Sunteți pe pagina 1din 3

Effciency

Production/Hr

SMV

16

SMV

16

Worker

56

Worker

56

Time

10

Production/Hr @

Producation

1000

65%

137

Input

33600

70%

147

Output

16000

80%

168

Efficiency

48%

Green Cell entry only.

100%
210
Green Cell entry only.

SMV Calculation
Process:
TMU

In Sec

Bas. Mins

Allowance Std Time

Machine Time

24.9

0.7471

0.0125

25%

0.0156

Manual Time

160.5

4.8155

0.0803

11%

0.0891

Total Time

185.4

5.5626

0.0927

Manual%

87%

0.1046

Contingency allow%

1%

0.0010

Bundling Time in sec

0.0500

SMV per Unit

0.1557

Standard Capacity/ Hr
Capacity @
***Entry only on the white cell

80%

385
308

SMV

TGT

OP REQ

OP

TGT

MANUAL

5.287

272

24.0

24

272

LS1

3.17

132

7.0

15

284

OL4

1.106

132

2.4

271

MC6

0.544

132

1.2

221

BH

0.25

132

0.6

240

BS1

0.29

132

0.6

207

S-ar putea să vă placă și