Sunteți pe pagina 1din 1

The Battery Modes of Operation:

Maintenance mode
o Access (Discrete I/O of 5V to and from J2 Connector) and (NO
BAT_COMMAND_ON) and (3 seconds PTT) and (serial port state) determines
availability.
o Process
Developer Piece
1. Select serial port
2. Check status of serial port, e.g., errors
3. Check transfer register availability (is it empty?)
4. Tests (algorithm for each)
a. Log data (read/write/read)
b. Memory (algorithm ?)
c. C-rate
5. Get parameters from caller (port, test)
6. Verify test results
Test Piece
1. Call (serial port, test)
2. Provide test data
3. Verify test results
Test mode
o Access (Discrete I/O of 5V to and from J2 Connector) and (NO
BAT_COMMAND_ON) and (NO 3 seconds PTT) and (serial port mode)
determines availability.
o Process
Unit Test
1. White Box
2. Cyclomatic Complexity based
BSP Test
1. Device driver
2. Operating system
Software System Test
1. Gray box
Operation Mode
o Access (NO Discrete I/O of 5V to and from J2 Connector) and (NO 3 seconds
PTT) and (serial port mode) determines availability.

S-ar putea să vă placă și