Building Data

PEB (CLOSED SHED)


No.

Description

L
W
#REF! ###
Unit

Civil Works
R.C.C (1:2:4) in Plinth Beam
Steel for Footings and columns
Flooring
Earth Filling with Compaction
Providing and laying Brick ballast 3" thick
Providing and laying P.C.C (1:2:4)
Providing and laying R.C.C (1:2:4) for deck
Providing and Fixing tiles on floor
Total amount of Civil Works

Cft
Kg
Cft
Cft
Sft
Cft
Sft

Area
#REF!

Perimeter
#REF!

Nos

Qty

Rate

1
1
1
1
1
1
1
1

#REF!
#REF!

260
90
0
15
50
40
0
120
#REF!
25%
6.0%

#REF!
251
1,005
1,005

Add Tax
TOTAL WITH TAX

#REF!

LGS STRUCTURE (Supply and fabrication)

1
3
4
5
6
7
13
14
16
17
18
19
19-a
20
21
23
24
25
26
27
28

Total wieght of LGS structure


Roof Purlins
Trims and flashing
wall girts
Wall sheet (0.5mm prepainted)
Roof sheet (0.55mm Prepainted
Screws
Ancher bolts
over heads
Fiber Glass insullatin 2" thick
Gypsum
Cement
Paint
Rain water accessries
False Ceiling
Doors
Windows or vantilators
Mastic tape
Elctrification
Plumbing +Sanitary
A-C 1.5 Ton

Unit Wieght
Covered Area
kg
1
Kg
1
Kg
1
Kg
1
Kg
1
Kg
1
Nos.
1
kg
1
kg
1
Sft
1
Sft
1
Sft
1
Sft
1
rft
1
Sft
1
Sft
1
Sft
1
Nos.
1
Sft
1
Sft
1
Nos.
1

1.55
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
578
1,500
101
#REF!
#REF!
#REF!
#REF!
#REF!
40
1,005
#REF!
#REF!
455
1,005
1,005
2

Add Tax
TOTAL WITH TAX

125
125
126
125
132
132
4
27
3
13
60
80
25
100
80
550
500
18
50
90
65000
#REF!
25%
3.5%

#REF!

Clear H
#REF!
Amount
#REF!
#REF!
#REF!
12,563
40,200
120,600
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
76,280
6,000
2,736
#REF!
#REF!
#REF!
#REF!
#REF!
4,000
80,400
#REF!
#REF!
8,190
50,250
90,450
130,000
#REF!
#REF!
#REF!

#REF!

Microtech Engineering Services


GROUND FLOOR

LIGHT GAUGE STEEL STRUCTURE

Sr. No.
Description
1
Structure (Light gauge steel structure)
Material Supply,Fabrication, Installation and Transportaion
2
Civil works
Foundation with Plinth beam (9"x9"),Flooring including 3" dry birck ballast ,3"
Thick P.C.C and Finish with Tiles.
3
Insulation
Providing and fixing Glass wool insulation in roof and walls
(50mm thick)
4

Cladding and finishing

Internal wall cladding with Cement board and Fall ceiling with gypsum board
Paint Works
Providing and laying paint on cement board and wall sheet.

7
8

Doors and Windows


Providing and fixing PVC Panel doors and Aluminnium windows with 5mm thick white glass.
Electrification
Only internal Electric works
Public Health Works
Only internal plumbing works

Covered Area
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

Total Amount without Tax


I- tax @

Total Amount without Tax

FIRST FLOOR
Sr. No.
Description
1
Structure (Light gauge steel structure)
Material Supply,Fabrication, Installation, Rain water acceries, and Transportaion
2

3
4

5
6

7
8

Civil works
Foundation with Plinth beam (9"x9),Flooring including 2" Thick P.C.C and Finish
with Tiles.
Insulation
Providing and fixing Glass wool insulation in roof and walls (50mm thick)
Cladding and finishing
Internal wall cladding with Cement board and Fall ceiling with gypsum board
Paint Works
Providing and laying paint on cement board, roof and wall sheet.
Doors and Windows
Internal wall Finish with Gyp. Board and preparing surface with paint compete all respects.
Electrification
Points & Connections
Public Health Works
Only internal plumbing works

Covered Area
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Total Amount without Tax


I- tax @

Total Amount with Tax

ces

Rate/sft

Amount

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

6%

#REF!
Rate/Sft

#REF!

Rate/sft

Amount

#VALUE!

#VALUE!

#REF!

#REF!

#REF!

#REF!

#VALUE!

#VALUE!

#REF!

#REF!

#VALUE!

#VALUE!

#REF!

#REF!

#REF!

#REF!

#VALUE!
6%

#VALUE!

#VALUE!
Rate/Sft

#VALUE!

Project : CLOSED SHED (208'-0"X78'-9")


Sr. No.
Description
1
Material Supply and Fabrication

Covered Area
#REF!
I- tax @

Total Amount with Tax

Sr. No.
Description
2
Erection, Painting and Transportation

Covered Area
#REF!
I- tax @

Total Amount with Tax

Price Summry
Sr. No.
Description
1
Material Supply and Fabrication
2
Erection, Painting and Transportation

Covered Area
#REF!
#REF!

GRAND TOTAL

Insullattion and ventilators (Add On)


Sr. No.
1

Description
Roof and Wall insullation with 50 mm thick glass wool, Ridge
vantilators and sky lights

Covered Area
#REF!
I- tax @

GRAND TOTAL

Civil works (Add On)


Sr. No.
2
Civil works

Description

Excavation, R.C.C Columns with Footing ,Periphery brick


wall 10'-0" high from F-FL with foundation,1/2" Thick Plaster
on brick wall (Botth Side, Flooring including 3" Thick P.C.C
(1:4:8) ,3" Thick P.C.C (1:2:4) with 1'-6" back filling.

Covered Area

#REF!

Total Amount without Tax


I- tax @

Total Amount with Tax

Amount

Rate/sft
#REF!
3.5%

#REF!
#REF!

#REF!
Rate/Sft

#REF!

Rate/sft

Amount

#REF!
6%

#REF!
#REF!

#REF!
Rate/Sft

#REF!

Rate/sft
#REF!
#REF!

Amount
#REF!
#REF!

#REF!

Rate/Sft

#REF!

Rate/sft

Amount

#REF!

#REF!
#REF!

3.5%

#REF!
Rate/Sft

#REF!

Rate/sft

Amount

#REF!

#REF!

#REF!
#REF!

6%

#REF!
Rate/Sft

#REF!

Microtech Engineering Ser vices


LIGHT GAUGE STEEL STRUCTURE SCHOOL
Summary
Sr. No.

Description

Covered Area

Rate/sft

GROUND FLOOR

#REF!

#REF!

FIRST FLOOR

#REF!

#VALUE!

#REF!

#REF!

Grand Total

ces

CHOOL
Price
#REF!
#VALUE!

#REF!

Microtech Engineering Ser vices


PEB STRUCTRE
Project : TCF SCHOOL KARACHI

SECTION -1
PEB STRUCTURE
MATERIAL SUPPLY & FABRICATION

COVERED AREA

RATE PER SFT

#REF!

#REF!

3.5%

INCOME TAX @

#REF!

GRAND TOTAL

SECTION -2
ERECTION AND
TRANSPORTATION

COVERED AREA

RATE PER SFT

#REF!

#REF!

6%
#REF!

INCOME TAX @
GRAND TOTAL

SECTION -3
CIVIL WORKS
(FLOORING & FOUNDATION)

COVERED AREA

RATE PER SFT

#REF!

#REF!

6%
#REF!

INCOME TAX @
GRAND TOTAL

GRAND TOTAL

RATE/SFT

#REF!

PRICE
#REF!

#REF!
#REF!

PRICE
#REF!

#REF!
#REF!

PRICE
#REF!

#REF!
#REF!

#REF!

UNHCR Pre Fab Building


BILLS OF QUANTITIES
EPS Sandwith Panels
Ser

Description of Work

Qty

Unit

Site Clearance and Preparatory Works


Excavation for plot leveling in all kind of soils including Rocks, bracing, shoring, stock
piling, disposal of unsuitable material outside the project limits up-to 2km and stacking
of suitable material as designated/approved by the engineer.

Job

Excavation for Foundations


Excavation up-to 16" deep from natural ground level in all kind of soils including Rocks,
bracing, shoring, stock piling, disposal of unsuitable material outside the project limits
up-to 2km and stacking of suitable material as designated/approved by the engineer.

488

CFT

Back-Filling
Supplying, stacking, filling and compacting local / imported soil as per approved
drawings, specifications and as directed by engineer.

872

CFT

Sand Filling
Providing, layinging and compacting local sand under the floor and foundations 4" thk
as per approved drawings, specifications and as directed by engineer.

409

CFT

PCC 1:4:8
Providing and layinging PCC 1:4:8, 4" thk under thr floor and foundations over
compacted sand as per approved drawings, specifications and as directed by engineer.

409

CFT

PCC 1:2:4
Providing and layinging PCC 1:2:4 2" thk under the floor, over PCC 1:4:8 as per
approved drawings, specifications and as directed by engineer.

288

CFT

Brick Walls
Typical brick step foundation
masonary with (1:6) cement mortar after excuvation and compaction of earth.as per
drawing

370

CFT

113

CFT

Civil works

Plinth Beam 9" x 9" x length:


Providing and laying reinforced cement concrete (1:2:4) using crush in foundations,
solid floors etc including form work as specified.
Plinth Beam Round Bar:
Supply and fix bars round 4#4 and ties bar #3 @ 6" c-c spacing, using deformed bars
grade - 40 including cutting, bending, binding and placing reinforcement in position.

PCC Flooring:
Providing and laying 4" thick Cement concrete (1:2:4) after compaction of earth.

1161

SFT

10

Floor Tiles:
Providing and laying glazed floor tiles 1 ft x 1 ft with (1:6) c/s plaster base on floors.

871

SFT

11

Tough Tiles:
Providing and laying Tough Tiles after 3" thk sand beeding 3 ft wide walkway on front
side of building

164

SFT

Total Amount of Civil Works

Rate

Amount

Structural Work

Complete Main Frame Structure with Columns, Purlins, roof truss :


Supply of tube section 3" x 1-1/2" x 1.5 mm thk of ASTM A-36 for main frame supprting
structure and roof purlins including Trims and flashings, Connection Plates, GI C-Chanel
2"x1"x 16 gauge etc including fabrication.

1680

kg

Roof Panel:
0.45 mm thk Alu-Zinc Prepainted sheet is used as inner side of roof while the same but
profiles sheet is used on outer side of roof to make the Sandwich Panel with 50 mm
thick Polestyrene, density 15 kg/m3.

1132

SFT

Wall Panel:
0.45 mm thk Alu-Zinc Prepainted sheet is used as inner and outer side of walls to make
the Sandwich Panel with 50 mm thick Polestyrene, density 15 kg/m3.

2100

SFT

Tiles in Wet Area:


supply and fixing of Ceramic Tiles in wet area up to 7 feet height on wall panel including
chamical.

392

SFT

Expention Bolts :
Supply of 12 mm dia Expention bolts 100mm long with nuts and washers A 325 Anchor
Bolt all as spd

150

Nos

Screws / rivits for Roof & Wall Panel :


Supply of Self Taping EPDM metal screw & Rivits for roof and wall panels and Button
head screw for Gypsum and cement board.

Lot

Drain Water Pipe:


Providing of Upvc Pipe 3" dia for rain water drain with other accessries (bend elbow etc.)

100

RFT

False Ceiling:
Providing and fixing false ceiling with gypsum board (24"x24) including supporting
frame

871

SFT

Doors:
Providing and fixing of Aluminum doors 3'-6"x7'.

112

SFT

10

Windows:
Providing and fixing of sliding Aluminum windows with 5 mm thk clear glass.

100

SFT

C
1

Total Amount of Structural Work


MISC. (Electrification/ Plumbing etc)
Main Distribution Board
Providing and fixing of good quality Distribution Board, with terminal block, singlr phase
circuit breackers etc

Nos

Energy Savors / Tube Lights


Providing and fixing of good quality Energy Savors and tube lights.

Lot

Point & Connections


Providing and fixing of indoor lights / AC points including PVC Conduits, Imported
Switch Plates and boxes, single core cables with earth wire of Pakistan Cable /
equivalent brand. Complete in all respects.

Lot

Telephone Sockets / wiring


Providing and fixing of indoor telephone sockets / wiring including PVC Conduits,
Imported Switch Plates and boxes.

Lot

General Purpose Power Outlets


Providing 13 Amp switch/socket outlet, imported switch socket as required.

Lot

Out Door Lights


Providing and fixing of required number of weather proof lights 100 watts, out side the
building

Nos

Plumbing works
Icluding bath room accessories like wash basin, for bath and kitchen

871

SFT

Kitchen Accessories
Including 10 Cft Refrigerator(PEL/Waves), Microwave Oven (PEL/Waves), Wooden
Rack & Marble slab etc.

Lot

Electric accessories like Ceiling fans, exhaust fans etc (without AC)

Lot

Total Amount of Misc.


D

Erection and Transportation

Erection of Complete job with all respect

Transportation of complete job with all types of material at site

871

SFT (Covered
area)

1.0

Job

Total Amount of Erection

Grand Total (A+B+C+D)


Rate/sft (covered area 871sqft)
Note:
3 feet overhang included on front side of the building