Sunteți pe pagina 1din 5

THERMAL POWERTECH CORPORATION INDIA LTD

Document Type:
LLF CHECKLIST
Revision: 0

Location:
ELECTRICAL
DEPARTMENT
Date:

Document NO
TPCIL-EMP-0

HT SWITCH
GEAR

LOOK LISTEN FEEL CHECK LIST


TPCIL-EMP-00

Prepared By: Neeraja/Venkatesh


REVIEWED BY:
SRIKANTH. A
BIDYUT

Revision
0

Description
Reviewed

GM
HOD

By
Team

Date

ELECTRICAL
ELECTRICAL

Approved
RR Pillai

TABLE OF CONTENTS
Description

Page

OVERALL TABLE OF CONTENTS

SAFETY PRECAUTIONS
TOOLS & TACKLES
FREQUENCY OF INSPECTION
REMARKS

3
3
3
5

DATE:

EQUIPMENT/MODULE:

MAKE:

SL NO:

SAFETY PRECAUTIONS:
1. ENSURE THE DEPLOYMENT OF TRAINED /SKILL
WORKFORCE
Page 2 of 5

2. ENSURE THE USE OF PROPER PPE/INSULATING TOOLS, GLOVES

TOOLS & TACKLES TO BE CARRIED OUT DURING THE PM:


1. RUBBER MAT, INSULATING GLOVES, INSULATION TAPE &
INSULATING TOOLS

SL
NO

DESCRIPTION
TAKE PTW BEFORE PROCEDING WITH VISUAL INSPECTION.
ENSURE HT SWITCH BOARD PANEL SURROUNDING SHALL BE
CLEAN i.e. NO DEBRIS SURROUNDNG THE PANEL.
ENSURE ALL THE UN WANTED OPENINGS IN THE PANEL
SHALL BE SEALED PROPERLY INCLUDING THE BOTTOM
GLAND HOLES, FLOOR OPENINGS.
CHECK FOR ANY MOISTURE TRACES ON TOP ROOF THE PANEL
& HUMIDITY.
CHECK THE PANEL DOOR SEALING IS PROPER AND DOOR IS IN
LOCKING POSITION. DOOR LOCKS ARE IN GOOD CONDITION.

1.
2.
3.
4.
5.
6.
7.
8.
9.

ENSURE THE RAT TRAP/TROUBLE GUM IS IN PLACE (OUT


SIDE)
ENSURE THE BARE CONDUCTORS (IF ANY) TO BE PROVIDED
WITH PROPER INSULATION TAPES.
CHECK IF ANY ALARMAS ARE PERSISITING IN RELAY DISPLAY
UNIT.
ENSURE NO CABLES ARE HANGING OUT OF TBS WITH UNINSULATED.

REMARKS
WEEKLY
WHENEVER
WORK IS
CARRIED OUT
15DAYS
WHENEVER
WORK IS
CARRIED OUT
WEEKLY
15DAYS
DAILY
WHENEVER
WORK IS
CARRIED OUT

LLF CHECK LIST FOR HT SWITCH GEAR PANEL


SL
NO

DESCRIPTION

10

ENSURE ALL THE CABLES ARE DRESSED NEATLY AND TIED


PROPERLY.

11

ENSURE PANEL SPACE HEATER SHALL BE IN OFF CONDITION

12

ENSURE BREAKER CHAMBER MECHANICAL INDICATIONS

13

14
15
16

REMARKS
WHENEVER
WORK IS
CARRIED OUT
WEEKLY
WEEKLY

DURING LLF CHECK DO NOT OPERATE ANY


SWITCH/MCB/BUTTON etc., WITH OUT PERMISSION FROM
SHIFT CHARGE ENGINEER or FIELD OPERATOR OTHER
THAN METER CONTROL BUTTONS (TO READ THE METER
READINGS).
LLF IS STICKTLY AN OBSERVATION ACTIVITY.
ENSURE EARTHING OF THE PANEL

DAILY

ENSURE THE HEALTHYNESS OF THE DC SUPPLY TO THE


PANEL.
THE PANELS DOORS SHALL NOT BE OPENED WHEN THE UNIT
IS UNDER RUNNING CONDITION WITH OUT PRIOR
INTIMATION TO THE CONCERNED AREA MANGER

DAILY

15DAYS

Page 3 of 5

17
18
19
20
21
22
23
24

25
26

27

28
29

LISTEN FOR ANY HISSING NOISE OR CHATTERING NOISE OR


SPARKING NOISE IN THE TBs, CONTACTORS & RELAYS OF THE
PANEL.
ENSURE USB PORT SHOLUD BE IN BLOCKED CONDITION.
ENSURE CD SHALL SCANNED FOR VIRUS BEFORE USE FOR
READING/WRITING ANY RELAY DATA.
BEFORE CONNECTING ANY LAPTOP TO REALY ENSURE
PROPER LICENSED ANTI VIRUS SOFTWATE IS INSTALLED IN
THAT LAPTOP AND TO BE SCANNED.
ANY CORROSION ON THE CRITICAL ITEMS OF THE PANEL.
CHECK READY INDICATION ON THE RELAY (RUN GREEN
INDICATION SHOULD GLOW) TO ENSURE THE HEALTHINESS
OF THE RELAY.
NO ALARM SHOULD PRESENT ON SCREEN DISPLAY UNIT OF
RELAY (RED LED SHOULD NOT GLOW).
CHECK THE READINGS IN THE DISPLAY OF THE RELAY UNIT
FOR VOLTAGE, CURRENT, POWER etc., TO ENSURE THE
DISPLAY HEALTHINESS
ENSURE ALL LOCK OUT RELAYS FLAGS SHALL BE IN RESET
CONDITION.
CHECK ALL THE METERS (Voltmeter, Ammeter, MFM & TVM etc.,)
IS INDICATING THE READINGS WHEN THE LOAD IS ON.
METERING CHAMBER: When the Breaker is ON the following lamps
will glow :
1.BKR ON, Spring Charge, BKR in Service, DC Healthy, L/C Relay A,
L/C Relay B Healthy, DC Source-1, Trip Ckt Healthy, Remote
selection.
BUS PT,INCOMER & TIE FEEDERS : ENSURE R,Y &B
INDICATIONS HEALTHYNESS
BUSCOUPLER : ENSURE AC ON, DC ON INDICATIONS
HEALTHYNESS

WEEKLY

15DAYS
WHENEVER
WORK IS
CARRIED OUT
WHENEVER
WORK IS
CARRIED OUT
15DAYS
DAILY

DAILY
DAILY

DAILY
DAILY
DAILY

DAILY
DAILY

REMARKS:

Page 4 of 5

DATE

PERFORMED BY

CHECKED BY

Page 5 of 5