Documente Academic
Documente Profesional
Documente Cultură
Production/Hr
SMV
16
SMV
16
Worker
56
Worker
56
Time
10
Production/Hr @
Producation
1000
65%
137
Input
33600
70%
147
Output
16000
80%
168
Efficiency
48%
100%
210
Green Cell entry only.
SMV Calculation
Process:
TMU
In Sec
Bas. Mins
Machine Time
24.9
0.7471
0.0125
25%
0.0156
Manual Time
160.5
4.8155
0.0803
11%
0.0891
Total Time
185.4
5.5626
0.0927
Manual%
87%
0.1046
Contingency allow%
1%
0.0010
0.0500
0.1557
Standard Capacity/ Hr
Capacity @
***Entry only on the white cell
80%
385
308
SMV
TGT
OP REQ
OP
TGT
MANUAL
5.287
272
24.0
24
272
LS1
3.17
132
7.0
15
284
OL4
1.106
132
2.4
271
MC6
0.544
132
1.2
221
BH
0.25
132
0.6
240
BS1
0.29
132
0.6
207