Documente Academic
Documente Profesional
Documente Cultură
RDC (BOUTIQUES)
0
Unit
Quantit
PU (FCFA)
Montant (FCFA)
0.1
Installation de chantier
ff
0.2
ff
0.3
Dcapage-Nivellement
300,00
0.4
Implantation de l'ouvrage
1,00
0.5
m3
25,40
75,96
101,36
107,80
0.6
0.7
0.8
I-
INSFRASTRUCTURES
1.1
m3
3,10
1.2
25,40
1.3
63,52
1.4
12,64
1.5
3,54
1.6
m3
20,94
1.7
292,00
1.8
m3
8,00
1.9
m3
3,00
26,96
1.10
II -
SUPERSTRUCTURES
2.1
SOUS TOTAL 1
m3
25,10
3,54
1,90
2.2
2.3
m3
2.4
175,00
382,00
134,00
3,72
2.5
2.6
2.7
m
m3
III -
COUVERTURE EN DALLE
SOUS TOTAL 2
3.1
268,00
IV -
4.1
4.2
4.3
4.4
4.5
4.6
Portail garage
SOUS TOTAL 4
V-
5.1
ff
5.2
5.3
20
5.4
5.5
30
5.6
5.7
F, P de reglette complte de 60
5.9
12
5.10
5.11
5.12
F, P d'interrupteur va et vien
5.13
ff
5.17
Prise de tlvision
5.18
Prise informatique
VI -
SOUS TOTAL 5
6.1
m2
269,52
6.2
Plinthe
ml
134,6
6.4
m2
39,6
SOUS TOTAL 6
VII -
PLOMBERIE SANITAIRE
7.1
ff
7.2
7.3
7.4
7.6
7.9
Regard de visite de 40 x 40
7.10
7.11
SOUS TOTAL 7
VIII - PEINTURE
8.1
m2
268,00
172,00
45,26
868,00
8.2
8.3
m2
8.4
SOUS TOTAL 8
QTE
P.U
P.T
IX-
SUPERSTRUCTURES
9.1
0,96
9.2
m3
5,38
9.3
m3
3,24
9.4
m3
6,48
ff
2,00
2,86
9.5
9.6
3
2
9.7
932,00
9.8
m2
1864,00
X-
CHARPENTE -COUVERTURE
10.1
m2
288
10.2
270
10.3
m2
47,6
XI -
11.1
11.2
11.3
11.4
11.5
11.6
18
11.7
ml
37,8
XII -
12.1
ff
12.2
12.3
18
12.4
12
12.5
12.6
36
12.7
F et P de reglette complte de 60
12.8
22
12.9
12
SOUS TOTAL 10
SOUS TOTAL 12
XIII - REVETEMENT SOL
13.1
270
13.2
134
13.3
Plinthe
ml
337
SOUS TOTAL 13
XIV
PLOMBERIE SANITAIRE
14.1
ens
14.2
14.3
14.4
14.5
F, P evier
14.6
XV-
PEINTURE
15.1
SOUS TOTAL 14
15.3
15.4
436,00
64,00
1698,00
SOUS TOTAL 15
TOTAL R + 1 (APPARTEMENTS)
RECAPITULATIF GENERAL
RECAPITULATIF RDC
MONTANT
TRAVAUX PREPARATOIRES-TERRASSEMENT
INFRASTRUCTURES
SUPERSTRUCTURES
ELECTRICITE-COURANT FAIBLE
PLOBERIE SANITAIRE
PEINTURE
TOTAL RDC HT - HD
RECAPITULATIF R+1
MONTANT
SUPERSTRUCTURES
ELECTRICITE-COURANT FAIBLE
REVETEMENT SOL
PLOBERIE SANITAIRE
PEINTURE
TOTAL RDC
TOTAL R+1