Documente Academic
Documente Profesional
Documente Cultură
Eugen Dyckerhoff
Gottlieb Widmann
DSI Worldwide
Americas
Europe
Local Presence
Global Competence
DSI Global Presence
Asia-Pacific
Tanks
LNG Tanks
Qalhat, Oman
Excavation
Domestic Building
Commercial Build.
Slope Stabilization
Rock of Gibraltar
British Crown Colony, UK
Tunnelling
Mining
Marine Projects
Miscellaneous
Caruachi Hydroelectric
Power Station, Venezuela
Prestressed Cconcrete
Sleepers, Greece
Specialty consulting
Bonded PT-Systems
Unbonded PT-Systems
Removable Anchors
External Prestressing
GEWI Piles
Mining Systems
Construction Methods
Form Travellers
GEWI System
Flimu Extruded Coupler Splices
Form Ties and Accessories
Monitoring, Repair and Strengthening
Special Services
Jet-Grouting and Anchor Installation
Site Labour
Equipment Rental
General
PT Placer
DYWIDAG-Systems Intl
Engineer
ND Lea Associates
Owner
BC Ministry of
Transportation
Post-Tensioning Systems
Balanced Cantilever Method
INFO
Project
Post-Tensioning Systems
General
External tendons
upgradeable
Walter & SCI Construction
Engineer
Owner
City of Calgary
200th Street,
Completion 2003
2-way Flat Slab
650mm Thick
CIP = 2 spans @ 23m
52 tendons x 15-0.6 x 46m
53 tendons x 9-0.6x(33-46m)
Post-tensioning Systems
General
Coquitlam Ridge
Engineer
Owner
City of Langley
DSI
Services
General
NAC Construction
PT Installer SteelPro
Threadbar Post-tensioning
Engineer
ACRES Engineers
Owner
Defence Canada
Preparing to Stress
Spans #1 & #2
Preparing for
Stressing Girder
Tendons
DSI
Services
Post-tensioning Systems
General
SAR Transit
Engineer
J Muller International
Owner
Translink
Cablestay Bridges
Koror-Babeldoab Bridge,
Palau Republic
Esplanade Riel,
Winnipeg, MB
Completion 2003
Design, Supply, Erect and
operate the form traveler
Supply and install the posttensioning
Supply and install the precast anchor blocks
Supply and install the stay
cables
General
MD Steele Construction
Engineer
Wardrop Engineering
Construction
Engineer
Owner
City of Winnipeg
Stays used as
Temporary support
for Form Traveler
Clevise Connection at
Top of Pylon
Stressing Tendons
with Conten System
Threadbar Stays
INFO
Project
DSI
Services
Threadbar Stays
Bottom anchor
connection
Tank Post-tensioning
INFO
Project
Skeena Effluent,
Skeena, BC
DSI
Services
Post-tensioning Systems
Digester-Water Tanks
Post-Tensioning Ring Beam w/ Bolster
Ring Tendon PT
INFO
Portable Equipment
Reduced Concrete
Post-tensioning Systems
Strengthening
ADVANTAGES
Little impact on
existing structure
Architectural Detail
Easy installation
Time & Cost Saving
Services
Contractor
Engineer
Watson Engineering
Owner
Ministry of Transportation
DSI
Undercord Strengthening
Unbonded Monostrand
SERVICES
ADVANTAGES
Supply of material
Reduced concrete
Fabrication of tendons
Longer spans
Site supervision
Bigger Balconies
Equipment rental
Open spaces
Deflection control
More Artistic
Structures
More Economical
Bentall V, Vancouver, BC
INFO
Project
18 Typical Slabs
Post-tensioning Systems
Bentall V,
Vancouver, BC
Completed 2002
Owner
Bentall Developments
372 tendons/slab
Engineer
RJC
General
Contractor
Carina Tower,
Vancouver, BC
Completed 2003
Post-tensioning Systems
Engineer
Glotman Simpson
General
Contractor
Post-Tensioning Systems
General
Clark Construction
Engineer
RJC
Bankers Court
Building, Calgary, AB
200 tons - 0.6" strands with
anchor sizes 9 to 19
1-way Beam & Slab
Strands oiled to allow for
grouting in spring
(5 months later)
General
Engineer
RJC
Bonded Post-tensioning of
16 Level High-rise Building
Post-Tensioning Systems
18,000 ft Floor
No Interior Columns
5 Day Cycle
Compact Drilling
Equipment
Easy Installation
Slope stabilization
Tie Downs
Uplift Prevention
Tie Rods
Soil Nails
Pile Foundations
Tunneling
Limited Headroom
Temporary Tiebacks
Drilling methods
DRILLING
Auger
Down-the-Hole (DTH)
hammer
With or Without
Casing
Air Flushing
YOHO Bridge
INFO
Project
YOHO Bridge, BC
Under Construction 2003
Services
Contractor
Owner
BC Minirty of
Transportation
DSI
YOHO Bridge
INFO
Drilling Boreholes
and Installation of
Permanent DCP Rock
Anchors
DSI
Services
Contractor
Kani Foundation
Owner
Ministry of Transportation
INFO
Installing Anchor
Strand Anchors
ADVANTAGES
High Capacity
Long continuous
anchor lengths
without coupling
Strand Anchors
7-Mile Dam,
Nelson, BC
Completion 2002
DSI
Services
Strand Anchors
General
Driller
Engineer
BC Hydro
Owner
BC Hydro
7-Mile Dam,
Nelson, BC
Completion 2002
DSI
Services
Strand Anchors
General
Driller
Engineer
BC Hydro
Owner
BC Hydro
Easy installation
Time & Cost Saving
Environmentally Sensitive
Small drilling equipment
in tight spaces and low
headroom.
Equal capacity in
compression and tension.
Increased capacity by
post-grouting in weak soils
Vibration free drilling.
Helicopter portable
equipment
Confined Space!!!!!
INFO
GEWI-Piles &
Anchors can be
installed in as small
a space as the
equipment can fit
into.
Sometimes the
equipment can be
modified to fit
especially small
spaces.
DSI
Services
Contractor
GEWI-Piles
Kani Foundation
Technologies Ltd.
Pier No. 1
View upstream
Pier No. 2
View upstream
DSI
Services
Driller
Kani Foundation
Technologies Ltd.
Drilling of Boreholes
PR26 Widening,
San Juan, PR
Completion 1998
DSI
Services
Schematic View
Micropiles
Drilling
Contractor
Kani Foundation
Technologies
General
Constructora Santiago,
Puerto Rico
Geotech
Engineer
URS Greiner
Owner
Testing Piles
24 Hour Compression
Test of Piles to 1246 kN
without any failures
DSI
Services
GEWI-Piles
Drilling
Contractor
General
PCL Construction
Geotech
Engineer
Owner
Ministry of Transportation
Drilling of Borehole
Testing of GEWI-Piles
DSI
Services
GEWI-Piles
LENGTH=1200m
Guy Anchors
ADVANTAGES
No excavation
Easy installation
Time & Cost Saving
Environmentally Sensitive
Structural Anchorbolts
ADVANTAGES
Structural Anchorbolts
APPLICATIONS
Structural columns
Sign Structures
Light Poles
Towers
Structural Anchorbolts
ADVANTAGES
Structural Anchorbolts
ADVANTAGES
QUESTIONS?
www.dsicanada.ca