Sunteți pe pagina 1din 32

10/27/2011

ReticulatedMicropiles
ReinforceExistingStructures
andStabilizeSlope
Presentedby:DanielDUranowski,P.E.
SlopeStabilizationwithDeepFoundationElements
October18,2011
Boston,Massachusetts

Outline

SiteHistory
Micropile DesignDetails
SiteConditions
Micropile LoadTest
P d i Pil I
ProductionPileInstallation
ll i
Conclusion

10/27/2011

SiteHistory

SiteHistory

10/27/2011

SiteHistory

SiteHistory

10/27/2011

SiteHistory

PreviousRemediationMeasures
UpperTierods
AnchoredToeButtress

SiteHistory
2011AdditionalRemediation
ReticulatedMicropiles proposedbyCivil&Environmental
Consultants,Inc.
DesignperNHIMicropile DesignandConstructionReference
Manual(FHWANHI05039andSA97070)
Increaseslopestabilityfactorofsafety
Considerbendingandshearcapacityofindividualandmicropile
g
p
y
p
group
Considermicropile spacing,inclination,andpotentialforsoil
movementbetweenmicropiles
Axialtension&compression
Pilecaptoresistaxialandbendingloads

10/27/2011

Micropile DesignDetails

Micropile DesignDetails

10/27/2011

Micropile DesignDetails

Micropile DesignDetails

10/27/2011

Micropile DesignDetails

Micropile DesignDetails

320LFReticulatedPileWall
85eaMicropiles
12Dia Hole
95/8PermanentCasing
65
65
80
80length,including20RockSocket
length,including20 RockSocket
Batteredupslope/downslope
105kipDesignload(tensionorcompression)
Testto175kips

10/27/2011

SiteConditions

SiteConditions

10/27/2011

SiteConditions

SiteConditions

10/27/2011

SiteConditions

WorkSequence

SitePrep
RemoveexistingTier4wall
Installtestpile
Installproductionpiles
I
Installconcretecap
ll

10

10/27/2011

SitePrep

RemoveTier4

11

10/27/2011

RemoveTier4

RemoveTier4

12

10/27/2011

RemoveTier4

TestPile

13

10/27/2011

TestPile

TestPile

14

10/27/2011

TestPile

TestPile

15

10/27/2011

TestPile

TestPile

16

10/27/2011

TestPile

TestPile

17

10/27/2011

Micropile InstallationProcedure
Drill/seat133/8temporarycasingintorock
Advance12hole20intorock
Removedrillstringandinsert95/8permanentcasingfull
length
Tremie placegroutfulllength
P ll /8t
Pull133/8temporarycasingandaddgrouttomaintain
i d dd
tt i t i
fulllengthplacement
Trim95/8casingtopilecutoffelevation
Install#7barinupslopepiles

Installation

18

10/27/2011

Installation

Installation

19

10/27/2011

Installation

Installation

20

10/27/2011

Installation

Installation

21

10/27/2011

Installation

Installation

22

10/27/2011

Installation

Installation

23

10/27/2011

Installation

Installation

24

10/27/2011

Installation

Installation

25

10/27/2011

Installation

Installation

26

10/27/2011

Installation

Installation

27

10/27/2011

Installation

Installation

28

10/27/2011

Installation

Installation

29

10/27/2011

Installation

Construction
Monitoring

30

10/27/2011

ConstructionMonitoring

Conclusion

Reticulatedmicropiles offeraviableandeconomical
solutionforstabilizingmovementofexisting
structures.Benefitsinclude:
Canbeinstalledinlimitedaccessconditions
Utilizecompactequipmentandmaterials
Minimizevibration,noise,anddisturbancetoexisting
Mi i i ib i i ddi
b
i i
structures
Simplifiedtestingcanbeperformedtoverify
assumptions

31

10/27/2011

Thankyou

32

S-ar putea să vă placă și