Sunteți pe pagina 1din 3

Employer:

MZ & Partners
Architectural and
Engineering Consultancy

Project:

Contractor:

3B+G+7 Commercial and


Residential Development at
Muntazah, Doha

Document Ref. :MCR-ZIQMST-130

GAP Analysis of construction welfare

Standards requirement
1.1.1

Air conditioner in all habitable


buildings

1.1.2

Pest Control

1.2.1

Drinkable water on site (offices,


mess halls, field rest

1.2.2

Water quality to be checked

1.2.3

Filter cartridge and disinfection sets

1.3.1

Existence of toilets and sanitary


washbasin and urinals
Located where the construction
work is being carried out

1.3.2

1.3.3

Exhaust ventilation in toilet rooms

1.3.4

Toilets walls are installed with


impervious wipe clean surface

1.3.5

Toilets are partitioned and lockable

1.3.6

Potable facility shall be regularly


cleaned and emptied for hygienic
reasons

1.3.7

700 workers need: 10 Toilets seats,


12 urinals, 10 washbasin
Wash hand liquids and towels shall
be available and refilled regularly

Existing on site
Offices, mess halls and
accommodations are all equipped
with AC
Not implemented Yet

No Gap

Drinkable water is everywhere in


our site and exceeds the
standards
Not yet done

No Gap

All water points are equipped with


filter cartridges and the tanks and
portable water containers are
chlorinated and disinfected
regularly and maintained clean
Toilets and washbasins exist but
No urinals
Well located near access to the
construction site and everybody
have easy access
No yet installed

1.3.9

N/A

All toilets walls and ground are


installed with impervious wipe
surface
All toilets are separated with thick
walls and have locks in each door
All tanks and water coolers are
cleaned regularly by the
housekeepers and maintained
clean
Actually on site; 10 toilets, 0
Urinals, 8 washbasins
All washbasin is equipped with
liquid soap dispenser and towels
and the housekeeper refilled
when the dispenser is empty
N/A

1.3.1
0

Septic tank shall be installed and


emptied regularly

Our septic tanks are installed and


emptied regularly

1.3.8

Remedial Actions

Procedure to be in place

Water to be sent to the


laboratory to check the
quality
No Gap

Urinals to be installed near


toilets seats
No Gap

Exhaust fans to be installed


in every toilets sets
No Gap

No Gap
No Gap

To install 12 urinals, 2
washbasins
No Gap

N/A
No Gap

Employer:

MZ & Partners
Architectural and
Engineering Consultancy

Project:

Contractor:

3B+G+7 Commercial and


Residential Development at
Muntazah, Doha

Document Ref. :MCR-ZIQMST-130

GAP Analysis of construction welfare

1.3.11

1.4.1

Cleaning teamd shall be in place


and clean regularly at least one
time per day prior the
commencement of first shift
Accessible mess area

1.4.2

Mess area shall be enclosed, free


of dust and AC installed

1.4.3

Mess area shall be located away


from construction area

1.4.4

Mess area fitted with tales and


chairs and sufficient for the number
of workers
Consumption and storage of food
shall be in the mess area, and
every worker shall have proper
meal
Eating utensils for every worker

114.5

1.4.6

1.4.7

Cooking shall not be allowed on


site, no on site kitchen

1.4.8

Cooking and transportation of


construction food shall be in
accordance to the standards

1.4.9

De3dicating housekeeping team in


the mess hall to clean and disinfect
the area

1.5.1

Notice boqrd shall be provided on


site

1.5.2
(a)
(b)

HSE policy signed and displayed


Names and work location of nurse,
first aiders, HSE personnel and fire
marshals

Our housekeepers are always in


the toilets and clean immediately
and more than one time per day
and also filled the checklist
Mess area is accessible for
everybody on site
Our mess area is totally enclosed,
no dust and sand ingress and it is
air conditioned
Our mess hall is located far from
the construction site and in a
dedicated area
Our mess hall is equipped with
table and chairs and is sufficient
to contain all workers by shift
The storage and consumption of
meals are dedicated in the mess
hall and every worker has his
proper food and meal
Every worker is provided by food
utensils and identified by numbers
of badges
The cooking is carried out away
from the site and no kitchen
required on site
Not Verified

Designated 2 housekeepers
especially to clean and disinfect
the area after each meals taken
by workers
2 notice board are provided in our
site, one in the main gate and one
in the main access to the site
Exst anmd signed by the
management
The notice boards equipped with
name and phone number of HSE
personnel, nurse, first aiders and
fire marshals, no location is

No Gap

No Gap
No Gap

No Gap

No Gap

No Gap

No Gap

No Gap

Control the standards of


cooking and transportation
of food and requirement to
be implemented
No Gap

No Gap

No Gap
Provide the location
information of appointed
personnel

Employer:

Project:

Contractor:

3B+G+7 Commercial and


Residential Development at
Muntazah, Doha

MZ & Partners
Architectural and
Engineering Consultancy

Document Ref. :MCR-ZIQMST-130

GAP Analysis of construction welfare

provided
(c)

Location of first aid kits on site

(d)

Emergency escape routes, exits


and muster points

(E)

N/A

(f)
(g)

(h)
1.6.1

Construction site rules and


procedures
Shift starting and ending and
duration and duration of rest hour

N/A

1.6.2

Appropriate medical provision


based on workers numbers
Rapid access to first aid

1.6.3

N/A

1.6.4

Fully trained first aiders

1.6.5

Registered nurse

1.6.6

Recognized training course for first


aiders

1.6.7

First aid box

1.6.8

Defibrillator

1.6.9

REPORTING INJURIES

First aid kits on site are located in


the map in the notice board
Emergency escape routes, exits
and muster points are located in
the maps and identified with
different colors and displayed in
the notice boards
N/A

No Gap

All new rules on site is displayed


in the notice board
All things related to timing is
communicated to workers through
a memo from our administration
and displayed in the notice board
N/A

No Gap

Our site clinic is sufficient to our


workers in accordance to SCH
The first aid station is easy
accessible by everybody
N/A

No Gap

14 persons are fully trained and


certified in first aid standards to
cover the whole site
2 registered nurse are present on
site to cover 24 hours working
First aiders are trained BLS and
first aid training in hamad
international training center
The content is not being verified
and only one boxes is available
Not available

No Gap

All injuries are reported as the


internal procedures

No gap

No Gap

N/A

No Gap

N/A

No Gap
N/A

No Gap
No Gap

Content and location to be


verified
TO BE PURCHASED

S-ar putea să vă placă și