Sunteți pe pagina 1din 4

House Wise Pending Works

House No

Civil

13

pending works and patch works

16

compound wall gate

25

laying of plinth beam,


compound wall brick work,
compound wall plastering,
set back area PCC
kitchen room plat form
cup boards
head room roof work
fixing of main door frame

52

Plumbing
fixing of taps and other final
fitting 14/09/16

Tiles

Carpentry work

kitchen room granite work fixing of doors, fixing of


step tiles, kitchen wall tiles window grills
parking tiles, kitchen wall kitchen room doors, window
tiles, kitchen granite work grills
parking tiles, kitchen wall
tiles 25gf, 25ff
flooring tiles, step tiles,
kitchen granite work

window grills in 25gf, 25ff, 25sf


making of window shutters in
25sf,
fixing of doors in 25sf

plinth beam, compound wall brick work, taps and other final fitting
compound wall plastering, set back area work, fixing of water tank
PCC, elevation work, cup boards work,
water tank plot form, flooring plastering,

parking tiles, step tiles,


kitchen plot form

window grills, bath room


doors and main door

66

compound wall finishing work,


compound wall gate, finishing work,
water tank plot form

water tank, basins and final


fitting works

step tiles

kitchen window frame, grills

90

external bath room work

external bath room


work

step tiles, kitchen wall


door locks in 90ff, window
tiles in 90sf, finishing work grills

entrance steps construction,

other final fitting works

parking tiles, elevation tiles grills, main door

99B

rain water pipe,


fixing of taps and other final
works in 25sf,
waste drainage line 25gf

108

135A

135B

elevation works
cup boards
external plastering work, elevation work
compound wall plinth beam, compound
wall brick work, compound wall
plastering, set back area PCC,
cup boards, kitchen plot form, flooring
plastering, water tank plot form
Drop work
compound wall brick work, compound
wall plastering, finishing work

tanks and other final works


water tank fitting work,
waste line

flooring tiles, bath room


window grills, fixing of doors
tiles, kitchen tiles, parking and windows shutters, making
tiles, step tiles
of window shutters

pending works,

step tiles, parking tiles

fixing of main door, window


grills,

House Wise Pending Works


House No.
13

Electrical
fans, lights, dummys

Painting
Colours

16

Colours

25 Gf

Colours

25 Ff
25 Sf

Iron fabrication
Hand railing, Elevation grills

Hand railing
Grills, Hand railing

Wiring, switch boards, not started


fans, lights

Grills, Hand railing

48

wiring, switch boards,


fans, lights, dummys

white wash, primer,


colour

window grills

52

wiring, fans, lights,


dummys

colours

window grills

compond painting
14/09/16

window grills

66

body colour

90
108

elevation painting
14/09/16
bath room light, motor colours
wire 14/09/16

105A,B

dummys 14/09/16

colours

101

dummys 14/09/16

colours

100
99B

99A
117
118

hand railing

hand railing

colours
dummys 14/09/16

south, east sides white


wash

elevation glass frames,


compound wall grills
hand railing at ff

Glass
Elevation glass work

Elevation glass work

window glasses

window glass work

window glass work