[DOCUMENT CONTROL LOG FOR M&E INSTALLATION WORK]

No.

Document name

Estimation Sheet for Submission by July 31

Invitation to Bid plamen project(M&E)

VERSION-1

VERSION-2

VERSION-3

VERSION-4

Date

Date

Date

Date

07-Jul-15
ITB-day

07-Jul-15

Attachment file
1

Attachment 01. Referance drawings

ITB-day

Attachment 02. BOQ

ITB-day

Attachment 03. Detail work scope

ITB-day

Attachment 04. Construction specfication for mechanical

ITB-day

Attachment 05. Construction specfication for electrical

ITB-day

Attachment 06. Construction specfication for instrument

ITB-day

Attachment 07. Construction specfication for fire fighting

ITB-day

Attachment 08. Document for contract sheet(draft)

ITB-day

Attachment 09. Milestone schedule

ITB-day

10

Attachment 10. Equipment list

ITB-day

11

Attachment 11. Installation Procedure for Equipment

ITB-day

12

Attachment 12. Equipment location plan

13

Attachment 13. Piping material specification

ITB-day

14

Attachment 14. Thermal design insulation specification

ITB-day

15

Attachment 15. Quality Management Plan

ITB-day

16

Attachment 16. Site HSSE Plan

ITB-day

17

Attachment 17. Contact point list

ITB-day

18

Attachment 18. Explaination to electrical document

ITB-day

07-Jul-15

07-Jul-15

07-Jul-15
07-Jul-15

REMARKS