ABSTRACT
This industrial training report shows the responsibilities and routines of Incoming Quality Control
(IQC) department in Spansion. By working with Incoming Quality Control (IQC) department, the
incoming parts will be inspected to ensure that good quality products will be produced. The role of
IQC is to feedback the defects that found in supplies to the suppliers and make some arrangements
for compensation like parts replacement or refund or rework. In this report, initially, a brief
introduction to Spansion Sdn.Bhd. will be given, followed by the description of the job that I have
been assigned and experiences that I had gained from the my past 16-weeks industrial training
program at Spansion Penang.
During this past 16-weeks training program, I have met different kind of situations in the job that
being assigned to me which helped me gained a lot of meaningful experiences. This job had
sharpened my decision-making skill due to there were many times that I have came across a situation
which needed me to decide whether the condition of the incoming parts is acceptable by our
customers. Furthermore, whenever there were defects found in the parts, I need to find out the cause
for the defects whether its suppliers quality issue or product lines issue. Moreover, my
communication skill has improved due to my tasks which needed me to deal with different kind of
people from different departments. Skills that I have gained would help me in my future field work.
My weekly routine is to do particle counting inside KGD are and Sort, where my daily task is to
update EBR (Equipment buy off report) and Manual for every department in Spansion. I also do
some test and calibration there.
ACKNOWLEDGEMENT
I would like to express my gratitude towards Spansion for letting me to join this three months
Internship program. In the three months time that I worked at Incoming Quality Control (IQC)
department in Spansion, I have gained a lot of experience and knowledge. I also want to express my
appreciation to the people who have helped me accomplished the tasks.
First of all, I would like to thank Spansion for supporting this program. Spansion has provided a
good learning ground for internship students. Many thanks to my internship supervisor, Mr. Namas
for his willingness and patience throughout the whole internship in developing my skills and addedon a great deal knowledge and experience for me. Not to forget, all the staff in Spansion that I had
came in contact. They always gives me guidance, advice and opinion while I facing problem during
training. They are so dedicated and knowledge, the opinion and suggestion that they give me very
useful and valuable that help me a lot. Thanks also to everyone in Human Resource Department,
who organized an orientation session to introduce Plexus to us, and getting us familiarized with our
working environment.
TABLE OF CONTENT
Subject
Acknowledgements
Page Number
7
8
11
12
23
3.1 Calibration
Conclusion
Reference
Appendices
47
50
46
43
44
41
38
37
37
37
35
33
33
25
26
25
In order to provide our customers and partners with rapid, high-quality services, Spansion has
established headquarters, sales support, and manufacturing locations in major cities around the
world.
(a)
1.1
Company Profile
Spansion is a global leader in Flash memory-based embedded systems solutions. Spansions
Flash memory, microcontrollers, mixed-signal and analog products drive the development of faster,
more intelligent and energy efficient electronics. Spansion is at the heart of electronics systems,
connecting, controlling, storing and powering everything from automotive electronics and industrial
systems to the highly interactive and immersive consumer devices that are enriching people's daily
lives.
Spansion Penang Sdn. Bhd. was founded in 2003 after separation from AMD. Located in Bayan
Lepas, just about 15 minutes to the city center (Georgetown) and 5 minutes to Penang International
2
Airport. It has a build up area of 175k ft on 4 acres of land.
Spansion Penang provides global functions and shared services to Spansion globally with multiskilled, talented and experienced workforce to provide reliable and total flash solution to meet the
needs and expectations of Spansion's valued customers. It is also supported by the latest technology
such as state-of-the-art Failure Analysis, Reliability & Design Center.
Spansion Penang recently (June 2010) has been granted MSC (Malaysia Cybercentre) status and the
first among the Penang Industrial Zone companies.
Vision
Best-in-class business partner and shared service center.
Mission
To deliver excellent and value-added services through a collaborative unified way.
1.2
Market Sectors
Spansion is a Market Sector diversified organization whose strength is complex, high-tech
products. Spansion understands the unique requirements technology companies in each of our
Market Sectors have and are well positioned to fulfill these needs.
Networking/Communications
Industrial
Industrial applications are rapidly adopting user interfaces that are more
typical of consumer electronics. Spansion has an innovative range of solutions to address the needs
of next generation users and applications. Integrating human machine interfaces (HMI) into our
industrial grade components, and applying the industrys highest bandwidth interfaces, we deliver
highly optimized solutions for products suited for aerospace/avionics, energy systems, factory
automation, telehealth and white goods.
Automotive
Consumer
Training Scope
Spansion (Penang) SDN BHD is a semiconductor company, dealing with printed circuit
board assembly. Spansion is unique because his company is divided into several sections which are
located around the world. Spansion in Malaysia is the part of the Design Center is known as the
Penang Design Center.
In Spansion, I have been placed in Incoming Quality Control (IQC) department during my 16
weeks industrial training. IQC department is set up by Spansion to ensure the incoming parts from
suppliers are good in quality. Besides that, IQC acts as the middleman between Spansion and
suppliers to feedback the problems facing in production line to both sides.
ESD
Electrostatic Discharge (ESD): The transfer of electrostatic charge between bodies, or different regions of
same body, at different electrostatic potentials.
1. 3 major sources f ESD hazard
-people
-materials
-equipment
2. what cause static electricity
-friction between materials
-separation of materials
3. electrostatics charging:
i) Triboelectrification
The most common form of charge generation
-when two materials, at least one of which is an insulator, come in contact and then is
removed. Charges will be generated on both materials. Positive charge on one and negative
charge on the other.
-gate to source
-gate to drain
7. types of ESD damage
a) human body model: discharge :
i) machine model : discharge fom machine members
ii) charge device model : device charge up and pins contact ground
8. Grounding conductors a method of electrostatic charge controls
Charge conductor
+++++++
When grounded, a conductor will go to ground
+ +potential
+ + at+all points
++
Charge insulators can and do stay charged for days in extreme cases. Insulator can have
areas with no charge, +ve charge and ve charge at the same time. The charge on
insulator does not/ cannot move. A charge cannot be grounded off an insulator by
conventional means.
+ + + + +
++
+ + + + +
9. Insulator vs Conductors
+ at+electrostatic charge occurs primarily on insulator and isolated
- the generation and storage
conductors. These materials are used throughout the work enviroment.
- Conventional grounding technique cannot remove charge from insulators and can be
compared to a bird on a high voltage power line.
- There are 2 posite methods for removing charges from insilators:
10
10
Ionized air
10
resistance
10
10
10
12
14
10
Certification
Process
Electrical
properties
Physical
properties
Chemical
properties
Vendor / product
qualification list
Product qualified facility
tours trial runs
15. Packing Material Selection
Intimate Packing materials:
-anstatic if products slide
-static dissipative if intermittently touched
-conductive if leads are imbedded
Intermediate packing materials:
-exposed conductive layer is OK if not touching products
Outer Packing Material:
-non static generative
17. ESD foams
18. Conclusion
Resistance measurements may be the most important test
Material should be tested of the claimed properties
Test must be done at standard 12% RH and temperature for correlation
Certification required from suppliers
Use ESD Association standardized test methods
19. ESD Paperboard (Boxes, Totes, Sheets) ESD Corrugated Board
Electrical testing
Material characteristic
Mechanical results
Repulpability
Considerations
20. Verify Barrier Resistance
21. Consideration of paper
Verify product through testing
Low barrier resistance = better shielding
Surface resistance and relative humidity
Better mechanics = better performance
Rub resistance = no conductive particles
Repulbality considerations.
22. Extreme ESD : Class 0 Devices
ESD
-ionizer insulator
Spark-free = NO ESD
27. Spark-free processing
Device
input
Static
dissipative
metal
pinslayer
BAD
OOD
G
BEST
++++
++++
insulator
insulator
++++
insulator
Metal
Metal
Metal
Height = V
30. Conclusion
ESD Control should be required in all manufacturing locations.
no
no
Feed
back
to
supplier
with
NMCR*
yes
Accept
NCMR*
MRB***Critical Reject?
yes
CAR***
Feedback to
Supplier
According to Diagram 2, the incoming parts purchase by Spansion will ship to incoming
receiving department by suppliers. The operators of incoming receiving department have to verify
the correct quantity of parts is received and all the boxes or cartons are in good condition. If the
cartons are found to be in bad condition, forwarder would have to take responsibility and come to
Spansion to do sorting. For parts that are broken, forwarder has to make compensation. On the other
hand, if the cartons are in good condition, the engineer of incoming quality control (IQC) department
are need to inspect all the incoming parts those are required for receiving inspection (RI) based on
documentation part inspection instruction (PII). If the incoming parts are failed, it will on hold at
scrap hold. Otherwise, the technicians of Spansion Warehouse will receive the incoming parts and
store into the warehouse. They need to confirm the physical parts available in the warehouse are
matching to the quantity in the computer system with good condition.
Every time when production line technicians are need more parts to assembly the products,
they will request from kitting department. So the kitting area operators will kit the parts from
Spansion warehouse and send to production line. After receive the parts, all the production line
technicians and engineers will build up the products. If defect found in the parts, production will
purge the remaining parts in production line and it will on hold at scrap hold. After the product is
built up, it will pass to incoming quality contol (IQC) department for inspection. IQC engineers need
to confirm the outgoing products are in good quality. The products that are passing through IQC
engineers inspection will pack into boxes / cartons by operators of outgoing shipping department
before ship to customer.
As part of the training I was showed why and how calibration was performed. On my first training
on calibration a Digital Multimeter (DMM) was used for demonstration.
A brief introduction on the definition of calibration, purpose calibration, appropriate calibration
standard used and actual calibration on unit under test (UUT) was shown.
Purpose
Calibrate Measuring and Test Equipment that are used to determine conformance to specifications, at
the relevant Departments (including Maintenance and Engineering) and Laboratories.
Multimeter:
Is an electronic tool used vastly in electronic industries for the measurement typically AC & DC
Voltages, Resistance/Ohms, AC & DC currents, Diode test , Frequency calibration & extra of
machines, electronic devices.
Scope
Apply to area where the ESD shoe checker or auto-door is installed to check the functionality of
ESD (Electro Static Discharge) safe shoe used in Penang Plant.
References
<F00-014>
Records Management
<F00-016>
<F01-033>
<F01-039>
<813-340>
<F16-055>
Equipment
1.PRS-801 Resistance System or Trek-152 Resistance Meter or equivalent
2.Self-made ESD verifier. See figure 1.
Procedure
The shoe checker / foot-wear tester shall be checked using self-made ESD verifier at least quarterly.
See figure 2.
Use the self-made ESD verifier to check the following :
1.Right foot-plate verification method:
Connect the banana plug of verifier to the ESD shoe checker. See figure 3.
Turn verifier knob to check on the following resistance ranges and the light on
the ESD Shoe Checker will be indicating the verification result. The
verification result as per defined in Table 1 (Right Foot-plate Indicator).
Ignore the light indicator for Wrist Strap.
Turn verifier knob to check on the following resistance ranges and the light on
the ESD Shoe Checker will be indicating the verification result. The
verification result as per defined in Table 1 (Left Foot-plate Indicator).
Ignore the light indicator for Wrist Strap.
ORANGE
800K
GREEN
GREEN
10M
GREEN
GREEN
20M
GREEN
GREEN
30M
GREEN
GREEN
40M
GREEN
GREEN
90M
GREEN
GREEN
RED
RED
Table 3.1: ESD Shoe Checker Verifiers Resistance Range vs. Verification result
If any of above fail, please put a DOWN tag on the checker and contact the Supervisor for repair.
See <F01-033> for the usage of down tag.
If pass, record verification date, the next due date and person doing the verification on the yellow
color of ESD Control sticker and stick it on the checker. See figure 5.
If any of above fail, open the casing and tune variable resistor until it is within the limit or replace
the faulty resistor. Inform ESD Coordinator and dispose the out of tolerance situation per <813340>.
Record result per Appendix A.
1.1
1.1.1
665K
700K
735K
800K
760K
800K
840K
10M
9.5M
10M
10.5M
20M
19.0M
20M
21.0M
30M
28.5M
30M
31.5M
40M
38.0M
40M
42.0M
90M
85.5M
90M
94.5M
100M
95.0M
100M
105.0M
110M
104.5M 110M
115.5M
All
Criteria
Good
Quarterly 16055
Good
ESD Shoes
Resistance
Half
Yearly
16055
Good
Smock
16055
Good
ESD Checker
Functionality
16055
Good
Yearly
i. Electrical Requirements
Surface Resistivity of EPG material shall be between 0.1 megohms/square
5
Equipment
Objectives
Procedure :
9.63 X 107
5.462 X 108
2.75 X 106
5. 584 X 108
9.82 X 107
XL 4.36 X 109
9.82 X 107
6.533 X 106
Table 3.2.1: ESD for jumpsuit
Conclusion:
9
A jumpsuit pass the test if the reading of resistance less than exponent 8 X 10 ). If not, the jumpsuit
fails to use in the production and it should return to the supplier.
Equipment
Objectives
Procedure:
Observation:
Drawing No Size Resistance ()
29309/B
3.12 X 106
6 X 108
7.352 X 107
2.5 X 108
5.75 X 106
6.82 X 108
XL 9.33 X 107
8.98 X 106
6.5 X 106
A boot pass the test if the reading of resistance less than exponent 8 (10 ). If not, the boot fails to use
in the production and it should return to the supplier.
Document Management is the minimum set of business processes that must be in place in order to
ensure the appropriate use of documents.
Documentation Services at major Spansion sites, is available to provide service and support for
document management and record management needs. As a minimum, Documentation Services
provide document management support for policy and system level documents, in addition to
meeting site document management needs.
Equipment Manual:
Are manuals used for operating a specific equipment. In Spansion PNG the QE department controls
document and endorses the manuals with a stamp and date & captures all relevant manual in the
Access data base.
Although the manuals are kept by the equipment owners , regular verifications are done by QE to
ensure all documents available in the database are also available in the owners filing cabinet.
Equipment buyoff report (EBR):
Where a new equipment is bought off before put in use. The buy off entails details checks by en-user
on the functionality of the equipment . Followed by Safety personnel checking the safety aspects of
the equipment to ensure there is no potential safety hazard in using the equipment. And finally the
QE dept will conduct a Electro Static Discharge (ESD) check any charge generated by the machine is
within Spansion spec limits .
Similar procedure as used for Manual is used to ensure availability of EBR documents.
i. Stability, bias, linearity, gauge repeatability and reproducibility for variable data
ii. Attribute MSA for pass/fail data
iii. Inspection Capability Study for operator pass/fail data.
TRAINING DESCRIPTION
During the 16-weeks of industrial training, I have exposed to the real working environment
and gaining a lot of experiences which include theory and real production applications, quality
control and improvements and other hands on approach. As a result, I had been trained to be familiar
with working environment and had been widen my knowledge both in knowledge that are related to
my fields of study and general knowledge.
Besides that, I have improved my soft skills such as communication and negotiation skills.
Most of the working time, we need to communicate with staff from different kinds of levels. We used
email to contact and deal with our customer, supplier and also colleagues at company. Other than
email, we also will meet up with them to discuss and negotiate with them. From here, I learned to
handle problems and work as teamwork. It also provides me a very good chance to brush up my
English as well.
Besides working on the mentioned task which is usually requested from supervisor
previously, there are other tasks done as well. Those tasks are such as helping engineers to do
sorting. Sorting is done when production detects some defective parts and IQC will be responsible to
screen through the available part in store and to sort out the good part and the defective part. These
jobs are not included in previous chapters as it is more to complicate daily tasks that sometimes
require some technical skill. They are all about study on the given vendor drawing, rework and
measure by using the tooling, assist on some data collecting and entry jobs.
Others than that, in IQC, photo taking is part of my job whenever there is complaint from
customer, production, or IQC engineers of defective part received for future reference. Furthermore,
there are defects that will be photographed in order to obtain disposition from supplier to whether
RMA back to supplier or scrap the part. During my internship training, I have photographed various
types of defect on various items.
Problem Arises
Incoming Quality Control engineer is not an easy job as we always need to deal with
strangers. We might upset them unintentionally, thus we have to be careful when dealing with
someone that we do not know. Our job is to try to keep a good relationship with all the suppliers and
avoid any unnecessary arguments. This job is mainly requiring us to have strong interpersonal skills.
However, I did discover my shortcomings as well through this industrial. Lacking of
experience and knowledge about the job had made me an acquaintance. It was my major
shortcoming. I was having dilemma when trying to make some critical decisions and I had always
had to consult with my supervisor. I do tend to make silly mistakes when doing the paperwork as
well.
Besides, challenges and obstacles are faced during the moments dealing to people who is
controlled and take care for parts in company ware house. Sometimes, sorting and screening was
suspended half way and couldnt be fully completed due to unavailability of tool and unsteady
physical quantity as shown in system. Task cannot be done as planned even though raise to purge
notice has been out for few days due to others who played the role on it proceed over the expected
time. This has seriously delayed the task timeline and causes a lot of time wasted. Therefore, it is
important for all employees to plan ahead for the managements on tasks and to meet each others
commitments.
1. Communication skill
Good communication skill would aid in communicate with other staff from different kinds of
levels. Good communication would lead to good understanding which could speed up the
process when seeking approval for certain action.
working and start to perform well in coming 4-weeks. Besides that, although it is time consuming
because other than working, we also need to write log book and prepare for the final report, but this
will be a good opportunity for students to learn on the ways to manage their time wisely.
CONCLUSIONS
The purpose of the industrial training is to provide students an opportunity so that they could
expose themselves to a real working environment. Instead of studying theories without putting them
into practical, industrial training gives students a chance to use the knowledge that they learnt in
university and use it in their tasks. From that, students could compare and get a clear picture of the
difference between theories and practical. Besides letting students to use knowledge that they have,
industrial training is also good for students to gain extra knowledge and experience. Furthermore,
industry is more than a just a place for interns to gain technical knowledge, it is also a place for
interns to learn how to be independent and work in a group. It helps interns to sharpen their
communication skills as to keep an organisation moving, communication between departments is
needed, and this provides interns an environment to practise while completing their tasks.
As a globalised compony, Spansion provides a good environment for interns to utilize their
skills. Spansion is an assembly site, due to its varies supplies from all around the world, interns are
able to expose themselves to different types of technologies.
For the past 3 months being assigned to IQC department, I have gained a lot of working
experience under the guidance of my supervisor, Namaswayan. IQC department plays a very
important role in Spansion, IQC engineer act as the middle person between Spansion and vendors. If
there is a quality issue, IQC needs to feedback the problem to both Plexus and vendors. IQC
engineers needs to be familiar with the customer specifications so that they could differentiate parts
that can be accepted and parts that cant be accepted. From that, I had gained a lot of knowledge in
checking the quality of the parts.
Furthermore, the most important thing that I had gained from this internship is my
communication skill. As a IQC engineer, when there is an issue, it is necessary to have a good
communication with staff from other departments like KGD department, financial department so that
the quality and quantity issue can be solved in a much efficient way. Moreover, it trained me to adapt
to working under pressure so that when there is a lot of issues, I could complete my tasks
accordingly to their importance.
In a nutshell, industrial training is good for students as it could expose them to a real working life,
giving them extra practical knowledge and the responsibility while working. This would prepare
them in their future career.
REFERENCES
The following report provides information on a variety of topic.
1. INTERNET
http://pearlnet/
http://pearlnet/10aboutus/About_pg.htm
http://www.spansion.com/About/Pages/About.aspx
2. BOOKS
WS Foo & WW Yau (2004). Do you know we are using Flash everyday?. Magazine of
Logbook
3. RESPONDANCE
Namaswayan (Spansion Quality engineer)
APPENDICES
JCI NO. AMD 08-16-01
Ref No.
Bad mark contamination on Bond Lead
8D Reporting date
Plant
Feb/05/2008
Feb/26/2008
Issue Date
3663
Apr/14/2008
Part
Name
Part No
30210 Rev.1
JCI No
1602
Sep/09/2008
1 Use of team
approach
H.UMEDA
MFG.
2 Problem
Description
NCMR#C3663, JCI shipment
information:
M.SHIMIZU
MFG.
O.ISHIKAWA MFG
K.OGUSHI
QA
T.INOUE
QA
TCI-C:
Fang
Ricky
QA Dep. Manager
QA Engineer
QA Engineer
3 Containment /Short
term
%
Effect
Implementation
Date
100%
Apr/17/2008
100%
Apr/17/2008
- JCI will sort RTS balance lot for the above defect reported.
100%
Pending RTS
100%
Apr/28/2008
Corrective Action
- Defect information was reported to the related process operators for their
awareness. (Please refer to the attached below.)
- Inspected JCI retained sample form the delivered lot but did not found
the mention defect.
% Contribution
JCI did not receive actual defect samples. Hence, we conjecture the below rot cause
based
100%
Bearing
Timing belt
Machine trouble happened during lot # 0808-1944 processing, machine was repaired
mid way of loading but operator did not suspect that the trouble will leads to this
defect. Lot was release as per normal production.
Implementation
To add the conditions check of the printing machine in daily check sheet.
To standardize the above check item on the work procedure. (Please check the
Date
Apr/17/2008
attached.)
- Any affected WIP to be put on MRB for confirmation before release to
production
when machine of such trouble occur again.
Implementation
- TCI-C will monitor the defects in FQA data (LRR & DPM) in order to confirm the
effectiveness of the corrective action for 1 month (by end May).
Date
May/2008
TCIC-C did not observed any FQA reject of UV ink contamination during Apr to Jun.
Hence, JCI consider that the above corrective action is effective.
TCI-C FQA data:
7 Prevent Recurrence
April/28/2008
- To check the bond lead surface of good unit after UV ink printing process also of
possible
ink contamination on Line and FQA.
8 Approval
Prepared by T. Inoue
Close Date
Reported
by
Checked by T. Sawada
Apr/28/2008
T. Inoue
Approved by Y. Kuboshiki
JCR-20020108
(X-OUT Marking)
(FQA)
pansion Limited
NCMR No. 3663
Appendix B
NCM report
Non-Conforming Material Report
Creation Date: 2008-4-23 9:46:42
Commodity: SUBSTRATE
Supplier Lot Number: 0708-1641,
Spansion/QC Lot No.: P-96-1190
P.O. No: 7100015847
Pack Slip/Invoice No.: SP-P-96-1190
Supplier Quality
__ Supplier Admin
Description:
Bad mark contamination on Bond Lead
__ Blanket
Debit No.: 0
CAR No.:
Date:
Qty:
__ Use As Is - Prod.
__ Use As Is - Engr
__ Use As Is - Insp
Deviation
__ Testing/Eval.
__ Screen/Rework
__ Scrap
Date
DM Mgr.
ENG Mgr.
royce yeoh
MAC Mgr.
no mak
PRO Mgr.
sk ong
SQE
Buyer
50