Sunteți pe pagina 1din 6

1*F

8*J

3*L

6*C

7*R

9*T

11*S

12*C

14*H
17*G

2*B

4*O
5*P

C
10*P

13*E

15*H 16*S

18*B

19*P

20*F

#
1

11
13

16

17

ACROSS ( Left to RIGHT )


Clue
This is a kind of NDT test for Pavements
A standard weight is made to fall from a standard height on the pavement
surface
and the response shown by the pavement such as surface deformation is
recorded to evaluate the pavement surface strength
this is a kind of database system for the complete Maintenance of
Pavement
all information is stored in this and all decisions regarding Repairs,
Maintenance, Relays, etc. are decided from the analysis done using this
system
this is the fundamental strength parameter used in the design of
pavement thickness
it is based on the best rock / stone available in a foreign city
ACROSS ( Left to RIGHT )
it is originally a Japanese concept
followed by all manufacturing and construction companies
Uisng this concept, we can
Avoid Delays,
Avoid Waiting
Avoid Wastage and Damage to Raw materials and Finished Products
as per this concept, every activity is done exactly at the moment it is
required
Not TOO EARLY
Not TOO LATE
a kind of steel reinforcement
its properties are improved by subjecting the steel to heating, cooling and
some mechanical processes
ACROSS ( Left to RIGHT )
this is the most fundamental soil test parameter any structural engineer
will ask while designing the foundation
this is an analytical study carried out by experts
it is done to quantify the effects and damages on the environment
that MAY HAPPEN
due to the proposed
new construction work
new factory manufacturing process
or any such activity
Only based on this study, the Government decides whether to allow the
project or refuse permission
or whether to ask the project owner to make modifications
this is a type of cement
used mainly for underground concrete constructions
used when the soil is suspected to be infected with chemicals that may
damage the concrete
ACROSS ( Left to RIGHT )
this is a type of cement
manufactured by adding one type of POZZALONIC material obtained
when metallic mineral ores are SMELTED / MELTED
This POZZALONIC material is waste byproduct for the mineral extraction
process but is an useful ingredient for cement
Name the cement type

Letter Answer
3
FWD

PMS

CBR

JIT

TMT

SBC

EIA

SRC

GGBS

19

20

this is one type of consultancy for civil and any engineering projects
the consultant prepares all Time Schedules, QA / QC plans,
all as per the needs of the Client and based on the specifications and
designs given by Architect, Structural Engineer and other Consultants
this type of consultancy is responsible to coordinate between the
contractors in the project and other agencies related to the project
this is one type of Brick or Block
No Clay
A waste material from Thermal Power Plants is the main raw material
the oldest type of Cementitious / Binder material is added to bind the
main raw material

PMC

FaL-G

also another chemical is added is very small quantity to prevent flash


setting of that binder
FIRING in Kilns is NOT REQUIRED
Mechanical Compression and Chemical Reaction give the strength for the
brick

#
1

DOWN ( Top to DOWN )


Letters Answer
Clue
This is a conventional concrete but an additional reinforcement called as
SECONDARY REINFORCEMENT is added
This secondary reinforcement is very thin, very short, and very flexible
3
FRC
The secondary reinforcement acts as Crack Arrestors, or as Crack
Bridging
Name this type of Concrete
this is one type of executiuon of construction projects
the owner does not invest money
he only gives land to the contractor
the contractor invests all the money and completes the construction
then the contractor hands over the finished facility to some Operator
who pays all the money to the Contractor
4
BOLT
This Operator will operate the facility for a certain number of years
collect user fee ( TOLL ) from all users during that fixed period

After that fixed period, the facility is TRANSFERRED to the Original


Owner who gave the land
This is a type of certification for Buildings and other built facilities
different ratings are given for the Built Facility
the rating depends on
how much damage to the environment is REDUCED / MINIMISED
by the built- up facility
by suitable design
by reduced consumption of natural material
by more consumption of waste materials
by more consumption of materials which may pollute the environment
by reduced consumption of Energy

LEED

DOWN ( Top to DOWN )


this is a design parameter
for a natural material
This NATURAL Material of 3 ELEMENTS - SOLIDS, WATER and AIR
By OPTMISING one element from the above 3 elements
another one element is MAXIMISED

OMC

RMC

PIEV

Name the Design Parameter


this is a PRODUCT
OR / AND
This is a manufacturing PROCESS

all operations are carried out only on WEIGHT basis


7

10

12

the required construction product is supplied readily from a


Centralised Plant located outside the site or at the site itself
Since all operations are automated, wastage is reduced
The product is formed by mixing a chemically REACTIVE powder and
chemically INERT materials of bigger and different sizes and along with
another material which helps to initiate the chemical reaction
Name the PRODUCT / PROCESS
this is a concept representing 4 different BEHAVIOURAL aspects of a
Driver or any other Road User
based on
how fast or slowly
the user can

See
Understand
Decide
React
DOWN ( Top to DOWN )
a kind of steel reinforcement

CRS

HGL

HMA

its manufacturers claim this rebar is highly effective against the most
dangerous chemical process that may cause the rebar to become
thinner and thinner with the passage of time
14

Name the Rebar type


this is an IMAGINARY line
drawn above pipelines carrying liquids
any point on this line is the
Quantitative Indication of the SUM of two forms of energy possessed by
the liquid inside the pipe
the two forms of energy does not depend on the flow inside
name this line

15

this is a PRODUCT
OR / AND
This is a manufacturing PROCESS
manufactured by mixing the binding liquid in hot condition and inert
materials

the liquid will be mostly a thick soft or hard paste in normal


temperatures

18

name the product / process


DOWN ( Top to DOWN )
this is a computer aided graphical modeling of the given building or any
such facility

BIM

by this technique, all operations can be visualized and all situations and
scenarios can be easily picturized in the 3 D model and thereby all
fouling can be avoided
it is a database approach,
3 D graphical tool
all kinds of structural designs
and different kinds of Construction Techniques for the same structure
and different sequences of the construction
can be visualized and analysed

SUBJECT

name this technique

11

12

14

13

15

16

10

ROUND 3

ABBREVIATIONS

19

20

17

11

12

14

18

13

15

16

19

20

10

SUBJECT ABBREVIATIONS

18

ROUND 3

17

S-ar putea să vă placă și