CIVIL ENGINEER
M.E.P ENGINEERS
ARCHITECT OF RECORD
LANDSCAPE ARCHITECT
ENEA GARDEN DESIGN INC.
7580 NE 4TH COURT, STUDIO 105
MIAMI, FLORIDA 33138
DESIGN ARCHITECT
INTERIOR DESIGNER
STRUCTURAL ENGINEER
GREENBERG TRAURIG
333 SE 2nd AVENUE
MIAMI, FLORIDA 33131
INDEX OF DRAWINGS
LAYOUT ID
LAYOUT NAME
LAYOUT ID
LAYOUT NAME
COVER
A-108
SURVEY
A-201a
A-002
CONTEXT DIAGRAM
A-201b
A-003
RENDERINGS
A-202a
A-004
RENDERINGS - CONTINUED
A-202b
A-004a
A-203a
A-004b
A-203b
A-005
LOCATION MAP
A-204a
A-006
CONTEXT PHOTOS
A-204b
A-007
ZONING DATA
A-205a
BIKE CALCULATIONS
A-205b
A-008
A-206a
A-009
A-206b
A-010
A-207a
A-011
F.L.R. CALCULATION
A-207b
A-012
A-208
BAYWALK RENDERINGS
A-209
A-013
A-210
A-014
A-211
A-014b
WAIVER # 2 CONT.
A-212
A-015
A-301
A-101
A-302
A-101.1
A-303
A-101.2
A-304
A-102
A-401
A-103
A-402
A-104
A-105
A-106
A-107
A-007A
A-012A
700 EDGEWATER
777 NE 26th STREET
MIAMI, FLORIDA 33137
SURVEY
SCALE: 1:2
1''
2''
4''
Biscayne Beach
Icon Bay
Onyx
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
700 EDGEWATER
revuelta
architecture
international
Santiago, Chile
Miami
revuelta.com
Project
700
700 EDGEWATER
EDGEWATER
GRAN PARAISO
54 stories
Revisions
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
Consultant
Design by
Elysee
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
CONTEXT DIAGRAM
A-002
Sheet No.
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
700 EDGEWATER
revuelta
architecture
international
Santiago, Chile
Miami
revuelta.com
Project
Revisions
700 EDGEWATER
DEVELOPMENT LLC
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
RENDERINGS
A-003
Sheet No.
CLIENT / OWNER
700 EDGEWATER
DEVELOPMENT, LLC
revuelta
architecture
international
CONSTRUCTION MANAGER
COASTAL
CONSTRUCTION COMPANY
Miami
Santiago, Chile
revuelta.com
MEP + FP
KORDA ENGINEERING
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
800 Brickell Avenue, 6th Floor. Miami, FL 33131.
Project
305.441.0755
ARCHITECT OF RECORD
FACADE CONSULTANT
305.590.5000
VIDARIS, INC
ARCHITECT
TOWER CROWN
700 EDGEWATER
REVUELTA
ARCHITECTURE INTERNATIONAL PA
212.689.5389
212.343.7333
SEAL
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Revisions
2016/03/07
TOWER ENCLOSURE
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
700 EDGEWATER
MIAMI
Consultant
DRAWING TITLE
RENDERINGS
DRN
DATE (YY.MM.DD):
SCALE:
CHKD
APPVD
Design by
2016/03/07
N/A
SHEET NO.
G-004
PROGRESS SET
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
RENDERINGS - CONTINUED
Sheet No.
A-004
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
700 EDGEWATER
Project
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Revisions
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
VEHICULAR ENTRY &
PROMENADE PLAZA
VIEW FROM NE 26th STREET (PRINCIPAL FRONTAGE) LOOKING NORTH-EAST TOWARDS OUR ELEVATED VEHICULAR DROP OFF, LANDSCAPED PROMENADE/PLAZA AND BISCAYNE BAY BEYOND
Sheet No.
A-004a
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
VIEW OF LOBBY LEVEL BAY TERRACE AND TENANT LAWN AREA SURROUNDED BY TIERED GARDENS - OVERLOOKING THE BAYWALK BELOW (NOT SEEN) AND BISCAYNE BAY BEYOND
777 NE 26th STREET
MIAMI, FL 33137
700 EDGEWATER
revuelta
architecture
international
Santiago, Chile
Miami
revuelta.com
Project
Revisions
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
A-004b
Sheet No.
revuelta
architecture
international
SITE LOCATION
Miami
Santiago, Chile
PARAISO
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
SITE LOCATION
BACARDI BUILDING
LANDMARK
700 EDGEWATER
BISCAYNE BOULEVARD
Project
Revisions
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
SITE
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
SITE PLAN
GREATER MIAMI
MIAMI MARRIOTT
BISCAYNE BAY
Design by
Luis O. Revuelta
AR-0007972
ZONING
ZONING MAP
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LOCATION MAP
Sheet No.
A-005
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
700 EDGEWATER
Project
Revisions
C
D
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
PHOTO SURVEY
Sheet Name
CONTEXT PHOTOS
Sheet No.
A-006
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
folio # 01-3230-052-0010
PROJECT ADDRESSES
700 N.E. 26th Terrace
777 N.E. 26th Street
SF
91,384
Lot Area
Legal Description
Acres
2.10
Lots 2, 4, 6, 8, 10 and 12, as shown on the proposed plat of ESCOTTONIA COURT, as shown on a copy of said plat recorded in Deed Book 1619 at Page 330 of the Public Records of Miami-Dade County, Florida.
TOGETHER WITH:
Lot "J" less the South 5.0 feet and all of Lots "E", "F", "G", "H", "I", "K", "L" and "M" in Block "A", AMENDED AND EXTENDED PLAT OF BLOCKS A, B, AND C OF BANYAN PLACE according to the Plat thereof, as recorded in
Plat Book 8, at Page 55, of the Public Records of Dade County, Florida.
TOGETHER WITH:
Tract A, ASSOCIATES TRACT, according to the plat thereof, as recorded in Plat Book 114, at Page 19, of the Public Records of Miami-Dade County, Florida; Lot N, Block A, AMENDEN AND EXTENDED PLAT OF BLOCKS
A, B, & C BANYAN PLACE, according to the plat thereof, as recorded in Plat Book 8, at Page 55, of the Public Records of Miami-Dade County, Florida, less the South 5 feet thereof deeded to the City of Miami; and Lot O, of
Block A, Plat Book 8, at Page 55, of the Public Records of Miami-Dade County, Florida, less the South 5 feet thereof deeded to the City of Miami.
.
Flood Elevation
This property appears to be located in Flood Zone AE -EL10 as per Federal Emergency Management Agency (FEMA) 0316-L Effective July 8th, 2016
Zoning Classification
T6-36A-L
FLR
Allowable FLR
BENEFIT FLR (40%) = 0 sf PROPOSED
91,384
12
1,096,608 SF
771,241 SF
2.10
Allowable
315
Proposed
146
Required
Proposed
150
91,384
0.10
Lot Coverage
91,384
Revisions
Principal Frontage
Secondary Frontage
Rear Setback
Waterfront Setback
View Corridor (25% of lot width - see sheet A-009 for calculations)
Maximum Height
Maximum Building Height
Maximum Benefit Height
Refer to sheet A-402 for story calculation
Total Allowable Building Height
0.80
Proposed
multipliers
Maximum Density
150 units per net Acre* (See note 1)
Allowable
areas
Setbacks
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Project
Zoning Summary
700 EDGEWATER
WAIVER LIST
Required
9,138 SF
Proposed
32,702 SF
Allowable
73,107 SF
18,000 SF
Proposed
54,603 SF
13,800 SF
Required
Proposed
70%
70%
70%
73%
72.5%
85.0%
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Sustainability Requirements
As per Miami 21, Article 3, Section 3.13.1(b):All new buildings of more than 50,000sf of habitable rooms or habitable space in
the T5,T6,CI and CS zones shall be at a minimum certified as SILVER by the United States Green Building Council (USGBC)
Leadership in Energy and Environmental Design (LEED) standards or equivalent standards adopted or approved by the City.
Parking Space Requirements
Design by
Required
Proposed
219
15
234
320
5
239
7
327
12
18
AR-0007972
Required
Proposed
ZONING
1
0
1
2
2
1
3
146
1.5
0.1
100
45
NOTES:
*1. Bonus height to be achieved through participation in the City's Public Benefit Program, Section 3.14 of Miami 21.
2. Article 4, Table 5, of Miami 21: one (1) Industrial loading berth (12ft x 55ft x 15 ft) may be substituted by two (2) Commercial berths (12ft x 35ft x 15ft)
Luis O. Revuelta
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
ZONING DATA
Sheet No.
A-007
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
219
15
234
5
239 spaces
327 spaces
700 EDGEWATER
Project
SIDEWALK
LANDSCAPE
PROPERTY LINE
VIEW
CORRIDOR
STEPS
LANDSCAPE
OUT
IN
FD
UP
LANDSCAPE
PLAZA
BICYCLE REPAIR
OUT
VEHICULAR
DROP-OFF
EXIT
UP
FD
3RD LAYER
GROUND LEVEL PARKING SETBACK
3RD LAYER
GROUND LEVEL PARKING SETBACK
TRASH HOLDING
TIERED GARDENS
UP
15.15 %
IN
SIDEWALK
+7'-0" N.G.V.D.
UP
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
+4'-6" N.G.V.D.
UP
+12'-0" N.G.V.D.
+9'-6" N.G.V.D.
+5'-6" N.G.V.D.
FD
FD
FD
LANDSCAPE
+3'-6" N.G.V.D.
FD
LAWN
UP
FILL
AREA NOT ACCESSIBLE
PROPERTY LINE
UP
STAIR #3
FD
15.15 %
PROPERTY LINE
BATH
RAMP
UP
DOCKMASTER
LANDSCAPE
FPL VAULT
LOADING
ZONE
+5'-6" N.G.V.D.
Revisions
BACKFLOW
PREVENTORS
PLAZA
VIEW
CORRIDOR
LOADING
ENTRY /
EXIT
SIDEWALK
10.00 %
PARKING
ENTRY /
EXIT
SIDEWALK
Bike Lounge-North
PROPERTY LINE
FD
FD
STORAGE
ONE WAY
NORTH
EGRESS
CORRIDOR
LOADING #1
12'X35'
FD
1Ms
LANDSCAPE
FD
+3'-6" N.G.V.D.
UP
BUILDING STORAGE
STAIR #1
4
3
LOADING #2
12'X35'
FD
UP
FILL
AREA NOT ACCESSIBLE
1Ms
PARKING
LEVEL 1
2M
F.1
2Ms
2M
SERVICE
CORRIDOR
1Ms
STORAGE
2C
F.1
3 x 6" = 1'-6"
UP
FD
+3'-6" N.G.V.D.
LOADING #3
10'X20'
UP
PARKING
10.00 %
FPL-12"x28"
+2'-0" N.G.V.D.
RAMP
16.95 %
LANDSCAPE
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
FD
PUMP
1Mss
2Ms
10.00 %
FD
+5'-2" N.G.V.D.
FILL
AREA NOT ACCESSIBLE
LAWN
+5'-2" N.G.V.D.
FD
TIERED GARDENS
ELEVATOR
PRESSURIZATION
SE-1
FD
5.00 %
+2'-0" N.G.V.D.
SERVICE
ENTRY
BAYWALK
2Ms
2M
2Mss
+5'-6" N.G.V.D.
TC.
STORAGE FD
2Ms
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
FD
STORAGE
10
FILL
AREA NOT ACCESSIBLE
9
S
8
7
4
3
2
TRASH COLLECTION RM
2M
STAIR #2
SE-2
+3'-6" N.G.V.D.
UP
2C
F.1
2Cs
UP
11 x 7" = 6'-6"
6
5
LOADING AREA
FD
FD
FD
FD
FD
PROPERTY LINE
FD
SOUTH
EGRESS
CORRIDOR
FILL
AREA NOT ACCESSIBLE
LANDSCAPE
RAMP
UP
LANDSCAPE
16.78 %
UP
LAWN
01 02 03
04 05 06 07 08 09
EXIT
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
UP
STAIR #5
STAIR #4
BIKE
REPAIRS
BICYCLE PARKING
9 BICYCLES
UP
BICYCLE PARKING
9 BICYCLES
UP
BACKFLOW
PREVENTORS
UP
+9'-6" N.G.V.D.
FD+3'-6" N.G.V.D.
8.33 %
8.33 %
Owner Information
+3'-6" N.G.V.D.
UP
UP
VIEW
CORRIDOR
BACKFLOW
PREVENTORS
04 05 06 07 08 09
8.33 %
VEHICULAR
DROP-OFF
ENTRY
PLAZA
+7'-0" N.G.V.D.
8.33 %
8.33 %
+5'-2" N.G.V.D.
TIERED GARDENS
UP
LANDSCAPE
PLAZA
VIEW
CORRIDOR
LANDSCAPE
8.33 %
STEPS
SIDEWALK
10.00 %
LANDSCAPE
8.33 %
Bike Lounge-South
01 02 03
8.33 %
EXIT
16.78 %
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
2M
F.1
2M
F.1
LANDSCAPE
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
PROPERTY LINE
SIDEWALK
PROPERTY LINE
PLAZA
700 EDGEWATER
DEVELOPMENT LLC
1'-0"
Consultant
STEPS
Design by
BICYCLE REPAIR
01 02 03
04 05 06 07 08 09
01 02 03
04 05 06 07 08 09
1'-0"
Luis O. Revuelta
AR-0007972
EXIT
ZONING
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
UP
STAIR #5
STAIR #4
BIKE
REPAIRS
BICYCLE PARKING
9 BICYCLES
UP
BICYCLE PARKING
9 BICYCLES
Date
9/6/2016
Drawn By
UP
Checked By
KK
Scale
AS SHOWN
LANDSCAPE
LANDSCAPE
Project No.
1433
LANDSCAPE
STEPS
Sheet Name
1'-0"
BIKE CALCULATIONS
Sheet No.
A-007A
269'-7"
PROPERTY LINE
PROPERTY LINE
1
2
10.00 %
PROPERTY LINE
3RD LAYER
GROUND LEVEL PARKING
SETBACK
UP
UP
UP
8.33 %
8.33 %
8.33 %
8.33 %
12'-3"
LOT G
11 x 7" = 6'-6"
UP
5.00 %
LOT F
194'-4"
UP
16.95 %
10.00 %
8.33 %
223'-3"
S T R E E T
262'-9"
486'-4"
F R O N T
P R I N C I P A L
15.15 %
PROPERTY LINE
10.00 %
VIEW
CORRIDOR
26TH
8.33 %
3 x 6" = 1'-6"
UP
N E
8.33 %
8.33 %
16.78 %
N E
A
T T
O R
N A
P
8.33 %
8.33 %
LOT E
LOT 4
8.33 %
5TH
LOT 2
UP
A V.
UP
3RD LAYER
GROUND LEVEL PARKING SETBACK
PROPERTY LINE
3RD LAYER
2ND LAYER - GROUND PARKING SETBACK
GROUND LEVEL PARKING SETBACK
15.15 %
VIEW
CORRIDOR
NOT A PART
OF SCOPE
PROJECT
BOUNDARY
T E R R A C E
S E C O N D A R Y
T. 305.590.5000
F. 305.590.5040
Project
Revisions
1'-0"
498'-2"
F R O N T
PROPERTY LINE
S T R E E T
486'-4"
F R O N T
PEDESTAL (LEVELS 3 TO 7)
TOWER (LEVEL 8)
Consultant
194'-4"
VIEW
CORRIDOR
12'-3"
B I S C A Y N E
T O W E R
PROPERTY LINE
B R I D G E
PROPERTY LINE
P R I N C I P A L
700 EDGEWATER
DEVELOPMENT LLC
VIEW
CORRIDOR
PROPERTY LINE
30'-0"
GARAGE
26TH
25'-0"
VIEW
CORRIDOR
N E
25'-0"
Owner Information
30'-0"
PROPERTY LINE
5TH
A
T T
O R
N A
P
188'-1/2"
A V.
VIEW
CORRIDOR
50'-0"
B A Y
36'-4"
PROPERTY LINE
N E
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
26TH
N E
revuelta.com
223'-3"
36'-4"
5'-4"
F R O N T
50'-0"
10.00 %
S E C O N D A R Y
498'-2"
Miami
Santiago, Chile
700 EDGEWATER
T E R R A C E
8.33 %
26TH
8.33 %
N E
B I S C A Y N E B A Y
B I S C A
Y N E
B A Y
architecture
international
8.33 %
revuelta
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
SITE PLAN | SETBACK
DIAGRAM
Sheet No.
A-008
revuelta
architecture
international
N E
26TH
T E R R A C E
S E C O N D A R Y
Miami
Santiago, Chile
F R O N T
revuelta.com
PROPERTY LINE
T O W E R
802 sq ft
31,634 sq ft
20,662 sq ft
21,291 sq ft
11,411 sq ft
PROPERTY LINE
N E
26TH
S T R E E T
F R O N T
P R I N C I P A L
OPEN SPACE
32,702 sq ft
LOT AREA
91,384 sq ft
B R I D G E
G A R A G E
Project
700 EDGEWATER
TOWER
MAXIMUM FLOORPLATE OUTLINE
B A Y
PROPERTY LINE
GARAGE
MAXIMUM FLOORPLATE OUTLINE
B I S C A Y N E
N E
5TH
A
T T
O R
N A
P
PROPERTY LINE
A V.
T. 305.590.5000
F. 305.590.5040
Revisions
N E
26TH
1'-0"
T E R R A C E
S E C O N D A R Y
F R O N T
PROPERTY LINE
Owner Information
31,634 sq ft
B R I D G E
T O W E R
802 sq ft
22,167 sq ft
PROPERTY LINE
N E
26TH
S T R E E T
P R I N C I P A L
F R O N T
LOT COVERAGE
54,603 sq ft
LOT AREA
91,384 sq ft
B A Y
B I S C A Y N E
G A R A G E
TOWER
MAXIMUM LOT COVERAGE
PROPERTY LINE
GARAGE
MAXIMUM LOT COVERAGE
5TH
A
T T
O R
N A
P
PROPERTY LINE
A V.
700 EDGEWATER
DEVELOPMENT LLC
N E
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
SCALE: 1/32" =
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
OPEN SPACE & LOT
COVERAGE
Sheet No.
A-009
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
1'-0"
LEVEL 29 | MECHANICAL
SCALE: 1/32" =
1'-0"
LEVEL 57 | PH UPPER
SCALE: 1/32" =
1'-0"
700 EDGEWATER
Revisions
30/30
30/30
72/18
26/28
10" CT
10" CT
48/48
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
CT
58/24
EPF1H
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
1'-0"
FLOORPLATE GROSS AREA
AREA
LEVEL
AREA
LEVEL
1'-0"
AREA
LEVEL
AREA
LEVEL
*
45,425*
36,772*
47,835*
49,342*
53,412*
18,720*
15,569*
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
39,794
Consultant
AREA
Design by
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
LEVEL 29 - MECHANICAL
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
13,713
Luis O. Revuelta
13,713
13,713
13,713
13,697
AR-0007972
13,713
13,713
13,713
LEVEL 57 - 2 UNITS PH
13,673
ZONING
8,951
1,777
975,765 sq ft
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
A-010
8.33 %
8.33 %
8.33 %
16.78 %
UP
UP
8.33 %
8.33 %
8.33 %
B A Y
T. 305.590.5000
F. 305.590.5040
S
UP
UP
8.33 %
8.33 %
UP
UP
8.33 %
10.00 %
8.33 %
8.33 %
8.33 %
10.00 %
revuelta.com
8.33 %
UP
8.33 %
8.33 %
UP
8.33 %
16.78 %
16.78 %
8.33 %
8.33 %
16.78 %
8.33 %
Miami
Santiago, Chile
UP
UP
B I S C A Y N E
10.00 %
15.15 %
8.33 %
8.33 %
15.15 %
8.33 %
UP
UP
UP
PROPERTY LINE
8.33 %
UP
10.00 %
8.33 %
8.33 %
15.15 %
15.15 %
UP
8.33 %
8.33 %
UP
architecture
international
8.33 %
UP
NOT A PART
revuelta
UP
R= 30'-0"
Project
PER MIAMI 21 SECTION 5.6.3.b "The Calculation of the F.L.R. shall not apply to the portion of the
building that is entirely below Base Flood Elevation."
FILL - AREA NOT ACCESSIBLE
SCALE: 1/64" =
1'-0"
UP
UP
UP
UP
UP
2.70 %
UP
UP
1'-0"
UP
UP
UP
UP
UP
UP
UP
SCALE: 1/64" =
UP
UP
LEVEL 3 | MECHANICAL
1'-0"
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
1'-0"
UP
UP
1'-0"
700 EDGEWATER
SCALE: 1/64" =
LEVEL 2 | LOBBY
2.70 %
SCALE: 1/64" =
1'-0"
Revisions
UP
S
S
EAST POOL
DECK BELOW
1'-0"
1'-0"
SCALE: 1/64" =
1'-0"
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
S
Consultant
S
10
LEVEL 29 | MECHANICAL
SCALE: 1/64" =
11
1'-0"
LEVEL 57 | PH UPPER
SCALE: 1/64" =
12
1'-0"
F.L.R.
LEVEL
LEVEL 1 - SERVICE / LOADING ENTRY
30/30
30/30
72/18
26/28
10" CT
10" CT
CT
48/48
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
UP
58/24
EPF1H
13
F.L.R.
AREA
LEVEL
SCALE: 1/64" =
1'-0"
F.L.R.
AREA
LEVEL
Design by
F.L.R.
AREA
LEVEL
F.L.R.
AREA
LEVEL
AREA
195
11,592
11,592
11,592
11,592
40,389
11,592
11,592
11,592
11,592
36,774
11,592
11,592
11,592
11,592
46,439
11,592
LEVEL 29 - MECHANICAL
11,592
11,592
11,592
49,332
11,592
11,592
11,592
11,592
17,838
11,592
11,592
11,592
11,592
10,774
11,592
11,592
11,592
11,588
Date
9/6/2016
11,592
11,592
11,592
11,592
LEVEL 57 - 2 UNITS PH
9,534
Drawn By
11,592
11,592
11,592
11,592
1,777
11,592
11,592
11,592
1,777
11,592
11,592
11,592
11,592
11,592
11,592
11,592
11,592
SCALE: 1/64" =
11,592
1'-0"
771,241 sq ft
Luis O. Revuelta
AR-0007972
ZONING
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
F.L.R. CALCULATION
F.L.R. CALCULATION
Sheet No.
A-011
NE 26TH TERRACE
3'-0"
3'-0"
15'-0"
PROPERTY LINE
architecture
P: 305-590-5000
international
3'-0"
10'-4"
15'-0"
revuelta
NEW SEA
WALL CAP
SAFETY
ZONE
CIRCULATION
ZONE
3'-0" 3'-0"
NE 26TH TERRACE
3'-0"
PASSIVE
ZONE
TRANSITION
ZONE
MATCH LINE
700 EDGEWATER
REVUELTA
DEVELOPMENT LLC
MEP ENG.:
Miami
STRUCTURA
Santiago, Chile
KORDA
DESIMONE
revuelta.com
LAWN
800
BRICKELL AVEN
T. 305.590.5000
F. 305.590.5040
SUITE 200.
MIAMI, FL 33131
P: 305-441-0755
CIVIL ENG.:
POOL CONS
Project
STREET NUMBER
MIAMI, FL , 33144
P: 305-551-6267
OUTLINE OF
LOBBY CANOPY
BY ARCHITECTS
LIFT
SAFETY ZONE
CIRCULATION ZONE
PASSIVE ZONE
FPL VAULT
TBD
TBD
MAIN
ELECTRICAL
ROOM
STAIR #1
A/C CLO.
PROPOSED LIGHTING
garden design
Enea Garden Design Inc.
7580 NE 4th Court, Studio 105
Miami, Florida 33138, USA
T+1 305.576.6702 | F+1 305.576.6703
HEAT PUMPS 12
EGRESS
CORRIDOR
FIRE PUMPS
MAX 5% SLOPE
TRANSITION ZONE
STAIR #4
P: XXX-XXX-XXX
700 EDGEWATER
RAMP
www.enea.ch | info.miami@enea.ch
REG.No: LC26000339
Revisions
PE-1
PE-1
1
2
3
+16'-0" N.G.V.D.
LOBBY
DROP OFF
@ LEVEL 2
TBD
STO.
ELECTRIAL RM.
TBD
TBD
8.33 %
LOBBY
JAN.
JAN.
CLOSET
CLOSET
SEAL:
TBD
SERVICE
CORRIDOR
SERVICE
SERVICE
ENTRY CORRIDOR
RECEPTION
TBD
TBD
TBD
SMALL
PACKAGES
SERVICE
CORRIDOR
PE-2
SAFETY ZONE
PROPOSED BENCHES
PE-2
3'-0" 3'-0"
TBD
BATHROOM
TBD
SE-1
SE-1
TBD
TC.
TC.
TBD
STORAGE
STO.
LARGE
PCKG. RM.
TBD
STO.
FIRE COMMAND
CENTER
TRASH COLLECTION RM
STAIR #2
LOADING AREA
+14'-0" N.G.V.D.
3'-0"
OUTDOOR TERRACE
STO. TBD
TBD
+17'-4" N.G.V.D.
15'-0"
BAYSIDE LOUNGE
TBD STO.
8.33 %
8.33 %
WATER FEATURE
HOLDING TANK
PE-3
PE-3
CIRCULATION PATH
Owner Information
700 EDGEWATER
DEVELOPMENT
LLC
FIRM:_______________
FOR THE
GERARDO 2525
JAVIER
DELGADO
PONCE DE LEON BLV #4
PASSIVER.L.A.
ZONE 0001574
CORAL GABLES, FLORIDA
33134
DATE:
SE-2
VALET
OFFICE
TBD
EGRESS
CORRIDOR
MAIL ROOM
8.45 %
+10'-0" N.G.V.D.
FLOOD ELEVATION
TBD
EGRESS
CORRIDOR
WOMEN'S
BATHROOM
BUILDING STORAGE
8.45 %
TBD
TBD
MEN'S
BATHROOM
10
SAFETY ZONE
8.25 %
8.25 %
+4'-0" N.G.V.D.
8.27 %
+4'-0" N.G.V.D.
8.27 %
LOPE
8.27 %
8.27 %
PROPERTY LINE
8.45 %
WATER FEATURE
BY ARCHITECTS
8.45 %
EMERGENCY
GENERATOR RM.
Design by
MAX 5% SLOPE
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
8.33 %
02
TBD
BAYWALK
4 x 6" = 2'-0"
UP
TBD
No: DATE:
1
02.09.16
ISSUE FOR
50% Design Deve
03.11.16
Luis O. Revuelta
AR-0007972
ZONING
TRANSITION ZONE
Date
9/2/2016
Drawn By
Checked By
KK
PROPERTY LINE
RAMP
Scale
AS SHOWN
Project No.
1433
BAYWALK PLAN
REFER TO LANDSCAPE DWGS FOR ADDITIONAL INFORMATION REGARDING BAYWALK INCLUDING PROPOSED
HARDSCAPE, PLANTING MATERIALS, SEATING BENCH DETAILS, GENERAL & LANDSCAPE LIGHTING
ISSUED FOR:
Sheet Name
BAYWALK & WATERFRONT
DIAGRAMS
Sheet No.
A-012
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
LOBBY LEVEL
BAYVIEW TERRACE
LOBBY LEVEL
LAWN AREA
TIERED
GARDENS
BAYWALK
BISCAYNE BAY
T. 305.590.5000
F. 305.590.5040
700 EDGEWATER
Project
Revisions
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
AERIAL VIEW LOOKING NORTH FROM NE 26th STREET (PRINCIPAL FRONTAGE) SHOWING PROPOSED LOBBY LEVEL BAYVIEW TERRACE, LAWN AREA, TIERED GARDENS, BAYWALK AND BISCAYNE BAY BEYOND
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
AERIAL VIEW LOOKING WEST FROM BISCAYNE BAY (WATERFRONT FRONTAGE) SHOWING PROPOSED LOBBY LEVEL BAYVIEW TERRACE, LAWN AREA, TIERED GARDENS AND PROPOSED BAYWALK
BAYWALK RENDERINGS
Sheet No.
A-012A
revuelta
architecture
international
MONUMENT LINE
Miami
Santiago, Chile
revuelta.com
5'-4"
223'-3"
PROPERTY LINE
Project
SIDEWALK
PLAZA
1'-0"
VIEW
CORRIDOR
STEPS
OUT
IN
SIDEWALK
IN
OUT
UP
PROPERTY LINE
UP
3RD LAYER
GROUND LEVEL PARKING SETBACK
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
19'-8"
SIDEWALK
LOADING
ENTRY /
EXIT
700 EDGEWATER
7'-6"
PARKING
ENTRY /
EXIT
UP
UP
ONE WAY
Revisions
LOADING #1
12'X35'
LOADING #2
12'X35'
UP
129'-0"
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
LOADING #3
10'X20'
UP
10.00 %
RAMP
16.95 %
10.00 %
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
5.00 %
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
Consultant
11 x 7" = 6'-6"
UP
PROPERTY LINE
UP
3RD LAYER
GROUND LEVEL PARKING
SETBACK
UP
12'-0"
EXIT
UP
UP
13'-10"
UP
STEPS
SIDEWALK
SIDEWALK
SIDEWALK
EXIT
UP
VIEW
CORRIDOR
5'-0"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
PARKING
LEVEL 1
Luis O. Revuelta
AR-0007972
ZONING
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
WAIVER #1 - LOADING BERTHS
Sheet No.
A-013
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
POOL DECK
T. 305.590.5000
F. 305.590.5040
PARKING
700 EDGEWATER
ART
TREATMENT
Project
PARKING
EL. +36'-5" N.G.V.D.
LEVEL 4 - DUPLEX LOWER / PARKING
MONUMENT LINE
Revisions
1
A-302
23'-9"
5'-4"
223'-3"
7'-6"
PROPERTY LINE
REV
3RD LAYER
GROUND LEVEL
PARKING SETBACK
PROPERTY LINE
18'
-0"
UP
3RD LAYER
GROUND LEVEL PARKING
SETBACK
56
8'-6
57
8'-6"
UP
18'-0"
55
1a
A-014
ONE WAY
54
11
12
13
14
15
16
17
8'-6
10
"
21
20
19
18
17
16
15
14
13
12
REV
18
OPEN
TO LOADING
AREA
BELOW
-0"
18'
PARKING
"
12'-0"
VIEW
CORRIDOR
2'-0"
10
9
8
7
6
5
4
3
2
1
16'-9"
52
50
DN
"
19
46
45
44
43
42
41
40
1a
A-014
ONE WAY
8'-6
47
38
"
37
36
35
34
33
32
31
SCALE: 1/4" =
1'-0"
PROPERTY LINE
22
28
27
26
25
3RD LAYER
GROUND LEVEL
PARKING SETBACK
24
23
UP
11'-10"
ZONING
Date
9/6/2016
1a
A-014
Drawn By
223'-3"
Checked By
KK
MONUMENT LINE
CENTERLINE OF N.E. 26th STREET
PRINCIPAL FRONTAGE
14
A-301
Luis O. Revuelta
AR-0007972
UP
VIEW
CORRIDOR
Design by
21
29
UP
5'-0"
1ST LAYER
2ND LAYER
3RD LAYER
1a
10
9
8
7
6
5
4
3
2
1
8'-6"
30
UP
20
39
18'-0"
3RD LAYER
GROUND LEVEL PARKING
SETBACK
48
18'
-0"
15'-0"
PROPERTY LINE
49
10.00 %
8'-6
14.51 %
10 x 6" = 5'-4"
UP
PARKING
57 SPACES
RAMP
DN
PARKING
LEVEL 2
2
A-302
PARKING
10.00 %
11 x 7" = 6'-6"
+10'-0"N.G.V.D.
FEMA FLOOD ELEVATION
UP
23'-0"
51
1
A-401
Consultant
22'-0"
144'-0"
BICYCLE
LOUNGE
700 EDGEWATER
DEVELOPMENT LLC
UP
23'-0"
Owner Information
11
53
-0"
18'
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
1a
A-014
17'-9"
PARKING
WAIVER # 2 - WAIVER FOR ART WALL FOR PARKING IN SECOND LAYER ABOVE STREET LEVEL
REFER TO SHEET A-014a FOR ADDITIONAL ART WALL INFORMATION
Scale
AS SHOWN
Project No.
1433
Sheet Name
WAIVER #2 - GARAGE - ART
TREATMENT
Sheet No.
A-014
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
EAST ELEVATION
SOUTH ELEVATION
700 EDGEWATER
Project
NORTH ELEVATION
WEST ELEVATION
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
BL
O
CK
(P N
RI E
M 26
AR th
Y ST
FR R
O EE
NT T
AG
E)
PA
SS
AG
E
ZONING
CR
O
SS
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Revisions
(S
EC NE
O 26
ND th
AR TE
Y RR
FR A
O CE
NT
AG
E)
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
WAIVER # 2 CONT.
Sheet No.
A-014b
revuelta
architecture
international
Miami
Santiago, Chile
2
A-401
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
99'-2"
34'-1"
1
A-302
35'-5"
223'-3"
10'-0"
10'-0"
54'-8"
10'-0"
PROPERTY LINE
10'-0"
R= 30'-0"
10'-0"
10'-0"
BASE BUILDING LINE
148'-3"
16'-6"
Project
10'-0"
TIERED GARDENS
700 EDGEWATER
10%
10.00 %
PROPERTY LINE
NOT A PART
10'-0"
5'-4"
55'-6"
NORTH VEHICULAR
CURB CUT
10
21
20
19
18
17
16
15
14
13
12
ONE WAY
11
12
13
14
15
16
17
"
18
OPEN
TO LOADING
AREA
BELOW
-0"
18'
54
8'-6
11
10
9
8
7
6
5
4
3
2
1
53
16'-9"
UP
23'-0"
UP
10.00 %
PARKING
LEVEL 2
10.00 %
DN
45
44
43
42
41
40
152 sq ft
10 x 6" = 5'-4"
UP
10
9
8
7
6
5
4
3
2
1
LAWN
39
Revisions
1
A-401
1
A-301
10%
46
20
-0"
18'
49
19
DN
"
8'-6
11 x 7" = 6'-6"
50
8'-6"
30
UP
28
27
26
25
3RD LAYER
GROUND LEVEL
PARKING SETBACK
24
23
UP
UP
UP
LANDSCAPE
Owner Information
16.78 %
18'-0"
29
10'-0"
8.33 %
8.33 %
8.33 %
LANDSCAPE
TIERED GARDENS
Consultant
PROPERTY LINE
10'-0"
223'-3"
8.33 %
700 EDGEWATER
DEVELOPMENT LLC
VIEW
CORRIDOR
31
20'-10"
32
+4'-6" N.G.V.D.
GRADE-VARIES
33
+12'-0" N.G.V.D.
34
RAMP
15%
35
10%
36
22
10.00 %
37
ONE WAY
VEHICULAR DRIVE
23'-0"
15'-0"
18'
-0"
38
"
8.33 %
8'-6
47
8.33 %
ONE WAY
8.33 %
48
8.33 %
PROPERTY LINE
21
16.78 %
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
14.51 %
COVERED
DROP-OFF
PARKING
57 SPACES
RAMP
51
22'-0"
52
194'-5"
55
8.33 %
8.33 %
128'-11"
8.33 %
18'-0"
12'-0"
UP
8'-6"
"
8.33 %
+12'-0" N.G.V.D.
8'-6
57
8.33 %
ONE
15.15WAY
%
VEHICULAR DRIVE
56
8.33 %
10%
PROPERTY LINE
18'
-0"
RAMP
17%
UP
15.15 %
3RD LAYER
GROUND LEVEL
PARKING SETBACK
GRADE-VARIES
+4'-6" N.G.V.D.
LANDSCAPE
23'-0"
LOADING
CURB CUT
VIEW
CORRIDOR
PARKING ENTRY/EXIT
CURB CUT
T. 305.590.5000
F. 305.590.5040
MONUMENT LINE
44'-8"
MONUMENT LINE
10'-0"
48'-8"
154'-3"
9'-10"
MONUMENT LINE
Design by
14
A-301
20'-0"
33'-4"
2
A-401
SOUTH VEHICULAR
CURB CUT
Luis O. Revuelta
AR-0007972
ZONING
1'-0"
SECTION 5.6.4(g) OF MIAMI 21 - OFF-STREET PARKING DRIVEWAY STANDARDS
b. THE VEHICULAR ENTRANCE AT THE FRONTAGE LINE:
1. T6: SHALL BE NO WIDER THAN THIRTY (30) FEET AND THE MINIMUM DISTANCE BETWEEN
VEHICULAR ENTRANCES SHALL BE SIXTY (60) FEET UNLESS APPROVED BY WAIVER.
MAX. ALLOWED CURB CUT = 30'-0" FEET
PROVIDED CURB CUTS - TOTAL OF 3 CURB CUTS =
@ NORTH VEHICULAR ACCESS @ N.E. 26th TERRACE = 35'-5"
@ NORTH LOADING ACCESS @ N.E. 26th TERRACE = 34'-1"
@ SOUTH VEHICULAR ACCESS @ N.E. 26th STREET = 33'-4"
WAIVER TO PERMIT DISTANCE BETWEEN VEHICULAR ENTRANCES TO PARKING GARAGE TO EXCEED
MINIMUM OF 60'-0" FEET ALONG N.E. 26th TERRACE AT 99 FEET 2 INCHES
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
WAIVER #3 - VEHICULAR CURB
CUTS
Sheet No.
A-015
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
223'-3"
23'-0"
SIDEWALK
202'-11"
PROPERTY LINE
15'-0"
10'-0"
TRASH HOLDING
LOADING
ZONE
10
44'-8"
10'-0"
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
UP
UP
BATH
8'-6"
Revisions
STORAGE
"
8'-6
50
13
14
15
16
17
NORTH
EGRESS
CORRIDOR
LOADING #1
12'X35'
18
-0"
18'
12
20'-0"
UP
DOCKMASTER
ONE WAY
11
UP
LAWN
14'-10"
UP
TIERED GARDENS
15.15 %
12'-0"
STAIR #3
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
VEHICULAR
DROP-OFF
EXIT
PLAZA
PEDESTAL FRONT SETBACK
FPL VAULT
18'-0"
"
18'-0"
OUT
BICYCLE REPAIR
18'
-0"
UP
3RD LAYER
GROUND LEVEL PARKING SETBACK
8'-6
8'-6"
STEPS
IN
UP
PROPERTY LINE
OUT
IN
SIDEWALK
15.15 %
19'-8"
1'-0"
2ND LAYER
GROUND LEVEL PARKING SETBACK
PLAZA
PROPOSED BACKFLOW
PREVENTOR LOCATION
10'-0"
10'-0"
SIDEWALK
LOADING
ENTRY /
EXIT
10.00 %
7'-6"
7'-6"
50'-0"
TO EAST PROPERTY LINE
PROPERTY LINE
10'-0"
7'-6"
PARKING
ENTRY /
EXIT
SIDEWALK
16'-6"
34'-1"
BACKFLOW
PREVENTORS
5'-4"
PROPOSED FIRE
HYDRANT LOCATION
NOT A PART
1
A-302
49
700 EDGEWATER
MONUMENT LINE
2
A-401
BUILDING STORAGE
LOADING #2
12'X35'
STAIR #1
S
16.95 %
PARKING
19
20
13'-4"
45
28'-0"
36
35
34
33
32
31
30
29
28
27
26
25
23
24
STAIR #4
UP
UP
488 sq ft
PROPERTY LINE
PROPOSED FIRE
HYDRANT LOCATION
VEHICULAR
DROP-OFF
ENTRY
10'-0"
SIDEWALK
5'-0"
5'-0"
SIDEWALK
10'-0"
10'-0"
SIDEWALK
STEPS
UP
723 sq ft
BACKFLOW
PREVENTORS
PLAZA
8.33 %
8.33 %
PLAZA
Design by
8.33 %
TIERED GARDENS
SIDEWALK
SIDEWALK
SIDEWALK
PROPOSED BACKFLOW
PREVENTORS LOCATION
PROPERTY LINE
8.33 %
UP
10'-0"
BIKE
REPAIRS
UP
5'-0"
BICYCLE PARKING
9 BICYCLES
UP
Consultant
LAWN
EXIT
UP
5'-0"
5'-8"
5'-0"
10'-0"
BICYCLE PARKING
9 BICYCLES
5'-8"
8'-6"
UP
10.00 %
18'-0"
20'-0"
FILL
AREA NOT ACCESSIBLE
20'-10"
37
SOUTH
EGRESS
CORRIDOR
BACKFLOW
PREVENTORS
38
8'-6"
PROPERTY LINE
12'-0"
13'-10"
VIEW
CORRIDOR
5'-0"
39
8.33 %
22
202'-11"
9'-10"
NOT A PART
OF SCOPE
PROJECT
BOUNDARY
14
A-301
10'-0"
10'-0"
Luis O. Revuelta
AR-0007972
MONUMENT LINE
CENTERLINE OF N.E. 26TH STREET (PRINCIPAL FRONTAGE)
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
STAIR #2
16.78 %
UP
1
A-301
STORAGE
18'-0"
40
EXIT
BAYWALK
TRASH COLLECTION RM
16.78 %
3RD LAYER
GROUND LEVEL PARKING
SETBACK
UP
2ND LAYER
STAIR #5
GROUND LEVEL PARKING SETBACK
TIERED GARDENS
1
A-401
43
41
TC.
LAWN
ELEVATOR
PRESSURIZATION
SE-1
SE-2
1H.C.
23'-0"
42
SERVICE
ENTRY
LOADING AREA
STORAGE
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
44
21
23'-0"
8.33 %
188'-0"
129'-0"
46
2
A-302
FILL
AREA NOT ACCESSIBLE
10.00 %
128'-11"
RAMP
10.00 %
LOADING #3
10'X20'
8.33 %
UP
SERVICE
CORRIDOR
8.33 %
1
A-401
STORAGE
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
PUMP
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
5.00 %
47
PARKING
LEVEL 1
48
ZONING
2
A-401
20'-0" PEDESTRIAN
CROSS-BLOCK PASSAGE
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
ELEV.+3'-6" N.G.V.D.
FEMA BASE FLOOD ELEVATION @ +10'-0" N.G.V.D.
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-201a & A-201b
Sheet Name
LEVEL 1 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
A-101
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
448'-1"
FRONTAGE BETWEEN SETBACKS
104'-9"
PARKING
FRONTAGE
23'-0"
LOADING
ENTRY/EXIT
53'-6"
PARKING
FRONTAGE
55'-0"
PEDESTRIAN & VEHICULAR
PASSAGE WAY
148'-3"
TOWER FRONTAGE
50'-0"
WATERFRONT SETBACK
PROPERTY LINE
MONUMENT LINE
NOT A PART
IN
BICYCLE REPAIR
TRASH HOLDING
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
UP
FPL VAULT
BUILDING STORAGE
STAIR #1
PUMP
FILL
AREA NOT ACCESSIBLE
10.00 %
PARKING
TC.
LAWN
TIERED GARDENS
ELEVATOR
PRESSURIZATION
SE-1
BAYWALK
STORAGE
5.00 %
TRASH COLLECTION RM
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
SERVICE
ENTRY
LOADING AREA
STORAGE
STAIR #2
SE-2
16.78 %
PROPERTY LINE
B A Y
Owner Information
PLAZA
8.33 %
8.33 %
8.33 %
8.33 %
TIERED GARDENS
UP
PLAZA
SIDEWALK
SIDEWALK
10'-0"
BACKFLOW
PREVENTORS
UP
10'-0"
SIDEWALK
10'-0"
BACKFLOW
PREVENTORS
SIDEWALK
PROPERTY LINE
MONUMENT LINE
CENTERLINE OF N.E. 26TH STREET (PRINCIPAL FRONTAGE)
700 EDGEWATER
DEVELOPMENT LLC
PROJECT
BOUNDARY
Consultant
Architect of Record
223'-2"
PARKING STRUCTURE FRONTAGE
55'-0"
PEDESTRIAN & VEHICULAR
PASSAGE WAY
148'-3"
TOWER FRONTAGE
50'-0"
WATERFRONT SETBACK
436'-4"
FRONTAGE BETWEEN SETBACKS
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
5'-0"
UP
VEHICULAR
DROP-OFF
ENTRY
10.00 %
UP
5'-0"
STEPS
5'-0"
5'-0"
SIDEWALK
UP
STAIR #4
UP
10'-0"
10'-0"
5'-0"
SIDEWALK
10'-0"
BICYCLE PARKING
9 BICYCLES
BIKE
REPAIRS
EXIT
8.33 %
UP
BICYCLE PARKING
9 BICYCLES
LAWN
8.33 %
EXIT
16.78 %
3RD LAYER
GROUND LEVEL PARKING
SETBACK
UP
STAIR #5
2ND LAYER - GROUND PARKING SETBACK
UP
8.33 %
UP
SOUTH
EGRESS
CORRIDOR
FILL
AREA NOT ACCESSIBLE
8.33 %
VIEW
CORRIDOR
16.95 %
25'-0"
RAMP
10.00 %
20'-0"
UP
SERVICE
CORRIDOR
LOADING #3
10'X20'
STORAGE
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
Revisions
B I S C A Y N E
NORTH
EGRESS
CORRIDOR
158'-9"
FRONTAGE BETWEEN SETBACKS
STORAGE
116'-1"
73% BUILDING FRONTAGE
ONE WAY
PROPERTY LINE
STAIR #3
PEDESTAL
SETBACK
BATH
PROPERTY LINE
VIEW
CORRIDOR
UP
PARKING
LEVEL 1
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
25'-0"
LAWN
UP
DOCKMASTER
LOADING
ZONE
LOADING #2
12'X35'
NOT A PART
OF SCOPE
20'-0"
UP
LOADING #1
12'X35'
LOT G
TIERED GARDENS
15.15 %
PROPERTY LINE
3RD LAYER
GROUND LEVEL PARKING SETBACK
UP
VEHICULAR
DROP-OFF
EXIT
UP
UP
OUT
PLAZA
PEDESTAL FRONT SETBACK
15.15 %
15'-0"
10'-0"
OUT
IN
PLAZA
10'-0"
SIDEWALK
LOADING
ENTRY /
EXIT
BACKFLOW
PREVENTORS
10.00 %
7'-6"
PROPERTY LINE
10'-0"
SIDEWALK
7'-6"
PARKING
ENTRY /
EXIT
10'-0"
PROPERTY LINE
PEDESTAL
SETBACK
PROPERTY LINE
SIDEWALK
MONUMENT LINE
Project
700 EDGEWATER
PROPERTY LINE
18'-7"
23'-0"
PARKING
PARKING
FRONTAGE ENTRY/EXIT
Luis O. Revuelta
AR-0007972
SHORELINE DEVELOPMENT
Date
8/01/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
SETBACKS & FRONTAGES
EXHIBIT
Sheet No.
A-101.1
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
MONUMENT LINE
MONUMENT LINE
15'-4"
25'-8"
SIDEWALK
44'-5"
PROPERTY LINE
3RD LAYER
GROUND LEVEL PARKING SETBACK
OUT
UP
BICYCLE REPAIR
TRASH HOLDING
3RD LAYER
GROUND LEVEL PARKING SETBACK
TIERED GARDENS
UP
UP
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
UP
FPL VAULT
LAWN
UP
DOCKMASTER
15.15 %
BATH
STAIR #3
ONE WAY
STORAGE
PROPERTY LINE
LOADING
ZONE
UP
NORTH
EGRESS
CORRIDOR
LOADING #1
12'X35'
BUILDING STORAGE
LOADING #2
12'X35'
15'-0"
IN
VEHICULAR
DROP-OFF
EXIT
PLAZA
PEDESTAL FRONT SETBACK
15.15 %
UP
STEPS
UP
PROPERTY LINE
OUT
IN
10'-0"
VIEW
CORRIDOR
PLAZA
700 EDGEWATER
VIEW
CORRIDOR
10'-0"
SIDEWALK
LOADING
ENTRY /
EXIT
10.00 %
7'-6"
10'-0"
SIDEWALK
7'-6"
PARKING
ENTRY /
EXIT
PROPERTY LINE
BACKFLOW
PREVENTORS
33'-7"
Project
NOT A PART
STAIR #1
Revisions
S
PARKING
LEVEL 1
PUMP
STORAGE
UP
RAMP
10.00 %
16.95 %
SERVICE
CORRIDOR
LOADING #3
10'X20'
FILL
AREA NOT ACCESSIBLE
10.00 %
PARKING
TC.
SE-1
LAWN
TIERED GARDENS
ELEVATOR
PRESSURIZATION
BAYWALK
STORAGE
5.00 %
TRASH COLLECTION RM
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
SERVICE
ENTRY
LOADING AREA
STORAGE
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
STAIR #2
SE-2
19'-8"
9'-5"
15'-4"
75'-0"
9'-4"
20'-0"
PLAZA
8.33 %
8.33 %
8.33 %
8.33 %
PLAZA
SIDEWALK
SIDEWALK
Consultant
TIERED GARDENS
UP
VIEW
CORRIDOR
UP
10'-0"
SIDEWALK
5'-0"
PROPERTY LINE
64'-8"
10'-0"
10'-0"
STEPS
VEHICULAR
DROP-OFF
ENTRY
BACKFLOW
PREVENTORS
5'-0"
UP
5'-0"
10'-0"
5'-0"
SIDEWALK
UP
10.00 %
5'-0"
SIDEWALK
UP
UP
10'-0"
BACKFLOW
PREVENTORS
VIEW
CORRIDOR
BICYCLE PARKING
9 BICYCLES
EXIT
STAIR #4
BIKE
REPAIRS
LAWN
8.33 %
UP
BICYCLE PARKING
9 BICYCLES
700 EDGEWATER
DEVELOPMENT LLC
8.33 %
EXIT
Owner Information
UP
16.78 %
3RD LAYER
GROUND LEVEL PARKING
SETBACK
UP
STAIR #5
FILL
AREA NOT ACCESSIBLE
8.33 %
UP
SOUTH
EGRESS
CORRIDOR
8.33 %
PROPERTY LINE
16.78 %
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
SIDEWALK
PROPERTY LINE
Design by
MONUMENT LINE
CENTERLINE OF N.E. 26TH STREET (PRINCIPAL FRONTAGE)
PROJECT
BOUNDARY
Luis O. Revuelta
AR-0007972
ZONING
1'-0"
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
GROUND LEVEL DOOR
LOCATION EXHIBIT
Sheet No.
A-101.2
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
10%
10.00 %
10'-0"
15.15 %
10
ONE WAY
12
13
14
15
16
17
18
OPEN
TO LOADING
AREA
BELOW
10%
11
MAIN
ELECTRICAL
ROOM
53
23'-0"
STAIR #1
16'-9"
ELECTRIAL RM.
22'-0"
RAMP
14.51 %
10.00 %
DN
LOBBY
VALET OFFICE
SERVICE-CORRIDOR
PARKING VESTIBULE
"
8'-6
19
20
TC.
39
8'-6
"
37
36
35
34
33
32
31
PRIVATE 2 CAR
GARAGE
22
8'-6"
30
18'-0"
29
UP
28
27
26
25
3RD LAYER
GROUND LEVEL
PARKING SETBACK
24
23
UP
STAIR #4
10%
5'-0"
10.00 %
10'-0"
MAIL ROOM
ELEV.
CONTROL RM.
UP
5'-0"
STORAGE
STAIR #2
PE-3
PROPERTY LINE
223'-3"
STAFF
REST.
PLAZA
1
A-401
1
A-301
700 EDGEWATER
DEVELOPMENT LLC
WOMEN'S
REST.
MEN'S
REST.
Consultant
LANDSCAPE
8.33 %
8.33 %
8.33 %
LANDSCAPE
Design by
8.33 %
TIERED GARDENS
48'-8"
154'-3"
9'-10"
Luis O. Revuelta
AR-0007972
MONUMENT LINE
14
A-301
Owner Information
+12'-0" N.G.V.D.
40
10%
41
ONE WAY
VEHICULAR DRIVE
42
RAMP
15%
43
23'-0"
15'-0"
18'
-0"
44
16.78 %
11'-10"
45
STAIR #5
VIEW
CORRIDOR
5'-0"
46
16.78 %
UP
LAWN
ONE WAY
38
OUTDOOR TERRACE
SERVICE
STORAGE
CORRIDOR
STORAGE
FIRE COMMAND
CENTER
SE-2
21
PRIVATE 2 CAR 47
GARAGE
SE-1
BAYSIDE LOUNGE
PRIVATE 2 CAR
GARAGE
S
PRIVATE 2 CAR
GARAGE
49
20'-10"
50
48
PE-2
RECEPTION
COVERED
DROP-OFF
PARKING
57 SPACES
2
A-302
PACKAGES
PARKING
+4'-6" N.G.V.D.
GRADE-VARIES
144'-0"
10.00 %
-0"
18'
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By #Last saved by - Date: 9/6/2016
UP
PARKING
LEVEL 2
3RD LAYER
GROUND LEVEL PARKING
SETBACK
JAN.
CLOSET
1
A-401
PE-1
S
52
PRIVATE 2 CAR
GARAGE 51
HEAT
PUMPS
"
-0"
18'
54
8'-6
FIRE PUMPS
Revisions
194'-5"
8.33 %
128'-11"
MECHANICAL BALCONY
12'-0"
55
RAMP
17%
18'
-0"
8.33 %
ONE
15.15WAY
%
VEHICULAR DRIVE
UP
8.33 %
8.33 %
8'-6"
8.33 %
2'-0"
"
EMERGENCY
GENERATOR RM.
8.33 %
8.33 %
8'-6
57
BOILER ROOM
PRIVATE 2 CAR
GARAGE
8.33 %
GRADE-VARIES
+4'-6" N.G.V.D.
10'-0"
LANDSCAPE
3RD LAYER
GROUND LEVEL
PARKING SETBACK
UP
+12'-0" N.G.V.D.
10'-0"
18'-0"
TIERED GARDENS
8.33 %
17'-9"
VIEW
CORRIDOR
2ND LAYER - GROUND LEVEL PARKING SETBACK
STAIR #3
3RD LAYER
GROUND LEVEL PARKING
SETBACK
56
16'-6"
PROPERTY LINE
PRIVATE 2 CAR
GARAGE
148'-3"
8.33 %
7'-6"
7'-6"
PROPERTY LINE
54'-8"
44'-8"
223'-3"
NOT A PART
5'-4"
R= 30'-0"
700 EDGEWATER
MONUMENT LINE
2
A-401
ZONING
2
A-401
Date
9/6/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 2 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-202a & A-202b
A-102
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
5'-4"
223'-3"
54'-8"
146'-10"
18'-1"
PROPERTY LINE
7'-6"
PROPERTY LINE
7'-6"
700 EDGEWATER
MONUMENT LINE
18'-0"
67
10
11
12
13
OPEN
BELOW
16
PRIVATE 1 CAR
GARAGE
ONE WAY
17
18
19
20
21
22
23
24
25
26
27
28
"
29
-0"
18'
66
8'-6
1HC
ELECTRICAL
10.00 %
RAMP
14.51 %
14.51 %
10.00 %
DN
142'-0"
OPEN
BELOW
40'-8"
22'-0"
UP
PARKING
69 SPACES
(3 HANDICAP)
72 SPACES
2
A-302
BUSDUCT
CLOSET
PARKING
3HC
MDF
COVERED
DROP-OFF
ELECTRICAL RM.
PE-2
CORRIDOR
SE-1
T.C.
"
8'-6
62
PE-1
JAN.
CLOSET
OPEN
BELOW
PRIVATE 2 CAR
GARAGE 63
STAIR #1
CORRIDOR
2HC
SERVICE STORAGE
CORRIDOR
STORAGE
STORAGE
58
12'-0"
18'
-0"
PRIVATE 2 CAR
GARAGE 59
57
56
55
54
53
52
51
50
49
48
47
46
30
45
37'-8"
31
"
44
43
42
41
40
39
38
37
36
35
34
33
32
UP
UP
PRIVATE 2 CAR
GARAGE
UP
UP
Consultant
OPEN
BELOW
STAIR #4
Design by
20'-7"
11'-10"
700 EDGEWATER
DEVELOPMENT LLC
BUILDING STORAGE
ONE WAY
8'-6
Owner Information
5'-0"
PE-3
PRIVATE 1 CAR
GARAGE
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #5
STAIR #2
2'-0"
60
BOOSTER PUMPS
SE-2
1
A-301
20'-10"
3RD LAYER
GROUND LEVEL
PARKING SETBACK
PRIVATE 2 CAR
GARAGE
61
1
A-401
6'-5"
-0"
18'
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
23'-0"
PARKING
LEVEL 3
64
1
A-401
FIRE PUMPS
COMM
65
23'-0"
Revisions
128'-11"
VOID OVER
GENERATOR
ROOM
15
14
12'-0"
8'-6"
"
8'-6
69
37'-10"
68
PRIVATE 2 CAR
GARAGE
18'
-0"
PRIVATE 2 CAR
GARAGE
UP
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #3
UP
6'-5"
2'-0"
25'-11"
17'-9"
2
A-401
PROPERTY LINE
223'-3"
PROPERTY LINE
54'-8"
146'-10"
11'-4"
AR-0007972
MONUMENT LINE
14
A-301
Luis O. Revuelta
ZONING
2
A-401
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 3 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-203a & A-203b
A-103
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
5'-4"
223'-3"
54'-8"
18'-1"
10'-0"
89'-9"
10'-3" 1'-11"
"
14
3
12'-0"
8'-6"
18'-0"
68
10
11
12
5'-10"
6'-5"
6'-5"
NORTH DUPLEX
LOWER LEVEL
13
16 PRIVATE 2 CAR
ONE WAY
18
19
20
21
22
23
24
25
26
27
28
29
"
17
30
-0"
18'
67
EAST
BALCONY
GARAGE
8'-6
1HC
66
23'-0"
142'-0"
ELECTRICAL RM.
PARKING
RAMP
14.51 %
14.51 %
10.00 %
DN
3HC
PARKING
70 SPACES
(3 HANDICAP)
73 SPACES
2
A-302
OPEN
BELOW
BRIDGE ABOVE
116'-1"
22'-0"
10.00 %
PE-2
MECHANICAL
SE-1
DROP-OFF
CANOPY BELOW
"
8'-6
63
T.C.
EAST DUPLEX
LOWER LEVEL
EAST
BALCONY
SERVICE
CORRIDOR
TRASH
VESTIBULE
5'-0"
58
57
56
55
54
53
52
51
50
49
48
47
31
PRIVATE 1 CAR
GARAGE
BATH
EAST
BALCONY
BATH
44
43
42
41
40
39
38
37
36
35
34
33
UP
UP
PRIVATE 2 CAR
GARAGE
SOUTH DUPLEX
LOWER LEVEL
OPEN
BELOW
UP
STAIR #4
UP
6'-5"
45
Consultant
5'-10"
46
LOCKERS
32
"
6'-5"
8'-6
700 EDGEWATER
DEVELOPMENT LLC
SERVICE CORRIDOR
ONE WAY
Owner Information
36'-11"
PEDESTAL FRONT
SETBACK
10'-0"
89'-9"
10'-3" 1'-11"
Design by
15'-0"
12'-0"
59
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #5
PE-3
S
14'-10"
11'-10" 2'-0"
PRIVATE 2 CAR
GARAGE 60
STAIR #2
SE-2
3RD LAYER
GROUND LEVEL
PARKING SETBACK
61
18'
-0"
PRIVATE 2 CAR
GARAGE
62
1
A-401
1
A-301
5'-10"
-0"
18'
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
2HC
UP
PE-1
PRIVATE 2 CAR
GARAGE 64
1
A-401
STAIR #1
23'-0"
PARKING
LEVEL 4
65
Revisions
15
116'-1"
8'-6
70
OPEN
BELOW
69
PRIVATE 2 CAR
GARAGE
18'
-0"
PRIVATE 2 CAR
GARAGE
UP
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #3
UP
3RDSETBACK
LAYER
2nd LAYER PARKING
GROUND LEVEL
PARKING SETBACK
5'-10"
2'-0"
20'-1"
38'-10"
7'-6"
7'-6"
146'-10"
PROPERTY LINE
PROPERTY LINE
17'-9"
700 EDGEWATER
MONUMENT LINE
2
A-401
PROPERTY LINE
223'-3"
PROPERTY LINE
54'-11"
146'-10"
11'-4"
AR-0007972
MONUMENT LINE
14
A-301
Luis O. Revuelta
ZONING
2
A-401
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 4 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-204a & A-204b
A-104
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
5'-0"
223'-3"
54'-11"
18'-1"
10'-0"
89'-9"
10'-3"
12'-6"
14
"
10
11
12
13
5'-10"
6'-5"
6'-5"
KIDS CLUB
29
19
20
21
22
23
24
25
26
27
30
23'-0"
23'-2"
KID'S
REST.
PRIVATE 2 CAR
31 GARAGE
STAIR #1
WOMEN'S
REST.
MEN'S
REST.
JANITOR
CLOSET
A/C
PARKING
LEVEL 5
10.00 %
PARKING
14.51 %
10.00 %
DN
33
PRIVATE 2 CAR
GARAGE
SKY BRIDGE
SKY BRIDGE
LOBBY
CORRIDOR
"
8'-6
66
DUPLEX-E
UPPER LEVEL
PE-2
S
SERVICE
CORRIDOR
T.C. TRASH
STORAGE
VESTIBULE
SE-1
PARKING
72 SPACES
2
A-302
CORRIDOR
ELECTRICAL RM.
32
RAMP
PE-1
SCREENING ROOM
LOUNGE
61
60
59
58
57
56
55
54
53
52
51
34 PRIVATE 1 CAR
50
47
46
45
44
43
42
41
40
39
38 37
36
Consultant
A/C
PRIVATE 2 CAR
GARAGE
SCREENING ROOM
OFFICE
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #5
UP
UP
UP
STAIR #4
UP
EAST POOL
EQUIPMENT ROOM
OFFICE
6'-5"
48
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
OFFICE
5'-10"
UP
"
6'-5"
UP
49
35
UP
36'-11"
PEDESTAL FRONT
SETBACK
14'-10"
UP
8'-6
1
A-301
DUPLEX-S
UPPER LEVEL
ONE WAY
5'-10"
PRIVATE 2 CAR
GARAGE
63
1
A-401
50'-10"
62
12'-0"
64
PE-3
S
10'-0"
89'-9"
10'-3"
12'-6"
Design by
5'-0"
11'-10" 2'-0"
STAIR #2
SE-2
GARAGE
18'
-0"
3RD LAYER
GROUND LEVEL
PARKING SETBACK
-0"
18'
PRIVATE 2 CAR
GARAGE 65
18
DUPLEX-N
UPPER LEVEL
116'-1"
17
"
15'-0"
16
8'-6
ONE WAY
70
67
Revisions
50'-9"
12'-0"
PRIVATE 2 CAR
GARAGE
PET SALON
28
PRIVATE 2 CAR
GARAGE
22'-0"
8'-6"
15
-0"
18'
18'-0"
68
142'-0"
18'
-0"
72
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
8'-6
14'-7"
UP
71
PRIVATE 2 CAR
GARAGE
UP
PRIVATE 2 CAR
GARAGE
PRIVATE 2 CAR
GARAGE
69
1
A-401
3RD LAYER
GROUND LEVEL
PARKING SETBACK
STAIR #3
UP
3RDSETBACK
LAYER
2nd LAYER PARKING
GROUND LEVEL
PARKING SETBACK
5'-10"
2'-0"
20'-1"
38'-10"
7'-6"
7'-6"
146'-10"
PROPERTY LINE
PROPERTY LINE
17'-9"
700 EDGEWATER
MONUMENT LINE
2
A-401
PROPERTY LINE
223'-3"
PROPERTY LINE
54'-11"
146'-10"
11'-4"
AR-0007972
MONUMENT LINE
14
A-301
Luis O. Revuelta
ZONING
2
A-401
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 5 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-205a & A-205b
A-105
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
223'-3"
54'-11"
20'-1"
17'-11"
10'-0"
81'-0"
8'-9"
10'-3"
6'-5"
NORTH TERRACE
UP
UP
12'-8"
CHILDREN'S CABANA
Revisions
UNISEX-POOL
BAY TERRACE/NORTH ACCESS
RESTROOM
WOMEN'S
RESTROOM
LANDSCAPE
AREA
STORAGE
FAMILY
RESTROOM-1
STAIR #1
PE-1
S
CABANA
CABANA
JANITOR
CLOSET
CABANA
MEN'S
RESTROOM
20'-0"
1.68 %
OLYMPIC POOL
PE-2
WEST TERRACE
WARMING PANTRY/
BAR
CABANA
TC.
CABANA
LANDSCAPE
AREA
TRASH
VEST.
STAIR #2
CORRIDOR
STORAGE
2.70 %
CABANA
BAY
POOL
SE-1 SERVICE/CORRIDOR
WOMEN'S
RESTROOM
STORAGE
PE-3
LOUNGE POOL
SPA
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
FAMILY
RESTROOM-2
12'-8"
A/C
1
A-301
GAME ROOM
YOGA LAWN
1
A-401
EAST TERRACE
UNISEX-POOL
RESTROOM
Consultant
12'-8"
MEN'S
RESTROOM
SOUTH TERRACE
CABANA
STAIR #4
MECHANICAL
UP
UP
UP
UP
UP
6'-5"
CABANA
5'-10"
CABANA
19'-0"
17'-10"
PEDESTAL
FRONT SETBACK
10'-0"
81'-0"
8'-9"
10'-3"
12'-6"
Design by
15'-0"
CABANA
6'-5"
STAIR #5
CABANA
14'-10"
UP
CABANA
UP
5'-10"
SERVICE CORRIDOR
UP
11'-10" 2'-0"
35'-6"
LANDSCAPE
AREA
PROPERTY LINE
5'-0"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
POOL DECK
1
A-401
142'-0"
ELECTRICAL RM.
UP
LANDSCAPE
AREA
LANDSCAPE
AREA
90'-10"
LANDSCAPE
AREA
LANDSCAPE
AREA
LOUNGE
SPLASH
ZONE
2.70 %
A/C
2
A-302
12'-6"
6'-5"
BBQ & BAR CABANA
12'-8"
SERVICE CORRIDOR
19'-0"
5'-10"
UP
FURNITURE STORAGE
LANDSCAPE
AREA
SE-3
35'-4"
2'-0"
17'-9"
38'-10"
7'-6"
7'-6"
CONTROL ROOM
18'-1"
PROPERTY LINE
PROPERTY LINE
UP #3
STAIR
146'-10"
5'-10"
5'-0"
700 EDGEWATER
MONUMENT LINE
2
A-401
PROPERTY LINE
223'-3"
PROPERTY LINE
54'-11"
146'-10"
11'-4"
AR-0007972
MONUMENT LINE
14
A-301
Luis O. Revuelta
ZONING
2
A-401
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 6 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-206a & A-206b
A-106
revuelta
architecture
international
Miami
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
MONUMENT LINE
1
A-302
62'-1"
234'-10"
127'-10"
18'-1"
PROPERTY LINE
7'-6"
PROPERTY LINE
7'-6"
700 EDGEWATER
MONUMENT LINE
P703
SE-3
ZZ
A-24.1
ZZ
A-24.1
19'-0"
VESTIBULE
P704
STORAGE
110'-0"
19'-1"
P701
STAIR #3
UP
17'-11"
2'-0"
25'-11"
17'-9"
TENNIS COURT
Revisions
C703
C711
WOMEN'S/LOCKERSGROOMING
AC
C713
C723
C724
STEAM
STO.
STO
MECH
SE-1
SAUNA
C732
SERVICE/CORRIDOR
STAIR #2
STORAGE
C731
SHOWERS
AC
C714
11'-10" 2'-0"
UP
STORAGE
700 EDGEWATER
DEVELOPMENT LLC
FREE
WEIGHTS
C704
19'-0"
Consultant
P705
Design by
17'-10"
PEDESTAL FRONT SETBACK
90'-11"
19'-0"
5'-0"
Owner Information
20'-10"
P702
20'-7"
VESTIBULESTAIR #5
1
A-301
19'-1"
ZZ
A-24.1
MEN'SC710 C709
WOMEN'S
RESTROOM RESTROOM
PE-3
1
A-401
C719
C712
ZZ
A-24.1
C702
C734
MEN'S/LOCKERS GROOMING
EAST POOL
DECK BELOW
C708
T.C. TRASH
C735
VESTIBULE
C722
C720 C721
COLD/SHOWER
MEN'S
RELAXATION
AREA
C701
90'-10"
90'-10"
142'-0"
PE-2
PRIVATE/SHOWER
TREATMENT
ROOM
EXERCISE ROOM
ELECTRICAL RM.
PRIVATE/SHOWER
BRIDGE BELOW
2
A-302
C733 STORAGE
C736
1
A-401
TREATMENT
ROOM
C705
C707
STORAGE
STO
STEAM C727
MECH
C725
STO.
C706
STORAGE
STAIR #1 C730
PE-1
C729 COLD/SHOWER
C728
C715
SAUNA SHOWERS
C726
YOGA
CORRIDOR
WOMEN'S
RELAXATION
AREA
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
2
A-401
PROPERTY LINE
62'-1"
PROPERTY LINE
363'-0"
11'-4"
AR-0007972
MONUMENT LINE
14
A-301
Luis O. Revuelta
ZONING
2
A-401
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 7 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
1'-0"
NOTE: FOR ADDITIONAL DIMENSIONS REFER TO ENLARGED PLANS ON SHEETS A-207a & A-207b
A-107
revuelta
127'-10"
17'-10"
10'-6"
110'-0"
88'-10"
10'-8"
10'-6"
architecture
international
110'-0"
88'-10"
10'-8"
10'-6"
88'-10"
10'-8"
5'-9"
5'-9"
5'-9"
5'-9"
5'-9"
5'-9"
Miami
Santiago, Chile
revuelta.com
UNIT 1
UNIT 1
13'-3"
BALCONY 1 EAST
PE-1
Project
PRIVATE
ELEV. LOBBY 1
PRIVATE
ELEV. LOBBY 1
TERRACE 1 WEST
STAIR #1
BALCONY 1
BALCONY 1
STAIR #1
STAIR #1 PE-1
WV
WV
PE-1
S
PRIVATE
ELEV. LOBBY 2
TRASH RM.
STAIR #2
TERRACE 2 WEST
PE-3
S
PRIVATE
ELEV. LOBBY 3
TC.
STAIR #2 PE-3
STORAGE
SERVICE CORRIDOR
MECHANICAL ROOM
STORAGE
PRIVATE
ELEV. LOBBY 3
STAIR #2 PE-3
BALCONY 3
BALCONY 3
13'-4"
BALCONY 3 EAST
BALCONY
117'-5"
117'-5"
128'-11"
SE-1
SERVICE CORRIDOR
TC. TRASH
RM.
TC.
PE-2
BALCONY 1
SE-1
BALCONY 2
700 EDGEWATER
UNIT 2
117'-5"
PE-2
117'-5"
128'-11"
BALCONY 2 EAST
117'-5"
90'-10"
128'-11"
UNIT 2
PE-2
ELECTRICAL RM.
PRIVATE
ELEV. LOBBY 2
ELECTRICAL RM.
ELECTRICAL RM.
88'-10"
10'-8"
10'-6"
5'-9"
5'-9"
1'-0"
88'-10"
12'-2"
5'-9"
5'-9"
110'-0"
85'-8"
12'-2"
5'-9"
12'-2"
5'-9"
10'-8"
Revisions
1'-0"
110'-0"
88'-10"
10'-8"
LEVEL 29 - MECHANICAL
SCALE: 1/16" =
110'-0"
85'-8"
12'-2"
TERRACE 1
AHU4
72/18
30/30
PRIVATE
ELEV. LOBBY 1
36/36
84/18
PE-1
30/30
PE-1
48/16
STAIR #1
AHU3
28/28
PH 1
46"
700 EDGEWATER
DEVELOPMENT LLC
52"
26/28
30/30
26/28
EPF1I
Owner Information
64/40
36/36
PE-1
Consultant
10"
CT
CT1B
10"
Design by
SERVICE CORRIDOR
CT
ELEVATOR
MACHINE ROOM
SE-1
46/46
117'-5"
PE-2
117'-5"
128'-11"
ROOF LEVEL
MECHANICAL
22/38
SE-1
117'-5"
38/22
PE-2
M
52"
8" HPCR(H)
8" HPCS(H)
113'-7"
117'-5"
128'-11"
CT1A
PE-2
TC. TRASH
TC.
VESTIBULE
34/22
117'-5"
128'-11"
ELECTRICAL RM.
PRIVATE
ELEV. LOBBY 2
STAIR #2 PE-3
TC.
32/20
CT
CT1C
STAIR #2 PE-3
PH 2
STAIR #2 PE-3
26/28
48/48
40/20 UP
36 SF
58/24 UP
58/24
60 SF
EPF1H
Luis O. Revuelta
ROOF LEVEL
MECHANICAL PUMP ROOM
AR-0007972
10'-6"
LEVEL 57 - 2 UNITS PH
SCALE: 1/16" =
1'-0"
88'-10"
10'-8"
12'-2"
85'-7"
1'-0"
12'-2"
5'-9"
5'-9"
Date
9/2/2016
5'-9"
5'-9"
TERRACE 1
5'-9" 3'-10"
ZONING
5'-9"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
10'-6"
10'-6"
10'-8"
5'-9"
SCALE: 1/16" =
88'-10"
5'-9"
10'-6"
5'-9"
5'-9"
17'-10"
5'-9"
UNIT 3
5'-9"
UNIT 3
12'-2"
85'-7"
12'-2"
1'-0"
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
LEVEL 8 - OVERALL
FLOORPLAN - 1/16"
Sheet No.
A-108
20'-1 1/2"
48'-0"
20'-0"
6'-8 1/2"
30'-0"
8"
5'-8"
47'-7 1/2"
29'-9"
32'-2"
5'-4"
8"
architecture
international
8"
5'-4"
8"
UP
3'-1/2"
+3'-6" N.G.V.D.
"
0 1/2
12'-1
FD
1'-7"
22'-6"
7'-10"
1'-0"
4'-4"
revuelta.com
1'-0"
26
T. 305.590.5000
F. 305.590.5040
1'-0"
3'-6"
+9'-6" N.G.V.D.
22'-6"
2'-3"
LAWN
152
42'-10"
33'-7"
1'-0"
4'-6" 8"
1Ms
4"
32'-5"
STAIR #1
FD
12'-3"
2M
F.1
2Ms
2Ms
8"
FD
17'-10"
3'-4"
6'-6"
FILL
AREA NOT ACCESSIBLE
8"
10'-6"
SERVICE
ENTRY
8'-4"
8"
7'-6"
+5'-2" N.G.V.D.
3'-4"
LAWN
65'-11"
26'-10"
1'-0"
8"
6'-0"
TIERED GARDENS
ELEVATOR
PRESSURIZATION
SE-1
Revisions
169
BAYWALK
2Ms
2M
8"
+2'-0" N.G.V.D.
10 1/2"
FD
LANDSCAPE
1Mss
20'-9"
8"
+3'-6" N.G.V.D.
FPL-12"x28"
6'-7"
10'-3"
2C
F.1
3 x 6" = 1'-6"
UP
6'-6"
+2'-0" N.G.V.D.
2M
SERVICE
CORRIDOR
8"
1Ms
5'-10"
8"
PUMP
8"
4'-9" 8"
9'-0"
10'-8 1/2"
5'-6 1/2"
+3'-6" N.G.V.D.
2'-2"
58'-3"
6'-1/2" 8"
10'-0"
50'-5 1/2"
CROSSWALK AT GRADE LVL
PEDESTRIAN BRIDGE AT 8TH LVL
118
1'-0"
8'-10"
17'-5"
BUILDING STORAGE
5'-6 1/2"
135
2'-1"
UP
4'-1 1/2"
135
NORTH
EGRESS
CORRIDOR
10 1/2"
9'-11 1/2"
7'-6 1/2"
1Ms
FILL
AREA NOT ACCESSIBLE
11'-5"
34'-3 1/2"
12'-10"
700 EDGEWATER
1'-8"
13'-7 1/2"
6'-7"
FILL
AREA NOT ACCESSIBLE
7'-1/2"
6'-7 1/2"
15.15 %
20'-10"
9'-0"
11'-5"
Project
11'-5"
RAMP
10'-9 1/2"
6"
26
8.33 %
3'-1/2"
+12'-0" N.G.V.D.
8.33 %
BACKFLOW
PREVENTORS
UP
1'-0"
20'-0"
8'-7 1/2"
Santiago, Chile
6'-4"
6"
8.33 %
8.33 %
8"
12'-1
0 1/2
"
Miami
8" 4'-5"
+4'-6" N.G.V.D.
3'-1/2"
8.33 %
1'-0"
8.33 %
UP
LANDSCAPE
18'-6"
3'-1/2"
15.15 %
MATCH LINE
5'-0"
TIERED GARDENS
UP
+7'-0" N.G.V.D.
14'-10 1/2"
UP
8"
10'-0"
VEHICULAR
DROP-OFF
EXIT
UP
MATCH LINE
3'-0"
6" 3'-6"
3'-0"
LANDSCAPE
LANDSCAPE
10'-0"
revuelta
188'-9"
5'-6 1/2"
STORAGE FD
13'-9"
2Ms
TRASH COLLECTION RM
2M
+3'-6" N.G.V.D.
S
9'-0"
20'-10"
1'-8"
22'-6"
13'-3 1/2"
11'-5"
+3'-6" N.G.V.D.
+3'-6" N.G.V.D.
1'-0"
3'-1/2"
Design by
26
5'-0" 6"
27'-1"
8.33 %
2'-3"
+7'-0" N.G.V.D.
8.33 %
8.33 %
8.33 %
+5'-2" N.G.V.D.
Luis O. Revuelta
TIERED GARDENS
6"
LANDSCAPE
19'-2"
78'-7 1/2"
6"
5'-0"
PLAZA
12'-2"
AR-0007972
78'-7 1/2"
10.00 %
12'-1
0 1/2
"
FD
PLAZA
UP
4'-6"
3'-1/2"
BACKFLOW
PREVENTORS
+9'-6" N.G.V.D.
4'-6" 6"
3'-1/2"
1'-0"
26
"
0 1/2
12'-1
20'-0"
KEY PLAN
11'-5"
18'-0"
LANDSCAPE
RAMP
MATCH LINE
BACKFLOW
PREVENTORS
LAWN
152
30'-0"
5'-0"
6'-4"
5'-0"
94'-6"
5'-0"
6"
22'-0"
5'-6"
8"
236'-9"
ZONING
Date
9/2/2016
Drawn By
SIDEWALK
UP
10.00 %
SIDEWALK
18'-0"
28'-7 1/2"
15.15 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
1
2
8.33 %
UP
ZZ
A-24.1
16.78 %
UP
UP
S
16.78 %
UP
SIDEWALK
8.33 %
11 x 7" = 6'-6"
UP
UP
3 x 6" = 1'-6"
UP
S
8.33 %
8.33 %
8.33 %
8.33 %
10.00 %
8.33 %
ZZ
A-24.1
A-201b
Checked By
KK
5'-0"
15.15 %
8.33 %
8.33 %
A-24.1
ZZ
A-24.1
MATCH LINE
1'-7"
20'-0"
15'-0"
Consultant
8.33 %
3'-0"
1'-0"
8.33 %
10'-0"
4'-4"
118
8.33 %
2'-0"
1'-0"
FILL
AREA NOT ACCESSIBLE
UP
VEHICULAR
DROP-OFF
ENTRY
UP
7'-10"
700 EDGEWATER
DEVELOPMENT LLC
8.33 %
LANDSCAPE
2M
F.1
Owner Information
UP
16.78 %
UP
2M
F.1
2'-2"
2'-1"
172
SOUTH
EGRESS
CORRIDOR
16.78 %
UP
1'-8 1/2"
2C
F.1
2Cs
1'-0"
1'-0"
3'-11"
UP
32'-0"
8'-7 1/2"
STAIR #2
7'-1/2"
1'-0"
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
135
TC.
LOADING AREA
2'-10"
135
FILL
AREA NOT ACCESSIBLE
2Mss
A-201a
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 1 | SITE PLAN PARTIAL - 1/8"
Sheet No.
A-201a
27'
12'-0"
23'-6 1/2"
14'-10 1/2"
2'-0"
OUT
UP
Miami
BICYCLE REPAIR
FD
30
8'-6"
1'-0"
1'-8"
FD
11
12
88'-6"
13
14
13'-4"
15
18'-10"
30'-0"
8"
5'-5"
5"
6'-0"
8"
FD
FD
ONE WAY
2'-0"
8"
12'-0"
FD
7'-4"
+5'-6" N.G.V.D.
16
2'-0"
24'-2"
700 EDGEWATER
Project
6"
8'-6
T. 305.590.5000
F. 305.590.5040
20'-4"
8"
FD
STORAGE
2'-8"
13'-10"
8"
30'-6"
8"
3'-10"
1'-0"
"
LOADING #1
12'X35'
17
35'-0"
18
FD
5'-0" 8"
FD
-0"
18' P.
TY
LANDSCAPE
UP
UP
BATH
5'-0"
1'-8"
10
-0"
18'
5
4
3
LOADING #2
12'X35'
2
1
UP
49
1'-0"
DOCKMASTER
24'-0"
LOADING
ZONE
17'-0"
(2) SPACES @ 8'-6" EA.
50
35'-0"
8'-8"
+5'-6" N.G.V.D.
23'-0"
8"
8"
18'-0"
18
TY '-0"
P.
"
1
18'-0"
18'-0"
TYP.
13'-2"
8"
2'-0"
18'
-0"
9'-10"
FD
revuelta.com
FPL VAULT
8'-6
STAIR #3
14'-4"
8"
3'-5"
Santiago, Chile
14'-10 1/2"
19'-10"
9'-9 1/2"
architecture
international
10'-0"
UP
6'-8"
8'-6 1/2"
1'-0"
MATCH LINE
1'-0"
30'-6"
TRASH HOLDING
23'-4 1/2"
1'-8 1/2"
21'-10"
8"
IN
UP
2'-0"
23'-4"
OUT
FD
29'-1"
32'-6"
4'-8" 2'-0"
IN
57'-1 1/2"
MATCH LINE
6'-1 1/2"
STEPS
2'-0"
2'-4 1/2"
6'-3 1/2" 1'-4" 1'-0"
18'-0"
1'-0"
revuelta
210'-10"
PLAZA
48
8"
24'-6"
10'-0"
9'-10"
8"
PARKING
50 SPACES
(1 HANDICAP)
51 SPACES
142'-0"
20'-0"
5'-4"
2'-0"
STORAGE
FD
LOADING #3
10'X20'
Revisions
47
8"
10.00 %
1'-6"
1'-6"
17'-7"
1'-6"
21
2'-0"
1'-0"
REMOVABLE BOLLARDS
4'-0" O.C. SPACING, TYP.
18'-0"
FD
8"
3'-0"
9
8
6
5
3
2
28'-0"
5'-0"
1'-0"
SE-2
UP
5'-0"
28'-0"
8"
10
1H.C.
18'-0"
Owner Information
2'-0"
44
9'-8"
45
11'-6"
5'-8"
13'-4"
8"
8'-6"
7'-1"
2'-0"
8"
17'-0"
(2) SPACES @ 8'-6" EA.
11 x 7" = 6'-6"
1'-0"
STORAGE
12'-0"
8"
43
23'-0"
136'-0"
(16) SPACES @ 8'-6" EA.
FD
FD
40
FD
39
38
37
FD
FD
36
35
34
33
32
31
30
29
28
FD
27
26
25
42
18'-0"
18'-0"
18'-0"
TYP.
3'-2"
700 EDGEWATER
DEVELOPMENT LLC
1'-0"
8'-6"
23'-0"
22
25'-6"
(3) SPACES @ 8'-6" EA.
18'-0"
TYP.
23
Consultant
24
UP
30'-0"
41
8'-6"
Design by
MATCH LINE
1'-0"
8"
5'-7 1/2"
STAIR #5
UP
BICYCLE PARKING
9 BICYCLES
BICYCLE PARKING
9 BICYCLES
5'-7 1/2"
1'-0"
UP
10'-0"
12'-0"
UP
STAIR #4
BIKE
REPAIRS
UP
MATCH LINE
EXIT
EXIT
UP
1'-0"
Luis O. Revuelta
UP
AR-0007972
LANDSCAPE
LANDSCAPE
2'-0"
23'-1"
18'-10"
1'-0"
2'-0"
6'-0"
8"
24'-9"
8"
84'-8"
8"
STEPS
29'-1"
KEY PLAN
42'-3"
8"
5'-0"
1'-0"
1'-0"
2'-0"
LANDSCAPE
164'-4"
222'-10"
23'-4 1/2"
2'-1/2"
29'-5"
SIDEWALK
2'-0"
10'-0"
15'-0"
ZONING
Date
9/2/2016
Drawn By
UP
10.00 %
SIDEWALK
15.15 %
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
1
2
ZZ
A-24.1
8.33 %
8.33 %
UP
16.78 %
UP
UP
Scale
AS SHOWN
8.33 %
8.33 %
8.33 %
8.33 %
8.33 %
10.00 %
8.33 %
11 x 7" = 6'-6"
UP
UP
16.78 %
UP
Checked By
KK
3 x 6" = 1'-6"
UP
S
ZZ
A-24.1
SIDEWALK
15.15 %
8.33 %
A-24.1
ZZ
A-24.1
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
4"
2'-0"
2'-0"
2'-6"
20
28'-5"
8"
100'-11"
100'-11"
PARKING
+5'-6"
N.G.V.D.
46
19
1'-6"
FD
10'-0"
UP
16.95 %
18'-0"
22'-0"
FD
RAMP
10.00 %
5.00 %
188'-1/2"
3'-8"
30
PARKING
LEVEL 1
A-201b
A-201a
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 1 | SITE PLAN PARTIAL - 1/8"
Sheet No.
A-201b
8.33 %
5'-4"
8"
architecture
international
Miami
Santiago, Chile
+12'-0" N.G.V.D.
8.33 %
ONE WAY
VEHICULAR DRIVE
26
26
3"
8.33 %
revuelta.com
T. 305.590.5000
F. 305.590.5040
3"
8.33 %
0"
12'-1
12'-1
0"
1'-7"
2'-3"
62
8"
17'-8"
8"
36'-2"
8"
4'-0"
FD
2M.2
FD
FIRE PUMPS
1'-8"
FD
2'-2"
8"
9'-1 1/2"
2M.2
2C
28"x42"
FD
2'-1"
33'-1"
16'-7 1/2"
10%
118
HEAT
PUMPS
2'-1"
MAIN
ELECTRICAL
ROOM
2M.2
F.1
10"
2M.2
F.1
1 1/2"
6'-7 1/2"
8"
2M.2
F.1
UP
+12'-0" N.G.V.D.
STAIR #1
PE-1
DN
5 1/2"
17'-3"
8"
9'-8"
+12'-0" N.G.V.D.
2M.2
2C
F.1
7'-1"
8"
M.2
F.1
2'-5"
FPL-12"x28"
FPL - S.A.
20"x42"
8"
RECEPTION
R.A.
20"x72"
M.2
F.1
10'-10"
10 1/2"
LOBBY
17'-5"
38'-8"
8"
2M.2
F.1
COVERED
DROP-OFF
BAYSIDE LOUNGE
LAWN
STORAGE
2M.2
F.1
FIRE LOBBY
TC.
FD
STORAGE
STORAGE
9'-10 1/2"
8"
SERVICE
CORRIDOR
2M.2
8"
5'-4"
2M.2
F.1
FD
OUTDOOR TERRACE
SE-1
SERVICE-CORRIDOR
Revisions
PE-2
2M.2
F.1
180'-5"
2M.2
ELECTRIAL RM.
PACKAGES
+12'-0" N.G.V.D.
JAN.
CLOSET
8"
10'-8 1/2"
2M.2
F.1
2M.2
F.1
2M.2
F.1
S.P.
22"x62"
107'-10 1/2"
37'-9 1/2"
S.A.
18"x36"
194'-5"
S.P.
18"X46"
10'-3"
+8'-8" N.G.V.D.
+12'-0" N.G.V.D.
9'-3"
700 EDGEWATER
9'-0"
2'-9"
15.15 %
11'-5"
Project
2M.2
6'-6"
revuelta
8.33 %
8.33 %
RAMP
8"
155'-3"
15.15 %
MATCH LINE
MATCH LINE
13'-0"
26'-10"
52'-1"
20'-0"
15'-0"
155'-3"
LANDSCAPE
17%
48'-0"
2M.2
F.1
1M.2
F.1
STAIR #2
8"
12'-11 1/2"
FIRE COMMAND
CENTER
1M.2
F.1
2M.2
172
UP
2C
F.1
2C
F.1
13'-6 1/2"
6'-7"
ONE WAY
VEHICULAR DRIVE
9 BOXES
(2 PARCELS)
9'-1 1/2"
9 BOXES
9 BOXES
9 BOXES
9 BOXES
9 BOXES
Pm.3
MAIL ROOM
153 MAILBOXES
16 PARCEL BOXES
WOMEN'S
REST.
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
3SH
Fm.6
Fm.6
2SH
P.6
MEN'S
REST.
9 BOXES
(2 PARCELS)
1'-8"
4 BOXES
(1 PARCEL)
4 BOXES
(1 PARCEL)
16.78 %
9 BOXES
1 1/2"
STAFF
REST.
9 BOXES
(2 PARCELS)
9 BOXES
9 BOXES
(2 PARCELS)
Fm.6
9 BOXES
(2 PARCELS)
9 BOXES
28"x42"
Fm.6
2'-1"
8"
10%
16'-8"
FD
9 BOXES
(2 PARCELS)
9 BOXES
Pm.6
Fm.6
Fm.6
9 BOXES
(2 PARCELS)
Consultant
P.6
Pm.3
11'-5"
FD
LANDSCAPE
+12'-0" N.G.V.D.
S
S
10
9
8
7
6
5
4
3
2
1
ZZ
A-24.1
16.78 %
8.33 %
8.33 %
8.33 %
8.33 %
10.00 %
8.33 %
A-202b
UP
UP
S
16.78 %
ZZ
2ND LAYER
- GROUND
LEVEL
UP
A-24.1
UP
PARKING SETBACK
8.33 %
3"
8.33
+7'-0" N.G.V.D.
8.33 %
+5'-2" N.G.V.D.
3'-10"
8.33 %
+8'-8" N.G.V.D.
TIERED GARDENS
A-202a
Luis O. Revuelta
118'-9 1/2"
56'-11 1/2"
6'-0"
ZONING
12'-1"
LANDSCAPE
8"
AR-0007972
7'-0"
B I S C A Y N E
10.00 %
15.15 %
15.15 %
8.33 %
8.33 %
11 x 7" = 6'-6"
DN
10 x 6 1/2" = 5'-4"
UP UP
8.33 %
8.33 %
8"
B A Y
15%
10%
8.33 %
8.33 %
21
20
19
18
17
16
15
14
13
12
11
1
90
8
7
6
5
4
3
2
1
8.33 %
8.33 %
UP
ZZ
A-24.1
PLAZA
NOT A PART
8.33 %
A-24.1
3"
MATCH LINE
RAMP
10.00 %
R= 30'-0"
12'-1
0"
+9'-6" N.G.V.D.
8.33 %
KEY PLAN
13'-0"
26
8.33 %
48'-0"
8.33 %
0"
12'-1
20'-0"
15'-0"
Design by
2'-3"
8.33 %
26
16.78 %
MATCH LINE
1'-7"
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
DN
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 2 | LOBBY PARTIAL - 1/8"
Sheet No.
A-202a
27'
revuelta
222'-10"
0"
210'-10"
11'-0"
1'-0"
Miami
30
Mss.2
56
10"
1'-8"
57
'TY 0""
P.
1
22'-4"
1'-1/2"
8"
26'-10"
19'-10"
8"
18'-0"
TYP.
10'-0"
10'-0"
2Ms.2
1'-0"
5'-0" 8"
2Ms.2
MECHANICAL BALCONY
FD
FD
86'-10"
11
12
13
14
20
FD
19
15'-0"
8'-6
25'-6"
(3) SPACES @ 8'-6" EA.
8"
21
ONE WAY
23'-0"
15
16
1'-4"
8"
40'-8"
17
"
1'-0"
14
13
Mss
17
4'-7"
15
12
18
-0"
18'
FD
11
OPEN
TO LOADING
AREA
BELOW
-0"
18' P.
TY
10
9
8
7
6
5
4
40'-0"
21'-10"
18
31'-1"
16
"
8'-6 P.
Y
T
3
2
1
8"
1'-0"
9 1/2"
52
30
23'-0"
10'-0"
58'-0"
10'-0"
25'-2"
8"
26'-10"
8"
29'-10"
8"
18'-2"
2'-4"
UP
53
8'-4"
Project
10
1'-9"
FD
54
18'-0"
T. 305.590.5000
F. 305.590.5040
EMERGENCY
GENERATOR RM.
21'-10"
55
1'-0"
9
12'-0"
8'-6"
1'-1"
1'-0"
6'-2"
UP
18'-0"
8"
88'-6
18'-0"
2Ms
revuelta.com
700 EDGEWATER
5'-6"
BOILER ROOM
1'-4"
27'-1"
2Cs
PRIVATE 2 CAR
GARAGE
18'
-1
TY 0 1/2"
P.
18'
-0"
22'-3"
PRIVATE 2 CAR
GARAGE
2Ms.2
Santiago, Chile
MATCH LINE
UP
FD
MATCH LINE
STAIR #3
2'-0"
8"
29'-1"
architecture
international
15'-0"
1'-7"
12'-0"
1'-0"
5'-4"
18'-4"
1'-0"
6'-6"
+12'-0" N.G.V.D.
UP
14.51 %
10.00 %
DN
Revisions
Ms.2
F.1
+17'-4" N.G.V.D.
8"
FD
RAMP
10.00 %
4'-3 1/2"
8"
51
22'-0"
PARKING
18'-0"
PRIVATE 2 CAR
GARAGE
41
40
39
8"
90'-4"
6'-1/2"
10 x 6 1/2" = 5'-4"
UP
8"
7'-1"
8
9
+17'-4" N.G.V.D.
Mss.2
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
11"
18'-0"
24'-11"
59'-6"
(7) SPACES @ 8'-6" EA.
FD
1'-0"
5'-9"
22'-8"
1'-0"
"
35
34
33
32
31
8"
10'-0"
1'-0"
30
8'TY 6"
P.
29
28
27
26
25
24
23
Mss.2 ELEV.
Design by
2C
18'-0"
18'-0"
TYP.
18'-0"
CONTROL RM.
4"
KEY PLAN
R= 30'-0"
10.00 %
15.15 %
8.33 %
15.15 %
8.33 %
8.33 %
S
S
10
9
8
7
6
5
4
3
2
1
ZZ
A-24.1
16.78 %
16.78 %
8.33 %
8.33 %
8.33 %
8.33 %
10.00 %
8.33 %
UP
UP
8.33 %
11 x 7" = 6'-6"
DN
10 x 6 1/2" = 5'-4"
UP UP
8.33 %
8.33 %
21
20
19
18
17
16
15
14
13
12
11
1
90
8
7
6
5
4
3
2
1
8.33 %
8.33 %
UP
ZZ
A-24.1
11'-4"
2'-0"
UP
Luis O. Revuelta
1'-0"
164'-4"
A-202a
27'-5"
29'-5"
1'-0"
AR-0007972
15'-0"
ZONING
222'-10"
Date
9/2/2016
NOT A PART
8.33 %
30
1'-7" 8"
B A Y
1'-0"
B I S C A Y N E
28'-1"
29'-1"
STAIR #4
MATCH LINE
36
12'-0"
1'-2"
37
8"
UP
UP
Consultant
22
18
TY '-0"
P.
5'-0"
5'-6"
18'
-0"
38
PRIVATE 2 CAR
GARAGE
7'-7"
7'-2"
1'-0"
FD
8'-6"
A-202b
UP
2ND LAYER
- GROUND
LEVEL
UP
A-24.1
UP
PARKING SETBACK
MATCH LINE
8'-6
STAIR #5
ZZ
FD
22'-6"
15'-0"
FD
47
2C
A-24.1
ONE WAY
23'-0"
PRIVATE 2 CAR
GARAGE
8"
20'-10"
18'-0"
6"
18'-0"
TYP.
6"
FD
18'-0"
8"
5'-0"
42
1'-2"
43
8"
8"
44
5'-0" 1'-0"
SE-2
6"
45
8"
21
48
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
-0"
18' P.
TY
8"
8
6
46
9
7
"
8'-6 P.
TY
9'-0"
+12'-0" N.G.V.D.
10
49
Mss.2
20
Mss.2
-0"
18'
PRIVATE 2 CAR
GARAGE
19
PRIVATE 2 CAR
GARAGE
DN
50
'-6"
8"
3'-0"
11 x 7" = 6'-6"
4'-1 1/2"
30
5'-8"
PARKING VESTIBULE
PARKING
57 SPACES
24'-5"
8"
1'-0"
8"
PARKING
+17'-4" N.G.V.D.
LEVEL 2
4'-6 1/2"
100'-11"
160'-10"
VALET OFFICE
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 2 | PARKING PARTIAL - 1/8"
Sheet No.
A-202b
architecture
international
Miami
Santiago, Chile
MATCH LINE
12'-1
0"
0"
12'-1
26
8"
17'-8"
T. 305.590.5000
F. 305.590.5040
3"
6'-7 1/2"
9'-3"
2'-3"
1'-7"
9'-0"
revuelta.com
26
3"
MATCH LINE
revuelta
Project
OPEN
BELOW
8"
40'-10"
8"
20'-3"
FD
2M.2
2M.2
F.1
STAIR #1
8"
2'-0"CORRIDOR
7'-0"
2M.2
PE-1
DN
2M.2
2C
S.P.
18"X46"
BUSDUCT
CLOSET
S.A.
18"x36"
2M.2
F.1
2M.2
2M.2
8"
8"
2'-2"x7'-6"
9'-8"
17'-5"
20'-9"
20'-9"
40'-8"
121'-3"
8"
8"
FPL - S.A.
20"x42"
CORRIDOR
MDF
2M.2
F.1
FPL-12"x28"
7'-1"
COVERED
DROP-OFF
SERVICE
CORRIDOR
10 1/2"
8"
8'-9"
9'-9"
FIRE LOBBY
T.C.
2M.2
F.1
25'-0"
17"x54"
2M.2
F.1
DN
2C
7'-6 1/2"
2M.2
F.1
STORAGE
STORAGE
2M.2
F.1
BOOSTER PUMPS
STAIR #2
UP
2M.2
2C
F.1
2M.2
9'-1 1/2"
22'-3"
9'-1 1/2"
28"x42"
1'-8"
2M.2
F.1
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2M.2
8"
2M.2
7'-5"
1 1/2"
BUILDING STORAGE
2M.2
F.1
8"
Consultant
6'-7 1/2"
OPEN
BELOW
3"
3"
MATCH LINE
26
0"
12'-1
1'-7"
2'-3"
26
12'-1
0"
Luis O. Revuelta
AR-0007972
188'-11 1/2"
ZONING
Date
9/2/2016
KEY PLAN
Drawn By
ZZ
A-24.1
UP
A-24.1
Checked By
KK
S
Scale
AS SHOWN
S
S
MATCH LINE
Design by
UP
S
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
STORAGE
2M.2
F.1
2M.2
S.P.
22"x64"
OPEN
BELOW
S
SE-1
5'-4"
Revisions
PE-2
R.A.
20"x72"
2M.2
F.1
8"
2C
F.1
2M.2
F.1
OPEN
BELOW
7'-0"
JAN.
CLOSET
L.V.
2M.2
10'-3"
2'-1"
2M.2
ELECTRICAL RM.
2M.2
2'-2"
+26'-7" N.G.V.D.
UP
2'-1"
9'-1 1/2"
28"x42"
ELECTRICAL
11'-8 1/2"
5'-1"
10'-2"
2C
2'-1"
9'-2"
25'-7"
1'-8"
8"
30'-8"
25'-7 1/2"
7'-6 1/2"
9'-1"
22'-3"
8"
FD
M
700 EDGEWATER
FIRE PUMPS
FD
COMM
121'-3"
2M.2
F.1
ZZ
A-24.1
UP
UP
A-203b
UP
UP
ZZ
A-24.1
N
A-203a
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 3 | MEZZANINE
- PARTIAL - 1/8"
Sheet No.
A-203a
revuelta
222'-10"
UP
8'-6
69
14
"
24'-4"
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
VOID OVER
GENERATOR
ROOM
15
Project
10
11
12
13
18'-0"
FD
FD
FD
17
18
19
20
21
22
23
24
25
26
27
"
28
29
-0"
18'
RAMP
14.51 %
14.51 %
10.00 %
PARKING
DN
+27'-9" N.G.V.D.
FD
3HC
Cs
5'-0"
1'-0"
4'-2"
Revisions
23'-0"
PARKING
69 SPACES
(3 HANDICAP)
72 SPACES
"
8"
8'-9"
19'-10"
18'-0"
Mss.2
57
56
55
54
53
52
51
50
49
48
47
46
Mss.2
Owner Information
45
FD
133'-5 1/2"
"
24'-1/2"
22'-8"
31
Consultant
44
43
42
41
40
39
38
37
36
35
34
33
8'TY 6"
P.
PRIVATE 2 CAR
GARAGE
32
Design by
UP
STAIR #4
4"
1'-0"
164'-4"
27'-5"
29'-5"
222'-10"
18'-10"
Drawn By
UP
UP
ZZ
A-24.1
Checked By
KK
Scale
AS SHOWN
S
S
S
UP
A-203b
AR-0007972
Date
9/2/2016
UP
Luis O. Revuelta
ZONING
KEY PLAN
ZZ
A-24.1
1'-0"
1'-0"
1'-0"
1'-7"
27'-1"
29'-1"
1'-0"
1'-0"
UP
10'-0"
12'-0"
STAIR #5
5'-4"
12'-0"
1'-0" 10'-0"
UP
MATCH LINE
2C
MATCH LINE
Mss.2
UP
1'-0"
A-24.1
1'-0"
1'-0"
2C
19'-10"
5'-6"
18'
-0"
18'-0"
2'-1
11
/2"
FD
18'-0"
8'-6
FD
1'-5"
FD
23'-0"
59
ONE WAY
2'-6"
18'-0"
TYP.
PRIVATE 2 CAR
GARAGE
700 EDGEWATER
DEVELOPMENT LLC
Ms.2
18
TY '-0"
P.
8"
FD
12'-0"
60
PRIVATE 1 CAR
GARAGE
Mss.2
1'-8"
8"
SE-2
30
10'-0"
58
-0"
18'
61
1'-0"
130'-0"
130'-0"
142'-0"
2'-0"
62
PRIVATE 2 CAR
GARAGE
4'-8"
5'-0"
10'-0"
24'-0"
(2) SPACES @ 12'-0" EA.
UP
58'-0"
10.00 %
8'-6
1'-0"
18'-0"
TYP.
1'-0"
10'-0"
22'-0"
FD
8" 4'-6"
100'-11"
1HC
2HC
+27'-9" N.G.V.D.
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
Mss.2
12'-0"
2'-3 1/2"
1'-6"
18'-0"
142'-0"
63
1'-0"
PRIVATE 1 CAR
GARAGE
30
PARKING
LEVEL 3
PRIVATE 2 CAR
GARAGE
22'-0"
16
23'-0"
64
8"
4'-2 1/2"
ONE
ONEWAY
WAY
FD
8'-6
65
1'-1 1/2"
10'-0"
7'-0"
20'-10"
66
8"
8"
FD
134'-4"
1'-0"
1'-1 1/2"
67
25'-6"
(3) SPACES @ 8'-6" EA.
8'-6"
18'-0"
2'-8"
12'-0"
18'-0"
1'-0"
5'-4"
2Ms.2
700 EDGEWATER
7'-2"
UP
1'-9 1/2"
8"
8"
68
2Ms.2
18
TY '-0"
P.
19'-10"
2Cs
PRIVATE 2 CAR
GARAGE
8'TY 6"
P.
18'
-0"
29'-1"
27'-1"
20'-7"
Mss.2
PRIVATE 2 CAR
GARAGE
Miami
Santiago, Chile
MATCH LINE
STAIR #3
MATCH LINE
1'-0"
architecture
international
1'-7"
1'-0"
8"
1'-0"
210'-10"
1'-7"
12'-0"
10'-0"
5'-4"
UP
UP
ZZ
A-24.1
N
A-203a
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 3 | PARKING PARTIAL - 1/8"
Sheet No.
A-203b
architecture
international
Miami
0"
12'-1
BEDROOM 04
12'-8"x13'-0"
DEN/HOME
OFFICE
9'-0"x17'-0"
26
POWDER
CLO.
7'-4"(L.F.)
11'-5"
8"
6'-7 1/2"
GRAND FOYER
14'-10"x17'-0"
CLO.
EAST TERRACE
12'-0"x32'-0"
PANTRY
OVEN
1'-8"
UP
DW
UTILITY
8'-3"x7'-8"
9'-1 1/2"
2M.2
F.1
9'-1"
EAST
BALCONY
MW
GOURMET
KITCHEN
10'-0"x 18'-3"
1Pd
2'-1"
38"x68"
2C
DINING
23'-6"x 17'-9"
WC
2'-2"
A/C
UTILITY
BATH
REF
STO
A/C
STAIR #1
2C
+36'-5" N.G.V.D.
UP
PRIVATE
F.1
ELEVATOR LOBBY
7'-0"x22'-10"
2M.2
PE-1
2C
F.1
1Pd
2M.2
F.1
CLO.
9'-3"
(L.F.)
A/C
GREAT ROOM
23'-3"x34'-8"
A/C
FOYER
12'-9"x8'-9"
PRIVATE
ELEVATOR LOBBY
7'-0"x16'-0"
PE-2
2M.2
F.1
R.A.
20"x72"
Revisions
GALLERYEAST DUPLEX
LOWER LEVEL
14'-9"x16'-9"
UP
MECHANICAL
SE-1
2M.2
F.1
10 1/2"
2M.2
T.C.
S.P.
22"x64"
1Pd
SERVICE
CORRIDOR
TRASH
VESTIBULE
2'-2"x7'-6"
STO
2M.2
F.1
7'-6 1/2"
FR
PRIVATE
ELEVATOR LOBBY
7'-0"x22'-5"
2M.2
+36'-5" N.G.V.D.
UP
2C
F.1
2'-1"
2M
F.1
1P.3
STO
UTILITY
BATH
REF
Owner Information
A/C
GOURMET
KITCHEN
10'-0"x18'-2"
2M.2
F.1
6'-7"
BATH
9'-3"
8"
25'-5"
8"
MW
GALLERY
18'-7"x7'-7"
4'-1 1/2"
9'-6 1/2"
SOUTH DUPLEX
LOWER LEVEL
Design by
GREAT ROOM
23'-4"x26'-0"
POWDER
2M.2
F.1
1'-7"
Consultant
CLO.
7'-4"
(L.F.)
3"
MATCH LINE
0"
12'-1
EAST
BALCONY
PANTRY
EAST TERRACE
12'-0"x32'-0"
2M.2
F.1
BEDROOM 04
12'-8"x13'-0"
DEN/HOME
OFFICE
9'-0"x17'-0"
26
2'-3"
BATH 04
12'-1
0"
Luis O. Revuelta
AR-0007972
47'-4 1/2"
55'-0"
89'-0"
136'-4 1/2"
10'-0"
KEY PLAN
Drawn By
UP
ZZ
A-24.1
UP
A-24.1
Checked By
KK
S
Scale
AS SHOWN
S
S
ZZ
A-24.1
UP
UP
A-204b
ZONING
Date
9/2/2016
MATCH LINE
CLO.
GRAND FOYER
14'-10"x17'-0"
OPEN
BELOW
26
OVEN
2M.2
F.1
2M.2
F.1
DINING
23'-6"x17'-8"
DW
LOCKERS
11'-5"
9'-0"
UTILITY
8'-2"x7'-8"
UP
1P.3
BATH
700 EDGEWATER
DEVELOPMENT LLC
WC
SERVICE CORRIDOR
1'-8"
MW
FR
A/C
38"x68"
DINING
15'-6"x15'-10"
DW
OVEN
FD
2M.2
F.1
GOURMET
KITCHEN
10'-0"x14'-7"
DEN/HOME
OFFICE
12'-7"x9'-7"
UTILITY
7'-6"x9'-7"
PE-3
S
9'-1 1/2"
REF
WC
STAIR #2
9'-1 1/2"
POWDER
UTILITY
BATH
2M.2
F.1 DN
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
EAST TERRACE
12'-0"x51'-0"
2M.2
F.1
12'-3"
DROP-OFF
CANOPY BELOW
EAST
BALCONY
3"
38'-8"
121'-3"
BRIDGE ABOVE
FPL - S.A.
20"x42"
140'-4"
FPL-12"x28"
OPEN
BELOW
CLO.
140'-4"
5 1/2"
FD
2M.2
F.1
117'-7"
2M.2
S.A.
18"x36"
1'-10"
S.P.
18"X46"
BEDROOM 04
14'-0"x12'-7"
BATH 04
DN
9'-6 1/2"
7'-6 1/2"
2'-1"
FR
25'-5"
700 EDGEWATER
8"
Project
NORTH DUPLEX
LOWER LEVEL
GALLERY
18'-7"x7'-7"
9'-3"
T. 305.590.5000
F. 305.590.5040
GREAT RM.
23'-4"x26'-0"
OPEN
BELOW
9'-0"
1'-10"
3"
4'-1 1/2"
26
revuelta.com
3"
9'-6 1/2"
2'-3"
BATH 04
12'-1
0"
Santiago, Chile
9'-6 1/2"
1'-7"
MATCH LINE
MATCH LINE
revuelta
UP
UP
ZZ
A-24.1
N
A-204a
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 4 | DUPLEX
LOWER - PARTIAL - 1/8"
Sheet No.
A-204a
27'
5'-4"
210'-10"
1'-0"
Miami
18
TY '-0"
P.
10"
2'-5"
MATCH LINE
T. 305.590.5000
F. 305.590.5040
10
11
12
8"
14
15
Project
8"
18'-0"
Mss.2
8'TY 6"
P.
"
revuelta.com
13
8"
3'-6"
18'-0"
4'-8" 8"
19
20
21
22
23
24
25
26
27
28
29
8"
30
-0"
18'
1'-0"
17
1HC
22'-0"
FD
+38'-2" N.G.V.D.
PARKING
70 SPACES
(3 HANDICAP)
73 SPACES
UP
RAMP
14.51 %
14.51 %
10.00 %
DN
+38'-2" N.G.V.D.
FD
Revisions
3HC
1'-0"
5'-8"
7'-4"
8"
SE-2
8"
56
55
54
53
52
51
50
49
48
47
Owner Information
31
10'-0"
57
PRIVATE 1 CAR
GARAGE
FD
FD
133'-5 1/2"
23'-4 1/2"
8"
32
22'-8"
Consultant
45
44
43
42
41
40
39
38
37
36
35
34
PRIVATE 2 CAR
GARAGE
8'TY 6"
P.
33
Design by
10'-0"
1'-0"
164'-4"
27'-5"
29'-5"
222'-10"
1'-0"
1'-0"
1'-0"
UP
1'-7"
27'-1"
1'-0"
1'-0"
6'-4"
12'-0"
10'-0"
UP
STAIR #5
STAIR #4
MATCH LINE
UP
2M.2
MATCH LINE
2C
1'-0"
2'-6"
Mss.2
Luis O. Revuelta
AR-0007972
ZONING
18'-10"
Date
9/2/2016
KEY PLAN
Drawn By
UP
ZZ
A-24.1
Checked By
KK
S
Scale
AS SHOWN
S
S
S
A-204b
1'-0"
"
UP
4"
UP
18
TY '-0"
P.
19'-10"
18'
-0"
46
FD
18'-0"
18'-0"
8'-6
5'-6"
ONE WAY
FD
23'-0"
29'-1"
UP
700 EDGEWATER
DEVELOPMENT LLC
Ms.2
1'-5"
12'-0"
FD
18'-0" TYP.
1'-0"
ZZ
A-24.1
7'-1"
8'-9"
19'-10"
18'-0"
1'-8"
1'-0"
2M.2
A-24.1
1'-0"
Mss.2
61
UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
58
Mss.2
2C
5'-0"
59
60
8"
-0"
18'
62
PRIVATE 2 CAR
GARAGE
9'-0"
8"
8"
8"
5'-0"
"
8'-6
Mss.2
8"
1'-0"
Cs
63
PRIVATE 2 CAR
GARAGE
4'-8"
1'-0"
4'-2" 8"
10.00 %
18'-0"
TYP.
23'-4 1/2"
142'-0"
54'-1 1/2"
111'-4"
12'-0"
24'-0"
(2) SPACES @ 12'-0" EA.
58'-0"
PARKING
4'-6"
100'-11"
2HC
10'-0"
18'-0"
142'-0"
64
PARKING
LEVEL 4
1'-0"
1'-0"
10"
8"
65
PRIVATE 2 CAR
GARAGE
5'-0"
2'-3 1/2"
66
22'-0"
1'-1 1/2"
18
23'-4 1/2"
"
8'-6
700 EDGEWATER
134'-1 1/2"
20'-10"
67
FD
FD
18'-0"
FD
PRIVATE 2 CAR
GARAGE
1'-0"
ONE WAY
FD
23'-0"
25'-6"
(3) SPACES @ 8'-6" EA.
18'-0"
TYP.
16
12'-0"
8'-6"
FD
12'-0"
68
18'-0"
1'-1 1/2"
1'-0"
6'-2"
UP
4'-9"
8'-6
70
8"
69
Santiago, Chile
8"
19'-10"
2Cs
20'-6"
PRIVATE 2 CAR
GARAGE
18'
-0"
29'-1"
27'-1"
21'-7"
PRIVATE 2 CAR
GARAGE
18'-0"
Mss.2
MATCH LINE
UP
5'-4" 1'-0"
8"
STAIR #3
architecture
international
1'-7"
10'-0"
8"
1'-0"
1'-0"
12'-0"
revuelta
222'-10"
UP
UP
ZZ
A-24.1
N
A-204a
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 4 | PARKING PARTIAL - 1/8"
Sheet No.
A-204b
architecture
international
revuelta.com
CLO.
7'-0"
(L.F.)
26
KIDS CLUB
PET SALON
5 1/2"
3"
CLO.
8'-0"
(L.F.)
DN
7'-0"
6'-9"
4'-7" 5"
WOMEN'S
FD REST.
8"
5"
3'-6"
5"
5'-1"
5'-1"
5 1/2"
REST.
5" 4'-11"
3'-0"
3'-2"
7'-5 1/2"
8'-2"
5"
2'-2"
2M.2
F.1
3SH
38"x68"
SECONDARY
ENTRY
W
WV
+48'-7" N.G.V.D.
2M.2
LAUNDRY
PE-1
BATH 02
A/C
SECONDARY SUITE
15'-0"x16'-0"
S.P.
18"X46"
2C
F.1
S.A.
18"x36"
2M.2
F.1
A/C
JANITOR
CLOSET
2M.2
2C
F.1
2M.2
L.V.
2'-2"x7'-6"
ELECTRICAL RM.
16'-11"
FPL - S.A.
20"x42"
CLO.
CLO.
4'-0"
(L.F.)
BATH 03
CLO.
11'-0"
(L.F.)
CORRIDOR
DUPLEX-E
UPPER
LEVEL
LOFT
12'-5"x12'-9"
BEDROOM 03
15'-2"x12'-3"
PE-2
R.A.
20"x72"
Revisions
OPEN
TO
BELOW
1Pd
S
5"
6'-10"
5"
4'-0"
S.P.
22"x64"
TRASH
VESTIBULE
2'-10"
2'-2"x7'-6"
HIS
9'-5" (L.F.)
STORAGE
2M.2
F.1
MASTER
BATH
2M.2
F.1
8"
12'-0"
7'-6 1/2"
18'-6"
T.C.
8'-11 1/2"
5'-8"
CORRIDOR
2'-6"
5"
DN
2M.2 SERVICE
F.1
2M.2
8"
5" 2'-0"
10 1/2"
6'-4"
SE-1
MASTER SUITE
23'-5"x15'-7"
DRESSING
AREA
2M.2
STAIR #2
3"
HER
12'-5" (L.F.)
+48'-7" N.G.V.D.PE-3
UP
1P.6
3'-8"
8"
9'-2"
14'-7"
6'-6"
A/C
8"
8'-2"
5"
10'-1"
1Pd
A/C
MASTER
BATH
SECONDARY
ENTRY
Owner Information
DRESSING
AREA
700 EDGEWATER
DEVELOPMENT LLC
MASTER
BEDROOM
23'-5"x17'-4"
DUPLEX-S
UPPER LEVEL
HIS
10'-9" (L.F.)
A/C
Consultant
GALLERY
2Ms.2
F.1
P.6
2Ms.2
F.1
P.3
OFFICE
10'-10"
2'-10"
P.3
SCREENING ROOM
2M.2
F.1
4'-2" 8"
FD
HERS
13'-2" (L.F.)
2M
F.1
38"x68"
3SH
8"
3'-2"
5"
5" 2'-0"
31'-2"
5"
6'-7"
C
F.1
5"
8"
2C
F.1
8"
5'-7"
2'-6"
7'-2"
9'-1 1/2"
20'-10"
2'-1"
19'-2 1/2"
3SH
11'-5"
DUPLEX-N
UPPER LEVEL
HERS
13'-3" (L.F.)
1Pd
FPL-12"x28"
20'-2 1/2"
5"
P.6
9'-0"
OFFICE
DN
CLO.
8'-0"
(L.F.)
EAST POOL
EQUIPMENT ROOM
11'-4"
BEDROOM 03
12'-9"x17'-0"
CLO.
7'-0"
(L.F.)
P.3
BATH 03
SECONDARY SUITE
13'-7"x16'-3"
3"
2'-5 1/2"
8"
8"
OFFICE
1'-7"
0"
12'-1
3'-11"
8"
26
9'-6 1/2"
8"
3"
MATCH LINE
2'-7"
5'-11"
Design by
OPEN
TO
BELOW
26
2'-3"
WV
12'-1
0"
BATH 02
Luis O. Revuelta
AR-0007972
55'-0"
67'-2 1/2"
8"
ZONING
Date
9/2/2016
KEY PLAN
A-24.1
Drawn By
ZZ
A-24.1
Checked By
KK
S
Scale
AS SHOWN
S
S
MATCH LINE
LAUNDRY
UP UP
UP UP
S
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
MASTER
BEDROOM
23'-4"x17'-2"
DRESSING
AREA
2'-1"
STAIR #1
12'-3"
SCREENING ROOM
LOUNGE
MASTER
BATH
2M.2
F.1
1P.6
5'-8"
10'-1"
2M.2
F.1
38'-8"
13'-4"
3 1/2"
140'-4"
SKY BRIDGE
LOBBY
5"
HIS
10'-9" (L.F.)
SECONDARY
1Pd ENTRY
UP
12'-3"
SKY BRIDGE
2'-6"
1P.6
1P.6
A/C
3SH
1P.3
A/C
FD
7'-7"
2'-1"
8"
2'-8 1/2"
4'-7" 5"
7'-3"
5" 2'-6" MEN'S FD
A/C
5"
5"
11'-10"
7"
7'-3"
1P.6
1'-2"
8"
3'-2"
8'-1"
8"
5" 5'-0"
24'-9"
1P.6
5'-1"
5"
9'-1/2"
7"
1'-2"
20'-2 1/2"
5'-0"
20'-10"
7'-6 1/2"
KID'S
REST.
9'-1"
9'-0"
1Pd
Project
GALLERY
2"
5'-1"
6'-7 1/2"
8"
8'-4"
1M.2
F.1
T. 305.590.5000
F. 305.590.5040
1M.2
F.1
4'-10" 4"
8" 5'-0"
33'-9"
1P.6
26
LAUNDRY
1M.2
F.8
Pwt.3
OPEN
TO
BELOW
5"
1P.6
Pwt.6
1P.6
SECONDARY
SUITE
13'-7"x16'-3"
1C
F.8
14'-8"
4'-9 1/2"
3"
BEDROOM 03
12'-9"x17'-0"
3'-4"
11'-5"
2'-10"
2'-3"
WV
1Pdm
1Pws
0"
12'-1
BATH 02
BATH 03
Santiago, Chile
700 EDGEWATER
1'-7"
9'-10 1/2"
12'-1
0"
9'-6 1/2"
MATCH LINE
Miami
MATCH LINE
revuelta
ZZ
A-24.1
UP UP
UP UP
A-205b
UP UP
UP UP
ZZ
A-24.1
N
A-205a
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 5 | DUPLEX
UPPER - PARTIAL - 1/8"
Sheet No.
A-205a
27'
revuelta
12'-0"
1'-0"
architecture
international
1'-7"
10'-0"
Miami
5'-4"
14'-0"
UP
15
5'-0" 8"
14
8'
Project
28
3
10
11
12
13
FD
136'-1"
12'-0"
16'-5"
1'-2"
1'-6"
ONE WAY
FD
FD
18'-0"
1'-2"
4'-6" 8"
29
23'-8"
1'-0"
FD
FD
UP
6'-11 1/2"
18'-0"
PRIVATE 2 CAR
GARAGE
700 EDGEWATER
18'-0"
8"
UP
5'-1"
18
19
20
21
22
23
24
25
26
27
70
30
69
PRIVATE 2 CAR
GARAGE
18'-0"
18'-0"
PRIVATE 2 CAR
GARAGE
21'-2"
-0"
18'
8'-6"
17
"
1'-5 1/2"
16
1'-2"
8"
8'-6
18'-0"
T. 305.590.5000
F. 305.590.5040
Mss.2
9'- - 6 "
TY 8"
P.
1
72
8"
40'-0"
UP
31'-4 1/2"
19'-10"
2Cs
71
PRIVATE 2 CAR
GARAGE
18'
-0"
PRIVATE 2 CAR
GARAGE
19'
TY 10"
P.
21'-7"
19'-0"
Mss.2
revuelta.com
31
Cs
STAIR #3
Santiago, Chile
MATCH LINE
1'-0"
8"
1'-0"
210'-10"
MATCH LINE
222'-10"
SEE L-4
FOR DIM.
58'-0"
10'-0"
5'-1 1/2"
1'-0"
32
FD
14.51 %
10.00 %
DN
20'-0"
22'-0"
18'-0"
67
RAMP
10.00 %
FD
+48'-7" N.G.V.D.
2'-6 1/2"
8'-6
"
CORRIDOR
8"
66
5'-2" 8"
8"
1'-0"
PARKING
72 SPACES
4'-2" 8"
3'-6"
PRIVATE 2 CAR
GARAGE
33
+48'-7" N.G.V.D.
90'-0"
Revisions
18'-0"
PARKING
LEVEL 5
PARKING
PRIVATE 2 CAR
GARAGE
142'-0"
1'-0"
68
8"
2'-0"
8'-0"
20'-2"
18'-0"
62
61
60
59
58
57
56
55
54
53
52
51
34
50
SE-2
Mss.2
Owner Information
PRIVATE 1 CAR
GARAGE
10'-0"
65
700 EDGEWATER
DEVELOPMENT LLC
Ms.2
23'-0"
8'-6
18'-0"
8"
5'-0" 1'-0"
Consultant
"
48
47
46
45
44
43
42
41
40
39
38
37
8'TY 6"
P.
3'-3"
5'-6"
UP
35
23'-0"
UP
2M.2
10'-0"
1'-0"
UP
8"
PRIVATE 2 CAR
GARAGE
36
18
TY '-0"
P.
15'-2"
49
2C
FD
Design by
Mss.2
UP
STAIR #5
UP
1'-0"
UP
2C
2M.2
UP
UP
MATCH LINE
63
FD
133'-6"
18'-0"
PRIVATE 2 CAR
GARAGE
12'-0"
FD
MATCH LINE
18'-0"
TYP.
ONE WAY
FD
18'
-0"
8"
FD
18'-0"
64
12'-0"
8"
1'-5"
1'-8"
Mss.2
STAIR #4
Luis O. Revuelta
1'-0"
28'-1"
10'-1"
39'-10"
4"
8"
143'-2"
8"
143'-2"
222'-10"
5'-2 1/2"
32'-11 1/2"
39'-10"
18'-10"
KEY PLAN
A-24.1
ZZ
A-24.1
Scale
AS SHOWN
A-205b
ZONING
Checked By
KK
S
UP UP
UP UP
AR-0007972
Drawn By
ZZ
A-24.1
1'-0"
Date
9/2/2016
UP UP
UP UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
-0"
18'
PRIVATE 2 CAR
GARAGE
Mss.2
UP UP
UP UP
ZZ
A-24.1
N
A-205a
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 5 | PARKING PARTIAL - 1/8"
Sheet No.
A-205b
architecture
international
Miami
FD
12'-1 1/2"
Santiago, Chile
FD
FD
0"
12'-1
FD
1'-7"
revuelta.com
12'-1/2"
12'-1
0"
26
3"
26
T. 305.590.5000
F. 305.590.5040
3"
MATCH LINE
MATCH LINE
revuelta
FD
FD
FD
2'-3"
FD
FD
FD
FD
15'-6 1/2"
NORTH TERRACE
Project
WOMEN'S
RESTROOM
P.6
1P.3
FAMILY
RESTROOM-1
2M
2M
F.1
5'-7"
4
3
2
1
F.1
UP
50'-10 1/2"
1P.3
TD
5 x 8 1/2" = 3'-6"
6'-6"
1P.6
1P.6
700 EDGEWATER
UNISEX-POOL
RESTROOM
38"x68"
TD
2M.2
F.1
TD
2'-1"
2Pm.6
STAIR #1
1Pd
+63'-11" N.G.V.D.
UP
2M.2
PE-1
DN
2.70 %
2C
F.1
S.P.
18"X46"
S.A.
18"x36"
2M.2
F.1
JANITOR
CLOSET
2M.2
2M
8'-1 1/2"
SE-1
P.6
STORAGE
2M.2
F.1
F.1
2M.2
STAIR #2
2'-1"
4'-11"
1'-0"
P.6
6'-6"
96
4'-0"
R= 2'-0"
1P.6
GAME ROOM
8"
FD
7'-0"
5"
5'-0" 5"
2M
F.1
Owner Information
3'-1/2"
3'-1/2"
1P.6
4'-3" 5"
27'-2"
10'-5 1/2"
5"
6'-6"
8"
10'-2"
5" 2'-4"
UNISEX-POOL
RESTROOM
39'-0"
6'-5"
4'-6"
62'-8"
11'-3"
12'-7 1/2"
109'-0"
26'-4"
33'-11"
2'-3"
10'-10 1/2"
3'-3"
FD
135
R= 1'-0"
8'-0"
R= 1'-0"
TYP.
1'-11"
5'-0"
5'-7"
+63'-11" N.G.V.D.
TD
Consultant
5'-6"
2'-3"
Design by
3"
8'-5"
14'-3 1/2"
6'-5 1/2"
135 R= 1'-0"
135
4'-0"
2'-7 1/2"
3'-6 1/2"
1'-10 1/2"
135
4'-8"
3"
0"
12'-1
3'-9"
12'-1 1/2"
MATCH LINE
26
FD
FD
TD
700 EDGEWATER
DEVELOPMENT LLC
21'-4 1/2"
1'-9"
FD
12'-1
0"
FD
5'-7"
26
3'-3"
FD
TANK
HATCH
FD
1'-6 1/2"
5'-0"
4'-6 1/2"
FD
R= 1'-0"
TYP.
19'-8"
Luis O. Revuelta
55'-0"
47'-4 1/2"
55'-0"
89'-0"
22'-11 1/2"
159'-4"
ZONING
KEY PLAN
A-24.1
Drawn By
ZZ
A-24.1
S
2.70 %
UP
UP UP
UP UP
A-206b
UP UP
UP UP
2.70 %
S
S
ZZ
A-24.1
AR-0007972
Date
9/2/2016
MATCH LINE
1'-7"
15'-0"
R= 2'-0"
SOUTH TERRACE
FD
EAST TERRACE
R= 2'-0"
R= 2'-0"
7'-5"
TD
1P.3
1P.3
1P.6
21'-11 1/2"
2C
F.1
38"x68"
2P.6
1'-7"
50'-10 1/2"
2'-1"
FD
5'-7"
25'-1"
5 x 8 1/2" = 3'-6"
UP
5'-0"
UP UP
UP UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
DN
15'-6 1/2"
S.P.
22"x64"
1Pd
TRASH
VEST.
FD 2M.2
12'-1/2"
TC.
2.70 %
5'-0" 3"
17"X54"
1'-7"
5"
CORRIDOR
2M.2
F.1
2M.2
16'-3 1/2"
2M.2
F.1
SERVICE/CORRIDOR
2C
F.1
84
Revisions
WARMING PANTRY/
BAR
C
F.1
R= 2'-0"
BAY
POOL
6'-0" 7 1/2"
5"
1'-5 1/2"
PE-2
R.A.
20"x72"
7 1/2"
3"
10 1/2"
FD
3"
FPL - S.A.
20"x42"
P.3
P.3
2M
FPL-12"x28"
2C
F.1
2'-3 1/2"
R= 4'-11 1/2"
NORTH SIDE
SYMMETRICAL
WITH
SOUTH SIDE
SEE SOUTH SIDE
FOR DIMENSIONS
U.O.N.
74'-0"
WEST TERRACE
2C
F.1
2M.2
F.1
7"
9'-10"
R= 29'-1/2"
5'-8"
14'-4"
2'-2"x7'-6"
ELECTRICAL RM.
140'-4"
5'-3"
5 1/2"
L.V.
P.3
1P.6
FD
ZZ
A-24.1
N
A-206a
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 6 | POOL DECK
- PARTIAL - 1/8"
Sheet No.
A-206a
27'
revuelta
222'-10"
1 1/2"
9'-0"
STAIR UP
#3
8"
10'-8"
UP
5'-4"
2Ms.2
R= 5'-0"
TYP.
SE-3
141
5'-4"
8"
8"
6'-2 1/2"
8"
8'-0"
8"
SERVICE CORRIDOR
4'-1"
39'-4 1/2"
8'-2 1/2"
R= 2'-6"
TYP.
UP
5'-8"
8"
5'-4"
8"
7'-9"
19'-7"
2'-0"
12'-8 1/2"
7'-0"
R= 3'-0"
42'-8"
2'-10 1/2"
8'-8"
R= 2'-0"
5'-1"
LANDSCAPE
AREA
LANDSCAPE
AREA
8'-0"
6'-0"
23
62
101
R= 3'-0"
8
59
R= 4'-0"
R= 4'-0"
5'-4"
Ms.2
LANDSCAPE
AREA
R= 3'-1/2"
24'-8"
PLANTING BED
R= 2'-0"
1'-0"
R= 2'-0"
R= 15'-6 1/2"
LANDSCAPE
AREA
82
R= 3'-0"
8"
1'-8"
7'-6"
2'-0"
8"
10'-2"
CABANA
CABANA
POOL CABANAS
CABANA
15'-1"
136'-5 1/2"
10'-8 1/2"
3'-0"
1'-0"
2'-7"
1'-4"
164'-0"
1'-4"
6'-11"
8"
6'-6"
5"
16'-4"
22'-4"
1'-4"
2'-6"
Ms
F.1
137'-5 1/2"
CABANA
9'-8 1/2"
CABANA
5'-4"
R= 2'-6"
TYP.
3'-0"
R= 1'-6"
TYP.
96
8"
8"
1Ms.2
CABANA
R= 2'-0"
TYP.
8"
10'-2"
STORAGE
10'-2"
10'-2"
2'-0"
8"
Ms.2
Fm.1
15'-10"
LANDSCAPE
AREA
1'-0"
15'-2 1/2"
5"
13'-9"
5'-0"
5'-8 1/2"
2'-2"
POOL CABANAS
121
R= 2'-0"
TYP.
14'-3"
2"
8"
90'-0"
2"
1'-8"
WOMEN'S
RESTROOM
1.68 %
OLYMPIC POOL
Revisions
+63'-11" N.G.V.D.
4'-0"
Cs
Fm.1
2" 8'-1"
2'-0"
8"
Ms.2
Fm.1
+63'-11" N.G.V.D.
12'-0"
5'-4"
5'-6"
1'-4"
14'-2"
2'-0"
POOL DECK
Mss
142'-0"
15'-10"
90
Fm.3
Fm.3
/2"
-3 1
'
4
1
LANDSCAPE
AREA
PLANTING BED
R= 15'-11 1/2"
59
Owner Information
11'-8"
R= 2'-0"
R= 1'-11 1/2"
37'-9"
12'-7"
26'-6 1/2"
CABANA
1Ms
4'-0"
3'-10"
2Cs
CABANA
UP
170
UP
STAIR #4
6'-0"
MECHANICAL
CABANA
2Ms.2
Design by
1'-0"
CABANA
1'-0"
UP
2Ms
10'-0"
CABANA
3'-9"
R= 3'-0"
R= 4'-0"
R= 1'-0"
TYP.
4'-0"
UP
MATCH LINE
1'-4"
1'-0"
1'-0"
SPA
1'-4"
CABANA
8'-0"
STAIR #5
UP
10'-0"
1'-0"
1Ms.2
UP
UP
1'-4"
R= 2'-6"
TYP.
1"
2Ms.2
6'-10"
1'-4"
1'-4"
Ms.2
F.1
3'-0"
UP
70'-0"
LOUNGE POOL
6'-0"
8"
5'-4"
8"
5'-4"
SERVICE CORRIDOR
12'-0"
10'-0"
1'-0"
2Cs
1'-4"
1'-4"
A/C
1Mss.2
14'-4"
5'-5"
P.3
21'-3"
Consultant
YOGA LAWN
121
4'-6 1/2"
12'-0"
8'-5"
15'-0"
MIN.
5'-1" 8"
2'-0" 4'-0"
1"
14'-7"
6'-0"
5'-2"
8"
5'-3" 8"
21'-1"
84
Css
8"
700 EDGEWATER
DEVELOPMENT LLC
MATCH LINE
26'-8"
5'-1"
8'-0"
26'-8"
23'-6"
Ms.2
F.1
1'-0"
28'-1"
39'-10"
4"
10'-1"
8"
21'-8"
143'-2"
121'-6"
8"
5'-2 1/2"
32'-11 1/2"
39'-10"
1'-0"
1'-7"
Luis O. Revuelta
222'-10"
18'-10"
Date
9/2/2016
ZZ
A-24.1
S
2.70 %
A-24.1
Drawn By
UP
UP UP
UP UP
A-206b
UP UP
UP UP
2.70 %
S
S
ZZ
A-24.1
AR-0007972
ZONING
KEY PLAN
UP UP
UP UP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
13'-9"
14'-3"
5"
7'-1"
MEN'S
RESTROOM
2" 3'-0" 2" 2'-10" 2'-10" 2"
2'-2"
5'-0"
5'-0" 2"
2'-6"
5"
1'-4"
6'-6"
98
1'-8" 4'-0" 8"
5'-2" 5"
R= 2'-0"
TYP.
LANDSCAPE
AREA
28
2"
5"
R= 2'-8"
TYP.
Ms.2
F.1
Ms.2
Fm.1
3'-0"
14'-3"
13'-6"
16'-8"
16'-8"
Css
STORAGE
T. 305.590.5000
F. 305.590.5040
Project
SPLASH
ZONE
R= 2'-0"
67
4'-5"
23'-6"
38
R= 1'-0"
R= 2'-0"
R= 2'-0"
A/C
8"
6'-9 1/2"
revuelta.com
R= 3'-0"
14
8"
6'-11"
UP
8"
R= 2'-0"
32
11"
Miami
139
CHILDREN'S CABANA
LAWN
LOUNGE
2Ms.2
35'-8 1/2"
1"
81
21'-4"
6'-1"
13'-3 1/2"
130
8'-4"
2"
2"
35'-8"
130
Ms.2
F.1
Ms.2
2Cs
12'-3"
R= 3'-0"
TYP.
8"
2M
1'-1/2"
144
14'-7"
31'-5"
UP
40'-0"
10'-7 1/2"
5'-4"
8"
8"
8"
10'-0"
FURNITURE STORAGE
R= 3'-0"
141
Ms.2 2Ms.2
5'-0" 8"
Santiago, Chile
PLANTING BED
LANDSCAPE
AREA
144
CONTROL ROOM
architecture
international
6'-9"
700 EDGEWATER
8"
MATCH LINE
10'-7 1/2"
MATCH LINE
8"
1'-7"
32'-8"
1'-0"
1'-0"
161'-4"
1'-0"
61'-6"
48'-11 1/2"
5'-4"
ZZ
A-24.1
N
A-206a
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 6 | POOL DECK
- PARTIAL - 1/8"
Sheet No.
A-206b
revuelta
architecture
international
MATCH LINE
0"
12'-1
12'-1
0"
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
26
26
1'-7"
ZZ
A-24.1
T. 305.590.5000
F. 305.590.5040
3"
1'-6 1/2"
3"
MATCH LINE
Miami
Santiago, Chile
2'-3"
Project
GROOMING
AC C713
P.6
38"x68"
2'-1"
2M.2
2M.2
F.1
5"
1'-11"
OPEN
TO BELOW
STAIR #2
5"
2M.2
SAUNA
Pws.3
5"
4'-0"
8"
10'-0"
1'-11"
8"
P.3
C710
S
2'-2"
MEN'S
RESTROOM
C709
P.3
WOMEN'S
RESTROOM
Pws.3
SHOWERS
MEN'S/LOCKERS
C702
2'-6"
PE-3
UP
9'-4"
6'-9"
C731
8'-5"
2C
STORAGE
C734
8"
DN
BALLET BAR
1Pd
2M.2
F.1
C722
Fws.6
17"x54"
2M.2
F.1
5'-2" 5"
S.P.
22"x64"
EAST POOL
DECK BELOW
2M.2
F.1
SERVICE/CORRIDOR
TRASH
VESTIBULE C735
Revisions
21'-11"
7 1/2"
T.C.
STO
MECH
5"
BALLET BAR
C708
2M.2
F.1
2M.2
COLD/SHOWER
C720
5"
7'-4"
STO.
5"
5"
7'-4"
5'-2"
C721
1'-3"
1'-8" 6'-2"
P.3
6'-2"
1Pd
C719
2M.2
F.1
P.6
Pws.6
AC
GROOMING
38"x68"
C714
SPA LOBBY SOUTH
5"
7'-0"
5"
5'-0" 2"
Pm.3
Pm.3
5'-2"
P.6
7'-7"
5"
4'-6" 5"
Owner Information
P.6
7'-8"
5"
700 EDGEWATER
DEVELOPMENT LLC
11"
1Pd
3'-10"
7 1/2"
5"
C712
22'-9"
13'-6 1/2"
4'-0" 5"
2'-4 1/2"
C724
SE-1
4'-0"
19'-5"
10 1/2"
16'-3 1/2"
2C
F.1
PE-2
R.A.
20"x72"
S
Pws.3
STEAM
5"
9'-2 1/2"
FPL - S.A.
20"x42"
C732
Pm.3
6'-3"
2'-2"x7'-6"
PRIVATE/SHOWER
Pm.3
5"
C701
1Pd
2M.2
FPL-12"x28"
Pws.3
PRIVATE/SHOWER
C723
EXERCISE ROOM
7'-0"
2M.2
F.1
Fws.6
Pm.3
C705
5"
BALLET BAR
TREATMENT
ROOM
P.3
STORAGE
2M.2
ELECTRICAL RM.
Pws.3
6'-11"
5 1/2"
C725 STO.
STORAGE
C736
P.3
Pm.3
TREATMENT
ROOM
C733
STORAGE
16'-11"
S.A.
18"x36"
C707
10'-0"
S.P.
18"X46"
STO
MECH
L.V.
C726
6'-9"
2M.2
6'-6"
C730
C727
STEAM
FREE
WEIGHTS
1Pd
8"
C704
12'-11"
Consultant
2'-11 1/2"
ZZ
A-24.1
3"
1'-6 1/2"
0"
12'-1
Design by
2'-3"
3"
MATCH LINE
26
26
12'-1
0"
Luis O. Revuelta
73'-11"
AR-0007972
ZONING
Date
9/2/2016
KEY PLAN
UP
A-24.1
Drawn By
ZZ
A-24.1
S
S
S
MATCH LINE
1'-7"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
PE-1
DN
C706
16'-11"
Pm.3
2'-11" 5"
STAIR #1
8"
Fws.6
C728
Pm.3
+76'-11" N.G.V.D.
UP
CORRIDOR
16'-8 1/2"
Pws.3
Pws.3
8"
SHOWERS
SAUNA
COLD/SHOWER
MEN'S
RELAXATION
AREA
YOGA
1Pd
C715
C729
BRIDGE BELOW
1Pd
Pm.3
WOMEN'S
RELAXATION
AREA
NORTH SIDE OF
SPA SYMMETRICAL
WITH
SOUTH SIDE
SEE SOUTH SIDE
FOR DIMENSIONS
U.O.N.
2M.2
F.1
2'-1"
9'-2 1/2"
Pws.6
700 EDGEWATER
WOMEN'S/LOCKERS
19'-11 1/2"
C703
C711
Pm.3
6'-6"
Pm.3
Checked By
KK
EAST POOL
DECK BELOW
Scale
AS SHOWN
ZZ
A-24.1
UP
A-207b
ZZ
A-24.1
N
A-207a
Project No.
1433
1'-0"
Sheet Name
E PODIUM - LVL 7 | GYM & SPA PARTIAL - 1/8"
Sheet No.
A-207a
27'
NOT FOR CONSTRUCTION
revuelta
9'-6"
8"
27'-8"
8"
12'-0"
8"
8'-0"
8"
4"
160'-4"
architecture
international
1'-1"
Miami
Mss
VESTIBULE
5'-10"
2M
P703
P704
SE-3
STORAGE
Ms
Mss
Santiago, Chile
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
8"
8"
2M
MATCH LINE
P701
MATCH LINE
STAIR #3
8"
11'-10"
10'-6"
UP
3'-8"
8"
1'-0"
8"
ZZ
A-24.1
ZZ
A-24.1
Project
700 EDGEWATER
TENNIS COURT
142'-0"
Revisions
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
ZZ
A-24.1
ZZ
A-24.1
8"
VESTIBULE
P702
2'-0"
8'-2"
Ms
P705
STAIR #5
STORAGE
UP
8"
27'-8"
60'-10"
8"
19'-8"
MATCH LINE
6'-4 1/2"
5'-1/2" 8"
2Ms
MATCH LINE
Design by
Luis O. Revuelta
2'-0"
222'-3"
121'-6"
39'-11"
AR-0007972
ZONING
18'-10"
Date
9/2/2016
KEY PLAN
UP
A-24.1
Drawn By
ZZ
A-24.1
S
S
S
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
123'-9"
Checked By
KK
EAST POOL
DECK BELOW
Scale
AS SHOWN
ZZ
A-24.1
UP
A-207b
ZZ
A-24.1
N
A-207a
Project No.
1433
1'-0"
Sheet Name
W PODIUM - LVL 7 | TENNIS PARTIAL - 1/8"
Sheet No.
A-207b
revuelta
architecture
international
128'-9 1/2"
Miami
107'-0"
28'-9 1/2"
89'-0"
11'-0"
8'-0"
89'-0"
Santiago, Chile
10'-0"
26
26
3"
DW
0"
12'-1
UNIT 1
3'-4 1/2"
12'-1
0"
MW
4'-0"
UNIT 1
0"
12'-1
FR
REF
SL.
1/8"/FT
FR
WC
REF
FD
SL.
1/8"/FT
WV
T. 305.590.5000
F. 305.590.5040
Project
WC
WV
BALCONY 1 EAST
BALCONY 1
SL.
1/8"/FT
BALCONY 1
1'-3"
PRIVATE
ELEV. LOBBY 1
+90'-1" N.G.V.D.
UP
UP
16'-3 1/2"
STAIR #1
S.A.
18"x36"
2M.2
F.1
26'-2"
10"
3"
PLANTER
19'-6"
FPL-S.A.
20"x42"
A/C
L.V.
2'-2"x7'-6"
ELECTRICAL RM.
FPL-12"x28"
PRIVATE
ELEV. LOBBY 2
FPL-12"x28"
R.A.
20"x72"
PE-2
2M.2
F.1
WC
REF
91'-9"
2'-2"x7'-6"
ELECTRICAL RM.
2M.2
F.1
2M.2
UNIT 2
BALCONY 2 EAST
FR
FPL - S.A.
20"x42"
117'-7"
10"
SL.
1/8"/FT
A/C
S.A.
18"x36"
R.A.
20"x72"
2M.2
F.1
Revisions
PE-2
WC
REF
1'-2 1/2"
FD
A/C
S.P.
18"X46"
UNIT 2
130'-1"
10"
L.V.
2C
F.1
PRIVATE
ELEV. LOBBY 2
2M.2
WV
A/C
STO
PE-1
DN
SL.
1/8"/FT
S.P.
18"x46"
WV
2C
F.1
PRIVATE
ELEV. LOBBY 1
+100'-11" N.G.V.D.
STAIR #1
STO
PE-1
DN
1'-4"
SL.
1/8"/FT
TERRACE 1 WEST
1'-3"
1'-3"
1'-3"
1'-4"
13'-1"
MW
26
OVEN
3"
12'-1
0"
700 EDGEWATER
1'-8"
DW
1'-6 1/2"
3"
OVEN
2'-3"
PANTRY
1'-6 1/2"
26
1'-7"
3"
2'-3"
PANTRY
7 1/2"
4'-5"
1'-7"
5'-7 1/2"
revuelta.com
BALCONY 2
FR
PLANTER
10"
17"x54"
A/C
2M.2
F.1
SL.
1/8"/FT
16'-3 1/2"
A/C
S.P.
22"x64"
DN
1'-3"
A/C
PE-3
PE-3
+100'-11" N.G.V.D.
UP
2C
F.1
1'-4"
2M.2
2C
STO
PRIVATE
ELEV. LOBBY 3
STAIR #2
1'-3"
+90'-1" N.G.V.D.
2C
2C
F.1
1'-4"
1'-3"
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
SL.
1/8"/FT
1'-3"
A/C
2M.2
F.1
2M.2
F.1
STO
PRIVATE
ELEV. LOBBY 3
1'-3"
2M.2
UP
TRASH
RM.
DN
STAIR #2
TERRACE 2 WEST
OVEN
PANTRY
TC.
2M.2
F.1
A/C
17"x54"
FD
PANTRY
TRASH RM.
2M.2
F.1
2M.2
OVEN
MW
DW
SERVICE CORRIDOR
TC.
S.P.
22"x64"
2M
F.1
SE-1
SL.
1/8"/FT
MW
DW
A/C
2M.2
F.1
2M.2
BALCONY 3 EAST
D
BALCONY 3
BALCONY 3
D
SL.
1/8"/FT
FD
WV
Consultant
WV
4'-1"
4'-1/2"
WC
REF
FR
FR
12'-1
0"
UNIT 3
MW
0"
12'-1
7 1/2"
UNIT 3
3'-4 1/2"
2'-3"
3"
3"
3"
PANTRY
26
5'-7 1/2"
4'-5"
OVEN
26
89'-0"
OVEN
1'-7"
8'-0"
28'-9 1/2"
12'-1
0"
Design by
DW
1'-6 1/2"
DW
1'-7"
4'-0"
MW
PANTRY
89'-0"
3"
1'-8"
0"
12'-1
26
WC
1'-6 1/2"
13'-1"
REF
SL.
1/8"/FT
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
2M.2
F.1
SERVICE -CORRIDOR
SE-1
26
2'-3"
10'-0"
11'-0"
128'-9 1/2"
107'-0"
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
1'-0"
Project No.
1433
LEVEL 9 | 3 UNITS
SCALE: 1/8" =
1'-0"
Sheet Name
TOWER - LEVELS 8 & 9
Sheet No.
A-208
revuelta
architecture
international
107'-0"
1'-7"
10'-0"
1'-9"
26
26
MW
revuelta.com
2'-3"
26
3'-4 1/2"
12'-1
0"
0"
12'-1
UNIT 1
1'-6 1/2"
12'-1
0"
10'-0"
3"
DW
1'-6 1/2"
3"
OVEN
3"
89'-0"
1'-7"
2'-3"
PANTRY
26
8'-0"
Santiago, Chile
6'-3"
89'-0"
1'-1 1/2"
8'-0"
Miami
107'-0"
"
11'-7
4'-0"
FR
REF
Project
WC
2'-11"
3'-0
"
32
BALCONY 1
WEST
3'-0"
1'-11"
14'-6 1/2"
2M.2
STAIR #1
2M.2
F.1
6'-0"
2'-6" 3'-0"
7'-3"
18'-9"
3'-0"
S
S.P.
18"x46"
A/C
S.A.
18"x36"
2M.2
2M.2
2M.2
ELECTRICAL RM.
ELECTRICAL RM.
PRIVATE
ELEV. LOBBY 2
2C
FPL-12"x28"
R.A.
20"x72"
2M.2
Revisions
PE-2
SE-1
BALCONY
5'-1/2"
SERVICE CORRIDOR
2M.2
2M.2
OVEN
MECHANICAL ROOM
2M.2
A/C
117'-7"
BALCONY 1
MW
DW
SERVICE CORRIDOR
2M.2
BALCONY 2
EAST
FPL-S.A.
20"x42"
STORAGE
2M
F.1
2M
F.1
UNIT 2
FR
SE-1
WC
REF
6'-0"
PE-2
21'-6"
2M.2
F.1
R.A.
20"x72"
130'-1"
FPL-12"x28"
FPL - S.A.
20"x42"
16'-3"
L.V.
L.V.
130'-1"
PE-1
W
A/C
S.A.
18"x36"
1'-4"
DN
WV
2C
F.1
130'-1"
1'-2"
UP
STO
PE-1
DN
S.P.
18"X46"
1'-3"
4'-11"
STAIR #1
1'-3"
1'-3"
UP
1'-3"
PRIVATE
ELEV. LOBBY 1
10'-2"
1'-3"
3'-0"
1'-3"
1'-4"
1'-3"
1'-9"
2M.2
BALCONY 1
EAST
700 EDGEWATER
1'-2"
1'-8 1/2"
WV
PANTRY
A/C
DN
2M.2
2M.2
DN
STAIR #2
2M.2
STO
PE-3
2M.2
2C
F.1
PE-3 1'-3"
1'-3"
18'-9"
UP
2C
6'-0"
2'-6" 3'-0"
2C
3'-0"
2C
STAIR #2
PRIVATE
ELEV. LOBBY 3
UP
1'-3"
1'-3"
1'-9"
1'-4"
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
14'-6 1/2"
BALCONY 3
WEST
D
1'-2"
BALCONY 3
EAST
W
Consultant
WV
32
2'-11"
3'-0
"
1'-8"
4'-1/2"
4'-1/2"
WC
REF
FR
0"
12'-1
12'-1
0"
UNIT 3
MW
0"
12'-1
3'-4 1/2"
11'-7
"
4'-0"
Design by
PANTRY
8'-0"
89'-0"
1'-7"
2'-3"
10'-0"
8'-0"
1'-9"
89'-0"
26
2'-3"
6'-3"
26
1'-6 1/2"
1'-7"
26
1'-1 1/2"
OVEN
3"
26
1'-6 1/2"
3"
DW
3"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
STORAGE
6'-9 1/2"
F.1
S.P.
22"x64"
9'-4 1/2"
2M.2
F.1
4'-6"
A/C
1'-3"
S.P.
22"x64"
TC.
TRASH
VESTIBULE
2M.2
10'-2"
TC.
10'-0"
107'-0"
107'-0"
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
1'-0"
Project No.
1433
LEVEL 29 | MECHANICAL
SCALE: 1/8" =
1'-0"
Sheet Name
TOWER - LEVELS 10-28 & 29
Sheet No.
A-209
revuelta
architecture
international
Miami
107'-0"
89'-0"
26
revuelta.com
PANTRY
26
OVEN
T. 305.590.5000
F. 305.590.5040
3'-4 1/2"
MW
DW
1'-6 1/2"
DW
4'-0"
UNIT 1
0"
12'-1
MW
UNIT 1
FR
FR
REF
REF
WC
WV
BALCONY 3
BALCONY 1
700 EDGEWATER
XX BALCONY 1
EAST
XX BALCONY 1
WEST
10"
9"
1'-3"
Project
WC
WV
PRIVATE
ELEV. LOBBY 1
UP
STAIR #1
STAIR #1
STO
PE-1
S.A.
18"x36"
2M.2
F.1
S.P.
18"X46"
A/C
S.A.
18"x36"
A/C
2M.2
F.1
A/C
2M.2
L.V.
L.V.
ELECTRICAL RM.
SLEVES TO BE
COORDINATED
IN THIS AREA
ELECTRICAL RM.
PRIVATE
ELEV. LOBBY 2
2M.2
F.1
PE-2
2M.2
F.1
SLEVES TO BE
COORDINATED
THIS AREA
SERVICEINCORRIDOR
2M.2
UNIT 2
XX BALCONY 2
EAST
FR
2M.2
F.1
SE-1
WC
REF
FPL - S.A.
20"x42"
130'-1"
R.A.
20"x72"
2M.2
F.1
2M.2
F.1
A/C
OVEN
S.P.
22"x70"
A/C
2M.2
F.1
F.1
S.P.
22"x70"
A/C
2C
F.1
DN
STAIR #2
2M.2
2C
XX TRASH
VESTIBULE
2M
A/C
2M.2
F.1
F.1
PE-3
A/C
2C
F.1
DN
STO
STAIR #2
2M.2
PRIVATE
ELEV. LOBBY 3
UP
9"
PANTRY
TC.
XX TRASH
VESTIBULE
2M
BALCONY 2
MW
DW
PANTRY
TC.
UNIT 2
FR
SERVICE CORRIDOR
2M.2
WC
REF
2M.2
F.1
A/C
OVEN
Revisions
PE-2
S
SE-1
MW
DW
R.A.
20"x72"
S
FPL - S.A.
20"x42"
PRIVATE
ELEV. LOBBY 2
FPL-12"x28"
FPL-12"x28"
117'-7"
2C
F.1
2M.2
130'-1"
WV
A/C
STO
PE-1
DN
WV
2C
F.1
S.P.
18"X46"
PRIVATE
ELEV. LOBBY 1
UP
DN
STO
PE-3
PRIVATE
ELEV. LOBBY 3
UP
2C
10"
1'-3"
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
XX BALCONY 3
EAST
XX BALCONY 3
WEST
D
BALCONY 3
BALCONY 3
D
W
WV
Consultant
WV
4'-1/2"
WC
REF
REF
FR
0"
12'-1
UNIT 3
3'-4 1/2"
4'-0"
MW
12'-1
0"
UNIT 3
1'-7"
Design by
MW
DW
OVEN
PANTRY
3"
1'-6 1/2"
3"
26
WC
FR
DW
6'-3"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
20
3"
OVEN
12'-1
0"
70
2'-3"
PANTRY
3"
6'-3"
1'-7"
10'-0"
8'-0"
Santiago, Chile
26
OVEN
2'-3"
20
PANTRY
70
8'-0"
89'-0"
107'-0"
10'-0"
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
LEVEL 30 | 3 UNITS
SCALE: 1/8" =
1'-0"
Project No.
1433
1'-0"
Sheet Name
TOWER - LEVELS 30 & 31-56
Sheet No.
A-210
revuelta
architecture
international
107'-0"
8'-0"
Miami
107'-0"
89'-0"
10'-0"
8'-6"
88'-0"
Santiago, Chile
10'-6"
4'-0"
26
26
3'-6"
12'-1
0"
0"
12'-1
4'-2"
6'-1 1/2"
2'-3"
3"
3"
10'-4"
TERRACE 1
1'-7"
3"
26
26
6'-6 1/2"
2'-3"
6'-2 1/2"
1'-7"
3"
6'-2 1/2"
revuelta.com
T. 305.590.5000
F. 305.590.5040
0"
12'-1
HP
Project
SL.
1/4"/FT
SL.
1/4"/FT
SL.
1/4"/FT
46"
PH 1
10"
6"
1'-3"
9"
9"
8'-0"
HP
84/18
36/36
2C
F.1
PRIVATE
ELEV. LOBBY 1
S.A.
18"x36"
S.P.
18"x46"
2M.2
F.1
S.A.
18"x36"
2M.2
SL.
1/4"/FT
MW
WC
8" HPCR(H)
ROOF LEVEL
MECHANICAL
PRIVATE
ELEV. LOBBY 2
2M.2
DN
PE-3
CT1C
130'-1"
RD 1/4"/FT
PE-3
2M.2
UP
2C
F.1
SL.
SL.
32/20
1/4"/FT
26/28
9"
9"
2C
STAIR #2
PH 2
UP
RD 1/4"/FT
2M.2
DN
2M.2
SL.
SL.
1/4"/FT
RD
LP
SL.
1/4"/FT
S.P.
22"x70"
RD
LP
SL.
1/4"/FT
2Ms.2
34/22
CORRIDOR
SL.
1/4"/FT
SL.
1/4"/FT
46/46
2MSERVICE
2M.2
STAIR #2
CT1B
SE-1
WC
2M.2
F.1
2M.2
F.1
117'-0"
22/38
TC.
TRASH
VESTIBULE
Revisions
PE-2
2M.2
2M.2
F.1
2M.2
R.A.
20"x72"
38/22
117'-0"
130'-1"
REF
117'-7"
FR
FPL-S.A.
20"x42"
SERVICE CORRIDOR
REF
MW
2M.2
F.1
FR
119'-8"
OVEN
OVEN
PANTRY
PE-2
PANTRY
117'-7"
2M.2
F.1
DW
R.A.
20"x72"
DW
1'-3"
40/20 UP
10"
Owner Information
36 SF
700 EDGEWATER
DEVELOPMENT LLC
10"
58/24 UP
60 SF
FD
FD
ROOF LEVEL
MECHANICAL PUMP ROOM
FD
FD
FD
7'-6"
8'-0"
0"
12'-1
Consultant
4'-1/2"
99'-0"
4'-0"
3'-4 1/2"
0"
12'-1
12'-1
0"
3'-6"
4'-2"
12'-1
0"
Design by
3"
26
1'-7"
8'-0"
8'-0"
89'-0"
107'-0"
10'-0"
26
2'-3"
89'-0"
107'-0"
6'-6 1/2"
2'-3"
6'-1 1/2"
1'-7"
26
6'-2 1/2"
26
3"
3"
6'-2 1/2"
TERRACE 1
3"
130'-1"
52"
8" HPCS(H)
SE-1
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
RD 1/4"/FT
CT1A
FPL-12"x28"
S.P.
22"x70"
SL.
SL.
1/4"/FT
2M.2
ELECTRICAL RM.
TC.
RD
LP
SL.
1/4"/FT
SL.
1/4"/FT
L.V.
FPL-S.A.
20"x42"
RD
LP
2M.2
SL.
1/4"/FT
S.P.
18"x46"
2Ms.2
SL.
1/4"/FT
DN
SL.
1/4"/FT
PE-1
PE-1
48/16
STAIR #1
AHU3
28/28
1'-3"
10"
SL.
1/4"/FT
SL.
1/4"/FT
30/30
SL.
1/4"/FT
52"
26/28
RD
LP
SL.
1/4"/FT
700 EDGEWATER
EPF1I
SL.
1/4"/FT
64/40
SL.
1/4"/FT
RD
LP
HP
HP
SL.
1/4"/FT
36/36
RD
LP
SL.
1/4"/FT
SL.
1/4"/FT
AHU4
10'-0"
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
LEVEL 57 | PENTHOUSE
SCALE: 1/8" =
1'-0"
Project No.
1433
1'-0"
Sheet Name
TOWER - LEVELS 57 & 58
Sheet No.
A-211
revuelta
architecture
international
Miami
109'-11"
109'-11 1/2"
2'-3"
12'-2 1/2"
3'-9"
26
12'-10 1/2"
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
3"
3"
26
84'-10"
3'-10"
1'-7"
3'-10"
4'-2"
Santiago, Chile
16'-4"
0"
12'-1
13'-6 1/2"
12'-1
0"
Project
72/18
11"
57
2'-0
1'-6"
26/28
26/28
4'-6"
1'-3"
9"
28'-2"
1'-2"
10"
30/30
30/30
47'-2 1/2"
10'-11 1/2"
1'-3"
30'-11"
47'-1/2"
19'-8 1/2"
2'-0
5"
13'-1"
"
28
30/30
8"
30/30
9"
HP
S.A.
18"x36"
LP
HP
S.P.
18"x46"
2M.2
RD
SL.
1/4"/FT
HP
SL.
1/4"/FT
PE-1
4"
700 EDGEWATER
9"
5"
"
5'-3 1/2"
72/18
SL.
1/4"/FT
SL.
1/4"/FT
2M.2
69'-5 1/2"
10"
CT
SE-1
ELEVATOR
MACHINE ROOM
10"
SL.
1/4"/FT
10"
LP
TC.
HP
CT
DN
PE-3
2M.2
8"
30'-10"
8"
CT
HP
13'-6 1/2"
0"
12'-1
HP
26
4'-2"
48/48
9"
Consultant
HP
12'-1
0"
OPEN TO
BELOW
SL.
1/4"/FT
1'-7"
26
2'-3"
109'-11 1/2"
4'-2"
Design by
3'-10"
"
57
RD
SL.
1/4"/FT
EPF1H
16'-4"
HP
11"
HP
58/24
LP
HP
SL.
1/4"/FT
700 EDGEWATER
DEVELOPMENT LLC
3'-10"
SL.
1/4"/FT
SL.
1/4"/FT
RD
SL.
1/4"/FT
SL.
1/4"/FT
2'-0
SL.
1/4"/FT
SL.
1/4"/FT
LP
SL.
1/4"/FT
RD
HP
SL.
1/4"/FT
LP
HP
30"X36" GALV.
STEELROOF
ACCESS HATCH
EPF1H
SL.
1/4"/FT
HP
58/24
RD
SL.
1/4"/FT
Owner Information
HP
LP
13'-1"
SL.
1/4"/FT
47'-2 1/2"
9"
10"
HP
14'-2 1/2"
"
1'-2"
5'-1" 7"
28'-2"
HP
9"
HP
SL.
1/4"/FT
1'-3"
HP
28
HP
2'-0
4'-6"
48/48
HP
8"
HP
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
STAIR #2
HP
2M.2
2M.2
SL.
1/4"/FT
SL.
1/4"/FT
SL.
1/4"/FT
S.P.
22"x70"
Revisions
CT
2M.2
2M
128'-10 1/2"
HP
121'-3"
96'-2 1/2"
53'-11"
HP
53'-9"
55'-3"
121'-3"
PE-2
2M.2
128'-11"
128'-11"
R.A.
20"x72"
CT
128'-10 1/2"
CT
10"
12'-2 1/2"
84'-10"
12'-10 1/2"
109'-11"
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
1'-0"
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
Sheet Name
LEVELS 59 & ROOF
Sheet No.
A-212
+10'-0" N.G.V.D.
S-1:
S-2:
SMOOTH SKIM COAT UNDERSIDE OF BALCONY, W/ PAINT FINISH COLOR WHITE, TYP.
S-3:
ST-3:
R-1:
CLEAR LAMINATED GUARD RAIL W/ S.S. SUPPORT POST & CAP, TYP.
L-1:
P-1:
CLIENT / OWNER
M-1:
M-3:
M-3a
PC-1:
11'-3"
COASTAL
CONSTRUCTION COMPANY
5959 Blue Lagoon Drive, Suite 200. Miami, FL 33126. 305.559.4900
MEP + FP
KORDA ENGINEERING
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
305.441.0755
REFER TO SPECIFATIONS
FOR FINISHES AND CODESINTERNATIONAL
ARCHITECTURE
CLIENT / OWNER
PA
305.590.5000
700 CONSULTANT
EDGEWATER
FACADE
DEVELOPMENT, LLC
VIDARIS, INC
CONSTRUCTION MANAGER
360 Park Avenue South, 15th Floor, New York, NY 10010
212.689.5389
COASTAL
ARCHITECT
CONSTRUCTION COMPANY
5959 Blue Lagoon Drive, Suite 200. Miami, FL 33126. 305.559.4900
MEP + FP
11-45 46th avenue, Long Island City, NY 11101
212.343.7333
www.asymptote.net
KORDA ENGINEERING
SEAL
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
800 Brickell Avenue, 6th Floor. Miami, FL 33131.
S-2
305.441.0755
ARCHITECT OF RECORD
REVUELTA
ARCHITECTURE INTERNATIONAL PA
2950 SW 27 AVE #110. Miami, FL. 33133.
GL-1
305.590.5000
GL-1
FACADE CONSULTANT
VIDARIS, INC
2016/03/07
TOWER ENCLOSURE
360 Park Avenue South, 15th Floor,
New York, NY 10010
212.689.5389
ARCHITECT
L-1
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
11-45 46th avenue,
Long Island
NYNOT
11101
212.343.7333 IN PART OR IN WHOLE
ARCHITECTS,
ANDCity,
MAY
BE REPRODUCED
www.asymptote.net
WITHOUT PERMISSION. ANY REPRODUCTION MUST CARRY THEIR
NAME. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THE
SEAL
R-1
R-1
PROJECT
ST-1
700 EDGEWATER
MIAMI
DRAWING TITLE
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
ST-3
CHKD
DATE (YY.MM.DD):
ST-3
2016/03/07
SCALE:
2016/03/07
TOWER ENCLOSURE
SHEET NO.
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
PROGRESS SET
APPVD
N/A
G-006
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
S-2
PROJECT
MATERIAL FINISH
P-1
700 EDGEWATER
MIAMI
DRAWING TITLE
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
CHKD
DATE (YY.MM.DD):
S-1
SCALE:
S-3
OPEN
TO
BEYOND
N/A
SHEET NO.
G-007
PROGRESS SET
GL-1
GL-1
OPEN
TO
BEYOND
R-1
R-1
ST-3
ST-3
9'-10"
MT-1
R-1
ST-1
GL-1
ST-1
ST-1
+0'-0" N.G.V.D.
EAST ELEVATION
SCALE: 1/32" =
1'-0"
GL-1
15'-4"
OPEN
TO
BEYOND
R-1
2016/03/07
12'-2"
OPEN
TO
BEYOND
R-1
APPVD
649'-0"
CONSTRUCTION MANAGER
10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
13'-2"
700 EDGEWATER
DEVELOPMENT, LLC
13'-0"
revuelta.com
MEP + FP
KORDA ENGINEERING
1650 Watermark Drive. Columbus, OH. 43215.
1'-0"
614.487.1650
T. 305.590.5000
F. 305.590.5040
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
800 Brickell Avenue, 6th Floor. Miami, FL 33131.
305.441.0755
ARCHITECT OF RECORD
REVUELTA
ARCHITECTURE INTERNATIONAL PA
2950 SW 27 AVE #110. Miami, FL. 33133.
Project
305.590.5000
FACADE CONSULTANT
VIDARIS, INC
360 Park Avenue South, 15th Floor, New York, NY 10010
212.689.5389
ARCHITECT
212.343.7333
SEAL
2016/03/07
TOWER ENCLOSURE
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
ARCHITECTS, AND MAY NOT BE REPRODUCED IN PART OR IN WHOLE
WITHOUT PERMISSION. ANY REPRODUCTION MUST CARRY THEIR
NAME. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THE
DRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT ONLY AND
SHALL NOT BE USED OTHERWISE WITHOUT THE WRITTEN
PERMISSION OF THIS OFFICE.
Revisions
PROJECT
700 EDGEWATER
MIAMI
DRAWING TITLE
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
DATE (YY.MM.DD):
SCALE:
CHKD
APPVD
2016/03/07
N/A
SHEET NO.
G-006
PROGRESS SET
+10'-0" N.G.V.D.
EL. +12'-0" N.G.V.D.
FEMA FLOOD ELEVATION
LEVEL 2 - LOBBY / PARKING
EL. +3'-6" N.G.V.D.
LEVEL 1 - SERVICE / LOADING ENTRY
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
EAST & SOUTH ELEVATION OVERALL - 1/32"
SOUTH ELEVATION
SCALE: 1/32" =
Santiago, Chile
+0'-0" N.G.V.D.
14
Miami
COASTAL
CONSTRUCTION COMPANY
10'-6"
ST-1:
CONSTRUCTION MANAGER
14'-7"
architecture
international
13'-5"
10'-6"
13'-5"
14'-7"
11'-3"
649'-0"
10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
13'-2"
MT-1:
14'-7"
GLASS, TYP.
3'-6" 8'-6"
13'-0"
15'-4"
GL-1:
12'-2"
L-1
9'-10"
14'-7"
700 EDGEWATER
DEVELOPMENT, LLC
ST-3
revuelta
700 EDGEWATER
ST-3
3'-6" 8'-6"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
CLIENT / OWNER
LEVEL 13 - OMMITED
NOTE: REFER TO ENLARGED PEDESTAL ELEVATIONS ON SHEET A-303
Sheet No.
A-301
+0'-0" N.G.V.D.
1'-0"
ST-3:
R-1:
CLEAR LAMINATED GUARD RAIL W/ S.S. SUPPORT POST & CAP, TYP.
L-1:
P-1:
M-1:
M-3:
M-3a
PC-1:
11'-3"
700 EDGEWATER
DEVELOPMENT, LLC
2525 Ponce De Leon Blvd, Fourth Floor. Coral Gables, FL 33134.
CONSTRUCTION MANAGER
COASTAL
CONSTRUCTION COMPANY
MEP + FP
KORDA ENGINEERING
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
305.441.0755
REFER TO SPECIFATIONS
FOR FINISHES AND CODESINTERNATIONAL
ARCHITECTURE
CLIENT / OWNER
PA
305.590.5000
700 CONSULTANT
EDGEWATER
FACADE
DEVELOPMENT, LLC
VIDARIS, INC
CONSTRUCTION MANAGER
360 Park Avenue South, 15th Floor, New York, NY 10010
212.689.5389
COASTAL
ARCHITECT
CONSTRUCTION COMPANY
5959 Blue Lagoon Drive, Suite 200. Miami, FL 33126. 305.559.4900
MEP + FP
11-45 46th avenue, Long Island City, NY 11101
212.343.7333
www.asymptote.net
KORDA ENGINEERING
SEAL
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
800 Brickell Avenue, 6th Floor. Miami, FL 33131.
S-2
305.441.0755
ARCHITECT OF RECORD
REVUELTA
ARCHITECTURE INTERNATIONAL PA
2950 SW 27 AVE #110. Miami, FL. 33133.
GL-1
305.590.5000
GL-1
FACADE CONSULTANT
VIDARIS, INC
2016/03/07
TOWER ENCLOSURE
360 Park Avenue South, 15th Floor,
New York, NY 10010
212.689.5389
ARCHITECT
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
11-45 46th avenue,
Long Island
NYNOT
11101
212.343.7333 IN PART OR IN WHOLE
ARCHITECTS,
ANDCity,
MAY
BE REPRODUCED
www.asymptote.net
WITHOUT PERMISSION. ANY REPRODUCTION MUST CARRY THEIR
NAME. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THE
SEAL
S-2
ST-1
700 EDGEWATER
MIAMI
DRAWING TITLE
P-1
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
ST-3
CHKD
DATE (YY.MM.DD):
ST-3
2016/03/07
SCALE:
2016/03/07
TOWER ENCLOSURE
SHEET NO.
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
PROGRESS SET
APPVD
N/A
G-006
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
ARCHITECTS, AND MAY NOT BE REPRODUCED IN PART OR IN WHOLE
WITHOUT PERMISSION. ANY REPRODUCTION MUST CARRY THEIR
NAME. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THE
DRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT ONLY AND
PROJECT
MATERIAL FINISH
700 EDGEWATER
MIAMI
DRAWING TITLE
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
DATE (YY.MM.DD):
R-1
S-1
SCALE:
CHKD
APPVD
2016/03/07
N/A
SHEET NO.
S-3
G-007
PROGRESS SET
M-1
15'-4"
13'-0"
13'-2"
GL-1
OPEN
TO
BEYOND
12'-2"
S-1
9'-10"
MT-1
M-3a
GL-1
R-1
M-3a
649'-0"
S-3
1'-0"
Santiago, Chile
revuelta.com
MEP + FP
KORDA ENGINEERING
1650 Watermark Drive. Columbus, OH. 43215.
614.487.1650
T. 305.590.5000
F. 305.590.5040
STRUCTURAL ENGINEER
DESIMONE
CONSULTING ENGINEERS
800 Brickell Avenue, 6th Floor. Miami, FL 33131.
305.441.0755
ARCHITECT OF RECORD
REVUELTA
ARCHITECTURE INTERNATIONAL PA
2950 SW 27 AVE #110. Miami, FL. 33133.
Project
305.590.5000
FACADE CONSULTANT
VIDARIS, INC
360 Park Avenue South, 15th Floor, New York, NY 10010
212.689.5389
ARCHITECT
212.343.7333
SEAL
2016/03/07
TOWER ENCLOSURE
2016/02/26
PROGRESS SET
2016/01/29
PROGRESS SET
2015/12/21
2015/10/06
COPYRIGHT:
ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPERTY OF THE
ARCHITECTS, AND MAY NOT BE REPRODUCED IN PART OR IN WHOLE
WITHOUT PERMISSION. ANY REPRODUCTION MUST CARRY THEIR
NAME. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THE
DRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT ONLY AND
SHALL NOT BE USED OTHERWISE WITHOUT THE WRITTEN
PERMISSION OF THIS OFFICE.
Revisions
PROJECT
700 EDGEWATER
MIAMI
DRAWING TITLE
MATERIALS - DICHROIC
GLASS, METAL, MESH &
STONE
DRN
DATE (YY.MM.DD):
SCALE:
CHKD
APPVD
2016/03/07
N/A
SHEET NO.
G-006
PROGRESS SET
+10'-0" N.G.V.D.
EL. +12'-0" N.G.V.D.
FEMA FLOOD ELEVATION
LEVEL 2 - LOBBY / PARKING
EL. +3'-6" N.G.V.D.
LEVEL 1 - SERVICE / LOADING ENTRY
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
2525 PONCE DE LEON BLV #4
CORAL GABLES, FLORIDA 33134
Consultant
Design by
Luis O. Revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
NORTH & WEST ELEVATION OVERALL - 1/32"
WEST ELEVATION
SCALE: 1/32" =
Miami
COASTAL
CONSTRUCTION COMPANY
+0'-0" N.G.V.D.
ST-1
architecture
international
10'-6"
13'-5"
SMOOTH SKIM COAT UNDERSIDE OF BALCONY, W/ PAINT FINISH COLOR WHITE, TYP.
S-1
14'-7"
S-2:
10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
13'-5"
11'-3"
10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
13'-2"
13'-0"
S-1:
GL-1
15'-4"
649'-0"
NORTH ELEVATION
SCALE: 1/32" =
14'-7"
ST-1:
3'-6" 8'-6"
+10'-0" N.G.V.D.
12'-2"
MT-1:
9'-10"
GLASS, TYP.
14'-7"
GL-1
L-1
GL-1:
8'-6"
14'-7"
10'-6"
700 EDGEWATER
DEVELOPMENT, LLC
ST-3
revuelta
700 EDGEWATER
ST-3
3'-6"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
CLIENT / OWNER
LEVEL 13 - OMMITED
NOTE: REFER TO ENLARGED PEDESTAL ELEVATIONS ON SHEET A-304
Sheet No.
A-302
architecture
international
GL-1:
GLASS, TYP.
MT-1:
ST-1:
S-1:
S-2:
SMOOTH SKIM COAT UNDERSIDE OF BALCONY, W/ PAINT FINISH COLOR WHITE, TYP.
S-3:
ST-3:
R-1:
CLEAR LAMINATED GUARD RAIL W/ S.S. SUPPORT POST & CAP, TYP.
L-1:
P-1:
M-1:
M-3:
M-3a
PC-1:
Miami
Santiago, Chile
13'-0"
Project
700 EDGEWATER
R-1
10'-10"
10'-10"
P-1
13'-2"
revuelta.com
revuelta
15'-4"
ST-3
12'-2"
14'-7"
Revisions
ST-3
9'-10"
GL-1
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
+0'-0" N.G.V.D.
8'-6"
+10'-0" N.G.V.D.
3'-6"
ST-1
1'-0"
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
R-1
PC-1
S-1
GL-1
ST-3
Consultant
GL-1
R-1
Design by
ST-3
MT-1
Luis O. Revuelta
AR-0007972
ZONING
+10'-0"
N.G.V.D.
FEMA FLOOD
ELEVATION
R-1
Drawn By
Checked By
KK
R-1
GL-1
Date
9/2/2016
ST-1
Scale
AS SHOWN
1'-0"
Project No.
1433
Sheet Name
ENLARGED EAST & SOUTH
ELEVATIONS
Sheet No.
A-303
architecture
international
GLASS, TYP.
MT-1:
ST-1:
S-1:
S-2:
SMOOTH SKIM COAT UNDERSIDE OF BALCONY, W/ PAINT FINISH COLOR WHITE, TYP.
S-3:
ST-3:
R-1:
CLEAR LAMINATED GUARD RAIL W/ S.S. SUPPORT POST & CAP, TYP.
L-1:
P-1:
M-1:
M-3:
M-3a
PC-1:
10'-10"
R-1
S-2
13'-2"
GL-1
10'-10"
10'-10"
P-1
Miami
Santiago, Chile
M-1
revuelta.com
2950 SW 27TH AVE.
SUITE 110
MIAMI, FL 33133
T. 305.590.5000
F. 305.590.5040
Project
700 EDGEWATER
10'-10"
GL-1:
revuelta
13'-0"
15'-4"
Revisions
12'-2"
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
8'-6"
14'-7"
9'-10"
S-1
+10'-0" N.G.V.D.
SCALE: 1/16" =
S-1
S-1
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
1'-0"
ST-3
GL-1
Consultant
S-3
GL-1
Design by
ST-3
Luis O. Revuelta
MT-1
AR-0007972
ZONING
Date
9/2/2016
Drawn By
+10'-0" N.G.V.D.
Checked By
KK
ST-1
M-3a
R-1
R-1
GL-1
M-3a
1'-0"
Scale
AS SHOWN
Project No.
1433
Sheet Name
ENLARGED WEST & NORTH
ELEVATIONS
Sheet No.
A-304
revuelta
architecture
international
EL. +649'-0" N.G.V.D.
LEVEL 60 - HIGH ROOF
E.M.R.
ROOF - MECHANICAL
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
MECHANICAL
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
TENNIS COURT
SPA
CATERED
DINING RM.
FITNESS
GAME RM.
OLYMPIC POOL
BRIDGE BEYOND
PARKING
SCREENING RM.
PARKING
PARKING
VEHICULAR
DROP-OFF VALET
PARKING
PARKING
DUPLEX - UPPER
MECH.
LOADING
BEYOND
LOBBY
LOUNGE
LOBBY EAST
TERRACE
GARDENS
+10'-0" N.G.V.D.
SERVICE TUNNEL
BAYWALK
Luis O. Revuelta
AR-0007972
ZONING
DUPLEX - LOWER
ENTRY
LOBBY
Design by
3 UNITS
Consultant
3 UNITS
3 UNITS
700 EDGEWATER
DEVELOPMENT LLC
3 UNITS
Owner Information
3 UNITS
Revisions
3 UNITS
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
3 UNITS
3 UNITS
+10'-0" N.G.V.D.
3 UNITS
3 UNITS
Project
3 UNITS
3 UNITS
3 UNITS
T. 305.590.5000
F. 305.590.5040
3 UNITS
3 UNITS
revuelta.com
3 UNITS
JR. PENTHOUSES
Santiago, Chile
2 UNITS - PENTHOUSES
Miami
700 EDGEWATER
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
1'-0"
1'-0"
Sheet Name
SECTIONS A-A & B-B OVERALL - 1/32"
Sheet No.
A-401
3 UNITS
JR. PENTHOUSES
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
These Design And Drawings Are The Copyrighted Property Of Revuelta Architecture International P.A. and May Not Be Reproduced Except with Specific Written Consent of the Architect.
The Conttractor Must Check And Verify all Dimensions Of The Job And Be Responsible For Same, Reporting Any Discrepancies to The Architects Before Commencing work. Drawings Not to be Scaled.
File: BIM Server: RAI - BIM Server_1 - BIM Server 19/1433_700 EDGEWATER/1433_700 EDGEWATER _ CORE _ FPL STUDY - By fzicari - Date: 9/2/2016
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
3 UNITS
10'-6"
3 UNITS
STORY 56 - CONDO
2 STORIES
2 UNITS - PENTHOUSES
3 UNITS
13'-5"
14'-7"
ROOF - MECHANICAL
11'-3"
3 UNITS
3 UNITS
10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
3 UNITS
3 UNITS
STORY 54 - CONDO
3 UNITS
STORY 53 - CONDO
3 UNITS
STORY 52 - CONDO
3 UNITS
STORY 51 - CONDO
3 UNITS
STORY 50 - CONDO
3 UNITS
STORY 49 - CONDO
3 UNITS
STORY 48 - CONDO
3 UNITS
STORY 47 - CONDO
3 UNITS
STORY 46 - CONDO
3 UNITS
STORY 45 - CONDO
3 UNITS
STORY 44 - CONDO
3 UNITS
STORY 43 - CONDO
3 UNITS
STORY 42 - CONDO
3 UNITS
STORY 41 - CONDO
3 UNITS
STORY 40 - CONDO
FITNESS
STORY 39 - CONDO
STORY 38 - CONDO
STORY 37 - CONDO
DUPLEX - UPPER
STORY 36 - CONDO
DUPLEX - LOWER
STORY 35 - CONDO
LOBBY
LOUNGE
STORY 34 - CONDO
LOBBY EAST
TERRACE
GARDENS
+10'-0" N.G.V.D.
STORY 33 - CONDO
STORY 32 - CONDO
BAYWALK
+10'-0" N.G.V.D.
+4'-6" N.G.V.D.
T. 305.590.5000
F. 305.590.5040
STORY 28 - CONDO
MECHANICAL
STORY 27 - CONDO
Project
STORY 26 - CONDO
STORY 25 - CONDO
STORY 24 - CONDO
STORY 23 - CONDO
STORY 22 - CONDO
STORY 21 - CONDO
STORY 20 - CONDO
STORY 19 - CONDO
STORY 18 - CONDO
STORY 17 - CONDO
STORY 16 - CONDO
Revisions
STORY 15 - CONDO
STORY 14 - CONDO
STORY 13 - CONDO
STORY 12 - CONDO
STORY 11 - CONDO
STORY 10 - CONDO
STORY 9 - CONDO
STORY 8 - CONDO
Owner Information
700 EDGEWATER
DEVELOPMENT LLC
Consultant
STORY 2 -MECHANICAL
STORY 1 - LOBBY
Design by
AS PER ARTICLE 3.5.1 - "In the event that the base flood elevation, as
established by FEMA, is higher than the sidewalk or grade elevations, the Height
of the first story but not the height of fences and walls shall be measured from the
base flood elevation.
AS PER ARTICLE 3.5.2 - "for T6-36, a single floor level exceeding fourteen (14)
feet may count as one (1) story if the building height does not exceed the
maximum height, including all applicable bonuses, allowed by the transect at
fourteen (14) feet per floor.
STORY 29 - CONDO
revuelta.com
MECHANICAL
STORY 30 - CONDO
700 EDGEWATER
Miami
Santiago, Chile
2 STORIES
3 UNITS
STORY 31 - CONDO
1 STORY
13'-2" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10" 10'-10"
3 UNITS
13'-0"
15'-4"
3 UNITS
architecture
international
9'-10" 12'-2"
16'-7"
3 UNITS
revuelta
AR-0007972
ZONING
Date
9/2/2016
Drawn By
Checked By
KK
Scale
AS SHOWN
Project No.
1433
Sheet Name
MIAMI 21 - STORY
CALCULATIONS
Sheet No.
A-402