Infrastructure Recovery Monthly Report

SEPTEMBER 15, 2016

SPECIAL
POINTS OF
INTEREST:

15 flood related bridge


replacements
have been
completed

22 roads are
still closed
due to dam
breaches.
Road and
bridge repairs
will begin
once DHEC
certifies the
dam owners
repair or
abandonment

SCDOT,
DHEC and
elected officials continue
to examine
possible dam
alternatives
and repairs

Road Closure Update


SCDOT Continues to Make Progress on Flood Related Closures
SCDOT continues to
work on the closures
related to the October
2015 flood. All of the
remaining road closures
require full bridge replacement or are related to
dam failures.
The Congaree Road (SC
769) bridge over Cedar
Creek in Richland County
opened on September 1.
Seven more of the remaining twenty-nine closures
are due to bridge failures
and require full bridge

replacement. SCDOT is
projecting that two of
these bridge replacements will be complete
by the end of October,
Old Shoals Road (S-151)
in Aiken County and
Hope Station Road (S170) in Newberry County. SCDOT continues
to monitor all flood
impacted bridges for
signs of latent damage.
Twenty-two of the
remaining closures are

due to dam failures. At


one of these locations,
Devils Backbone Road
(S-59)
in
Lexington
County, repair work has
progressed rapidly after
the owner elected to
abandon the dam structure. The contract for
this work was awarded
to Cherokee, Inc. in July
and the anticipated completion date is September
30, 2016.

Bluff Road Bridge Replacements


An inspection in Spring
of 2016 showed erosion
around the supports of
three bridges on Bluff
Road (SC 48) in Richland
County - Dry Branch,
Cedar Creek and Back
Swamp.
The original
1940s design could not
be repaired without a
long term closure, so
SCDOT opted to replace
all three bridges under an
emergency declaration.
Emergency
procurement for design and
construction was used to

expedite project completion.


A design-build
contract for the three
structures was awarded
to Crowder Construc-

tion Company on June 2,


2016 for $5,885,000. All
three bridges are scheduled to be open to traffic
by December 31, 2016.

Bluff Road (SC 48) bridge construction in Richland County

Please visit www.scdot.org for additional updates

PAGE

Roadway Closures (as of September15, 2016)


Road Name
Aiken County

From

To

Description

Status

Projected Opening

US 1

Mt. Pl ea s a nt Roa d

Bri dge Repl a cement

Under Cons tructi on

10/31/2016

Church Camp Road

SC 33

Dwight Swamp Road

Dam Failure

Regulated

TBD

Community Club Road

SC 6

SC 267

Dam Failure, Bridge Replacement

Regulated

TBD

Ol d Shoa l s Roa d

Calhoun County

29 road

Clarendon County

closures
remain in
South
Carolina.
This is down
95% from
the peak
closure of
541 roads.

Gunter Road

Jackson Road

Stone Road

Dam Failure

Unregulated

TBD

Hi ghwa y 301

North Brewi ngton Roa d

Ra i nbow La ke Roa d

Bri dge Repl a cement

Under Cons tructi on

11/14/2016

Old River Road

Lilly Martin Road

Liberty Hill Road

Dam Failure

Regulated

TBD

Pudding Swamp Road

Pudding Swamp Road

Sandhill Road

Dam Failure

Regulated

TBD

Rainbow Lake Road

US 301

SC 527

Dam Failure

Regulated

TBD

Ri dgewa y Roa d

Grey Fox Roa d

Bri dge Repl a cement

Under Cons tructi on

9/23/2016

Kershaw County
Pi ne Grove Roa d

Lexington County
Cherokee Tra i l

Ol d Cherokee Roa d

Northwood Roa d

Bri dge Repl a cement

In Des i gn

Fa l l /Wi nter 2017-18

Devils Backbone Road

SC 245

Derrick Hollow Road

Dam Failure

Under Construction

9/30/2016

Drawdebil Road

Jeter Road

Sandy Hill Road

Dam Failure

Regulated

TBD

Durham Drive

Tarrytown Lane

Woodhurst Drive

Dam Failure

Unregulated

TBD

Ramblin Road

Daniel Road

Crystal Lane

Dam Failure

Unregulated

TBD

Wilton Road

Dawn Drive

South Woodside Parkway

Dam Failure

Unregulated

TBD

US 176

Pea k Roa d

Bri dge Repl a cement

Under Cons tructi on

10/31/2016

Newberry County
Hope Sta ti on Roa d

Richland County
Arcadia Lakes Drive

Arcadia Woods Road

Arcadia Woods Road

Dam Failure

Regulated

TBD

Arcadia Lakes Drive East

North Trenholm Road

Sandwood Drive

Dam Failure

Regulated

TBD

Community Pond Road

McCords Ferry Road

Chain Gang Road

Dam Failure

Unregulated

TBD

Eastshore Drive

Lakeshore Drive

Shorebrook Drive

Dam Failure

Regulated

TBD

Millbrook Road

Pine Lake Road

Edgewater Drive

Dam Failure

Unregulated

TBD

Overcreek Road

Percival Road

East Shore Road

Dam Failure

Regulated

TBD

Overpond Road

Springpond Road

Pinelake Road

Dam Failure

Unregulated

TBD

Rawlinson Road

Emeral Road

Trotwood Road

Dam Failure

Regulated

TBD

Shorebrook Road

Spring Lake Road

Eastshore Road

Dam Failure

Regulated

TBD

Wilson Boulevard

Koon Store Road

Harscrabble Road

Dam Failure

Regulated

TBD

Zeigler Road

Congaree Road

Old Isaac Road

Dam Failure

Regulated

TBD

Sa muel Pa dgett Roa d

Spa nn Roa d

Church Roa d

Bri dge Repl a cement

In Des i gn

11/30/2016

Spa nn Roa d

US 378

SC 391

Bri dge Da ma ge

In Des i gn

TBD

Saluda County

Congaree Road (SC 769) in Richland County opened on September 1, 2016.

INFRASTRUCTURE

RECOVERY

MONTHLY

REPORT