OBRA:

POO TUBULAR PROFUNDO


SERVIOS: PERFURAO, REVESTIMENTO, SUCO/RECALQUE, RESERVAO E DISTRIBUIO
MUNICPIO: OLINDA NOVA
LOCAL: PROJETO CASULO SANTA RITA
CRONOGRAMA FSICO-FINANCEIRO
ITEM

DISCRIMINAO

VALORES (R$)

PROFUNDIDADE: 120,00m
DATA:

PERODO (dias corridos)


60

30

TOTAL
90

100%
1.

SERVIOS PRELIMINARES

3.560,48
3.560,48

3.560,48

24.315,00

100%
2.

SERVIOS DE PERFURAO

24.315,00
24.315,00

100%
3.

SERVIOS DE REVESTIMENTO

20.721,26
-

20.721,26

20.721,26

4.578,21

100%
4.

SERVIOS DE CONCLUSO DO POO

4.578,21
-

4.578,21
30%

5.

SUCO/RECALQUE

70%

20.203,99
-

6.061,20

14.142,79

20.203,99

4.853,16

16.177,20

70% 30%
6.

ESTRUTURA DA CAIXA D'GUA

16.177,20
-

11.324,04

100%
7.

RESERVAO/DISTRIBUIO

32.824,27
-

TOTAL NO PERODO
TOTAL ACUMULADO
PERCENTUAL NO PERODO
PERCENTUAL ACUMULADO

122.380,41

27.875,48
27.875,48
22,78%
22,78%

42.684,71
70.560,18
34,88%
57,66%

32.824,27
51.820,23
122.380,41
42,34%
100,00%

32.824,27
122.380,41