Documente Academic
Documente Profesional
Documente Cultură
MINISTRY OF DEFENCE
ON
CRASH FIRE TENDER, 6500 LITRES
MANAKIKARAN NIDESHALAYA
RAKSHA UTPADAN TATHA POORTI VIBHAG
RAKSHA MANTRALAYA, 'H' BLOCK, NIRMAN BHAWAN PO
NEW DELHI - 110 011
DIRECTORATE OF STANDARDISATION
DEPARTMENT OF PRODUCTION & SUPPLIES
MINISTRY OF DEFENCE, 'H'- BLOCK, NIRMAN BHAWAN PO
NEW DELHI - 110 011
ON
CRASH FIRE TENDER, 6500 LITRES
MANAKIKARAN NIDESHALAYA
RAKSHA UTPADAN TATHA POORTI VIBHAG
RAKSHA MANTRALAYA, 'H' BLOCK, NIRMAN BHAWAN PO
NEW DELHI - 110 011
DIRECTORATE OF STANDARDISATION
DEPARTMENT OF PRODUCTION & SUPPLIES
MINISTRY OF DEFENCE, 'H'- BLOCK, NIRMAN BHAWAN PO
NEW DELHI - 110 011
The following members were consulted in approving the document:Name & Designation
Organisation
13.
14.
15.
16.
Wg Cdr NB Singh
Col SK Sharma, Jt Dir
17.
19.
20.
21.
22.
Cdr BD Yadav
Lt Col Atul Kasal,
Secretary
18.
Amendment pertains
to:
Sl. No./ Para No./
Column No.
Authority
iii
Amended by
Name & Appointment
(IN BLOCK
LETTERS)
Signature
&
Date
Page No.
0. FOREWORD
1. SCOPE
3. TERMINOLOGY
4. GENERAL REQUIREMENTS
5. MATERIAL
12
13
24
24
9. MARKING
26
27
11. LITERATURE
27
28
30
14. TRAINING
30
31
31
APPENDIX A & B
32 40
TEST SCHEDULE
41-45
iv
FOREWORD
0.1
This Joint Services Specification has been prepared by the Engineering
Equipment Standardisation Sub Committee on the authority of Standardisation
Committee, Ministry of Defence.
0.2
This specification has been approved by the Ministry of Defence and is
mandatory for use by the Defence Services.
0.3
This specification has been prepared based on JSS 4210-13:1998 and
supersedes the same.
0.4
This specification shall be used to design, manufacture, quality assurance
and procurement of Crash Fire Tender, 6500 litres.
0.5
The responsibility of Quality Assurance for important/ indigenous chassis
to be used for the equipment shall rest with CQA(V), Ahmednagar and AHSP
responsibility in respect of imported/ indigenous TATRA chassis shall rest with
CQA(BEML), Bangalore and the responsibility for VHF Radio Set shall rest with
CQA(L), Bangalore. However the overall AHSP responsibility for the complete
equipment covered by this specification shall rest with CQA(FE), Pune. Enquiries
regarding this specification relating to any contractual conditions should be addressed
to Quality Assurance Authority named in the tender or contract. Other enquiries
should be referred to :The Director,
Directorate of Standardisation,
Ministry of Defence,
H Block, DHQ PO
New Delhi-110 011
0.6
0.7
issued.
This specification holds good only for the supply order for which it is
SCOPE
1.1
This specification lays down the requirements regarding material, design,
construction, workmanship & finish, performance, accessories, spares and quality
assurance of Crash Fire Tender, 6500 litres for the use by three services. The
equipment is required to be designed and manufactured on chassis to be provided by
the purchaser, complete with on chassis Power Take Off as per the details in the
tender enquiry.
2.
2.1
IS 444:1987
(fourth revision)
(Amendment 1)
Reaffirmed 1988
(b)
IS 446:1987
(fourth revision)
(Amendment 1)
Reaffirmed 1998
(c)
IS 636:1988
(third revision)
Reaffirmed 1998
(d)
IS 703:1966
(Amendments 2)
(e)
IS 704:1984
(second revision)
(Amendments 2)
Reaffirmed 2000
(f)
IS 841:1983
(second revision)
(Amendments 3)
Reaffirmed 1998
(g)
IS 903:1993
(fourth revision)
(Amendment 1)
Reaffirmed 1998
IS 907:1984
(second revision)
Reaffirmed 2000
(j)
IS 910:1980
(second revision)
(Amendment 1)
Reaffirmed 2000
(k)
IS 926:1985
(second revision)
Reaffirmed 2000
(l)
IS 927:1981
(second revision)
(Amendment 1)
Reaffirmed 2002
(m)
IS 1084:1994
(fourth revision)
(Amendment 1)
Reaffirmed 1999
(n)
(o)
IS 2871:1983
(first revision)
Reaffirmed 2000
(p)
IS 3582:1984
(first revision)
Reaffirmed 2000
(q)
IS 3650:1981
(second revision)
(Amendment 1)
Reaffirmed 2000
(r)
IS 4571:1977
(first revision)
(Amendment 5)
Reaffirmed 2000
(s)
IS 4643:1984
(first revision)
Reaffirmed 2000
IS 4770:1991
(first revision)
(Amendment 1)
Reaffirmed 2001
(u)
IS 4861:1984
(first revision)
(Amendment 1)
Reaffirmed 2000
(v)
(w)
(x)
IS 5068:1969
Reaffirmed 1999
Grab hook
(y)
IS 5120:1977
(first revision)
(Amendments 5)
Reaffirmed 2001
(z)
IS 5131:2002
(second revision)
(aa)
IS 5169:1986
(first revision)
Reaffirmed 2002
(ab)
IS 5200:1998
(first revision)
(ac)
IS 5486:1985
(first revision)
Reaffirmed 2000
(ad)
IS 5505:1985
(first revision)
(Amendment 1)
Reaffirmed 2000
(ae)
IS 5545:1977
(first revision)
Reaffirmed 2000
IS 5604:1984
(first revision)
Reaffirmed 2000
(ag)
(ah)
(aj)
IS 5714:1981
(first revision)
(Amendment 1)
Reaffirmed 2002
(ak)
IS 6603:2001
(first revision)
(al)
IS 6912:1985|
(first revision)
Reaffirmed 2001
(am)
IS 9137:1978
(Amendments 4)
Reaffirmed 2002
(an)
IS 9583:1981
Reaffirmed 1999
(ao)
IS 9961:1981
Reaffirmed 2000
(ap)
IND/CIFE/PROV/0038(b)/I
ND/VEH/0065/2004:Issue
(b)
(aq)
IND/CQAFE/PROV/0041(b)
Breathing Apparatus
(ar)
IND/CQAFE/PROV/0056(a)
(as)
IND/CQAFE/PROV/0073
(at)
JSS 4210-02:2005
(Revision No. 1)
JSS 4210-06:1999
(Revision No. 2)
(Amendment No. 3)
(av)
JSS 4210-20:2001
Drawings
(i)
General Arrangement
(ii)
FESK-0041
(iii)
FESK-0042
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(xiii)
(xiv)
(xv)
(xvi)
(xvii)
2.2
Copies of Departmental Specifications at Sl No. (ap) to (as), Joint Service
Specification at Sl No. (at) to (av) and Drawings are obtainable on payment from:The Controller,
Controllerate of Quality Assurance
(Fire Fighting Equipments),
Aundh Camp,
Pune-411 027
3.
TERMINOLOGY
3.1
Foam Induction Ratio: It is the proportion of foam liquid concentrate, in
the solution of foam liquid to water.
3.2
Proportionator/ Inductor: It is the system designed for induction of foam
liquid concentrate and ensuring control of pre-determined ratio of foam liquid
concentrate to the quantity of water being discharged.
3.3
Expansion Ratio/ Factor: It is the ratio of the volume of foam to the
volume of liquid in the foam.
3.4
25% Drainage Time: It is the time required for drainage of 25% of liquid
in the foam as per test method adopted by IS 4989 (Part 1) & (Part 2).
3.5
Static Suction Lift: It is the difference in elevation between the pump
datum and the liquid level in the liquid source when the pump is running.
3.6
Abbreviations:
RRL
ATC
PTO
VHF
UHF
GVW
TRS
HT
High Tension
LT
Low Tension
GENERAL REQUIREMENTS
4.1
The superstructure of Crash Fire Tender shall be built on chassis with fully
automatic transmission duly approved by concerned vehicle Quality Assurance
Authority. i.e., CQA(V) Ahemdnagar for imported/ indigenous vehicle and
CQA(BEML) Bangalore, for imported/ indigenous TATRA vehicle. It shall consist of
a water tank of 6500 litres capacity with necessary fittings as per Para 6.1 to 6.10 of
this specification. A foam tank of 800 litres capacity shall be provided with necessary
fitting as per 6.1.5.1 to 6.1.5.16 of this specification. A midship mounted pump,
driven off the vehicle power- take-off (PTO) shall be fitted, having a minimum output
of 4000 litres per minute at a delivery pressure of 850 kPa (8.5 bar) and suction lift of
3m. The pump shall also be capable of minimum output of 3000 litres per minute at
higher pressure of 1250 kPa (12.5 bar) to suit the monitor output for same suction lift.
4.1.1
In the past, Tatra (ex. Import) F-23 (indigenous) ex. M/s Ashok Leyland,
MAN and Magirus chassis were used for CFT. In case of use of any other chassis, the
same be quality assured by concerned AHSP.
4.2
The Crash Fire Tender shall be capable of the following minimum
performance with the monitor mounted on the roof of the cabin and 2 handlines on
either side :a) A minimum output of 3000 litres through monitor at pressure not
exceeding 1250 kPA (12.5 bar) to give effective monitor throw, of 55
metres minimum of specified quality foam. The monitor shall be
capable of being operated electro-pneumatically/ hydraulically by
joystick with arrangements for manual over-ride.
(b) A minimum output of 500 litres of water foam solution through each of
the two handlines, on either side of the Crash Fire Tender to give a
minimum effective throw, of 25 metres of specified foam, at pump
delivery pressure not exceeding 850 kPa (8.5 bar) and using 30 metres
of specified hose and specified quality foam.
(c) It shall be possible to operate the monitor and the two handlines at
pump delivery pressure of 850 kPa (8.5 bar).
(d) During operation of Crash Fire Tender there shall not be any undue
vibrations. If any, it shall be kept to the minimum level by providing
suitable dampening arrangements and sound deadners.
4.3
The monitor and handlines must employ self-aspirating type foam
production system, where aeration is done at the branch pipe. The foam compound
used shall conform to IS 4989 (Part 1) & (Part 2) to give performance indicated in
Para 4.2 at the induction ratio specified in Para 4.3.1. The quality of foam produced
shall satisfy requirements stipulated in Para 4.3.2.
8
1:8
(b)
4.4
A first aid hose reel service shall be provided on the appliance with 60 m
hose, fed from the water supply available on the Crash Fire Tender.
4.5
It shall be possible for the Crash Fire Tender to use water from a separate
source of water supply for prolonged use and foam supply through a pick up tube
from drums at ground level.
4.6
The Crash Fire Tender shall be equipped with five Nos. self Defence foam
nozzles for self-protection, particularly of the wheels. The angle of the front nozzles
shall be so adjusted that a throw of 6 metres with a total coverage of 6 metres width is
achieved when the front nozzles are operated at 590 kPa (6 kgf/cm2) pressure. Self
Defence foam nozzle shall deliver foam mix solution with a discharge capability of
approximately 180 litres/ min. The water tank, foam tank, monitor, handlines and selfDefence shall have pneumatically controlled ball valves for operation and control
from within the cabin. It shall be possible to switch over to manual control by
isolating pneumatic control system.
All pneumatic control system shall be used with air supply at pressure
available from the vehicle air brake system. The vehicle air brake system shall be
tapped for the pneumatic control system with a regulator valve so that the minimum
air pressure required for operating the vehicle is available all the time and the
pneumatic control for fire operation actuates when the air pressure in the system
exceeds this minimum level. In case of any leakage in the pneumatic control system,
the vehicle operation shall not be adversely affected. Opening and closing valves to
the monitor, handlines and to the pump shall be achieved through operation of
pneumatic controls from the cabin.
4.7
The supplementary agent shall consist of carbon di-oxide extinguisher of
2 x 22.5 kg capacity mounted on the rear side of the equipment with a common
header, a 15 m hose reel and extended applicator with necessary mounting and
controls to give the performance as specified and Dry Chemical Powder extinguisher
9
320 mm
(b)
Angle of approach
300 minimum
(c)
Angle of departure
300 minimum
(d)
120 minimum
(chassis parameter)
(e)
Gradeability
35 %
(f)
12 m maximum
10
600 mm
(h)
(j)
(k)
(l)
Stability
To stop within 9 m at
speed of 32 km/h
with full pay load.
(n)
Articulation
(o)
Reliability of structure
(p)
Operating range
4.14
4.14.1
The Crash Fire Tender is required to give the specified performance under
the following normal ambient conditions:Normal Operating Conditions:
(a)
(b)
(c)
Temperature
Altitude
Humidity
:
:
:
0 to 500C
Up to 600 m above mean sea level.
Up to 80 percent under the above conditions.
11
5.
(a)
Temperature
-25 to +35C
(b)
Altitude
MATERIAL
5.1
The choice of materials to be used for the construction of the appliance
shall be made with a view to combine lightness with strength and durability.
5.2
5.3
The appliance is intended for use in tropical conditions with constant high
humidity and heat. This shall be given full consideration while selecting materials and
components. Material and treatment shall be such as to avoid rusting and deterioration
of superstructure items between overhauls.
5.4
All parts which form waterways or come into contact with Foam
Compound shall be of SS material. All metal pipe lines shall be stainless steel,
conforming to ERW schedule 20 of AISI 304. These pipe lines and its connected
valves shall withstand hydraulic pressure test at 2353.58 kPa (24 kgf/cm2). Valve
should be made of SS AISI 304 grade. All metal parts exposed to atmosphere shall be
of SS material. All fasteners shall be stainless steel to avoid rusting over prolonged
use.
5.5
All material and components shall be selected keeping in view the
requirement of serviceability, ambient conditions, high loading and acceleration
conditions. Particular care shall be taken in use of rubber and plastic material, which
should be of best quality to give reliable service under all conditions. Specific
maintenance schedule for replacement of components, which deteriorate at a faster
rate, shall be available as replacement kits. The manufacturer shall quote details of
such fast moving items giving full particulars and items cost with the offer.
12
6.1
Design and construction of superstructure shall be in accordance with
General arrangement Drawing No. FEGA-008(a). Overall unladen height to highest
point to to exceed 3.8 m, Overall widths not to exceed over structures, including grab
handles but excluding mirrors 2.5 m and Overall length not to exceed 10 m. This is a
schematic layout, broadly defining the location and positioning of important subassemblies for uniformity and standardisation. The firms should submit actual layout
of their design alongwith the offer incorporating specific construction, equipments
and controls. All plumbing shall be stainless steel conforming to ERW schedule 20 of
AISI 304. Plumbing and other connections between various sub-assemblies shall have
flexible joints to cater for relative movement due to flexor of chassis and other
deflections/displacements. The technical details of design requirements of major subassemblies shall be as follows :6.1.1
Water Tank
6.1.1.1
The water tank mounted on the chassis shall be capable of carrying 6500
litres of water as mentioned in Para 4.1. It shall be fabricated out of stainless steel of
AISI-304 grade with a thickness of 5 mm at the base and 3.15 mm for remaining
portion. The tank shall withstand a hydrostatic pressure of 30 kPa (0.3). Hydraulic
pressure only be checked through calibrated pressure gauge. It shall be suitably
baffled transverse and longitudinal to prevent fluid surge effect while the vehicle is
accelerating, cornering and breaking. The design of the baffles shall be such as to
afford clear waterway for the entire contents of the tank of flow into the pump and
also provide access to all the compartments for repair and maintenance. All bolting
shall be done with stainless steel bolts and nuts. The tank shall be so designed and
mounted as to bring the center of gravity of the appliance as low as possible. It shall
be flexibly mounted to accommodate all chassis bending and torsional movement.
The mounting shall permit full contents of the tank to flow to the pump on the level
and ascending and descending a 30% slope, and side ways on a 20% slope, a
minimum of 75% of contents can be pumped out.
6.1.1.2
Four foldable lifting eyes shall be provided on the shell of the tank to
enable the tank to be lifted off the vehicle for repairs/replacements as necessary.
6.1.1.3
The tank shall be fitted with manhole cum filling orifice of 450 mm
diameter on top of the tank fitted with removable strainer as per drawing No. FESK0041. The manhole shall be quick opening type and shall be clearly marked "Water".
Of aluminum casting letter of size 50 mm minimum. The drainpipe shall be of not less
than 80 mm diameter, with a valve. The end of drain pipe shall be fitted with a quick
action male coupling so that water could be drained away from the vehicle by using
reinforced rubber lined delivery hose fitted with female end connection. A five-meter
hose with end connections shall be supplied for this purpose.
6.1.1.4
One overflow pipe, of not less than 100 mm internal diameter shall be
fitted to the tank. The overflow pipe shall have no obstruction, to avoid over
pressurisation of the tank while filling through hydrant connection/pump and also act
13
Hose Reels
6.1.2.1
One first aid hose reel shall be provided and mounted so as to be
accessible for use, on left side of the Crash Fire Tender.
14
Pump
6.1.3.1
The pump shall be made of any suitable alloy, compatible with AFFF
(Aqueous Film Forming Foam) and Flouroprotein besides Protein Foam Compound
with stainless steel shaft, suitable for use with brackish water. The pump shall be
capable of delivering not less than 4000 litres per minute of water at a pressure of 850
kPa (8.5 kgf/cm2) and 3000 litres per minute of water at a pressure of 1250 kPa (12.5
kgf/cm2) when operated at suction lift of 3 m. The pump shall be single stage/ double
stage and closed impeller type, where the impeller is dynamically balanced to reduce
any thrust. Impeller dynamic balance certificate to be produce to Quality Assurance
Authority by the supplier. The pump shaft shall preferably be designed to run on two
deep groove ball bearings, lubricated effectively to ensure long trouble free service. A
mechanical seal shall be provided, which shall be capable of running dry up to one
minute without damage. Pump design shall be such that the desired output indicated
in this specification shall be obtained at maximum efficiency. The Pump shall also be
supported with independent automatic priming system. It shall be accessible and
readily removable for repair and maintenance. Pump characteristics including
efficiency shall be supplied alongwith the offer.
6.1.3.2
The pump shall be driven off the Power Take Off through a drive shaft
rated for transmitting a minimum of 135 kW at the pump operating rev/min. This
shall be complete with two universal joints and a sliding yoke.
6.1.3.3
The pump shall be mid-ship mounted. The pump control panel shall be
located on either side of the appliance, in addition to that positioned in the cabin.
6.1.3.4
The suction inlet and delivery outlets of the pump shall be fitted on the
pump control panels on both sides of the appliance.
6.1.3.5
A removable brass strainer and chromium plated brass blank cap shall be
provided for the suction inlet(s) for the pump. The blank cap shall be secured with a
15
Primer
6.1.4.1
The primer shall be capable of a suction lift of 7 metres in not more than
30 seconds with indicator and using 100 mm suction hose. The Primer design shall be
such as to maintain full efficiency with normal maintenance between overhauls and
shall have automatic engagement and disengagement provision..
6.1.5
Foam Equipment
6.1.5.1
Foam Compound Tank : A foam compound tank of 800 litres capacity
shall be mounted on the chassis in addition to the water tank as a separate and distinct
unit which can be removed separately for replacement.
6.1.5.1.1 The foam compound tank shall be of rigid type and shall be of stainless
steel as per IS 1570(Part 5) Grade 07 Kr 18 In 9 or AISI-304 grade welded
construction. The shell thickness shall be minimum 2 mm except the base, which shall
be 2.50 mm.
6.1.5.1.2 The foam tank shall have its top dished with funneling arrangement
provided to enable easy filling from 20 litres drums. Suitable stainless steel sharp
edged puncturing device shall be provided at the dished end so that the foam
compound can be poured directly from the drum into the tank without spillage and
undue frothing. Funneling arrangement shall be extended for delivery of the foam
concentrate near the bottom of the tank to avoid frothing. General arrangement and
details of filling orifice are covered in drawing No. FESK-042. The tank shall be
suitably baffled to prevent surge while the vehicle is accelerating, moving on uneven
16
6.1.5.2.1 Automatic proportionating arrangements shall be provided where the preset induction ratio of foam compound/ water solution is maintained within specified
limit when flow of water is varied as per demand, merely by opening and closing the
monitor/hand lines, through the full operating range from a single hand line to
maximum output of the system. This shall be achieved without any complex system
of linkage that may be susceptible to distortion due to chassis flexure. The system
shall be reliable and shall not require frequent calibration checks and shall conform to
provisions of Para 4.3.1.
6.1.5.3
Foam Monitor
6.1.5.3.1 A foam monitor shall be mounted on the roof of the cabin such that it can
be operated remotely, pneumatically by joy-stick with provision for manual over ride.
The arrangement shall be such that it could be operated by a member of the cabin
crew or by the driver, enabling the operation by one man in an emergency. The
monitor shall be capable of traversing through 270 in a horizontal plane, elevating
from horizontal to 45 and depressing from horizontal to not less than 15 and fully
rotating in both directions. The monitor shall be fitted with a deflector to enable it to
lay a wide carpet of foam for quick coverage of spill fires when necessary. The
change from jet to spray shall be instantaneous by the operation of a simple lever
from within the cabin. The monitor shall be so positioned on the roof of the cabin that
the foam produced could be directed towards a fire at a minimum distance of 12
metres ahead of the cabin when the monitor is at its maximum depression from
horizontal. The monitor operation shall be easy for one man. Controls being fully
reliable between overhauls and indicative of direction of throw. In addition to the
normal operation and control of the monitor from inside the cabin, it shall be possible
to operate the monitor from roof of the cabin with a provision of telescopic handle
lockable at any desired position in emergency conditions as required. A suitably
located hatch of 2 mm thick Aluminium chequered plate with necessary structural
support may be provided for monitor operation as an alternative to operation from the
roof top after approval by the Quality Assurance Authority.
6.1.5.3.2 The monitor shall be of self-aspirating type with a flow rate of at least
3000 litres per minute of solution at a pump pressure range of 1250 kPa to (12.5 bar).
It shall have an expansion ratio of not less than 1:8, using foam compound
conforming to IS 4989 (Part 1 & 2) at an induction rate specified in Para 4.3.1.
Maximum output of monitor at this condition however, shall not exceed 3500 litres
per minute. The foam so produced shall have 25 % drainage time: (i) For Protein
Foam 120 to 210 second (ii) For AFFF 120 second.
6.1.5.3.3 The aggregate foam solution discharge at 8.5 bar shall be not less than
4000 litres per minute through combination of monitor and 2 hand lines or 3000 litres
per minute through monitor only. The appliance shall be capable of yielding 3000
litres per minute at 12.5 bar through monitor while it is creeping, in either direction.
18
Hand lines
6.1.5.4.1 Four hand lines, two on either side of the appliance, shall be provided.
These shall terminate in foam making branch pipes, fitted with spray/ jet attachments,
with hand control. Each foam making branch pipe shall be capable of delivering not
less than 500 litres of water/ foam solution with pump pressure not exceeding 850 kPa
(8.5 kgf/cm2) with an expansion of not less than 1:8 and minimum throw of 25 m
when either all four hand lines are used simultaneously (with monitor not operating)
or two of them are used in combination with the monitor. 25 % drainage time (i) For
Protein Foam 120 to 210 second (ii) For AFFF 120 second.
6.1.5.4.2 The hand lines hose shall be located as close to the panel as possible, duly
coupled to delivery end and branch pipe. The hoses for the hand lines shall an internal
diameter of 63 mm. These shall be of the reinforced rubber lined (RRL) and be in
length of 30 m each and conforming to IS 636 Type B. Non-ferrous wire shall be
used for binding coupling to hoses.
6.1.5.4.3 The controls for the hand line outlets shall be of the pneumatic operated
stainless steel ball valves type fitted in the cabin control panel. In addition to these,
manual over-ride controls shall also be provided and fitted on the side control panels.
It shall be possible to isolate each sideline independently from the pneumatic system
and operate by respective over-ride as required. The isolation shall be located on the
side control panel for easy operation and identification.
6.1.6
6.1.6.1
The supplementary extinguishing agent shall be DCP of 75 kg capacity
and CO2 extinguisher of 45 kg (2 x 22.5 kg) capacity
6.1.6.2
Extinguisher fir DCP 75 kg capacity with 390 10 mm OD shall be
located at RHS of rear locker of the vehicle. The extinguisher Fire DCP Kg capacity
shall be as per Appendix A attached to this specification.
6.1.6.3
CO2 gas extinguishing system shall be located at LHS of rear locker of the
vehicle. The CO2 gas extinguishing system consists of two CO2 gas cylinders each of
22.5 kg capacity and 267 mm dia. The CO2 gas extinguishing system shall be as per
Appendix A attached to this specification.
19
6.1.7.1
A 7.5 m light alloy hollow two-piece extension ladder as per IS 4571 shall
be mounted on suitable gallows fitted with rollers and designed to facilitate easy and
quick removal of the ladder by one man from the rear of the appliance. The headlock
on the gallows shall be positive in action. No equipment shall be positioned as to
interfere with the easy and independent removal of the extension ladder. In addition,
two light hollow stretcher folding type as specified in the General arrangement
Drawing No. FEGA-0008 shall be mounted separately on the appliance in such a way
that these could be easily, quickly and independently removed when required.
6.1.8
6.1.8.1
Adequately illuminated pump operating control panels shall be provided
on either side of the appliance. Each of these shall include the following: (a) Auxiliary throttle control for the engine.
(b) Illuminated & Glycerin filled Pump pressure gauge calibrated (0 to 25
kgf/cm2). Leastcount: 0.5 kgf/cm2.
(c) Illuminated & Compound gauge calibrated as follows :i) Pressure from 0 to 17.5 kgf/cm2).
ii) Compound gauge from -1 to 17 kg/cm2.
(d) Gravity type acrylic tube gauge with 3 Way brass cock for water tank
(e) Gravity type acrylic tube gauge with 3 Ways brass gauge for foam tank
(f) Two 63 mm male instantaneous hydrant connection with ball control
valves and non-return valve.
(g) Suction inlet of pump with isolating valve control.
(h) Two 63 mm female instantaneous delivery outlets of pump (for hand
lines) with manual over-ride control (Pneumatic control of these to be
in cabin)
(j) First aid hose reel valve control (On portside)
(k) Control valve for self-filling of water tank from pump.
(l) Control for using auxiliary foam compound pick-up tube on portside
only.
(m) CO2 Extinguisher equipment operating control (on CO2 system).
20
The following controls shall be provided in the cabin :(a) Hand throttle with arrangement to lock it in any position when
required.
(b) Illuminated & Glycerin filled Pump pressure gauge calibrated (0 to 25
kgf/cm2). Least count : 0.5 kgf/cm2.
(c) Water tank isolating pneumatically controlled valve.
(d) Pneumatically controlled valve for foam tank.
(e) Pneumatic valve control for monitor operation.
(f) Pneumatic valve controls for independent operation of four foam hand
lines with visual indication.
(g) Pneumatic valve control for self Defence foam nozzles.
(h) Pneumatic circuit isolating control.
(j) Switches for operation of siren, fog lamps, reversing light, airfield
obstruction light, revolving beacon light, searchlight and spot light.
(k) Green bulb indicator to show opening of pneumatic valves.
(l) Engine revolution counter.
(m) Engine temperature and lubricating oil temperature gauge.
(n) Engine oil pressure gauge with a warning glow lamp.
(o) Battery charging with ammeter with a voltage setting 0 to 12 volt
warning glow lamp.
(p) Air pressure gauge for the braking systems with warning device
21
Body Work
6.1.9.1
Cabin: Accommodation for 6 men, including the driver shall be provided
in a fully enclosed flexibly mounted crew compartment. The design of the cabin shall
be such that it shall afford maximum possible vision for the crew and shall ensure
adequate ventilation to avoid discomfort to crew under tropical conditions. Adequate
lighting in the cabin shall be provided. Hinged doors shall be provided on both sides
of the appliance giving ready access to driver and crew wearing fire proximity suit
alongwith breathing apparatus. The doors should open outwards. These shall be hung
forward, and have locks with double catch striking plates. These shall not be liable of
being opened inadvertently from the inside. Nonslip steps grab rails/ handles shall be
provided to assist the driver and crew to get in and out. The design of the steps should
facilitate very quick entry and exit from cabin. If required, the steps should be bolted
to avoid fouling if the cabin is of tilting type. Driver's seat and co-driver seat shall be
adjustable having safety belt provision. All glass fitted to window shall be splinter
proof safety glass. The construction of the cabin shall be such that the roof shall
support the weight of two men without damage and deflection and shall have 2.0 mm
Aluminium chequered plate on top. Dual sun visors and long arm outside fittings rear
view mirrors shall be fitted to the cabin. The cabin design shall provide protection
from heat, rain, dust, noise, etc. All structure shall be of stain less steel of AISI 304.
Inside upholstery shall be of best quality as approved by Quality Assurance Authority.
6.1.9.2
The cabin shall be designed such that comfortable seating and enough
head room is provided for the crew to be ready for fire fighting operation on reaching
the site. Care should be taken to provide access to the engine elements requiring
regular attention without resorting to tilting of the cabin. Space for proper location
22
Stability
6.1.10.1 The stability of the appliance shall be such that, when under fully equipped
and loaded condition, if the surface on which the appliance stands is tilted to either
side, the point at which over-turning occurs is beyond an angle of 28 with the
horizontal.
7.
7.1
The standard of workmanship and finish of all mechanical and other parts
shall be of high quality, reliability compatible with service duty and life of the
equipment, interchangeable for replacement and ensure ease of maintenance and
servicing.
7.2
The appliance shall be painted 'Fire Red' on the outside with the Fire
Service insignia in golden yellow paint with black colour shading with letter of size
140 mm x 100 mm leaving a gap of 50 mm from top with 100mm gap between two
lines.
7.3
The cabin shall be painted cream. Inside lockers wall shall be 1.6 mm
thick Aluminium chequered plate. Lockers shall be finished in SS shadow board with
black colour engraved plate to show the position of each piece of accessories.
7.4
7.5
Necessary anticorrosion and priming coats shall be applied before
painting. Paint shall be procured from approved sources and all painting work shall
carry a warranty for five years for defective material and unsatisfactory process.
7.6
Two coats of PU paints shall be applied over the Fire Red paint.
8.
8.1
Accessories: The following accessories shall be installed in addition to
those normally fitted on the chassis :
(a) Electrically Operated Siren (One): To be mounted externally. 95
decible sound out put at 100 m ahead & not less than 90 decible at 90
degree either side at a distance of 100 m having range of 2 km at 24
Volt. (75 Watt).
(b) Fog Lamps (Two): These shall be low-mounted in front of the
appliance conforming to IS 5545
24
MARKING
9.1
Each appliance shall be legibly and permanently marked with the
following, preferably on a metal plate attached in the cabin and also near/ on the
pump operation control panels.
a) Manufacturer's name and trade mark.
b) Year of manufacture.
c) Srl No.
d) Capacity of pump (in l/min), water tank (in litres) and foam compound
tank (in litres)
e) Chassis Model and Number
f) Engine Model and Number
g) Pump Model and Number
h) Pump Manufacturers Name
j) Chassis supplier's name and country of origin.
9.2
Instruction plates with permanent inscription containing operating/
maintenance instructions suitably engraved on it shall be provided on each control
panel for easy reference for the operator.
26
10.1
Manufacturers/suppliers shall satisfy themselves that the stores are in
accordance with the terms of the contract and fully conform to the required
specification by carrying out a thorough pre-inspection of each lot before actually
tendering the same for inspection to the Quality Assurance Officer nominated under
the terms of the contract. A declaration by the contractor that necessary pre-inspection
has been carried out on the stores tendered, will be submitted alongwith the challan.
The declaration will also indicate the method followed in carrying out pre-inspection
showing the features checked/tested and will have the test certificate attached to the
challan/ declaration.
10.2
If the Quality Assurance Officer finds that the pre-inspection of the
consignment as required above has not been carried out the consignment is liable to
rejection.
11.
LITERATURE
11.1
The following Bi-language (Hindi-English) literature shall be provided
(Two sets with each equipment and as specified in the tender). In addition three sets
of literature for Quality Assurance Authority, one set for Technical Committee and
one set for Quality Assurance Officer shall be provided.
(a) User Hand Book: This book shall contain technical description of the
equipment with layout drawings, illustration and performance
capabilities with instruction to user for commissioning the equipment
for end use, operation with limitations and precautions to be observed,
normal maintenance and field repairs, lubrication schedule with grades
of lubricants to be used, fault finding guide, storage instructions and
warning plates against possible wrong use. For independently mounted
equipments, e.g. battery charger, supplementary extinguishers, rescue
tools, radio, telephone set, and other accessories independent chapters
shall be added to the main book. Content and format require approval
of Quality Assurance Authority.
(b) Illustrated Part Identification Manual : This manual shall contain
fully exploded and illustrated details of the entire superstructure and all
carried sub-assemblies, suitably grouped for easy identification of each
and separately demandable spare for replacement as required, will
include details of bought out items with part numbers, and source of
supply. Format shall require approval of Quality Assurance Authority.
(c) Workshop Manual: This manual shall contain fully illustrated
instructions on repair and overhaul of all super-structure items supplied
against this specification including proprietary items fitted/ supplied
with details of fitment tolerances, special tools to be used, procedure
27
QUALITY ASSURANCE
12.1
The design offered by manufacturers shall be thoroughly evaluated
covering performance, quality of material, standard of manufacture, preservation,
finish, layout and documentation for each new design. The offer must contain details
of the design for assessment, which will be followed by Technical and User trials as
covered in the contract for the equipment during development stage through Pilot
Sample testing. The pilot samples shall be offered by the manufacturer to the Quality
Assurance Authority at CQA(FE), Pune and collected back under their own
arrangement after trials.
12.2
12.2.1
The following information shall be provided by the manufacturer
alongwith technical details of the design offered against the specification :
a) Layout of the equipment through layout drawings showing essential
elements of the superstructure with supporting details, drawing/
description, covering material, dimensions, manufacture, assembly,
details of bought out items and details of fabricated items. General
arrangement drawings, material used, method of fabrication, mounting,
connections etc. shall be covered by supporting design drawings.
Layout of water, foam, pneumatic and electrical circuits shall be
provided with circuit diagrams covering all details.
b) Overall dimensions of the superstructure, axle loadings, expected total
gross vehicle weight (GVW), height, width, expected center of gravity,
stability, angle of approach, angle of departure, inter axle clearance,
under chassis clearance etc. shall be shown in the general arrangement
drawing.
c) Orientation and location of controls, the types and details of control
panel, location of manual over-rides, sheet metal work, approach to
various equipments, details of cabin design shall be covered through
the design/ drawing/ description to be offered with the quotations. All
these details would be used to evaluate the offer without any prejudice
to the right of the Government to advise and effect changes as
considered necessary from technical and user angle.
28
12.3.1
The following tests shall be carried out as per Test Schedule at Appendix
'C' before accepting the vehicle. These shall be carried out at manufacturer's works or
at a place to be mutually agreed upon. All materials and facilities required for such
tests will be provided by the manufacturer till acceptance, free of cost.
a) Road tests to check acceleration, maximum speed and braking
efficiency:
These shall be carried out with appliance fully loaded.
Minimum of ten readings (5+5) in both directions including all
accessories duly mounted without spare wheel.
29
WARRANTY/ GUARANTEE
13.1
The manufacturer shall afford warranty/ guarantee the material,
workmanship and operation of the unit, excluding the chassis and other proprietary
equipment. The period of warranty/guarantee shall be one year from the date of
receipt of equipment.
13.2
The warranty/ guarantee period in respect of the chassis shall be in
accordance with the chassis manufacturer's stipulation.
13.3
The manufacturer shall be responsible for replacing any parts, which may
become unserviceable, due to use of defective and sub-standard materials and bad
workmanship, during the period of warranty/ guarantee, free of all charges.
13.4
The following certificates will be supplied with the tender documents
against each order: Any modifications, to the chassis to be carried out at the works
of the mounted equipment manufacturer, shall be carried out as acceptable to the
chassis manufacturer and certified as such, without affecting the parameters warranty
of the chassis.
14.
TRAINING
14.1
Manufacturer is responsible for imparting adequate training free of charge,
to the operators of the equipment from the unit holding the equipment. This training
30
The training will cover following areas :i) Assembling/ disassembling of pump, primer and monitor, pneumatic;
electronic/ electric; hydraulic control systems. Assembling,
disassembling will be done at least five times with complete
identification of all components of pump, primer and monitor etc.
alongwith control systems.
ii) Trouble shooting.
iii) Any other subject desired by the operator.
15.
15.1
The equipment shall bear a Defence Stores Catalogue Number before it is
accepted and despatched to consignee. The contractor should approach the Quality
Assurance Authority for Defence Stores Catalogue number well in advance.
15.2
Parameters for Codification: The firm shall be responsible for supplying
the following for allotment of DS Cat Number in respect of stores supplied as spares:a) Physical characteristics sufficient for unique identification of item and
manufacture.
b) Performance characteristics
c) Reference to standards to which manufactured
d) Drawings
16.
16.1
31
32
Component
Material
Specification
(i)
Discharge Hose
Type I of IS 7651
(Minimum) bursting
pressure shall be 275
kg/cm2
(ii)
Manifold
(iii)
Grip valve
-do-
-do-
(iv)
Discharge nozzle
-do-
-do-
(v)
Applicator tube
Aluminium alloy
IS 738
(vi)
Deflector plate
Aluminium
IS 736
A-1.3
Constructions of manifold applicator tube & Nozzle: The cylinder shall
be connected to a common manifold. One discharge outlet shall be provided on the
manifold for connecting the hose assembly. The manifold inlet connection with
cylinders shall be fitted with non-return ball valve with a copper tubing of 2 mm
thick. The manifold shall be subjected to a hydrostatic test pressure of 320 kgf/cm2
without leakage, distortion or failure. A suitable hose reel to accommodate hose shall
be provided inside the rear locker for ease of operation. A suitable over run brake
shall also be provided for reel.
A-1.4
The applicator tube shall comprise of telescopic tube complete with lever
type grip valve at the inlet end. At the discharge end, the applicator should be
connected to elbow and discharge horn with nozzle. The construction of the whole
33
34
Governing
Specification
Qty
1.
JSS 4210-20:2001
Suction hose 2.5 meters length
armoured with an internal diameter
of 100 mm with standard round
thread GM couplings conforming to
IS 902/2410
4 Nos.
2.
IS 318
(IND/CQAFE/PROV
/ 0025/a
1 No.
3.
IS 3582
1 No.
4.
Suction Wrenches
IS 4643
1 Pair
Fixed type.
5.
IS 636 Type B
4 length
6.
IS 5612 (Part 2)
12 Nos.
7.
Hose Clamps
IS 5612 (Part 1)
Type B
06 Nos.
8.
IS 2871
02 Nos.
9.
IS 903
10.
IS 903
11.
Item
(a)
12 mm
01 No.
(b)
19 mm
01 No.
Nozzle spanner
IS 903
35
02 Nos.
Remarks
Item
Governing
Specification
Qty
12.
01 No.
13.
01 No.
14.
01 No.
15.
02 Nos.
Fire Extinguisher, dry powder type, JSS 4210-06:1999
10 kg capacity & suitable for fighting Revision No. 2 with
metal fires in charged condition with amendment No. 1&2
applicator.
16.
IS 9583
02 Nos.
17.
IS 3650
&
IS 4770
02 Sets
18.
IS 5505
01 No.
19.
IS 926
05 Nos.
20.
IS 5486
1 length
21.
1 length
22.
IS 1084
(Gde 2)
1 length
23.
IS 5604
01 No.
24.
Hook, grab
IS 5068
01 No.
25.
JSS 4210-02
02 Nos.
26.
IS 910
Remarks
To be worn
by crew on
duty.
475 x 350 x
180 mm with
chain and
handle
As per
Annexure -I
36
ANNEXURE I
TO APPENDIX B1 OF JSS
Sl.
No.
Qty
1.
01 No.
2.
01 No.
3.
04 Nos.
4.
01 No.
5.
01 No.
6.
02 Nos.
7.
02 Nos.
8.
01 No.
9.
01 No.
10.
01 No.
11.
01 No.
12.
01 No.
13.
01 No.
14.
20 Nos.
15.
Paracetamol tablets
20 Nos.
16.
Avil tablets
20 Nos.
NOTES (1)
(2)
37
Item
Description
1.
VHF Radio
Telephone
set
Manufactured to
International
Standard and duly
approved by the
Quality Assurance
Authority for
Defence use.
1 Set
2.
Motorised
barrel
Transfer
Pump
IND/CQAFE/
PROV/0073
1 Set
3.
Hydraulic
Rescue
Tools
Manufactured to
International
Standard and duly
approved by the
Quality Assurance
Authority for
Defence use.
1 Set
38
Specification
Qty.
Sl.
No.
Item
Hydraulic
Rescue
Tools
(Contd.)
Description
Specification
Qty.
Manufactured to
International
Standard and
duly approved
by the Quality
Assurance
Authority for
Defence use.
1 Set
-do-
1 Set
(d) Accessories:
i)
1 Pair
ii)
1 Pair
39
1.8 m Long
(Approx.)
Sl.
No.
4.
5.
Item
Breathing
Apparatus
Set
compressed
air type 30
Min. rating
Fire
proximity
suit complete
with
headwear,
handwear &
footwear.
Description
Self contained breathing apparatus
with following brief particulars :
(a)
(b)
(c)
Duration: 30 minutes.
(d)
(e)
(f)
40
Specification
Qty.
IND/CQAFE/
PROV/0041(a)
2 sets
IND/CQAFE/PROV/
0188
02 Sets
Type of
Test
01.
Stage
Inspection
Refer
Specification
Clause No.
Inspection
100% /
partially
6.1.1
100%
6.1.5
100%
100%
5.4
100%
5.4
10% of lot
A-4 of
Appx A
100%
41
Sl.
No.
02.
Type of
Test
Physical
Check
03.
Performance
Test
Refer
Specification
Clause No.
Inspection
100% /
partially
100%
6.1.8.1,
6.1.8.2 & 8.1
100%
100%
6.1.3.1
100%
6.1.3
100%
42
Sl.
No.
Type of
Test
Refer
Specification
Clause No.
Inspection
100% /
partially
6.1.5.2
100%
4.3.1
6.1.5.3.2
100%
6.1.5.4.1
100%
and
and
4.3.2
6.1.5.3.4
100%
6.1.5.1.6
6.1.5.3.1
100%
(i) Monitor
: 12.5 kg/cm2
43
Type of
Test
Refer Specification
Clause No.
Inspection
100% /
partially
14.1 of specification
IND/CQAFE/PROV/0
038 (b)
100%
6.1.2
100%
4.6
100%
6.1.4
100%
4.13
100%
4.13
100%
(p) Stability at 28
4.13
6.1.9.1
100%
(a) Acceleration.
Acceleration
from 0 to 80 km/h with full pay
load in maximum of 40 seconds.
4.12
12.2.2
100%
4.13
100%
04.
Mobility Test
44
Type of
Test
05.
Misc. Test
Refer
Specification
Clause No.
12.2.2
Inspection
100% / partially
12.2.2
100%
100%
100%
100%
100%
100%
100%
45