ENGINEERING DIVISION

PURCHASE REQUISITION

HINDUSTAN DORR-OLIVER LIMITED, MUMBAI 400 099


CUSTOMER:
NUCLEAR POWER CORPORATION OF INDIA LIMITED

JOB NO.

PROJECT/JOB:

KAPP - 3 & 4 - UGP AND WMP PACKAGE

PAGE

CONSULTANT:

NA

MR NO. : A4-110301-DS-I-027

TITLE:

MATERIAL REQUISATION FOR RESTRICTION


ORIFICE PLATES

DATE

PURPOSE
For Review
S.NO.

01

BYC- 110301
1

OF

: 27.08.2014

REV.

R3

SHIPMENT REQUIRED
Please Consult Planning Dept.
ITEM NO

RESTRICTION ORIFICE
PLATES

APPROVAL OF DRAWINGS

YES

DESCRIPTION

QTY.

Scope:
Design, supply of materials, fabrication, testing
and delivery of RESTRICTION ORIFICE
PLATES as per HDO Spec. No.: A4-110301DS-I-027, Rev: R2
dated 18.09.2013
R3 DATED
27.08.2014

10 Nos.

NO

REMARKS

BY: HDO

DRAWINGS & DATA REQUIRED FOR


APPROVAL OR FOR INFORMATION
SHOP INSPECTION REQUIRED: YES
REMARKS:

_____________________
RECEIVED BY
PURCHASE

REQUISITIONER :

Yogesh Salvi

CHECKED BY

: Amit

APPROVED BY

: V. Krishnadas

_____________________
RECEIVED BY
PROJECT DEPARTMENT

Dhavan

_____________________
RECEIVED BY
INSPECTION DEPARTMENT

ENGINEERING DIVISION

PURCHASE REQUISITION

HINDUSTAN DORR-OLIVER LIMITED, MUMBAI 400 099


CUSTOMER:
NUCLEAR POWER CORPORATION OF INDIA LIMITED

JOB NO.

PROJECT/JOB:

KAPP - 3 & 4 - UGP AND WMP PACKAGE

PAGE

CONSULTANT:

NA

MR NO.: A4-110301-DS-I-027

TITLE:

MATERIAL REQUISATION FOR RESTRICTION ORIFICE


PLATES

27.08.2014
DATE: 18.09.2013

PURPOSE
For Review

02

REV.

SHIPMENT REQUIRED
Please Consult Planning Dept.
DOCUMENTATIONS:
A) Following Documents in triplicate shall be submitted along with
technical offer:
a) Detailed technical literature on the offered

b)
c)
d)
e)
f)

g)
h)
i)

RESTRICTION ORIFICE PLATES indicating


dimensions, material of construction, service
conditions, tests carried out, installation procedures,
applicable standards etc.
List of in-house manufacturing facilities.
List of in-house inspection and test facilities.
Standard QA Plan
QA manual of the company
Reference list of customers to whom similar
RESTRICTION ORIFICE PLATES have been
supplied, indicating quantities supplied, purchase
order reference, order value, scheduled delivery
dates, and actual dates of supply
List of suppliers/sub-vendors of raw material and
inspection/testing agencies
Point wise confirmation on each clause of this
specification
Copies of the test reports, if the offered
RESTRICTION ORIFICE PLATES have earlier
undergone various tests mentioned in this
specification.

B) Immediately after placement of Purchase Order, 3 copies

of following documents shall be submitted for the


purchasers review and approval.

a) GA & Dimensional Drawing, wiring & Termination


Drawing.

b) Quality Assurance Plan (QAP)


c) Instruments catalogue and model nos. decoding sheet
d) Detailed Inspection Procedure

BYC- 110301
2

R3

OF

ENGINEERING DIVISION

PURCHASE REQUISITION

HINDUSTAN DORR-OLIVER LIMITED, MUMBAI 400 099


CUSTOMER:
NUCLEAR POWER CORPORATION OF INDIA LIMITED

JOB NO.

PROJECT/JOB:

KAPP - 3 & 4 - UGP AND WMP PACKAGE

PAGE

CONSULTANT:

NA

MR NO.: A4-110301-DS-I-027

TITLE:

MATERIAL REQUISATION FOR RESTRICTION ORIFICE


PLATES

27.08.2014
DATE: 18.09.2013

PURPOSE
For Review

REV.

SHIPMENT REQUIRED
Please Consult Planning Dept.
C) Following Documents in 5 Copies shall be supplied along

with Supply of Instruments


a)
b)
c)
d)
e)
f)

Instruments Test and Calibration Report


Guarantee Certificate as per HDOs PO clause
Instruction Manual
Certificate of Complience
History Dockets including all test reports
6 Copies of above documents in CD/DVD form.

Each drg & doc shall be stamped & signed by authorized


personal of HDO.
All documents as per HDOs specifications to be furnished for
HDOs approval. All Document shall have the following Project
information:
Project : KAPP - 3 & 4 - UGP AND WMP PACKAGE
Client : NUCLEAR POWER CORPORATION OF INDIA
LIMITED
P.O. No.:

Inspection:
Quality Plan with above Project information in eight (3) copies is
to be submitted by vendor before commencement of manufacture
for approval by HDO. The list of tests to be conducted on each
equipment in line with the requirement of IS or other relevant
standards.
All routine and acceptance tests as specified by the applicable
standard shall be carried out by the vendor and shall be
witnessed by HDO/NPCIL without any additional cost. Any other
tests and quality assurance requirement as defined elsewhere in
the specification shall also be complied.
Vendor should give at least 15 days prior notice for the Inspection.
Below are the some of the specific test are listed as follows:
a) Chemical Analysis & Physical Properties Check
b) Ultrasonic Test
c) Dye Penetration Test

d)
e)
f)
g)

Micro Etch Test


Magnetic Particle Test
Dimentional Check Up
Pressure Tap Checking

BYC- 110301
3

R3

OF

ENGINEERING DIVISION

PURCHASE REQUISITION

HINDUSTAN DORR-OLIVER LIMITED, MUMBAI 400 099


CUSTOMER:
NUCLEAR POWER CORPORATION OF INDIA LIMITED

JOB NO.

PROJECT/JOB:

KAPP - 3 & 4 - UGP AND WMP PACKAGE

PAGE

CONSULTANT:

NA

MR NO.: A4-110301-DS-I-027

TITLE:

MATERIAL REQUISATION FOR RESTRICTION ORIFICE


PLATES

27.08.2014
DATE: 18.09.2013

PURPOSE
For Review

REV.

SHIPMENT REQUIRED
Please Consult Planning Dept.

On Site Visit: Vendor should include cost of his rep visit to


the site for commissioning / calibration of supplied
instrument without any cost to HDO

BYC- 110301
4

R3

OF

COVER SHEET
HDO
DOCUMENT NO.

REVISION

A4-110301-DS-I-027

R -3

TITLE

MATERIAL REQUISITION FOR RESTRICTION ORIFICE PLATES FOR HEAVY


WATER UPGRADING PLANT AND WASTE MANAGEMENT PLANT

PROJECT

HEAVY WATER UPGRADING PLANT AND WASTE MANAGEMENT PLANT


FOR KAPP 3 & 4

NUCLEAR POWER CORPORATION OF INDIA LTD.

OWNER
CONTRACTOR

TOTAL
NO. OF
SHEETS
(EXCL.
COVER
SHEET)
24

HINDUSTAN DORR OLIVER LIMITED, MUMBAI

PREPARED
REV.
NO.

DATE

3 27.08.14

NAME

YLS

SIGN.

CHECKED

NAME

AGD

APPROVED

SIGN.

NAME

VKD

SIGN.

TABLE OF CONTENTS
Sr. No.

DESCRIPTION

1)

SUMMARY SHEET

2)

ANNEXURE-A - INSTRUMENT SPECIFICATION


SHEET FOR RESTRICTION ORIFICE PLATES

DOCUMENT NO.

KAPP-3&4/ 63493/2017/ISS

PAGE NO.
FROM

TO

24

REMARK

SUMMARY SHEET
Sr.
No.
1)

DESCRIPTION

DOCUMENT NO.

ORIFICE PLATES ASSEMBLY & FLANGES _UGP


TOTAL

KAPP-3&4/ 63493/2017/ISS

QTY.

REMARK

MAIN

SPARE

KAKRAPARA ATOMIC POWER PROJECT


2 x 700 MWe Nuclear Power Project Unit 3 &4

ANNEXURE - A
INSTRUMENT SPECIFICATION SHEET FOR
RESTRICTIONORIFICE PLATES

MATERIAL REQUISATION FOR RESTRICTION


ORIFICE PLATES

REVISION
For Information
For Information

REV
R2
R3

DATE
18.09.13

BY
YLS

CHKD.
AGD

APP.
VKD

27.08.2014

YLS

AGD

VKD