ScopingDocument
Heading
ScopingDocument
Author
ProposedRPAuthor
GordonLawrence
Volunteerlistsofar:
SeeAppendix
GeneralOverview
Whendevelopingadesignpackageforanewproject(todevelopan
estimateand/ortodevelopthefullyengineereddesign)itisnecessaryto
issuealistofrequireddeliverables.
Thisstudywillattempttodevelopagenericlist.
Theperceivedadvantageisthatowners,contractorsandvendorswillbegin
toconvergeonastandard,commonunderstandingofwhatisrequiredat
eachstage.
SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC
PAGE 1 OF 4
CommunityofPracticeProjectManagementCOP
ScopingDocument
TopicstobeIncluded
inthescopeofthe
list
TopicsExcluded
Thelistshouldprovidefor,anddifferentiatebetween:
A30%ConceptualDesignestimate
A10%BasicDesignandfundsapprovalestimate
Issuedforconstructionpackage
Thelistshouldtakeaccountof:
BulkAPIchemicalfacilities
Bulkbiofacilities
Secondary/Pharma/formulation&finishingfacilities
Laboratories(QA/ChemicalResearch,BioResearch,development,
Vivarium)
Kilolabs
Thelistshouldinclude(anddifferentiatebetween)deliverablesprepared
by:
OwnerManagementTeam
OwnerEndUserTeam
Design/engineeringcontractor
Equipmentvendors
ConstructionContractors
Commissioning&Validationteam
TBA
References
AACEInternationalRecommendedPracticeNo18R97Cost
EstimateClassificationSystemAsappliedinEngineering,
ProcurementandConstructionfortheProcessIndustries
CIIPDRI,IPAFELandAPNetworksProjectPyramid/ReadinessIndex
allrequirepurchaseandsomaynotbeavailable
OthersTBA
1.
2.
3.
4.
Agreescopingdocumentdone26April2010
Agreedefinitions(ProposedDefinitionsAppended)
Assigntasks
Reviewnextsteps
Pathforward
SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC
PAGE 2 OF 4
CommunityofPracticeProjectManagementCOP
ScopingDocument
APPENDIX
Definitions
DeliverableListIssuePoints
The deliverable lists should relate to key points in the project definition cycle when a design package is
issued. The points chosen are:
The requirements of a Best Practical design package at the end of Conceptual Design, as defined
by Construction Industry Institutes Project Definition Rating Index
The requirements of a Best Practical design package at the end of Conceptual Design, as defined
by Asset Performance Networks Project Pyramid
The requirements of a Best Practical design package at the end of FEL2, as defined by
Independent Project Analysis Front End Loading Index.
The 10% Basic Design and funds approval estimate, point should be in alignment with:
The requirements of a Best Practical design package at the end of Basic Design, as defined by
Construction Industry Institutes Project Definition Rating Index
The requirements of a Best Practical design package at the end of Basic Design, as defined by
Asset Performance Networks Project Pyramid
The requirements of a Best Practical design package at the end of FEL3, as defined by
Independent Project Analysis Front End Loading Index.
SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC
PAGE 3 OF 4
CommunityofPracticeProjectManagementCOP
ScopingDocument
Volunteers
Family
Name
J.Patrick
Brady
KishorD.
Datar
ThierryC.
Fiems
JeffreyS.
Fluharty
Etienne
Fockedey
DouglasJ.
Gackstetter
NormanA.
Goldschmidt
AndrewV.
Haines
NiallS.
Johnson
GordonR.
Lawrence
MichaelA.
Machin
TodorDraganov Massev
Andre
Michel
Hector
Olson
PietroP.
Perrone
Mongi
Sakly
Fred
Schiller
JohnM.
Wichelt
Anders
Widov
DennisM.
Woolley
GivenName
emailaddress
patrick.brady@ch2m.com
datarkishor@yahoo.co.in
thierry.fiems@UCB.com
fluharty_jeffrey_s@lilly.com
efockedey@hotmail.com
Doug.Gackstetter@PerfVal.com
ngoldschmidt@geieng.com
ahaines@ipsdb.com
nsjohnson@rcn.com
gordon_R_lawrence@hotmail.com
mike.machin1@btinternet.com
tmassev@actavis.bg
amichel300@gmail.com
hector.olson.b@bayer.com
deltapcube@hotmail.com
msakly@aol.com
schillerf@ebsi.com
john.wichelt@propharmagroup.com
aw@frph.se
dwoolley@taiengineering.com
SCOPING DOCUMENT-DELIVERABLES-03-FINAL.DOC
PAGE 4 OF 4