usonga

Rarieda

Central
Alego

West
Uyoma

Nyabera

PROGRAMME BASED BUDGET JUNE 2016

Purchase And Free


Distribution Of Fifa
Standard Football Game,
Netball Game, And
Volleyball Game Balls For
45 Clubs/Teams,
Organizing Ward Ball
Games Competition And
Award Of Best Performers
Equiping Of Ecds At
Misori, Wambisa, Nyabera,
Mirando, Ogango And
Magare Island

B/F
2015/2016

Estimates
2016/17
3,000,000

250,000

2,500,000

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

2210807

250,000

2210807

Medals, Awards
And Honors

2,500,000

3110202

Medals, Awards
And Honors

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 88

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Rarieda

West
Uyoma

Kagwa

Education

Ecd

Construction Of Ecd Block


At Kawuondi Primary
School

Rarieda

West
Asembo

Education

Ecd

Ecd At Rambira Primary


School

Bondo

North
Sakwa

Education

Ecd

Starting Construction Of
Ecd And Toilet At
Matangwe Primary

Bondo

North
Sakwa

Education

Ecd

Fencing Of Bar Opuk


Primary

Alego Usonga

West
Alego

Kodiere

Education

Ecd

Construction And Equiping


Of Ecd At Unyolo Primary
School

Ugenya

West
Ugenya

Sifuyo East

Education

Ecd

Construction Of Ecd Block


At Sifuyo Primary School

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
3,500,000

3,000,000

3,000,000

400,000

3,200,000

3,000,000

Total
Estimates

Code

Description

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

400,000

3110599

3,200,000

3110202

Other
Infrastructure
And Civil
Works

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 89

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

Sub Location

Sector

Function

Proposed Project

North
Uyoma

Education

Ecd

Ecd At Kobonyo Primary

Rarieda

North
Uyoma

Education

Ecd

Ecd At Mituri Primary

Rarieda

North
Uyoma

Education

Social Services

Youth And Women


Empowerment

Gem

Central
Gem

Education

Ecd

Ecd At Kagilo Primary

Gem

Central
Gem

Education

Ecd

Ecd At Nyawara Primary

Gem

South
Gem

Education

Ecd

Ecd At Odok Rera Primary


School

3,500,000

Gem

South
Gem

Education

Ecd

Ecd At Abuche Primary


School

3,500,000

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
3,000,000

3,000,000

2,000,000

2,000,000
3,000,000

3,000,000

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

4,000,000

2640302

3,000,000

3110202

Medium And
Small
Enterprises

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 90

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

Sub Location

Sector

Function

Proposed Project

East
Asembo

Education

Social Services

Construction Of
Polytechnic At Rariw
Primary

Rarieda

South
Uyoma

Education

Ecd

Ecd At Gudwa

Bondo

South
Sakwa

Education

Ecd

Construct Uhendo Ecd

Bondo

South
Sakwa

Education

Ecd

Construct Magak Ecd

Bondo

South
Sakwa

Education

Ecd

Construct Oganya Ecd Toilet

Ugenya

Ukwala

Education

Ecd

Construction Of Ecd
Classroom At Nzoia
Primary School

Siranga

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17

1,000,000

1,600,000

3,000,000

3,200,000

3,200,000

400,000

3,250,000

Total
Estimates

Code

Description

2,600,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,200,000

3110203

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

400,000

3110204

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,250,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 91

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugenya

Sub Location

Sector

Function

Proposed Project

East
Ugenya

Education

Ecd

Ecd At Kodongo Primary


School

Ugenya

East
Ugenya

Education

Ecd

Ecd At Nyang'ungu
Primary School

3,500,000

Ugenya

East
Ugenya

Education

Ecd

Ecd At Luanda Primary


School

3,500,000

Gem

Yala
Township

Education

Ecd

Ecd At Yala Township


Primary School

3,300,000

Gem

Yala
Township

Education

Polytechnics

Gem

East Gem

Education

Ecd

Construction Of A Toilet
At Arude Youth
Polytechnic
Ecd At Uranga Primary
School

Bondo

Yimbo
West

Education

Social Services

PROGRAMME BASED BUDGET JUNE 2016

Completion Of Mageta
Resource Centre

B/F
2015/2016

Estimates
2016/17
3,500,000

400,000
3,000,000

4,000,000

Total
Estimates

Code

Description

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,300,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

400,000

3110300

Construction Of
Buildings-Other

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

4,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 92

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Bondo
Bondo

Sub Location

Sector

Function

Proposed Project

Yimbo
West

Education

Polytechnics

Completion Of Nyayo
Polytechnic

Yimbo
West

Education

Sports

Sports Across The Ward

B/F
2015/2016

Estimates
2016/17
1,835,711

Usire

Education

Polytechnics

Completion Of Masita
Youth Polytechnic

1,000,000

Bondo

West
Sakwa

Nyawita

Education

Ecd

Ecd At Uloma Primary


School

3,000,000

Executive

Executive

Executive

Education

Social Services

Executive

Executive

Executive

Education

Social Services

Social Health Insurance


Scheme (Nhif For The
Indigents)
Empowerment Fund For
Youths, Women And Pwds

Executive

Executive

Executive

Education

Sports

Upgrading Of Siaya
Stadium

Executive

Executive

Executive

Education

Sports

Migwena Sports Stadium

Executive

Executive

Executive

Education

Polytechnics

Alego Usonga

Siaya
Township

Karapul

Education

Social Services

Subsidized Youth
Polytechnic Tuition (Sypt)

PROGRAMME BASED BUDGET JUNE 2016

Code

1,835,711

West
Sakwa

Training Of Jua Kali


Artisan(Trade Test)

Total
Estimates

12,000,000
20,000,000
1,046,320

12,490,000

5,000,000

10,000,000

15,000,000

200,000

Description

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2210807

Medals, Awards
And Honors

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

12,000,000

2430101

National Health
Insurance Fund

20,000,000

2640302

13,536,320

3110599

Medium And
Small
Enterprises

15,000,000

3110599

15,000,000

2510118

200,000

2210711

Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works

Grants To Youth
Polytechnics
Tuition Fees

Page 93

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

South
East
Alego

Mur Ng'iya

Education

Ecd

Construction Of Ecd At
Sigana Primary School

Alego Usonga

South
East
Alego

Masumbi

Education

Ecd

Construction Of Ecd At
Nduru Primary School

Executive

Executive

Executive

Education

Polytechnics

Purchase Of Equipment
And Tools To 18 Newly
Constructed Youth
Polytechnics

Gem

Yala
Township

Education

Ecd

Construction Of A Toilet
At Ecd Anyiko

400,000

Gem

Yala
Township

Education

Social Services

Renovation Of Yala Jamii


Hall

1,000,000

Gem

North
Gem

Education

Ecd

Ecd At Malanga Primary


School

3,000,000

Malanga

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
3,000,000

3,000,000

9,000,000

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

9,000,000

2211006

400,000

3110202

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110203

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 94

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sector

Function

Proposed Project

West
Gem

Education

Polytechnics

Construction Of Vip
Toilets And Fencing Of
Nguge Polytechnic

Gem

West
Gem

Education

Social Services

Printing Of Joint
Examinations Papers For
The Primary Schools

Gem

West
Gem

Education

Social Services

Construction Of Vip
Toilets, Fencing And
Electrification Of Wagai
Multi-Media Resource &
Learning Centre

Gem

West
Gem

Education

Polytechnics

Construction Of Computer
Lab At Malunga
Polytechnic

Gem

West
Gem

Education

Sports

Sports Development

Education

Social Services

Education

Ecd

Purchase Of Furniture For


Ulamba Moving Mountains
Orphanage

Education

Sports

Gem

Sub Location

West
Gem

Alego Usonga

North
Alego

Ugenya

East
Ugenya

Komolo

PROGRAMME BASED BUDGET JUNE 2016

Pit Latrine At Gombe Ecd

Sports Across The Ward

B/F
2015/2016

Estimates
2016/17
1,000,000

400,000

1,000,000

1,200,000

300,000
200,000
400,000

500,000

Total
Estimates

Code

Description

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

400,000

3111109

1,000,000

3110202

Purchase Of
Educational
Aids And
Related
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

300,000

2210807

200,000

3111001

Medals, Awards
And Honors

400,000

3110202

500,000

2210807

Purchase Of
Office Furniture
And Fittings
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Medals, Awards
And Honors

Page 95

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Executive

Executive

Executive

Education

Ecd

Equipping Of Completed
Ecd Classrooms

Alego Usonga

Central
Alego

Koyeyo

Education

Ecd

Construction And Electrical


Wiring Of Palpal Ecd
Centre And Vip Latrine

Rarieda

North
Uyoma

Education

Ecd

Construction Of Got
Odiero Primary

3,000,000

Gem

South
Gem

Education

Social Services

Equipping Of Akala
Anchor Site Library

500,000

Ugunja

Sigomre

Education

Sports

Rarieda

West
Asembo

Education

Ecd

Youths And Sporting


Activities

500,000

Rarieda

East
Asembo

Education

Sports

PROGRAMME BASED BUDGET JUNE 2016

Ecd At Saradidi Primary


School

Fencing Of Nyilima Play


Ground

B/F
2015/2016

Estimates
2016/17
30,000,000

3,000,000

2,950,000

600,000

Total
Estimates

Code

Description

30,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3111109

500,000

2210807

2,950,000

3110202

Purchase Of
Educational
Aids And
Related
Equipment
Medals, Awards
And Honors

600,000

3110599

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works

Page 96

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

Sector

Function

Proposed Project

East
Asembo

Education

Ecd

Completion Of Kandaria
Ecd

Rarieda

East
Asembo

Education

Social Services

Purchase Of Motor Bikes


For Registered Groups

1,000,000

500,000

Rarieda

East
Asembo

Education

Social Services

Education

Sports

Training Of Motor Bike


Riders

200,000

300,000

Sidindi

Education

Ecd

Ecd At Sidindi Primary

Ugunja

Sidindi

Education

Ecd

Ecd At Rangala Girls


Primary School Primary

3,000,000

Alego Usonga

Siaya
Township

Education

Social Services

Purchase Of Motor Bikes


For Registered Groups

1,800,000

Bondo

North
Sakwa

Education

Social Services

Purchase Of Motor Bike


For Registered Groups

450,000

Bondo

North
Sakwa

Education

Sports

Sports For The Ward

Education

Sports

Sports For The Ward

Rarieda
Ugunja

Ugunja

Sub Location

East
Asembo

Ugunja

Karapul

PROGRAMME BASED BUDGET JUNE 2016

Sports For The Ward

B/F
2015/2016

Estimates
2016/17
500,000

500,000
3,000,000

400,000
500,000

Total
Estimates

Code

Description

500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,500,000

3110704

500,000

2210711

Purchase Of
Bicycles And
Motorcycles

500,000

2210807

3,000,000

3110202

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,800,000

3110704

450,000

3110704

Purchase Of
Bicycles And
Motorcycles

400,000

2210807

500,000

2210807

Tuition Fees

Medals, Awards
And Honors
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Purchase Of
Bicycles And
Motorcycles

Medals, Awards
And Honors
Medals, Awards
And Honors

Page 97

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Sector

Function

Proposed Project

Usonga

Education

Ecd

Construction Of Ecd And


Pit Latrine At Lunyu

Alego Usonga

Usonga

Education

Social Services

Alego Usonga

Usonga

Education

Ecd

Purchase Of Motor Cycles


And Training Of Boda
Boda Riders

Gem

North
Gem

Education

Social Services

Rarieda

West
Uyoma

Education

Ecd

Education

Ecd

West
Uyoma
Yimbo
West

Education

Ecd

Education

Ecd

Rarieda

West
Asembo

Education

Ecd

Bondo

North
Sakwa

Education

Ecd

Gem

West
Gem

Education

Ecd

Rarieda
Rarieda
Bondo

West
Uyoma

Sub Location

Malanga

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Pit Latrine


At Uwasi Ecd

Purchase Of Motor Cycle


For North Gem Boda Boda
Sacco
Construction Of Ecd
Classrooms At Uyoha

Construction Of Ecd
Classrooms At Got Korua
Ecd Block At Majengo

Construction Of Ecd
Classrooms At Mitundu
Primary School
Construction Of Ecd
Classrooms At Atemo,
Ujwanga And Rarieda
Primary Schools
Construction Of Ecd At
Lwala Primary

Additional Funding For


Ecd At Ober And
Nyapiedho And Nguge
Polytechnic

B/F
2015/2016

Estimates
2016/17
3,500,000

1,000,000
500,000

1,200,000
299,987
299,987
348,008

1,164,289
278,091
3,000,000

2,000,000

Total
Estimates

Code

Description

3,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110704

500,000

3110202

Purchase Of
Bicycles And
Motorcycles

1,200,000

3110704

Purchase Of
Bicycles And
Motorcycles

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

299,987

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

299,987
348,008
1,164,289
278,091
3,000,000

2,000,000

Page 98

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Ugenya

Ukwala

All

Education

Ecd

Ugenya

Ukwala

All

Education

Ecd

Ugenya

Ukwala

Doho West

Education

Polytechnics

Additional Funding For


Mathiwa Ecd
Additional Funding For
Udhine Ecd
Aditional Funding For
Classrooms At Yenga
Polytechnic

Ugenya

Ukwala

Doho West

Education

Ecd

Ugunja

Sidindi

Education

Ecd

Ugunja

Sidindi

Education

Ecd

Alego Usonga

Central
Alego

Kochieng A

Education

Ecd

Alego Usonga

Central
Alego

Kakum
Kombewa/
Koyeyo

Education

Ecd

Construction Of Rarieda
Uyore Primary School
Complete Ecd Block& Ecd
Vip Latrine:

Alego Usonga

Central
Alego

Kakum
Kombewa/
Koyeyo

Education

Ecd

Construction Of Nyadhi
Primary School Complete
Ecd Block& Ecd Vip
Latrine:

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

800,000
700,000
1,590,075

Aditional Funding For Ecd


At Kamrembo

196,635

Construction Of Ecd
Classrooms At Lolwe
Primary School
Construction Of Ecd
Classrooms At Nyiera
Primary School
Construction Of Kochieng
Primary School Ecd
Block& Ecd Vip Latrine:

Estimates
2016/17

163,604
163,604
2,550,000

2,550,000

2,550,000

Total
Estimates

Code

Description

800,000
700,000

1,590,075

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,550,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,550,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,550,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

196,635
163,604
163,604

Page 99

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

Central
Alego

Obambo/Ojwando
A

Education

Ecd

Construction Of Ndai
Primary School Complete
Ecd Block& Ecd Vip
Latrine:

Alego Usonga

Central
Alego

Education

Social Services

Bondo

Central
Sakwa

Education

Social Services

Facilitation Of Term I,
Ii&Iii Joint Cats/Mock
Exams For 24 Primary And
5 Secondary Central Alego
Ward Schools:
Allocation For Disaster
Management For Ward

Rarieda

2,550,000

500,000

500,000

East
Asembo

Omia Mwalo

Education

Ecd

Rarieda

East
Asembo

Omia Diere

Education

Ecd

Construction Of Ecde
Classroom At Wera
Primary

3,000,000

Rarieda

East
Asembo

Omia Malo

Education

Ecd

Construction Of Ecde
Classroom At Ongielo
Primary

3,000,000

Rarieda

East
Asembo

South Ramba

Education

Ecd

Construction Of Ecde At
Luoro Primary

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Ecde
Classroom At Boi Primary

B/F
2015/2016

3,000,000

2,000,000

Estimates
2016/17

Total
Estimates

Code

Description

2,550,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3111109

500,000

2810201

3,000,000

3110202

Purchase Of
Educational
Aids And
Related
Equipment
Emergency
Fund

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 100

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County
Rarieda

Ward
East
Asembo

Sub Location

Sector

Function

Proposed Project

North Ramba

Education

Ecd

Construction Of Ecde At
Lela Primary School

B/F
2015/2016
3,000,000

Rarieda

East
Asembo

South Ramba

Education

Ecd

Construction Of Ecd
Classrooms At Oboch

Rarieda

East
Asembo

Omia Malo

Education

Ecd

Construction Of Ecd
Classrooms At Kamin
Ogedo Primary School

Rarieda

East
Asembo

Education

Ecd

Construction Of Ecd At
Kandaria Primary School

2,400,000

Gem

East Gem

Lihanda

Education

Ecd

Construction Of Ecd At
Omindo Primary School

959,020

Gem

East Gem

Marenyo

Education

Ecd

Construction Of Ecd At
Sinaga Primary

959,020

PROGRAMME BASED BUDGET JUNE 2016

152,079

510,643

Estimates
2016/17

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

152,079

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

510,643

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,400,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

959,020

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

959,020

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 101

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

East Gem

Gem

Sub Location

Sector

Function

Proposed Project

Ramula

Education

Ecd

Construction Of Ecd Block


At Kanyuto Primary School

East Gem

Uranga

Education

Polytechnics

Gem

East Gem

Lihanda

Education

Social Services

Electrification And
Purchase Of Furniture At
Bar Kalare Resource
Center

Gem

East Gem

Uranga

Education

Gem

East Gem

Marenyo

Gem

East Gem

Ramula

Gem

East Gem

Ugenya

East
Ugenya

Ugenya

East
Ugenya

B/F
2015/2016
949,198

500,000

Empowerment Of Widows
And Widowers

625,000

Social Services

Empowerment Of Widows
And Widowers

625,000

Education

Social Services

Empowerment Of Widows
And Widowers

625,000

Education

Social Services

Empowerment Of Widows
And Widowers

625,000

Education

Social Services

Kathieno C

Education

Ecd

Purchase Of Motorcycle
For Registered Bodaboda
Saccos

Kathieno A

Education

Ecd

PROGRAMME BASED BUDGET JUNE 2016

1,500,000

E.C.D At Nyangera
Nursery

3,000,000

E.C.D At Usinga Primary


School

3,000,000

Estimates
2016/17

Total
Estimates

Code

Description

949,198

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3110599

625,000

2640302

Other
Infrastructure
And Civil
Works

625,000

2640302

625,000

2640302

625,000

2640302

1,500,000

3110704

3,000,000

3110202

3,000,000

3110202

Medium And
Small
Enterprises
Medium And
Small
Enterprises
Medium And
Small
Enterprises
Medium And
Small
Enterprises

Purchase Of
Bicycles And
Motorcycles

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 102

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Ugenya

East
Ugenya

Kathieno B

Education

Ecd

E.C.D At Murumba
Primary School

Ugenya

East
Ugenya

Anyiko

Education

Ecd

E.C.D At Muhwayo
Primary School

3,000,000

Ugenya

East
Ugenya

Sihayi

Education

Ecd

. E.C.D At Uringi Primary


School

3,000,000

Ugenya

East
Ugenya

Ramunde

Education

Ecd

E.C.E. At Ramunde
Primary School

2,838,572

Bondo

Yimbo
East

Education

Ecd

Bondo

Yimbo
East

Education

Social Services

Construction Of 2 Ecd
Centres (Jusa And Othach)
At 3m Each
Purchase Of Mathematical
Sets To All Std 8
Candidates

Executive

Executive

Education

Social Services

Equiping Of Pwds
Rehabilitation Centres At
Gem, Bondo And Alego
Usonga Sub Counties

Executive

Executive

Education

Sports

Sporting Activities

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
3,000,000

5,000,000
200,000

229,440

6,002,400

Estimates
2016/17

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,838,572

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

200,000

3111109

229,440

2211006

6,002,400

2210807

Purchase Of
Educational
Aids And
Related
Equipment
Purchase Of
Workshop
Tools, Spares
And Small
Equipment
Medals, Awards
And Honors

5,000,000

Page 103

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

North
Alego

Gem

North
Gem

Gem

Sub Location

Sector

Function

Proposed Project

Education

Ecd

Ecd At Hono Pri. School

Maliera

Education

Ecd

Construction Of Ecd At
Ligoma Primary

1,475,650

North
Gem

Lundha

Education

Ecd

Construction Of Ecd At
Lundha Primary

514,097

Gem

North
Gem

Asayi

Education

Ecd

Construction Of Ecd At
Ndegwe Primary School

514,097

Gem

North
Gem

Asayi

Education

Ecd

Construction Of Staff
Room For Ecd At Uhonya
Primary School

Gem

North
Gem

Sirembe

Education

Ecd

Construction Of Ecd At
Sirembe Primary School

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
3,000,000

1,000,000

514,097

Estimates
2016/17

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,475,650

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 104

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Gem

North
Gem

Sirembe

Education

Ecd

Construction Of Ecd
Classrooms At Bar
Komeno, Asayi And Ndere
Pri. Schools

Gem

North
Gem

Got-Regea

Education

Ecd

Construction Of Ecd
Classrooms At Got
Kokwiri Pri. School

Gem

North
Gem

Asayi

Education

Ecd

Rehabilitation Of Ecd
Sirodha Primary

Gem

North
Gem

Nyabeda

Education

Ecd

Construction Of Ecd
Classrooms At Miro Pri.
School

827,297

Gem

North
Gem

Got Regea

Education

Ecd

Construction Of Ecd
Classrooms At Got
Kokwiri Pri. School

1,000,000

Gem

North
Gem

Got Regea

Education

Ecd

Construction Of Staff
Room For Ecd At Regea
Primary School

1,400,000

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
4,807,767

2,000,000

1,000,000

Estimates
2016/17

Total
Estimates

Code

Description

4,807,767

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

827,297

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,400,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 105

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Gem

North
Gem

Malanga

Education

Ecd

Construction Of Staff
Room For Ecd At Malanga
Primary School

Gem

North
Gem

Ndere

Education

Ecd

Construction Of Staff
Room For Ecd At Mulare
Primary School

1,200,000

Gem

North
Gem

Nyabeda

Education

Ecd

Construction Of Staff
Room For Ecd At Nyabeda
Sec School

1,200,000

Gem

North
Gem

Asayi

Education

Ecd

Construction Of Staff
Room For Ecd At Ujimbe
Primary School

1,200,000

Bondo

North
Sakwa

Education

Ecd

Education

Ecd

Ecd Kachola Buoro And


Toilet Construction

Education

Ecd

Education

Ecd

Education

Polytechnics

Bondo
Bondo
Bondo
Bondo

North
Sakwa
North
Sakwa
North
Sakwa
North
Sakwa

Bar Chando

PROGRAMME BASED BUDGET JUNE 2016

Ecd Kamnara And Toilet


Construction
Ecd Atilili And Toilet

Construction Of Ecd
Classrooms At Gobei
Primary School

Purchase Of Equipments
For Ndira Youth
Polytechnic

B/F
2015/2016

Estimates
2016/17

1,200,000

2,000,000

1,000,000

2,000,000

1,000,000

2,000,000

1,000,000

3,000,000

277,846

600,000

Total
Estimates

Code

Description

1,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,200,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2211006

Purchase Of
Workshop
Tools, Spares
And Small
Equipment

3,000,000
3,000,000
3,000,000
3,277,846
600,000

Page 106

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

North
Sakwa

Ugenya

North
Ugenya

Ugenya

Sub Location

Sector

Function

Proposed Project

Education

Polytechnics

Construction Of Classroom
At Ndira Polytechnic

Ligala

Education

Ecd

Ecd At Ligala Primary


School

3,000,000

North
Ugenya

Jera

Education

Ecd

Construction Of Ecd At
Lela Primary School

3,000,000

Ugenya

North
Ugenya

Sega

Education

Ecd

Construction Of Ecd At
Sega Township Primary
School

3,000,000

Ugenya

North
Ugenya

Nyamsenda

Education

Ecd

Construction Of Ecd
Classrooms At Nyamsenda
Primary

569,126

247,700

Ugenya

North
Ugenya

Jera

Education

Ecd

Construction Of Ecd
Classrooms At Mauna
Primary

569,126

247,700

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17

2,000,000

Total
Estimates

Code

Description

2,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

816,826

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

816,826

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 107

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Rarieda

North
Uyoma

Ragengni

Education

Ecd

Construction Of Ecde At
Kunya Primary

Rarieda

North
Uyoma

Masala

Education

Ecd

Construction Of Ecde
Classroom At Ruma
Primary School

Rarieda

North
Uyoma

E. Katwenga

Education

Ecd

Construction Of Ecde At
Migowa Primary

3,000,000

Rarieda

North
Uyoma

Ochienga

Education

Ecd

Construction Of Ecde At
Kayundi Primary

3,000,000

Rarieda

North
Uyoma

Education

Ecd

Construction Of Ecd
Classrooms At Chianda
And Ochienga Primary
Schools

Rarieda

North
Uyoma

Education

Ecd

Construction Of Ecd Centre


At Maramba Primary
School

West Katwenga

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
3,000,000

3,000,000

5,400,000

564,650

Estimates
2016/17

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

5,400,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

564,650

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 108

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Rarieda

North
Uyoma

W. Katwenga

Education

Ecd

Construction Of Ecde At
Okela Primary

Alego Usonga

Siaya
Township

Karapul &
Nyandiwa

Education

Ecd

Alego Usonga

Siaya
Township

All

Education

Social Services

Ugunja

Sidindi

Rang'ala

Education

Ecd

Ugunja

Sidindi

Ruwe

Education

Ecd

Construction Of Ecd At
Central And Naman
Akumu Primary Schools
Issuing Of Boda Boda
Operators With Driving
License
Construction Of Ecd
Classroom At Simero
Primary School

Ugunja

Sidindi

Education

Polytechnics

Ugunja

Sigomre

Education

Ecd

Construction Of Lunjre Ecd

Ugunja

Sigomre

Education

Ecd

Ugunja

Sigomre

Education

Ecd

Ugunja

Sigomre

Education

Polytechnics

Construction Of Tihinga
Ecd
Constrution Of Ecd
Classrooms At Ngop
Primary School

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Ecd
Classroom At Ruwe
Primary School.

Completion Of Rangala
Youth Polytechnic

Construction Of Ichinga
Polytechnic

B/F
2015/2016
3,000,000

6,000,000
1,000,000
740,494
740,494
1,205

740,494
740,494
249,412
685,998

Estimates
2016/17

Total
Estimates

3,000,000

Code

Description

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2210711

Tuition Fees

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

6,000,000
1,000,000
740,494
740,494
1,205

740,494
740,494
249,412
685,998

Page 109

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugunja

Sigomre

Alego Usonga

South
East
Alego
South
East
Alego

Sector

Function

Proposed Project

Education

Polytechnics

Equiping Mungao Youth


Polytechnic

All

Education

Sports

Promotion Of Sports

Musumbi

Education

Ecd

Ecd At Ojalo Primary


School

2,000,000

Alego Usonga

South
East
Alego

Pap Oriang

Education

Ecd

Ecd At Ochiewa Primary


School

3,000,000

Gem

South
Gem

Kaudha West

Education

Ecd

Kanyadet

Education

Ecd

Construction Of Odendo
Primary School Ecd

514,097

South
Gem

Rera

Education

Polytechnics

Bondo

South
Sakwa

Nyaguda

Education

Ecd

Bondo

South
Sakwa

Got Abiero

Education

Ecd

Rarieda

South
Uyoma

Lieta Sub
Location

Education

Ecd

Alego Usonga

Gem
Gem

South
Gem

Sub Location

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Malele
Primary School Ecd

Construction Of Rera
Youth Polytechnic At Rera
Mtc

Construction Of Ecd Centre


At Miganga And Saga
Primary Schools
Construction Of Ecd
Centres At Migono
Primary School, Got
Kachieng And Abimbo
Primary Schools
Construction Of Ecd
Classroom At Agok
Primary School

B/F
2015/2016

Estimates
2016/17

2,500,000

450,000

937,225
2,500,000

3,000,000
3,000,000

2,000,000

Total
Estimates

Code

Description

2,500,000

2211006

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
Medals, Awards
And Honors

450,000

2210807

2,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097
937,225
2,500,000

3,000,000
3,000,000

2,000,000

Page 110

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Rarieda

South
Uyoma

Ndigwa

Education

Ecd

Rarieda

South
Uyoma

Ndigwa Sub
Location

Education

Polytechnics

Construction Of Ecd
Classrooms At Kadundo
Primary School

Rarieda

South
Uyoma

Education

Ecd

Rarieda

South
Uyoma

Education

Ecd

Education

Ecd

Rarieda
Ugunja

South
Uyoma

Ugunja

Ligega

Education

Ecd

Ugunja

Ugunja

Ambira

Education

Ecd

Ugunja

Ugunja

Ugunja

Education

Ecd

Ugunja

Ugunja

Education

Ecd

Ugenya

Ukwala

Simu East

Education

Ecd

Ugenya

Ukwala

Simu East

Education

Ecd

Ugenya

Ukwala

Education

Ecd

Alego Usonga

Usonga

Education

Ecd

Alego Usonga

Usonga

Education

Ecd

Simur

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Resource
Centre At Ndigwa Chiefs
Camp

Construction Of Ecd
Classroom At Nyangoye
Primary School
Construction Of Pit Latrine
At Ndonyo Primary School
Construction Of Pit Latrine
At Lweya Primary School

Costruntion Of A Ecd At
Masambara Primary School
Construction & Equipping
Of Ecd At Dendyo
Construction Of Ecd At
Uref Pri. Schools.
Construction Of Ecd
Classes At Mauna

Construction Of Ecd At
Undhine Primary School

Construction Of Ecd At
Mathiwa Primary School

Construction Of Ecd
Classrooms At Simur,
Doho And Simur Kondiek
Primary Schools
Construction Of New Ecd
Classrooms At Bakhowa
And Nyangera
Construction Of New Pit
Latrines At Uhere, Ulupi
And Nyambare Ecd
Centres

B/F
2015/2016

Estimates
2016/17

617,847

Code

Description

617,847

2,000,000

2,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3,000,000

500,000

500,000

500,000

500,000

1,107,360

1,107,360

1,140,494

1,140,494

140,494

140,494

262,844

262,844

2,400,000

2,400,000

2,400,000

2,400,000

5,957,645

5,957,645

5,000,000
1,500,000

Total
Estimates

5,000,000
1,500,000

Page 111

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

West
Alego

Alego Usonga

Sub Location

West
Alego

Sector

Function

Proposed Project

Education

Ecd

Education

Ecd

Equipping Of Ecd At
Misori Primary School

Construction Of Ecd
Classrooms At Malomba,
Sirinde, Kabura Uhui And
Kalkada
Construction Of Ecd
Classrooms At Sangala
Primary School
Construction Of Ecd
Classrooms At Tiga
Primary
Construction Of Ecd
Classrooms At
Kawamangaria Primary
Construction Of New
Polytechnic At Mabinju

Rarieda

West
Asembo

Siger

Education

Ecd

Rarieda

West
Asembo

Akom

Education

Ecd

Rarieda

West
Asembo

Nyagoko

Education

Ecd

Rarieda

West
Asembo

Education

Polytechnics

Gem

West
Gem

Wagai East

Education

Polytechnics

Equipping Wagai Resource


Centre

Gem

West
Gem

Wagai East

Education

Social Services

Improvement Of Wagai
Multi-Media Resource &
Learning Centre

Bondo

West
Sakwa

Education

Ecd

Bondo

West
Sakwa

Education

Polytechnics

2 New Ecd Centres At


Utonga Beach And
Sinapanga Primary School
Establishment Of A Youth
Polytechnic At
Masita/Milenga

Bondo

West
Sakwa

Education

Social Services

PROGRAMME BASED BUDGET JUNE 2016

Boda Boda Operators


Training For Licensing

B/F
2015/2016

Estimates
2016/17

500,000
11,000,000

1,004,882

522,062

500,000

6,148,310

5,000,000

300,000

Description

500,000

11,000,000

2,000,000

2,000,000

1,000,000

Code

1,211,115

1,211,115

1,995,118

Total
Estimates

3,000,000
522,062

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

2211006

6,148,310

3111002

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
Purchase Of
Computers ,
Printers & Other
It Equipment

5,000,000
1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

300,000

2210711

Tuition Fees

Page 112

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

West
Sakwa

Ugenya

Sub Location

Sector

Function

Proposed Project

Education

Sports

Sports
Construction Of Ecd
Classrooms At Got Rembo
School

B/F
2015/2016
500,000

West
Ugenya

Ndenga

Education

Ecd

Ugenya

West
Ugenya

Ndenga

Education

Polytechnics

Ugenya

West
Ugenya

Sifuyo West

Education

Ecd

Ugenya

West
Ugenya

Karadolo East

Education

Ecd

Ugenya

West
Ugenya

Nyalenya

Education

Ecd

Ugenya

West
Ugenya

Uyundo

Education

Ecd

West
Ugenya

Sifuyo East

Education

Polytechnics

Ugenya

West
Ugenya

Sifuyo East

Education

Polytechnics

Fencing Of Land For


Social Hall

550,000

Rarieda

West
Uyoma

Kobong

Education

Ecd

Nyabera

Education

Ecd

Ecd Construction: Pala


Kobong Primary School

2,100,000

Ugenya

Rarieda

West
Uyoma

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Nyamninia
Polytechnic

Construction Of Ecde Class


Room At Lunga Primary
School
Construction Of A Modern
Ecde Class Room At
Nyaharwa Primary School
Construction Of Three
Classrooms At Nyalenya
Primary. School.

Constraction Of Latrines At
Nganga Primary School.
Construction Of A Social
Hall

Ecd Construction: Kahoya


Primary School

2,159,842
1,471,921

3,000,000
3,000,000
3,000,000
500,000
2,500,000

3,100,000

Estimates
2016/17

Total
Estimates

500,000

Code

Description

2210807

Medals, Awards
And Honors

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

550,000

3110599

Other
Infrastructure
And Civil
Works

2,159,842
1,471,921

3,000,000
3,000,000
3,000,000
500,000

2,100,000
3,100,000

Page 113

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Rarieda

West
Uyoma

Kobong/Rachar

Education

Polytechnics

Kobong Polytechnic
(Equipment)

Bondo

West
Yimbo

Mahanga

Education

Ecd

West
Yimbo

Got Agulu

Education

Ecd

Construction Of Modern
Ecd At Mageta Pri School

West
Yimbo

Utuoma

Education

Ecd

Usenge

Education

Polytechnics

Bondo
Bondo
Bondo

West
Yimbo

Construction Of Ecd
Classroom At Ulowa Pri
School
Constructions Of Ecd At
Kanyibok Pri School

Construction Of A Modern
Social Hall At Usenge

Gem

Yala
Township

Education

Ecd

Gem

Yala
Township

Education

Ecd

Gem

Yala
Township

Education

Polytechnics

Executive

Executive

Education

Social Services

Construction Of Resource
Center At Yala

Gem

Yala
Township

Education

Social Services

Purchase Of 6 Motorcycles
For The Registered Within
Yala Township

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Modern
Ecd At Tatro Primary
School
Construction Of Modern
Ecd At St. Kizito Primary
School
Arude Polytechnic
Construction

B/F
2015/2016
200,000

3,000,000
3,000,000
3,000,000
3,000,000

3,400,000
1,000,000
521,172

3,000,000

600,000

Estimates
2016/17

Total
Estimates

200,000

Code

Description

2211006

Purchase Of
Workshop
Tools, Spares
And Small
Equipment

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

521,172

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

600,000

3110704

Purchase Of
Bicycles And
Motorcycles

3,000,000
3,000,000
3,000,000
3,000,000

3,400,000
1,000,000

Page 114

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sector

Function

Proposed Project

Yala
Township

Education

Social Services

Construction Of Yala
Social Hall

Alego Usonga

North
Alego

Education

Ecd

Construction Of Ecd
Classrooms At Nyalgunga,
Rachuonyo, Aluny, Agoro
Tula And Barkodhiambo
Primary Schools

Alego Usonga

North
Alego

Education

Polytechnics

Alego Usonga

West
Alego

Education

Social Services

Construction Of Toilet
Block At Umala
Polytechnic

Alego Usonga

West
Alego

Education

Ecd

Alego Usonga

West
Alego

Education

Ecd

Alego Usonga

West
Alego

Education

Ecd

Alego Usonga

Alego Usonga

Sub Location

Umala

South
East
Alego

Bar Agulu

Education

Social Services

South
East
Alego

Mur Ngiya

Education

Ecd

PROGRAMME BASED BUDGET JUNE 2016

Provision Of Text Books

Construction Of Ecd
Classrooms At Gangu
Ninga
Construction Of Ecd
Classrooms At Wang'
Chieng
Construction Of Ecd
Classrooms At Mahola
Construction Of
Educational Resource
Centre At Karemo

Construction Of Ecd
Classrooms At Ngiya
Mixed Primary School

B/F
2015/2016
2,474,747

11,734

25,000
500,000

432,926
432,926
1,490,797
1,069,496

544,965

Estimates
2016/17

Total
Estimates

Code

Description

2,474,747

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

11,734

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

25,000

3110296

Construction Of
Buildings-Other

500,000

3111109

Purchase Of
Educational
Aids And
Related
Equipment

1,069,496

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

544,965

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

432,926
432,926
1,490,797

Page 115

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

South
East
Alego

Nyangoma

Education

Ecd

Construction Of New Ecd


Classrooms At Bar
Kagwanda

Alego Usonga

South
East
Alego

Bar Osimbo

Education

Ecd

Construction Of Ecd
Classrooms At Mugane
Primary School

1,552,175

Alego Usonga

South
East
Alego

Education

Ecd

Construction Of New Ecd


Classrooms At Magungu
Primary School

1,169,849

Alego Usonga

South
East
Alego

Education

Social Services

Installing Ict Centre At The


Resource Centre

Alego Usonga

Central
Alego

Kokeyo

Education

Ecd

Construction And
Installation Of Electricity
Wiring At Aduwa Primary
Ecd Block

Alego Usonga

Central
Alego

Kochieng' A

Education

Ecd

Construction And
Installation Of Electricity
Wiring System Of Ecd
Classrooms At Uyiko
Primary School

Alego Usonga

Siaya
Township

Education

Ecd

Construction Of Ecd
Classrooms At Nyandiwa
And Anduro Primary
Schools

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
544,965

1,500,000

7,258

1,439,801

316,274

Estimates
2016/17

Total
Estimates

Code

Description

544,965

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,552,175

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,169,849

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,500,000

3111002

Purchase Of
Computers ,
Printers & Other
It Equipment

7,258

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,439,801

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

316,274

Page 116

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Sub Location

Sector

Function

Proposed Project

Siaya
Township

Education

Sports

Alego Usonga

Usonga

Education

Ecd

Organizing Tournaments,
Purchase Of Uniforms,
Balls And Trophies

Alego Usonga

Usonga

Education

Polytechnics

Alego Usonga

Usonga

Education

Ecd

Alego Usonga

Usonga

Education

Ecd

Alego Usonga

Usonga

Education

Social Services

Bondo

North
Sakwa

Education

Sports

Bondo Sports Complex

Bondo

North
Sakwa

Abom

Education

Ecd

Bondo

South
Sakwa

East Migwena

Education

Sports

Construction Of Ecd
Classrooms At Kayogo
Primary School

Bondo

Central
Sakwa

Education

Ecd

PROGRAMME BASED BUDGET JUNE 2016

Construction Of 2 Ecd
Classrooms At Ulupi And
Uhere

Construction Of A
Polytechnic At Nyandheho

Contruction Of 2 New Pit


Latrines At Lolwe Ecd And
Kamalunga Ecd
Construction Of New Ecd
Classrooms At Luhwa Pri
School

Rehabilitation Of
Nyadorera Resource Centre

Fencing Of Migwena
Sports Ground
(Construction Of Toilet
And Repair Of Fence)

Construction Of Ecd
Classrooms At Onyinyore

B/F
2015/2016

Estimates
2016/17

240

Description

2210807

Medals, Awards
And Honors

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

6,117

3110599

Other
Infrastructure
And Civil
Works

3110599

Other
Infrastructure
And Civil
Works

1,000,000

1,000,000

590,813

590,813
500,000

6,117

298,660

240

81,732

81,732

1,000,000

Code

5,011,600

5,011,600

1,927,186

Total
Estimates

1,222,154

3,149,340
1,000,000

298,660

Page 117

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Central
Sakwa

Bondo

Sub Location

Central
Sakwa

Function

Proposed Project

Education

Ecd

Education

Ecd

Construction Of Ecd
Classrooms At Odao

Education

Ecd

Construction Of Ecd
Classrooms At Ndeda
Island
Renovation Of Oyamo Ecd
Classroom

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Nyangoma

Education

Polytechnics

Construction Of Workshop
And Administration Block
At Onyinyore Polytechnic

Bondo

West
Sakwa

Utonga

Education

Ecd

Nyawita

Education

Ecd

Construction Of Ecd
Classrooms At Ujwanga

Bondo

West
Sakwa

Ndeda/Oyamo,
Nyangoma

Sector

Bondo

West
Yimbo

Education

Ecd

Bondo

West
Yimbo

Education

Ecd

Bondo

West
Yimbo

Education

Polytechnics

Bondo

Yimbo
East

Education

Ecd

Bondo

Yimbo
East
Yimbo
East

Education

Ecd

Education

Ecd

Bondo

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Ecd
Classrooms At Nyakasumbi
Primary School
Construction Of Ecd
Classrooms At Mahanga
Primary School
Construction Of Ecd
Classrooms At Mitundu
Primary School
Construction Of Nyayo
Polytechnic

Construction Of Ecd
Classrooms At Pap Lela
Primary

Provision Of Text Books

Construction Of Ecd
Classrooms At Ragak
Primary

B/F
2015/2016
298,680
3,000,000
1,000,000
182,164

33,767
33,767
1,200,010
62,070
1,757,193

691,716
500,000
926,477

Estimates
2016/17

Total
Estimates

Code

Description

298,680

3,000,000
1,000,000
182,164

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

33,767
33,767
1,200,010
62,070
1,757,193

691,716
500,000
926,477

Page 118

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Sub Location

Sector

Function

Proposed Project

Yimbo
East

Education

Ecd

Gem

East Gem

Education

Ecd

Construction Of Ecd
Classrooms At Agwenyo
Primary

Gem

East Gem

Education

Gem

East Gem

Gem

Central
Gem

Gem

Gem

B/F
2015/2016
1,200,010

Construction Of Ecd
Classrooms At Lihanda
Primary School

720,842

Social Services

Completion Of Resource
Center At Bar Kalare
Chief's Camp

1,701,326

Education

Polytechnics

Supply Of Workshop
Equipment At Mindhine
Youth Polytechnic

1,000,000

Nyandiwa

Education

Ecd

Construction Of Ecd
Classrooms At Luri
Primary School

1,022,032

Central
Gem

Nyawara

Education

Ecd

Construction Of Ecd
Classrooms At Gongo
Primary School

130,000

Central
Gem

Nyandiwa

Education

Polytechnics

Construction Of
Nyandhondho Youth
Polytechnic

447,306

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

Total
Estimates

Code

Description

1,200,010
720,842

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,701,326

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

2211006

1,022,032

3110202

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

130,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

447,306

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 119

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sector

Function

Proposed Project

Central
Gem

Education

Ecd

Construction Of Ecd
Classrooms At Karariw
Primary School

Gem

Central
Gem

Education

Ecd

Construction Of New Ecd


Classrooms At Migosi
Primary School

717,251

Gem

South
Gem

Education

Ecd

3,740,390

Gem

West
Gem

Education

Social Services

Construction Of Ecd
Classrooms At Akala And
Pala

Gem

West
Gem

Education

Social Services

Improvement Of Orhanage
Hall

138,456

Gem

West
Gem

Education

Polytechnics

Installation Of Electricity
At Malunga Polytechnic

500,000

Gem

Yala
Township

Sauri

Education

Ecd

Jina

Education

Ecd

Construction Of Ecd
Classrooms At Bar Sauri

1,324,281

Nyamninia

Education

Ecd

Nyamninia

Education

Ecd

Gem
Gem
Gem

Yala
Township
Yala
Township
Yala
Township

Sub Location

Akala

PROGRAMME BASED BUDGET JUNE 2016

Furnishing Of Gem
Disabled Sheltered
Production Workshop

Construction Of Ecd
Classrooms At Jina Ecd

Construction Of Ecd
Classrooms At Bar Turo
Construction Of Ecd
Classrooms At Uganga

B/F
2015/2016
1,302,610

500,000

1,324,281
1,324,281
1,324,280

Estimates
2016/17

Total
Estimates

Code

Description

1,302,610

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

717,251

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

2211006

138,456

3110202

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3110599

3,740,390

1,324,281

Other
Infrastructure
And Civil
Works

1,324,281
1,324,281
1,324,280

Page 120

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Yala
Township

Gem

North
Gem

Ugunja

Sub Location

Sector

Function

Proposed Project

Education

Social Services

Construction Of Resource
Center At Yala

Education

Ecd

Construction Of Kitchen At
Sirembe Secondary School

Sidindi

Education

Ecd

Ugunja

Sidindi

Education

Ecd

Construction Of Ecd
Classrooms At Nyiera And
Lolwe Primary School

Ugunja

Sigomre

Education

Polytechnics

Ugunja

Sigomre

Education

Ecd

Ugunja

Sigomre

Education

Ecd

Ugunja

Ugunja

Education

Ecd

Ugunja

Ugunja

Education

Ecd

Sirembe

PROGRAMME BASED BUDGET JUNE 2016

Construction Of New Ecd


Classrooms Mayingo
Primary School
Construction Of Asango
Polytechnic

Constrution Of Ecd
Classrooms At Luru
Primary School

Construction Of New Ecd


Classrooms At Sigomre
Primary School
Construction Of Ecd
Classes At Suwinga
Construction Of Ecd
Classes At Daho

B/F
2015/2016
3,000,000

999,400

2,933,261
538,654
257,564

249,411
114,840
3,000,000
1,880,476

Estimates
2016/17

Total
Estimates

Code

Description

3,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

999,400

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2,933,261
538,654
257,564

249,411
114,840
3,000,000
1,880,476

Page 121

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

East
Asembo

Rarieda

East
Asembo

Rarieda

Rarieda

Sector

Function

Proposed Project

North Ramba

Education

Ecd

Construction Of Ecd
Classrooms At St Lazaro

Omia Diere

Education

Ecd

Construction Of Ecd
Classrooms At Raliew

338,384

East
Asembo

Education

Polytechnics

Purchase Of Equipments
At Boi Polytechnic

500,000

North
Uyoma

Education

Ecd

West
Asembo

Education

Polytechnics

Purchase Of Equipments
For Learning

500,000

Rarieda

West
Asembo

Education

Ecd

Rarieda

West
Asembo

Education

Ecd

Rarieda

West
Uyoma

Nyabera

Education

Ecd

Kokwiri

Education

Ecd

Rarieda

Rarieda

West
Uyoma

Sub Location

PROGRAMME BASED BUDGET JUNE 2016

Construction Of
Classrooms/Workshop At
Aila Nyamor Polytechnic

Construction Of Ecd
Classrooms At Atemo,
Ujwanga And Rarieda
Primary Schools

Construction Of New Ecd


Classrooms At Omboye
Primary School
Construction Of Ecd
Classrooms At Uyoha

Construction Of Ecd
Classrooms At Got Korua

B/F
2015/2016
1,728,688

1,148,983

4,010,451

558,652
29,903
131,541

Estimates
2016/17

Total
Estimates

Code

Description

1,728,688

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

338,384

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

2211006

Purchase Of
Workshop
Tools, Spares
And Small
Equipment

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000
1,148,983

4,010,451

558,652
29,903
131,541

Page 122

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugenya

East
Ugenya

Ugenya

North
Ugenya

Ugenya

Sector

Function

Proposed Project

Education

Polytechnics

Purchase Of Tools And


Equipments For Sigulu
And Komoro Youth
Polytechnics

Education

Ecd

Construction Of Ecd
Classrooms At Got Nanga
Primary

596,128

North
Ugenya

Education

Ecd

Construction Of New Ecd


Classrooms At Bar Odar
Primary School

668,342

Ugenya

Ukwala

Education

Polytechnics

Completion Of
Classroom/Workshop At
Yenga Polytechnic

344,984

Ugenya

Ukwala

Education

Social Services

Provision Of Text Books

Ugenya

Ukwala

Siranga

Education

Ecd

Ugenya

West
Ugenya

Masat East

Education

Polytechnics

Construction Of Ecd
Classrooms At Kamrembo
Primary School

Ugenya

West
Ugenya

Masat West

Education

Ecd

Education

Social Services

Gem

East Gem

Sub Location

Ligala

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
157,661

500,000

754,000

Equiping West Ugenya


Youth Polytechnic

1,000,000

Construction Of Ecd
Classrooms At Pap Olang

2,159,842

Training Of Boda Boda


Operators

Estimates
2016/17

350,000

247,700

Total
Estimates

Code

Description

157,661

2211006

843,828

3110202

668,342

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

344,984

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000

3111109

Purchase Of
Educational
Aids And
Related
Equipment

2211006

Purchase Of
Workshop
Tools, Spares
And Small
Equipment

2210711

Tuition Fees

754,000
1,000,000

2,159,842
350,000

Purchase Of
Workshop
Tools, Spares
And Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 123

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

East Gem

Alego Usonga

North
Alego

Alego Usonga

Sub Location

Sector

Function

Proposed Project

Education

Social Services

Bar Kalare Resource


Center

Maliera

Education

Ecd

Construction Of Ecd At
Ligoma Primary

1,109,020

North
Alego

Lundha

Education

Ecd

Construction Of Ecd At
Lundha Primary

514,097

Alego Usonga

North
Alego

Asayi

Education

Ecd

Construction Of Ecd At
Ndegwe Primary

514,097

Alego Usonga

North
Alego

Sirembe

Education

Ecd

Construction Of Ecd At
Sirembe Primary

514,097

Alego Usonga

North
Alego

Nyabeda

Education

Ecd

Construction Of Ecd At
Miro Primary

827,297

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016
500,000

Estimates
2016/17

Total
Estimates

Code

Description

500,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,109,020

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

514,097

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

827,297

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 124

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

North
Alego

Alego Usonga

North
Alego

Rarieda

South
Uyoma

Got Regea

Education

Ecd

Construction Of Ecd At
Got Kokwiri Primary

Asayi

Education

Ecd

Construction Of Staff
Room For Ecd At Uhonya
Primary School

1,000,000

Education

Ecd

Construction Of Ecd
Classrooms At Nyangoye
Primary School

3,000,000

Ndigwa

Total

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17

1,000,000

332,672,649

Total
Estimates

Code

Description

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

1,000,000

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000
296,376,283

629,048,932

Page 125

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


NO: 007

VOTE TITLE: DEPARTMENT OF HEALTH SERVICES.

Part A. VISION: To be a globally competitive, healthy and productive county

Part B. MISSION: To deliberately build a responsive, progressive and sustainable


technologically-driven, evidence-based and client-centred health system for accelerated
attainment of highest standard of health to the people of Siaya County
PART C: Strategic Objectives
Programme
CP.1 General Administration Planning and Support
Services
CP.2 Curative and Rehabilitative health Care Services
CP.3 Preventive, Promotive and Health Services
CP.4 Waste Management.

Strategic Objectives.
To provide transformative leadership, capacity and
policy direction in service delivery
To provide accessible and appropriate diagnostic and
curative services
To reduce incidences of preventable diseases
To improve environmental hygiene and sanitation
sustainably within the County by proper collection and
disposal of waste.

Part D: Context for Budget Intervention

The health sector comprises of 4 sub sectors of General Administration and Planning, curative
and Rehabilitative Services, preventive and Promotive health services and waste management.
The medium term expenditure framework for the year 2016/2017 and 2017/2018 is guided by the
county health strategic plan, first Siaya CIDP, the second medium plan of Kenya vision 2030 and
the Kenya health policy 2012-2030 and the constitution of Kenya 2010.

The sector mandate is to promote and participate in the provision of integrated and high quality
curative, preventive and rehabilitative health services that is equitable, responsive, accessible and
accountable to all.
Sectors achievements during the period under review
Completion and operationalization of 21 new health facilities.
Operationalization of three maternity units namely Ndere Karuoth, Mur-Malanga and
Sirembe Dispensary.
Recruitment and deployment of 199 Health care workers
Renovation of Uembo, Usenge and Saradidi Health facilities.
Refurbishments of The County Referral Hospital in progress
Operationalization of beyond Zero dispensary
Development of the draft County health services Bill.
Appraisal and promotion of 90 Health Care Workers
Distribution of new and donated equipment and consumables to 56 health facilities
PROGRAMME BASED BUDGET JUNE 2016

Page 126

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Strengthening Community case management by training CHVs on ICCM


Improved imaging services at Bondo and Siaya County Referral Hospital.
Strengthening of partnership in achievements of 90,90,90 strategy, improvement of TB
curate from 86% to 94%
Involvement of partners in budget development process

Despite the above achievements there were notable challenges that included; delayed funding
that was not in line with cash flow projections of the department, persistent staff shortage,
dilapidated infrastructures, limited Equipment in health facilities, Stagnation of health workers in
one grade thereby leading to low motivation. Inadequate supply of essential commodities,
inadequate utility vehicles for the CHMT and lack of a distribution for drugs and other supplies,
lack of a central commodity store and office space, emerging and re-emerging of diseases e,g
Cholera, leprosy and weak partner coordination.
While the Department continued to grapple with some of these challenges, some were
addressed by engaging partners to provide financial and other support. The county government
will however continue to recruit more health workers and respond to the human resource
development needs, renovate health facilities and procure more equipment.
During the ensuing MTEF period, 2016/17 to 2018/19, the department will focus on scaling up
policy interventions aimed at enhancing the equitability of access to health care and improving
the quality of services. This will include: Continued provision of free maternal health care,
increased access to Primary Health care in Public Health Centres and Dispensaries and equipping
all public health facilities for efficient service delivery

To address the challenges highlighted above, the sector expects to utilize Kshs. 1,314,749,264
for recurrent and Kshs.687, 935,373 for development in the FY 2016/2017. The allocation is
expected to increase to Kshs. 1,446,224,190 for recurrent and Kshs. 756,728,910 for
development in the FY 2017/2018 and Kshs. 1,590,846,609 for recurrent and Kshs. 832,401,801
for development in the FY 2018/2019.
Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2017/18
Sub-Program
CP 1: General

Delivery Unit

Key output

Key Performance
Indicators

Administration Planning Monitoring and Evaluation.


Outcome: Efficient and effective service delivery
Finance and
Administration

County Health
HQs

Improved
budget
preparation and
execution
Availability of
Cash flow
projections
Procurement
Plan
Improved
Financial
Management

PROGRAMME BASED BUDGET JUNE 2016

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

Budget Prepared.

100%

100%

100%

100%

Cash flow
Projection

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Procurement Plan
Number of
Requisition Made
% Utilization of
allocated of

Page 127

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub-Program

Information
Communication
Technology

Planning Monitoring and


Evaluation

Governance and
Leadership

Health Infrastructure

Health Products and


Technology and
Equipment.

Delivery Unit

County Health
H/Qs

County Health
H/Qs

County H/Qs

County HQs

County HQ

Key output

Full exploitation
of ICT in the
development
and
management of
health research

Strengthened
framework for
Monitoring and
evaluation on
continuous basis
Competent and
accountable
leadership

Improved health
Infrastructure

Reduced stock
out of drugs

Key Performance
Indicators
allocated funds
Expenditure
Returns
Financial Books
Maintained
Levels of funding
of AIEs Achieved
% increase in
revenue collection
Audited Accounts
Timely feedback
and use of
Information for
planning
Internet
Connectivity and
emails for all staffs
Establish Website
for the department
Performance
Review Meetings
Support
Supervision
Data Quality
Audits
Hospital Boards
Trained on
Management
Health Centres
Managements
committee trained
Minutes of Boards
Meeting
Anti-Corruption
Committees
established in 7
Hospitals
Staff trained on
Senior
Management
Health Facilities
Renovated
Fencing of
Dumpsite
Maternity Units
Constructed
Construction of
County Health
Administration
Block
Proper focusing
done
Health facilities
managers trained
on drugs
management
Procurement of
drugs
Purchase of
Hospital Beds

CP 2: Curative and Rehabilitative Services


Outcome: an affordable, accessible and appropriate diagnostic and curative service
County Referral Services
Hospitals
Establish a
Blood bank
functional blood
available at the
bank at the
referral hospital
referral hospital

PROGRAMME BASED BUDGET JUNE 2016

Baseline
2015/16

0%

Target
2016/17

Target
2017/18

Target
2018/19

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%
100%

100%
100%

100%
100%

100%
100%

60%

80%

85%

90%

65%

70%

75%

80%

0%

100%

100%

100%

60%

70%

80%

90%

75%

80%

85%

90%

45%

50%

60%

75%

0%

50%

70%

100%

0.00

40%

60%

80%

10%

100%

100%

100%

142

142

15%

30%

50%

100%

40%

60%

70%

80%

30%

60%

70%

80%

50%

100%

100%

100%

45

100

100

100

100%

100%

100%

100%

140

200

180

200

100%

100%

100%

Page 128

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub-Program

Delivery Unit

Key output
Reduced stock
out of health
commodities

Key Performance
Indicators

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

No. of days stock


out reduced

40%

20%

15%

10%

No.of facilities
doing proper
forecasting of
commodities.

30%

70%

80%

100%

50%

80%

100%

100%

Improved
commodity
management
Inpatient comfort
improved

Primary health services


Health centres and
Dispensaries

Percent of
facilities with
adequate linen
Facilities with
adequate medical
equipments

60/%

80%

100%

100%

50/%

80%

100%

100%

Facilities
reporting to have
adequate patient
food

60%

80%

100%

100%

Availability of
cleaning and
sanitation
materials in the
hospitals

70%

90%

100%

100%

Number of staff
trained on safe
care and Nursing
process

20%

50%

80%

90%

No of hospitals
with quality
improvement
committee

0%

50%

80%

100%

Imaging and
diagnostic
services available
in the seven
referral hospitals

Number of
referral facilities
with ultrasound
machine

Number of
hospitals with
staffs trained on
ultrasonography

Functional new
born unit and
nursery.

Number of
hospitals with
functional new
born unit and
nursery

PROGRAMME BASED BUDGET JUNE 2016

Page 129

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub-Program

Delivery Unit

Key Performance
Key output
Indicators
All facilities are
Number of
equipped with the facilities equipped
required furniture
and equipment

Baseline
2015/16
70%

Target
2016/17
90%

Target
2017/18
100%

Target
2018/19
100%

Data collection
and reporting
strengthened

Number of
facilities with
adequate data
collection and
reporting tools

60%

90%

100%

100%

Reduced stock
out of health
commodities

Number of
facilities reporting
stock out of health
commodities

40%

20%

10%

10%

Number of health
facilities doing
proper forecasting

30%

70%

90%

100%

Percentage facility
reporting
availability of
patient linen

50%

80%

90%

100%

Percentage
facilities reporting
availability of
patient food

50%

90%

100%

100%

Availability of
cleaning and
sanitation
materials in health
facilities

60%

80%

100%

100%

Inpatient comfort
improved

CP 3: Preventive and Promotive Health services


Outcome: incidences of preventable diseases reduced
HIV/AIDs
Community
Incidences of HIV
reduced among the
population.

Number of
new cases of
HIV reported

42%

90%

93%

95%

Proportion of
clients
receiving care
and treatment.
Number of
new cases of
TB reported

62%

90%

95%

96%

80%

90%

90%

90%

Improved care and


treatment to people
with TB

Proportion of
clients
receiving care
and treatment.

94%

95%

98%

100%

Immunization
coverage increased

Proportion of
children under
1 year fully

76%

90%

95%

95%

Improved care and


treatment to people
living with HIV
TB

Community

Community

Incidences of TB
reduced among the
population

PROGRAMME BASED BUDGET JUNE 2016

Page 130

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub-Program

Delivery Unit
Community

Malaria

Community

Key output

Health Facility

Environmental health
Programs

Facility/Commu
nity.

Target
2017/18

Target
2018/19

62%

72%

80%

86%

Increased number of
women of
reproductive age
screened for cervical
cancer

Proportion of
women of
Reproductive
age receiving
screened for
cervical cancer
screening.
Proportion of
pregnant
women
distributed with
LLITN
Proportion of
patients tested
for malaria
Proportion of
patient testing
positive for
malaria
managed
Proportion of
under 5
children
receiving
Vitamin A
supplementatio
n.
Proportion of
under five
children who
are
underweight
Number of
cases detected.

36%

52%

76%

80%

90%

100%

100%

100%

70%

80%

90%

95%

100%

100%

100%

100%

80%

90%

95%

95%

4%

3%

2%

1%

60%

70%

80%

100%

Proportion of
population
accessing safe
water

70%

80%

85%

90%

78%

82%

92%

1005

50%

80%

100%

100%

100%

100%

Increase number of
pregnant women
distributed with
LLITN

Increasing number of
under 5 children
receiving vitamin A
supplementation
Reduced number. Of
Children under weight

Integrated disease
surveillance and
Response

Target
2016/17

Proportion of
women of
reproductive
age receiving
modern
methods of FP

Improved malaria case


management
Community

Baseline
2015/16

Increased Women of
Reproductive age
receiving modern
methods of FP

Increased malaria case


identification

Nutrition

Key Performance
Indicators
immunized

Increase Case
detection rate for
priority communicable
diseases
Increase population
accessing safe water
Increase number of
household with latrine
Proportion of
individuals infected
with jiggers reduced

CP 4: Waste Management
Outcome: An Environment with proper waste Management
Waste management
county
Waste management
committee
established
Survey to establish
the base line done

PROGRAMME BASED BUDGET JUNE 2016

Proportion of
household with
latrines
Proportion of
individuals
infected by
Jiggers
No. of meetings
held
Survey report

Page 131

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub-Program

Delivery Unit

Key output

Key Performance
Indicators

Baseline
2015/16

Target
2016/17

Target
2017/18

Target
2018/19

The plan document

100%

100%

100%

Tools available
No. of sub counties
with adequate
transfer stations

20%

80%

100%

100%

No. of Subcounties with


tippers /lorries to
transport waste
The number of
workforce
recruited and
trained in waste
segregation

12

12

12

50%

100%

100%

Waste management
plan developed
Collection and
disposal equipment
and machinery
purchased

A workforce
recruited and
trained in waste
segregation
salaries budgeted for
the workforce
Dumpsites provided
in each sub county

Cemeteries
identified in each
sub county

Budget for wages


-No of sub
counties with a
dumpsite well
fenced

0
0%

No of sub
counties with
cemeteries

Part F: Summary of Expenditure By Programmes, 2016/17 -2018/19 (Kshs.)


Programme

Programme 1:General Administration


Total Expenditure for Program 1
Programme 2: Curative Services
Total Expenditure for Program 2
Programme Preventive and Promotive
Total Expenditure for Program 3
Programme 4:waste Management
Total Expenditure for Program 4
Total Expenditure For All Programs

Baseline Estimates
2015/16
733,396,805
733,396,805
737,615,257
737,615,257
423,117,864
423,117,864
261,706,957
261,706,957
2,155,836,883

Estimates 2016/17

949,368,078
949,368,078
277,090,803
277,090,803
743,933,906
743,933,906
32,291,850
32,291,850
2,002,684,637

Projected Estimates
2017/18
2018/19
1,044,304,886
1,148,735,374
1,044,304,886
1,148,735,374
304,799,883
335,279,872
304,799,883
335,279,872
818,327,297
900,160,026
818,327,297
900,160,026
45,653,190
50,218,509
45,653,190
50,218,509
2,213,085,256
2,434,393,781

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.)


Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development
Total Expenditure of Vote

1,486,989,871
975,970,514
511,019,357

1,314,749,264
859,886,468
454,862,796

668,847,012
668,847,012
2,155,836,883

PROGRAMME BASED BUDGET JUNE 2016

687,935,373
687,935,373

1,446,224,190
945,875,115
500,349,076
0
0
756,728,910
756,728,910

1,590,846,609
1,040,462,626
550,383,983
0
0
832,401,801
832,401,801

2,002,684,637

2,202,953,101

2,423,248,411

Page 132

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Part H : Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification
CP 1: General Administration
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Program 1
CP 2 Curative Services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Program 2
CP 3 preventive and Promotive
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 3
CP 4 Waste Management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 4
Total Expenditure For All Programs

Baseline

Estimates

2017/18

Projected Estimates
2018/19

733,396,805
611,336,805
122,060,000

949,368,078
859,886,468
89,481,610

1,044,304,886
945,875,115
98,429,771

1,148,735,374
1,040,462,626
108,272,748

733,396,805

949,368,078

1,044,304,886

1,148,735,374

440,977,393
311,884,553
129,092,840

236,390,803
0
236,390,803
0

296,637,864

40,700,000
40,700,000

260,029,883
0
260,029,883
0
0
44,770,000
44,770,000

286,032,872
0
286,032,872
0
0
49,247,000
49,247,000

737,615,257

277,090,803

304,799,883

335,279,872

104,150,000

96,698,533

106,368,386

117,005,225

104,150,000

96,698,533

106,368,386

117,005,225

318,967,864

647,235,373
647,235,373

711,958,910
711,958,910

783,154,801
783,154,801

318,967,864
423,117,864

743,933,906

818,327,297

900,160,026

261,706,957
52,749,156
208,957,801

32,291,850
0
32,291,850

35,521,035
0
35,521,035

39,073,139
0
39,073,139

35,521,035
2,202,953,101

39,073,139
2,423,248,411

0
0
261,706,957
2,155,836,883

PROGRAMME BASED BUDGET JUNE 2016

32,291,850
2,002,684,637

Page 133

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code

Item

Gen.Admin

Curative
Health
Service

Preventive
and
Promotive

FIF

Waste
Managem
ent

429,637,504

TOTAL

2110101

Basic Salary civil services

2110301

House Allowance

58,591,942

58,591,942

2110314

Commuter/ Transport allowance

61,182,143

61,182,143

2110315

Extraneous Allowance

121,438,187

121,438,187

2110318

Non-Practising Allowance

16,596,000

16,596,000

2110320

Leave Allowance

5,528,440

5,528,440

2110322

Health risk Allowance

31,456,219

31,456,219

Emergency Call Allowance

15,480,000

15,480,000

uniform Allowance

5,465,000

5,465,000

Stipend for Community Work Volunteers

77,552,000

77,552,000

2110402

Refund of Medical Expenses-InPatient

12,888,000

12,888,000

2120101

Employer contribution to NSSf

429,637,504

2,340,000

2,340,000

Employee Arrears

11,945,079

2110202

Casual Wages

9,785,954

2210101

Electricity Expenses

224,200

8,048,000

1,900,000

3,528,848

13,701,048

2210102

Water and Sewerage charges

237,500

1,287,925

528,625

1,381,000

95,000

3,530,050

2210201

Telephone,Telex,Facsmile and M

250,500

250,500

247,000

247,000

95,000

1,090,000

2210203

Courier and Postal Services

95,000

42,142

19,000

156,142

2210301

Travel Costs(Airlines,Bus,Railway)
Domestic- (Transport Re imbursement, Conduct Outreach Services From Referral &
Primary Health Facilities)
Daily Subsistance Allowances (CHEW, Community Dialogue Meetings, Community
Disease Surveylance & Travel Reimbursements)

3,497,372

300,000

300,000

300,000

4,397,372

7,505,000

475,000

475,000

762,800

570,000

9,787,800

2,850,000

665,000

1,900,000

619,400

570,000

6,604,400

2210302
2210303

PROGRAMME BASED BUDGET JUNE 2016

11,945,079
9,785,954

Page 134

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Item

Gen.Admin

Curative
Health
Service

Preventive
and
Promotive

FIF

Waste
Managem
ent

TOTAL

2210304

Sundry Items(Airport tax,taxis)

750,000

9,500

9,500

28,500

797,500

2210502

Publishing and Printing Services(M0H Registers, IEC materials)

550,000

393,000

342,000

578,950

478,950

2,342,900

2210503

Subscription to Newspapers,

47,500

28,500

76,000

2210504

advertising awareness

3,250,000

380,000

550,000

4,180,000

2211004

Small agriculture,fungicides and sprays

152,000

152,000

2210505

Trade Shows and Exhibitions

190,000

713,000

190,000

1,093,000

2210603

Rents and Rates - Non-Residential

950,000

950,000

2210604

Hire of Transport

190,000

95,000

285,000

570,000

2210710

Travel & Accomodation

450,000

427,500

142,500

1,020,000

2210710

Training fees(Training of Board Members)

675,000

650,000

650,000

95,000

2,070,000

2210711

Tuition fees

300,000

300,000

300,000

900,000

2210801

Cartering services, receptions,Ac

950,000

1,470,000

47,500

2,467,500

2210802

Boards and committees

570,000

570,000

587,300

587,300

142,500

2,457,100

2211001

Medical Drugs

85,782,253

38,817,486

124,599,739

2211002

Dressing and Nonpharmaceuticals

45,526,278

15,161,916

60,688,194

2211005

Chemiical and Industrial gases

1,900,000

947,949

839,800

570,000

4,257,749

2211008

Laboratory materials and supplies

16,263,972

10,462,217

1,900,000

28,626,189

2211015

Food and rations

950,000

26,164,273

9,210,000

9,321,150

45,645,423

2211103

Sanitary and cleaning materials,

270,750

1,458,610

700,000

133,000

19,000

2,581,360

2211016

Purchase os staff uniform and clothing

237,500

190,000

665,000

1,092,500

2211021
2211019

And nametags for Health care workers

Beddings and linen


Purchase of patient uniform and clothing

3,055,073

1,500,000

475,000

5,030,073

PROGRAMME BASED BUDGET JUNE 2016

Page 135

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Item

Gen.Admin
-

Curative
Health
Service
570,000

Preventive
and
Promotive
190,000

FIF
361,000

Waste
Managem
ent
-

TOTAL
1,121,000

3,399,634

3,399,634

2211024

Purchase of x ray materials

2211101

General Office supplies

650,000

675,800

700,000

950,000

11,400

2,987,200

2211201

Refined fuel and lubricants

1,541,811

855,000

950,000

1,204,000

950,000

5,500,811

2211201

Refined fuel and lubricants(Ambulance)

4,748,194

1,565,000

6,313,194

2211201

Refined fuels boat ambulance

532,000

532,000

2211204

Other fuels-charcoal,firewood

2,102,150

1,075,000

1,109,200

95,000

4,381,350

2211301

Bank services

64,866

64,866

2211305

Contracted guards and cleaning services

3,155,000

1,707,254

4,898,027

10,121,281

2211310

Contracted services(waste mgt)

24,500,000

24,500,000

2211307

Transport Costs and Charges (freight, loading/unloading, clearing and s

8,890,400

8,890,400

2211310

Contracted professional services

2,321,200

1,420,000

1,330,000

5,071,200

2220101

Maintenance expense-motor vehicle

2,575,000

1,007,500

1,231,100

1,350,000

6,163,600

361,000
-

Danida

13,765,000

13,765,000

2220101

Maintenance expense - motor cycle

700,000

475,000

1,175,000

2220101

Maintenance expense-motor vehicle(Ambulance)

4,116,508

4,116,508

2220201

Maintenance of plants and equipments

717,800

950,000

478,000

2,145,800

2220202

Maitenance of office furniture and equipments

165,000

196,786

190,000

826,786

2220205

Maintenance of building and stations

900,000

850,000

3,040,000

4,790,000

2220210

Maintenance of computers,softwares,networks and comm.equipments

475,000

285,000

285,000

500,000

47,500

1,592,500

3110902

Purchase of Household and Institutional Appliances

66,500

311,600

378,100

3111003

Purchase of air conditioner,heating appliances and fans

47,500

190,000

237,500

2220210

Purchase of medical and dental equipment

78,400

78,400

PROGRAMME BASED BUDGET JUNE 2016

275,000
-

Page 136

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code

Item

3110300

Refurbishment of Buildings

3111001

Purchase of office furniture and fittings


PURCHASE of utility vehicle for CHMT supervisions(long chasis)

Curative
Health
Service

Gen.Admin

Preventive
and
Promotive

FIF

Waste
Managem
ent

7,000,000

TOTAL
-

2,350,000

190,000

2,540,000

7,000,000

Purchase of drug distribution vehicle( Built single cab pick up)

4,750,000

4,750,000

3111114

Rehabilitation materials

142,500

142,500

2211024

Eye clinic

190,000

190,000

380,000

Insurance for ambulances

31110023

User fee forgone

Purchase of Computers, Printers and other IT Equipment

TOTAL

PROGRAMME BASED BUDGET JUNE 2016

481,850,891

559,127

475,000

1,034,127

666,028,307

96,698,533

37,879,683

32,291,850

1,314,749,264

Page 137

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT

Sub County

Ward

Ugunja

Sub Location

Sector

Function

Proposed Project

Sigomre

Health

Health

Ugunja

Sigomre

Health

Health

Toilet And Fencng Of Uloma


Dispensary
Construction Of Muhwayo
Dispensary

Gem

North Gem

Health

Health

Completion Of Nyabeda
Dispensary

Gem

North Gem

Health

Health

Completion Of Sirandu
Dispensary

Gem

North Gem

Health

Health

Completion Of Malanga Health


Center Maternity Wing

1,000,000

Bondo

Central
Sakwa

Health

Health

1,500,000

Bondo

Central
Sakwa

Health

Health

Alego
Usonga

Central
Alego

Kakum Kombewa

Health

Health

Renovation Of Outpatient Unit


And Construction Of
Toilet/Piping Water From
Rabango Junction To Rapogi
Dispensary And Water Tank
(10,000 Liters)
Renovation Of Outpatient
Department Block, Construction
Of Toilet, Provision Of Water
Tank At Minyiri Dispensary (10,
000 Liters
Construction Of Nyadhi Health
Centre Marternity Block

Alego

Central

Kochieng' B

Health

Health

Nyabeda

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Vip Latrine At

B/F 2015/2016

Estimates
2016/17
500,000
4,000,000

1,000,000

500,000

1,500,000

4,000,000

330,000

Total
Estimates
500,000
4,000,000

1,000,000

500,000

1,000,000

1,500,000

1,500,000

4,000,000

Code

Description

3110299

Construction Of
Buildings-Other
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works

3110202

3110202

3110202

3110202

3110600

3110601

Other
Infrastructure
And Civil
Works

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Construction Of

3110299

Page 138

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Usonga

Alego

Alego
Usonga

Central
Alego

Obambo

Health

Health

Alego
Usonga

Central
Alego

Ojwando A

Health

Health

Rarieda

West Uyoma

Rachar

Health

Health

Rarieda

West Uyoma

Nyabera

Health

Health

Purchase Of Ward Equipments At


Misori Dispensary

2,000,000

Rarieda

West
Asembo

Health

Health

Completion Of Bar Aluru Ward

1,853,694

Rarieda

West
Asembo

Health

Health

Completion Of Rambugu
Dispensary

1,000,000

Rarieda

West
Asembo

Health

Health

Completion Of Ndwara
Dispensary

1,000,000

Bondo

North Sakwa

Health

Health

Equiping Laboratory At Mawere


Dispensary

Bondo

North Sakwa

Health

Health

Completion Of Masinya
Dispensary

Bondo

North Sakwa

Health

Health

Fencing Of Manyonge
Dispensary

PROGRAMME BASED BUDGET JUNE 2016

Function

Proposed Project
Kochieng Community Health
Centre
Construction Of Vip Latrine At
Obambo Community Health
Centre
Construction Of Vip Latrine At
Lake Kanyaboli Community
Health Centre
Purchase Of Equipment At
Nyagwara Dispensary

B/F 2015/2016

Estimates
2016/17
330,000
340,000
3,000,000

400,000

1,600,000

300,000

Total
Estimates
330,000
330,000
340,000
3,000,000
2,000,000
1,853,694

1,000,000

1,000,000

400,000

1,600,000

300,000

Code

Description
Buildings-Other

3110299

Construction Of
Buildings-Other

3110299

Construction Of
Buildings-Other

2211021

Purchase Of
Bedding And
Linen
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Laboratory
Materials,
Supplies And
Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil

2211021
3110202

3110202

3110202

2211008

3110202

3110599

Page 139

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego
Usonga

West Alego

Hawinga
Kaugagi

Health

Health

Constrution Of New Out-Patient


Block At Hawinga Health Centre

3,500,000

Ugenya

West Ugenya

Karadolo West

Health

Health

Completion Of Bar Owengo


Dispensary

3,000,000

Ugenya

West Ugenya

Masat East

Health

Health

Construction Of Nyalweny
Dispensary

3,000,000

Rarieda

East Asembo

Health

Health

Equiping Of Ochuoga Kowi


Dispensary

1,000,000

Rarieda

East Asembo

Health

Health

Construction Of Female Ward At


Abidha Health Center

1,000,000

Rarieda

East Asembo

Health

Health

Purchase Of Xray And Oxygen


Machine For Ongielo Health
Center

1,000,000

Rarieda

South
Uyoma

Health

Health

Equiping Rabel Dispensary

1,000,000

Rarieda

South
Uyoma

Health

Health

Additional Allocation For


Construction Of Lwala
Dispensary

Bondo

Yimbo East

Health

Health

Construction Of Mago
Dispensary

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

350,000

2,000,000

Total
Estimates
3,500,000

3,000,000

3,000,000

1,000,000
1,000,000

1,000,000

1,000,000
350,000

2,000,000

Code
3110202

3110202

3110202

2211021
3110202

2211008

2211021
3110202

3110202

Description
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Laboratory
Materials,
Supplies And
Small
Equipment
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,

Page 140

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Yimbo East

Ugenya

North
Ugenya
North
Ugenya

Ugenya

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Estimates
2016/17

Health

Health

Electrification And Guttering At


Radier Dispensary

1,000,000

Ligala

Health

Health

500,000

Ligala

Health

Health

Construction Of Latrine At Ligala


Dispensary
Fencing Of Ligala Dispensary

Health

Health

Completion Of Usenge Maternity

500,000

250,000

Bondo

Yimbo West

Bondo

West Sakwa

Usire

Health

Health

Completion Of Masita
Dispensary

Bondo

West Sakwa

Usire

Health

Health

Equipping Laboratory At
Kambajo Dispensary

600,000

Bondo

West Sakwa

Nyawita

Health

Health

Renovation Of Nyodima
Dispensary

500,000

Bondo

West Sakwa

Nyawita

Health

Health

Renovation Of Got Winyo


Dispensary

500,000

Bondo

West Sakwa

Maranda

Health

Health

Renovation And Equipping Of

500,000

PROGRAMME BASED BUDGET JUNE 2016

1,000,000

Total
Estimates
1,000,000

500,000
250,000

500,000

1,000,000

600,000

500,000

500,000

Code
3110202

3110299
3110202

3110202

3110202

2211008

3110202

3110202

3110302

Description
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Construction Of
Buildings-Other
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Laboratory
Materials,
Supplies And
Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Refurbishment

Page 141

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Ugadhi Community Pharmacy To


A Functional State
Executive

Executive

Executive

Health

Health

Executive

Executive

Executive

Health

Health

Executive

Executive

Executive

Health

Executive

Executive

Executive

Executive

Executive

Executive

Estimates
2016/17

Purchase Of Ct Scan For County


Referal Hospital
Purchase Of Kepi Fridges

35,000,000

Health

Completion Of Works At County


Referral Hospital

63,126,209

Health

Health

Leasing Of Medical Equipment

Executive

Health

Health

Executive

Executive

Health

Health

Alego
Usonga

South East
Alego

Pap Oriang'

Health

Health

Construction Of 2 Staff Houses


At Ukwala And Rera Health
Centres
Solid Waste Management:
Purchase Of 5 Acre Per Sub
County At Ksh. 200,000 Per Acre
Construction Of Maternity Wing
At Pap Oriang' Dispensary

Alego
Usonga
Gem

Health

Health

Chv Motivational Materials

500,000

Health

Health

Health

Health

Construction Of A Toilet At
Tatro Health Centre
Extension And Construction Of
Kanyadet Dispensary

400,000

Gem

Siaya
Township
Yala
Township
South Gem

Gem

West Gem

Health

Health

PROGRAMME BASED BUDGET JUNE 2016

Construction And Equipping Of


The Children's Ward & Septic
Tank At Wagai Dispensary,
Nyagondo

7,500,000

82,369,671

95,744,681
10,000,000
6,000,000
3,200,000

2,000,000

2,000,000

Total
Estimates
500,000
35,000,000
7,500,000
63,126,209

178,114,352
10,000,000
6,000,000
3,200,000

500,000
400,000
2,000,000

2,000,000

Code

2211031
2211031
3110202

3111101
3110299
3130101
3110202

3110299
3110202

3110202

Description
Of NonResidential
Buildings
Specialised
Materials
Specialised
Materials
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Medical And
Dental
Equipment
Construction Of
Buildings-Other
Acquisition Of
Land

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Construction Of
Buildings-Other
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 142

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem
Rarieda

Sector

Function

Proposed Project

West Gem

Health

Health

North
Uyoma
West Uyoma

Health

Health

Health

Health

Alego
Usonga
Alego
Usonga

Usonga

Health

Health

Usonga

Health

Health

Construction Of Vip Toilets,


Fencing And Installation Of
Electricity At Nguge Dispensary
Electrification Of Chianda
Hospital
Completion Of Staff House At
Kagwa Dispensary
Construction Of Pit Latrine At
Uhembo Dispensary
Construction Of Shutters And
Civil Works At Benga
Dispensary

Alego
Usonga
Rarieda

Usonga

Health

Health

West Uyoma

Health

Health

Health

Health

Gem

West
Asembo
West Gem

Health

Health

Alego
Usonga

Central
Alego

Health

Health

Alego
Usonga

Central
Alego

Health

Health

Gem

Central Gem

Obambo

Health

Health

Construction Of Health Centre At


Lela

Gem

Central Gem

Siriwo

Health

Health

Construction Of Fence And


Latrines At Lela Dispensary

1,500,000

Bondo

Central
Sakwa

Health

Health

Upgrading Of Uyawi Dispensary

1,692,335

Rarieda

Rarieda

Sub Location

Obambo/Ojwando
A

PROGRAMME BASED BUDGET JUNE 2016

Construction Of Pit Latrine At


Udamayi Dispensary
Construction Of Maternity At
Wagoro Dispensary
Construction Of Lab At Obaga
Dispensary
Repair Of Staff House At Dienya
Health Centre
Supply Of Standard Medical Kits
To 94 Central Alego Ward
Chws/Chvs:
Construction Plus Installation Of
Electricity Wiring System Of
Obambo Community Health
Centre

B/F 2015/2016

Estimates
2016/17
800,000
200,000
2,000,000
500,000
500,000

500,000
900,000
372,171
200,000
11,900
2,636,545

986,000

Total
Estimates
800,000
200,000
2,000,000
500,000
500,000

500,000

Code

Description

3110299

Construction Of
Buildings-Other

3110499

Construction Of
Roads- Other
Construction Of
Buildings-Other
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Construction Of
Buildings-Other

3110299
3110202

3110299

900,000
372,171
200,000
11,900
2,636,545

986,000

1,500,000
1,692,335

3110202

3110202

3110599
3110197

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
NonResidential
Buildings

Page 143

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Central
Sakwa

Bondo

Central
Sakwa

Bondo

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Health

Health

Rehabilitation Of Oyamo
Dispensary

Ndeda/Oyamo,
Nyangoma

Health

Health

Construction Of Staff House


Block At Ndeda Dispensary

2,000,000

Central
Sakwa

Nyangoma

Health

Health

Construction Ofa Staff House


Block At Mbeka Dispensary

2,000,000

Bondo

Central
Sakwa

Nyangoma

Health

Health

Construction Of Sifu Dispensary


First Aid Block

1,000,000

Rarieda

East Asembo

Nyangoma

Health

Health

Construction Of Male Ward At


Abidha Health Centre

1,028,435

Health

Health

Fencing And Putting A Gate At


Onding Health Center

500,000

Health

Health

Health

Health

Purchase Of Laboratory
Equipment At Ramula Health
Centre
Dispensary Mindhine

Gem

East Gem

Gem

East Gem

Gem

East Gem

Ramula

PROGRAMME BASED BUDGET JUNE 2016

44,392

1,500,000
512,481

Estimates
2016/17

Total
Estimates

44,392

2,000,000

2,000,000

1,000,000

1,028,435

500,000
1,500,000
512,481

Code

3110198

3110199

3110200

3110201

3110202

3110599
2211021
3110202

Description
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 144

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

East Gem

Ugenya

East Ugenya

Ugenya

East Ugenya

Ugenya

East Ugenya

Ugenya

East Ugenya

Bondo

Sub Location

Sector

Function

Proposed Project

Health

Health

Lihanda Health Centre

51,238

Kathieno A

Health

Health

Equipment At Masasia
Dispensary

500,000

Anyiko

Health

Health

Construction Of Bar Ndege


Dispensary Staff Quarters

457,074

Health

Health

Upgrading Of Urenga Health


Centre

Ramunde

Health

Health

Construction Of Inungo
Dispensary

998,159

Yimbo East

Kathieno A

Health

Health

895,466

Executive

Executive

Pala

Health

Health

Completion Of Maternity Wing


At Ogam Dispensary
Construction Of Urenga
Dispensary

Executive

Executive

Health

Health

Construction Of Theatre At
Ukwala

5,000,000

Executive

Executive

Health

Health

Renovation Of Yala Sub County


Hospital

8,000,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

Total
Estimates
51,238

500,000
457,074

5,282,457

5,282,457

998,159

10,000,000

895,466
10,000,000

5,000,000

8,000,000

Code

Description

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

2211021
3110202

3110202

3110202

3110202

3110202

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,

Page 145

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Executive

Sub Location

Sector

Function

Proposed Project

Executive

Health

Health

Renovation Of Bondo Sub


County Hospital

Executive

Executive

Health

Health

Renovation Of Madiany Sub


County Hospital

1,741,874

Executive

Executive

Health

Health

Renovation Of Wagai Health


Centre

600,501

Executive

Executive

Health

Health

Renovation Of Sigomre Health


Centre

2,000,000

Executive

Executive

Health

Health

Renovation Of Ukwala Sub


County Hospital

1,306,642

Executive

Executive

Health

Health

Renovation Of Ambira Sub


County Hospital

5,000,000

Executive

Executive

Health

Health

Completion Of Esp Project At


Rwambwa Health Centre

1,846,808

Executive

Executive

Health

Health

Construction Of Mortuary At
Ambira Hospital

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
5,000,000

Total
Estimates
5,000,000

1,741,874

2,399,499

3,000,000

2,000,000

1,306,642

5,000,000

3,153,192

5,000,000

5,000,000

5,000,000

Code
3110202

3110202

3110202

3110202

3110202

3110202

3110202

3110202

Description
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings

Page 146

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Executive

Executive

Health

Health

Construction Of Blood Bank

Executive

Executive

Health

Health

Repairs And Maintenance Of


Bondo Sub County Hospital

Executive

Executive

Health

Health

5,000,000

Executive

Executive

Health

Health

Purchase Of Medical Equipments


(Beds, Mattresses, Beddings) For
Bondo Hospital
Purchase Of X-Ray Machine For
Yala Hospital

Executive

Executive

Health

Health

Purchase Of Beds, Mattresses,


Beddings For Ambira Hospital

3,000,000

Executive

Executive

Health

Health

Completion Of Rwambwa
Hospital

5,000,000

Executive

Executive

Health

Health

Purchase Of X-Ray Machines At


Ukwala

Executive

Executive

Health

Health

Construction Of Madiany Sub


District Hospital

Alego
Usonga

North Alego

Health

Health

Completion Of Ulaf Dispensary,


Electrical Wiring, Fencing And
Construction Of Gates

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17
5,000,000

109,420

5,000,000

10,000,000
7,361,525

209,331

Total
Estimates

5,000,000

109,420

5,000,000
5,000,000
3,000,000
5,000,000

10,000,000
7,361,525

209,331

Code

3110202

3110202

2211021
3111101
2211021
3110202

3111101
3110202

3110202

Description
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Bedding And
Linen
Purchase Of
Medical And
Dental
Equipment
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Medical And
Dental
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,

Page 147

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

North Gem

Gem

Sub Location

Sector

Function

Proposed Project

Health

Health

Malanga Healh Centre-Staff


House And Maternity
Construction

North Gem

Health

Health

Maternity Wing At Gogo


Dispensary

Bondo

North Sakwa

Health

Health

Construction Of Kitchen And


Hospital Gate At Gobei
Dispensary

1,500,000

Bondo

North Sakwa

Health

Health

Completion Of Mawere
Maternity Wing

1,500,000

Bondo

North Sakwa

Abom

Health

Health

Construction Of Bar Kowino


Dispensary At Udimba

Ugenya

North
Ugenya

Bar Kowino

Health

Health

Completion Of Ligala Dispensary

1,003,345

Rarieda

North
Uyoma

Health

Health

Rehabilitation Of Matera
Dispensary

1,000,000

Rarieda

North
Uyoma

Health

Health

Construction Of Maternity Wing


At Ragengi

3,900,000

Ulafu

Ochienga

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

1,182,952

1,182,952

218,508

883,143

Total
Estimates

218,508

1,500,000
2,000,000

3,500,000

883,143

1,003,345

1,000,000

3,900,000

Code
3110202

3110202

3110599
3110202

3110202

3110202

3110203

3110202

Description
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,

Page 148

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego
Usonga

Siaya
Township

Ugunja

Sidindi

Ragengni

Health

Health

Equipping Mulaha Maternity


Wing

1,000,000

Health

Health

Construction Of Staff Houses In


Sikalame, Simenya & Sihui
Dispensary

7,907,620

Ugunja

Sidindi

Health

Health

Fencing Of Uhuyi Dispensary

Alego
Usonga

South East
Alego

Health

Health

Construction Of Maternity Wing


At Randago Dispensary

2,500,000

Alego
Usonga

South East
Alego

Barding

Health

Health

Construction Of Out Patient And


Maternity Wing At Barding
Dispensary

4,000,000

Alego
Usonga

South East
Alego

Barding

Health

Health

Construction Of Maternity Ward


At Nyangoma Health Centre

1,000,000

Alego
Usonga

South East
Alego

Nyangoma

Health

Health

Construction Of Staff House At


Bar Agulu Dispensary

1,000,000

Gem

South Gem

Health

Health

Construction Of Female Ward


Lidha Dispensary

2,000,000

Gem

South Gem

Health

Health

Construction Of Ward At Siala


Dispensary

2,000,000

Mulaha

Bar Agulu

Kaudha East

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

294,893

Estimates
2016/17

Total
Estimates
1,000,000
7,907,620

294,893
2,500,000

4,000,000

1,000,000

1,000,000

2,000,000

2,000,000

Code
2211021
3110202

3110202

3110202

3110202

3110202

3110203

3110204

Description
Hospitals, Etc)
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,

Page 149

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Gem

South Gem

Onyonyore

Health

Health

Bondo

South Sakwa

Gombe

Health

Health

Bondo

South Sakwa

E. Migwena

Health

Health

Bondo

South Sakwa

Got Abiero

Health

Health

Bondo

South Sakwa

Nyaguda

Health

Health

Bondo

South Sakwa

Health

Health

Rarieda

South
Uyoma

Health

Health

Rarieda

Health

Health

Ugunja

South
Uyoma
Ugunja

Health

Health

Ugunja

Ugunja

Health

Health

Ugenya

Ukwala

Health

Health

Ugenya

Ukwala

Health

Health

Alego
Usonga
Alego
Usonga

Usonga

Health

Health

Usonga

Health

Health

Alego
Usonga

Usonga

Health

Health

Alego
Usonga

West Alego

Health

Health

West Migwena

Naya

Siranga

Gangu

PROGRAMME BASED BUDGET JUNE 2016

Proposed Project
Construction Of Toilets At
Uthanya Dispensary
Construction Of Toilets At
Migwena Sports
Construction Of Maternity Ward
At Ouya Health Centre
Construction Of General Ward At
Nyaguda Dispensary
Completion Of Anyuongi
Dispensary Block
Construction Of Staff House At
Gombe Dispensary
Construction Of Administration
Block At Madiany Sub County
Hospital
Construction Of A Dispensary At
Lwala
Construction Of Maternity Ward
At Ombwede Dispensary
Expansion And Equiping
Rambula Health Centre
Construction Of A Dispensary At
Osure
Construction Of Lwero
Dispensary
Construction Of Mortuary At
Rwambwa Health Centre
Renovation And Modernization
Of Drainage System With
Installation Of Overhead Water
System At Sumba Dispensary
Construction Of Maternity Wing
At Uhembo Dispensary

Construction Of Gangu Health


Centre

B/F 2015/2016
143,380
1,000,000
2,531,076
2,000,000
500,000
11,697
2,800,000
3,000,000
1,494,650
1,500,000
4,000,000
1,804,700
2,000,000
1,500,000
1,693,168

2,900,000

Estimates
2016/17

Total
Estimates

Code

Description
Schools,
Hospitals, Etc)

143,380
1,000,000
2,531,076
2,000,000
500,000
11,697
2,800,000
3,000,000
1,494,650
1,500,000
4,000,000
1,804,700
2,000,000
1,500,000
1,693,168

2,900,000

3110189

3110190

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 150

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Rarieda

West
Asembo

Rarieda

West
Asembo

Rarieda

Sub Location

Sector

Function

Proposed Project

Health

Health

Construction Of Wards At
Rambugu Dispensary

2,000,000

Siger

Health

Health

Construction Of New Dispensary


At Ndwara

2,000,000

West
Asembo

Mahaya

Health

Health

Renovation Of Jar Dispensary

1,000,000

Rarieda

West
Asembo

Akom

Health

Health

Construction Of Laboratory At
Obaga Dispensary

1,044,174

Rarieda

West
Asembo

Health

Health

Renovation Of Saradidi Health


Centre

1,000,000

Gem

West Gem

Health

Health

Construction Of Orombe
Dispensary At Orombe.

3,000,000

Gem

West Gem

Health

Health

1,000,000

Gem

West Gem

Health

Health

Laboratory Equipment At Wagai


Health Centre
Construction Of 3 Medical Wards
At Wagai Health Centre

Bondo

West Sakwa

Health

Health

Electric Wiring At Kapiyo Health


Centre

740,000

Uriri

Wagai West

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

2,695,934

Estimates
2016/17

Total
Estimates
2,000,000

2,000,000

1,000,000

1,044,174

1,000,000

3,000,000

1,000,000
2,695,934

740,000

Code

Description

3110191

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110191

3110192

3110193

3110194

3110195

3110195

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 151

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Sub Location

Sector

Function

Proposed Project

West Sakwa

Health

Health

Construct And Equip A New


Dispensary At Masita Village

Bondo

West Sakwa

Health

Health

Construct Staff House At


Nyodima Dispensary

Bondo

West Sakwa

Health

Health

Rehabilitation Of Staff House,


Fencing And A Gate At Kambajo
Dispensary

Bondo

West Sakwa

Health

Health

Construction Of Staff House At


Got Winyo Dispensary

700,000

Bondo

West Sakwa

Health

Health

Purchase Of Beds, Beddings And


Wiring

303,500

Ugenya

West Ugenya

Kapiyo

Health

Health

Construction Of Wadenya Health


Centre

3,000,000

Ugenya

West Ugenya

Uyundo

Health

Health

Completion Of Staff Houses At


Sifuyo Health Centre

1,750,000

Ugenya

West Ugenya

Health

Health

Fencing /Staff Houses At


Nyangu Dispensary

2,000,000

Rarieda

West Uyoma

Health

Health

Staff House Construction: Kagwa

1,300,000

Karadolo East

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
1,000,000

700,000

1,000,000

Estimates
2016/17

Total
Estimates
1,000,000

700,000

1,000,000

700,000

303,500
3,000,000

1,750,000

2,000,000

Code

Description

3110195

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Purchase Of
Bedding And
Linen
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Non-

3110196

3110197

3110198

2211021
3110195

3110196

3110197

3110198

Page 152

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Health Centre

Rarieda

West Uyoma

Kagwa

Health

Health

Staff House Construction: Pap


Kodero Health C.

1,300,000

Rarieda

West Uyoma

Kobong

Health

Health

Staff House Construction: Ndere


Dispenary

1,300,000

Bondo

West Yimbo

Health

Health

Construction Of Maternity Wing


At Nyenye Misori Dispensary

3,000,000

Bondo

West Yimbo

Health

Health

Construction Of Mortuary At Got


Agulu Dispensary

2,112,777

Gem

Yala
Township

Health

Health

Construction Of Doctor's House


At Anyiko/Tatro Clinic

1,000,000

Gem

Yala
Township

Health

Health

Construction Of Modern Toilets


At Muhanda Market

500,000

Gem

Yala
Township

Health

Health

Construction Of Anyiko Tatro


Clinic

Alego

West Alego

Health

Health

Fencing & Installation Of Gate

Kokwiri

Utuoma

PROGRAMME BASED BUDGET JUNE 2016

1,031,502

839,944

Estimates
2016/17

Total
Estimates
1,300,000

1,300,000

1,300,000

3,000,000

2,112,777

1,000,000

500,000
1,031,502

Code

3110199

3110200

3110201

3110201

3110202

3110599
3110202

3110599

Description
Residential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other

Page 153

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Usonga

Proposed Project

B/F 2015/2016

And Electricity Connection At


Mwer Health Center

Alego
Usonga

South East
Alego

Health

Health

Fencing And Renovation Of


Nduru Health Centre

Alego
Usonga

South East
Alego

Health

Health

Construction Of Twin Staff


House At Pap Oriang Dispensary

1,000,000

Alego
Usonga

Central
Alego

Health

Health

Construction Of Lake Kanyaboli


Community Health Centre

117,428

Alego
Usonga

Central
Alego

Health

Health

Construction Of Uhembo
Community Health Centre

655,434

Alego
Usonga

Central
Alego

Health

Health

Construction Of Kochieng
Community Health Centre

2,000,000

Alego
Usonga

Siaya
Township

Health

Health

Building Maternity Wing At


Mulaha Dispensary

Alego
Usonga

Usonga

Health

Health

Construction Of Staff House At


Sumba Dispensary

Bondo

North Sakwa

Health

Health

Equiping Kibuye Dispensary

Masumbi

Pap Oriang

PROGRAMME BASED BUDGET JUNE 2016

500,000

700,000

1,500,000

300,000

Estimates
2016/17

Total
Estimates
839,944
500,000
1,000,000

117,428

655,434

2,000,000

700,000

1,500,000

300,000

Code

3110599
3110202

3110202

3110202

3110202

3110202

3110202

2211008

Description
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Laboratory
Materials,
Supplies And

Page 154

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Bondo

North Sakwa

Health

Health

Construction Of Manyonge
Dispensary

Bondo

South Sakwa

Health

Health

Construction Of Laboratory At
Gombe Dispensary

1,200,000

Bondo

South Sakwa

West Migwena

Health

Health

Construction Of Laboratory At
Mabinju Dispensary

1,200,000

Bondo

West Sakwa

East Migwena

Health

Health

Fencing, Construction Of Toilets


And Water Tanks For Nyodima
Dispensary

24,150

Bondo

West Sakwa

Health

Health

Construction Of Maternity Wing


At Kamabajo Dispensary

2,801,558

Bondo

West Yimbo

Health

Health

500,000

Gem

East Gem

Health

Health

Provision Of Generator At Got


Agulu Sub District Hospital
Completion Of Staff House At
Ramula Health Centre

Gem

East Gem

Health

Health

500,000

Gem

Yala
Township
North Gem

Health

Health

Health

Health

Landscaping, Fencing And


Putting A Drainage System At
The Staff Quarters Of Lihanda
Health Centre
Construction Of Doctor's House
At Sauri
Construction Of Maternity Wing
At Sirando Dispensary

Gem

PROGRAMME BASED BUDGET JUNE 2016

886,980

500,000

554,194
177,775

Estimates
2016/17

Total
Estimates
886,980

1,200,000

1,200,000

24,150
2,801,558

500,000
500,000

Code
3110202

3110203

3110204

3110599
3110204

Description
Small
Equipment
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3110202

NonResidential

500,000
554,194
177,775

Page 155

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

North Gem

Gem

North Gem

Ugunja

Sub Location

Sector

Function

Proposed Project

Health

Health

Construction Of Dispensary In
Nyabeda

Health

Health

Malanga Healh Centre-Staff


House And Maternity
Construction

Sigomre

Health

Health

Rarieda

East Asembo

Health

Health

Purchase Of Dispensary
Equipments At Uloma
Dispensary
Equiping Ongielo Dispensary

Rarieda

Health

Health

Rarieda

West
Asembo
West Uyoma

Health

Health

Rarieda

West Uyoma

Health

Health

Rarieda

West Uyoma

Nyabera

Health

Health

Ugenya

East Ugenya

Kokwiri

Health

Health

Ugenya

East Ugenya

Health

Health

Complection Of Masasia
Dispensary

Ugenya

North
Ugenya

Health

Health

Construction Of Obuogore
Dispensary

Nyabeda

Sihay

PROGRAMME BASED BUDGET JUNE 2016

Fencing And Wiring At Nyagoko


Dispebsary
Construction Of Dispensary
Nyagwara
Wiring And Fencing Of Misori
Dispensary
Construction Of Maternity At
Wagoro Dispensary
Construction Of Lur Dispensary

B/F 2015/2016

244,864

1,976,628

500,000
500,000
75,795
230,912
427,564
3,000,000
3,000,000

896,968

1,120,179

Estimates
2016/17

Total
Estimates

244,864

1,976,628

Code

3110202

3110202

Description
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

500,000
500,000
75,795
230,912
427,564
3,000,000
3,000,000

896,968

1,120,179

3110202

3110202

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,

Page 156

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugenya

North
Ugenya

Ugenya

West Ugenya

Ugenya

West Ugenya

Executive

Sub Location

Function

Proposed Project

B/F 2015/2016

Health

Health

Constructing Doctor's Quarters


At Jera Dispensary

Health

Health

Health

Health

Executive

Health

Health

Construction Of Dispensary At
Mudondo Village
Construction Of Staff Houses At
Bar Achuth Health Centre
Refurbishment Of Maternity
Wing At Bondo Sub County
Hospital

Executive

Executive

Health

Health

Maternal Health Care

Bondo

Central
Sakwa
Central
Alego

Health

Health

500,000

Health

Health

Construction Of Septic Tank At


Uyawi Health Center
Construction Of Soak Pit,
Placenta Pit And Drainage Works
At Karuoth Ndere Dispensary

Usonga

Health

Health

120,944
550,000

500,000

Alego
Usonga

Nyamsenda

Sector

Sifuyo

Alego
Usonga
Alego
Usonga
Gem

Usonga

Health

Health

East Gem

Health

Health

Construction Of Staff House At


Rwambwa Health Centre
Provide And Instal Water Tanks
At Benga Dispensary
Marenyo Health Centre

Gem

East Gem

Health

Health

Lihanda Health Centre

Alego
Usonga

South East
Alego

Health

Health

Contruction Of Mur Malanga


Dispensary

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

710,673

Total
Estimates
710,673

3,000,000

Code
3110202

Description
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)

3,000,000

271,005

271,005

11,745,040

11,745,040

64,318,400

64,318,400
500,000

800,000

800,000

3110202

4540199

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Reimbursements
And RefundsOther(Budget)

3110599

Other
Infrastructure
And Civil
Works

3110202

NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
NonResidential

120,944

200,000

200,000
550,000

500,000

550,217

550,217

3110202

3110202

Page 157

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Total

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

376,035,710

Estimates
2016/17

311,899,663

Total
Estimates

687,935,373

Code

Description
Buildings
(Offices,
Schools,
Hospitals, Etc)

Page 158

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 008
VOTE TITLE: DEPARTMENT OF LANDS, PHYSICAL PLANNING AND HOUSING

Part A: Vision: Excellence in land and housing management for sustainable development

Part B: Mission: to facilitate administration and management of land and access to adequate
and affordable housing.
Part C: Strategic Objectives
Program

Strategic Objectives

CP.1 General Administration, planning


and support services

To provide transformative leadership, capacity and policy direction


in service delivery

CP.2. County public land administration,


Land use planning and surveying

To provide a spatial frame work that will guide and coordinate land
use development for sustainable livelihood
To secure property boundaries of public/plot, government houses
and trading centers.
To secure land for public use and investments

CP.3. Housing development

To provide adequate, affordable and decent housing for all.


To provide quality estates management services

Part D. Context for Budget Intervention


The department comprises of Lands, physical planning, land survey and housing sub sectors.

The key items of expenditure for the department were: procurement and installation of GIS software at
Kshs. 5, 647, 981, acquisition of land for investment at Kshs. 22,000,000, preparation of county spatial plan
41,106,300, and profiling public land Kshs. 4,000,000, renovation of government houses at Kshs. 1,070,000.
Major achievements during the period are; Installation of a G.I.S Laboratory as a process of records
automation, preparation of County spatial plan is ongoing, preparation of -Siaya town Integrated
Urban Development Plan which is in its final stages, Valuation Roll for Siaya town Bondo and other
small towns, Purchase of 28.23 Acres (11.3 Hectares) of land for public use and investment, Issuance
of Title Deeds in the county, Audit and Inventory of public land 80%complete, Renovation of
government Houses as well as Training and Sensitization of the locals on the use of ABT .

The following were the major challenges: slow pace of harmonizing and taking up the functions as
given in schedule four of the constitution of Kenya on land matters, lengthy procurement and
litigations, late fund disbursement and ineffective and inefficient staff due to skewed training for
many years making them out of tune with current market practices.
To address the challenges highlighted above and achieve its strategic objectives, the sector expects to
utilize Kshs. 48,771,466 For recurrent and Kshs. 90,568,083 for development in the FY 2016/2017.
The allocation is expected to increase to Kshs.53, 648,613 for recurrent and Kshs. 99,624,891 for
development in the FY 2017/2018 and Kshs. 59,013,474 for recurrent and Kshs.109, 587,380
development in the FY 2018/2019.

PROGRAMME BASED BUDGET JUNE 2016

Page 159

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part E: Summary of Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2018/19
Programme

Key
Target
Target
Performance
(Baseline)
2016/17
Indicators
2015/16
CP.1: General Administration, Planning And Support Services
OUTCOME: Efficient Service Delivery And Improved Working Environment
SP1.1
General CEC
Efficient
No. of Staff 44
50
Administration
CO
service
established
Chief Admin delivery
Training Needs 1
1
Assessments
prepared
annually
No. of Staff 20%
50%
trained
No. of staff 0%
10%
promoted
No. of staff 12
12
meetings held
No. of progress 12
12
reports
No.
of 20
25
Conferences,
workshops and
seminars
conducted
Monitoring and Depends on the Depends on
Evaluation
projects
the projects
Liaison
and As need arises
Continuous
Partnerships
SP1.2.
planning CEC
Efficient
Signed overall 1
1
and
Support CO,
Chief service
Performance
services
admin and
delivery
Contracts
Heads of the
Performance
4
4
Directorates
reports
No. of policies 6
6
/Bills / papers
formulated
No. of plans 4
4
prepared (work
plans
and
budgets)
No. of Office 60% of the 70%
equipment
requirement
bought and well
maintained
No. of vehicles 0
1
bought and well
maintained
Utility costs
12
12
CP.2: County Land Administration, Land Use Planning And Surveying
OUTCOME: Well Managed Land And Its Resources For Sustainable Development Of The County
CEC,
CO, County
No. of Plans and 1
County 3
Urban
SP2.1
Land Use Planning County
Spatial Plan Reports prepared Spatial Plan
Centers
Directorate
and Planning Planning reports
Spatial
of Physical Reports
plans
Planning
SP2.2 Surveying
CEC,
CO, Surveying and No.
of 5
market 12 market
County
mapping
of markets/centers
centers
centers
Directorate
land
surveyed
and
of Surveys
beaconed.

SP.2.3.
Public
Banking

County
Land

Delivery
Unit

CEC,
CO,
County
Directorate
of lands

Key Outputs

(Land
banking)

No. of surveyed
public plots/land

2 public plots
to be surveyed

No. of land
disputes resolved

50
No.
boundary
disputes/cases
resolved
13 hectares of
land

The No. of land


parcels Secured
for investment
and
public

PROGRAMME BASED BUDGET JUNE 2016

Target
2017/18

Target
2018/19

56

75

75%

100%

75%

100%

12

12

12

12

25

25

Depends on
the projects
Continuous

Depends on
the projects
Continuous

80%

100%

12

12

3
Urban
Centers
Spatial
plans

3
Urban
Centers
Spatial plans

1
major
urban center
and
10
market
centers

1
major
urban center
and
10
market
centers

5
public
land to be
surveyed
Continuous

5
public
land to be
surveyed
Continuous

5 public land
to
be
surveyed
Continuous

15 hectares

20 hectares

10 hectares

Page 160

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery
Unit

Key Outputs

Target
2016/17

Target
2017/18

Target
2018/19

CEC,
CO, Public Land
6 sub counties
County
Database
public land
Directorate
of lands
SP.2.5 Valuation CEC,
CO, Updated Land
6 sub counties
Roll
County
Rates for all
land rates
Directorate
public land
of lands
SP.2.6 Automation CEC,
CO, A
digital The number of 6 sub counties
of Land Records
County
database
of land
parcel land records
Directorate
land records
records digitized
of lands
CP.3: Housing Development
OUTCOME: Delivery Of Adequate, Decent And Affordable Housing Units To All.

Continuous
process

Continuous
process

Continuous
process

Continuous
process

Continuous
process

Continuous
process

Continuous
process

Continuous
process

Continuous
process

P3.1:
Housing
Development

10 units

10 units

20 units

30 units

80

100

150

250

20

25

40

50

SP.2.4 Public land


audit

County
Directorate
of Housing

Estate
management
Adoption
ABMT

of

Key
Performance
Indicators
purposes
The no. of public
plots/lands
audited
and
profiled
The
no.
of
valued land

-The No. of
government
houses improved
and maintained.
No. of ABT
centers
established
No. of youths
trained
No. of affordable
housing
units
constructed
through ABMT
and PPP

Target
(Baseline)
2015/16

Table F. Summary of Expenditure by Programmes 2016/17-2018/19(Kshs)


Programme
C P 1: General Administration, Planning And Support
Services
Total Expenditure of program 2

Baseline
Estimates
2015/2016

CP 2: Physical planning

Total expenditure of programme 2


CP. 3. Land surveying and mapping
Total Expenditure of program 3
Cp 4. Housing Development
Total Expenditure of program 4
Total For All Programs

PROGRAMME BASED BUDGET JUNE 2016

Estimates

18,146,798
18,146,798

0
14,612,106
14,612,106
7,856,503
7,856,503
92,456,986

2016/2017

27,027,533

Projected Estimates

2017/2018

29,730,286

27,027,533

29,730,286

50,974,484
50,974,484
8,550,498
8,550,498
7,256,091
7,256,091
93,808,606

56,071,932
56,071,932
9,405,548
9,405,548
7,981,700
7,981,700
103,189,467

2018/2019

32,703,315

32,703,315

61,679,126
61,679,126
10,346,103
10,346,103
8,779,870
8,779,870
113,508,413

Page 161

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Table G: Summary of Expenditure by Economic Classification 2016/17-2018/19 (Kshs)
Expenditure Classification

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development
Total Expenditure of Vote

Baseline Estimates 2015/16

Estimates 2016/2017

Projected Estimates

49,806,786
22,985,001
26,821,785

54,504,388
19,647,188
34,857,200

2017/2018
59,954,827
21,611,907
38,342,920

60,886,817
60,886,817

39,304,218

43,234,640

47,558,104

39,304,218
93,808,606

43,234,640
103,189,467

47,558,104
113,508,413

110,693,603

2018/2019
65,950,309
23,773,097
42,177,212

Table H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification 2016/172018/19(Ksh.)


Baseline
Estimates
2015/16
Cp.1 General Administration, Planning And Support Services
Current Expenditure
18,146,798
Compensation to Employees
6,780,198
Use of goods and services
11,366,600
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Programme 1
18,146,798
CP. 2 Physical Planning
Current Expenditure
10,191,380
Compensation to Employees
5,616,300
Use of goods and services
4,575,080
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
41,286,817
Acquisition of Non-Financial Assets
41,286,817
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure for programme 2
51,478,197
CP. 3 Land Surveying and Mapping
Current Expenditure
13,712,106
Compensation to Employees
6,914,452
Use of goods and services
6,797,654
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
1,000,000
Acquisition of Non-Financial Assets
1,000,000
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of programme 3
14,712,106
Cp.4. Housing Development.
Current Expenditure
7,856,502
Compensation to Employees
3,674,052
Use of goods and services
4,182,450
Current Transfers Govt. Agencies
Other Recurrent
Capital Expenditure
0
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development
Total Expenditure of Program 4
7,856,502
Total for All Programs
110,693,603
Expenditure Classification

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

27,027,533
5,442,384
21,585,149
0
0
0.00
0.00
0
0
27,027,533
11,670,267
5,116,300
6,553,967
0
0
39,304,217
39,304,217
0
90,568,083
50,974,484
8,550,497
5,414,452
3,136,045
0
0
0
0
0
0
8,550,497
7,256,092
3,674,052
3,582,040
0
0
0
0
0
0
7,256,092
93,808,606

Projected Estimates

2017/18

2018/2019

29,730,286
5,986,622
23,743,664
0.00
0
29,730,286
12,837,294
5,627,930
7,209,364
0
43,234,639
43,234,639
56,071,932
9,405,547
5,955,897
3,449,650
0
0
0
9,405,547
7,981,701
4,041,457
3,940,244
0
0
0

7,981,701
103,189,467

32,703,315
6,585,285
26,118,030
0.00
0
32,703,315
14,121,023
6,190,723
7,930,300
47,558,103
47,558,103
61,679,126
10,346,101
6,551,487
3,794,614
0
0
10,346,101
8,779,871
4,445,603
4,334,268
0
0

8,779,871
113,508,413

Page 162

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code

2110101
2110301
2110308
2110309
2110310
2110311
2110312
2110313
2110314
2110315
2110317
2110318
2110320
2110321
2110327
2110402
2110403
2110404
2210101
2210102
2210201
2210202
2210203
2210301
2210302
2210303
2210309
2210401
2210402
2210403
2210409
2210503
2210504
2210505
2210603
2210604
2210710
2210711
2210802
2210801
2210804
2211009
2211021

Item

Basic Salary civil services


House Allowance
Medical Allowance
Special Duty Allowance
Top Up Allowance
Transfer Allowance
Responsibility Allowance
Entertainment Allowance
Transport Allowance
Extraneous Allowance
Domestic Servant Allowance
Non-Practising Allowance
Leave Allowance
Administrative Allowance
Executive Allowance
Refund of Medical Expenses-Inpatient
Refund of Medical Expenses-Ex-Gratia
Commutation of Leave
Electricity Expenses
Water and Sewerage charges
Telephone,Telex,Facsmile and M
Internet Connection
Courier and Postal Services
Travel Costs(Airlines,Bus,Railwayc)
Accommodation Domestic
Daily Subsistence Allowances
Field Allowance for M & E of Development Projects
Travel Costs(Airlines,Bus,Railwayc)
Accommodation Foreign
Daily Subsistence Allowances
Field Allowance for M&E of Development Projects
Subscription to Newspapers,
advertising awareness
Trade Shows and Exhibitions
Rents and Rates - Non-Residential
Hire of Transport
Travel & Accomodation
Tuition fees
Boards, Committees and Seminars
Cartering services,receptions,Ac
Land Control Boards
Education and Library Supplies
Curtains

PROGRAMME BASED BUDGET JUNE 2016

General
Administration
2,370,384
1,596,000
1,476,000
237,500
142,500
47,500
47,500
237,500
280,000
270,000
285,000
222,500
331,619
275,000
59,280
212,500
47,500
190,000
212,500
1,990,000
165,000
47,500

Physical
Planning
3,483,100
1,321,200
312,000
11,400
4,750
133,000
190,000
237,500
95,000
190,000
142,500
29,640
127,500
142,500
104,595
165,000
57,000
13,642
23,750

Land Survey And


Mapping
2,553,652
1,648,800
1,212,000
47,500
47,500
76,000
11,400
4,750
190,000
185,000
270,000
29,640
151,500
142,500
190,000
165,505
165,000
14,250
47,500

Housing

2,872,452
621,600
180,000
17,100
5,368
76,000
3,800
76,000
171,000
29,640
47,500
95,000
109,250
95,000
114,000
28,500
23,750

Total

11,279,588
5,187,600
3,180,000
302,100
195,368
199,500
22,800
60,800
636,500
826,000
777,500
285,000
317,500
521,619
417,500
148,200
539,000
95,000
441,750
579,595
657,005
1,990,000
387,000
56,392
142,500

Page 163

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code

Item

2211016
2211101
2211102
2211103
2211201
2211301
2211305

Purchase of Uniforms and Clothing - Staff


General Office Supplies (consumables)
Supplies and accessories for computers and printers
Sanitary and cleaning materials,
Refined Fuels & Lubri
Bank Commissions & Charges
Contracted Guards and Cleaning Services
Membership Fees, Dues and Subscriptions to Professional and Trade
Bodies
Legal Dues/fees, Arbitration and Compensation Payments
Contracted Professional Services
Maintenance Expenses - Motor Vehicles
Maintenance of Plant, Machinery and Equipment (including lifts)
Maintenance of Office Furniture and Equipment
Maintenance of Buildings and Stations -- Residential
Maintenance of Buildings and Stations -- Non-Residential
Maintenance of Computers, Software, and Networks
Gratuity - Funeral expenses civil servants
Gratuity - County Executive Members
Refurbishment of Buildings
Purchase of Household and Institutional Appliances
Purchase of Office Furniture and Fittings

2211306
2211308
2211310
2220101
2220201
2220202
2220204
2220205
2220210
2710102
2710105
3110300
3110902
3111001
3110302
3111002
3111005
3110701
3111401

Refurbishment of Non Residential Buildings


Purchase of Computers, Printers and other IT Equipment
Purchase of Photocopiers
Purchase of motor vehicles
Audit of lands
Purchase of survey equipment
Prefeasibility, Feasibility and Appraisal studies
Purchase of motor vehicles
Automation of land records
TOTALS

3114001
3111701

DEVELOPMENT
Sub County
Ward

General
Administration
76,000
177,500
190,000
42,750
375,000
945,000
47,500

925,000
159,000
19,000
47,500
19,000
8,000,000
76,000
185,000
5,000,000
27,027,533

Sub Location

Sector

Function

Proposed Project

Physical
Planning And
Development
Physical
Planning And
Development
Physical

Lands

Land Buying For Anyiko Market

Physical
Planning And
Development
Physical

Preparation Of County Spatial Plan

Gem

Yala
Township

Executive

Executive

Executive

Executive

Executive

Executive

PROGRAMME BASED BUDGET JUNE 2016

Public Land Audit

Physical
Planning
66,500
142,500
114,000
47,500
209,190
47,500

Land Survey And


Mapping
47,500
140,000
133,000
28,500
270,000
95,000

Housing

218,500
555,000
494,000
166,250
1,044,190
1,030,500
925,000
422,500
38,000
1,842,731
191,900
38,000
8,000,000
332,000

9,500
9,500
-

187,500
9,500
95,000
9,500
-

76,000
1,842,731
49,400
-

90,000

90,000

76,000

150,000
4,000,000
11,670,267

150,000
142,500
-

142,500
-

8,550,497

7,256,091

B/F 2015/2016

241,217

Estimates
2016/17
500,000
20,000,000
6,000,000

Total

28,500
95,000
57,000
47,500
190,000
85,500

Total
Estimates
500,000
20,241,217

190,000

627,500
142,500
5,000,000
4,000,000
54,504,388

Code

Description

3130101

Acquisition
Of Land

2211310

Contracted
Professional
Services
Contracted

2211310

Page 164

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Executive

Executive

Executive

Alego Usonga

Central Alego

Ojwando A

Gem

South Gem

Bondo

Yimbo East

Executive

Executive

Bondo

West Yimbo

Gem

Yala
Township

Gem

Yala
Township

Ugenya

West Ugenya

Gem

South Gem

Nyamonye

Sifuyo East

Sector

Function

Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development

Planning And
Development
Physical
Planning And
Development
Lands

Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development

Lands

PROGRAMME BASED BUDGET JUNE 2016

Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development
Physical
Planning And
Development

Proposed Project

B/F 2015/2016
1,063,000

Surveying Of Yala Swamp

Estimates
2016/17
1,500,000

Compensation Of Land Owners


Over The Surrendered Lake
Kanyaboli Community Health
Centre Land
Purchase Of Land For Development

200,000
1,500,000

Purchase Of Land, Fencing And


Construction Of Toilets At
Nyamonye Cattle Ring
County Land Bank

1,000,000
2,900,000

Purchase Of Market Land At


Mahanga

500,000

Lands- Purchase Of Community


Land At Bar Sauri

1,500,000

Purchase Of Land For Uganga


Ecd

400,000

Purchase Of Land For Social Hall

1,000,000

Purchase Of Land For Stadium At


Akala Market

1,000,000

Total

1,304,217

38,000,000

Total
Estimates
7,063,000
1,500,000
200,000
1,500,000

Code
2211310
3130101

Description
Professional
Services
Contracted
Professional
Services
Acquisition
Of Land

3130101

Acquisition
Of Land

3130101

Acquisition
Of Land

1,000,000
2,900,000
500,000
1,500,000
400,000
1,000,000
1,000,000
39,304,218

Page 165

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 009
VOTE TITLE: TRADE, INDUSTRY & COOPERATIVE DEVELOPMENT

Part A: Vision: A globally competitive economy with sustainable Trade, Industrial, and
Cooperative sub-sectors
Part B: Mission: To formulate and coordinate Trade, Industrial, and Cooperative
Development policies, strategies and programmes for a prosperous and globally competitive
economy
Part C Strategic Objectives
Programme
Trade Development and Promotion

Strategic Objectives
To create an enabling environment for enterprise development.

Fair Trade Practices and Consumer Protection


Services
Co-operative Development & Management

To improve compliance with Weights and Measures


regulations and Consumer Confidence
To mobilize resource for enterprise development through cooperative societies

General Administration, Planning and Support


Services

To provide transformative leadership, capacity and policy


direction in service delivery.

Part D: Context for Budget Intervention

In 2014/15 the total budget for the department was Kshs. 182,908,637 out of which Kshs.
139,806,191 was development expenditure, Kshs 28, 088,844 was operations and maintenance
expenditure and compensation to employees was Kshs.15, 013,602. In 2015/16 the total budget for
the department was Kshs. 117,979,585 out of which Kshs. 18,396,517 was compensation to
employees; Kshs. 24,420,574 was operations and maintenance and Kshs. 75,162,494 was
development expenditure.
The key items of expenditure for the department were: construction and improvement of market
infrastructure, strengthening co-operatives movement and enforcement of fair trade practices.

Major achievements during the period are; construction and improvement of market infrastructure,
revitalizing and strengthening co-operatives movement, enforcement of fair trade practices,
installation of solar lamps and recruitment of the new staff by the department and acquisition of
relevant office equipment and machineries.

The following were the major challenges: delayed funding from the exchequer and underfunding of some projects and in-adequate resources (human, office space & equipment)

During the FY 2016/2017, the focus of the department is on the prioritized projects that
would revamp the economy of the county, some of which include: - Construction of modern
markets, establishment of county trade development loan fund & cooperative revolving fund,
Capacity building of MSEs & co-operatives, rehabilitation and equipping of cooperative
dairy processing plants, rice mills, cotton ginneries & fish cold storage plants and
construction of a fully equipped verification centre.
To achieve the above, the department is currently working on the bills and policies and
recruiting more staff in the very needy areas to improve service delivery at the sub-county
level.
PROGRAMME BASED BUDGET JUNE 2016

Page 166

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


The department expects to utilize Kshs. 46,590,591 on recurrent expenditure and Kshs.
188,269,892 on development expenditure in FY 2106/2017. The allocation for recurrent and
development expenditures is projected to increase to Kshs. 51,249,650 and Kshs.
207,096,881 respectively in the FY 2017/18. During the FY 2018/19 recurrent expenditure is
projected at Kshs. 56,374,615 and development at Kshs. 227,806,569
Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2015/17- 2017/18
Programme

Delivery
Unit

Key Output

Key Performance
Indicators

Baseline
Estimates
2015/2016

Target
2016/2017

Target
2017/2018

Target
2018/19

2 SMEs

6 SMEs

6 SMEs

Trade
No. of markets
Developme
improved
nt
PROGRAMME 2: Fair Trade Practices and Consumer Protection Services
OUTCOME: Fair trading practices
SP1.1:- Standards Weights
Compliance with
-% of traders
Administration
and
the weights and
complying with the
and Conformity
Measures
measures
regulations
regulations
-Number of
weighing and
measuring
equipment
Examined, tested
and stamped
No. of annual
calibration
- Verification
Centre established
and operationalized

10

-76% of the
traders
-821
Weighing
Machines,
1600 Weights,
150
Measuring
Instruments
-Bi-annual
calibration
Conducted as
per the
National
Government
Programme,
-

-92% of the
traders
-916
Weighing
Machines,
1800
Weights, 180
Measuring
Instruments
-Bi-annual
calibration
Conducted as
per the
National
Government
Programme,
- Site
identification
and estimates

SP1.2:ENFORCEMEN
T&
AWARENESS
CAMPAIGNS

-201 Business
premises
Inspected
-At least 8
complaints
investigated
-At least 3
prosecutions
conducted
conclusively
-3 Awareness
Campaigns
planned and
implemented
-1 trade fairs
-15 test
purchases
conducted

-231
Business
premises
Inspected
-At least 5
complaints
investigated
-At least 2
prosecutions
conducted
conclusively
-5 Awareness
Campaigns
planned and
implemented
-2 trade fairs
-18 test
purchases
conducted

-98% traders
-1021
Weighing
Machines,
2000
Weights, 200
Measuring
Instruments
-Bi-annual
calibration
Conducted
as per the
National
Government
Programme,
Verification
hall
established
and
operationaliz
ed
-250
Business
premises
Inspected
-At least 6
complaints
investigated
-At least 1
prosecutions
conducted
conclusively
-7
Awareness
Campaigns
planned and
implemented
-2 trade fairs
-20 test
purchases
conducted

PROGRAMME 1: Trade Development and Promotion


OUT COME: Conducive environment for enterprise development
S.P.1:- Trade
Trade
Improved trade
No. of policies and
Development and
Developme
regulatory
legislations enacted
Investment
nt
framework,
Functional credit
facilities
Improved
entrepreneurial
and management
skills
Improved market
infrastructure

S.P.3:-Market
Development

Weights
and
Measures

-Reduced number
of criminal
offences on
infringement of
weights and
measures
regulations
-Improved
packaging of
goods
- Increased access
to weights and
measures services
and information

No. of facilities
No. of SMEs
trained

-Number of
inspections
conducted
-No. of complaints
investigated
-No. of
prosecutions
conducted
conclusively
-No. of pre-package
controls conducted
-No. of trade fairs
organized and
attended
-No. of awareness
campaign
programmes
developed and
Implemented in
both Electronic and
Print Media

PROGRAMME BASED BUDGET JUNE 2016

Page 167

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery
Unit

Key Output

Key Performance
Indicators

Baseline
Estimates
2015/2016

Target
2016/2017

Target
2017/2018

95

156

187

Kshs.3.0M

Kshs.1.7M

Kshs. 0.4M

No. of Inquiry
Reports
No. of
Inspection
Reports
No. of Policies
& legislations
developed
Increased % of
sales & high
returns
-Quality
assurance
No. of societies
adopting value
addition
strategies and
accessing
markets

30

50

70

2 policy &
bills

2 Acts

40%

60%

70%

15

27

39

No. of training
reports

100

138

179

No. of
awareness
campaigns
conducted
No. of advisory
reports

79

97

136

PROGRAMME 3: Co-operative Development & Management


OUTCOME: Increased resource mobilization for enterprise development
Sp.1 CoCoImproved
No. of societies
Operative
operative
accountability and
complying with
Governance
services
prudent management
cooperative
legislations
Reduced outstanding
Amount of
Remittance to saccos
remittances still
outstanding
Inspections &
Inquiries conducted in
co-operative societies

Sp.2: CoOperative
Marketing And
Value Addition

Co-operative Policies
& legislations
formulated
market information ,
research &
development
Marketing strategies
for value addition
and market access

Sp.3: CoOperative
Extension
Services

Conducting training
and exchange
programs
conducting cooperative awareness
campaigns
Intensify Extension &
advisory service in
societies

Programme No. 4: General Administration, Planning And Support Services


Outcome: An Enhanced Institutional Framework For Excellent, Efficient And Effective Service Delivery Within The Sector.
Sub Programme
Delivery
Key output
Key Performance
Target
Target
Target
Unit
indicators
2015/16
2016/17
2017/18
General
Accounting -Structures
-Organogram
-Optimal
Implementati
Implementati
Administration
officer
established and
developed
Staffing levels on of the
on of the
operationalized.
attained
departmental
departmental
-Implementation
-No. of policies and 4
organogram
organogram
of policies for the
bills implemented.
sector
Implementatio 3
1
-Staff and customer n of Survey
-Improved work
satisfaction survey
report
Continuous
Continuous
environment
Conducted
recommendati
review of the
review of the
on
report
report
-Improved
-Performance
Performance
contracting
performance
Review and
Continuous
Management
document signed
targets
implementati
review and
and implemented
reviewed
on of set
implementati
targets.
on of set
targets
Planning and
Accounting Coordinated
-No. of review
12
12
12
Support services
officer
sectoral functions
meetings, monthly
to ensure effective & quarterly reports
service delivery
& customer
7
10
10
-Interdepartmental satisfaction survey
coordination
- No. of staff
4
4
4
-Monitoring and
trained
evaluation of
projects done
-No. of M&E
Reports on

PROGRAMME BASED BUDGET JUNE 2016

Target
2018/19

Page 168

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery
Unit

Key Output

Key Performance
Indicators
programs and
projects status

Baseline
Estimates
2015/2016

Part F. Summary of Expenditure by Programmes (Kshs.)


Programme

Baseline 2015-16

60,500,000

66,550,000

5,266,700

5,793,370

70,579,892

77,637,881

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
Acquisition of Non-Financial
Assets
Capital Transfers to Government
Agencies
Other Development
Total Expenditure of Vote

Baseline 2015/16

Target
2018/19

73,205,000
6,372,707

85,401,669

136,346,592

149,981,251

164,979,376

5,529,094

6,082,003

6,690,204

1,234,096

1,357,506

1,493,256

6,763,190

7,439,509

8,183,460

48,106,067

52,916,674

58,208,341

9,600,000

10,560,000

11,616,000

5,792,555

6,371,811

7,008,992

63,498,622

69,848,484

76,833,333

20,236,169

22,259,786

24,485,764

8,015,910

8,817,501

9,699,251

28,252,079

31,077,287

234,860,483

258,346,531

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs.)


Expenditure Classification

Target
2017/2018

Projected Estimates
2017/18
2018/19

Estimates 2016-17

Programme 1:- Trade Development And Promotion


SP 1. 1: Trade Development
2,975,266
And Investment
SP 1. 2: Entrepreneurial And
2,936,257
Management Training
SP 1.3 :Market Development
75,162,494
Total Expenditure of
81,074,017
Programme 1
Programme 2:- Fair Trade Practices And Consumer Protection Services
SP 2. 1: Standards
7,529,524
Administration & Conformity
SP2. 2: Enforcement &
394,438
Awareness Campaigns
Total Expenditure of
7,923,962
Programme 2
Programme 3:- Co-Operative Development & Management
SP 3.1: Cooperative
Governance And
2,263,251
Accountability
SP 3.2:Cooperative
Marketing And Value
3,126,894
Addition
SP 3.3: Cooperative
2,274,855
Extension Services
Total Expenditure of
7,665,000
programme 3
Programme:4:- General Administration, Planning And Support Services
SP 4.1: General
18,396,517
Administration
SP 4.2: Planning And Support
6,242,583
Services
Total Expenditure of
24,639,100
Programme 4
Total expenditure of vote
121,302,079

Target
2016/2017

Estimates 2016/17

34,185,016

284,181,184

Projected Estimates

42,817,091
18,396,517
24,420,574

46,590,591
15,725,030
30,865,561

2017/18
51,249,650
17,297,533
33,952,117

2018/19
56,374,615
19,027,286
37,347,329

75,162,494

188,269,892

207,096,881

227,806,569

75,162,494

188,269,892

207,096,881

227,806,569

117,979,585

234,860,483

258,346,531

284,181,184

Part H. Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification

Baseline Estimates 2015/16

Programme 1: Trade Development And Promotion


Current Expenditure
4,545,873

PROGRAMME BASED BUDGET JUNE 2016

Estimates 2016/17
5,216,700

Projected Estimates

2017/18

5,738,370

2018/2019
6,312,207

Page 169

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Compensation to Employees
Use of goods and services
4,545,873
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
75,162,494
Acquisition of Non75,162,494
Financial Assets
Capital Transfers to Govt.
Agencies
Other Development
Total Expenditure for
79,708,367
Programme 1
Programme 2: Fair Trade And Consumer Protection Services
Current Expenditure
7,923,962
Compensation to Employees
Use of goods and services
7,923,962
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
Acquisition of NonFinancial Assets
Capital Transfers to Govt.
Agencies
Other Development
Total Expenditure for
7,923,962
Programme 2
Programme 3: Cooperative Development And Management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
Acquisition of NonFinancial Assets
Capital Transfers to Govt.
Agencies
Total Expenditure for
Programme 3
Programme 4: Administration, planning and support services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
Acquisition of NonFinancial Assets
Capital Transfers to Govt.
Agencies
Other Development
Total Expenditure for
Programme 4
Total Expenditure For
117,979,585
Vote

PROGRAMME BASED BUDGET JUNE 2016

5,216,700

5,738,370

6,312,207

131,129,892

144,242,881

158,667,169

136,346,592

149,981,251

164,979,376

6,763,190

7,439,509

8,183,460

6,763,190

7,439,509

8,183,460

6,763,190

7,439,509

8,183,460

6,358,622

6,994,484

7,693,933

6,358,622

6,994,484

7,693,933

57,140,000

62,854,000

62,854,000

69,139,400

69,139,400

63,498,622

69,848,484

76,833,333

28,252,079
15,725,030
12,527,049

31,077,287
17,297,533
13,779,754

34,185,016
19,027,286
15,157,729

28,252,079

31,077,287

34,185,016

234,860,483

258,346,531

284,181,184

131,129,892

57,140,000

144,242,881

158,667,169

Page 170

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code
2110101
2110301
2110308
2110309
2110310
2110311
2110312
2110313
2110314
2110315
2110317
2110318
2110320
2110321
2110327
2110402
2110403
2110404
2210101
2210102
2210201
2210203
2210301
2210303
2210503
2210504
2210505
2210603
2210604
2210606
2210710
2210711
2210801
2211006
2211009
2211016

Items
Basic Salary civil services
House Allowance
Medical Allowance
Special Duty Allowance
Top Up Allowance
Transfer Allowance
Responsibility Allowance
Entertainment Allowance
Transport Allowance
Extraneous Allowance
Domestic Servant Allowance
Non-Practising Allowance
Leave Allowance
Administrative Allowance
Governor/Deputy Governor Allowance
Risk Allowance
Executive Allowance
Refund of Medical Expenses-InPatient
Refund of Medical Expenses-Ex-Gratia
Commutation of Leave
Electricity Expenses
Water and Sewerage charges
Telephone,Telex,Facsmile and M
Courier and Postal Services
TravelCosts(Airlines,Bus,Railwayc)
Daily Subsistance Allowances
Subscription to Newspapers, journals
Advertisement, Awareness & Public Campaigns
Trade Shows and Exhibitions
Printing and publishing services
Rents and Rates - Non-Residential
Supplies and Accessories for Computers and Printers
Hire of Transport
Purchase of other Office Equipment
Boads, Committee,Conferences and Seminers
Hire of Equipment,Plant and Machinery
Travel &Accomodation
Tuition fees
Cartering services,receptions,Ac
Purchase of Workshop Tools
Education and Library Supplies
Purchase of Uniforms and Clothing Staff
Purchase of Safety Gears

PROGRAMME BASED BUDGET JUNE 2016

ADMINSTRATION
15,725,030
28,500
28,500
76,000
28,500
931,750
1,027,612
28,500
228,829
76,000
133,000
95,000
104,500
38,000
72,660
-

TRADE
DEVELOPMENT

34,200
44,242
42,750
12,825
475,000
1,568,750
26,961
625,561
611,500
85,500

128,250
221,000
95,000
174,800
28,500
8,550

FAIR TRADE
PRACTICES

8,550
21,375
43,225
8,550
406,458
734,958
36,668
1,500,225
735,490
179,550
34,200
51,965
132,525
119,700
97,223
416,290
36,562
47,025
54,245

COOPERATIVES
DEVELOPMENT
86,355
86,446
129,390
85,500
494,067
783,323
86,366
1,100,100
940,500
172,283
123,024
109,350
253,650
85,500
125,970
-

TOTAL
15,725,030
157,605
180,563
291,365
135,375
2,307,275
4,114,643
178,495
3,225,886
2,516,319
513,333
34,200
128,250
51,965
609,549
419,050
630,173
416,290
188,562
254,205
54,245

Page 171

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code
2211101
2211103
2211201
2211305
2211306
2211308
2210309
2211310
2211311
2211311
2220101
2220201
2220202
2220205
2220210
2710102
2710105
3110300
3110902
3111001
3111002
3111003
3111004
3111005
3111010
3110701

Items
Purchase of Protective Clothing
General Office Supplies (consumables)
Sanitary and cleaning materials,
Refined Fuels &Lubri
Contracted Guards and Cleaning Services
Membership Fees, Dues and Subscriptions to Professional and Trade Bodies
Legal Dues/fees, Arbitration and Compensation Payments
Field Allowance for M & E for Development Projects
Contracted Professional Services
Contracted Technical Services
LVRLAC
Coffin & Burial Advertisements
Confidential Expenditure
Maintenance Expenses - Motor Vehicles
Maintenance of Plant, Machinery and Equipment (including lifts)
Maintenance of Office Furniture and Equipment
Maintenance of Buildings and Stations -- Non-Residential
Maintenance of Computers, Software, and Networks
Gratuity - Funeral expenses civil servants
Gratuity - County Executive Members
Refurbishment of Buildings
Purchase of Household and Institutional Appliances
Purchase of Office Furniture and Fittings
Purchase of Computers, Printers and other IT Equipment
Purchase of Airconditioners, Fans and Heating Appliances
Purchase of Exchanges and other Communications Equipment
Purchase of Photocopiers
Purchase of Weights and Measures Equipment
Purchase of motor vehicles
TOTAL

PROGRAMME BASED BUDGET JUNE 2016

ADMINSTRATION
95,000
86,498
256,250
5,700
47,500
460,000
156,250
28,500
142,500
47,500
8,000,000
76,000
95,000
47,500
19,000
66,500
28,252,079

TRADE
DEVELOPMENT
131,408
42,750
285,950
171,000
9,500

163,711
42,750
45,122

49,590
59,850
31,680

5,216,700

FAIR TRADE
PRACTICES
18,620
172,900
42,750
336,948
186,200
8,550
102,600
265,541
147,382
179,870
42,750
51,300

76,095
42,750
64,600
87,400
272,150
6,763,190

COOPERATIVES
DEVELOPMENT
152,103
152,970
361,800
265,910

169,924
-

42,750
190,700
52,600

68,400
40,185
130,850
68,606
6,358,622

TOTAL
18,620
551,411
324,968
1,240,948
623,110
23,750
47,500
562,600
265,541
637,267
179,870
156,750
333,200
196,522
8,000,000
220,495
227,525
302,800
138,080
135,106
272,150
46,590,591

Page 172

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT

Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

North Alego

Hono

Trade
Development

Markets

Toilet Block For Kikomba Market

Rarieda

West Asembo

Trade
Development

Markets

Drainage At Wangarot Market

800,000

Bondo

North Sakwa

Trade
Development

Markets

10 By 10 Installation Of 2 Gates

900,000

Bondo

North Sakwa

Trade
Development

Markets

Migingo Market Installation Of 2


Gates

3110599

Bondo

North Sakwa

Trade
Development

Markets

Obama Market Installation Of 2


Gates

3110599

Bondo

North Sakwa

Trade
Development

Markets

Ajigo Market Installation Of 2


Gates

3110599

Bondo

North Sakwa

Trade
Development

Markets

Additional Funding For Ajigo


Market Shades

1,000,000

Alego Usonga

West Alego

Trade
Development

Market

Construction Of Pit Latrine At


Mwer Market

500,000

Rarieda

North Uyoma

Trade
Development

Markets

Market Shades At Madiany

1,400,000

Rarieda

North Uyoma

Trade
Development

Markets

Market Shades At Ragengni

1,400,000

Gem

Central Gem

Trade
Development

Markets

Stone Pitched Drainage At


Nyangweso Market

1,700,000

Gem

Central Gem

Trade
Development

Markets

Stone Pitched Drainage At Wagai


Market

2,300,000

Ugenya

North Ugenya

Trade

Markets

Construction Of Pit Latrine At

Ulawe

Jera

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
500,000

500,000

Total
Estimates
500,000
800,000
900,000

1,000,000
500,000
1,400,000
1,400,000
1,700,000
2,300,000

Code
3110296
3110599
3110599

3110296
3110296
3110296
3110296
3110599
3110599
3110299

Description
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction

Page 173

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Development

Proposed Project
Uhola Market

B/F 2015/2016

Estimates
2016/17

Gem

Yala
Township

Trade
Development

Markets

Construction Of Eco-Toilet At
Yala Market Phase 2

600,000

Gem

Yala
Township

Trade
Development

Markets

Toilet At Yala Old Market

400,000

Gem

East Gem

Trade
Development

Markets

Market Shades At Border Market

1,000,000

Bondo

Yimbo West

Trade
Development

Markets

Completion Of Mahanga Modern


Toilet

500,000

Bondo

Yimbo West

Trade
Development

Markets

Completion Of Usenge Modern


Market

Bondo

West Sakwa

Nyawita

Trade
Development

Markets

Fencing And Building A Latrine


At Got Winyo Market

Executive

Executive

Executive

Trade
Development

Trade

Construction Of Modern Markets


In Ramba, Bondo And Yala

Executive

Executive

Executive

Trade
Development

Trade

Establishment Of Trade Loan Fund

Executive

Executive

Executive

Cooperative

Coop Revolving Fund

38,000,000

Executive

Executive

Executive

Trade
Development
Trade
Development

Solar Lights

Installation Of Solar Lights In


Various Markets

10,000,000

Alego Usonga

South East
Alego

Randago

Trade
Development

Markets

Construction Of Toilets At
Randago Market

500,000

Alego Usonga

South East
Alego

Barding'

Trade
Development

Markets

Construction Of Toilets At
Barding' Market

500,000

Gem

Yala
Township

Trade
Development

Markets

Construction Of A Toilet At Yala


Jamii Hall

400,000

Gem

West Gem

Cooperative

North Alego

Revolving Fund For Genesis


Entrepreneurs Sacco
Solar Lights At Kikomba Market

1,100,000

Alego Usonga

Trade
Development
Trade
Development

Hono

PROGRAMME BASED BUDGET JUNE 2016

Markets

4,000,000
600,000
50,778,158
6,490,000

400,000

Total
Estimates
500,000
600,000
400,000
1,000,000
500,000
4,000,000
600,000
50,778,158
6,490,000
38,000,000
10,000,000
500,000
500,000
400,000
1,100,000
400,000

Code
3110299
3110299
3110299
3110299
3110299
3110299
3110299
2640302
2640303
3110599
3110299
3110299
3110299
2640303
3110599

Description
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Medium And
Small
Enterprises
Co-Operative
Societies
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Co-Operative
Societies
Other
Infrastructure

Page 174

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Estimates
2016/17

Alego Usonga

North Alego

Nyamila

Trade
Development

Markets

Solar Lights At Got Oyenga


Market

400,000

Alego Usonga

North Alego

Ulafu

Trade
Development

Markets

Solar Lights At Ogwato Market

400,000

Ugenya

Ukwala

All

Cooperative

Gem

South Gem

Gem

South Gem

Trade
Development
Trade
Development
Trade
Development

Empowerment Of Ukwala Women


Development Sacco
Women Revolving Fund For South
Gem Women Group Sacco
Purchase Of Motorcycles/ Training
For South Gem Bodaboda Sacco

Ugenya

North Ugenya

Trade
Development

Markets

Fencing Of Kagonya Market

250,000

Alego Usonga

Usonga

Trade
Development

Markets

Construction Of Pit Latrine At


Harambee Market

500,000

Alego Usonga

Usonga

Trade
Development

Markets

Construction Of Pit Latrine At


Nyadorera Market

500,000

Rarieda

West Uyoma

Trade
Development

Cooperative

Purchase Of Motor Cycle For


Boda Boda Sacco

Bondo

Yimbo West

Trade
Development

Markets

Construction Of Pit Latrine At


Honge Beach

Bondo

Yimbo East

Trade
Development

Cooperative

Purchase Of Motorcycles For


Bodaboda Sacco

1,000,000

Bondo

Yimbo East

Cooperative

Ukwala

All

Empowerment Fund For Women


Sacco
Provision Of Motor Cycles To
Registered Groups/Saccos

1,000,000

Ugenya

Trade
Development
Trade
Development

Alego Usonga

South East

Mur Malanga

Trade

Cooperative

Kagonya

Kagwa

PROGRAMME BASED BUDGET JUNE 2016

Cooperative
Cooperative

Cooperative

Financial Support To Boda Boda

3,000,000
4,000,000
2,000,000

2,000,000
500,000

1,000,000
500,000

Total
Estimates
400,000
400,000
3,000,000
4,000,000
2,000,000
250,000
500,000

500,000
2,000,000
500,000
1,000,000
1,000,000
1,000,000

Code
3110599
3110599
2640303
2640303
3110704
3110599
3110202

3110299
3110704
3110299
3110704
2640303
3110704
2640303

Description
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Co-Operative
Societies
Co-Operative
Societies
Purchase Of
Bicycles And
Motorcycles
Other
Infrastructure
And Civil
Works
NonResidential
Buildings
(Offices,
Schools,
Hospitals, Etc)
Construction
Of BuildingsOther
Purchase Of
Bicycles And
Motorcycles
Construction
Of BuildingsOther
Purchase Of
Bicycles And
Motorcycles
Co-Operative
Societies
Purchase Of
Bicycles And
Motorcycles
Co-Operative

Page 175

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Alego

Sector

Function

Development

Proposed Project
And Cham Luchi Women Groups
Each Kshs. 250,000
Purchasing Of 7 Motorcycle For
Boda Boda Groups

B/F 2015/2016

Estimates
2016/17

Ugenya

Ukwala

Simu East

Trade
Development

Cooperative

700,000

Gem

West Gem

All

Trade
Development

Cooperative

Purchase Of 10 Motor Bikes For


Registered

1,000,000

Ugenya

West Ugenya

Ward

Cooperative

Women And Youth Saccos

1,000,000

Alego Usonga

Central Alego

Kochieng
B

Trade
Development
Trade
Development

Markets

Construction Of Market Shade For


Mbolori Open Air Market Traders:

1,368,000

Bondo

Central
Sakwa

Nyango'ma

Trade
Development

Markets

Improvement Of Kopolo And


Kongawo Markets And Installation
Of Solar Lights

2,000,000

Bondo

Central
Sakwa

Nyango'ma

Trade
Development

Markets

Fencing Landing Site At Sirongo

1,000,000

Bondo

Central
Sakwa

Uyawi

Trade
Development

Markets

Upgrading Of Nango Market

1,000,000

Bondo

Central
Sakwa

Trade
Development

Markets

Construction Ofa Toilet Each At


Oyamo And Ndeda Beaches

700,000

900,000

1,000,000
1,000,000
1,368,000
2,000,000
1,000,000
1,000,000
900,000

Gem

East Gem

Ramula

Trade
Development

Markets

Market Shades At Ramula Market

1,000,000

Gem

East Gem

Uranga

Trade
Development

Markets

Construction Of Market Shades At


Bar Kalare

1,000,000

Gem

East Gem

Ramula

Trade
Development

Markets

Fencing And Putting Of Two


Gates At Ramula Market

200,000

Ugenya

East Ugenya

Kathieno C

Trade
Development

Markets

Construction Of Toilet At Luthehe


Market

500,000

Ugenya

East Ugenya

Kathieno B

Trade
Development

Markets

Construction Of Toilet At Luanda


Konyango Market

500,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates
500,000

1,000,000
1,000,000
200,000
500,000
500,000

Code

Description
Societies

3110704
3110704
2640303
3110599
3110599
3110599
3110599
3110299
3110299
3110299
3110599
3110299
3110299

Purchase Of
Bicycles And
Motorcycles
Purchase Of
Bicycles And
Motorcycles
Cooperative
Societies
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther

Page 176

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Ugenya

East Ugenya

Ramunde

Trade
Development

Markets

Construction Of Toilet At Sihayi


Market

Bondo

Yimbo East

Pala

Trade
Development

Markets

Fencing Of Oele Beach And


Construction Of Toilets At The
Beach

Trade
Development

Markets

Construction Of Pit Latrine And


Fencing Of Inungo Market

Trade
Development

Markets

Improvement Of Drainage At
Akala Market

1,939,064

Trade
Development

Markets

Putting Up Additional Shades At


Ajigo Market

1,400,000

Executive

Executive

B/F 2015/2016
500,000

87,414

Executive
North Sakwa

Ugenya

North Ugenya

Nyamsenda

Trade
Development

Markets

Construction Of Latrine At
Kirindo Market Centre

Alego Usonga

Siaya
Township

All

Trade
Development

Markets

Construction Of Modern Sheds At


Fish Monger's Market

Alego Usonga

Siaya
Township

All

Trade
Development

Markets

Construction Of Market Hub At


Modern Market

Alego Usonga

Siaya
Township

Trade
Development

Markets

Construction Of Toilets At Usenge


Market

400,000

Alego Usonga

South East
Alego

Nyagoma
Kogelo

Trade
Development

Markets

Construction Of Modern Toilets At


Nyangoma Mkt

500,000

Alego Usonga

South East
Alego

Barding

Trade
Development

Markets

Construction Of Modern Toilets At


Una Market

500,000

Gem

South Gem

Trade
Development

Markets

Construction Of Toilet At Ogero


Market

400,000

Bondo

South Sakwa

Got Abiero

Trade
Development

Markets

Fencing Of And Construction Of


Toilets At Anyuongi Market

500,000

Ugunja

Ugunja

Ligega Sub

Trade

Markets

Construction Of Market Toilets At

400,000

Total
Estimates
500,000

1,000,000

Executive
Bondo

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/17

1,000,000
87,414

500,000

1,939,064
1,400,000
500,000

47,965

47,965
2,565,080

2,565,080
400,000
500,000
500,000
400,000
500,000

Code
3110299
3110599
3110599
3110599
3110299
3110299
3110299
3110299
3110299
3110599
3110599
3110299
3110299
3110299

Description
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction

Page 177

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Loc

Development

Function

Proposed Project

B/F 2015/2016

Sira Yath Rateng'

Ugunja

Ugunja

Ligega Sub
Loc

Trade
Development

Markets

Construction Of Market Toilets At


Mbosie Market

400,000

Ugunja

Ugunja

Ligega Sub
Loc

Trade
Development

Markets

Construction Of Market Toilets At


Ambira

400,000

Ugunja

Ugunja

Ligega Sub
Loc

Trade
Development

Markets

Construction Of Market Toilets At


Ngunya

400,000

Alego Usonga

Usonga

Trade
Development

Markets

500,000

Alego Usonga

Usonga

Trade
Development

Markets

Construction Of Public Modern


Toilet At Rwambwa Junction
Centre
Construction Of Public Pit Latrine
At Uwasi Market

Alego Usonga

Usonga

Trade
Development

Markets

Levelling And Murruming Of


Harambee Market

503,018

Rarieda

West Asembo

Trade
Development

Markets

Construction Of Shades At
Kapuoyo Market

Bondo

West Sakwa

Co-Operatives

West Yimbo

Promotion Of Co-Operative
Societies Across The Ward
Construction Of Toilet At Siungu
Market

340,000

Bondo

Trade
Development
Trade
Development

Bondo

West Yimbo

Trade
Development

Markets

Construction Of Toilet At Uhwaya


Beach

500,000

Bondo

West Yimbo

Trade
Development

Markets

Construction Of Toilet At
Kabarwa

500,000

Gem

Yala
Township

Trade
Development

Markets

Improvement Of Anyiko Market

500,000

Gem

Yala
Township

Trade
Development

Markets

Improvement Of Muhanda Market

500,000

Rarieda

South Uyoma

Lieta

Trade
Development

Trade

Construction Of Toilet At Lweya


Primary School

500,000

Alego Usonga

South East

Mur Malanga

Trade

Markets

Construction Of Modern Toilets

23,200

Nyagoko

PROGRAMME BASED BUDGET JUNE 2016

Markets

500,000

29,591

500,000

Estimates
2016/17

Total
Estimates
400,000
400,000
400,000
400,000
500,000
500,000
503,018
29,591
340,000
500,000
500,000
500,000
500,000
500,000
500,000

Code
3110299
3110299
3110299
3110299
3110299
3110599
3110299
2640303
3110299
3110299
3110299
3110299
3110299
3110299
3110599

Description
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Cooperative
Societies
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other

Page 178

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Alego
Alego Usonga

South East
Alego

Bondo

Sector

Function

Development

B/F 2015/2016

And Flood Lights At Mur Malanga


Market

Estimates
2016/17

Trade
Development

Markets

Construction Of Public Toilets At


Uhuru Market

168,518

West Yimbo

Trade
Development

Markets

Construction Of Toilet At Waka


Waka

500,000

Bondo

West Yimbo

Trade
Development

Markets

Construction Of Usenge Modern


Market

152,079

Gem

East Gem

Trade
Development

Markets

Building Of Pit Latrine In 3


Markets

430,979

Gem

Central Gem

Trade
Development

Markets

Replanning And Drainage Of


Ondisore Market

Gem

West Gem

Trade
Development

Markets

Improvement Of Ngiya Modern


Market

500,000

Gem

Yala
Township

Trade
Development

Markets

Shades For Travellers At Yala


Market

300,000

Gem

Yala
Township
Yala
Township

Trade
Development
Trade
Development

Co-Operatives

Yala Dairy Co-Operative

500,000

Markets

Yala Market Shades

Ugunja

Sidindi

Trade
Development

Markets

Improvement Of Sidindi And


Rangala Markets

4,000,000

Rarieda

West Uyoma

Markets

West Ugenya

Revolving Fund For West Uyoma


Co-Op Society- Sacco
Construction Of Toilets At Ligingo
Market

1,000,000

Ugenya

Trade
Development
Trade
Development

Ugenya

West Ugenya

Trade
Development

Markets

Construction Of Toilets At Kolali


Market

Gem

Central Gem

Trade

Markets

Murruming Of Ring Road At

Gem

Bar Agulu

Proposed Project

Kagilo

PROGRAMME BASED BUDGET JUNE 2016

Markets

Total
Estimates
23,200
168,518
500,000

781,048

933,127
430,979

1,400,000

1,400,000
500,000
300,000
500,000

75,778

75,778

500,000

4,000,000
1,000,000
500,000

500,000

500,000
1,900,000

Code

3110599
3110299
3110299
3110299
3110599
3110599
3110299
2640303
3110299
3110599
2640303
3110299
3110299
3110499

Description
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of BuildingsOther
Cooperative
Societies
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works
Cooperative
Societies
Construction
Of BuildingsOther
Construction
Of BuildingsOther
Construction

Page 179

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Development

Proposed Project
Nyangweso Market And
Construction Of Latrines At
Resrio And Luri Markets
Construction Of Toilets At Apate
Market

B/F 2015/2016

Estimates
2016/17

Alego Usonga

West Alego

Trade
Development

Markets

Gem

North Gem

Trade
Development

Markets

Construction Of Market Shades At


Kodiaga Market

1,000,000

Ugenya

North Ugenya

Trade
Development

Markets

Solar Lights At Sega

1,800,000

Nyamsenda

Total

PROGRAMME BASED BUDGET JUNE 2016

440,000

17,298,542

Total
Estimates
1,900,000
440,000

170,971,350

1,000,000
1,800,000
188,269,892

Code

Description
Of RoadsOther

3110299
3110299
3110599

Construction
Of BuildingsOther
Construction
Of BuildingsOther
Other
Infrastructure
And Civil
Works

Page 180

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 010

VOTE TITLE: DEPARTMENT OF ICT, TOURISM, CULTURE AND WILDLIFE


CONSERVATION
Part A Vision; A globally competitive tourist destination and world class ICT infrastructure
facilities, for sustainable socio-economic development.

Part B Mission; To establish integrated socio-economic and environmentally friendly


policies and programmes for hospitality, wildlife conservation and ICT for a vibrant
economy.
Part C: Strategic Objectives
Programmes

Strategic Objectives

CP.1 General Administration, planning and support


services

To provide transformative leadership, capacity and


policy direction in service delivery.

CP.2 Information & Communication Services

To increase access and utilization of ICT in service


delivery
To increase tourism sector contribution to countys
economic development

CP.3 Tourism development and promotion

Part D: Context for Budget Intervention


In 2014/15 the total budget for the department was Kshs. 32,913.585 out of which Kshs.
21,500,000 was development expenditure, Kshs.21, 413,585 was operations and maintenance
expenditure. In 2015/16 the total budget for the department was Kshs. 96,502,589 out of
which Kshs. 14,093,582 was compensation to employees; Kshs. 27,909,007 was operations
and maintenance and Kshs. 54,500,000 was development expenditure.
The key items of expenditure for the department were: Installation of Wide Area Network,
Provision of Internet Services, Development of County Website and Mail Communication.

Major achievements during the period are: Installation of Wide Area Network connecting the
County Headquarter with Sub County Offices, development of County Website and Mail
Communication, operationalization of ICT Policy, Installation of IP PABX ( Intercom
System), participating in the Miss Tourism Kenya to market Siaya as a tourist destination ,
successfully organized Tourism Investment Conference, renovation of Got Ramogi Hills
Cottages.

Challenges
The following were the major challenges: delayed funding from the exchequer and underfunding of some projects, inadequate legislative framework for establishment of Tourism
board.
Way forward
During the FY 2016/17 budget, the sector will undertake; Tourism promotion, marketing,
Information & Communication management (software services), ICT hardware development,
maintenance, tourism product development and diversification, tourism regulation, cultural
promotion, marketing, planning and support services.
PROGRAMME BASED BUDGET JUNE 2016

Page 181

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


This Department proposes to utilize Kshs 112,525,207 on recurrent expenditure and Kshs.
46,027,122 on Capital expenditure during the year 2016/17. The 2016/2017 allocation is
approximated to increase to Kshs. 123,777,728 recurrent and Kshs. 50,629,834 for
development in the FY 2017/2018 and Kshs. 136,155,500 for recurrent and
Kshs.55,692,818for development in FY 2018/2019.
Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2015/16- 2017/18
Programme

Delivery Unit

Key Outputs

Key
Performance
Indicators

Target
(Baseline)
2016/17

Target
2017/18

Target
2017/18

General Administration, planning and support services


Outcome: Improved and efficient administrative and financial support services
General
Administratio
Efficient and Policies and standards 100 %
100 %
100 %
Administration
n
effective
complied with.
Unit
administrative
system
Planning and Administratio
Efficient and Reports
on 4
4
4
support services n
effective
implementation
of
Unit
service
departmental plans
delivery
No. of staff trained on 0
9
19
modern ICT skills
Financial and Administratio
Implementation The amount /No. 0
5 million
10
donor support n
of
targeted resources donated
million
services
Unit
projects
Information & Communication Services
Outcome; Improved ICT enabled service delivery and universal access to affordable and quality ICT infrastructure
Information & ICT section
Government
-% of government -less than 10%
-20%
-30%
Communication
records
records digitized
management
digitized
(software
-government
-No of applications 1
5
2
services)
services
deployed
automated
- online (E- -No
of
County 1
2
3
Government)
services
available
public service online
delivery
ICT Hardware
Development
and
maintenance

ICT section

-Computers & -Number of offices


related
installed with the
accessories
equipment
installed
in -%
of
county
various offices
buildings/departments
- county wide connected
connectivity-Data
center
LAN&WAN
established
-Data
center Number of county
established
offices connected to
connectivity to GCCN.
GCCN network
Tourism development and promotion
Outcome; Siaya promoted and marketed as a destination of choice
Tourism
Tourism
Branded Siaya Branded Signage at
promotion and Section
County
all key entrances
marketing
Improvement in Number of visitors
visitor
received
arrivals/visits
Number
of
Tourism
exhibitions organized
Exhibitions
and attended
organized

PROGRAMME BASED BUDGET JUNE 2016

Target
2018/19

100 %

200
15 million

-40%
5
3

50

200

150

100

40%

80%

90%

100%

2000

3000

4000

0.5

One
established
All

Page 182

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Programme

Delivery Unit

Key Outputs
/Attended
Tourism
conferences
attended
Tourism
marketing and
promotional
materials
developed
Tourism
stakeholder
forums held
Tourism and luo
cultural festival
organized and
attended
Tourism Events
organized

Tourism
product
development
and
diversification
Tourism
infrastructure
development

-No.
of
tourism
conferences attended

--No. of stakeholder meetings held


Tourism and luo
cultural
festival
attended

No of Tourism events
held and/or organized

Number of tourism
products developed

Tourism
Section

Improved
access
to
tourism sites

Condition of access
roads
to
tourist
attraction
sites
improved

Tourism policy
regulation
formulated

Target
2017/18

Target
2017/18

Target
2018/19

10

12

-Calender of events
developed

Diverse range of
tourism products
developed

Tourism unit

Target
(Baseline)
2016/17

Number
of
promotional materials
and
strategies
developed

Tourism
Section

Improved
amenities
infrastructure
Tourism
regulation

Key
Performance
Indicators

Electricity ,water, and


floodlights installed

Tourism
strategic
plan in place

Tourism
place

County Tourism Bill 0


in place
Programme 3: Cultural tourism development and promotion
Outcome: Development and Promotion of cultural heritage tourism
Cultural festivals held
Culture
Tourism unit
Culture
promotion and
promoted and
Marketing
marketed
Exhibitions
organized
attended
Community forums held
Elders education and
exchange programs
Promotional materials
developed
Exhibitions organized

3
2

4
3

5
4

policy

PROGRAMME BASED BUDGET JUNE 2016

in

Page 183

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part F: Summary of Expenditure by Programmes, 2016/17 -2018/19 (Kshs.)
Programme

Programme 1: General
Administration, planning and
support services
Total Expenditure of
Programme 1
Programme 2: Information &
Communication Services
Total Expenditure of
Programme 2
Programme 3: Tourism
development and promotion
Total Expenditure of
Programme 3
Total Expenditure of vote

Baseline Estimates
2015/16

Estimates 2016/17

Projected Estimates

2017/18

2018/19

35,560,000

53,627,829

58,990,612

64,889,673

35,560,000

53,627,829

58,990,612

64,889,673

50664312

54,008,664

59,409,530

65,350,483

50,664,312

54,008,664

59,409,530

65,350,483

47631250

50,915,836

56,007,420

61,608,162

47,631,250

50,915,836

133,855,562

56,007,420

158,552,329

61,608,162

174,407,562

191,848,318

Part G: Summary of Expenditure by Vote and Economic Classification (Kshs. Million)


Expenditure Classification

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt.
Agencies
Other Recurrent
Capital Expenditure
Acquisition of NonFinancial Assets
Capital Transfers to
Government Agencies
Other Development
Total Expenditure of Vote

Baseline Estimates
2015/16
-

Estimates
2016/17
112,525,207
12,046,954
100,478,253

Projected Estimates
2017/18
123,777,728
13,251,649
110,526,078

2018/19
136,155,500
14,576,814
121,578,686

46,027,122

50,629,834

55,692,818

46,027,122

158,552,329

50,629,834

174,407,562

55,692,818

191,848,318

Part H; Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs. Million)
Expenditure
Classification

Baseline Estimates

Estimates

Projected Estimates

2015/16
2016/17
2017/18
Programme 1: General Administration, planning and support services
53,627,829
58,990,612

Current Expenditure
Compensation to
12,046,954
Employees
Use of goods and
41,580,875
services
Current Transfers
Govt. Agencies
Other Recurrent
Capital Expenditure
0
Acquisition of Non0
Financial Assets
Capital Transfers to
Govt. Agencies
Other Development
Total Expenditure
53,627,829
for Programme 1
Programme 2: Information & Communication Services
Current Expenditure
21,008,664
Compensation to
0
Employees
Use of goods and
21,008,664
services
Current Transfers
Govt. Agencies
Other Recurrent
Capital Expenditure
33,000,000
Acquisition of Non33,000,000
Financial Assets
Capital Transfers to

PROGRAMME BASED BUDGET JUNE 2016

2018/19
64,889,673

13,251,649

14,576,814

45,738,963

50,312,859

58,990,612

64,889,673

23,109,530

25,420,483

23,109,530

25,420,483

36,300,000

39,930,000

36,300,000

39,930,000

Page 184

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Govt. Agencies
Other Development
Total Expenditure
54,008,664
for Programme 2
Programme 3: Tourism Promotion and Culture Development
Current Expenditure
37,888,714
Compensation to
0
Employees
Use of goods and
37,888,714
services
Current Transfers
Govt. Agencies
Other Recurrent
Capital Expenditure
13,027,122
Acquisition of Non13,027,122
Financial Assets
Capital Transfers to
Govt. Agencies
Other Development
Total Expenditure of
50,915,836
programme 3
Total expenditure of
158,552,329
vote

PROGRAMME BASED BUDGET JUNE 2016

59,409,530

65,350,483

41,677,585

45,845,344

41,677,585

45,845,344

14,329,834

15,762,818

56,007,420

61,608,162

174,407,562

191,848,318

14,329,834

15,762,818

Page 185

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT

Code

Item

Administration

Ict Main

Tourism & Culture

12,046,954

Total

2110101

Basic Salaries - Civil Services

2110301

House Allowance

2110314

Transport Allowance

2110320

Leave Allowance

2120101

Employer Contributions to NSSF

Gratuity

12,046,954

2210102

Water and Sewarage Charges

57,000

57,000

2210201

Telephone, Telex, Facsmile & Mobile Phone Services

47,500

47,500

2210203

Courier & Postal Services

95,000

95,000

2210301

Travel Costs (Airline, Bus, Railway, Mileage Allowances, etc.)

3,437,500

237,500

712,500

4,387,500

2210303

Daily Subsistance Allowance

3,462,500

462,500

475,000

4,400,000

2210309

Field Allowance

2,332,500

285,000

570,000

3,187,500

2210401

Travel Costs (airlines, bus, railway, etc.)

2,212,500

380,000

2,592,500

2210502

Publishing & Printing Services

665,000

142,500

3,165,000

3,972,500

2210503

Subscription to News Papers, Magazines & Periodicals

152,000

2210504

Advertisement, Awareness & Public Campeigns

665,000

475,000

2,450,000

3,590,000

2210505

Trade Shows and Exhibitions

712,500

712,500

3,325,000

4,750,000

2210604

Hire of Transport, Equipment

95,000

95,000

2210710

Accommodation Allowance

450,000

950,000

2,868,714

2210711

Tuition Fees Allowance

315,000

325,000

325,000

965,000

2210801

Catering Services (receptions), Accommodation, Gifts, Food & Drinks

237,500

95,000

237,500

570,000

2210805

National Celebrations

47,500

47,500

PROGRAMME BASED BUDGET JUNE 2016

152,000

190,000
4,268,714

Page 186

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Code

Item

Administration

Ict Main

Tourism & Culture

Total

2211016

Purchase of Uniforms and Clothing - Staff

190,000

190,000

2211101

General Office Supplies (papers, pencils, small office equipment etc)

462,500

462,500

2211102

Supplies & Accessories for Computers & Services

325,000

190,000

190,000

705,000

2211103

Sanitary and Cleansing Materials, Supplies and Services

380,000

380,000

2211201

Refined Fuel and Lubricants for Transport

3,687,500

3,000,000

6,687,500

2211305

Contracted Guards and Cleaning Services

285,000

285,000

2211306

Membership Fees, Dues & Subscriptions to Professional & Trade Bodies

95,000

95,000

2211310

Contracted Proffessional Services

2,475,000

2,475,000

2220101

Maintenance Expenses - Motor Vehicles

2,550,000

2,550,000

2220202

Mainternance of Office Furniture & Equipment

1,185,000

1,185,000

2220210

Maintenance of Computers, Software, Networks and Communications Equipment

490,853

1,900,000

2,390,853

2220212

Maintenance of Communication Equipments

189,098

4,950,000

5,139,098

3110300

Refurbishment of Buildings

3110902

Purchase of Household and Institutional Appliances

3111001

Purchase of Office Furniture and Fittings

3111002

8,000,000

8,000,000

1,364,424

1,364,424

275,000

275,000

Purchase of Computers, Printers and other IT Equipment

2,737,500

550,000

3111111

Purchase of ICT, Networking and Communication Equipments

2,000,000

840,000

2,840,000

3111112

Purchase of Computer Software (windows Operating system and Microsoft Office Suite & Antivirus)

5,798,664

5,798,664

Annual tourism, luo cultural festival and promotion of culture and heritage

95,000

3,382,500

15,000,000

15,000,000

Tourism promotion and marketing

3,000,000

3,000,000

Tourism events

5,000,000

5,000,000

TOTAL

PROGRAMME BASED BUDGET JUNE 2016

53,627,829

21,008,664

37,888,714

112,525,207

Page 187

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


DEVELOPMENT

Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Executive

Executive

Executive

Ict & Tourism

Tourism

Development Of Got Ramogi

Executive

Executive

Executive

Ict & Tourism

Ict

Equipping Of The County Data


Center

6,000,000

Executive

Executive

Executive

Ict & Tourism

Ict

4,000,000

Executive

Executive

Executive

Ict & Tourism

Ict

Purchase Of Computer Software


(Windows Operating System And
Microsoft Office Suite &
Antivirus)
Provision Of Internet Servicing To
All County Offices

Executive

Executive

Executive

Ict & Tourism

Ict

Information & Communication


Management (Applications)

5,000,000

Executive

Executive

Executive

Ict & Tourism

Tourism

Branding Of Key Sites

1,000,000

Executive

Executive

Executive

Ict & Tourism

Tourism

Construction Of Changing Room

1,000,000

Executive

Executive

Executive

Ict & Tourism

Tourism

Landscaping

Executive
Executive

Executive
Executive

Executive
Executive

Ict & Tourism


Ict & Tourism

Tourism
Tourism

Completion Of Visitors Rest House


Landscaping

1,000,000
200,000

Executive
Executive

Executive
Executive

Executive
Executive

Ict & Tourism


Ict & Tourism

Tourism
Tourism

Tourism Promotion & Marketing


Rehabilitation Of Odera Akango
Cultural Site

1,037,122
4,000,000

1,037,122
4,000,000

Bondo

West Yimbo

Ict & Tourism

Tourism

Culture
Total

500,000
46,027,122

500,000
46,027,122

PROGRAMME BASED BUDGET JUNE 2016

B/F
2015/2016

Estimates
2016/17
3,990,000

18,000,000

300,000

Total
Estimates
3,990,000
6,000,000
4,000,000
18,000,000
5,000,000
1,000,000
1,000,000
300,000
1,000,000
200,000

Code
3110504
3111111
3111111
3111111
3111111
3110504
3110504
3110504

Description
Other
Infrastructure And
Civil Works
Purchase Of Ict
Networking And
Communications
Equipment
Purchase Of Ict
Networking And
Communications
Equipment
Purchase Of Ict
Networking And
Communications
Equipment
Purchase Of Ict
Networking And
Communications
Equipment
Other
Infrastructure And
Civil Works
Other
Infrastructure And
Civil Works
Other
Infrastructure And
Civil Works

3110504

Other
Infrastructure And
Civil Works

3110504

Other
Infrastructure And
Civil Works

Page 188

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


VOTE NO: 011

VOTE TITLE: ROADS, PUBLIC WORKS AND TRANSPORT

Part A: Vision: To provide cost-effective, world-class infrastructure facilities and services in


support of Vision 2030.

Part B: Mission: To provide efficient, affordable and reliable infrastructure for sustainable
economic growth and development through construction, modernization, rehabilitation and
effective management of roads and all infrastructure facilities

Part C: Strategic Objectives

Programme

Programme 2: Transport Management & Safety

Strategic Objective
To increase accessibility and mobility within the
county
Efficient and safe Transport system

Programme 4: Street Lighting


Programme 5 : General Administration, Planning & Support
Services

Improved security in the working environment


To provide transformative leadership, capacity and
policy direction in service delivery

Programme 1: Transport Infrastructure Development


Programme 3: County Government Buildings Services

Enhanced building safety and output quality

Part D: Context for Budget Intervention

In 2014/15 the total budget for the department was Kshs. 581,547,266 out of which Kshs.
561,864,766 was development expenditure; Kshs 19,682,500 was operations and maintenance
expenditure. In 2015/16 the total budget for the department was Kshs. 917,508,233 out of which
Kshs. 20,810,558 was compensation to employees; Kshs. 19,883,169 was operations and
maintenance and Kshs. 876,814,506 was development expenditure.
The key items of expenditure for the department were: construction and upgrading county roads
and bridges, street lighting, maintenance of county government houses, transport management and
safety.
Major achievements during the period are; constructed 600km of new roads, upgraded 206km of
the existing road networks, acquired Mechanical Equipment plants from the National
Government, established mechanical works yard for Plant and motor maintenance.
The financial year 2016/17, the sector will focus mainly on flagship projects, maintenance of
roads, public buildings and equipping of materials laboratory and works yard. The department
intends to, establish a fully functional Mechanical and Transport Fund (MTF), installation of
street lights within the county and improvement of urban and rural infrastructure. The department
intends to fast-track policy on MTF and levying of parking fees.

To address the challenges highlighted above and achieve its strategic objectives, the sector
expects to utilize Kshs. 93,017,366 for recurrent and Kshs. 1,130,927,750 for development in the
FY 2016/2017. The allocation is expected to increase to Kshs.102, 319,103 for recurrent and
Kshs. 1,244,020,525 for development in the FY 2017/2018 and Kshs. 112,551,013 for recurrent
and Kshs.1, 368,422,578 development in the FY 2018/2019.
PROGRAMME BASED BUDGET JUNE 2016

Page 189

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Part E: Summary of the Programme Outputs, Performance Indicators and Targets for FY 2016/17- 2018/19
Programme

Delivery Unit

Key Outputs

Programme 1: Transport Infrastructure Development


Outcome: Sustained Economic Development
SP 1.1
To increase
Roads
Construction and
accessibility and
engineering
Maintenance of
mobility within
Department
County Roads
the county.
SP1.2
Roads
Improved
Construction of
engineering
connectivity
bridges
Department
Revolving fund
SP1.3
Roads
for improved
Mechanical
engineering
mechanization
Transport Fund
Department
of roads
transport sector
SP1.4
Roads
To increase
Improvement of
engineering
accessibility and
Airstrips
Department
mobility.
SP1.5
Roads
To increase
Construction and
engineering
accessibility and
Maintenance of
Department
mobility.
Jetties and Piers
Improved
SP1.6
Roads
parking areas
Construction and
engineering
and increase
Maintenance of
Department
revenue
Parking Bays
collection
Programme2: Storm Water Management
Outcome: Sustained Economic Development
SP 2.1
Improved
Roads
Construction and
drainage
engineering
Maintenance of
systems within
Department
Drainage system
urban areas
Programme3: Transport Management & Safety
Outcome: Efficient and safe Transport system
SP3.1 Transport
Licensing

Department of
Roads &
Transport

Department of
Roads &
Transport

No.
of
constructed
maintained

Km
and

Target
2017/18

Target
2018/19

300

450

500

No. of bridges
constructed.

No of mechanical
equipment
acquired and
maintained

No of airstrips
improved

No. of Jetties and


Piers Constructed
and Maintained

No of parking
bays/bus parks
constructed and
operational

No. of urban
areas improved

No of licenses
issued
Percentage
of
road
accidents
and Incidences

Efficiency in
fire fighting

No
of
Engines
purchased
No
of
Equipment
purchased

Programme 5: Street Lighting


Outcome: Improved security in the working environment

Target
2016/17

500

well-regulated
transport
operations
systems

Programme4: Fire Fighting


Outcome: Effective Emergency Response

SP4.1 Purchase
of Fire Engine
and Firefighting
Equipment

Target
(Baseline)
2015/16

Key
Performance
Indicators

Fire
Fire

SP5.1
Installed street
Roads
Number
of
Installation
lighting units in
engineering
lighting
units
Street lights &
major streets in
Department
installed
flood lights
urban areas
Programme 6: County Government Building services
Outcome: Enhanced building safety and built environment
SP6.1
Buildings
of No of buildings
Construction and
Public works
Constructed and constructed and
Maintenance of
maintained
maintained
buildings
Buildings
No of buildings
SP6.2 Quality
inspected
inspected,
assurance &
Public works
Standards
Sample building No of samples
control
materials tested
tested
Programme 7.0 : General Administration, Planning & Support Services

PROGRAMME BASED BUDGET JUNE 2016

300

450

100

60

45

30

30

30

30

205

200

200

200

30

500

580

650

720

200

500

600

Page 190

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Outcome: Improved service delivery
SP7.1 General
Administration
planning
&
Support Services

General
Administration
&
planning
section

No of work plans
prepared
No.
quarterly
reports prepared,
No. of projects
M&E reports
effective
communication
system in place

Efficient
working
environment

Part F: Summary of Expenditure by Programmes 2016/17 -2018/19 (Kshs.)


Expenditure Classification
Programme 1: Transport
Infrastructure Development
Programme 2: Storm Water
Management
Programme 3: Transport
Management & Safety
Programme 4: Fire Fighting
Programme 5: Street
Lighting
Programme 6: County
Government Buildings
Services
Programme 7.0 : General
Administration, Planning &
Support Service
Total Gross Expenditure

Baseline
Estimates 2015/2016

737,484,723

Estimates
2016/2017

969,617,595

Projected Estimates
2017/2018

10,385,558

2018/2019

1,066,579,355

1,173,237,290

45,000,000

114,539,915

125,993,907

138,593,297

77,305,000

45,826,216

50,408,838

55,449,721

15,914,455

31,395,085

34,534,594

37,988,053

1,223,945,116

1,346,339,628

1,480,973,590

76,418,497

62,566,305

68,822,936

Part G. Summary of Expenditure by Vote and Economic Classification (Kshs)


Expenditure Classification

Baseline Estimates 2015/16

Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Government Agencies
Other Development expenditures
Total Expenditure

Estimates

2016/17

75,705,229

Projected Estimates

40,693,727
20,810,558
19,883,169

93,017,366
17,788,511
75,228,855

2017/18
102,319,103
19,567,362
82,751,741

876,814,506

1,130,927,750
1,130,927,750

1,244,020,525
1,244,020,525

1,368,422,578
1,368,422,578

1,223,945,116

1,346,339,628

1,480,973,590

876,814,506

2018/19
112,551,013
21,524,098
91,026,915

Part H: Summary of Expenditure by Programme, Sub-Programme and Economic Classification (Kshs.)


Expenditure Classification

Programme 1: Transport Infrastructure


Development

Baseline
Estimates
2015/2016

Current Expenditure

40,693,727

Compensation to Employees

20,810,558

Use of goods and services

19,883,169

Current Transfers Govt. Agencies


Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total Expenditure
Programme 2: Storm Water Management
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies

40,693,727

PROGRAMME BASED BUDGET JUNE 2016

Estimates
2016/2017

Projected Estimates

2017/2018

2018/2019
24,921,239

20,596,065

22,655,672

20,596,065

22,655,672

949,021,530
949,021,530

1,043,923,683
1,043,923,683

1,148,316,051
1,148,316,051

969,617,595

1,066,579,355

1,173,237,290

24,921,239

Page 191

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total Expenditure
Programme 3: Transport Management & Safety
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total Expenditure
Programme 4: Fire Fighting
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total Expenditure
Programme 5: Street Lighting

10,385,558
10,385,558

10,385,558

45,000,000
45,000,000
45,000,000

Current Expenditure

Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure

76,418,497

Acquisition of Non-Financial Assets

76,418,497

Total Expenditure

76,418,497

Capital Transfers to Govt. Agencies


Other Development expenditures

Programme 6: County Government Buildings


Services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total Expenditure
Programme 7: General Administration Services
Current Expenditure
Compensation to Employees
Use of goods and services
Current Transfers Govt. Agencies
Other Recurrent expenditures
Capital Expenditure
Acquisition of Non-Financial Assets
Capital Transfers to Govt. Agencies
Other Development expenditures
Total expenditure
Total expenditure for vote

73,000,000
73,000,000
73,000,000

114,539,915
114,539,915

125,993,907
125,993,907

138,593,297
138,593,297

114,539,915

125,993,907

138,593,297

21,200,000

23,320,000

21,200,000

23,320,000

41,366,305

45,502,936

41,366,305

45,502,936

62,566,305

68,822,936

45,826,216
45,826,216

50,408,838
50,408,838

55,449,721
55,449,721

50,408,838

55,449,721

45,826,216

25,652,000

25,652,000
50,053,229
50,053,229

75,705,229
0

40,693,727
20,810,558
19,883,169

31,395,085
17,788,511
13,606,574

34,534,594
19,567,362
14,967,231

37,988,053
21,524,098
16,463,955

40,693,727

31,395,085
1,223,945,116

34,534,594
1,346,339,628

37,988,053
1,480,973,590

PROGRAMME BASED BUDGET JUNE 2016

Page 192

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


RECURRENT
Code
2110101
2110301
2110314
2110318
2110320
2110402
2110403
2110404
2210101
2210102
2210201
2210203
2210301
2210303
2210503
2210504
2210505
2210603
2210604
2210710
2210711
2210801
2211009
2211016
2211101
2211103
2211201
2211305
2211306
2211308
2211310
2220101
2220201
2220202
2220205
2220210
3111001
3111002
3111003

Item
Basic Salary civil services
House Allowance
Transport Allowance
Gratuity
Leave Allowance
Refund of Medical Expenses-InPatient
Refund of Medical Expenses-Ex-Gratia
Leave Expenses
Electricity Expenses
Water And Sewerage Charges
Telephone,Telex,Facsmile And M
Courier And Postal Services
Travelcosts(Airlines,Bus,Railwayc)
Daily Subsistance Allowances
Subscription To Newspapers,
Advertising Awareness
Trade Shows And Exhibitions
Rents And Rates - Non-Residential
Hire Of Transport
Accommodation
Tuition Fees
Cartering Services,Receptions,Ac
Education And Library Supplies
Purchase Of Uniforms And Clothing - Staff
General Office Supplies (Paper
Sanitary And Cleaning Materials,
Refined Fuels & Lubri
Contracted Guards And Cleaning Services
Membership Fees, Dues And Subscriptions To Professional And Trade Bodies
Legal Dues/Fees, Arbitration And Compensation Payments
Contracted Professional Services
Maintenance Expenses - Motor Vehicles
Maintenance Of Plant, Machinery And Equipment (Including Lifts)
Maintenance Of Office Furniture And Equipment
Maintenance Of Buildings And Stations -- Non-Residential
Maintenance Of Computers, Software, And Networks
Purchase Of Office Furniture And Fittings
Purchase Of Computers, Printers And Other IT Equipment
Repair and maintainance of streetlights
Power bill for streetlights
Purchase Of Air Conditioners, Fans And Heating Appliances

PROGRAMME BASED BUDGET JUNE 2016

General
Administration,
Planning and
Support services
11,440,902
3,357,600
2,112,000
323,009
205,000
100,000
100,000
150,000
2,260,000
8,550
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,905,100
2,000,000
0
0
0
171,000
256,500
141,000
0
0
2,500,000

Roads Infrastructure
Development and
Maintainance
57,000
11,400
104,510
71,000
323,750
490,466
71,250
137,500
142,500
107,350
51,300
162,200
245,800
244,755
34,200
100,500
227,738
85,500
707,500
507,500
42,750
111,000
6,446,219
10,000,000
32,377
36,000
44,000
-

Government
Building
Services
-

71,000
4,275
42,750
8,550
171,000
467,500
42,750
42,750
54,150
17,100
42,750
85,500
85,500
8,550
85,500
78,250
17,100
266,291
17,100
17,000,000
227,500
855,000
17,100
28,500
42,750
47,000
-

Street lighting
10,000,000
11,200,000
-

Total
11,440,902
3,357,600
2,112,000
323,009
205,000
100,000
100,000
150,000
2,388,000
24,225
147,260
79,550
494,750
957,966
71,250
180,250
185,250
161,500
68,400
204,950
331,300
330,255
42,750
186,000
305,988
102,600
973,791
507,500
59,850
17,111,000
5,132,600
8,446,219
10,855,000
49,477
235,500
299,250
232,000
10,000,000
11,200,000
2,500,000

Page 193

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030

Code
3111005

General
Administration,
Planning and
Support services
1,364,424
31,395,085

Item
Purchase Of Photocopiers
TOTAL

DEVELOPMENT

Sub County

Ward

Ugunja

Sub Location

Roads Infrastructure
Development and
Maintainance
20,596,065

Sector

Function

Proposed Project

Ugunja

Works

Roads

Opening, Grading And Murruming Of UlumbaSabar-Nyaguok-Corner Mbayaroad

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of SavannaGuok Onyuongo Road

2,000,000

Ugunja

Ugunja

Works

Roads

2,280,000

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of KopondoJasamba-Kaswan-Chik Ithi-Uriya-Magoya


Primary Road
Opening, Grading And Murruming Of Ngunya
School-Nyamasare Road

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of UrefMauna Road

2,500,000

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of OkiroNzoia Road

2,000,000

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of Nyabeda


Ring Road

2,000,000

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of UminaNaya-Urinda-Sirunga Road

2,000,000

Rarieda

West
Asembo

Siger

Works

Roads

Murraming And Culverting Of Siger Sangla


Wangarot

1,800,000

Rarieda

West
Asembo

Memba

Works

Roads

Lwak Kounga- Murraming And Culverting

1,400,000

Rarieda

West
Asembo

Works

Roads

Mabinju Asembo Bay;


Opening,Grading,Murraming And Culverting

1,500,000

Rarieda

West
Asembo

Mahaya

Works

Roads

Kadedi,Gingo,Mahaya;Murraming And
Culverting

2,000,000

Rarieda

West

Akom

Works

Roads

Kooro,Sinogo,Obuom;Murraming,Culverting

2,446,044

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Government
Building
Services
19,826,216
Estimates
2016/17
2,000,000

2,500,000

Street lighting
21,200,000

Total
Estimates
2,000,000
2,000,000
2,280,000
2,500,000
2,500,000
2,000,000
2,000,000
2,000,000
1,800,000
1,400,000
1,500,000
2,000,000

Total

1,364,424
93,017,366

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 194

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Asembo
Rarieda

West
Asembo

Rarieda

Proposed Project
And Bridge

Nyagoko

B/F 2015/2016

Estimates
2016/17

Works

Roads

Nyagoko Kapuoyo Waringa;Murraming And


Culverting

2,000,000

West
Asembo

Works

Roads

Kokara, Nyamboyo,Rakombe;Murraming And


Culverting

1,900,000

Bondo

North
Sakwa

Works

Roads

Grading And Murruming Of Bar Mwofu-OloyaKibuye Road

1,000,000

Bondo

North
Sakwa

Works

Roads

Grading And Murruming Of Migingo HotelLivestock Market Road

1,000,000

Bondo

North
Sakwa

Works

Roads

Opening, Grading, Gravelling And Culverting


Of Kaudi-Gwara Road

2,000,000

Bondo

North
Sakwa

Works

Roads

Opening And Culverting Of Oyieng-Atiela


Phase 2 Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Opening,Grading, Gravelling Of NyamboiKakremba Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Grading, Gravelling And Culverting Of


Ragengni-Adola Beach Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Grading, Gravelling And Culverting Of NdereLusi Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Openin , Grading And Murruming Of Madiany


Okela Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Grading, Gravelling And Culverting Of


Kopiata-Junction-Kopita Beach Road

3,000,000

Rarieda

East
Asembo

Works

Roads

Opening, Grading And Culverting Of Got


Anyango-Karindo Road

2,000,000

Rarieda

East
Asembo

Works

Roads

Opening, Grading And Culverting Of NgukaPowo-Nyangande Aluru Road

2,000,000

Rarieda

East
Asembo

Works

Roads

Grading And Culverting Of Number KandariaOseno Road

2,000,000

Rarieda

East

Works

Roads

Opening, Grading And Culverting Of Ndari-

2,000,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates
2,446,044
2,000,000
1,900,000
1,000,000
1,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
3,000,000
2,000,000
2,000,000
2,000,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 195

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Asembo

Proposed Project
Kadome-Kusa Road

B/F 2015/2016

Estimates
2016/17

Rarieda

East
Asembo

Works

Roads

Grading And Culverting Of Luoro-KaonjeOpano Road Road

2,000,000

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Kochino-Kamalago


Road

2,428,571

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Lieta-Mumbo Road

2,428,571

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Kandola-RamoyaKasigar Road

2,028,571

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Kolilo-Ndunya


Road

1,928,571

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Agok-Kogoye


Beach Road

1,928,571

Rarieda

South
Uyoma

Works

Roads

Opening,Grading And Gravelling Of NyaondoMirao-Winyanga Road

1,928,571

Bondo

South
Sakwa

Works

Roads

Kothecha- Ouya- Wichlum (Grading Culverting


And Murraming)

1,300,000

Bondo

South
Sakwa

Works

Roads

Kipasi - Gombe - Wagusu (Grading Culverting


And Murraming)

1,300,000

Bondo

South
Sakwa

Works

Roads

Okeya- Oluro Road (Grading Culverting And


Murraming)

1,300,000

Bondo

South
Sakwa

Works

Roads

Kodindo- Kabungu (Grading Culverting And


Murraming)

1,000,000

Bondo

South
Sakwa

Works

Roads

Kodumo- Oganya- Matangwe (Grading


Culverting And Murraming)

1,300,000

Bondo

South
Sakwa

Works

Roads

Koyaya- Abimbo- Wagusu (Grading Culverting


And Murraming)

1,000,000

Bondo

South
Sakwa

Works

Roads

Anyuongi- Ouya Road (Grading Culverting And


Murraming)

1,200,000

Bondo

South

Works

Roads

Gombe- Kopolo Road (Grading Culverting And

800,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates
2,000,000
2,000,000
2,428,571
2,428,571
2,028,571
1,928,571
1,928,571
1,928,571
1,300,000
1,300,000
1,300,000
1,000,000
1,300,000
1,000,000
1,200,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 196

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Sakwa

Proposed Project
Murraming)

B/F 2015/2016

Estimates
2016/17

Bondo

South
Sakwa

Works

Roads

Wagusu Akoko Road (Grading Culverting And


Murraming)

800,000

Bondo

South
Sakwa

Works

Roads

Amoyo- Kochilo Road (Grading Culverting And


Murraming)

800,000

Bondo

South
Sakwa

Works

Roads

Koiro- Ludhi- Wichlum Road (Grading


Culverting And Murraming)

700,000

Bondo

South
Sakwa

Works

Roads

Kodek- Uhendo Road (Grading Culverting And


Murraming)

700,000

Bondo

South
Sakwa

Works

Roads

Kararina- Nyamnwa- Gulkongo (Grading


Culverting And Murraming)

Bondo

South
Sakwa

Works

Roads

Kogodo- Orengo- Nyamnwa (Grading


Culverting And Murraming)

800,000

Bondo

South
Sakwa

Works

Roads

Orengo- Kangawa- Gulkongo (Grading


Culverting And Murraming)

800,000

Bondo

South
Sakwa

Works

Roads

Arambe- Nyamwenga Pri.- Yenga (Grading


Culverting And Murraming)

Bondo

South
Sakwa

Works

Roads

Kogola- Kopolo- Magak Pr. (Grading Culverting


And Murraming)

800,000

Bondo

South
Sakwa

Works

Roads

Anyuongu- Matangwe (Grading Culverting And


Murraming)

1,000,000

Bondo

Yimbo
East

Works

Roads

1,500,000

Bondo

Yimbo
East

Works

Roads

Openning, Grading, Culverting And Murraming


Of Dudi- Mugane- Ramogipri.- Kodinya Mrkt.
Nyandheho- Kowino Ring Road
Murraming Rangombe- Unyenjra- Aling'a Road

Bondo

Yimbo
East

Works

Roads

Opening Grading Culverting And Murraming Of


Jusa- Lupere- Angw'enyo Road

1,500,000

Bondo

Yimbo
East

Works

Roads

Openning Grading And Murraming KopalaMinyisia- Nyaudenge- Otono Road

1,500,000

Bondo

Yimbo

Works

Roads

Murrami And Culverting Of Kojaoko-

1,000,000

PROGRAMME BASED BUDGET JUNE 2016

1,000,000

1,000,000

1,000,000

Total
Estimates
800,000
800,000
800,000
700,000
700,000
1,000,000
800,000
800,000
1,000,000
800,000
1,000,000
1,500,000
1,000,000
1,500,000
1,500,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 197

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

East

Proposed Project
Komungu- Ogare - Ulongi- Othach- Koliech
Road
Opening Grading And Murraming Of KomunguChunga Primary Road

B/F 2015/2016

Estimates
2016/17

Bondo

Yimbo
East

Works

Roads

Bondo

Yimbo
East

Works

Roads

Opening Grading And Murraming Of Bar


Okwiri- Kayouth Road

1,500,000

Bondo

Yimbo
East

Works

Roads

Opening Grading And Murraming Of Bur YiroMasamba- Nyamonye Road

1,500,000

Bondo

Yimbo
East

Works

Roads

1,500,000

Bondo

Yimbo
East

Works

Roads

Executive

Executive

Executive

Works

Roads

Opening Grading And Murraming And


Culverting Of Bondo Ttc Achaye Rach- Ogam
Road
Opening Grading Murraming And Culverting Of
Nyamsaji Beach- Bar Awendo Pri. MajengoOrom- Ogam Road
Mechanical Transport Fund

10,000,000

Executive

Executive

Executive

Works

Roads

Road Maintenance Levy Fund

82,817,177

Executive

Executive

Executive

Works

Roads

Contingency For Roads

10,000,000

Executive

Executive

Executive

Works

Works

Completion Of Ugunja Town Hall

Gem

Central
Gem

Works

Roads

Maintenance Of Nyathenge-Luri

Gem

Central
Gem

Works

Roads

Maintenance Of Migosi-Nyathenge

2,000,000

Gem

Central
Gem

Works

Roads

Maintenance Of Nyandiwa-Uyuwe

1,000,000

Gem

Central
Gem

Works

Roads

Maintenance Of Uyonga-Sirandu

1,000,000

PROGRAMME BASED BUDGET JUNE 2016

1,000,000

1,500,000

5,000,000

700,000

Total
Estimates
1,000,000
1,000,000
1,500,000
1,500,000
1,500,000
1,500,000
10,000,000
82,817,177
10,000,000
5,000,000

700,000
2,000,000
1,000,000
1,000,000

Code
3110499
3110499
3110499
3110499
3110499
2630176
3110499
2810201
3110202

3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Mechanical
And
Transport
Fund
Construction
Of RoadsOther
Contingency
Fund
NonResidential
Buildings
(Offices,
Schools,
Hospitals,
Etc)
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Page 198

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sub Location

Sector

Function

Proposed Project

Central
Gem

Works

Roads

Maintenance Of Kolewe-Korondo-Gongo

Gem

Central
Gem

Works

Roads

Maintenance Of Nango-Gongo

800,000

Gem

Central
Gem

Works

Roads

Maintenance Of Olengo-Sirimba-Sipoklo

600,000

Gem

Central
Gem

Works

Roads

Maintenance Of Sipoklo-Gongo

600,000

Gem

Central
Gem

Works

Roads

Maintenance Of Lela-Kojuok-Wagai

600,000

Gem

Central
Gem

Works

Roads

Maintenance Of Karariw-Kabaridi

800,000

Gem

Central
Gem

Works

Roads

Drift At Sinderma River Along Kilo-SindermaSiongo

1,200,000

Gem

Central
Gem

Works

Roads

Mala Box Culvert Along Kilo-Sinderma Siongo Road

6,000,000

Gem

Central
Gem

Works

Roads

Maintenance Of Kilo- Sinderma - Siongo Road

500,000

Gem

Central
Gem

Works

Roads

Culvert Works At Siongo River Along KiloSinderma-Siongo Road

600,000

Gem

Central
Gem

Works

Roads

Opening Of Sigangu-Masinde-Siriwo

500,000

Gem

Central
Gem

Works

Roads

Opening Of Kakumu-Nyangweso

500,000

Gem

Central
Gem

Works

Roads

Opening Of Olengo-Sinderma

500,000

Gem

Central
Gem

Works

Roads

Opening Of Migosi-Kulo

600,000

Gem

Central
Gem

Works

Roads

Maintenance Of Gongo-Luri

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
500,000

1,000,000

Total
Estimates
500,000
800,000
600,000
600,000
600,000
800,000
1,200,000
6,000,000
500,000
600,000
500,000
500,000
500,000
600,000
1,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 199

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sub Location

Sector

Function

Proposed Project

East Gem

Works

Roads

Maintenance Of Dhene-Uranga

Gem

East Gem

Works

Roads

Maintenance Of Barkalare-Musudhudhu

900,000

Gem

East Gem

Works

Roads

Maintenance Of Rabuor-Omindo

500,000

Gem

East Gem

Works

Roads

Maintenance Of Rabuor- Yala

1,800,000

Gem

East Gem

Works

Roads

Maintenance Of Sinaga-Omindo-Maungo

1,000,000

Gem

East Gem

Works

Roads

Maintenance Of Lihanda-Lwala-Uranga

1,300,000

Gem

East Gem

Works

Roads

Opening Of Ramula-Obwolo

640,000

Gem

East Gem

Works

Roads

Maintenance Of Ramula-Nyangulu-Onding

720,000

Gem

East Gem

Works

Roads

Maintenance Of Lihanda-Mindhine-Sagam

590,000

Gem

East Gem

Works

Roads

Maintenance Of Sagam-Marenyo

500,000

Gem

East Gem

Works

Roads

Opening Of Lihanda-Mindhine-Chula

600,000

Gem

East Gem

Works

Roads

Maintenance Of Kalare-Maungo School-Gamba

1,000,000

Gem

East Gem

Works

Roads

Maintenance Of Sinaga-Masadhi-Omindo

1,700,000

Gem

East Gem

Works

Roads

Opening Of Nyangulu-Mborra

700,000

Gem

East Gem

Works

Roads

Maintenance Of Ramula-Barkalare

650,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
1,200,000

Total
Estimates
1,200,000
900,000
500,000
1,800,000
1,000,000
1,300,000
640,000
720,000
590,000
500,000
600,000
1,000,000
1,700,000
700,000
650,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 200

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sub Location

Sector

Function

Proposed Project

East Gem

Works

Roads

Opening Of Ulagai-Ramogi-Maungo

Gem

East Gem

Works

Roads

Opening Of Rabuor-Jordan

500,000

Gem

East Gem

Works

Roads

Maintenance Of Jina-Ngut Mbaka-Ratudi

500,000

Gem

East Gem

Works

Roads

Opening Of Ugungu-Sinaga

1,000,000

Gem

North
Gem

Works

Roads

Construction Of Bridge At Chibiri River

3,000,000

Gem

North
Gem

Works

Roads

Construction Of River Crossing Drift Ogada


Road

1,500,000

Gem

North
Gem

Works

Roads

Openning And Grading Of Sirodha Asayi Road

1,000,000

Gem

North
Gem

Works

Roads

Muramming Of Otok-Ndegwe

700,000

Gem

North
Gem

Works

Roads

Muramming Of Sirembe-Lundha Road

800,000

Gem

North
Gem

Works

Roads

Construction Of River Crossing Drift At Sidhehe

1,000,000

Gem

North
Gem

Works

Roads

Opening And Grading Of Kanyabola Magunda


Road

1,000,000

Gem

North
Gem

Works

Roads

Construction Of Culvert At Mranda

Gem

North
Gem

Works

Roads

Opening And Grading Of Miro-Ndere Road

1,000,000

Gem

West
Gem

Works

Roads

Nyagondo- Apuoyo R. Yala (Omoth)

17,000,000

Gem

West
Gem

Works

Roads

Nyagondo Sirembe (Sidhehe)

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
1,200,000

500,000

Total
Estimates
1,200,000
500,000
500,000
1,000,000
3,000,000
1,500,000
1,000,000
700,000
800,000
1,000,000
1,000,000
500,000
1,000,000
17,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 201

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sub Location

Sector

Function

Proposed Project

West
Gem

Works

Roads

Njenjra Alwala (R.Yala)

Gem

West
Gem

Works

Roads

Dienya Kotoo Panyako

3110499

Gem

West
Gem

Works

Roads

Wagai- Uriri Karuwa

3110499

Gem

West
Gem

Works

Roads

Komuok Kanyilaji (Nguge Drive)

3110499

Gem

West
Gem

Works

Roads

Ngiya Ulamba- Komuok- Urir-Siongo

3110499

Gem

West
Gem

Works

Roads

Ngiya-Gogo

3110499

Gem

West
Gem

Works

Roads

Ngiya-Barkawandu-Magari

3110499

Gem

West
Gem

Works

Roads

St. Jude -Suludhi Nyabiedho

3110499

Gem

West
Gem

Works

Roads

Ngiya Rakuom- Ober Dienya

3110499

Gem

West
Gem

Works

Roads

Orombe R.- Kothero-Alwala

3110499

Gem

West
Gem

Works

Roads

Ayora-Sinamro-Opal

3110499

Gem

West
Gem

Works

Roads

Komuok-Apuoyo-Orombe R/ Othidhe

3110499

Gem

West
Gem

Works

Roads

Nyarodi - Ober-Dienya

3110499

Gem

West
Gem

Works

Roads

Additional Funding For Ulamba Twala


Kayombi

3110499

Gem

West
Gem

Works

Roads

PROGRAMME BASED BUDGET JUNE 2016

Ayora -Abir

B/F 2015/2016

Estimates
2016/17

Total
Estimates

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499

Page 202

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

Sub Location

Sector

Function

Proposed Project

West
Gem

Works

Roads

Ulamba-Ober Kawela

Gem

West
Gem

Works

Roads

Malunga-Kamluo-Magari

Gem

Yala
Township

Works

Roads

Maintainance Of Kosolo-Rading Obwolo Road

2,000,000

Gem

Yala
Township

Works

Roads

Maintainance Of Saola-Omollo Okero-Ulumbi


Primary

2,000,000

Gem

Yala
Township

Works

Roads

Opening Of Kogol-Kadero-Sirodha

1,000,000

Gem

Yala
Township

Works

Roads

Opening Of Prof Ogot-Kawange-Aora AbaoUganga

1,000,000

Gem

Yala
Township

Works

Roads

Opening Of Ben Okwaro-Washindu -Randiki

1,000,000

Gem

Yala
Township

Works

Roads

Opening Of Yala Old Market Road

1,500,000

Gem

Yala
Township

Works

Roads

Maintenance Of Yala-Tatro-Anyiko

1,500,000

Gem

Yala
Township

Works

Roads

Yala-Anyiko-Sirodha-Kakamega County
Boundary

2,800,000

Gem

Yala
Township

Works

Roads

Musudhudhu-Marenyo

1,000,000

Gem

Yala
Township

Works

Roads

Maintainance Of Hippo Omollo Olando Road

Gem

Yala
Township

Works

Roads

Maintainance Of Muhanda Bar Turo

Alego Usonga

Central
Alego

Kadenge

Works

Roads

Gravelling, Grading And Constructing 3


Culverts At Kamlag Hwar Ninga Road

900,000

Alego Usonga

Central
Alego

Kadenge

Works

Roads

Gravelling, Grading And Construction 2


Culverts At Gendro School Road

800,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

Total
Estimates

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499

800,000
1,500,000

2,000,000
2,000,000
1,000,000
1,000,000
1,000,000
1,500,000
1,500,000
2,800,000
1,000,000
800,000
1,500,000
900,000
800,000

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 203

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

Central
Alego

Kadenge

Works

Roads

Alego Usonga

Central
Alego

Kakum Kombewa

Works

Roads

Opening, Grading, Culverting And Complete


Gravelling Of: Kamlag Kogwela-Tinga KoliechKomol-Ratuoro Kadenge Road
Construction Of Sese Stream Drift Culvert

Alego Usonga

Central
Alego

Kochieng A

Works

Roads

Alego Usonga

Central
Alego

Kochieng B

Works

Roads

Alego Usonga

Central
Alego

Ojwando A

Works

Alego Usonga

Central
Alego

Ojwando A

Alego Usonga

Central
Alego

Alego Usonga

B/F 2015/2016

Estimates
2016/17
3,600,000
1,800,000

Opening, Grading, Culverting And Complete


Graveling Of Mbolori- Dadra-Bar OriangUyugu-Kalenyjuok Road
Graveling And Grading Of Nyagwela School
Access Road

3,000,000

Roads

Construction Of Owanga-Kalenyjuok Drift


Culvert

2,000,000

Works

Roads

Graveling And Constructing 2 Culverts At


Kanyaboli School Access Road

700,000

Ojwando A

Works

Roads

Opening, Grading And Graveling Of


Kalenyjuok School Road

700,000

North
Alego

Olwa

Works

Roads

Grading And Gravelling Of Urewe-Bao Wang


Anjawni Road

1,800,000

Alego Usonga

North
Alego

Umala

Works

Roads

Grading And Gravelling Of Umala-AwachDondi Road

1,800,000

Alego Usonga

North
Alego

Obambo

Works

Roads

Grading And Gravelling Of Mbaga-KonyangoPoye Road

1,500,000

Alego Usonga

North
Alego

Ulafu

Works

Roads

Grading And Gravelling Of Nina-Unangwe Rd

1,600,000

Alego Usonga

North
Alego

Olwa

Works

Roads

Opening And Grading Of Tula-Ogongo Road

1,500,000

Alego Usonga

North
Alego

Komolo

Works

Roads

Grading And Gravelling Of Fuludhi -Kochanda


Road

1,500,000

Alego Usonga

North
Alego

Olwa

Works

Roads

Grading And Gravelling Of Kajairo-Urewe


Road

1,500,000

Alego Usonga

North
Alego

Hono

Works

Roads

Opening And Grading Of Alwala-Pandi Rd .

1,000,000

PROGRAMME BASED BUDGET JUNE 2016

500,000

Total
Estimates
3,600,000
1,800,000
3,000,000
500,000
2,000,000
700,000
700,000
1,800,000
1,800,000
1,500,000
1,600,000
1,500,000
1,500,000
1,500,000
1,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 204

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

North
Alego

Hono

Works

Roads

Grading And Gravelling Of Hono-Koyule

Alego Usonga

North
Alego

Nyamila

Works

Roads

Gravelling Of Ralwala-Athany Road.

1,500,000

Alego Usonga

Siaya
Township

Works

Roads

Siaya Central Primary School-Pandy-Rabango


Road

2,500,000

Alego Usonga

Siaya
Township

Works

Roads

Awelo Market-Futro Road

2,200,000

Alego Usonga

Siaya
Township

Works

Roads

Futro -Rae Police Road

2,300,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Banana-Catholic Ring Road

1,000,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Usenge-Market-Kolal-Usenge Catholic
Kanyangenge Road

1,800,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Obwede Dispensary-Tinga Kouda Road

1,000,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Awelo-Mulaha-Rae Road

1,000,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Nyandiwa-Lwala Kaor Road

1,300,000

Alego Usonga

Siaya
Township

Nyandiwa

Works

Roads

Omollo-Ahenda Chief Camp Rd.

1,000,000

Alego Usonga

South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego

Works

Roads

Opening And Grading Of Ngiya-Nduru- Uuna


Road

1,600,000

Works

Roads

Grading And Gravelling Of Kirindo-Pap


Nyadiel-Nduru Othithe' Road

1,249,783

Works

Roads

Opening And Grading Of Mur MalangaKaginga-Upanda Road

1,500,000

Works

Roads

Grading And Gravelling Daraja-Uloma-UpandaMatera Road

1,300,000

Alego Usonga
Alego Usonga
Alego Usonga

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
1,800,000

Total
Estimates
1,800,000
1,500,000
2,500,000
2,200,000
2,300,000
1,000,000
1,800,000
1,000,000
1,000,000
1,300,000
1,000,000
1,600,000
1,249,783
1,500,000
1,300,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 205

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Alego Usonga

South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
South
East
Alego
Usonga

Sector

Function

Proposed Project

Works

Roads

Grading And Gravelling Of Barding Schl-OjaloNyang'oma Road

Works

Roads

Grading And Gravelling Ofngiya-Thim Ralak


Road.

1,200,000

Bar Olengo

Works

Roads

Opening And Grading Komulo-Ulamba Road

1,000,000

Bar Olengo

Works

Roads

Opening And Grading Of Kasoyo Road

1,000,000

Kogelo

Works

Roads

Opening And Grading Of Nyang'oma-Bar


Kagwanda Road

1,200,000

Works

Roads

Grading And Gravelling Of Barding-Randago


Road

1,300,000

Works

Roads

Opening And Grading Of Baragulu-Kirindo


Legio Siganyanya Rd.

1,300,000

Works

Roads

Grading And Gravelling Of Pap OriangTingwangi Road

1,200,000

Works

Roads

Opening And Grading Of Free Pentecostal

1,100,000

Works

Roads

Maintainance Of Kodondo Road

Works

Roads

Maintanance Of Udamayi Ulupi-Uwasi Road

2,000,000

Alego Usonga

Usonga

Works

Roads

Maintanance Of Kagoya-Lunyu Road

2,500,000

Alego Usonga

Usonga

Works

Roads

Maintanance Of Kamalunga Road

2,000,000

Alego Usonga

Usonga

Works

Roads

Maitenance Of Nyadorera-Nyambuye Road

1,500,000

Alego Usonga

Usonga

Works

Roads

Maitenance Of Kagoye-Nyambuye Road

1,000,000

Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga
Alego Usonga

Sub Location

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
1,500,000

800,000

Total
Estimates
1,500,000
1,200,000
1,000,000
1,000,000
1,200,000
1,300,000
1,300,000
1,200,000
1,100,000
800,000
2,000,000
2,500,000
2,000,000
1,500,000
1,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 206

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Sub Location

Sector

Function

Proposed Project

Usonga

Works

Roads

Maitenance Of Kahaga-Luhwa Road

Alego Usonga

Usonga

Works

Roads

Maitenance Of Dibuoro-Bukhowa Road

2,000,000

Alego Usonga

Usonga

Works

Roads

Maitenance Of Uyingi-Nina Road

1,200,000

Alego Usonga

Usonga

Works

Roads

Maitenance Of Mahuru-Lunyu Road

1,000,000

Alego Usonga

Usonga

Works

Roads

Maitenance Of Nyachoma-Hawgaya Road

1,000,000

Alego Usonga

West
Alego

Kabura Hawinga

Works

Roads

Opening And Gravelling Of Mwer-Uradi Rd

2,000,000

Alego Usonga

West
Alego

Kodiere

Works

Roads

Opening Ande Grading Of Ojengo Rd.

1,800,000

Alego Usonga

West
Alego

Hawinga

Works

Roads

Grading And Gravelling Of Namba Kamusa


Hawinga Rd

1,800,000

Alego Usonga

West
Alego

Udenda Kaugagi

Works

Roads

Gravelling And Culverting Of Sirombi Rd

2,000,000

Alego Usonga

West
Alego

Uradi

Works

Roads

Gravelling Of Otuoma Uradi Rd

1,800,000

Alego Usonga

West
Alego

Uradi

Works

Roads

Maintenance Of Opar Kodinga Rd

1,800,000

Alego Usonga

West
Alego

Hawinga Kaugagi

Works

Roads

Maintenance Of Odianga Sirinde Rd

2,000,000

Alego Usonga

West
Alego

Mahola Ulawe

Works

Roads

Maintenance Of Karadier-Mahola-AremoNyawita Rd

2,000,000

Alego Usonga

West
Alego

Kodiere Uradi

Works

Roads

Kodiere-Nyasita-Sudhe Rd

1,800,000

Bondo

Central
Sakwa

Works

Roads

Opening,Grading,Culverting&Gravelling Of
Warianda Pri-Serawongo Pri Road

3,000,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
1,900,000

Total
Estimates
1,900,000
2,000,000
1,200,000
1,000,000
1,000,000
2,000,000
1,800,000
1,800,000
2,000,000
1,800,000
1,800,000
2,000,000
2,000,000
1,800,000
3,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 207

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

Sub Location

Sector

Function

Proposed Project

Central
Sakwa

Works

Roads

Opening,Grading,Culverting&Gravelling Of
Uyawi-Nyaserere-Liunda Road

Bondo

Central
Sakwa

Works

Roads

Opening, Grading ,Culverting And Murraming


Of Albert Ouko Road

Bondo

West
Sakwa

Works

Roads

Maintenance Of Maranda-Oseno Road

Bondo

West
Sakwa

Works

Roads

Opening, Grading And Murraming Of NdhereNg'iya-Alara Road

Bondo

West
Sakwa

Works

Roads

Maintenance Of Agwara-Riwa Road

Bondo

West
Sakwa

Works

Roads

Opening, Grading ,Culverting And Murraming


Of Ochuoga-Wath Guya Road

2,000,000

Bondo

West
Sakwa

Works

Roads

Maintenance Of Uloma-Milenga Road

1,700,000

Bondo

West
Sakwa

Works

Roads

Maintenance Of Milenga-Masita Road.

700,000

Bondo

Yimbo
West

Works

Roads

Completion Of Mageta Ring - Road

Bondo

Yimbo
West

Works

Roads

Opening, Grading And Murraming Of KokuneKomolo-Ataro Road

Bondo

Yimbo
West

Works

Roads

Opening, Grading And Gravelling Of UsengeKomenya-Uhanya Road

4,000,000

Bondo

Yimbo
West

Works

Roads

Maintenance Of Osieko-Nyayo-Honge Road

2,000,000

Bondo

Yimbo
West

Works

Roads

Maintenance Of Uhwaya-Ulowa Mkt Road

2,000,000

Bondo

Yimbo
West

Works

Roads

Completion Of Usenge Beach Jetty

1,500,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Got-Osimbo Samuga Road

1,800,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17
3,000,000
3,000,000
700,000
3,000,000
700,000

3,000,000

Total
Estimates
3,000,000

3110499

700,000

3110499

2,000,000

3110499

1,700,000

3110499

700,000

3110499

3,000,000
-

1,500,000
1,800,000

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of Roads-

3110499

3,000,000

2,000,000

3110499

3110499

700,000

2,000,000

Description

3110499

3,000,000

4,000,000

Code

3110499
3110499
3110499
3110499
3110599
3110499

Page 208

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugunja

Sub Location

Sector

Function

Proposed Project

Sigomre

Works

Roads

Maintenance Of Ninga Hawagaya

1,500,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Ugana Opata Road

1,200,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Madungu Luoka Road

2,000,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Sigomre-Sofia Road

2,000,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Sigomre-Asango Road

3,000,000

Ugunja

Sigomre

Works

Roads

Opening, Grading And Culverting Of UludheMungao-Hawagaya Road

2,000,000

Ugunja

Sigomre

Works

Roads

Construction Of Bridge Along Nyaranga Uloma


Road

2,000,000

Ugunja

Sigomre

Works

Roads

Maintenance Of Ngop Ukalama Road

1,500,000

Bondo

Yimbo
East

Works

Roads

Opening Of Bondo Kwach-Yala Road And


Bondo Kwach Market Ring Road

1,500,000

Bondo

Yimbo
East

Works

Roads

Opening And Grading Of Kasau-Achaye-RachOdhuro Road

1,500,000

Alego Usonga

Siaya
Township

Nyandiwa

Works

Roads

Openning Ofk.I.E -Simit-Kokech-KondigoBondo Road

1,800,000

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Prison -Odiedo-Pundo Road

1,400,000

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Agenya-Rabango-Wadhbar-Ramba Road

1,000,000

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Holly Cross-Uloma-Ugenge Road

1,000,000

Ugenya

West
Ugenya

Works

Roads

Opening And Grading Of Koruda-Bar Anyali


Road

1,500,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

Total
Estimates
1,500,000
1,200,000
2,000,000
2,000,000
3,000,000
2,000,000
2,000,000
1,500,000
1,500,000
1,500,000
1,800,000
1,400,000
1,000,000
1,000,000
1,500,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 209

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Ugenya

West
Ugenya

Karadolo East

Works

Roads

Opening And Grading Of Obet-Mauna Road

1,500,000

Ugenya

West
Ugenya

Karadolo West

Works

Roads

Opening And Grading Of Otit-Gaula Ukwala


Road

1,000,000

Ugenya

West
Ugenya

Nyalenya

Works

Roads

Opening And Grading Of Oguta Road

1,500,000

Ugenya

West
Ugenya

Uyundo

Works

Roads

Opening And Grading Of Wadenya Wath


Alwang'a Road

2,000,000

Ugenya

West
Ugenya

Uyundo

Works

Roads

Opening And Grading Of Murumba - Yath


Rateng Road

2,000,000

Ugenya

West
Ugenya

Ndenga

Works

Roads

Opening And Grading Of Uriya - Odima Road

2,000,000

Ugenya

West
Ugenya

Ndenga

Works

Roads

Opening And Grading Of Kobol - Kombonya


Road

2,000,000

Ugenya

West
Ugenya

Masat West

Works

Roads

Opening And Grading Of Kagweno - Olang


Road

2,000,000

Ugenya

West
Ugenya

Masat East

Works

Roads

Opening And Grading Of Koloch - Bonde Road

1,500,000

Ugenya

Ukwala

Siranga

Works

Roads

Opening,Grading And Culverting Of Wang'neno


Kamrembo- Simur Road

1,913,290

Ugenya

Ukwala

Simur

Works

Roads

Opening, Grading And Culverting Of Siranga


Center- Ober Wagogni Road

1,300,000

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Light Grading And Culverting Of AjukaLuhano Road

1,600,000

Ugenya

Ukwala

Simur East

Works

Roads

Opening, Grading And Culverting Of KayoreKademba Road

2,000,000

Ugenya

Ukwala

Simur East

Works

Roads

Opening, Grading And Culverting Of KayoreOnyango- Owila Road

1,700,000

Ugenya

Ukwala

Doho East

Works

Roads

Light Grading And Culverting Of UkwalAgwanda Road

1,600,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

Total
Estimates
1,500,000
1,000,000
1,500,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
1,500,000
1,913,290
1,300,000
1,600,000
2,000,000
1,700,000
1,600,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 210

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Ugenya

Ukwala

Doho East

Works

Roads

Grading And Culverting Of Awendo- Doho


Primary Road

1,200,000

Ugenya

Ukwala

Doho West

Works

Roads

Light Grading And Culverting Of Kamasingo


Road

1,500,000

Ugenya

North
Ugenya

Nyamsenda

Works

Roads

Opening And Grading Of Safu-Mugoma Road

800,000

Ugenya

North
Ugenya

Nyamsenda

Works

Roads

Opening And Grading Of Mahanga-Nyanyien


Road

900,000

Ugenya

North
Ugenya

Jera

Works

Roads

Opening, Grading Of Ralak Uhola Uhuamba


Road

1,400,000

Ugenya

North
Ugenya

Jera

Works

Roads

Opening, Grading Of Omito- Mauna PrimaryJera Market Road

1,700,000

Ugenya

North
Ugenya

Nyamsenda

Works

Roads

Murraming And Culverting Of Nyamsenda


Akuoyo Road

1,600,000

Ugenya

North
Ugenya

Kagonya

Works

Roads

Opening And Grading Of Ack LugingoAlwangni Odiado Road

1,456,900

Ugenya

North
Ugenya

Kagonya

Works

Roads

Opening And Grading Of Wedewo Kolwanda


Kakeya Road

1,000,000

Ugenya

North
Ugenya

Kagonya

Works

Roads

Opening, Grading Kamabla-Kobala Road

1,000,000

Ugenya

North
Ugenya

Sega

Works

Roads

Opening And Grading Of Odipo Ligose Road

Ugenya

North
Ugenya

Sega

Works

Roads

Opening, Grading And Murraming Of Sega


Alwala- Lifunga Road

1,500,000

Ugenya

North
Ugenya

Sega

Works

Roads

Maintenance, Culverting And Muramming Of


Ugambe Ogero Road

1,200,000

Ugenya

North
Ugenya

Jera

Works

Roads

Openning And Grading Of Udira Lela Road

2,100,000

Ugenya

East
Ugenya

Works

Roads

Construction Of Bridge On Nyalenda-OhagreMahui Road

8,000,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

900,000

Total
Estimates
1,200,000
1,500,000
800,000
900,000
1,400,000
1,700,000
1,600,000
1,456,900
1,000,000
1,000,000
900,000
1,500,000
1,200,000
2,100,000
8,000,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 211

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugenya

Sub Location

Sector

Function

Proposed Project

East
Ugenya

Works

Roads

Construction Of Bridge On Konya-Luthehe


Road

7,000,000

Ugenya

East
Ugenya

Works

Roads

Gravelling Of Ujwanga-Kowinga-Ligega Road

2,000,000

Gem

Yala
Township

Works

Roads

Maintainance Of Yala-D.O-Owino Ger-Railway


Crossing Road

Executive

Executive

Executive

Works

Works

Completion Of Government Buildings

Alego Usonga

Central
Alego

Obambo

Works

Roads

Opening ,Grading Culverting And Complete


Gravelling Of Got Aloo-Obambo Health Centre

1,000,000

Bondo

Central
Sakwa

Works

Roads

4,000,000

Bondo

Central
Sakwa

Works

Roads

Maintainance Of Wagusu Market-Yamo OlokoLiunda Sirongo-Warianda-Odongo Mangako


Road
Maintainance Of Kongao-Maresa Road

Bondo

Central
Sakwa

Works

Roads

Maintainance Of Kongao-Olago Beach Road

2,000,000

Rarieda

North
Uyoma

Works

Roads

Grading And Muramming Of Kogado-Kolo


Beach Road

1,000,000

Rarieda

West
Uyoma

Works

Roads

Muramming And Culverting Of OsindoKahoya-Tanga Road

Rarieda

West
Uyoma

Works

Roads

Muramming And Culverting Of MisoriMahanya-Wambisa Road

2,077,240

Rarieda

West
Uyoma

Works

Roads

Muramming And Culverting Of KowanoKaseda-Madiany Road

2,000,000

Rarieda

West
Uyoma

Works

Roads

Openning And Grading Kogonya-YawoKowenje-Gagra Church Road

Rarieda

West

Works

Roads

Muramming And Culverting Of Gagra-

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

Estimates
2016/17

500,000
21,000,000

2,000,000

Total
Estimates

Code
3110499

7,000,000

3110499

2,000,000

3110499

500,000

3110202

21,000,000

3110499

1,000,000

3110499

4,000,000

3110499

2,000,000

3110499

2,000,000

3110499

1,000,000
-

3110499

2,077,240

3110499

2,000,000
-

2,000,000

3110499

3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
NonResidential
Buildings
(Offices,
Schools,
Hospitals,
Etc)
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 212

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Uyoma

Proposed Project
Kakumba-Ojawa Road

B/F 2015/2016

Estimates
2016/17

Rarieda

West
Uyoma

Works

Roads

Muramming And Culverting Likungu-KadaudiKanyambuoro-Kona Kagowi Road

Rarieda

West
Uyoma

Works

Roads

Muramming And Culverting Osindo-ChuodhoKahoya Tanga Road Road

Rarieda

East
Asembo

Works

Roads

Maintenace And Culverting Of Number


Kandaria Katombo Road

1,500,000

Rarieda

East
Asembo

Works

Roads

Maitenance Of Kamito- Akado-Ralayo Road

1,000,000

Rarieda

East
Asembo

Works

Roads

Opening Kandhere-Akado Road

2,400,000

Rarieda

East
Asembo

Works

Roads

Maintenance Of Opapla Pap Oterre Road

1,700,000

Rarieda

East
Asembo

Works

Roads

Maintenance Of Ongielo-Koloo Ombok-Kamito


Oterre Road

Gem

North
Gem

Works

Roads

Openning And Grading Of Mutumbu-SiduriUmina Road

1,000,000

Gem

North
Gem

Works

Roads

Openning And Grading Of Kisendo Road

1,000,000

Gem

North
Gem

Works

Roads

Openning And Grading Of Malanga-Sirunga


Road

1,000,000

Bondo

North
Sakwa

Works

Roads

Grading, Gravelling And Culverting Of Ka


Elija-Komoso- Kogola Ototo Road

1,000,000

Alego Usonga

North
Alego

Works

Roads

Opening And Grading Of Koyogo-NywinjeNina Road

1,000,000

Bondo

West
Sakwa

Works

Roads

Opening Of Rozala-Obedi Road.

3,000,000

Bondo

West
Sakwa

Works

Roads

Maintenance Of Kapiyo-Komungu Road.

700,000

Bondo

West

Works

Roads

Maintenance Of Ochola-Sinyanya Road.

700,000

Ulafu

PROGRAMME BASED BUDGET JUNE 2016

2,000,000

Total
Estimates
2,000,000

Code
3110499

2,000,000
-

900,000

1,500,000
1,000,000
2,400,000
1,700,000
900,000
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
3,000,000
700,000

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 213

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Sakwa

B/F 2015/2016

Estimates
2016/17

Bondo

West
Sakwa

Works

Roads

Maintenance Of Kagola-Magawa Road.

800,000

Bondo

West
Sakwa

Works

Roads

Maintenance Of Nyamira-Ugadhi-Kambajo
Road.

700,000

Bondo

West
Sakwa

Works

Roads

Maintenance Of Nyamira-Uloma-Nyawita Road.

700,000

Bondo

West
Sakwa

Works

Roads

Opening And Grading Of Kokune-Omolo-Ataro


Road.

1,600,000

Rarieda

South
Uyoma

Works

Roads

Opening,Grading And Gravelling Of KogambiManga Road

1,200,000

Rarieda

South
Uyoma

Works

Roads

Opening,Grading And Gravelling Of KanyiriKowino Road

1,200,000

Gem

South
Gem

Works

Roads

Maintenance Of Nyamkiri-Kambare Road

300,000

Gem

South
Gem

Works

Roads

Maintenance Of Kambare-Aluor Road

200,000

Gem

South
Gem

Works

Roads

Maintenance Of Ndiru-Rera Road

250,000

Gem

South
Gem

Works

Roads

Maintenance Of Wambusa-Ndori Road

350,000

Gem

South
Gem

Works

Roads

Maintenance Of Wambusa-Ojwaya Road

400,000

Gem

South
Gem

Works

Roads

Opening Of Wang Bith Primary School Road

1,200,000

Gem

South
Gem

Works

Roads

Maintenance Of Malele-Knyadet-Omoth Road

1,000,000

Gem

South
Gem

Works

Roads

Maintenance Of Onyinyore-Powo-OgeroOranya Road

500,000

Gem

South

Works

Roads

Maintenance Of Oseno Primary-Akala-Kisumu

800,000

PROGRAMME BASED BUDGET JUNE 2016

Total
Estimates
700,000
800,000
700,000
700,000
1,600,000
1,200,000
1,200,000
300,000
200,000
250,000
350,000
400,000
1,200,000
1,000,000
500,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 214

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Gem
Gem

Yala
Township

Executive

Executive

Executive

Proposed Project
County Road

B/F 2015/2016

Estimates
2016/17

Works

Roads

Murruming Of Marenyo-Ngut-Mbaka Road

Executive

Works

Fire
Fighting

Equipping Fire Fighting Unit (Purchase Of Fire


Engine)

114,539,915

Executive

Executive

Works

Roads

Openning ,Grading And Gravelling Of MaleleNyagwela Road (1.8km)

2,662,478

Executive

Executive

Executive

Works

Roads

Grading And Gravelling Of Oganga Road


(4.4km) In Central Alego

7,996,182

Executive

Executive

Executive

Works

Roads

Grading And Gravelling Of Ndere-Nyadhi Road


(4.0km) In Central Alego

6,353,076

Executive

Executive

Executive

Works

Roads

Openning, Grading And Gravelling Of OsoroYwaya Road (2.1km) In Central Alego

5,146,201

Executive

Executive

Executive

Works

Roads

Opening ,Grading And Culverting Of Oganga


Road (13.7km) In West Alego/Usonga

12,356,950

Executive

Executive

Executive

Works

Roads

Opening,Grading And Gravelling Of DibuoroBuhowa (2.4km) In Usonga

4,953,803

Executive

Executive

Executive

Works

Roads

Grading And Gravelling Of OceanicBenga(4.3km) In Usonga

6,184,746

Executive

Executive

Executive

Works

Roads

Opening,Grading And Culverting Of Siaya


Town Road (2.9km) In Siaya Township

5,171,396

Executive

Executive

Executive

Works

Roads

3,447,056

Executive

Executive

Executive

Works

Roads

Opening, Grading And Gravelling Of


Harambee-Kamalunga-Nyadorera Quarry (2km)
In Usonga
Opening, Grading And Culverting Of AriyoAnyanga Road (3.2km) In West Ugenya

Executive

Executive

Executive

Works

Roads

Opening, Grading And Culverting Of Abele


Road (1.8km) In West Ugenya

3,545,876

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of


Magombe-Masat-Bonde Road (5.4km) In West

7,797,534

PROGRAMME BASED BUDGET JUNE 2016

400,000

4,849,157

Total
Estimates
800,000
400,000
114,539,915

2,662,478
7,996,182
6,353,076
5,146,201
12,356,950
4,953,803
6,184,746
5,171,396
3,447,056
4,849,157
3,545,876
7,797,534

Code
3110499
3111106

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Purchase Of
Firefighting
Vehicles
And
Equipment
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 215

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Executive

Executive

Executive

Works

Roads

Ugenya
Proposed Grading And Gravelling Of Millo
Road (3km) In West Ugenya

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of Kodienya


Road (2.3km) Inwest Ugenya

4,536,129

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of MasatUhumwa-Ratado (2.6km) In West Ugenya

4,511,260

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of SifuyoMilambo Dam Road (2.1km) In West Ugenya

3,212,879

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of MilamboObet Road (2.0km) In West Ugenya

3,588,112

Executive

Executive

Executive

Works

Roads

Proposed Grading And Gravelling Of RatadoUkolo Road (1.7km) In West Ugenya

3,356,084

Executive

Executive

Executive

Works

Roads

Opening ,Grading And Gravelling Of Karapul


Road (0.5km) In Siaya Township

501,120

Ugenya

North
Ugenya

Ligala

Works

Roads

Komuok Koga Road

700,000

Ugenya

West
Ugenya

Karadolo East

Works

Roads

Opening And Grading Of Karanja-Nyayombe


Road

1,000,000

Rarieda

West
Uyoma
West
Asembo
Central
Alego

Works

Roads

1,074,778

Siger

Works

Roads

Kadenge

Works

Roads

Grading And Gravelling Of Nyagwara-KonaKogowi Road


Murraming And Culverting Of Lwak-KachiengKotenga Road
Gravelling And Culverting Of Pap Kokune-Pap
Alara Road

Rarieda
Alego Usonga

B/F 2015/2016

Estimates
2016/17
6,224,966

2,300,000
1,700,000

Rarieda

North
Uyoma

Works

Roads

Grading, Gravelling And Culverting Of


Chianda-Osewre-Arongo Beach Road

1,000,000

Rarieda

South
Uyoma

Works

Roads

Grading And Gravelling Of Ndigwa-Buru Road

1,928,571

Alego Usonga

Siaya
Township

Works

Roads

Grading And Gravelling Of Vila-Selis-Rotary


Rao

1,965,080

Alego Usonga

Central

Works

Roads

Cheifs Camp-Obambo Dispensary Access Road

Karapul

PROGRAMME BASED BUDGET JUNE 2016

1,201,485

Total
Estimates
6,224,966
4,536,129
4,511,260
3,212,879
3,588,112
3,356,084
501,120
700,000
1,000,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

1,074,778
2,300,000
1,700,000
1,000,000
1,928,571
1,965,080

3110499
3110499
3110499
3110499
3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 216

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Alego
Alego Usonga

Central
Alego

Kadenge

Works

Roads

Opening, Grading, Culverting And Gravelling


Of Kokune/Pap Kalara Road:

2,600,000

Alego Usonga

Central
Alego

Obambo/Ojwando
A

Works

Roads

Opening, Grading, Culverting And Gravelling


Of Ndai/Kanyaboli/Kubar Road:

500,000

Alego Usonga

Central
Alego

Obambo/Ojwando
A

Works

Roads

Opening, Grading, Culverting And Gravelling


Of Bar-Olengo/Kadhugu/Nyalula Road:

111,479

Gem

Central
Gem

Works

Roads

8,358,592

Gem

Central
Gem

Works

Roads

Construction Of A Box Culvert And Sirimba


And Part And Maintenance Of Olengo Migosi
Road And Sipoklo -Olengo Road
Routine Maintenance Of Karariw-Kabaridi Olando Road

Gem

Central
Gem

Works

Roads

Routine Maintenance Of Gongo- Nango Road

1,370,000

Gem

Central
Gem

Works

Roads

Routine Maintenance Of Nyandiwa-Uyuwe


Road

1,194,434

Gem

Central
Gem

Works

Roads

Routine Maintenance And Spot Murruming Of


Lela - Kojuok/ Wagai-Lela Road

603,301

Gem

Central
Gem

Works

Roads

Routine Maintenance And Spot Murruming Of


Gongo-Luri Road

623,438

Bondo

Central
Sakwa

Works

Roads

Culverting & Murruming Of Yamoloko-LiundaKajohn Road

2,800,000

Bondo

Central
Sakwa

Works

Roads

Opening, Grading And Murruming Of OdongoMangako- Albert Ouko Road

395,071

Bondo

Central
Sakwa

Works

Roads

Allocation For Road Repairs

Bondo

Central
Sakwa

Works

Roads

Grading Of Kongawo-Kongombe-Maresa Road

26,962

Bondo

Central
Sakwa

Works

Roads

Construction Of Sifu Beach-Sifu Primary School


Road

1,470

Bondo

Central

Works

Street

Installation Of Solar Lights At Sirongo Beach,

Nyango'ma

Nyangoma
Nyango'ma

PROGRAMME BASED BUDGET JUNE 2016

1,244,296

1,500,000

2,800,000

Estimates
2016/17

Total
Estimates
1,201,485
2,600,000
500,000
111,479
8,358,592
1,244,296
1,370,000
1,194,434
603,301
623,438
2,800,000
395,071
1,500,000
26,962
1,470

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110599

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other

Page 217

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Sakwa

Function

Proposed Project

Lighting

Yamo Oloko, Uyawi, Liunda, Banga, Oyamo


Dispensary

B/F 2015/2016

Rarieda

East
Asembo

Omia Diere

Works

Roads

Opening Of Okiro Aduoyo Road

Rarieda

East
Asembo

North Ramba

Works

Roads

Grading Of Ndori-Kadome-Kusa Road

713,101

Rarieda

East
Asembo

Works

Roads

Number Kandaria-Oseno Road

850,360

Gem

East Gem

Lihanda

Works

Roads

Opening, Grading And Murraming Of Ulagai


Ramogi Maungo Road

372,208

Gem

East Gem

Uranga

Works

Roads

Opening And Grading Of Uranga Boarder


Rabuor Road

644,327

Gem

East Gem

Ramula

Works

Roads

Opening, Grading And Murraming Of Kongili


Kochondo Awach Road

145,708

Gem

East Gem

Works

Roads

Construction Of 5 Drifts Drifts Across The


Ward

4,344,724

Gem

East Gem

Works

Roads

2,273,501

Gem

East Gem

Works

Roads

Grading And Murraming Of Ramula-Nyangulu


Road, Puche-Uranga Road, Sinaga-Omindo
Road, Sagam-Mbinga Road, Ramula-Uranga
Road
Ramula - Onyoso Road

Gem

East Gem

Across The Ward

Works

Street
Lighting

Purchase And Installation Of Solar Light

2,000,000

Ugenya

East
Ugenya

Kathieno C

Works

Roads

Construction Of A Drift Bridge At Rakite Along


Umer Yogo Road

660,422

Ugenya

East
Ugenya

Kathieno C

Works

Roads

Murraming The 4 Roads Opened Vide 2013/14


Budget

400,000

Bondo

Yimbo
East

Got Ramogi

Works

Roads

Opening, Grading And Murraming Of


Rangombe Unyejra Alinga Road

2,000,000

Bondo

Yimbo

Bar Kanyango

Works

Roads

Opening, Grading And Murraming Of

1,500,000

PROGRAMME BASED BUDGET JUNE 2016

1,000,000

118,923

Estimates
2016/17

Total
Estimates
2,800,000
1,000,000
713,101
850,360
372,208
644,327
145,708
4,344,724
2,273,501
118,923
2,000,000
660,422
400,000
2,000,000

Code

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110599
3110499
3110499
3110499
3110499

Description
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 218

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

East

Proposed Project

B/F 2015/2016

Angwenyo Muguna Kowinyo Ttc Road

Bondo

Yimbo
East

Pala & Othach

Works

Roads

Opening, Grading And Murraming Of Kajaoko


Komungu Ogare Ulongi Othach
Koliech Road
Opening, Grading And Murraming Of Uwamba,
Nyangera Uwaria Beach Road

2,500,000

Bondo

Yimbo
East

Usigu

Works

Roads

Bondo

Yimbo
East

Works

Roads

Murruming Wath Kopondo-Kanyagol-Got


Ramogi Resort

5,000,000

Bondo

Yimbo
East

Works

Roads

Nyamonye-Uhanya-Aduwa Road

Bondo

Yimbo
East

Works

Street
Lighting

Installation Of 10 Solar Lights

Executive

Executive

Works

Roads

Routine Maintenance Of Orinda Road (1.5km)

Executive

Executive

Works

Roads

Grading & Murraming Kakuom Road

Executive

Executive

Works

Roads

Airstrip-Lwanda Stream (2.8km)

Executive

Executive

Works

Roads

Grading, Murruming & Culverting Of Malanga


- Matera Road

Executive

Executive

Works

Roads

Nyajuok Abindu Road

117,435

Executive

Executive

Works

Roads

Gama Junction-E1166 (0.7km)

136,538

Executive

Executive

Works

Roads

Gravelling Of Kalenjuok - Lwala Kaor Road

Executive

Executive

Works

Roads

Grading Murruming And Culverting Of Siaya


Town Roads

Executive

Executive

Works

Roads

Opening & Grading Of Siaya Sda Access Road


(1.5km)

All

PROGRAMME BASED BUDGET JUNE 2016

1,800,000

732,559
2,000,000
860,325
47,584
534,422
2,050,216

3,110
316,516
209

Estimates
2016/17

Total
Estimates
1,500,000
2,500,000
1,800,000
5,000,000
732,559
2,000,000
860,325
47,584
534,422
2,050,216
117,435
136,538
3,110
316,516
209

Code
3110499
3110499
3110499
3110499
3110599
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Page 219

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Executive

Sub Location

Sector

Function

Proposed Project

Executive

Works

Roads

Opening & Grading Of Madede Usenge Road

178,077

Executive

Executive

Works

Roads

Improvement Of Siaya Bus Park (Drainage &


Surface Improvements)

189,225

Executive

Executive

Works

Roads

Kagoya-Lunyu Road (1.5km)

570,830

Executive

Executive

Works

Roads

Uyingi-Nina Road (1km)

Executive

Executive

Works

Roads

Opoda-Kenya Power-D264 Jnc-UniversityMigingo Sinapanga (6.3km)

Executive

Executive

Works

Roads

Grading Spot Gravelling & Culverting Of Guba


- Matangwe Road

3,562,176

Executive

Executive

Works

Roads

Grading, Gravelling & Culverting Of Nyawita Manyonge Road

646,098

Executive

Executive

Works

Roads

Kopolo-Magak Pri.Sch. Road (300m)

412,365

Executive

Executive

Works

Roads

Siala-Myemwang Pri. Sch. Road (400m)

589,334

Executive

Executive

Works

Roads

Ouya Dispensary Road (200m)

301,864

Executive

Executive

Works

Roads

Garage-Kanyagwara Road (1km)

1,280,150

Executive

Executive

Works

Roads

Completion Of Materials Laboratory

1,569,529

Executive

Executive

Works

Roads

Rehabilitation Of Worksyard Shed

Executive

Executive

Works

Roads

Nyarodi-Ober-Dienya Road

3,120,850

Executive

Executive

Works

Roads

Routine Maintenance Of Ayora - SinambaOpal-Suludhi Road(3km)

1,926,644

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

7,266
250,984

948,720

Estimates
2016/17

Total
Estimates
178,077
189,225
570,830
7,266
250,984
3,562,176
646,098
412,365
589,334
301,864
1,280,150
1,569,529
948,720
3,120,850
1,926,644

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 220

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Executive

Sub Location

Sector

Function

Proposed Project

Executive

Works

Roads

Routine Maintenance Of Yala-Town Hall-St.


Marys Junction Road(1km)

Executive

Executive

Works

Roads

Powo Rariw-Kalem Omuga Road

3,125,300

Executive

Executive

Works

Roads

Aram - Lusi - Ndhere

2,736,650

Executive

Executive

Works

Roads

Migowa - Kolo Road

312,431

Executive

Executive

Works

Roads

Grading & Gravelling & Culverting Of


Kodawa- Tiengo Road

528,486

Executive

Executive

Works

Roads

Ukwala-Gudu Road

Executive

Executive

Works

Roads

Works

Street
Lighting

Opening & Grading Of Ngunya - Ugoso Ambira Road


Solar Street Lighting

B/F 2015/2016
630,550

2,011,629
3,440,675
18,641,155

Executive
Executive

Executive
Executive

Works

Roads

Electrical Installations At The Governor's Office


Compound

Executive

Executive

Works

Roads

Routine Maintenance Of Karemo - Uhuru Road


(2km)

Executive

Executive

Works

Roads

Ugunja Market Stalls

3,500,000

Executive

Executive

Works

Roads

Routine Maintenance Of Chianda - Ager Road (


1km)

1,600,000

Executive

Executive

Works

Roads

Routine Maintenance Of Oganga Road (1km)

34,734

Executive

Executive

Works

Roads

Routine Maintenance Of Osieko Junction Honge Road (2km)

15,633

Executive

Executive

Works

Roads

Opening And Grading Of Gombe - Airstrip


Road

3,184,641

PROGRAMME BASED BUDGET JUNE 2016

1,932,540
215,377

Estimates
2016/17

Total
Estimates
630,550
3,125,300
2,736,650
312,431
528,486
2,011,629
3,440,675
18,641,155
1,932,540
215,377
3,500,000
1,600,000
34,734
15,633
3,184,641

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

3110499
3110499
3110499
3110499
3110499
3110499
3110599
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Page 221

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Executive

Sub Location

Sector

Function

Proposed Project

Executive

Works

Roads

Routine Maintenance Of Anyuongi - Wangarot


Road In East Asembo Ward (9.8km)

410,024

Alego Usonga

North
Alego

Works

Roads

Nyalgunga-Ralwala Kaluo Dispensary Road

441,137

Gem

North
Gem

Got Regea

Works

Roads

Construction Of Bridge At Chibiri Along


Mutumbu Regea Road

1,000,000

Gem

North
Gem

Sirembe

Works

Roads

Murraming Sirembe-Sirodha Gogo Road

1,000,000

Gem

North
Gem

Malanga

Works

Roads

Grading, Murraming, - Malanga-Fuluga Road

936,797

Bondo

North
Sakwa

Works

Roads

Additional Funding For Spot Murruming And


Culverting Of Kolweru - Kamito Kipasi Road

23,200

Bondo

North
Sakwa

Works

Roads

Opening And Culverting Of Bar-MwofuKotwago-Kawoi Kawuor-Otiato Road

Ugenya

North
Ugenya

Nyamsenda

Works

Roads

Construction Of Akuoyo -Ligala Roads

2,500,000

Ugenya

North
Ugenya

Kagonya

Works

Roads

Construction Of Kadongo-Kagonya Road;

1,820,836

Ugenya

North
Ugenya

Kagonya

Works

Roads

Kagonya -Ndori/Ukaka Road

2,000,000

Ugenya

North
Ugenya

Jera

Works

Roads

Construction Of Bridge Along Jera-Lela Road


At Usula.

2,026,006

Ugenya

North
Ugenya

Sega

Works

Roads

Opening Ugambe-Ogero Road

Rarieda

North
Uyoma

Works

Roads

Opening And Formation Of Ukunja-Kayundi


Road

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Rehabilitation Of Road Network: Jabalo


Agage Dondi Road

286,375

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Rehabilitation Of Road Network: Wathbar


Opiyo Agenya Ramba Market Road

626,273

Bar Kowino East

Ragengni/Ochienga

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

718,002

520,700
2,604,129

Estimates
2016/17

Total
Estimates
410,024
441,137
1,000,000
1,000,000
936,797
23,200
718,002
2,500,000
1,820,836
2,000,000
2,026,006
520,700
2,604,129
286,375
626,273

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 222

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

Alego Usonga

Siaya
Township

Nyandiwa

Works

Roads

Rehabilitation Of Road Network: Anduro


Nyawanga Oking Nyausi Road

1,520,000

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Rehabilitation Of Road Network: Ugenge


Sandhof Road

1,520,000

Alego Usonga

Siaya
Township

Karapul

Works

Roads

Rehabilitation Of Road Network: Christian


Agoro Lieye Road

60,871

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Rehabilitation Of Road Network: Nyandiwa


Yawo Kosino Lwala Kaor Boro Road

161,496

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Rehabilitation Of Road Network: Mulaha


Dispensary Olalae Lwala Koudia Pap
Kakan Boro Road
Karapul-Sandhof-Ndere Road

1,458,192

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Chase Albert- Nyakongo Road

1,600,000

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Achola -Christian-Sellis Road

101,922

Alego Usonga

Siaya
Township

Mulaha

Works

Roads

Ombwede-Uyawa-Koware Road

321,328

Alego Usonga

Siaya
Township

Works

Roads

Uhongo - Achage Road 2014/2015

Alego Usonga

Siaya
Township

Works

Roads

Ugunja

Sidindi

Works

Street
Lighting

Construction Of Boro Junction-Rae Road,


Kamfuas-Akite-Achage Road, Christian Bridge
School-Prison Road, Belagon-Pandi-Lower
Rabango-Wadh Bar Junction-Chase Albert
Road, Naman Akumu Primary Ring RoadNyandiwa Primary Road. Rabango-Ramba
Market Road, Chief Camp-Omollo Road,
Nyandiwa-Agwambo Road
Street Lighting In Sidindi, Simenya, Sikhalame,
Wang Tong And Rangala Markets

Ugunja

Sidindi

Works

Roads

PROGRAMME BASED BUDGET JUNE 2016

Opening And Grading Of Mudhiero-OkwakoUlohowe Road

B/F 2015/2016

1,520,000

1,520,000
147,761

3,000,000
527,702

Estimates
2016/17

Total
Estimates
1,520,000
1,520,000
60,871
161,496
1,520,000
1,458,192
1,600,000
101,922
321,328
1,520,000
147,761

3,000,000
527,702

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

3110599
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Other
Infrastructure
And Civil
Works
Construction
Of Roads-

Page 223

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Ugunja

Sector

Function

Proposed Project

Sidindi

Works

Roads

Construction Of Sukuta Bridge

Ugunja

Sidindi

Works

Roads

Murumba-Sidondo-Sikhalame-Sikuta-Luanda

3,548,112

Ugunja

Sigomre

Works

Roads

Grading And Opening Of Kavera JunctionLukongo Primary-Oolre-Sigomere Road

1,021,625

Ugunja

Sigomre

Works

Roads

Grading And Opening Of Muhuyu-Ukalama


Road

Ugunja

Sigomre

Works

Roads

Madungu - Ligala - Ngop Road

Alego Usonga

South
East
Alego
South
East
Alego
South
Gem

Mur Ngiya

Works

Roads

Construction Of Culvert Along Nyala-NgiyaNdori Rd Junction

300,000

Masumbi

Works

Roads

Construction Of Nyarod-Wangapala-Akech
Road

799,690

Kaudha West

Works

Roads

Maintenance Oflidha Road (Kaudha/Kagor)

1,000,000

Gem

South
Gem

Ndori

Works

Roads

3,800,000

Gem

South
Gem

Onyinyore

Works

Roads

Maintenance Of Akala Urban Town Ring Road


(Malele-Wambusa-Nyaolo, Malele-WambusaNyaolo)
Nyalunya-Okuto-Malele
Akala-Riat-Anchor Site (Ciss) Oseno
Maintenance Of Powo Road (Onyinyore-PowoOgero-Oranya)

Gem

South
Gem

Works

Roads

Malele-Kanyadet Road

Bondo

South
Sakwa

West Migwena

Works

Roads

Opening And Grading And Murraming Of Olulo


Okeya Road.

3,000,000

Bondo

South
Sakwa

West Migwena

Works

Roads

Wagusu-Bonde-Kajalongo-Magak-Akoko Road

2,000,000

Bondo

South
Sakwa

E. Migwena

Works

Roads

Opening, Grading And Murraming Of Oganya


Kipasi Matangwe Road And Box Culvert At
The Seasonal River Crossing

2,700,000

Alego Usonga
Gem

Sub Location

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
800,253

394,645
1,316,832

1,000,000
784,512

Estimates
2016/17

Total
Estimates
800,253
3,548,112
1,021,625
394,645
1,316,832
300,000
799,690
1,000,000
3,800,000

1,000,000
784,512
3,000,000
2,000,000
2,700,000

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Page 224

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Bondo

South
Sakwa

Bondo

South
Sakwa

Bondo

South
Sakwa

Rarieda

Sub Location

Sector

Function

Proposed Project

Nyaguda

Works

Roads

Murraming And Culverting Of Kodindo


Kabundu Road And Ludhi Wich Lum Road

Nyaguda & Got


Abiero

Works

Roads

Construction Of Ndati Kawenwa Bridge

Nyaguda

Works

Street
Lighting

Provision Of Solar Lights At Wich Lum,


Amoyo, Saga, Kochilo, Nyamagonglo And
Nyamnwa Beach

500,000

South
Uyoma

Ndigwa

Works

Street
Lighting

Installation Of Electricity At Naya Youth


Polytechnic

500,000

Rarieda

South
Uyoma

Ndigwa

Works

Street
Lighting

Installation Of Floodlights At Ndigwa Market

500,000

Rarieda

South
Uyoma

Naya

Works

Street
Lighting

Installation Of Floodlights At Lwanda Market

500,000

Rarieda

South
Uyoma

Naya

Works

Street
Lighting

Installation Of Floodlights At Wi Omino Market

500,000

Rarieda

South
Uyoma

Works

Roads

Murruming Of Kogambi-Manga

1,112,861

Rarieda

South
Uyoma

Works

Roads

Murruming Of Chamakwaro-Rahongo-Kolilo

3,500,000

Ugunja

Ugunja

Works

Street
Lighting

Extension Of Solar Lights To Camunya, Yath


Rateng, Home Ground, Mosque, Nyasanda
Primary And Slaughter

2,000,000

Ugunja

Ugunja

Works

Roads

Opening, Grading And Murruming Of Various


Roads

3,979,342

Ugunja

Ugunja

Works

Street
Lighting

Extension Of Solar Lights To Various Markets

2,000,000

Ugunja

Ugunja

Works

Street
Lighting

Maintenance Of Street Lights

Umala

All Sub Locations

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
129,992
15,466

25,150

Estimates
2016/17

Total
Estimates
129,992
15,466
500,000
500,000
500,000
500,000
500,000
1,112,861
3,500,000
2,000,000
3,979,342
2,000,000
25,150

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure

3110499
3110599
3110599
3110599
3110599
3110599
3110499
3110499
3110599
3110499
3110599
3110599

Page 225

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Ugenya

Ukwala

Works

Roads

Routine Maintenance (Light Grading And


Culverting) Of Ukwala Guolo,

Ugenya

Ukwala

Works

Roads

Light Grading And Culverting Of Ukwala


Kogonda Road

Ugenya

Ukwala

Works

Roads

Light Grading And Culverting Of Owino-OlakUsibi-Kagunya Road

Ugenya

Ukwala

Works

Roads

Koruko Mwala River Bank, Owino Olak


Usidhi Kagunya Roads

1,200,000

Ugenya

Ukwala

Siranga

Works

Roads

Light Grading And Culverting Of Koruko Road


- Mwaha River Bank

1,500,000

Ugenya

Ukwala

Simur

Works

Roads

Light Grading And Culverting Of KogondaKoduoya Foot-Bridge

Ugenya

Ukwala

Works

Roads

7,294,421

Ugenya

Ukwala

Works

Roads

Culverting And Murruming Of Roads Opened In


2013/14 Budget- Lifunga-Bar Awendo Road,
Mathiwa-Ochol Road, Opening And Culverting
Kakumu-Ka Mike-Nzoia River Bank And
Usdiu-Draho Road, Yenga Polytechnic Road,
Ukwala - Uloma - Yenga, Owino OlakKagonya Opening And Grading Road
Light Grading And Culverting Of UkwalaNyamboyo-Doho-Diraho Road

Alego Usonga

Usonga

Works

Roads

Opening, Grading And Murraming Of Nyangera


Market Ecd Road

366,395

Alego Usonga

Usonga

Works

Roads

Murraming And Culverting Of Okudo Road

264,844

Alego Usonga

Usonga

Works

Roads

Murraming And Culverting Of Kahaga Luhwa


Road

Alego Usonga

Usonga

Works

Roads

Murraming And Culverting Of Nyadorera


Uhere Nyambuye Road

446,692

Alego Usonga

Usonga

Works

Roads

Murraming And Culverting Of Nyandheho


Benga Road

248,556

PROGRAMME BASED BUDGET JUNE 2016

500,000
1,000,000
279,617

278,096

58,856

1,100,218

Estimates
2016/17

Total
Estimates
500,000
1,000,000
279,617
1,200,000
1,500,000
278,096
7,294,421

58,856
366,395
264,844
1,100,218
446,692
248,556

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499

3110499
3110499
3110499
3110499
3110499
3110499

Description
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Page 226

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Sub Location

Sector

Function

Proposed Project

Usonga

Works

Roads

Opening, Grading And Murraming Of Maoho Mudao Road

Alego Usonga

Usonga

Works

Roads

Murraming And Culverting Of Mulambo Ulupi - Uwasi Road

Alego Usonga

West
Alego

Works

Roads

Opar Kodinga Nyawita Road

Alego Usonga

West
Alego

Works

Roads

Routine Maintenance And Culverting Of


Otuoma Uradi Road

Rarieda

West
Asembo

Siger

Works

Roads

Opening, Grading And Murraming Of The Road

Rarieda

West
Asembo

Memba

Works

Roads

Opening, Grading And Murraming Of KowitiOkiro-Okenye Road

2,000,000

Rarieda

West
Asembo

Memba

Works

Roads

Construction Of The Bridge At Adhiegra On


Oyude-Miyare Road

1,376,050

Rarieda

West
Asembo

Akom

Works

Roads

Opening, Grading And Murraming Of KayongoBalochi-Yao Kabuyo Road

2,000,000

Rarieda

West
Asembo

Nyagoko

Works

Roads

Opening, Grading And Murraming Of KiswaroOtieng Road

1,000,000

Rarieda

West
Asembo

Mahaya

Works

Street
Lighting

Putting Solar Light At Kapetro Stage

Gem

West
Gem

Malunga East

Works

Roads

Opening Ginga Valley Kodindo Suludhi


Road

Gem

West
Gem

Wagai East

Works

Roads

Opening Wagai Resource Centre St. Jude


Road

980,815

Gem

West
Gem

Dienya East

Works

Roads

Opening Dienya Kaumeri - Alwala Road

1,300,000

Gem

West
Gem

Malunga West

Works

Roads

Opening Bala-Kowiti Road

411,365

Gem

West
Gem

Works

Roads

Suludhi Kobango Culvert

1,000,000

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
2,000,000
235,682
7,999
11,210
230,303

300,000
1,221,222

Estimates
2016/17

Total
Estimates
2,000,000
235,682
7,999
11,210
230,303
2,000,000
1,376,050
2,000,000
1,000,000
300,000
1,221,222
980,815
1,300,000
411,365
1,000,000

Code

Description

3110499

Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110599
3110499
3110499
3110499
3110499
3110499

Page 227

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Gem

West
Gem

Gem

West
Gem

Bondo

West
Sakwa

Bondo

West
Sakwa

Bondo

Sub Location

Sector

Function

Proposed Project

Dienya West

Works

Roads

Orombe-Kothero-Aluala Road

500,000

Malunga West

Works

Roads

Magari-Kamluo-Malunga Road

437,400

Works

Roads

Opening, Grading And Murruming Of MilandoKenya-Nyamira Road

2,300,000

Works

Roads

1,400,000

West
Sakwa

Works

Roads

Maintenance Of Masita- Milenga, KambajoNyamira, Kochola-Sinyanya, Kapiyo-Kamungu


Roads
Magawa Ugambe

Ugenya

West
Ugenya

Works

Street
Lighting

Solar Flood Lights At Ligingo, Obet,


Nyambweke, Kolali And Nyaholo Markets

1,600,000

Ugenya

West
Ugenya

Masat West

Works

Roads

Grading And Murruming Of Bao Mbili - Pap


Olang Road

1,700,000

Ugenya

West
Ugenya

Karadolo West

Works

Roads

Construction Of Udolo Road

1,700,000

Ugenya

West
Ugenya

Works

Roads

Openning And Grading Of Koruda - Wangadia


Road

1,000,000

Ugenya

West
Ugenya

Works

Roads

Openning And Grading Of Manga-Udony Road

467,096

Ugenya

West
Ugenya

Works

Roads

Yath Rater Ogeya Road

1,406,245

Ugenya

West
Ugenya

Works

Roads

Construction Of Pap Olang-Anyali Road

1,000,000

Ugenya

West
Ugenya

Works

Roads

Construction Of Bao Mbili-Anyali Road

723,050

Ugenya

West
Ugenya

Sifuyo West

Works

Roads

Opening Of Roads Heading To Sand Harvesting


Points ( Gendro, Okio And Kodawa)

3,000,000

Ugenya

West

Masat West

Works

Roads

Kodienya Milo Road

1,200,000

Kapiyo

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016

162,188

Estimates
2016/17

Total
Estimates
500,000
437,400
2,300,000
1,400,000
162,188
1,600,000
1,700,000
1,700,000
1,000,000
467,096
1,406,245
1,000,000
723,050
3,000,000

Code
3110499
3110499
3110499
3110499
3110499
3110599
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 228

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Ugenya
Ugenya

West
Ugenya

Ndenga

Works

Roads

Opening And Grading (3km) Of Ndenga


Nyayombe Road

1,500,000

Rarieda

West
Uyoma

Rachar

Works

Roads

Opening, Grading And Murraming Kakumba


Ack -Ojawa Road

2,400,000

Rarieda

West
Uyoma

Rachar

Works

Roads

Opening Dagamoyo Nimba - Kogolo Road

500,000

Rarieda

West
Uyoma

Nyabera

Works

Roads

Opening Kodie Kokone-Migunga-RayolaKasombe-Koucho-Roads & Bridge Construction

2,000,000

Rarieda

West
Uyoma

Nyabera

Works

Roads

Opening Misori Primary Wambisa-Mahanya


Road

1,000,000

Rarieda

West
Uyoma

Kokwiri

Works

Roads

Opening Likungu-Kadaudi-Wagoro-Corner
Kagowi (Tarmac) Road

1,500,000

Rarieda

West
Uyoma

Works

Roads

Opening Of Tanga-Kahoya-Oboke-OsindoChuodho Road

85,868

Bondo

West
Yimbo

Usenge

Works

Roads

Opening And Grading Of Dhogoye Quarry Road

186,800

Bondo

West
Yimbo

Got Agulu

Works

Roads

Opening Of Got Agulu Pundo Road

171,650

Bondo

West
Yimbo

Works

Roads

Uhanya Nyenye Beach

Bondo

West
Yimbo

Works

Roads

Usenge Market Police

Gem

Yala
Township

Works

Roads

Murraming Of Hippo Olando Road

801,397

Gem

Yala
Township

Works

Roads

Kokota, Mutumbu, Bar Ngutu Road

553,092

Gem

Yala
Township

Works

Roads

Yala-Tatro-Anyiko 2 Km Road

429,257

Gem

Yala

Works

Roads

Construction Of Kamusak Rawalo Culvert

200,000

Nyabera/Kokwiri

PROGRAMME BASED BUDGET JUNE 2016

1,432,948
11,811

Estimates
2016/17

Total
Estimates
1,200,000
1,500,000
2,400,000
500,000
2,000,000
1,000,000
1,500,000
85,868
186,800
171,650
1,432,948
11,811
801,397
553,092
429,257

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 229

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Township
Bondo

Central
Sakwa

Works

Street
Lighting

Provision Of Solar Lanterns

Gem

West
Gem

Works

Street
Lighting

Extension Of Powerline To Nguge Polytechnic

Alego Usonga

North
Alego

Nyamila

Works

Roads

Opening Of Dag Liech-Nyaresi Ujimbe 3km


Road

300,000

Alego Usonga

North
Alego

Komolo

Works

Roads

Opening Of Karuben-Kaot Road 4km

200,000

Alego Usonga

North
Alego

Works

Roads

Umala-Mtembe-Kanuke Road

700,000

Alego Usonga

North
Alego

Works

Roads

Lunga-Pundo-Mbaga Center

500,000

Alego Usonga

West
Alego

Works

Roads

Opening,Grading And Culverting Of Sirombi


Road

101,632

Alego Usonga

West
Alego

Works

Roads

Construction Of Sidok-Ujwanga-Uhuyi Road

780,236

Alego Usonga

West
Alego

Works

Roads

Construction Of Karadier-Kodiere-Segere Road

177,200

Alego Usonga

West
Alego

Works

Roads

Construction Of Otok Road

Alego Usonga

Central
Alego

Kokeyo

Works

Roads

Opening Of Agul-Nyambusi-Olengo Road And


Culverts And Spot Gravelling

800,000

Alego Usonga

Central
Alego

Kadenge

Works

Roads

Opening, Culverting And Gravelling Of Ratuoro


Kamlag Road

904,036

Alego Usonga

Central
Alego

Ojwando B

Works

Roads

Openning, Culverting And Gravelling Of Segere


-Boro Road

433,252

Alego Usonga

Central
Alego

Works

Roads

Gravelling And Culverting Of Obambo-HayodaLegio Maria Road

21,666

Nguge

PROGRAMME BASED BUDGET JUNE 2016

500,000
1,000,000

2,000,000

Estimates
2016/17

Total
Estimates
200,000
500,000
1,000,000
300,000
200,000
700,000
500,000
101,632
780,236
177,200
2,000,000
800,000
904,036
433,252
21,666

Code
3110599
3110599
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Other
Infrastructure
And Civil
Works
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of Roads-

Page 230

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Alego Usonga

Sub Location

Sector

Function

Proposed Project

Usonga

Works

Roads

Opening Of Oceanic-Nyandheho-Benga Road


And Murruming

Alego Usonga

Usonga

Works

Roads

Road Construction Of Kagoya-Uhere Road

1,125,660

Alego Usonga

Usonga

Works

Roads

Road Construction Of Mudao-Maoho Road

1,346,130

Bondo

North
Sakwa

Works

Roads

Opening & Culverting Of Lwala-Onyango


Olwa-Odhuno Road

628,054

Bondo

South
Sakwa

Works

Roads

Kipasi-Gombe-Wagusu-Wich Lum Road

265,649

Bondo

Central
Sakwa

Works

Roads

Alara-Kodiga-Wambara Road

768,535

Bondo

West
Sakwa

Works

Roads

Opening, Grading And Murruming Of MilandoNyamira Road

Bondo

Yimbo
East

Works

Roads

Openning Of Ururi-Wambasa-Yaw PachiOdhuro Primary-Daraja Road

Bondo

Yimbo
East

Works

Roads

Daraja Lwala Kodida

Gem

East Gem

Works

Roads

761,077

Gem

East Gem

Works

Roads

Grading And Murraming Of Ramula-Kanyuto


Pri School-Ahenyo Road, Lihanda-Lwala Road
Murruming, Rabuor-Koloo River Road
Murruming
Allocation For Road Works

Gem

East Gem

Works

Roads

Construction Of Foot Bridges Across Major


Streams

344,724

Gem

West
Gem

Works

Roads

Grading Ayora-Abir Road

Gem

West
Gem

Works

Roads

Ng'iya - Rakuom - Ober - Dienya Road

1,420,681

Gem

Yala

Works

Roads

Murruming Yala- Tatro-Anyiko 3.5km Road

3,000,000

Malunga Central

PROGRAMME BASED BUDGET JUNE 2016

B/F 2015/2016
237,199

2,000,000
656,356
1,000,973

795,726

36,604

Estimates
2016/17

Total
Estimates
237,199
1,125,660
1,346,130
628,054
265,649
768,535
2,000,000
656,356
1,000,973
761,077
795,726
344,724
36,604
1,420,681

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Other
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 231

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Township
Gem

Yala
Township

Works

Roads

Murruming Ombaka-Sidimba 1km Road

750,000

Gem

Yala
Township

Works

Roads

Murruming Yala-Shauri-Do-Nyamninia Road

292,892

Gem

Yala
Township

Works

Roads

Murruming Uminu-Uganga-Rawalo Road

Gem

North
Gem

Ndere

Works

Roads

Grading Of Nyabeda Road

195,946

Gem

North
Gem

Lundha

Works

Roads

Construction Of 2 Bridges Along MalangaMusembe Road

170,000

Gem

North
Gem

Works

Roads

Kodiaga-Lundha-Gogo-Sirembe Road

Ugunja

Sidindi

Works

Roads

Opening Of Ugolwe-Mariwa-Simero-DahoKajambi Road

Ugunja

Sidindi

Works

Roads

Construction Of Footbridge Along SimeroSikang, Sidindi-Ndere, Ugolwe-Nyiera Road

Ugunja

Sigomre

Works

Roads

Grading Of Ywaya-Sirako-Sere Road

Ugunja

Sigomre

Works

Roads

Madungu - Kaisaya - Luoka Road

Rarieda

East
Asembo

Omia Mwalo

Works

Roads

Completion Of Akado-Kadam Road

Rarieda

East
Asembo

South Ramba

Works

Roads

Completion Oframbaa-Ombulu-Masand Road

Rarieda

East
Asembo

South Ramba &


Omia Malo

Works

Roads

Construction Of Luoro-Opapla Road, KaojeOpande Road

557,146

Rarieda

East
Asembo

Omia Diere & Omia


Mwalo

Works

Roads

Construction Of Raliew-Okiro-Nguka Road,


Osewre-Boi Road

200,840

Rarieda

East

Works

Roads

Construction Of Nyangona-Bao Kowade Road

PROGRAMME BASED BUDGET JUNE 2016

1,552,801

2,003,529
9,521
248,312
88,598
1,165,152
167,160
1,500,000

1,656,362

Estimates
2016/17

Total
Estimates
3,000,000
750,000
292,892
1,552,801
195,946
170,000
2,003,529
9,521
248,312
88,598
1,165,152
167,160
1,500,000
557,146
200,840

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 232

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Asembo
Rarieda

East
Asembo

Works

Roads

South Ramba-Ramba-Luoro-Ombulu Masanga


Road

Rarieda

North
Uyoma

Works

Roads

Opening And Formation Of Masala-Got Odiero


Road

Rarieda

North
Uyoma

Works

Roads

Ndere - Lusi Road

Rarieda

South
Uyoma

Works

Roads

Murruming Of Lweya-Onyono

2,320,210

Rarieda

South
Uyoma

Works

Roads

Kibanga - Ndonyo Road

1,260,982

Rarieda

South
Uyoma

Works

Roads

Kibanga - Agoch Kogoye Beach

Rarieda

South
Uyoma

Works

Roads

Lweya - Onyono

Rarieda

West
Asembo

Works

Roads

Kapuoyo-Soko-Nyagoko Road

158,020

Rarieda

West
Asembo

Works

Roads

Lwak-Kachieng-Kotenga Road

1,500,000

Rarieda

West
Uyoma

Kobong

Works

Roads

Opening Kowano-Kaseda-Madiany Road

170,640

Rarieda

West
Uyoma

Kobong

Works

Roads

Opening And Levelling Nyakongo JncnWandeo Valley-Akuom Village

1,300,000

Rarieda

West
Uyoma

Rachar

Works

Roads

Opening And Murraming Of Nyagwara-Kona


Kagowi Road

1,239,811

Rarieda

West
Uyoma

Kokwiri

Works

Roads

Opening And Murraming Of Nyakongo-Akuom


Road

2,700,000

Rarieda

West
Uyoma

Kagwa

Works

Roads

Murraming Of Kagwa Dispensary Road

Ugenya

North

Works

Roads

Construction Of Ndori Foot Bridge

Masala

Kagonya

PROGRAMME BASED BUDGET JUNE 2016

701,455
1,773,229
174,800

526,709
1,179,790

62,580
3,200,000

Estimates
2016/17

Total
Estimates
1,656,362
701,455
1,773,229
174,800
2,320,210
1,260,982
526,709
1,179,790
158,020
1,500,000
170,640
1,300,000
1,239,811
2,700,000
62,580

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 233

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Ugenya
Ugenya

North
Ugenya

Works

Roads

Kona Mbaya-Ochele Foot Bridge-Urembo Road

2,000,000

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Light Grading And Culverting Of KamalungaLihano Road And Bridge

2,000,000

Ugenya

West
Ugenya

Sifuyo West

Works

Roads

Openning And Grading Of Siaya - Nyambogo


Road

1,000,000

Ugenya

West
Ugenya

Works

Roads

Openning And Grading Of KapuoyoNyayombe-Nyambweke Road

2,000,000

Ugenya

West
Ugenya

Works

Roads

Opening Up Pap Olang Sand Harvesting Bay

Bondo

West
Sakwa

Works

Roads

Maintenance Of Obedi Road

901,546

Alego Usonga

West
Alego

Works

Roads

Culverting Of Odiang'a-Sirinde Road

840,935

Gem

West
Gem

Works

Roads

Ngiya-Wagwer-Katado Road

Bondo

Central
Sakwa

Works

Roads

Openng, Grading And Murruming Of Nango


Sirongo Road

Alego Usonga

Central
Alego

Works

Roads

Construction Of Kamlag-Ninga Road

751,550

Ugunja

Sigomre

Works

Roads

Ngop-Misengni-Nyaranga-Uloma Road

200,414

Rarieda

West
Asembo

Works

Roads

Rehabilitation Of Siger-Kochieng Road

1,000,000

Ugunja

Sigomre

Works

Roads

1,500,000

Ugunja

Ugunja

Works

Roads

Solar Lights At Sigomre, Ywaya, Asango, Got


Osimbo, Uloma Dispensary, Mungao, Sirako
Markets
Busia Road-Ulwan Sira Road

Bondo

Central

Works

Roads

Rabango Junction-Rabango Pri Road

PROGRAMME BASED BUDGET JUNE 2016

78,920

89,864
2,800,000

149,928
263,197

Estimates
2016/17

Total
Estimates
3,200,000
2,000,000
2,000,000
1,000,000
2,000,000
78,920
901,546
840,935
89,864
2,800,000
751,550
200,414
1,000,000
1,500,000
149,928

Code
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction

Page 234

DEPARTMENT OF FINANCE, PLANNING AND VISION 2030


Sub County

Ward

Sub Location

Sector

Function

Proposed Project

B/F 2015/2016

Sakwa

Estimates
2016/17

Bondo

Yimbo
East

Works

Roads

Wambasa Ogam Road

Bondo

North
Sakwa

Works

Roads

Openning Of Dier Aora-Bar Kowino-Kibuye


Road

1,350,000

Ugunja

Sidindi

Works

Street
Lighting

Street Lighting In Sidindi, Simenya, Sikhalame,


Wang Tong And Rangala Markets

3,000,000

Alego Usonga

Central
Alego

Works

Roads

Openning, Culverting And Gravelling Of NdaiKanyaboli -Kubar Road

2,500,000

Alego Usonga

Central
Alego

Works

Roads

Openning, Culverting And Gravelling Of


Obambo Market-Boro Market Road

3,798,515

Alego Usonga

Siaya
Township

Works

Roads

Openning, Culverting And Gravelling Of


Kamgenya-Nyadenge Road

2,000,000

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Routine Maintenance Of Ajuka-Quarry Road

2,337,408

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Opening, Grading And Murruming Of OberWagogni-Siranga Road

3,043,176

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Routine Maintenace Of Kogola-Koduoya Road

3,431,203

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Routine Maintenace Of Kamasawa-Kagunda


Road

3,141,613

Ugenya

Ukwala

Simur Kondiek

Works

Roads

Routine Maintenace Of Bar Awendo-Lifunga


Road

3,046,600

Total

PROGRAMME BASED BUDGET JUNE 2016

56,790

321,912,538

Total
Estimates
263,197
56,790
1,350,000
3,000,000
2,500,000
3,798,515

809,015,212

2,000,000
2,337,408
3,043,176
3,431,203
3,141,613
3,046,600
1,130,927,749

Code
3110499
3110499
3110599
3110499
3110499
3110499
3110499
3110499
3110499
3110499
3110499

Description
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Other
Infrastructure
And Civil
Works
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther
Construction
Of RoadsOther

Page 235